STATE BANK OF INDIA
PROPOSED CONSTRUCTION OF THE ADDITIONAL FLOOR OVER EXISTING
BRANCH BUILDING INCLUDING REPAIRING WORK OF COMPOUND WALL
AND INSTALLATION OF PAVER BLOCKS AT STATE BANK OF INDIA’S MAIN
BRANCH PREMISES, BETUL, MADHYA PRADESH
PART – B : PRICE BID
TENDER FOR :
CIVIL AND ELECTRICAL WORK
TENDER SUBMITTED BY :
NAME : __________________________________
ADDRESS : __________________________________
__________________________________
__________________________________
DATE : __________________________________
ARCHITECT :
PARELKAR OVALEKAR PARPIA,
139, SEKSARIA CHAMBERS,
NAGINDAS MASTER ROAD,
FORT, MUMBAI 400 001.
TEL. NO. 2267 3725 / 2267 5840
FAX NO. 2267 5840E-mail : [email protected]
SBI - Betul
NOS DESCRIPTION AMOUNT ( ₹)
A1 CIVIL WORK
A2 PLUMBING & SANITARY INSTALLATION
A3 ELECTRICAL WORK
B1 PAVER WORK
B2 COMPOUND WALL
TOTAL
SIGNATURE OF CONTRACTOR WITH SEAL
NAME
ADDRESS
PLEASE NOTE: LOWEST CONTRACTOR WILL BE DECIDED ON THE TOTAL OF 'A1 + A2 +A3 + B1
+B2'.
____________________________________________________________________________
STATE BANK OF INDIA
PROPOSED CONSTRUCTION OF ADDITIONAL FLOOR OVER EXISTING BRANCH INCLUDING
REPAIRING WORK OF COMPOUND WALL AND INSTALLATION OF PAVER BLOCKS STATE BANK
OF INDIA'S MAIN BRANCH PREMISES, BETUL, M.P.
SUMMARY A+B
IN WORDS RUPEES ________________________________________________________________________
SBI - Betul
A1
Nos Description Units Quantity Rate (₹) Amount (₹)
Demolition Items
1 Removing existing waterproofing carefully upto slab
level, without damaging the existing structure and
carting away the debris to any lift or lead, cleaning the
slab with water and making it dust free to receive, tiles
or brick wall as directed by the local authority, Banks
Engineer/ Architect complete.Sqm 450.00
Rs. (In words)
2 Removing/ demolishing existing parapet wall of any
height including coping & plaster upto slab level
carefully without damaging the existing structure and
carting away the debris to any lift or lead as directed by
the local authority/ Bank's Engineer/ Architect
complete. Rmt 90.00
Rs. (In words)
3 Demolition of R.C.C. Chajja carefully without damaging
the existing structure including providing/ fixing/
errecting Scaffolding around the Building structure or
any other places without any puncher to wall surface &
Covering it to external side scaffolding with Synthetic
cloth/ Jute screen including removing the same after
the work etc. and carting away the debris outside the
building premises complete as per the direction of
Consulting Engineer / in-charge.Cum 46.00
Rs. (In words)
PROPOSED CONSTRUCTION OF ADDITIONAL FLOOR OVER EXISTING BRANCH INCLUDING REPAIRING WORK
OF COMPOUND WALL AND INSTALLATION OF PAVER BLOCKS STATE BANK OF INDIA'S MAIN BRANCH
PREMISES, BETUL, M.P.
STATE BANK OF INDIA
SCHEDULE OF ITEMS - CIVIL WORK
Parelkar Ovalekar ParpiaArchitect Page 2 of 32 Signature of Contractor with Seal
SBI - Betul
Nos Description Units Quantity Rate (₹) Amount (₹)
4 Dismantling of existing R.C.C. water tank carefully of
existing building so that no damage is done to the
structure, including providing/ fixing/ errecting
Scaffolding around the Building structure or any other
places without any puncher to wall surface & covering
it to external side scaffolding with Synthetic cloth/ Jute
screen and carting away the debris outside the building
premises complete as per the direction of Consulting
Engineer / in-charge.Cum 5.00
Rs. (In words)
Rebars, grouting chemical & dispenser to be HILTI make
or equivalent, necessary test reports have to be
obtained from the company from whom have
purchased the chemicals and work should be got carried
out by the authorised HILTI personal) only.Nos. 28
Rs. (In words)
6 Excavation in any type of soil using mechanical or
manually and keeping a side excavated earth (except
black cotton) for refilling the pit after the foundation is
done including ramming watering the pit and using the
excess earth for levelling the ground, filling in plinth etc.
(please note that black cotton soil will not be used for
filling but shall be carted away to any lift or lead as
directed by local authority/ Architect). Rate includes
labour cost for filling back surplus excavated approved
earth in layers not exceeding 25 cm watered and
consolidated and spreading surplus material within the
plot and carting away extra material out of site
complete as directed at site.
Cum 25.00
Rs. (In words)
7 Filling in plinth and site with approved quality murum
brought from out side (at Contractor's cost) in layers not
exceeding 15 cm thick including watering and
compaction complete as directed. Cum 15.00
Rs. (In words)
8 Providing and laying 230 mm thick hand packed
Murrum boulder (approved quality stones) soling
including filling the voids with approved quality
murrum/hard soil including watering and compaction
complete as directed at site. Cum 8.00
Parelkar Ovalekar ParpiaArchitect Page 3 of 32 Signature of Contractor with Seal
SBI - Betul
Nos Description Units Quantity Rate (₹) Amount (₹)
Rs. (In words)
9 Providing and laying P.C.C. 1:2:4 in plinth, foundation,
coping, plinth protection etc including necessary
shuttering, curing, viberating, compacting etc, at all
heights and locations. The P.C.C. may be casted in
panels as desired by the Architect/ Consultant etc
complete.Cum 1.50
Rs. (In words)
10 Providing and laying Levelling Course P.C.C. 1:3:6 in
plinth, foundation, coping, plinth protection etc
including necessary shuttering, curing, viberating,
compacting etc, at all heights and locations. The P.C.C.
may be casted in panels as desired by the Architect/
Consultant etc complete.Cum 10
Rs. (In words)
11 Providing and laying cast-in-situ concrete M20 grade of
1:1-1/2 :3 in Columns, Beams, Slab, lintles, staircase
waist slab, canopies, encasing steel structure, chajjas,
bands, purdies (staircase & chajjas drop purdies), fins,
coping etc, at all heights including necessary shuttering,
scafolding, centering, propping, curing, viberating and
compacting etc. complete.
(A) RCC in Footings/Foundation Cum 2.50
(B) RCC in Columns at all Heights. Cum 30.00
(C) RCC in Beams at all Heights. Cum 55.00
(D) RCC in Slabs at all Heights. Cum 115.00
(E) RCC in Lintels & Chajja at all Heights. Cum 5.00
(F) RCC in Pardi at all Heights. Cum 30.00
Rs. (In words)
12 Providing and laying tested quality TMT Bar
rienforcement of approved company of desired size
including transporting it on site, cutting it to size,
bending, tying at all heights and in all positions,
providing concrete covers as required at any height etc
complete. MT 20
Rs. (In words)
Parelkar Ovalekar ParpiaArchitect Page 4 of 32 Signature of Contractor with Seal
SBI - Betul
Nos Description Units Quantity Rate (₹) Amount (₹)
13 Providing and laying one brick wall with well burnt
uniform size and colour locally available approved
quality bricks, and joing them together with sand
cement joints 1:5 of thickness not less than 12 mm thk,
including curing, scafolding, raking the joints at all levels
complete. Cum 140.00
Rs. (In words)
14 Providing and laying half brick wall with well burnt
uniform size and colour locally available bricks as per
sample approved and joing them together with sand
cement joints 1:4 of thickness not less than 12 mm thk,
including curing, scafolding, raking the joints and
providing 4' thick RCC stiffners (runner beam ) using 2
Nos 6 mm dia bars incased in CC 1:2:4 at approx every
1.00 m height intervals complete.Sqm 510.00
15 Providing and laying external sand cement plaster of
av 20 mm thk in two coats at all heights with first coat
to be of approx 12mm thk in 1:5 sand (fine) cement mix,
and the second coat to of approx 6mm thk in 1:4 sand
(fine) cement mix, including necessary shuttering,
scafolding, curing roughening the first coat to recieve
second coat of plaster etc, providing approved water
proofing compound approx 1kg to one bag of cement
and adding polyproplyne fibre of approved make to
prevent shrinkage cracks as per manufacturers
specifications complete.
Sqm 1410.00
Rs. (In words)
16 Providing and laying internal sand cement plaster av
12/15 mm thk in 1:5 sand (fine) cement mix on walls
including necessary shuttering, scafolding curing etc
adding polypropylene fibre of approved quality in
desired quantity per bag of cement as per
manufacturers specifications complete.Sqm 1610.00
Rs. (In words)
17 Providing and laying av. 6mm thk 1:5 sand (fine) cement
plaster on ceiling including necessary scafolding, curing
etc complete. Sqm 690.00
Rs. (In words)
Parelkar Ovalekar ParpiaArchitect Page 5 of 32 Signature of Contractor with Seal
SBI - Betul
Nos Description Units Quantity Rate (₹) Amount (₹)
18 Providing and laying Vitrified tiles of approximate size
600 x 600 mm of approved make and colour, fixing the
same in 1:6 cement sand mix, uniformly in line and level
in approved design and filling the joints with white
cement (adding coloured pigment if necessary) curing
the joints etc complete. Rate to include use of approved
spacers in tile flooring wherever directed at site. Basic
Rate - 65 ₹/Sft.Sqm 520.00
Rs. (In words)
19 Providing and laying vitrified tile skirting 100 mm high
in vitrified tile of approved colour and make in 1:4 sand
(fine) cement mix in level with the wall plaster
complete. Basic Rate - 65 ₹/Sft.
