10
Group B Calibration Target - Three Springs, Weatherby Springs, Hoagland Tunnel and Spring Creek Spring Presented by Jennifer Sukow, IDWR October 27, 2011

Status of calibration target for Three Springs Cell

  • Upload
    oceana

  • View
    23

  • Download
    0

Embed Size (px)

DESCRIPTION

Group B Calibration Target - Three Springs, Weatherby Springs, Hoagland Tunnel and Spring Creek Spring Presented by Jennifer Sukow, IDWR October 27, 2011. Status of calibration target for Three Springs Cell. - PowerPoint PPT Presentation

Citation preview

Page 1: Status of calibration target for Three Springs Cell

Group B Calibration Target - Three Springs, Weatherby Springs, Hoagland Tunnel and Spring Creek SpringPresented by Jennifer Sukow, IDWR

October 27, 2011

Page 2: Status of calibration target for Three Springs Cell

Status of calibration target for Three Springs Cell

• Last meeting we discussed problem with Covington & Weaver values used in superseded Group C target for this spring cell

• Committee requested that IDWR compile a transient target for this cell

• IDWR compiled data from records previously submitted to IDWR and posted draft memo & spreadsheet on September 19.

• John Koreny and the Jones Hatchery provided more detailed records to IDWR between Oct. 7 and Oct. 17, which facilitated correction of some of the previously reported data

• IDWR posted revised draft memo & spreadsheet on October 21.

Page 3: Status of calibration target for Three Springs Cell

Springs in ESPAM2 model cell 1041013

Page 4: Status of calibration target for Three Springs Cell

Data Availability

• Three/Weatherby/Hoagland Tunnel Complex Discharge(+) Jones Hatchery diversions (1975-2010)

(+) Three/Weatherby Pipe diversion (1996-2009) (-) Jones Hatchery inflow from Three/Weatherby Pipe (1980-2006) (+) Hoagland Tunnel Ditch diversion (2005-2008) (+) Undiverted flow at lower Weatherby Spring (8/26/1993; 6/22/2005)

• Spring Creek Spring (+) Lee Hatchery (1995-2009) (+) Spring Creek Spring Pipe (7/2004) (+) Musser Pump (annual volume from PCC for 1995-2010)

• Cell Target is the sum of 8 quantities (user reported & estimates)

Page 5: Status of calibration target for Three Springs Cell

Three/Weatherby/Hoagland Tunnel Diversions – 2005

Page 6: Status of calibration target for Three Springs Cell

Three/Weatherby/Hoagland Tunnel Complex

1/31/1993 10/28/1995 7/24/1998 4/19/2001 1/14/2004 10/10/2006 7/6/20090

10

20

30

40

50

60

70

"Spring Complex Discharge" Total Jones HatcheryThree/Wthby Pipe Hoagland TunnelHatchery flow from Three/Wthby Pipe Lower Weatherby undivertedSpring Complex Discharge (IDWR site visits)

Mon

thly

ave

rage

dis

char

ge (c

fs)

Page 7: Status of calibration target for Three Springs Cell

Spring Creek Spring

1/31/1993 10/28/1995 7/24/1998 4/19/2001 1/14/2004 10/10/2006 7/6/20090

1

2

3

4

5

6

Lee Hatchery Spring Creek Spring PipelineMusser Pump Spring Creek Spring Diversions

Mon

thly

ave

rage

dis

char

ge (c

fs)

Page 8: Status of calibration target for Three Springs Cell

Cell 1041013 Calibration Target

10/28/1995 7/24/1998 4/19/2001 1/14/2004 10/10/2006 7/6/20090

10

20

30

40

50

60

70

80

Cell 1041013 (cfs) Three/Weatherby/Hoagland (cfs) Spring Creek Spring (cfs)

Mon

thly

ave

rage

dis

char

ge (c

fs)

Page 9: Status of calibration target for Three Springs Cell

Comparison with Curren Tunnel Calibration Target

10/28/1995 7/24/1998 4/19/2001 1/14/2004 10/10/2006 7/6/20090

5

10

15

20

25

30

35

40

45

50

Cell 1041013 (cfs) Rangen Calibration Target

Mon

thly

ave

rage

dis

char

ge (c

fs)

Page 10: Status of calibration target for Three Springs Cell

End of Slides