9
related drawings: Pe n Ta b l e Po t Dr v e r : Fe Pa t h : Pr i n t e d by 12 10 19 PM a t 16 / 08 / 2012 on PAV_ BL ACK_ GREY. t b PAV_ PDF. p lt c f g G:\ Op s \ Pa v e me n t s \ J ob s \ Fe x b e Pa v e me n t s \ c u rr e n t p r o j ec t s \ Typ p a vd r a i n a g e d r g e d3 r e v2 P1347 \ 1 . W o r k \ VOL UME 6 - SUPPLEMENTARY MODELDRAW NGS\ MD_ R33_ R38_ Titl e . dgn t e tl e r ob VOLUME 6 - SUPPLEMENTARY MODEL DRAWINGS VOLUME 5 - RIGID PAVEMENT DETAILS VOLUME 3 - FULL DEPTH ASPHALT PAVEMENT DETAILS VOLUME 2 - GRANULAR PAVEMENT WITH BITUMINOUS SURFACING DETAILS VOLUME 4 - ASPHALT OVER BOUND SUBBASE PAVEMENT DETAILS VOLUME 1 - DESIGN AND LOCATION DRAINAGE DETAILS STANDARD PAVEMENT SUBSURFACE ' COPYRIGHT ROADS AND MARITIME SERVICES NETWORK MANAGEMENT ENGINEERING TECHNOLOGY PAVEMENT STRUCTURES SECTION PREPARED BY: SHEET No No OF SHEETS 02 0000.000.PT.0014 ISSUE ED3 REV 2 No OF VOLUMES 6 VOLUME No 6 REGISTRATION No OF PLANS 01 AND GEOTECHNICAL ENGINEER PRINCIPAL ROAD PAVEMENT SIGNED DATE SIGNED DATE J. ALLEN G. VOROBIEFF TECHNOLOGIST (FLEXIBLE PAVEMENTS) SUPERVISING PAVEMENT RECOMMENDED FOR APPROVAL APPROVED FOR USE

STANDARD PAVEMENT SUBSURFACE DRAINAGE DETAILS - … · 6 volume no 6 and geotechnical engineer principal road pavement approved for use network management engineering technology prepared

Embed Size (px)

Citation preview

Page 1: STANDARD PAVEMENT SUBSURFACE DRAINAGE DETAILS - … · 6 volume no 6 and geotechnical engineer principal road pavement approved for use network management engineering technology prepared

related drawings:

PenTable :

PlotDriver :

FilePath :

Printe

d b

y

12:1

0:1

9 P

Mat

16/0

8/2

012

on

PA

V_

BL

AC

K_

GR

EY.tbl

PA

V_P

DF.pltcfg

G:\

Ops\P

ave

ments\J

obs\Fle

xible P

ave

ments\c

urrent projects\T

yp p

av drainage drg e

d3 rev2 P

1347\1.

Work\V

OL

UM

E 6 - S

UP

PLE

ME

NT

AR

Y M

OD

EL D

RA

WIN

GS\M

D_

R33_

R38_Title.d

gn

tetlero

b

VOLUME 6 - SUPPLEMENTARY MODEL DRAWINGS

VOLUME 5 - RIGID PAVEMENT DETAILS

VOLUME 3 - FULL DEPTH ASPHALT PAVEMENT DETAILS

VOLUME 2 - GRANULAR PAVEMENT WITH BITUMINOUS SURFACING DETAILS

VOLUME 4 - ASPHALT OVER BOUND SUBBASE PAVEMENT DETAILS

VOLUME 1 - DESIGN AND LOCATION

DRAINAGE DETAILS

STANDARD PAVEMENT SUBSURFACE

' COPYRIGHT ROADS AND MARITIME SERVICES

NETWORK MANAGEMENT

ENGINEERING TECHNOLOGY

PAVEMENT STRUCTURES SECTION

PREPARED BY:

SHEET No

No OF SHEETS

02

0000.000.PT.0014ISSUE

ED3 REV 2

No OF VOLUMES

6

VOLUME No

6

REGISTRATION No OF PLANS

01AND GEOTECHNICAL ENGINEER

PRINCIPAL ROAD PAVEMENT

SIGNED DATE

SIGNED DATE

J. ALLEN

G. VOROBIEFF

TECHNOLOGIST (FLEXIBLE PAVEMENTS)