Sqm 255.00
Rs. (In words)
20 Providing and laying Ceramic tiles of approximate size
300 x 300 mm of approved make and colour, fixing the
same in 1:6 cement sand mix, uniformly in line and level
in approved design and filling the joints with white
cement (adding coloured pigment if necessary) curing
the joints etc complete. Rate to include use of approved
spacers in tile flooring wherever directed at site. Basic
Rate - 50 ₹/SftSqm 45.00
Rs. (In words)
21 Providing and laying Ceramic tile skirting 100 mm high
of approved colour and make in 1:4 sand (fine) cement
mix in level with the wall plaster complete. Basic Rate -
50 ₹/Sft Rmt 45.00
Rs. (In words)
22 Providing and laying anti skid ceramic tiles in flooring of
approximate size 300 x 300 mm with 1:4 cement sand
mix, in slope or as directed including filling the joints
with white cement (coloured pigment should be added
in case of coloured tiles), and cleaning the same with
dilute acid complete. 50.00 ₹/Sft
Sqm 30.00
Rs. (In words)
Parelkar Ovalekar ParpiaArchitect Page 6 of 32 Signature of Contractor with Seal
SBI - Betul
Nos Description Units Quantity Rate (₹) Amount (₹)
23 Providing and laying Ceramic Tiles of approximate size
300 x 600 or 300x 450 mm in dado/walls , and fixing the
same on plastered surface, with neat cement float in
proper line or level, including filling the joints with
matching pigmented white cement and cleaning it with
dilute acid complete. 50.00 ₹/ Sft
Sqm 110.00
Rs. (In words)
24 Providing and laying Granite tiles of approximate size
600 x 300 mm of approved make and colour, fixing the
same in 1:6 cement sand mix, uniformly in line and level
in approved design and filling the joints with white
cement (adding coloured pigment if necessary) curing
the joints etc complete. Rate to include use of approved
spacers in tile flooring wherever directed at site. 100.00
₹/Sft
Sqm 80.00
Rs. (In words)
25 Providing and laying Granite tile skirting 100 mm high
in vitrified tile of approved colour and make in 1:4 sand
(fine) cement mix in level with the wall plaster
complete. 100.00 ₹/ Sft Rmt 70.00
Rs. (In words)
26 Providing and fixing in position Granite stone for
platform, one or both side polish of approximate width
600 mm and thickness not less than 25mm thk
providing cement sand mix 1:2 for fixing stone above
complete. 100.00 ₹/ Sft Sqm 10.00
Rs. (In words)
27 Providing and fixing in position Marble stone both side
polished stone for Base supports and vertical supports
of Pantry Platform, Wash Basin counters, Urinal
Partitions etc. of approximate width 600 mm and
thickness not less than 18 mm thk. The vertical supports
to be provided with two sandwiched stone slabs joined
together with Araldite or any other approved adhessive
and fixed with cement sand mix 1:2 including necessary
jhiri cutting etc. complete. Basic Rate 65.00 ₹/ Sft
Sqm 15.00
Rs. (In words)
Parelkar Ovalekar ParpiaArchitect Page 7 of 32 Signature of Contractor with Seal
SBI - Betul
Nos Description Units Quantity Rate (₹) Amount (₹)
28 Providing and fixing Green Marble (Baroda Green) of
approximate width 270 mm from all sides in stepped
form for windows of thickness not less than 18mm,
fixing the same with cement sand (fine) mix 1:4, and
rounding of edges, pre mirror polished etc complete.Sqm 45.00
Rs. (In words)
29 Providing and placing in position aluminum sliding
windows of heavy duty aluminum sections anodised of
approved colour thickness not than 12 microns
includings screws, transparent glass of approx thickness
6-8 mm fixed in position with PVC gasket water tight,
window bottom section will have rollers for smooth
movement, including locks etc complete.
25 mm Series - 3 track
a) Frame with gutter bottom weighing not less than
1.619 kg/m
b) Frame top and sides weighing not less than 1.005
kg/m
c) Shutter to & side weighing not less than 0.53 kg/m
d) Interlock shutter weighing not less than 0.683 kg/m
e) Shutter bottom weighing not less than 0.678 kg/m
Sqm 40.00
Rs. (In words)
30 Providing and fixing approved quality adjustible,
lockable louvered window in aluminum sections fixed
on aluminum sub frame of approx weight 0.43 kg/m,
including fixing aluminum angle 20 x 20mm fixed on
bottom rail, providing approx 8mm thk opaque 'bajri
glass' with edges rounded of width not less than 100
mm, all aluminum sections are to be anodised of
approved colour not less than 13 microns complete.Sqm 2.00
Rs. (In words)
Parelkar Ovalekar ParpiaArchitect Page 8 of 32 Signature of Contractor with Seal
SBI - Betul
Nos Description Units Quantity Rate (₹) Amount (₹)
31 Providing, fabricating and fixing in position MS grill
Windows, Ventilators, Staircse Railing, collapsible
channel gate etc. of approved design made out of MS
flats, squares bars, rounds bars, angles, tees etc. and
anchoring it in walls with bolts, making manhole covers
for u/g tank etc. including two coats of enamel paint
over a coat of Zinc Oxide steel primer complete.Kgs 1875.00
Rs. (In words)
32 Providing and fixing in position Flush Door Shutters on
wooden door frame using approved quality seasoned
Sal or equivalant approved wood made in design, shape
and profile size as per drawing. The over all sectional
size of frame shall be about 125 x 75mm with horns 75
mm beyond frame including fixing in position with 6
nos. aluminium holdfasts anchored in 1:2:4 cement
concrete of approximate size 200 x 200 x 150mm,
making arrangements for fixing aldrop, tower bolts, slip
way (tadi) in the frame. The frame is finished with two
or more coat of french polish after preparing surface
complete.
The door shutter shall be 35 mm thk approved quality
and make MR Grade Flush Door provided 6/8mm thick
TW lipping on all edges. The door shall be finished
internally & externally with 1.00 mm thk laminate in
desired shades (one or more) and design as per sample
approved. Each door shutter will be provided with
125X30 mm 3 Nos MS oxidised butt hinges, tower bolts,
SS handle with 300 mm long MS Oxidised Aldrop, door
stopper etc complete.Sqm 25.00
Rs. (In words)
Parelkar Ovalekar ParpiaArchitect Page 9 of 32 Signature of Contractor with Seal
SBI - Betul
Nos Description Units Quantity Rate (₹) Amount (₹)
33 Providing and fixing in position Flush Door Shutters on
wooden door frames using approved quality seasoned
Sal or equivalant approved wood made in design, shape
and profile size as per drawing. The over all sectional
size of frame shall be about 125 x 75 mm fixed in
position with 6 nos. Aluminium holdfasts anchored in
1:2:4 cement concrete of approximate size 200 x 200 x
150mm, providing and fixing M.S. tie rod/ flat at the
base of the frame, making arrangements for fixing
aldrop, tower bolts, slip way (tadi) in the frame. The
frame is finished with two or more coat of french polish
before preparing surface.
The door shutter shall be 35 mm thk approved quality
and make MR Grade Flush Door provided 6/8mm thick
TW lipping on all edges and 8mm thick glass viewing
pane of approx 0.30 sqm fixed with TW beading as per
approved design given by Architect. The edges will have
wooden moulding polished in desired coat of french
polish or enamel painted. The door sahll be finished
internally & externally with 1.00 mm thk laminate in
approved patter and design.
Each door shutter will be provided with 125X30 mm 3
Nos MS oxidised butt hinges, tower bolts, SS handle
with 300 mm long MS Oxidised Aldrop, door stopper etc
complete. Sqm 25.00
Rs. (In words)
34 Main door - double shutter panelled door with
Aluminium frame having fixed glazing as mentioned
below, 12mm thk glass panels fixed in aluminium
sections 1.72 kg/mt with 3 nos. Aluminium hinges,
handles, aldrop, door stopper and tower bolts etc..
a) Aluminum section weighing approx 2.20kg/m, for
frame verticals
b) Aluminum section weighing approx 2.06 kg/m for
frame head
c) Aluminum section weighing approx 1.76 kg/m for
shutter vertical
d) Aluminum section weighing approx 1.72 kg/m for
shutter top & bottom
e) Aluminim section weighing approx 0.612 kg/m for
vertical interlink Sqm 5.00
Rs. (In words)
Parelkar Ovalekar ParpiaArchitect Page 10 of 32 Signature of Contractor with Seal
SBI - Betul
Nos Description Units Quantity Rate (₹) Amount (₹)
35 Providing and fixing in position water proof, solid FRP
Doors of approved quality and design of approx size 750
x 2010 mm x not less than 35mm thk, including
providing S.S. baby latch two nos and SS 100 mm long
handles complete. Sqm 10.00
Rs. (In words)
36 Providing and applying external grade Acrylic Emulsion
paint of approved make and shade in desired pattern,
including preparation of surface applying cement based
primer and filling the gaps with water proof material
and applying two or more coats of paint to the
satisfaction of Architects/ Clients complete.Sqm 1775.00
Rs. (In words)
37 Providing and applying Oil Bound Distemper of
approved shade and make in approved pattern
including preparation of surface by applying Birla putty
to have the surface in line and level, applying two or
more coats paint over a coat of primer to the
satisfaction of Architects/ Clients complete.Sqm 1610.00
Rs. (In words)
38 Providing and applying White wash on celing in two or
more coats or as directed including adding voilet colour
agent (stainer) and approved adhesive for bonding of
white wash as per manufactuers specification complete.
Sqm 690.00
Rs. (In words)
39 Providing and applying approved quality and shade
Enamel Paint to steel doors frames, window shutters,
MS Railing or as advised by Client/ Architect including
cleaning the surface to free loose scales etc. and then
applying a coat of steel primer and two or more coats of
enamel paint complete.Sqm 90.00
Rs. (In words)
40 Providing and laying waterproofing treatment for
sunken portion of W.C.'s, Bathroom etc. by applying
cement slurry mixed with water proofing cement
compound consisting of applying:
Parelkar Ovalekar ParpiaArchitect Page 11 of 32 Signature of Contractor with Seal
SBI - Betul
Nos Description Units Quantity Rate (₹) Amount (₹)
a) First layer of slurry of cement @ 0.5 kg/sqm with
water proofing cement compound @ 0.25 kg/sqm, this
layer will be allowed to air cure for approx 4 hrs.
b) Second layer of slurry of cement @ 0.25 kg/sqm
mixed with approved water proof compound @ 0.125
kg/sqm. This layer will be allowed to air cure for 48 hrs.
The waterproofed area will be filled with water and kept
for 7 days to insure that the treatment is done in order.
