Upload
oceana
View
23
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Group B Calibration Target - Three Springs, Weatherby Springs, Hoagland Tunnel and Spring Creek Spring Presented by Jennifer Sukow, IDWR October 27, 2011. Status of calibration target for Three Springs Cell. - PowerPoint PPT Presentation
Citation preview
Group B Calibration Target - Three Springs, Weatherby Springs, Hoagland Tunnel and Spring Creek SpringPresented by Jennifer Sukow, IDWR
October 27, 2011
Status of calibration target for Three Springs Cell
• Last meeting we discussed problem with Covington & Weaver values used in superseded Group C target for this spring cell
• Committee requested that IDWR compile a transient target for this cell
• IDWR compiled data from records previously submitted to IDWR and posted draft memo & spreadsheet on September 19.
• John Koreny and the Jones Hatchery provided more detailed records to IDWR between Oct. 7 and Oct. 17, which facilitated correction of some of the previously reported data
• IDWR posted revised draft memo & spreadsheet on October 21.
Springs in ESPAM2 model cell 1041013
Data Availability
• Three/Weatherby/Hoagland Tunnel Complex Discharge(+) Jones Hatchery diversions (1975-2010)
(+) Three/Weatherby Pipe diversion (1996-2009) (-) Jones Hatchery inflow from Three/Weatherby Pipe (1980-2006) (+) Hoagland Tunnel Ditch diversion (2005-2008) (+) Undiverted flow at lower Weatherby Spring (8/26/1993; 6/22/2005)
• Spring Creek Spring (+) Lee Hatchery (1995-2009) (+) Spring Creek Spring Pipe (7/2004) (+) Musser Pump (annual volume from PCC for 1995-2010)
• Cell Target is the sum of 8 quantities (user reported & estimates)
Three/Weatherby/Hoagland Tunnel Diversions – 2005
Three/Weatherby/Hoagland Tunnel Complex
1/31/1993 10/28/1995 7/24/1998 4/19/2001 1/14/2004 10/10/2006 7/6/20090
10
20
30
40
50
60
70
"Spring Complex Discharge" Total Jones HatcheryThree/Wthby Pipe Hoagland TunnelHatchery flow from Three/Wthby Pipe Lower Weatherby undivertedSpring Complex Discharge (IDWR site visits)
Mon
thly
ave
rage
dis
char
ge (c
fs)
Spring Creek Spring
1/31/1993 10/28/1995 7/24/1998 4/19/2001 1/14/2004 10/10/2006 7/6/20090
1
2
3
4
5
6
Lee Hatchery Spring Creek Spring PipelineMusser Pump Spring Creek Spring Diversions
Mon
thly
ave
rage
dis
char
ge (c
fs)
Cell 1041013 Calibration Target
10/28/1995 7/24/1998 4/19/2001 1/14/2004 10/10/2006 7/6/20090
10
20
30
40
50
60
70
80
Cell 1041013 (cfs) Three/Weatherby/Hoagland (cfs) Spring Creek Spring (cfs)
Mon
thly
ave
rage
dis
char
ge (c
fs)
Comparison with Curren Tunnel Calibration Target
10/28/1995 7/24/1998 4/19/2001 1/14/2004 10/10/2006 7/6/20090
5
10
15
20
25
30
35
40
45
50
Cell 1041013 (cfs) Rangen Calibration Target
Mon
thly
ave
rage
dis
char
ge (c
fs)
End of Slides