SUPERVISING PAVEMENT

RECOMMENDED FOR APPROVAL

APPROVED FOR USE

tetlerob
Stamp
Page 2: STANDARD PAVEMENT SUBSURFACE DRAINAGE DETAILS - … · 6 volume no 6 and geotechnical engineer principal road pavement approved for use network management engineering technology prepared

02

REVISION REGISTER AND INDEX

0000.000.PT.0014

02ED3 REV 2

PenTable :

PlotDriver :

FilePath :

Printe

d b

y

12:1

0:2

0 P

Mat

16/0

8/2

012

on

PA

V_

BL

AC

K_

GR

EY.tbl

PA

V_P

DF.pltcfg

G:\

Ops\P

ave

ments\J

obs\Fle

xible P

ave

ments\c

urrent projects\T

yp p

av drainage drg e

d3 rev2 P

1347\1.

Work\V

OL

UM

E 6 - S

UP

PLE

ME

NT

AR

Y M

OD

EL D

RA

WIN

GS\M

D_

R33_

R38_

RE

V.d

gn

tetlero

b

SHEET No

No OF SHEETS

' COPYRIGHT ROADS AND MARITIME SERVICESTHIS SHEET MAY BE PREPARED USING COLOUR AND MAY BE INCOMPLETE IF COPIED

REGISTRATION NUMBER

ISSUE No OF VOLUMES

6

VOLUME No

6AND GEOTECHNICAL ENGINEER

PRINCIPAL ROAD PAVEMENT

APPROVED FOR USE

NETWORK MANAGEMENT

ENGINEERING TECHNOLOGY

PREPARED BY: PAVEMENT STRUCTURES SECTION

G. VOROBIEFF

16/08/2012SUPPLEMENTARY MODEL DRAWINGS

STANDARD PAVEMENT SUBSURFACE DRAINAGE DETAILSA3 ORIGINAL

ISSUE DATE AUTHPREPAMENDMENT DESCRIPTION

ISSUE STATUS:

CHCK

FOR AMENDMENTS REFER TO SHEET No 02

FOR USE

ED/REV

ALL

ALL

SHEET ISSUE DETAIL

INITIAL SETUP

COMPLETE REVISION

AUTHORISED DATE

PRP&GE 28.10.2010

-

*

* DENOTES PRINCIPAL ROAD PAVEMENT AND GEOTECHNICAL ENGINEER

REGISTRATION No

0000.000.PT.0014

SHEET DESCRIPTION

1 COVER SHEET

0000.000.PT.0014 2

1

1

1

1

1

2

1 STAGE CONSTRUCTION OF TRENCH DRAIN

1

1

1 INTRA-PAVEMENT DRAINS

1

1

2

EDGE DRAINS

EDGE DRAINS

CLEANOUT STRUCTURES FOR 100 mm SUBSURFACE DRAINS

CLEANOUT STRUCTURES FOR 65 mm SUBSURFACE DRAINS

MD.R33.A01.A.1

MD.R33.A02.A

MD.R33.A03.A SUBSURFACE DRAIN FLUSHING AND INSPECTION STRUCTURES

1

MD.R33.A05.A.2 TYPICAL CROSS SECTION OF TRENCH DRAINS

COMBINED STORMWATER AND SUBSURFACE DRAINAGE LAYOUT

DETAILS OF MARKER PEG SUBSURFACE DRAINAGE

MD.R37.A02.A TYPICAL DRAINAGE LAYER APPLICATIONS

DENOTES DRAWINGS HAVE BEEN WITHDRAWN

3/0

MINOR REVISION3/1 PRP&GE*1 - 2

MD.R37.A01.B.2

MD.R38.A01.D.1

MD.R38.A01.D.1

REVISION REGISTER AND INDEX

BATTER OUTLET STRUCTURES FOR SUBSURFACE DRAINSMD.R33.A04.D.0

MD.R33.A06.B.2

MD.R33.A06.B.2

MD.R33.A07.B.2

MD.R33.A08.B.2

15.04.2011

2 BATTER OUTLET STRUCTURES FOR SUBSURFACE DRAINSMD.R33.A04.D.0

MD.R33.A09.A.0

3/2 PRP&GE*ALL COMPLETE REVISION 16/08/2012

REVISION REGISTER INDEX

DETAILS FOR TRENCH DRAINS

DETAILS FOR TRENCH DRAINS

Page 3: STANDARD PAVEMENT SUBSURFACE DRAINAGE DETAILS - … · 6 volume no 6 and geotechnical engineer principal road pavement approved for use network management engineering technology prepared

02

01

ED D REV 0

MD.R33.A04

BTC/1 TITLE BLOCK, MINOR REVISION15.04.2011

D/0 TITLE BLOCK, MINOR REVISION BT16/08/2012

JA

JA

GV

GV

FOR SUBSURFACE DRAINS

BATTER OUTLET STRUCTURES

NOTES

ALL DIMENSIONS IN MILLIMETRES UNLESS SHOWN OTHERWISE.2.