The rate includes preparation of surface, treatment and
sealing of all joints, corners, junctions , pipes, and
masonry with approved quality poymer mixed slurry
complete. Sqm 30.00
Rs. (In words)
41 Providing and laying integral cement based water
proofing treatment including preparation of surface as
required for treatment of roofs, balconies, terraces etc.
consisting of the following operations:
a) Applying a slurry coat of neat cement using 2.75
kg/sqm of cemnt admixed with approved water
proofing compound confirming to Is 2645 and approved
by Architect/ Client over RCC slab including adjoining
walls upto 300 mm height including cleaning of surface
before treatment.
b) Laying brick bats with mortar using broken bricks/
brick bats 25 to 115 mm size with 50% of cement
mortar 1:5 ( 1 cement: 5 coarse sand) admixed with
approved quality water proofing compound confirming
to IS: 2645 and approved by Architect / Client over 20
mm thick layer of cement mortar of mix (1 cement: 5
coarse sand) admixed with approved water proofing
compound confirming to Is 2645 and approved by
Architect/ Client to required slope and treating similarly
the adjoing walls up to 300 mm height including
rounding of junctions of walls and slab.
c) after two days of proper curing applying second coat
of cement slurry using 2.75 kg/sqm of cement admixed
approved water proofing compound confirming to IS
2645 and approved by Architect/ Client.
Parelkar Ovalekar ParpiaArchitect Page 12 of 32 Signature of Contractor with Seal
SBI - Betul
Nos Description Units Quantity Rate (₹) Amount (₹)
d) Finishing the surface with 20mm thick jointless
cement mortar of 1:4 (1 cement: 4 coarse sand)
admixed with approved waterproofing compound
confirming to IS 2645 and approved by Architect /
Client.
Rate including laying glass fibre cloth of approved
quality in top layer of plaster and finally finishing the
surface with trowel neat cement slurry not less than
10mm and placing broken china mosiac pieces in level
complete.
e) The whole terrace/ balcony etc so finished shall be
filled with water for a minimum period of two weeks for
curing and final testing.
Average thickness of 150 mm and minimum thickness at
rain water out let not less than 65 mm
Please note: measurement will be taken of the work
done including watta. Sqm 725.00
Rs. (In words)
42 Providing an Anti-termite treatment to Foundation
and Plinth
Carrying out pre-construction anti-termite treatment as
stipulated in the relevant Indian Standard Specification
latest edition at appropriate stages and as specified and
directed. The rate quated shall be for complete
item,inclusive of cost of all material & labour required
for the work
For RCC Frame structure:
(a) Soil which is immediat contact with vertical surface
of R.C.C. foundations i.e columns below ground level
,plinth beams shall be treated at the rate of 5 litrs/sqm
of contact area.
(b)Treatment of top surface of plinth filling: The
top surface of consolidated earth within plinth walls
shall be treated with chemical emulsion at the rate of 5
litrs/sqm of the surface before the rubbel soling is laid.
(c) Treatment of soil along external perimeter of
Building: After the
building is completed,earth along the external
perimeter of the building should be eroded and soil to
be treated with chemical emulsion at the rate of 7.5
litrs/sqm. Sqm 20.00
Rs. (In words)
TOTAL
Parelkar Ovalekar ParpiaArchitect Page 13 of 32 Signature of Contractor with Seal
SBI - Betul
A2
Nos Description Units Quantity Rate (₹) Amount (₹)
1 Providing and fixing in position Chlorinated
Polyvinyle Choride (CPVC) pipes concealed in the
brick masonary walls by cutting chases using
mechanical cutter, providing nails/clamps to hold
the pipes in position and making the surface good in
line and level . The pipes should have thermal
stability for hot & cold water supply including
providing required CPVC brass threaded fitings and
specials such as 'Tees, Bends, angles, Elbows,
reducers, unions etc and fixing the pipes with metal
clamps at 1.0 m c/c, including joining the pipes as
per manufacturers specifications using approved
quality CPVC Solvent and testing the joints complete
as per directed complete. Wherever necessary hot
water pipes to be suitably insulated to prevent heat
transfer to wall tiles etc.
(A) 15 mm nominal outer diameter pipe Rmt 30.00
Rs. (In words)
2 Providing and fixing in position Chlorinated
Polyvinyl Choride (CPVC) pipes externally having
thermal stability for hot & cold water supply
including all CPVC brass threaded fitings such as
'tees, bends, angles, reducers, unions etc and fixing
the pipes on metal clamps away from the wall at
1.00 m c/c including joining the pipes as per
manufacturers specification with one step CPVC
Solvent /solvent cement and testing the joints
complete as per directed, complete.
(A) 25 mm nominal outer diameter pipe Rmt 25.00
Rs. (In words)
(B) 32 mm nominal outer diameter pipe Rmt 85.00
STATE BANK OF INDIA
PROPOSED CONSTRUCTION OF ADDITIONAL FLOOR OVER EXISTING BRANCH INCLUDING REPAIRING WORK
OF COMPOUND WALL AND INSTALLATION OF PAVER BLOCKS STATE BANK OF INDIA'S MAIN BRANCH
PREMISES, BETUL, M.P.
SCHEDULE OF ITEMS-PLUMBING AND SANITARY WORK
Parelkar Ovalekar ParpiaArchitect Page 14 of 32 Signature of Contractor with Seal
SBI - Betul
Nos Description Units Quantity Rate (₹) Amount (₹)
Rs. (In words)
(C) 50 mm nominal outer diameter pipe Rmt 65.00
Rs. (In words)
3 Providing and fixing in position CP Brass Bib Cock of
approved quality and make, including all fittings and
fixturers complete. Nos 5
Rs. (In words)
4 Providing and fixing in position CP Brass Stop Cock
of approved make and quality including all fittings
and fixturers complete. Nos 8
Rs. (In words)
5 Providing and fixing ISI marked gun metal valve
with C.I. wheel of approved quality (screwed end)
and make complete.
(A) 50mm nominal bore Nos 2
Rs. (In words)
(B) 32 mm nominal bore Nos 2
Rs. (In words)
6 Providing and fixing ISI marked non return valve of
approved quality complete. Nos 1
Rs. (In words)
7 Providing and fixing in position long neck Bib Cock
for kitchen etc including all fittings and fixturers
complete. Nos 1
Rs. (In words)
Parelkar Ovalekar ParpiaArchitect Page 15 of 32 Signature of Contractor with Seal
SBI - Betul
Nos Description Units Quantity Rate (₹) Amount (₹)
8 Providing and fixing in position Wash Hand Basin,
counter sunk of ivory colour of approx size 440 mm
x 550mm including providing CP Brass Pillar Cock,
Bottle Trap, Stop Cock, PVC Connection, Base
Coupling etc. of approved quality and make,
including Providing & fixing 5mm thick mirror,
copper back finish, of required size over Plastic
Moulded frame. Mirror edge shall be smooth,
Mirror - size 0.45m x 0.60m. Rate to include suitable
MS bracket including 40mm dia connection GI pipe
upto nahani trap concealed in wall, and fixing of
mirror complete.
Nos 4
Rs. (In words)
9 Providing and fixing in position stainless steel sink
of approved make of approx overall size 535 x 460 x
190 mm deep fixed to Kitchen platform, including
providing CP brass, base coupling, bottle trap etc. of
approved make and making suitable connection to
nahani trap complete with 40mm dia GI pipe 'b
class' complete.
Nos 1
Rs. (In words)
10 Providing and fixing in position European WC pan
of approved make and size including providing and
fixing PVC Flushing Cistern of 12 liters capacity, PVC
toilet seatcover including necessary fitings and
fixturers viz. Flush pipe, CP brass stop cock, PVC
connection etc complete.
Nos 4
Rs. (In words)
11 Providing and fixing White glazed Flat back urinal
Pan with white PVC flushing cistern of 5 litres
capacity etc., including stop cock, all fittings and
connections complete. Nos 2
Rs. (In words)
Parelkar Ovalekar ParpiaArchitect Page 16 of 32 Signature of Contractor with Seal
SBI - Betul
Nos Description Units Quantity Rate (₹) Amount (₹)
12 Providing and fixing in position PVC heavy duty
'nahani trap' including all connections to waste
water line complete. Nos 5
Rs. (In words)
13 Providing and fixing in position CP brass soap
holder of approved make and quality including all
fittings and fixturers complete. Nos 5
Rs. (In words)
14 Providing and fixing in posiion CP brass hooks on
doors etc including all fittings and fixturers
complete. Nos 5
Rs. (In words)
15 Proviidng and fixing in position CP Brass Health
Faucet with flexible pipe and necessary two way
fitting of approved make including Bib cock,
necessary fittings and fixturers complete.
Nos 4
Rs. (In words)
16 Providing and fixing in position heavy duty PVC
down take pipes of Prince, Supreme, or equivalant
approved make including all acessories such as 'Y',
'angle junction', 'connectors', 'inspection joints' etc
joining together water tight using approved
adhessive and clamping it on wall with 'D' clamps
complete.
(A)100 mm dia Rmt 115
Rs. (In words)
(B) 65 mm dia Rmt 35
Rs. (In words)
Parelkar Ovalekar ParpiaArchitect Page 17 of 32 Signature of Contractor with Seal
SBI - Betul
Nos Description Units Quantity Rate (₹) Amount (₹)
17 Providing and constructing Inspection Chambers of
approx size 450 x 900mm in one brick thick walls,
including providing plaster 1:4 cement sand mix in
single coat about 12mm and with heavy duty PVC
cover including the frame as per sample approved.
The rate should include necessary earthwork in
excavation, disposal of surplus material as directed,
laying P.C.C. 1:3:6, 100mm thic levelling course,
making neat cement finish smooth benching,
hunches, channels etc. in CC 1:2:4 complete for
smooth flow as required. Rate to include for making
connections to stone ware/PVC pipes of minimum
150 mm dia in the brick wall complete.
Nos 10
Rs. (In words)
18 Providing making Gully Trap of approx size 450 x
450 in one brick thick, and finishing it with 12mm
thk 1:4 cement sand mix plaster, including providing
P.C.C. benching and providing stone ware pipe
connections, with approved quality CI/PVC cover
with frame complete.
Nos 4
Rs. (In words)
19 Providing and laying heavy quality (Minimum 6 Kg
pressure) PVC pipes for sewerage disposal system
including necessary excavation, laying 100mm thick
PCC 1:3:6 levelling base course with all fittings and
specials testing of joints and concealing the Pipe in
PCC 1:2:4 arr around with minimum 100 mm thick
concrete complete as direcetd at site.
(A)200 mm dia. Rmt 70
Rs. (In words)
(B)150 mm dia. Rmt 20
Rs. (In words)
Parelkar Ovalekar ParpiaArchitect Page 18 of 32 Signature of Contractor with Seal
SBI - Betul
Nos Description Units Quantity Rate (₹) Amount (₹)
20 Providing and fixing double layer PVC overhead
water storage Tank of required capacity including
construction of 150mm high platform with concrete
blocks/bricks/CC (finishing complete) and all
connections (inlet & outlet) and making them water
tight complete as under:-
PVC Tank (5000 litres) Nos 2
Rs. (In words)
TOTAL
Parelkar Ovalekar ParpiaArchitect Page 19 of 32 Signature of Contractor with Seal
A3
SEC. DESCRIPTION OF ITEM AMOUNT(₹)
A MAIN LT PANELS /DBS Rs.
