11
1 TENDER DOCUMENT Price Bid PROPOSED AIRCONDITIONING WORK Saptagiri Grameena Bank AT HEAD OFFICE, VISHAL MART BUILDING, 3 RD FLOOR, VELLORE ROAD, CHITTOOR-517 001 DATE OF ISSUE: - 11.11.2021 TENDER SUBMISSION ON: - 02.12.2021 AT 3.00 P.M. TENDER OPENING: 02.12.2021 AT 3.30 P.M COMPLETION PERIOD 60 Days SAPTAGIRI GRAMEENA BANK Head office, Chittoor HEAD OFFICE, P.B.17, NAIDU BUILDINGS CHITTOOR-517 001, Ph: 08572-233598 Architects KANAMADI AND ASSOCIATES #58, First Floor, 11 th Cross, Malleswaram, Bangalore -560 003 Ph: 080 23347210, Email: [email protected]

PROPOSED AIRCONDITIONING WORK Saptagiri Grameena Bank

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROPOSED AIRCONDITIONING WORK Saptagiri Grameena Bank

1

TENDER DOCUMENT

Price Bid

PROPOSED AIRCONDITIONING WORK

Saptagiri Grameena Bank

AT

HEAD OFFICE, VISHAL MART BUILDING, 3RD

FLOOR, VELLORE ROAD, CHITTOOR-517 001

DATE OF ISSUE: - 11.11.2021

TENDER SUBMISSION ON: - 02.12.2021 AT 3.00 P.M.

TENDER OPENING: 02.12.2021 AT 3.30 P.M

COMPLETION PERIOD – 60 Days

SAPTAGIRI GRAMEENA BANK

Head office, Chittoor

HEAD OFFICE, P.B.17, NAIDU BUILDINGS CHITTOOR-517 001, Ph: 08572-233598

Architects

KANAMADI AND ASSOCIATES

#58, First Floor, 11th Cross, Malleswaram, Bangalore -560 003

Ph: 080 23347210, Email: [email protected]

Page 2: PROPOSED AIRCONDITIONING WORK Saptagiri Grameena Bank

2

ABSTRACT OF COST

SUBJECT: AIR-CONDITIONING WORK SAPTAGIRI GRAMEENA BANK, HEAD OFFICE, CHITTOOR

Details of tender amount quoted by the contractor:

Sr.No Particulars of works Amount

1 AIRCONDITIONING WORKS – PART-A Rs.

2 GST-28%

3 AIRCONDITIONING WORKS – PART-B Rs.

4 GST-18% RS.

3 GRAND TOTAL (1+2+3+4) = RS.

(Total Quoted Amount in Words)=__________________________________

Rate inclusive of all Material charges, Transportation, Local levies as applicable, Loading,

Unloading, Lifting- Shifting, Erection, Testing , Commissioning, Scaffolding, etc. as applicable.

Signature of Contractor with Seal

Page 3: PROPOSED AIRCONDITIONING WORK Saptagiri Grameena Bank

3

CONTENTS

INDEX PAGE NO

INSTRUCTION 3

SUMMARY 4

BILL OF QUANTITIES

DRAWINGS

Page 4: PROPOSED AIRCONDITIONING WORK Saptagiri Grameena Bank

4

INSTRUCTIONS

1. The Bill of Quantities shall be read in conjunction with the Drawings, Conditions of Contract and

Specifications, as these documents are jointly explanatory and descriptive of the works included

in the Contract.

2. General directions and descriptions of work and materials given elsewhere in the Contract

documents are not necessarily repeated in the Bill of Quantities. Reference is to be made to the

other documents for information.

3. The Contractor shall be deemed to have visited the site before preparing his Tender and to have

examined for himself the conditions under which the work will be priced and all other factors

affecting the execution of the work and the cost thereof.

4. The Quantities of work and material in the Bill of Quantities are not to be considered as limiting

or extending the scope of work to be done and materials to be supplied by the Contractor. The

quantities in the Bill of Quantities are an estimate of the amount work but the work will be

measured on completion and the contractor will be paid on the actual measurement of work

approved by the Architect.

5. Any special methods of measurements used are stated at the head of or in text of the Bills of

Quantities for the items affected. All other items are measured net in accordance with the

drawings and no allowance has been made for wastage. Unless otherwise specified

measurements shall be as per relevant Indian Standard.

6. A price or rate in figures is to be entered against the item in the Bill of Quantities, whether

quantities are stated or not. Item against which no price is entered will be considered as

covered by other prices or rates in the Bills.

7. The prices and rates interested are to be the full inclusive value of the works described under

the various items, including all costs and expenses which may be required for the completion of

the work described, together with all cost and obligations set forth or implied in the conditions of

Contract, Specifications and the Drawings.

8. Some finishing items may be quantity wise completely altered (either added or omitted) and the

same shall not affect any rates quotes.

9. Where prices have been entered against Lump sum items, payment for such affected items shall

be made in proportion to the extent to which works have been done at the time of billing and the

same is at discretion of the Architect.

10. “Providing and Fixing” shall mean that the Contractor has to provide such materials not being

procured and borne by the Bank, but which are required for the item and if no materials need be

provided by the Contractor, the rate shall be only for fixing of the component covered in the item.

Page 5: PROPOSED AIRCONDITIONING WORK Saptagiri Grameena Bank

5

11. Bidders of the tender should be in the panel of Indian Bank with a networth not less

than Rs.5.0 crore.

12. The Bidder should have undertaken such contract works continuously for the past 7

years.

13. The bidder should strictly follow the specifications and quality standards as noted in

the online terms.