ALL CONCRETE N20.1.

PenTable :

PlotDriver :

FilePath :

Printe

d b

y

12:1

0:2

0 P

Mat

16/0

8/2

012

on

PA

V_

BL

AC

K_

GR

EY.tbl

PA

V_P

DF.pltcfg

G:\

Ops\P

ave

ments\J

obs\Fle

xible P

ave

ments\c

urrent projects\T

yp p

av drainage drg e

d3 rev2 P

1347\1.

Work\V

OL

UM

E 6 - S

UP

PLE

ME

NT

AR

Y M

OD

EL D

RA

WIN

GS\M

D_

R33_

A04_

D_1.d

gn

tetlero

b

SHEET No

No OF SHEETS

' COPYRIGHT ROADS AND MARITIME SERVICESTHIS SHEET MAY BE PREPARED USING COLOUR AND MAY BE INCOMPLETE IF COPIED

REGISTRATION NUMBER

ISSUE No OF VOLUMES

6

VOLUME No

6AND GEOTECHNICAL ENGINEER

PRINCIPAL ROAD PAVEMENT

APPROVED FOR USE

NETWORK MANAGEMENT

ENGINEERING TECHNOLOGY

PREPARED BY: PAVEMENT STRUCTURES SECTION

G. VOROBIEFF

16/08/2012SUPPLEMENTARY MODEL DRAWINGS

STANDARD PAVEMENT SUBSURFACE DRAINAGE DETAILSA3 ORIGINAL

ISSUE DATE AUTHPREPAMENDMENT DESCRIPTION

ISSUE STATUS:

CHCK

FOR AMENDMENTS REFER TO SHEET No 02

FOR USE

ELEVATION

PLAN

1

-

1

-

STEEP BATTERSTEEPER THAN 4 HOR : 1 VER

100400100

425

600

75

75

150

275

25

75

75TO SUIT BATTER SLOPE

6 mm REINFORCING BAR

6 mm REINFORCING BAR UNSLOTTED PIPE

WING WALL

RODENT PROOF MESH COVER

DEMOUNTABLE GALVANISED

180

300

PLAN

FLAT BATTER

ELEVATION

2

-

2

-

520

440

55

25 45

6 mm REINFORCING BAR

WING WALL

200

630

45

630

RODENT PROOF MESH COVER

DEMOUNTABLE GALVANISED

6 mm REINFORCING BAR6 mm REINFORCING BAR

RODENT PROOF MESH COVER

DEMOUNTABLE GALVANISED

6 mm REINFORCING BAR

4 HOR : 1 VER OR FLATTER

SCALE 1:10

SECTION

SCALE 1:10 -

1

SECTION

SCALE 1:10 -

2

75

TO S

UIT B

AT

TE

R S

LO

PE

75

SCALE 1:10

SCALE 1:10

SCALE 1:10

45 45

130

250

UNSLOTTED PIPE

Page 4: STANDARD PAVEMENT SUBSURFACE DRAINAGE DETAILS - … · 6 volume no 6 and geotechnical engineer principal road pavement approved for use network management engineering technology prepared

02

02

ED D REV 0

MD.R33.A04

AS SPECIFIED

FILTER MATERIAL

RIGHT ANGLES ACROSS SHOULDER TO OUTLET)

(USED WHERE SUBSURFACE DRAIN TURNED AT

PLAN OF JOINT

3

-

3

-

SELECTED BACK FILL MATERIAL

OUTLET

VE

RG

EP

AV

EM

EN

T

PLASTIC DRAINAGE PIPE

CORRUGATED NON-PERFORATED

C/1

D/0

15.04.2011

16/08/2012

TITLE BLOCK, MINOR REVISION

TITLE BLOCK, MINOR REVISION

BT

BT

JA

JA

GV

GV

FOR SUBSURFACE DRAINS

BATTER OUTLET STRUCTURES

NOTES

ALL DIMENSIONS IN MILLIMETRES UNLESS SHOWN OTHERWISE.3.