B CABLES / MAINS Rs.
C EARTHING (GENERAL / DEDICATED) Rs.
D INTERNAL LIGHTING & POWER WIRING Rs.
E TRENCHING / FLOOR -RACEWAYS Rs.
F LIGHTING FIXTURES Rs.
TOTAL - (A to F) Rs.
G VOICE NETWORKING Rs.
TOTAL - (A to F) + (G) Rs.
SIGNATURE OF CONTRACTOR WITH SEAL
NAME
ADDRESS
IN WORDS RUPEES____________________________________________________________________
______________________________________________________________________________________
PROPOSED CONSTRUCTION OF ADDITIONAL FLOOR OVER EXISTING BRANCH INCLUDING REPAIRING WORK OF COMPOUND
WALL AND INSTALLATION OF PAVER BLOCKS AT BETUL, M.P.
STATE BANK OF INDIA
ELECTRICAL & ALLIED WORKS ESTIMATE
BILL OF QUANTITIES FOR ELECTRICAL & ALLIED WORKS
SUMMARY OF ESTIMATED COST OF ELECTRICAL & ALLIED WORKS
S.N. PARTICULARS QTY UNIT Rate (₹) Amount (₹)
A MAIN LT PANEL / DB'S
1
Supply, installation, testing & commissioning of 100A IC TPN SFU with 100A
HRC fuses 415 V 3 phase & neutral 50 c/s AC23 duty with Enclosure with
cable end boxes, earthing, name plate danger board fixing accessories etc.
1 Set
Rs. (In words)
2
Suply and installation of 4-way, VTPN, Double door, (MCCB DB) Main Power
Distribution Board (MPDB), flush mounted on wall, interconnected wiring
complete with earthing lugs housing following switchgears : (Similar to
Legrand / Hager / Siemens / Schnider make)
a1 No. , 100A, 415V 50Hz FP MCCB complete with neutral & accessories as
incomer
b3 Nos., 63/40A, TP, MCB as outgoings (LDB - 1 no., RPDB - 1no., UPS - 1 No.,
Spare - 1 no.)c 3 nos, 40/32/25A, SP, MCB outgoings (Spare - 3 no.s)
Full Set as above 1 NosRs. (In words)
3
Suply and installation of 4-way, TPN, Double Door Lighting Distribution
Board (LDB), flush mounted on wall, interconnected wiring complete with
earthing lugs housing following switchgears : (Similar to MDS / equivalent
approved make)
a 1 no., 63A, 100mA, FP ELCB as incomerb 12 nos, 10/16/20A, SP, MCB outgoing
Full Set as above 1 NosRs. (In words)
4
Suply and installation of 8-way, TPN, Double Door Raw Power Distribution
Board (RPDB), flush mounted on wall, interconnected wiring complete with
earthing lugs housing following switchgears : (Similar to MDS / equivalent
approved make)
a 1 no., 63A, FP MCB as incomerb 24 nos, 10/16/20A, SP, MCB outgoing
Full Set as above 1 NosRs. (In words)
4
Suply and installation of 16-way, SPN, Double Door Distribution Board ,
flush mounted on wall, interconnected wiring complete with earthing lugs
housing following switchgears : (Similar to MDS / equivalent approved
make) (UPS DB)
a 1 no., 63/40A, DP MCB as incomerb 14 nos, 16/25A, SP, MCB outgoing
Full Set as above 1 NosRs. (In words)
5
Supply & Installation of 20/32A, DP, MCB, box with 20A, metal clad /
modular plug-socket including power circuit of (2x4 + 1x4) sq. mm FR copper
flexible wires directly taken from the relevant DB through PVC conduits for
room A/C / Geyser including all necessary hardware & accessories, etc.
(Schneider / Hager / Legrand / Siemens / L&T make)
1 Nos
Rs. (In words)
STATE BANK OF INDIA
PROPOSED CONSTRUCTION OF ADDITIONAL FLOOR OVER EXISTING BRANCH INCLUDING REPAIRING WORK OF COMPOUND WALL AND INSTALLATION OF
PAVER BLOCKS AT BETUL, M.P.
SCHEDULE OF ITEMS - ELECTRICAL AND ALLIED WORKS
Parelkar Ovalekar ParpiaArchitects Page 21 of 32 Signature of Contractorwith Seal
6
Supply & Installation of 63/40A, TPN MCB with Enclosure alongwith all
necessary hardware & accessories, etc. complete as required for UPS input /
output. (Schneider / Hager / Legrand / Siemens / L&T make)
1 Nos
Rs. (In words)
7
Supply & Installation of 63/40/32A, DP MCB with enclosure alongwith all
necessary hardware & accessories, etc. complete as required for UPS input
/ output. (Schneider / Hager / Legrand / Siemens / L&T make)
1 Nos
Rs. (In words)
8
Lumpsum charges for arranging temporary power supply and lighting for
all the contractor at site including the required number of tubelight fittings,
suffficient number of plug points with plug tops, providing temeporary
supply arrangements for temeparay workstations and including all the
necessary safety devices like ELCB etc. to ensure SAFE & CONTINUED supply
at site. Also removing of all type of existing electrical installations including
light fittings, conduits, switch, socket, casing-capping, DB's MCB's, etc.
complete as directed by the client / consultant at site & handing over to the
client / Branch Manager at site.
LS
Rs. (In words)
TOTAL of SECTION (A)
B CABELS / MAINS
1
Supply & Installation of 1100V grade armoured cable having sector / circular
shaped aluminium / copper conductor PVC insulated cores, laid up, PVC
tape wrappe d inner sheathed, GI strip / wire armoured and overall
extruded PVC sheathed confirming to IS: 1554, laid on wall / ceiling using GI
clamps & spacers / underground at necessary depth as required as per site
conditions & as per route shown / approved at site and further as directed
by Consultant / Client at site in the following sizes :- (Make - Polycab /
Finolex / CCI / RR / Havells)
NOTE :- All Armoured cables shall be provided with temporary labelling at
every 5mtrs & then finally with metal indentification tags showing the size
& the location from/to the respective Panel / DB, at both the ends.
1.13 1/2 C x 35 Sq.mm Aluminium Armoured cable with 2 runs of 8 SWG GI
bare wire) (For Main VTPN DB)45 Mtrs
Rs. (In words)
1.2 4C x 16 Sq.mm Copper Armoured cable with 2 runs of 12 SWG GI bare wire. 5 Mtrs
Rs. (In words)
1.34C x 10 Sq.mm Copper Armoured cable with 2 runs of 12 SWG GI bare
wire.(For Raw Power DB & UPS Input)55 Mtrs
Rs. (In words)
1.44C x 6 Sq.mm Copper Armoured cable with 2 runs of 12 SWG GI bare
wire.(For Lighting DB)15 Mtrs
Rs. (In words)
1.52C x 10 Sq.mm Copper Armoured cable with 2 runs of 12 SWG GI bare
wire.(For UPS DB)15 Mtrs
Rs. (In words)
1.6 2C x 6 Sq.mm Copper Armoured cable with 2 runs of 12 SWG GI bare wire. 5 Mtrs
Parelkar Ovalekar ParpiaArchitects Page 22 of 32 Signature of Contractorwith Seal
Rs. (In words)
1.71C x 10 Sq.mm Copper flexible lead wire through flexible PVC conduits (UPS
i/p, o/p connections, etc.)20 Mtrs
Rs. (In words)
1.81C x 6 Sq.mm Copper flexible lead wire through flexible PVC conduits (UPS
i/p, o/p connections, etc.)5 Mtrs
Rs. (In words)
2
GLANDING & TERMINATION :- Supply & Installation of end termination of
above mentioned cables including compressed type brass glands, crimping
type copper lugs, insulation tape etc. as 'required complete with earthing of
glands in following sizes :-
2.1 3 1/2 C x 35 Sq.mm Aluminium Armoured cable 2 NosRs. (In words)
2.2 4C x 16 Sq.mm Copper Armoured cable 1 NosRs. (In words)
2.3 4C x 10 Sq.mm Copper Armoured cable 4 NosRs. (In words)
2.4 4C x 6 Sq.mm Copper Armoured cable 2 NosRs. (In words)
2.5 2C x 10 Sq.mm Copper Armoured cable 4 NosRs. (In words)
2.6 2C x 6 Sq.mm Copper Armoured cable 1 NosRs. (In words)
2.71C x 10 Sq.mm Copper flexible lead wire through flexible PVC conduits (UPS
i/p, o/p connections, etc.)8 Nos
Rs. (In words)
2.81C x 6 Sq.mm Copper flexible lead wire through flexible PVC conduits (UPS
i/p, o/p connections, etc.)1 Nos
Rs. (In words)
TOTAL of SECTION (B)
C EARTHING (GENERAL / DEDICATED)
1
Supply & Installation of earth pit comprising of 600mm x 600mm x 3mm
thick GI plate buried at a minimum depth of 2.5 meter including necessary
materials like charcoal,salt etc as required conforming to BIS standards
having brick masonary chamber with hinged cover and watering
arrangement. (Electrical Earthing Pit)
1 Nos
Rs. (In words)
1
Supply & Installation of earth pit comprising of 600mm x 600mm x 3mm
thick Copper plate buried at a minimum depth of 2.5 meter including
necessary materials like charcoal,salt etc as required conforming to BIS
standards having brick masonary chamber with hinged cover and watering
arrangement. (Dedicated Earthing Pit)
2 Nos
Rs. (In words)
Parelkar Ovalekar ParpiaArchitects Page 23 of 32 Signature of Contractorwith Seal
2Supply & Installation of copper /GI earthing wires/strips in following sizes
including all necessary hardware & accessories, etc.:-
2.125 x 3 GI. Strip through PVC sleeve (Electrical Earthing) (From Electrical
Earthing Pit to Main Electrical Earthing Busbar)5 Mtrs
Rs. (In words)
2.2
1C x 10 sq.mm flexible Cu. Wire through heavy guage PVC conduit in case of
wall / ceiling surface / conceled run & through heavy guage M.S. conduit in
case of underground run including all necessary hardware & accessories,
etc. complete as required. (Dedicated UPS Earthing)
75 Mtrs
Rs. (In words)
TOTAL of SECTION (C)
D INTERNAL LIGHTING & POWER WIRING
1
Supply, Install, Test & Commission of point wiring for lighting,fans & power
sockets , using 440 V grade 3 # 1.5 Sqmm PVC insulated wires with stranded
copper conductors for Phase, Neutral & Earth in 25 mm dia. Heavy gauge
PVC Conduits junction boxes including 2.5 sq.mm circuit wires from the
relevent DB & also including the 2.5 sq.mm. green colour copper earth wire
& switch plate, switches, etc. All wiring shall be of concealed type.Price to
include (i) wires & conduits with accessories (ii) end connections of wires (iii)
ceiling roses, Light point with angle/straight holder & fan hooks (iv) all
circuits & sub circuits.
