Upload
franksh3147
View
220
Download
0
Embed Size (px)
Citation preview
8/14/2019 STaR Charts Slideshow Week2 Assignment, Part 3
http://slidepdf.com/reader/full/star-charts-slideshow-week2-assignment-part-3 1/12
STaRSTaR
ChartsCharts“Stay the course, light a star,
Change the world, where’eryou are.”
~ Richard Le Gallienne
8/14/2019 STaR Charts Slideshow Week2 Assignment, Part 3
http://slidepdf.com/reader/full/star-charts-slideshow-week2-assignment-part-3 2/12
AGENDA
• What is the Texas Star Chart?
• Why do we need it?
• Who uses it?
• Where does Annie Purl rank intechnology
performance?
• How does the STaR Chart measuresuccess?
• Conclusion
8/14/2019 STaR Charts Slideshow Week2 Assignment, Part 3
http://slidepdf.com/reader/full/star-charts-slideshow-week2-assignment-part-3 3/12
Texas School Technologyand Readiness Chart- STaR
• The Texas StaR chart is an onlineresource tool for self-assessment of GISD and Annie Purl’s efforts to
effectively integrate technologyacross the curriculum.
• It is aligned with the Texas Long-
Range Plan for Technology, 2006-2020.
8/14/2019 STaR Charts Slideshow Week2 Assignment, Part 3
http://slidepdf.com/reader/full/star-charts-slideshow-week2-assignment-part-3 4/12
The Texas Long-Range Planfor Technology 2006-2020
• Goal is to promote academic excellencefor all students.
Looks at 4 main areas:
1. Teaching and Learning (Focus onlearners.)
2. Educator Preparation andDevelopment
8/14/2019 STaR Charts Slideshow Week2 Assignment, Part 3
http://slidepdf.com/reader/full/star-charts-slideshow-week2-assignment-part-3 5/12
Why?
• To determine progress towardmeeting the goals of the TexasLong-Range Plan for Technology.
• To help meet the requirements of NoChild Left Behind (NCLB). Studentsmust be technology literate by the
end of the 8th grade.• To increase technology-based
accountability through targeted
planning and budgeting.
8/14/2019 STaR Charts Slideshow Week2 Assignment, Part 3
http://slidepdf.com/reader/full/star-charts-slideshow-week2-assignment-part-3 6/12
Who?
Teachers
• All teachers mustcomplete the
Texas STaRChart annually.
• This helpsdetermineneededprofessionaldevelopment in
Technology atthe campus and
district level.
District
• The Texas Campus STaRChart produces a profile of the campus toward
reaching the goals of theLong Range Plan for Technology and NCLB.
• http://www.tea.state.tx.us/starch
• The Texas Public STaR Chartallow all stakeholders toview the technologyreadiness of all campuses
across the state.
8/14/2019 STaR Charts Slideshow Week2 Assignment, Part 3
http://slidepdf.com/reader/full/star-charts-slideshow-week2-assignment-part-3 7/12
2006-2009 Annie Purl
8/14/2019 STaR Charts Slideshow Week2 Assignment, Part 3
http://slidepdf.com/reader/full/star-charts-slideshow-week2-assignment-part-3 8/12
Teaching and LearningScores of 6-8=Early Tech, 9-14=Developing Tech
15-20=Advanced Tech, 21-24=Target Tech
•
• Patterns of Classroom Use
• Frequency/Design of InstructionalSetting
• Content Are Connections
• Technology Applications TEKS
Implementation• Student Mastery of Technology
Applications
•
Online Learning
8/14/2019 STaR Charts Slideshow Week2 Assignment, Part 3
http://slidepdf.com/reader/full/star-charts-slideshow-week2-assignment-part-3 9/12
Development
Scores of 6-8=Early Tech, 9-14=Developing Tech
15-20=Advanced Tech, 21-24=Target Tech
• Professional DevelopmentExperiences
• Models of Professional Development
• Capabilities of Educators
• Access to Professional Development
•
Levels of Understanding and Patternsof Use
• Professional Development for OnlineLearning
8/14/2019 STaR Charts Slideshow Week2 Assignment, Part 3
http://slidepdf.com/reader/full/star-charts-slideshow-week2-assignment-part-3 10/12
Leadership, Administration,
and Instructional SupportScores of 6-8=Early Tech, 9-14=Developing Tech, 15-20=Advanced Tech,
21-24=Target Tech
• Leadership and Vision
• Planning
•
Instructional Support• Communication and Collaboration
• Budget
•
Leadership and Support for OnlineLearning
Focus: ALL Leaders
8/14/2019 STaR Charts Slideshow Week2 Assignment, Part 3
http://slidepdf.com/reader/full/star-charts-slideshow-week2-assignment-part-3 11/12
Infrastructure forTechnology
Scores of 6-8=Early Tech, 9-14=Developing Tech, 15-20=Advanced Tech, 21-24=Target Tech
• Students per Computers
• Internet Access Connectivity Speed
•
Other Classroom Technology• Technical Support
• Local Area Network Wide Area
Network• Distance Learning Capacity
Focus: Infrastructure System
8/14/2019 STaR Charts Slideshow Week2 Assignment, Part 3
http://slidepdf.com/reader/full/star-charts-slideshow-week2-assignment-part-3 12/12
In Conclusion…
• Our students must becomeproductive, self-sufficient citizens inthe technologically-driven world of
the 21stCentury. It is ourresponsibility to give them the skillsand tools needed for success.
•
We must stay the course, light theirstars, and
meet the world where our students