ASSOCIATED WITH UTILITIES.

ENSURE DEPTH OF OUTLET IS SUFFICIENT TO CATER FOR ANY FUTURE TRENCHING2.

ALL CONCRETE N20.1.

PLASTIC DRAINAGE PIPE

CORRUGATED PERFORATED

1.0m SWEEP BENDR

PenTable :

PlotDriver :

FilePath :

Printe

d b

y

12:1

0:2

1 P

Mat

16/0

8/2

012

on

PA

V_

BL

AC

K_

GR

EY.tbl

PA

V_P

DF.pltcfg

G:\

Ops\P

ave

ments\J

obs\Fle

xible P

ave

ments\c

urrent projects\T

yp p

av drainage drg e

d3 rev2 P

1347\1.

Work\V

OL

UM

E 6 - S

UP

PLE

ME

NT

AR

Y M

OD

EL D

RA

WIN

GS\M

D_

R33_

A04_

D_2.d

gn

tetlero

b

SHEET No

No OF SHEETS

' COPYRIGHT ROADS AND MARITIME SERVICESTHIS SHEET MAY BE PREPARED USING COLOUR AND MAY BE INCOMPLETE IF COPIED

REGISTRATION NUMBER

ISSUE No OF VOLUMES

6

VOLUME No

6AND GEOTECHNICAL ENGINEER

PRINCIPAL ROAD PAVEMENT

APPROVED FOR USE

NETWORK MANAGEMENT

ENGINEERING TECHNOLOGY

PREPARED BY: PAVEMENT STRUCTURES SECTION

G. VOROBIEFF

16/08/2012SUPPLEMENTARY MODEL DRAWINGS

STANDARD PAVEMENT SUBSURFACE DRAINAGE DETAILSA3 ORIGINAL

ISSUE DATE AUTHPREPAMENDMENT DESCRIPTION

ISSUE STATUS:

CHCK

FOR AMENDMENTS REFER TO SHEET No 02

FOR USE

FILTER MATERIAL AS SPECIFIED SELECTED BACK FILL MATERIAL

PAVEMENT VERGE MATERIAL

SECTION

NTS -

3

1 000 1 000100

PLASTIC DRAINAGE PIPE

CORRUGATED PERFORATED

PLASTIC DRAINAGE PIPE

CORRUGATED NON-PERFORATED

Page 5: STANDARD PAVEMENT SUBSURFACE DRAINAGE DETAILS - … · 6 volume no 6 and geotechnical engineer principal road pavement approved for use network management engineering technology prepared

02

01

ED B REV 2

MD.R33.A06

B/1

B/2

15.04.2011

16/08/2012

TITLE BLOCK, MINOR REVISION

TITLE BLOCK, MINOR REVISION

BT

BT

JA

JA

GV

GV

NOTE

ALL DIMENSIONS IN MILLIMETRES UNLESS SHOWN OTHERWISE.1.

DETAILS FOR TRENCH DRAINS

PenTable :

PlotDriver :

FilePath :

Printe

d b

y

12:1

0:2

2 P

Mat

16/0

8/2

012

on

PA

V_

BL

AC

K_

GR

EY.tbl

PA

V_P

DF.pltcfg

G:\

Ops\P

ave

ments\J

obs\Fle

xible P

ave

ments\c

urrent projects\T

yp p

av drainage drg e

d3 rev2 P

1347\1.

Work\V

OL

UM

E 6 - S

UP

PLE

ME

NT

AR

Y M

OD

EL D

RA

WIN

GS\M

D_

R33_

A06_

B_P

T1.d

gn

tetlero

b

SHEET No

No OF SHEETS

' COPYRIGHT ROADS AND MARITIME SERVICESTHIS SHEET MAY BE PREPARED USING COLOUR AND MAY BE INCOMPLETE IF COPIED

REGISTRATION NUMBER

ISSUE No OF VOLUMES

6

VOLUME No

6AND GEOTECHNICAL ENGINEER

PRINCIPAL ROAD PAVEMENT

APPROVED FOR USE

NETWORK MANAGEMENT

ENGINEERING TECHNOLOGY

PREPARED BY: PAVEMENT STRUCTURES SECTION

G. VOROBIEFF

16/08/2012SUPPLEMENTARY MODEL DRAWINGS

STANDARD PAVEMENT SUBSURFACE DRAINAGE DETAILSA3 ORIGINAL

ISSUE DATE AUTHPREPAMENDMENT DESCRIPTION

ISSUE STATUS:

CHCK

FOR AMENDMENTS REFER TO SHEET No 02

FOR USE

SIDE OF TRENCH

INFILTRATION FROM

FIGURE A

TOP OF TRENCH

INFILTRATION FROM

FIGURE B

500

OVERLAP

MINIMUM

GEOTEXTILE

100

WHERE SPECIFIED)

(OR NO FINES CONCRETE

AGGREGATE FILTER MATERIAL

OVERLAP LENGTH = W

100

GEOTEXTILE

150mm RIGID STRIP FILTER

DRAINAGE PIPE OR

PERFORATED PLASTIC

100 DIA CORRUGATED 150mm RIGID STRIP FILTER

DRAINAGE PIPE OR

PERFORATED PLASTIC

100 DIA CORRUGATED

WHERE SPECIFIED)

(OR NO FINES CONCRETE

AGGREGATE FILTER MATERIAL

300

FABRIC AT TOP OF TRENCH

SINGLE LAYER OF GEOTEXTILE

GEOTEXTILE

OF TRENCH LENGTH

OF GEOTEXTILE PER METRE

CALCULATION OF AREA

FIGURE C

DIRECTION OF TRENCH AND FLOW

DE

PT

H (

D)

WIDTH (W)

FOR FIGURE B; AREA = 2(D+W+300)

FOR FIGURE A; AREA = 2D+3W

AREA/METRE LENGTH OF FABRIC USED (CALCULATED TO INCLUDE LAPS).

DE

PT

H (

D)

WIDTH (W)

Page 6: STANDARD PAVEMENT SUBSURFACE DRAINAGE DETAILS - … · 6 volume no 6 and geotechnical engineer principal road pavement approved for use network management engineering technology prepared

02

02ED B REV 2

MD.R33.A06

1 15.04.2011 TITLE BLOCK, MINOR REVISION BT JA GV DETAILS FOR TRENCH DRAINS

NOTES

All dimensions in millimetres unless shown otherwise.g.

For grades greater than 2% the maximum outlet spacing can be increased to 120m.f.

Pipe can be either 100 nominal diameter corrugated perforated plastic pipe or 150 high rigid strip filter.e.

the pipe must be enclosed in a seamless tubular filter fabric.

Where Class F5 or Class F7 aggregate filter material are used with a corrugated perforated plastic drainage pipe,d.

with fines.

Where Class F5 aggregate filter material is used, a pipe must be used due to the likelihood of the drain cloggingc.

No fines concrete can be substituted for any grade aggregate filter material.b.

or as specified elsewhere.

with seamless tubular fabric filter or 300 rigid strip filter wrapped in geotextile. Maximum outlet spacing of 50m

with F20 aggregate and corrugated perforated plastic drainage pipes (2x100 on low side and 1x100 on high side)

Trench drains used to drain pavement drainage layers are to be 500 wide and extend 500 below drainage layera.

PenTable :

PlotDriver :

FilePath :

Printe

d b

y

12:1

0:2

2 P

Mat

16/0

8/2

012

on

PA

V_

BL

AC

K_

GR

EY.tbl

PA

V_P

DF.pltcfg

G:\

Ops\P

ave

ments\J

obs\Fle

xible P

ave

ments\c

urrent projects\T

yp p

av drainage drg e

d3 rev2 P

1347\1.

Work\V

OL

UM

E 6 - S

UP

PLE

ME

NT

AR

Y M

OD

EL D

RA

WIN

GS\M

D_

R33_

A06_

B_P

T2.d

gn

tetlero

b

SHEET No

No OF SHEETS

' COPYRIGHT ROADS AND MARITIME SERVICESTHIS SHEET MAY BE PREPARED USING COLOUR AND MAY BE INCOMPLETE IF COPIED

REGISTRATION NUMBER

ISSUE No OF VOLUMES

6

VOLUME No

6AND GEOTECHNICAL ENGINEER

PRINCIPAL ROAD PAVEMENT

APPROVED FOR USE

NETWORK MANAGEMENT

ENGINEERING TECHNOLOGY

PREPARED BY: PAVEMENT STRUCTURES SECTION

G. VOROBIEFF

16/08/2012SUPPLEMENTARY MODEL DRAWINGS

STANDARD PAVEMENT SUBSURFACE DRAINAGE DETAILSA3 ORIGINAL

ISSUE DATE AUTHPREPAMENDMENT DESCRIPTION

ISSUE STATUS:

CHCK

FOR AMENDMENTS REFER TO SHEET No 02

FOR USE

OPTIONS FOR TRENCH DRAINS

0.5 to = 1.0

> 1.0 to = 3.0

> 3.0 to = 5.0

> 5.0

(%)

Grade

Drain

(m)

Spacing

Outlet

Maximum

50

200 300 500 F20 F14 F10 F7 F5

100f

120

120

a

b

d c,d

Material size

Minimum Aggregate Filter

(mm)Trench Width W

eYesNo

Required

Pipe

Page 7: STANDARD PAVEMENT SUBSURFACE DRAINAGE DETAILS - … · 6 volume no 6 and geotechnical engineer principal road pavement approved for use network management engineering technology prepared

01

01

ED B REV 2

MD.R33.A07

STAGE CONSTRUCTION OF TRENCH DRAIN15.04.2011

16/08/2012 TITLE BLOCK, MINOR REVISION

TITLE BLOCK, MINOR REVISION

BT

BT JA GV

GVJA

1

2

NOTES

ALL DIMENSIONS IN MILLIMETRES UNLESS SHOWN OTHERWISE.2.

STRIP FILTER.

100mm DIA CORRUGATED PERFORATED PLASTIC DRAINAGE PIPE MAY BE REPLACED WITH A RIGID1.

PenTable :

PlotDriver :

FilePath :

Printe

d b

y

12:1

0:2

3 P

Mat

16/0

8/2

012

on

PA

V_

BL

AC

K_

GR

EY.tbl

PA

V_P

DF.pltcfg

G:\

Ops\P

ave

ments\J

obs\Fle

xible P

ave

ments\c

urrent projects\T

yp p

av drainage drg e

d3 rev2 P

1347\1.

Work\V

OL

UM

E 6 - S

UP

PLE

ME

NT

AR

Y M

OD

EL D

RA

WIN

GS\M

D_

R33_

A07_

B.d

gn

tetlero

b

SHEET No

No OF SHEETS

' COPYRIGHT ROADS AND MARITIME SERVICESTHIS SHEET MAY BE PREPARED USING COLOUR AND MAY BE INCOMPLETE IF COPIED

REGISTRATION NUMBER

ISSUE No OF VOLUMES

6

VOLUME No

6AND GEOTECHNICAL ENGINEER

PRINCIPAL ROAD PAVEMENT

APPROVED FOR USE

NETWORK MANAGEMENT

ENGINEERING TECHNOLOGY

PREPARED BY: PAVEMENT STRUCTURES SECTION

G. VOROBIEFF

16/08/2012SUPPLEMENTARY MODEL DRAWINGS

STANDARD PAVEMENT SUBSURFACE DRAINAGE DETAILSA3 ORIGINAL

ISSUE DATE AUTHPREPAMENDMENT DESCRIPTION

ISSUE STATUS:

CHCK

FOR AMENDMENTS REFER TO SHEET No 02

FOR USE

STAGE 1

OF SELECTED MATERIAL

CONSTRUCT BEFORE PLACEMENT

STAGE 3

EXTEND GEOTEXTILE AND BACKFILL WITH FILTER MATERIAL

TRENCH THROUGH SELECTED MATERIAL ZONE AND PLUG

STAGE 2

PLACE SELECTED MATERIAL.

SELECTED MATERIAL ZONE

STAGE 4

SELECTED MATERIAL ZONE

PAVEMENT LAYERS (PLACED AFTER CONSTRUCTION OF TRENCH DRAIN)

FINISHED SURFACE LEVEL

PLACE PAVEMENT LAYERS

50

100

300 M

IN

PLASTIC SHEETING

SACRIFICIAL GEOTEXTILE LAYER OR

COVER GEOTEXTILE OVERLAP WITH A

PLUG OF SELECTED FILL MATERIAL

GEOTEXTILE

FILTER MATERIAL

PLASTIC DRAINAGE PIPE

100 DIA CORRUGATED PERFORATED

100

300 M

IN

SELECTED MATERIAL ZONE

FILTER MATERIAL

GEOTEXTILE

PLASTIC DRAINAGE PIPE

100 DIA CORRUGATED PERFORATED

300 M

IN

50

100

300 M

IN

PLUG OF SELECTED FILL MATERIAL

GEOTEXTILE

FILTER MATERIAL

PLASTIC DRAINAGE PIPE

100 DIA CORRUGATED PERFORATED

300 M

IN

100

300 M

IN

FILTER MATERIAL

GEOTEXTILE

PLASTIC DRAINAGE PIPE

100 DIA CORRUGATED PERFORATED

300 M

IN

Page 8: STANDARD PAVEMENT SUBSURFACE DRAINAGE DETAILS - … · 6 volume no 6 and geotechnical engineer principal road pavement approved for use network management engineering technology prepared