All wiring shall be of conceled type as required & directed / instructed at site
by Client / Architect / Consultant. Price to include (i) wires & PVC Conduits /
casing caping with accessories (ii) end connections of wires (iii) ceiling roses
& fan hooks / lamp holder in case of light point (iv) all circuits & sub circuits
(v) switch, socket, plate, PVC / Metal Conceled / surface back box as
required complete with all necessary hardware & accessories, etc.
NOTE :- 1. Only FR wire shall be used; 2. Conduit / Casing caping carrying
circuit wiring should not carry point wiring and Conduit / casing caping
carrying point wiring should not carry submain/circuit wiring; 3. Flexible
conduits & Elbows are not allowed; 4. The wires from ceiling junction to
light points / light fixture shall be drawn in flexible PVC conduit with
adptor & cover for junction box & crimp type lugs at both the ends
alongwith necessary hardware & accessories, etc. as required; 5. Proper
ferrules, lugs, must be used in all cabling and wiring on both load / source
end; 6. Each switch board must be provided with respective ferrules
representing the respective DB, Phase & Circuit numbers; 7. Looping of
Neutral / Earth wire between two seperate Primary / Full Points is strictly
not allowed; 8. Looping of Neutral / Earth wire between two seperate
circuits on similar or other phase is strictly not allowed; 9. Ferulling /
numbering / taggning to wires with circuit number & db name for all
lighting & raw / ups power shall be strictly followed at both DB & switch
board / switch socket boards ends.
1.1 Primary light points including the cost of 5A switch. 58 NosRs. (In words)
1.2 Secondary light points looped from the above point 40 NosRs. (In words)
1.3 Two way light point including the cost of 5A two way switch 1 NosRs. (In words)
1.4
Fan Point including 120W Electronic type step regulator, anchor fastner & 'S'
type fan hook in ceiling to suspend ceiling fan by cutting / chiesling /
painting as required
50 Nos
Parelkar Ovalekar ParpiaArchitects Page 24 of 32 Signature of Contractorwith Seal
Rs. (In words)
1.5Bell point comprising of wiring as above including G-Magic Wireless Door
Bell 4061 with Remote, 32-Melodies & Flashing Light.3 Nos
Rs. (In words)
1.6
5A plug point as primary point independent mounted on wall / partition / on
work station, etc. (UPS / RAW Power) (Only five workstations / independent
mounted raw power points shall be looped in one raw power circuit.
Whereas in measurements out of five workstations / independent mounted,
four no.s of 5A s/s raw points will be considered as secondary points & 1 no.
of 5A s/s raw point will be considered as primary point.)
15 Nos
Rs. (In words)
1.7
Secondary 5A Plug point on switch board or looped from above 5A primary
point (UPS / RAW Power) (Only five workstations / independent mounted
raw power points shall be looped in one raw power circuit. Whereas in
measurements out of five workstations / independent mounted, four no.s of
5A s/s raw points will be considered as secondary points & 1 no. of 5A s/s
raw point will be considered as primary point.)
35 Nos
Rs. (In words)
1.8Exhaust fan point consisting of 5A socket near fan and switch on light switch
board5 Nos
Rs. (In words)
2
Supply & installation of 5/15A Plug Point directly taken from DB for Pantry /
geyser / zerox / printer / fridge, etc. including 2 x 2.5 sqmm FR grade circuit
wires directly taken from the relevant DB and also including 2.5 sqmm green
color copper earth wire all laid through PVC conduit with all necessary
hardware& accessories, etc. (UPS / Raw Power)
16 Nos
Rs. (In words)
3
Supply & Installation of point wiring for UPS or stabilized power plug points
on workstations / table for computers using 3C X2.5 Sqmm FRLS grade
copper conductor PVC sheathed white color flexible cable pulled through
already laid floor raceways and taken upto table top using PVC rigid or
flexible conduits run within wooden/metal partitions. Each point consisting
of 3 nos of 5A , 2/3 pin sockets below table top & 1 No., 15A Switch above
table top, wired together forming one point. The earth wire of 3 core
flexible cable to be of yellow-green color only. (ONLY FOUR tables
served by one circiut from DB)
35 Nos
Rs. (In words)
4
Supply & Installation of point wiring for UPS / RAW Power power plug points
on workstations / table for computers using 3C X2.5 Sqmm FRLS grade
copper conductor PVC sheathed white color flexible cable pulled through
already laid floor raceways and taken upto table top using PVC rigid or
flexible conduits run within wooden/metal partitions. Each point consisting
of 2 nos of 5A , 2/3 pin sockets & 1 No., 15A Switch , wired together
forming one point. The earth wire of 3 core flexible cable to be of yellow-
green color only. (ONLY FOUR tables served by one circiut from DB for
UPS & Only 6 tables served by one circiut from DB for Raw Power.)
8 Nos
Rs. (In words)
Parelkar Ovalekar ParpiaArchitects Page 25 of 32 Signature of Contractorwith Seal
5
Supply & Installation of TV socket outlet point including approved make
modular switchboard / in the existing switch board including all the
necessary hardware & accessories, etc.
3 Nos
Rs. (In words)
6Supply & Installation of RG6 TV cable with heavy guage PVC conduit to be
laid surface / concelled including all necessary hardware & accessories, etc.120 Rmt.
Rs. (In words)
TOTAL of SECTION (D)
E TRENCHING / FLOOR -RACEWAYS
1
Supply and laying Raceways / Conduits (for under floor trenches / On trays)
on existing flooring. Raceways / conduits shall be fixed to the flooring with
GI clamps for finished levels as per the site conditions or through partitions
with all accessories. The rate shall include preparation of trenches of
required sizes by carefully removing the malwa on existing floor for laying
Raceways/conduits for power, data, telephone cables etc. The depth of the
trenches shall be at least 2 inches from the finished floor level or upto RCC
of the slab. The rate shall include the cost of the Raceways/conduits. The
rate shall also include the activity of clearing the debris generated from the
preparation of trenches & filling the same with PCC. (FOR THE PORTION
WITHOUT FALSE FLOORING)
1.1 80 x 40 x 1.6mm thick Aluminium Raceways 75 MtrsRs. (In words)
1.232 mm heavy guage PVC conduit to be laid concelled / surface in / on wall /
floor as required as per the above mentioned specifications225 Mtrs
Rs. (In words)
1.325 mm heavy guage PVC conduit to be laid concelled / surface in / on wall /
floor as required as per the above mentioned specifications350 Mtrs
Rs. (In words)
2
Supply & Installation of floor junction boxes without top cover for above
raceways, of following sizes, fabricated out of M.S. sheets, fully powder
coated with provision for removable M.S. / S.S. screwed cover plates on all
four sides for blocking the entry into the junction box. All the junction boxes
to be (with stud) 'properly earth - bonded with the raceways pipe using 12
SWG Copper bare wire as directed at site.
2.1 Junction Box of size (250mm x 250mm x 50mm x 2.5mm thick) 30 NosRs. (In words)
2.2 Junction Box of size (300mm x 300mm x 50mm x 2.5mm thick) 8 NosRs. (In words)
3
Supply & Installation of suitable sizes 2mm thick removable cover plate
screwed on all four sides of M.S. sheet, fully powder coated, for blocking
the entry into the floor junction box for following sizes of junction boxes
with rounded corners as per the instruction given & sample approved by the
client / architect / consultant at site. Cover plate shall have required no.s of
1' dia knockouts for flexible conduit outlets as per the requirement.
3.1 for Junction Box of size (250mm x 250mm x 50mm x 2.5mm thick) 30 NosRs. (In words)
Parelkar Ovalekar ParpiaArchitects Page 26 of 32 Signature of Contractorwith Seal
3.2 for Junction Box of size (300mm x 300mm x 50mm x 2.5mm thick) 8 NosRs. (In words)
TOTAL of SECTION (E)
F LIGHTING FIXTURES
Supply & Installation of lighting fixtures with lamps as per the details below
including necessary hardware such as clamps, nuts, bolts, nails, screws and
suspension rods as required for fixing the fixtures in position as directed by
architect / consultant / client.
Note :- All Light Fixtures, Fans, Exhaust Fans & other fittings samples shall be
approved by the Client / Architect / Consultant before placing order to the
Light Fixture Vendor / Supplier. All Light Fixtures shall be of Philips / Wipro /
GE make only unless & otherwise other makes are specified. Client /
Architect / Consultant reserves right to approve / select final Light Fitxtures
from any make as required.
1S & I of 1 x 11w PL bracket/mirror light. (WIPRO Cat. No. WRP 21111 /
equivalent model in PHILIPS / CG / GE make)1 Nos
Rs. (In words)
2S & I of (20W) LED Tubelight with hardware & accessories (Wipro / CG / GE /
Philips make) 80 Nos
Rs. (In words)
3S & I of (10W) LED Tubelight with hardware & accessories (Wipro / CG / GE /
Philips make) 6 Nos
Rs. (In words)
4S & I of Wall mounted exhaust fan (9" dia.) of decorative plastic body and
blade with louvers on the outside of approved make5 Nos
Rs. (In words)
5
S & I of approved make Ceiling Fan (4'dia / 1200 mm dia) (BEE 5 star rated)
(Colour :- White / Brown / Ivory as approved by client / architect /
consultant) alongwith required hardware & accessories, etc.
45 Nos
Rs. (In words)
6S & I of approved make 400 mm dia. Decorative Wall Fan alongwith required
hardware & accessories, etc. as approved by Architech / Consultant / Client.1 Nos
Rs. (In words)
7
S & I of approved make 400 mm dia. Decorative Pedastal Fan alongwith
required hardware & accessories, etc. as approved by Architech / Consultant
/ Client.
1 Nos
Rs. (In words)
TOTAL of SECTION (F)
G VOICE NETWORKING
1
Supply & Installation of RJ-11 telephone socket outlet point alongwith PVC
back box including 2 pair telephone cable from Telephone MDF upto
individual Telephone socket outlet Including required size PVC conduits
including all necessary hardware & accessories, etc. complete as required.
