Status of Sustainable Groundwater Management Act Implementation
January 6, 2020
Recent Key Accomplishments
• Technical• Data Management System• Groundwater Dependent Ecosystems• Field Work• Hydrogeologic Conceptual Model
• Outreach Stakeholder Advisory Committee Stakeholder Communication and
Engagement Plan
• Round 3 Grant Application
Essential Consultant
Work
• Representative Work from Each Task for both GSI Water Solutions Inc. and CV Strategies
Data Review and Assessment
Hydrogeological Conceptual Model
Groundwater Model Update and Readiness
Groundwater Surface Water Interconnection
Water Budget Development
Sustainable Management Criteria
Projects and Management Actions
Preparation of the Groundwater Sustainability Plan
Six Month Look Ahead
Data Review and Assessment• Tech memos describing data
assessment, data gaps, recommendations for GW monitoring, Sampling and Analysis Plan
Hydrogeological Conceptual Model• Drafting cross sections and HCM,
technical memorandum. HCM specific workshop
Groundwater Model Update and Readiness• Model will be updated, model
documentation prepared for R2 Grant
Six Month Look Ahead
Groundwater Surface Water Interconnection• Technical memorandum on GDEs,
installation of six piezometers and up to 40 temperature probes
Water Budget Development• Early work to develop historical
water budget.
Round 3 Grant• If successful, preparation of grant
agreement, additional consultant work
Challenges
Technical memo on Groundwater Dependent Ecosystems took more time than expected.Site access agreements. Some delays but good progress being made on multiple fronts now (private land, City, County).Delays do not affect overall schedule, but can delay collection of new data. Currently mitigated by using water level data from shallow wells and use of groundwater flowmodel to examine predicted changes in groundwater conditions.
Fiscal
Anticipate using contingency funds for up to 2 additional workshops in FY 20/21.
During FY 20/21 budget process, we will propose moving approved contingency funds into contracts to cover this effort.
Round 3 Grant- if awarded some scope and budget changes to contracts will be necessary to reflect additional funds for installation of data loggers and other work.
Summary
• Significant work last quarter.• Schedule concern with field work being
mitigated.• Seating of Stakeholder Advisory Committee
means significant new work will take place.• Schedule graphic shows interrelationship of
technical work and workshops.
Task # Description of Task Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Task 2 Data Review and Assessment
Task 6 Hydrogeologic Conceptual Model
Task 3Groundwater Model Update and Readiness
Task 4
Groundwater/Surface Water Interconnection and Sustainability Criteria for GDE's
Task 4 Public Workshop Cycle
Task 5 Water Budget Development
Task 5 Public Workshop Cycle
Task 7Development of Sustainable Management Criteria
Task 7 Public Workshop Cycle
Task 8Projects and Management Actions and Implementation Plan
Task 8 Public Workshop Cycle
Task 9 GSP Document Preparation
Task 9 Public Workshop Cycle
Workshop Cycle
Workshop Cycle
Workshop Cycle
Workshop Cycle
TASK 7
TASK 8
TASK 9
Calendar Year 2021SCV GSP Development Schedule (12‐18‐19)
TASK 4
TASK 2
TASK 5
Calendar Year 2019 Calendar Year 2020
TASK 6
Workshop Cycle
TASK 3