01

01

ED B REV 2

MD.R33.A08

15.04.2011

16/08/2012 TITLE BLOCK, MINOR REVISION

TITLE BLOCK, MINOR REVISION BT

BT JA

JA GV

GV

1

2

SUBSURFACE DRAINAGE LAYOUT

COMBINED STORMWATER AND

NOTE

ALL DIMENSIONS IN MILLIMETRES UNLESS SHOWN OTHERWISE.1.

PenTable :

PlotDriver :

FilePath :

Printe

d b

y

12:1

0:2

4 P

Mat

16/0

8/2

012

on

PA

V_

BL

AC

K_

GR

EY.tbl

PA

V_P

DF.pltcfg

G:\

Ops\P

ave

ments\J

obs\Fle

xible P

ave

ments\c

urrent projects\T

yp p

av drainage drg e

d3 rev2 P

1347\1.

Work\V

OL

UM

E 6 - S

UP

PLE

ME

NT

AR

Y M

OD

EL D

RA

WIN

GS\M

D_

R33_

A08_

B.d

gn

tetlero

b

SHEET No

No OF SHEETS

' COPYRIGHT ROADS AND MARITIME SERVICESTHIS SHEET MAY BE PREPARED USING COLOUR AND MAY BE INCOMPLETE IF COPIED

REGISTRATION NUMBER

ISSUE No OF VOLUMES

6

VOLUME No

6AND GEOTECHNICAL ENGINEER

PRINCIPAL ROAD PAVEMENT

APPROVED FOR USE

NETWORK MANAGEMENT

ENGINEERING TECHNOLOGY

PREPARED BY: PAVEMENT STRUCTURES SECTION

G. VOROBIEFF

16/08/2012SUPPLEMENTARY MODEL DRAWINGS

STANDARD PAVEMENT SUBSURFACE DRAINAGE DETAILSA3 ORIGINAL

ISSUE DATE AUTHPREPAMENDMENT DESCRIPTION

ISSUE STATUS:

CHCK

FOR AMENDMENTS REFER TO SHEET No 02

FOR USE

UPSTREAM OF GULLY PITS

CROSS SECTION OF PIPE LAYOUTS

NOT TO SCALE

TRENCH DRAIN

STORMWATER PIPE

MIN

300

W

50

50

AND RUN TO THE NEXT OUTLET

NEAR THE SURFACE OF THE PIT

SUBSURFACE PIPE START AT OR

DRAINAGE PIPE

PERFORATED PLASTIC

CONNECT TO CORRUGATED

LAYOUTS AT GULLY PITNOT TO SCALE

DIRECTI

ON OF

FLOW

HEAD OF STORMWATER PIPE

DISCHARGE ABOVE HYDRAULIC

PLASTIC DRAINAGE PIPE

CORRUGATED PERFORATED

STORMW

ATER

PIPE

PIPE CAP

GULLY

PIT

WITH SPECIFICATION R11

IN ACCORDANCE

PIPE SUPPORT MATERIAL

WITH SPECIFICATION R11

IN ACCORDANCE

TRENCH BACKFILL MATERIAL

PIT WALL OR HEADWALL TO DRAIN STORMWATER TRENCH

FILTER SOCK TO BE LAID FOR 3.0m UPSTREAM OF THE GULLY

CORRUGATED PERFORATED PLASTIC DRAINAGE PIPE WITH

PLASTIC DRAINAGE PIPE

NON-PERFORATED CORRUGATED3.0m

STORMWATER TRENCH

3.0m LONG TO DRAIN

PLASTIC DRAINAGE PIPE

CORRUGATED PERFORATED

SUBSURFACE DRAINAGE PIPE CONNECTIONS AT STORM WATER PITS

STORMWATER PIPE

PAVEMENT

PIPE SUPPORT MATERIAL

5 000

100

NOT TO SCALE

TRENCH BACKFILL MATERIAL

3 0002 000

VA

RIA

BLE T

HIC

KN

ES

S

AGGREGATE FILTER MATERIAL

TRENCH DRAIN TRENCH AT OUTLET TO PIT

PLASTIC DRAINAGE PIPE TO BASE OF

TAPER CORRUGATED PERFORATED

HEADWALL TO DRAIN STORMWATER TRENCH

UPSTREAM OF THE GULLY PIT WALL OR

PIPE WITH FILTER SOCK TO BE LAID FOR 3.0m

CORRUGATED PERFORATED PLASTIC DRAINAGE

Page 9: STANDARD PAVEMENT SUBSURFACE DRAINAGE DETAILS - … · 6 volume no 6 and geotechnical engineer principal road pavement approved for use network management engineering technology prepared