38 Nos.
Rs. (In words)
Parelkar Ovalekar ParpiaArchitects Page 27 of 32 Signature of Contractorwith Seal
2
Supply, installation, testing and commissioning of indoor type telephone
Main Distribution Frame (MDF) / Box with suitable S.S. frame for mounting
tag module, cable, wires and incorporated in 16 SWG MS box with proper
lockable cover. The box should be fixed on wall with suitable fasteners
including painting & earthing. This also includes fixing the cable, distribution
chart sufficient space for the cables, wires etc.to be provided in the box for
:-
2.1Supply & Installation of 50 pair MDF with Krone module including all
hardware & accessoried , etc. complete as required.1 Nos.
Rs. (In words)
3Supply & Laying of 10 pair telephone cable through heavy guage pvc conduit
including all necessary hardware & accessories, etc.55 Rmt
Rs. (In words)
TOTAL of SECTION (G)
Parelkar Ovalekar ParpiaArchitects Page 28 of 32 Signature of Contractorwith Seal
SBI - Betul
B -1
Nos Description Units Quantity Rate (₹) Amount (₹)
1 Excavation in any type of soil using mechanical or
manually and keeping aside excavated earth (except
black cotton) for refilling the pit after the foundation is
done including ramming watering the pit and using the
excess earth for levelling the ground, filling in plinth etc.
(please note that black cotton soil will not be used for
filling but shall be carted away to any lift or lead as
directed by local authority/ Architect). Rate includes
labour cost for back filling the surplus excavated
approved soil as directed at site.
Cum 350.00
Rs. (In words)
2 Filling and Consolidating the murrum / hard soil with
water and murrum (brought from outside) upto depth of
150mm and moving road roller of minimum 10 tonnes
for proper compaction to the satisfaction of Architect/
Clients Engineer complete.
Sqm 1120.00
Rs. (In words)
3 Providing and laying 150 mm thick hand packed
approved quality stones soling including filling the voids
with approved quality murrum/hard soil including
watering and compaction complete as directed at site.
Cum 175.00
Rs. (In words)
STATE BANK OF INDIA
PROPOSED CONSTRUCTION OF ADDITIONAL FLOOR OVER EXISTING BRANCH INCLUDING REPAIRING WORK
OF COMPOUND WALL AND INSTALLATION OF PAVER BLOCKS STATE BANK OF INDIA'S MAIN BRANCH
PREMISES, BETUL, M.P.
SCHEDULE OF ITEMS- PAVER WORK
Parelkar Ovalekar ParpiaArchitect Page 29 of 32 Signature of Contractorwith Seal
SBI - Betul
Nos Description Units Quantity Rate (₹) Amount (₹)
4 Providing and laying 100mm av. thick base concrete
P.C.C. 1:2:4 in internal Road including necessary
shuttering, curing, viberating, compacting etc. The P.C.C.
may be casted in panels as desired by the Architect/
Consultant etc complete. Cum 135.00
Rs. (In words)
5 Supplying & laying CC paver blocks 80 mm thick using
minimum M 35 grade laid on 50mm avg thickness sand
bedding. Paver blocks to be procured from approved
manufacturers. Sqm 1025.00
Rs. (In words)
TOTAL
Parelkar Ovalekar ParpiaArchitect Page 30 of 32 Signature of Contractorwith Seal
SBI - Betul
B-2 SCHEDULE OF ITEMS -COMPOUND WALL
Nos Description Units Quantity Rate (₹) Amount (₹)
1 Removing/ demolishing existing Brick wall including
coping & plaster wherever needed for anochorage,
carefully without damaging the existing structure and
carting awy the debris to any lift or lead as directed by
the local authority/ Bank's Engineer/ Architect
complete. Rmt 46.00
Rs. (In words)
2 Providing and laying one brick wall with well burnt
uniform size and colour locally available approved
quality bricks, and joing them together with sand
cement joints 1:5 of thickness not less than 12 mm thk,
including curing, scafolding, raking the joints at all
levels complete. Cum 65.00
Rs. (In words)
3 Providing and laying 100mm av. thick base concrete
P.C.C. 1:2:4 in internal Road including necessary
shuttering, curing, viberating, compacting etc. The
P.C.C. may be casted in panels as desired by the
Architect/ Consultant etc complete.
Cum 10.00
Rs. (In words)
STATE BANK OF INDIA
PROPOSED CONSTRUCTION OF ADDITIONAL FLOOR OVER EXISTING BRANCH INCLUDING REPAIRING WORK
OF COMPOUND WALL AND INSTALLATION OF PAVER BLOCKS STATE BANK OF INDIA'S MAIN BRANCH
PREMISES, BETUL, M.P.
Parelkar Ovalekar ParpiaArchitect Page 31 of 32 Signature of Contractor with Seal
SBI - Betul
Nos Description Units Quantity Rate (₹) Amount (₹)
4 Providing and laying external sand cement plaster of
av 20 mm thk in two coats at all heights with first coat
to be of approx 12mm thk in 1:5 sand (fine) cement
mix, and the second coat to of approx 6mm thk in 1:4
sand (fine) cement mix, including necessary shuttering,
scafolding, curing roughening the first coat to recieve
second coat of plaster etc, providing approved water
proofing compound approx 1kg to one bag of cement
and adding polyproplyne fibre of approved make to
prevent shrinkage cracks as per manufacturers
specifications complete.
Sqm 1140.00
Rs. (In words)
5 Providing and applying external grade Snowsem paint
of approved make and shade in desired pattern,
including preparation of surface applying cement based
primer and filling the gaps with water proof material
and applying two or more coats of paint to the
satisfaction of Architects/ Clients complete.
Sqm 1140.00
Rs. (In words)
6 Placing and fixing Y-shaped angle of size 50x50x5 cm
at 2.5m spacing over existing Compound wall for fixing
concertina wire coil and horizontal wires including
cutting, hoisting, welding in position and including
applying approved steel primer with 3 coats of PU
enamel paint of approved make and shade and Fixing
concertina coil fencing with punched tape concertina
coil 600 mm dia, having 50 nos rounds per 6 metre
length, spring core wire (2.5mm thick) and fixing
the same with Y-shape angle iron
placed 2mapartand with 6 horizontal R.B.T.(Reinforced
Barbed Tape)wire, stud tied with G.I.staple sand
G.I.clips to retain horizontal, including necessary bolts,
all complete as per direction of Engineer-incharge.
Rmt 230.00
Rs. (In words)
TOTAL
Parelkar Ovalekar ParpiaArchitect Page 32 of 32 Signature of Contractor with Seal
11'-6"
41
' [1
9.3
7]
22'22'22'
19
'1
9'
19
'1
9'
19
'
67'-6"4'
11
1'-1
" [5
2.4
8]
3'
11'-6" 11'-6" 36'
3'
3'
16'
16'
16'
6'16
'
10'-6"
16'
10'-6"
4'-6"
4'-6"
4'-6"
14'
16'
6'-6"
11'-6"
16'
16'
4'4'-3"4'
4'
4'
4'-6"7'
6'
18'
12'-3"20'
18'
10'
18'
18'
13'
10'-7"
7'
10'
14'
25'
18'
5'
5'
10'
54'-6"
54'-6"
75
'
3'6"
GOVERNMENT CLERICAL
STRONG ROOM
18'-0" X 25'-0"
HEAD CASHIER
CASH DEPT.
B A N K I N G H A L L
54'-6" X 75'-0"
AGENTS TOILET
10'-O" X 7'-0"
AGENTS ROOM
13'-0" X 18'-0"
BOOK ROOM
10'-0" X 18'-0"
SAFE DEPOSIT
20'-0" X 18'-0"
WAITING AREA 2
12'-3" X 18'-3"
ENTRANCE
LOBBY
8'-0" X 16'-0"
GENERAL STAFF
TOILET
14'-0" X 16'-0"
GUARD ROOM
10'-6" X 16'-0"
MESSENGER
10'-6" X 16'-0"
RECORD ROOM
