June 15, 2005 1 PMG Ruth Pordes Status Report US CMS PMG July 15th Tier-1 LCG Service Challenge 3 (SC3) FY05 hardware delivery UAF support Grid Services & Open Science Grid Transition to OSG Consortium meeting & preproposal solicitation Baseline services, LCG & EGEE Application Services Dataset bookeeping service Distributed Computing Tools WMS workshop in Padua CMS Integration Workshop Software and Support EDM/Framework CMS annual review Project Office Jen Nahn going to MIT - need to maintain quality of support for travel.

Status Report US CMS PMG July 15th

  • Upload
    barny

  • View
    33

  • Download
    0

Embed Size (px)

DESCRIPTION

Status Report US CMS PMG July 15th. Tier-1 LCG Service Challenge 3 (SC3) FY05 hardware delivery UAF support Grid Services & Open Science Grid Transition to OSG Consortium meeting & preproposal solicitation Baseline services, LCG & EGEE Application Services Dataset bookeeping service - PowerPoint PPT Presentation

Citation preview

Page 1: Status Report US CMS PMG July 15th

June 15, 2005 1PMGRuth Pordes

Status ReportUS CMS PMG July 15th

• Tier-1– LCG Service Challenge 3 (SC3)– FY05 hardware delivery– UAF support

• Grid Services & Open Science Grid– Transition to OSG– Consortium meeting & preproposal solicitation– Baseline services, LCG & EGEE

• Application Services– Dataset bookeeping service

• Distributed Computing Tools– WMS workshop in Padua– CMS Integration Workshop

• Software and Support– EDM/Framework– CMS annual review

• Project Office– Jen Nahn going to MIT - need to maintain quality of support for travel.

Page 2: Status Report US CMS PMG July 15th

June 15, 2005 2PMGRuth Pordes

Service Challenge 3 - LCG goals

Page 3: Status Report US CMS PMG July 15th

June 15, 2005 3PMGRuth Pordes

CMS & SC3 throughput MB/sec

• CMS uses Phedex for managed data movement. LCG recommends gLITE File Transfer Service. State of FTS continues to be a cause for concern.

• FNAL has separate streams to Tape & Disk. Other sites are to disk.• Data transferred to US Tier-2s: Nebraska, Purdue, Wisconsin - to SRM/(resillient)

dCache interface. (Caltech, UFl, UCSD not far behind)

22 Terabytes

Page 4: Status Report US CMS PMG July 15th

June 15, 2005 4PMGRuth Pordes

System & Network monitoring & debugging

Cern Router

Rate to FNAL

• Some instability in LHCnet + problems with FNAL on site switches for automatic failover - Cisco investigating.

• Small problems of integration, scaling, error response resolved in phedex & srm configurations and software.

Page 5: Status Report US CMS PMG July 15th

June 15, 2005 5PMGRuth Pordes

Now moving to T1<->T2 tests- quotes

• CERN asks for exclusive access to the CERN servers and file transfers in order to debug the transfer infrastructure during July 11-21.

• CMS moves focus to disk-to-tape and T1/T2 and T2/T1 transfers.

– Test upload of MC results from T2 to T1 buffers and publishing in catalogs. In US commision each T2 in turn.

• Goal to sustain production-grade functionality at reasonable but reduced rate, e.g. at 20-50 MB/s to tape as appropriate per site, and as much as we can get out of T2s without interfering with T1 operations or completely clogging the networks.

Page 6: Status Report US CMS PMG July 15th

June 15, 2005 6PMGRuth Pordes

FY05 hardware purchases

• First batch of nodes arrived, being installed in GCC and tested one rack at a time.

• Will receive and install more nodes as each rack successfully commissioned.

Page 7: Status Report US CMS PMG July 15th

June 15, 2005 7PMGRuth Pordes

All production nodes at T1 accessible to UAF, LCG, & OSG

LCG test jobs

D0 reprocessing

CMS FNAL localUser Jobs

CMS OSG Productionjobs

CMS LCG CRAB analysisjobs

• Condor based production cluster of 650 nodes. • UAF users have 600 batch slots available

Page 8: Status Report US CMS PMG July 15th

June 15, 2005 8PMGRuth Pordes

Open Science Grid

• OSG release 0.2 being installed. • All US CMS Tier-2s (7) and Tier-1 transitioned to OSG by end of this week.• Improved ability for site and experiment management of access and prioritization of

jobs. OSG 14th July

Page 9: Status Report US CMS PMG July 15th

June 15, 2005 9PMGRuth Pordes

OSG support & operation

• US CMS grid operations process being prototyped.

