Status at DORIS Hall• Argus was removed by end of
march• Argus Parts (except 4 heavy
pieces) shipped to Hall 1 • Rails of electronics hut have
to be extended (ordered)• Hut to be moved away from
beam for 3 m to allow free access to pit for assembly of OLYMPUS
• Cables for power, telefon and firedetection to be adapted for movement of electronics hut
• Will have a fixed cable channel on the floor
Jan Hauschildt, MEA1, 26th April 2010
Status at DORIS Hall• Free space available now for
storage and mounting• Pipes for gassupply recovered
from ZEUS experiment• Work on piping started• Cables for power of coils :
routing fixed and ordered• Power supplies and polarity
switches : partly moved to DORIS hall
• Pipes and hoses for water supply : recovered from ZEUS experiment
• Discussion this morning with MKK → go with 12 bars, have orifice plates in each circuit, go without active regulating valve, replace fitting and hoses with DESY standards
Jan Hauschildt, MEA1, 26th April 2010
Status at DORIS Hall, Hall 1
• Work on shielding design started
• Work on lead curtain design in DORIS Tunnel started
Jan Hauschildt, MEA1, 26th April 2010