GTK WG Meeting May 24 th 2011 Status of Microchannel Cooling - Paolo Petagna 1/9 PH-DT Status of Microchannel Cooling J. Daguin (CERN PH/DT) A. Mapelli (CERN PH/DT) M. Morel (CERN PH/ESE) J. Noel (CERN PH/DT) G. Nuessle (UCL) P. Petagna (CERN PH/DT) Status of thermal tests Status of integration/infrastructure Micro-fabrication plans

Status of Microchannel Cooling

  • Upload
    morgan

  • View
    81

  • Download
    0

Embed Size (px)

DESCRIPTION

Status of Microchannel Cooling. J. Daguin (CERN PH/DT) A. Mapelli (CERN PH/DT) M. Morel (CERN PH/ESE) J. Noel (CERN PH/DT) G. Nuessle (UCL) P. Petagna (CERN PH/DT). Status of thermal tests Status of integration/infrastructure Micro-fabrication plans. Tests on “GTK SFB” Design Continue. - PowerPoint PPT Presentation

Citation preview

Page 1: Status of  Microchannel  Cooling

GTK WG MeetingMay 24th 2011

Status of Microchannel Cooling - Paolo Petagna 1/9

PH-DT

Status of Microchannel CoolingJ. Daguin (CERN PH/DT)A. Mapelli (CERN PH/DT)M. Morel (CERN PH/ESE)J. Noel (CERN PH/DT)G. Nuessle (UCL)P. Petagna (CERN PH/DT)

• Status of thermal tests

• Status of integration/infrastructure

• Micro-fabrication plans

Page 2: Status of  Microchannel  Cooling

GTK WG MeetingMay 24th 2011

Status of Microchannel Cooling - Paolo Petagna 2/9

PH-DT

Tests on “GTK SFB” Design Continue

Page 3: Status of  Microchannel  Cooling

GTK WG MeetingMay 24th 2011

Status of Microchannel Cooling - Paolo Petagna 3/9

PH-DT

New Kapton Heater: “GTKSym v1.1” FLOW IN

FLOW OUT

HEATING SURFACE• Better adapted size (40 x 60 mm)

• 3 separated heating regions

• 15 PT100 temperature sensors

• Test under mild vacuum (1÷2 ·10-2 mbar)

• No detectable leak

• Contact by thermal grease

(Electronics)

(Electronics)

(Sensor)

Waiting for new 3D thermo-mechanical simulator (“GTKSym v2.0) -> see talk by M.

Morel

Page 4: Status of  Microchannel  Cooling

GTK WG MeetingMay 24th 2011

Status of Microchannel Cooling - Paolo Petagna 4/9

PH-DT

Some Thermal Results (T uniformity)

FLOW IN (T ~ -2 °C)

FLOW OUT (T ~ +1.5 °C)

HEATING SURFACE(middle row of temperature sensors)

1 2 3 4 50123456789

10

Temperature distribution on heater surfaces

temperature sensor positionte

mpe

ratu

re [°

C]

1 2 3 4 5

1 2 3 4 5

• P = 15 W (½ nominal)

• Q = 0.0036 kg/s (½ nominal)

• DTIN-OUT ~ 3.5 °C

Page 5: Status of  Microchannel  Cooling

GTK WG MeetingMay 24th 2011

Status of Microchannel Cooling - Paolo Petagna 5/9

PH-DT

Thermal Results (Preliminary transients)

Page 6: Status of  Microchannel  Cooling

GTK WG MeetingMay 24th 2011

Status of Microchannel Cooling - Paolo Petagna 6/9

PH-DT

Thermal Test Programme

• Explore temperature uniformity in design conditions

• Explore temperature on sensor vs. inlet coolant temperature

• Explore sensitivity to flow rate errors

• Explore off-design conditions (e.g. partial chip failure)

• Explore time gradient of temperature in case of cooling failure

• Define electronics on/off transient properties (cooling on)

Page 7: Status of  Microchannel  Cooling

GTK WG MeetingMay 24th 2011

Status of Microchannel Cooling - Paolo Petagna 7/9

PH-DT

Integration in GTK Module

• Work space prepared inside the Divisional Silicon Facility (bldg 186)

• Dedicated Technical Student starts end of August

• Possibly one US Summer Student available before then

• Staystik: paste -> received; film -> sent from firm

• Also available: diamond-loaded SU-8 (spin-coatable in thickness < 1 mm

Diamond-loaded epoxy ME7159 from “Al Technology”

Page 8: Status of  Microchannel  Cooling

GTK WG MeetingMay 24th 2011

Status of Microchannel Cooling - Paolo Petagna 8/9

PH-DT

Infrastructure

Meeting agreed with EN/CV-DC on May 26th to start discussing detailed specs for the cooling plant (preferred option: cold liquid C6F14, scaled down from CMS PIX unit, single unit with 3 branches, controls under Unicos+PVSS)

1 rack needed in the cavern (exp. site visited on May 6th, preliminary requirements provided to Gilles Maire on May 17th).

Option A: rack in TCC8 + minimal distance from GTK– longer access time after dump

Option B: rack in ECN3 + shorter access time after dump– very long transfer lines

Open question: optimal position for controlling PLC?

Page 9: Status of  Microchannel  Cooling

GTK WG MeetingMay 24th 2011

Status of Microchannel Cooling - Paolo Petagna 9/9

PH-DT

Micro-fabrication plans

• Final round of optimization of micro-fluidics

design

• Define minimal thickness (long process, requires

many hours in clean room). Target: 150 mm

• Increase reliability of bonding process, in

particular for Si-Si

• Enhance analysis via non-destructive methods to

improve QA/QC for serial production