14. The bidder should complete the entire work within the time frame as given by the

bank.

15. The bidder has to follow and co-ordinate with M/s Kanamadi & Associates, Architects

& Engineers, Bangalore who were enrolled in the panel of Indian Bank, or to follow

and co-ordinate with any other agency/ Architect approved by the bank from time to

time during the course of contract work.

16. The contractor should reduce the cost of the unit of work to the extent of unit of

work/item of interior/electrical/AC proposed to remove or delete during the course of

execution/ erection/ fixation of the above said unit of work/item/fixtures.

Signature of Contractor with Seal

Consultants

Kanamadi and Associates

Architects & Engineers

Page 6: PROPOSED AIRCONDITIONING WORK Saptagiri Grameena Bank

6

Malleshwaram, Bangalore -03

PROPOSED AC WORK OF SAPTAGIRI GRAMEENA BANK, HEAD OFFICE AT CHITTOOR

Bill of Quantity: AC

SL. NO.

DESCRIPTION UNIT QTY. RATE AMOUNT

I HIGH SIDE - PART -A

1 Supply of Variable Refrigerant Volume (VRF) Outdoor units for following capacity

a 26 HP Nos

2.00

2 Supply of Indoor units for following capacities.

Cassette unit

2.0 TR Nos

1.00

2.5 TR Nos

8.00

3.0 TR Nos

3.00

3.5 TR Nos

1.00

Ductable unit

6.0 TR Nos

2.00

3 Supply of Chorded remote Nos

2.00

4 Supply of Chord less remote Nos

22.00

5 Supply and installation of suitable refnut joints to connect the VRF indoor units with outdoor unit.

Nos

24.00

TOTAL - PART-A

LOWSIDE - PART -B

Page 7: PROPOSED AIRCONDITIONING WORK Saptagiri Grameena Bank

7

1 Lifting ,Shifting and Installation of outdoor units

28 HP Nos

2.00

2 Installation of FCU indoor units

Hiwall Nos

9.00

Cassette Nos

13.00

Ductable Nos

2.00

3 Installation of refnet joints Nos

24.00

4 supply and Insulation of HARD DRAWN Refrigerant Copper piping insulated with Nitrile Rubber Tubular insulation

Refrigeration Copper pipe sizes below

41.3mm OD (insulation =19 mm thick) Rmt

20.00

34.9mm OD (insulation =19 mm thick) Rmt

38.00

28.9mm OD (insulation =19 mm thick) Rmt

38.00

22.2mm OD (insulation =13 mm thick) Rmt

45.00

19.1mm OD (insulation =13 mm thick) Rmt

40.00

15.9mm OD (insulation =13 mm thick) Rmt

35.00

12.7mm OD (insulation =13 mm thick) Rmt

25.00

9.5mm OD (insulation =13 mm thick) Rmt

18.00

5 supply and Insulation of soft drawn Refrigerant Copper piping insulated with Nitrile Rubber Tubular insulation

15.9mm OD (insulation =13 mm thick) Rmt

60.00

Page 8: PROPOSED AIRCONDITIONING WORK Saptagiri Grameena Bank

8

12.7mm OD (insulation =13 mm thick) Rmt

30.00

9.5mm OD (insulation =13 mm thick) Rmt

60.00

6.35mm OD (insulation =13 mm thick) Rmt

30.00

6 Supply and Installation of cables.

2C x 0.75 Sqmm ( VRF Communication Cable )

Rmt

230.00

3C x 1.5 Sqmm ( power cable ) Rmt

72.00

4C x 16 Sqmm ( Power Cable ) Rmt

10.00

8 SWG Earthing wire Rmt

20.00

7 Testing and Commissioning of equipments / system with vacumization and pressure test & gas charging

Kgs

45.00

8 Supply and installation of GI Rectangular duct

24G Sqmt

200.00

22G Sqmt

60.00

9

Supply and installation of acoustic

insulation of thickness - 10mm - (5m

only from ac unit outlet)

Sqmt

20.00

9 Supply and installation of Thermal insulation 0f thickness - 13mm - Tail end insulation only last 5m duct

Sqmt

50.00

10 Supply and installtion of Grills with Collar damper

Sqmt

4.00

11 Supply and installtion of Grills without Collar damper

Sqmt

4.00

12 Supply and installation of Drain pipe

40mm - dia Rmt

Page 9: PROPOSED AIRCONDITIONING WORK Saptagiri Grameena Bank

9

15.00

32mm - dia Rmt

20.00

25mm - dia Rmt

80.00

13 Supply, installation outdoor unit stands (standard sizes) nos

2.00

14 Supply and installation of canvass connection

nos

3.00

15 Supply and installation of drain pump

nos

2.00

Signature of Contractor with Seal

Page 10: PROPOSED AIRCONDITIONING WORK Saptagiri Grameena Bank

10

Accepted makes of Equipment and materials of

Air Conditioning work

SN DESCRIPTION MAKE

1. AC units Voltas/Bluestar/ LG (Inverter type with R410A gas & Copper condensing coil)

2. Power cable Polycab/Havells/Finolex/Anchor or equivalent approved by the bank

3. CPVC Drain pipe Supreme/Astral or equivalent approved by the bank

4. Copper pipe Rajaco/Nishan/Tofaline/Mexflow/Mandeva or equivalent approved by the bank

5. Stabilizer V-Guard or equivalent approved by the bank

Signature of Contractor with Seal

Page 11: PROPOSED AIRCONDITIONING WORK Saptagiri Grameena Bank

11