522P051-01 Alt 1 Page 1 of 7
STANDARD WORK JOB BREAKDOWN PROCEDUREFlange, Outer
522P051-01 Alt 1 Operation 30
MACHINE: Gantry - Integrex PROCESS: Operation 30
CHANGE FROM: Operation 20 CHANGE TO: Operation 30
CHANGEOVER TIME: Driven by customer demand FREQUENCY: 24 minutes
REVISION:001 DATE: May 1, 2009
! ▲ ONLY PERSONS TRAINED HOW TO DO THESE TASKS ARE TO CARRY OUT TASKS ▲ !
MATERIALS/TOOLS/PPEs REQUIRED FOR TASK
MATERIALS: Flange outer 522P051-20
TOOLS:
PPEs: ▲ SAFETY GLASSES
PURPOSE: N/A
SERIAL WORK INSTRUCTIONS
▲ = SAFETY POINT = QUALITY POINT = PPEs REQUIRED = TOOLS REQUIRED = CRITICAL NOTE
№ MAJOR STEP KEY POINT REASON FOR KEY POINTPHOTOGRAPHIC
DESCRIPTION
Production: Methods: Quality:Form GV-06 Rev A (2/5/09) Standard Work Job Breakdown Template
522P051-01 Alt 1 Page 2 of 7
1
First check traveler, making
sure all documentation is
completed from prior
operations.
▲ SAFETY POINT: Eye
protection required
CRITICAL NOTE:
This document must be
updated during each shift
QUALITY POINT:
Traveler must be BLUE in
color to represent
customer Goodrich
Other wise WHITE sheets.
Safety, Quality and Delivery of
parts to meet daily customer
demand
2
Please become fimiliar with
IDS documents to ensure
quality measurement are
performed correctly
▲ SAFETY POINT: Eye
protection required
CRITICAL NOTE:
QUALITY POINT:
Safety, Quality and Delivery of
parts to meet daily customer
demand
3
Please become fimiliar with
IDS documents to ensure
quality measurement are
performed correctly
▲ SAFETY POINT: Eye
protection required
CRITICAL NOTE:
QUALITY POINT:
Safety, Quality and Delivery of
parts to meet daily customer
demand
4
All QC checks are to be made
outside of the automatic
machine cycle time.
Check dimension 1.2500
+- .0005 when door opens
QUALITY POINT
You should only check parts
after making changes to
tooling and insert rotations.
▲ SAFETY POINT: Eye
protection required
CRITICAL NOTE:
QUALITY POINT: QC
check with Tri Mic TWO
places
#12 - 1.737 / 1.735
#14 - 2.238 / 2.236
Safety, Quality and Delivery of
parts to meet daily customer
demand
Production: Methods: Quality:Form GV-06 Rev A (2/5/09) Standard Work Job Breakdown Template
522P051-01 Alt 1 Page 3 of 7
5
Blow off flange with blow gun ▲ SAFETY POINT: Eye
protection required
CRITICAL NOTE:
QUALITY POINT: Check
surface finish before
removing flange from jaws
Safety, Quality and Delivery of
parts to meet daily customer
demand
6
IDS sheet- #1
DIA.6.062 – 6.058
Micrometers every 10th part
▲ SAFETY POINT: Eye
protection required
CRITICAL NOTE:
QUALITY POINT:
Safety, Quality and Delivery of
parts to meet daily customer
demand
7
IDS sheet #2
5 X DIA. .539 - .523
Go / No go gage
▲ SAFETY POINT: Eye
protection required
CRITICAL NOTE: Should
be checked before and
after deburr
QUALITY POINT:
Safety, Quality and Delivery of
parts to meet daily customer
demand
8
IDS sheet # 12
DIA. 1.737 / 1.735 CTQ
Tri - Mic
▲ SAFETY POINT: Eye
protection required
CRITICAL NOTE: Must be
checked with part inside
machine
QUALITY POINT:
Safety, Quality and Delivery of
parts to meet daily customer
demand
9
IDS sheet # 14
DIA. 2.238 / 2.236 CTQ
Tri - Mic
▲ SAFETY POINT: Eye
protection required
CRITICAL NOTE: Must be
checked with part inside
machine
QUALITY POINT:
Safety, Quality and Delivery of
parts to meet daily customer
demand
Production: Methods: Quality:Form GV-06 Rev A (2/5/09) Standard Work Job Breakdown Template