36'-0" X 16'-0"
LUMBER
11'-6" X 16'-0"
CLEARING
11'-6" X 16'-0"
C O R R I D O R 6'-0" W I D E
C Y C L E S H E D FOR 21 CYCLES
SIDE ENTRY
MA
IN
E
NT
RY
P U
B
L
I C
S
P
A
C
E
7
5' - 0
" X
1
0'-0
"
WAITING AREA
10'-0" X 14'-0"
3'3'
12'-6"
10'-
6"
SID
E E
NT
RY
GOVT. CASH
UP
ME
TE
R B
OX
LA
DIE
S T
OILE
T
16'-0" X
6'-6"
D
D3
D3 D
3 D3
D3
D3
D3
D3
D3
D3
D3
D3
D1
D2
D2
D5
D5
D5
D5
D5
D5
W3
W3
W3
W3
W4 W
4 W4
W4
W4
W4
W4
W4
W4
W4
W4
V3
V3
V3
V4
V4
V4
V4
V4
V3
V3
V3
V3
V4
V4 V
4
V4 V
4
WATER
W5
W5
W5
W5
W6
12" T
HK
R.C
.C
. W
ALL
R
.C
.C
. JA
LI
R.C.C. JALI
12
" T
HK
R
.C
.C
. W
AL
L
9" T
HK
R.C
.C
. W
ALL
62'
62' [29.29]
3'
9"
D1
W1
V1
W2
V2
W1
V1
W1
V1
W2
V2
W1
V1
W1
V1
W2
V2
W1V
1
10
'-7
"
43'-7
1
2" [20.61]
A'
A
145' [68.50]
DATE :
DRAWING NO: 2/4
PARELKAR OVALEKAR PARPIAARCHITECTS AND INTERIOR DESIGNERSNAGINDAS MASTER ROAD,FORT, MUMBAITEL: 22673725 / 22675840Email : [email protected]
SCALE :- 1/8" = 1'-0"
STATE BANK OF INDIA
BETUL - BRANCH
SUBJECT: GROUND FLOOR PLAN
24/11/1970
UP
UP
B'
B
C C'
22'-9"
10
'-7
"
67'-6" [31.89]
3'-4"
PROPOSED STAIRCASE
16'
CO
MM
ON
T
OI/B
AT
H
4'-6
" X
1
6'-0
"
74'-3"64'-6"
GROUND FLOOR PLAN (EXISTING + PROPOSED STAIRCASE)
AREA DIAGRAM OF BRANCH BUILDING(GROUND FLOOR)
AB
C
D
E
F
G
22'-9" 44'-9" 73'-6"4'
86'-7"
24'-6"
13'-3" 56'-9" 75'
4'
6'-7
1
2"
41'
63'-5
1
2"
11'-6"
16'-9"
10'-7"
10'-7"
STAIRCASE
145' [68.504]
11
1'-1
" [5
2.4
83
]
EXISTING AREA
EXISTING AREA
PROPOSED AREA
REV NO: DATE: DISCRIPTION:
1 23/08/2016 ADDITION OF PROPOSED FIRSTFLOOR ON EXISTING
TYPE SIZE DESCRIPTION
2'-3" X 4'-0"W
1
GLAZED STEEL WINDOW
4'-8" X 4'-0"W
2
4'-0" X 4'-0"W
3
6'-0" X 4'-0"W
4
2'-0" X 3'-0"W
5
SCHEDULE OF WINDOWS
4'-0" X 4'-0"W
6
GLAZED STEEL WINDOW
GLAZED STEEL WINDOW
GLAZED STEEL WINDOW
GLAZED STEEL WINDOW
GLAZED STEEL WINDOW
5'-0" X 7'-0"D
1
SIDE ENTRY T.W. DOOR
D
2
STANDARD STRONG DOORS
3'-0" X 7'-0"D
3
T.W PANELLED DOORS
4'-0" X 7'-0"D
4
2'-6" X 7'-0"D
5
T.W PANELLED DOOR
T.W PANELLED 2 SHUTTER DOORS
SCHEDULE OF DOORS
TYPE SIZE DESCRIPTION
8'-0" X 7'-0"D MAIN ENTRANCE T.W. DOOR
TYPE SIZE DESCRIPTION
2'-0" X 2'-0"
V
1
2'-0" X 2'-0"
V
2
V
3
6'-0" X 4'-0"V
4
16'-0" X 2'-0"V
5
SCHEDULE OF VENTILATORS
STRONG ROOM VENTILATRORS
GLAZED STEEL VENTILATORS
3'-6" X 2'-0"
GLAZED STEEL VENTILATORS
GLAZED STEEL VENTILATORS
GLAZED STEEL VENTILATORS
4'-11" X 2'-0"V
6
GLAZED STEEL VENTILATORS
PROPOSED EXTENSION ON FIRST FLOOR
96
'-6
"
41
' [1
9.3
7]
62' [29.29]
12'-3" 12'-3" 12'-3" 12'-3" 12'-3"
6'-3" [2.95]
62' [29.29]
3'
3'
23'-9" 36' [17.01]
16'
16'
6'
6'-6"
GE
NE
RA
L
ST
AF
F T
OILE
T
16'-0" X
6'-6"
D5
6'-6"
D5
6'
24'-
3"
C O R R I D O R 6'-0" W I D E
SU
PE
RV
IS
OR
ST
AF
F T
OILE
T
16'-0" X
6'-6"
STATIONERY
23'-9" X 16'-0"
TERRACE
36'-0" X 16'-0"
LEVEL +13'-6"
SUPERVISOR/
STAFF DINING
11'-9" X 16'-0"
GENERAL STAFF
DINING & RECREATION
34'-0" X 16'-0"
R.C.C. JALI
UP
DN
4'
4' 4'-3" 4'
W4
W4
W4 W
4
W4
W4
R.C.C. JALI
W5
W5
W3
D3
D3
D3
D3
D3D
3D
3
77'-6" [36.61]
LEVEL +15'-6"
UP
10'-9"
CA
NO
PY
O
VE
R E
NT
RA
NC
E
VE
RA
ND
AH
9" T
HIC
K B
RIC
K
WA
LL
22'
D3
D1
8'
16'
9'-9"
8'
6'
RECEPTION + WAITING
21'-5" X 8'-0"
MEETING ROOM
FOR 4 PEOPLE
16' X 9'-9"
VIDEO CONFERENCING
ROOM
FOR 10 PEOPLE
14'-6" X 19'-6"
CANTEEN
22'-3" X 12'
D3
76'
TERRACE
76'-0" X 24'-3"
D1
D3
D1
D3
S T O R A G E
S T
O
R
A
G
E
D3
D3
MANAGER MANAGER MANAGER MANAGER
MANAGER
MANAGERMANAGER
MANAGER
CONFERENCE ROOM
FOR 50 PERSON
54'-1" X 21'-11"
UPS
6'-00"x
12'-0"
SERVER
7'-3"x
12'-0"
MANAGER
MANAGER
MANAGER MANAGER MANAGER MANAGER
MANAGER
MANAGERMANAGER
MANAGER
MANAGER MANAGER
D3
4'
14'-6"
14'-6"
14'-6"
15'9
"
1'-6
"4' 9'
6'-6"
16'-6"
RECORD ROOM CUM
STATIONARY
20'-9" X 18'-3"
S T
O
R
A
G
E
S T
O
R
A
G
E
5'
8'-6"
2'-6
"
2'-3"2'-3"
2'-3"
2'-6
"
2'-3"
2'-3''
5'-3
"
4'-6"
2'-6"
7'-6"
2'-1
1"2'
-9"
2'-9
"
2'-9
"
3'-9
"
D5
18'-
3"
2'6"
7'-6"
5'
6'-3"
13'-
1"19
'-6"
S T O R A G ES T O R A G E
S T O R A G E
S T O R A G E
22'-3"
MANAGER
MANAGER
TOILET
5'-6"X9'-3"
D3
D3
D3
D3
D3
12'
14'-9"7'-3"6'
12'
12'
20'-9"
6'-3"
7'
PANTRY
12'-6"
5'
4'6"
12'-6"
7'-9"
9'9'
8'-9
"
12'-6"
12'-6"
MANGER H.R
OFFICE
12'-6"X'9'-0"
C.M OFFICE 1
12'-6"X'9'-0"
16'-3"
24'-
3"
4'
9'-3
"
REGIONAL
MANAGER
OFFICE
14'-6"X18'-6"
18'-6"
MANAGER
MANAGER
S T O R A G E S T O R A G E
TOILET(LADIES)
TOILET(GENTS)
C.M OFFICE 2
12'-6"X'8'-9"
81
'-6
" [3
8.5
0]
39'-
9"
32'
W1V
1
W2
V2
W1
V1
W1
V1
W2
V2
W1
V1
W1
V1
W2
V2
W1
V1
FIRST FLOOR PLAN (EXISTING + PROPOSED)
AREA DIAGRAM OF FIRST FLOOR
A'
A
UP
B'
B
C C'
R
.C
.C
. JA
LI
88
'-1
" [4
1.6
2]
27'-6" [12.99]
6'-8
" [3
.1
5]
50' [23.62]
22'-
2"
54'-1"
25
'-1
" [1
1.8
5]
DATE :
DRAWING NO: 3/4
PARELKAR OVALEKAR PARPIAARCHITECTS AND INTERIOR DESIGNERSNAGINDAS MASTER ROAD,FORT, MUMBAITEL: 22673725 / 22675840Email : [email protected]
SCALE :- 1/8" = 1'-0"
24/11/1970
9'-1
0" 4'
-11"
4'-1
1"
DN
21'-5"
10'-
9"P
AS
SA
GE
1
5' X
10'-9"
PA
SS
AG
E 2
4'-8" X
12'-6"
44'-9"
48'
4'-8"
12'-6"
61'-3"
16'
12' 34'
16'
5'-6"
24'-6"
A
B
C
D
E
G
H
EXISTING AREA
PROPOSED AREA
F
TERRACE
TERRACE
STAIRCASE
27'-6"
11'-4"
76'-9"
25'-1"
6'-8"
50' 68'-3"
145'-9" [68.858]
11
3'-2
" [5
3.4
68
]
63'-5
1
2"
6'-3"
16'-9"
70'-9" 6'-9" 68'-3"
8'-8
1
2"
8'-8
1
2"
24'-3"
16'-9"
36'
I
J
EXISTING AREA
26'
75'
145'-9" [68.86]
11
3'-2
" [5
3.4
7]
REV NO: DATE: DISCRIPTION:
1 23/08/2016 ADDITION OF PROPOSED FIRSTFLOOR ON EXISTING
STATE BANK OF INDIA
BETUL - BRANCH
PROPOSED EXTENSION ON FIRST FLOOR
SUBJECT: FIRST FLOOR PLAN
40'-6"
49'-6"
40'-6"
67'-7
1/2
"
15'
I.W.C
5' X 3'
MA
IN
E
NT
RY
W1
8'
D1
D1
W4
D2
D1
W4
W5
W5
W4
D1
W1
D1
W2
D2
D2
D1
W6
D4
D2
D1
W2
W5 W5
W2
W5
D1
W5
W5
D4
D3
D2
W3
W2
D1
W3
11'-6" [5.43]
41' [19.37]
67'-6" [31.89]
4' [1.89]
107'-1" [50.59]
4' [1.89]
3'
11'-6" 11'-6" 36'
3'
3'
16'
16'
16'
6'16
'
10'-6"
16'
10'-6"
4'-6"
4'-6"
4'-6"
14'
16'
6'-6"
11'-6"
16'
16'
4'4'-3"4'
4'
4'
4'-6"7'
6'
18'
12'-3"20'
18'
10'
18'
18'
13'
10'-7"
7'
10'
14'
25'
18'
5'
5'
10'
54'-6"
54'-6"
75'
3'6"
GOVERNMENT CLERICAL
STRONG ROOM
18'-0" X 25'-0"
HEAD CASHIER
CASH DEPT.
B A N K I N G H A L L
54'-6" X 75'-0"
TOILET
10'-O" X 7'-0"
AGENTS ROOM
13'-0" X 18'-0"
BOOK ROOM
10'-0" X 18'-0"
SAFE DEPOSIT
20'-0" 18'-0"
WAITING AREA
12'-3" X 18'-3"
ENTRANCE
LOBBY
8'-0" X 16'-0"
GENERAL STAFF
TOILET
14'-0" X 16'-0"
GUARD ROOM
10'-6" X 16' X 0"
MESSENGER
10'-6" X 16'-0"
RECORD ROOM
36'-0" X 16'-0"
LUMBER
11'-6" X 16'-0"
CLEARING
11'-6" X 16'-0"
C O R R I D O R 6'-0" W I D E
C Y C L E S H E D FOR 21 CYCLES
SIDE ENTRY
MA
IN
E
NT
RY
P U
B
L
I C
S
P
A
C
E
7
5' - 0
" X
1
0'-0
"
WA
IT
IN
G A
RE
A
14'-0" X
10'-0"
3'3'
11'-8"
10'-
6"
SID
E E
NT
RY
GOVT. CASH
UP
ME
TE
R B
OX
LA
DIE
S T
OILE
T
16'-0" X
6'-6"
D
D3 D
3 D3 D3
D3
D3
D3
D3
D3
D3
D3
D3
D1
D2
D2
D5
D5 D5
D5
D5
D5
W3
W3
W3
W3
W4 W4 W
4
W4
W4
W4
W4
W4
W4
W4
W4
V3
V3
V3
V4
V4
V4
V4
V4
V3
V3
V3
V3
V4
V4
V4
V4 V
4
WATER
W5
W5
W5
W5
W6
15" THICK
1
2
BK. WALL ALL
ROUND THE EXTERNAL
WALL, REFER DETAIL
R.C.C COLUMN AS
STRUCTURAL DWGS.