• Fermilab Computing Division Helpdesk and Indiana Grid Operations Center automated exchange of ticket information.

• US CMS grid support includes Fermilab and Tier-2 contributions.

• CD/US CMS working on developing accounting infrastructure.

Page 10: Status Report US CMS PMG July 15th

June 15, 2005 10PMGRuth Pordes

OSG meetings & preproposal solicitation

• OSG application meeting at SLAC in June attended by LCG/ARDA. Stimulated discussion on joint work (us atlas, us cms fkw, globus, lcg) on “Edge Services” (LCG VO boxes) to provide needed experiment services at grid sites.

• OSG consortium meeting next week at LIGO in Milwaukee: Ribbon cutting, press release to open OSG, demonstrations, presentations.

– Attendance includes NSF & DOE & several partners (some potential): LCG, TeraGrid, SURA, TACC,

• OSG call for 3 page pre-proposals or letters of intent to a program of work if funded. First round available July 22nd for Council to read & discuss.

– Help define the next round of proposal solicitations from NSF and DOE.

– Self-organize groups to work together.

– NSF interested in a summary mid-August. Talking about iVDGL & GriPhyN follow ons.

– DOE SciDAC-2 workshop early August at ANL.

Page 11: Status Report US CMS PMG July 15th

June 15, 2005 11PMGRuth Pordes

US CMS OSG working within WLCG

• Baseline services discussions.

• Define interfaces between OSG and EGEE operations. (joint workshop scheduled for fall).

• LCG participate in OSG interoperability activity to work on general mechanisms for OSG sites to be visible to LCG job submission and vice versa.

• US CMS evaluating how to submit jobs across OSG and EGEE infrastructures.

Page 12: Status Report US CMS PMG July 15th

June 15, 2005 12PMGRuth Pordes

Application Services

• Dataset Bookeeping Service initial prototype released to CMS for evaluation of interfaces and use.

• Dataset Location Service simple prototype being developed.

• Goal is end to end system interfaced to data and workload management in the fall for production use in DC06.

Page 13: Status Report US CMS PMG July 15th

June 15, 2005 13PMGRuth Pordes

Distributed Computing Tools

• Workshop this week in Padua (that’s where Ian and Frank are) between DCT, CMS WMS, EGEE ARDA/gLITE to define path forward for CMS-wide system and interfaces to different grids.

• Workshop next week at CERN (that’s where Lothar, Ian and Frank will be) for CMS Integration planning.

• Demos at OSG Consortium meeting:

– On demand Monte Carlo Production Service (Dave Evans).

– Prototype CMS Software Installation Service. (UFlorida).

– Computing Division LamdaStation management of network pipe usage (DonP).

– OSG-LCG Interoperability (Iowa evaluations).

Page 14: Status Report US CMS PMG July 15th

June 15, 2005 14PMGRuth Pordes

Software - short term plans from annual review

Page 15: Status Report US CMS PMG July 15th

June 15, 2005 15PMGRuth Pordes

EDM/Framework - from Liz

• Phase 0 (June delivery): Bare bones framework available and starting to be interfaced and integrated by a few groups. No show-stoppers yet.

• Phase 1 (August delivery): is on track so far. It is recognised by all that it is ambitious.

– Includes: Parameter Set System prototype and EventSetup; as well as start of collaboration with the data management for command line options, dataset selection, and output handling and with Event Format group for event streaming/logging and run handling capability

• Phase 3 (for Sep 2006 : Computing, Software, and Analysis Challenge, CSA-2006): The project plan is nearly complete.

Page 16: Status Report US CMS PMG July 15th

June 15, 2005 16PMGRuth Pordes

CMS annual reviewers responses

Page 17: Status Report US CMS PMG July 15th

June 15, 2005 17PMGRuth Pordes

done for today