522P051-01 Alt 1 Page 4 of 7
10
IDS sheet #20
.875 +- .005
Height Gage check every 5th part
▲ SAFETY POINT: Eye
protection required
CRITICAL NOTE:
QUALITY POINT:
Safety, Quality and Delivery of
parts to meet daily customer
demand
11
IDS sheet #21
1.597 – 1.593
Height gage check every 5th
part
▲ SAFETY POINT: Eye
protection required
CRITICAL NOTE:
QUALITY POINT:
Safety, Quality and Delivery of
parts to meet daily customer
demand
12
IDS sheet # 22
20 X DIA. .202 - .198
Go / No go gage – flow hole
▲ SAFETY POINT: Eye
protection required
CRITICAL NOTE: Should
be checked before and
after deburr
QUALITY POINT:
Safety, Quality and Delivery of
parts to meet daily customer
demand
13
IDS sheet #24
12 X DIA. .182 - .178
Go / No go gage – flow hole
▲ SAFETY POINT: Eye
protection required
CRITICAL NOTE: Run 5
tools then program stops
QUALITY POINT:
Safety, Quality and Delivery of
parts to meet daily customer
demand
14
IDS sheet #25
DIA. 1.2500+- .0005
Tri Mic
▲ SAFETY POINT: Eye
protection required
CRITICAL NOTE:
QUALITY POINT:
Safety, Quality and Delivery of
parts to meet daily customer
demand
Production: Methods: Quality:Form GV-06 Rev A (2/5/09) Standard Work Job Breakdown Template
522P051-01 Alt 1 Page 5 of 7
15
IDS sheet #27
5 X.314 - .310
Go / No go gage
▲ SAFETY POINT: Eye
protection required
CRITICAL NOTE:
QUALITY POINT:
Safety, Quality and Delivery of
parts to meet daily customer
demand
16
IDS sheet #31
DIA. .065 - .055
Go /No gage – Flow hole
▲ SAFETY POINT: Eye
protection required
CRITICAL NOTE: Check
both sides of part
QUALITY POINT:
Safety, Quality and Delivery of
parts to meet daily customer
demand
17
IDS Sheet # 33
2.740 – 2.720
Height stand
check every 10th part
▲ SAFETY POINT: Eye
protection required
CRITICAL NOTE:
QUALITY POINT:
Safety, Quality and Delivery of
parts to meet daily customer
demand
19
IDS sheet # 34MICRO Finish
Visual check
▲ SAFETY POINT: Eye
protection required
CRITICAL NOTE:
QUALITY POINT:
Safety, Quality and Delivery of
parts to meet daily customer
demand
TBD with new gage
20
Return to machine and blow
out jaws before inserting next
part
▲ SAFETY POINT: Eye
protection required
CRITICAL NOTE:
QUALITY POINT:
Safety, Quality and Delivery of
parts to meet daily customer
demand
21
Place next part flush into the
jaws making sure you have
good fit, rotate jaws to check
▲ SAFETY POINT: Eye
protection required
CRITICAL NOTE:
QUALITY POINT:
Safety, Quality and Delivery of
parts to meet daily customer
demand
Production: Methods: Quality:Form GV-06 Rev A (2/5/09) Standard Work Job Breakdown Template
522P051-01 Alt 1 Page 6 of 7
22When flange in place close door and press cycle start button on control panel
▲ SAFETY POINT: Eye
protection required
CRITICAL NOTE:
QUALITY POINT:
Safety, Quality and Delivery of
parts to meet daily customer
demand
TASK COMPLETE
SUPPLEMENTAL INFORMATION ON TOOLS - MATERIALS - PPEs - JSAs - ETC.
REVISION / REVIEW RECORD
Revision Level
Revision Date Description of Revision Revision By:
001 5/01/2009 Initial Release Standard Work Job Breakdown Procedure J.Petak002 5/12/2009 Updated document J.Petak
Production: Methods: Quality:Form GV-06 Rev A (2/5/09) Standard Work Job Breakdown Template
522P051-01 Alt 1 Page 7 of 7
Production: Methods: Quality:Form GV-06 Rev A (2/5/09) Standard Work Job Breakdown Template