12" T
HK
R.C
.C
. W
ALL
9" THK. BRICK WALL
PLASTERED
R
.C
.C
. JA
LI
R.C.C. JALI
12
" T
HK
R
.C
.C
. W
AL
L
9" T
HK
R.C
.C
. W
ALL
62' [29.29]
62'
41'-6" [19.61]
18'-6"
5'
34' [16.06]
245'
140'
215'
1
4
6
'
C Y C L E S H E D FOR
50 CYCLES
CO
MP
OU
ND
G
AT
E
CO
MP
OU
ND
G
AT
E
C
O
M
P
O
U
N
D
G
A
T
E
I.C.
I.C.
I.C.
I.C.
I.C.
I.C.I.C.
I.C.
I.C.
I.C.
I.C.
I.C.
I.C.
I.C.
I.C.
I.C.
I.C.
I.C.
I.C.
SOAK
PIT
SEPTIC
TANK
13'-4
1
2"
22'-11
1
2"
13'-4
1
2"
32'-11
3
4" [15.58]
10'-9"
14'-9"
1
5
' W
ID
E
P
R
O
P
O
S
E
D
R
O
A
D
BED ROOM
15'-0" X 12'-0"
LIVING AREA
12'-0" X 12'-0"
PASSAGE
11'-3" X 7'-0"
W.R
4' X 4'
STORE
10'-6" X 7'-0"
DINING
12'-0" X 12'-0"
SERVANT'S
ROOM
10'-0" X 11'-0"
GARAGE
10'-0" X 20'-0"
VERANDAH
12'-0" X 9'-6"
13'-3" x 8'-0"
VE
RA
ND
AH
EN
TR
AN
CE
V
ER
AN
DA
H
BED ROOM
15'-0" X 12'-0"
13'-3" x 8'-0"
VE
RA
ND
AH
BED ROOM
15'-0" X 12'-0"
I.W.C
4' X 3'
KITCHEN
10'-6" X 11'-0"
I.W.C
5' X 3'
TOILET
9'-0" X 6'-0"
BATH
9'-0" X 4'-0"
VERANDAH
12'-0" X 9'-6"
T
OI/B
AT
H
4'-0" X
12'-0"
9"
D1
W1V1
W2V2
W1V1
W1V1
W2V2
W1
V1
W1
V1
W2
V2
W1V1
10'-2" [4.80]
UP
UP
UP
UP
A'
A
UP
B'
B
C C'
R
.C
.C
. JA
LI
22'-9" [10.75]3'-4"
67'-6" [31.89]
10'-7"
PA
SS
AG
E 2
5'-6" X
14'-0"
14'
5'-6"
68'-10
1
2" [32.54]
10'-7" [5.00]
ELEVATION FACING EAST
SECTION C-C'
2'2' 3'
4'
3'4'
2'2'
13
'1
3'
PLINTH LVL
+0.75M
FIRST FLOOR LVL
+4.72M
TERRACE FLOOR LVL
+8.68M
2'-6
"
13
'1
3'
3'-6
"
3'-6
"
3'
6'-3"
3'
3'
2'2'
3'-6
"
2'2'
W1
V1
W2
V2
W1
V1
W1
V1
W2
V2
W1
V1
W1
V1
W2
V2
W1
V1
W1
V1
W2
V2
W1
V1
W1
V1
W2
V2
W1
V1
W1
V1
W2
V2
W1
V1
PLINTH LVL
+0.75M
FIRST FLOOR LVL
+4.72M
TERRACE FLOOR LVL
+8.68M
TERRACE BELOW
36'-0" X 16'-0"
R.C.C. JALI
DN
4'
4' 4'
R.C.C. JALI
4'-3"
CA
NO
PY
O
VE
R E
NT
RA
NC
E
VE
RA
ND
AH
50' [23.62]
TERRACE BELOW
76'-0" X 24'-3"
DN
D3
D3
90
'-1
" [4
2.5
6]
73
'-6
1
2" [3
4.7
4]
6'-3" [2.95]
16
'-9
" [7
.9
1]
25'-3" [11.93]
16
' [7
.5
6]
36'-9" [17.36]
25
' [1
1.8
1]
75' [35.43]
14
'-4
1
2" [6
.7
9]77'-1" [36.42]
TERRACE
81'-0" X 81'-11"
81
'-1
1" [3
8.7
0]
81'-0
3
4" [38.29]
22'-
9"
4'-1" 4'
11'-
5"6'
-8"
4'-8
"
4'-2"
19'-
63 4"1'-
6"
23
'-6
" [1
1.1
0]
23'-9" [11.22]
60'-6" [28.58]
75'-0
3
4" [35.46]
49'-3" [23.27]
72
'-9
1
2" [3
4.3
9]
TERRACE
60'-6" X 39'-6"
39
'-6
" [1
8.6
6]
4'
2'
2'
DN
D3
B'
B
C C'
A'
A
27'-6" [12.99]
4'-3
3
4" [2.03]
R
.C
.C
. JA
LI
+9.75M
6'-8
"
DATE :
DRAWING NO: 1/4
PARELKAR OVALEKAR PARPIAARCHITECTS AND INTERIOR DESIGNERSNAGINDAS MASTER ROAD,FORT, MUMBAITEL: 22673725 / 22675840Email : [email protected]
SCALE :- 1/8" = 1'-0"
24/11/1970
TERRACE FLOOR PLAN
REV NO: DATE: DISCRIPTION:
1 23/08/2016 ADDITION OF PROPOSED FIRSTFLOOR ON EXISTING
V
6
STATE BANK OF INDIA
BETUL - BRANCH
PROPOSED EXTENSION ON FIRST FLOOR
SUBJECT: SITE PLAN,TERRACE FLOORPLAN,ELEVATION,SECTION
SITE PLAN (NTS)
ELEVATION FACING NORTH
PLINTH LVL
+0.75M
FIRST FLOOR LVL
+4.72M
TERRACE FLOOR LVL
+8.68M
3'4'
2'2'
+9.75M
13
'1
3'
10
'
3'-6
"
3'-6
"
13'
3'-6
"13
'
APPROVED QUALITY
WATERPROOFING MATERIAL
OVER 4
1/2
" AV. BK. BAT COBA
LAID TO SLOPE.
APPROVED QUALITY
WATERPROOFING
MATERIAL OVER 4
1/2
" AV.
BK. BAT COBA LAID TO
SLOPE.
R.C. C PLINTH
BEAMS AS /
STRUCT. DRGS.
4
1
2
" THICK
CONC. BED
9" DRY RUBBLE PACKING
CONSOLIDATED
EARTH FILLING
W1
V1
W2
V2
W1
V1
W1
V1
W2
V2
W1
V1
W1
V1
W2
V2
W1
V1
RECORD ROOM
CUM STATIONARY
R.C.C. SLAB AS/
STRUCT. DWG
W2
V2
7'
7'7'
GLASS GLASS
7'
R.C.C CHHAJJA
PARAPET WALL
R.C.C. SLAB AS/
STRUCT. DWG
COMPOUND
WALL
COMPOUND
WALL
3'4'
2'2'
38
'-6
1
4"
3'4'
2'2'
13'
13'
SECTION B-B'
B A N K I N G H A L L
SECTION A-A'
2'-6
"
G.L
28
'2'
-
LEVEL + 2'-6"
4
1
2
" THICK
CONC. BED
9" DRY RUBBLE PACKING
CONSOLIDATED
EARTH FILLING
R.C. C PLINTH
BEAMS AS /
STRUCT. DRGS.
APPROVED QUALITY
WATERPROOFING MATERIAL
OVER 4
1/2
" AV. BK. BAT COBA
LAID TO SLOPE.
R.C.C. SLAB AS/
STRUCT. DWG
1
1
2
" THICK
FLOOR FINISH.
R.C.C MUSHROOM
COLUMN AS /
STRUCT. DRGS.
5'
B A N K I N G H A L L
7' 10'-
71 2"
13'
3'-6
"
P.L
4'1'-
6"
3'-6
"
7'
G.L
11'
2'
3'
LEVEL + 24'-6"
+0'-0"
4'
C O R R I D O R
3'
C O R R I D O R
LEVEL + 15'-6"
2' 2'
5'
5'
2'
2'-6"
3'-6
"
R.C.C. JALI
R.C.C. JALI
R.C.C. JALI
6
'-
3
"
RECORD ROOM
CUM STATIONARY
UPS SERVER
ROOM
CANTEEN PANTRY CORRIDOR
APPROVED QUALITY
WATERPROOFING MATERIAL
OVER 4
1/2
" AV. BK. BAT COBA
LAID TO SLOPE.
R.C.C. SLAB AS/
STRUCT. DWG
13'
11'
7'
7'
7'
ENTRANCE
CANOPY
LEVEL + 2'-6"
PLINTH LVL
+0.75M
FIRST FLOOR LVL
+4.72M
TERRACE FLOOR LVL
+8.68M
+9.75M
PLINTH LVL
+0.75M
FIRST FLOOR LVL
+4.72M
TERRACE FLOOR LVL
+8.68M
+9.75M
MID-LANDING
MID-LANDING
6'-6
"1
3'
DATE :
DRAWING NO: 4/4
PARELKAR OVALEKAR PARPIAARCHITECTS AND INTERIOR DESIGNERSNAGINDAS MASTER ROAD,FORT, MUMBAITEL: 22673725 / 22675840Email : [email protected]
SCALE :- 1/8" = 1'-0"
24/11/1970
REV NO: DATE: DISCRIPTION:
1 23/08/2016 ADDITION OF PROPOSED FIRSTFLOOR ON EXISTING
STATE BANK OF INDIA
BETUL - BRANCH
PROPOSED EXTENSION ON FIRST FLOOR
SUBJECT: SECTIONS,ELEVATIONS
13
'1
3'
10
'
2'-6
"
3'
4'
5'
2'
7'
3'-6
"3