01

INTRA-PAVEMENT DRAINS 01ED B REV 2

MD.R37.A01

1 15.04.2011 TITLE BLOCK, MINOR REVISION BT JA GV

2 TITLE BLOCK, MINOR REVISION BT JA GV16/08/2012

NOTES

ALL DIMENSIONS IN MILLIMETRES UNLESS SHOWN OTHERWISE.7.

AND PLACE THE DRAINAGE PIPE 100mm ABOVE THE BOTTOM OF THE TRENCH.

DRAINAGE PIPE EXTEND INTRA-PAVEMENT DRAIN TO 300mm BELOW THE SELECT MATERIAL ZONE

WHERE SLOTTED FRCP IS SUBSTITUTED WITH CLASS 1 000 CORRUGATED PERFORATED PLASTIC6.

FOR TWO WAY CROSS FALL SITUATIONS OUTLETS ARE REQUIRED ON BOTH SIDES.5.

CONSIDER INTERACTION WITH DRAINAGE LAYER WHERE GROUND WATER IS ENCOUNTERED.4.

CONSIDER PERMEABILITY OF PAVEMENT LAYERS IN RELATION TO SUITABILITY OF APPLICATION.3.

SPACING TO BE BASED ON RATIO OF FLOW PATH LENGTHS (LONGITUDINAL/HORIZONTAL).2.

TRANSVERSE FLOW PATH (LONGITUDINAL GRADE EXCEEDS CROSSFALL) AND/OR IN SAGS.

LAYERS IS EXPECTED AND WHERE THE LONGITUDINAL FLOW PATH IS GREATER THAN THE

MAY BE REQUIRED FOR USE ON STEEP GRADES WHERE SIGNIFICANT MOISTURE IN PAVEMENT1.

PenTable :

PlotDriver :

FilePath :

Printe

d b

y

12:1

0:2

4 P

Mat

16/0

8/2

012

on

PA

V_

BL

AC

K_

GR

EY.tbl

PA

V_P

DF.pltcfg

G:\

Ops\P

ave

ments\J

obs\Fle

xible P

ave

ments\c

urrent projects\T

yp p

av drainage drg e

d3 rev2 P

1347\1.

Work\V

OL

UM

E 6 - S

UP

PLE

ME

NT

AR

Y M

OD

EL D

RA

WIN

GS\M

D_

R37_

A01_

B.d

gn

tetlero

b

SHEET No

No OF SHEETS

' COPYRIGHT ROADS AND MARITIME SERVICESTHIS SHEET MAY BE PREPARED USING COLOUR AND MAY BE INCOMPLETE IF COPIED

REGISTRATION NUMBER

ISSUE No OF VOLUMES

6

VOLUME No

6AND GEOTECHNICAL ENGINEER

PRINCIPAL ROAD PAVEMENT

APPROVED FOR USE

NETWORK MANAGEMENT

ENGINEERING TECHNOLOGY

PREPARED BY: PAVEMENT STRUCTURES SECTION

G. VOROBIEFF

16/08/2012SUPPLEMENTARY MODEL DRAWINGS

STANDARD PAVEMENT SUBSURFACE DRAINAGE DETAILSA3 ORIGINAL

ISSUE DATE AUTHPREPAMENDMENT DESCRIPTION

ISSUE STATUS:

CHCK

FOR AMENDMENTS REFER TO SHEET No 02

FOR USE

CROSS FALL CROSS FALL

OUTLET

INTRA-PAVEMENT DRAINS

INTRA-PAVEMENT DRAINS

PAVEMENT TO BE DRAINED

INTRA-PAVEMENT DRAINS

TRENCH DRAIN

1

-

1

-

1

-

1

-

SECTION

NTS -

1

A

-

DETAIL

NTS

A

-

PLAN FOR CUTTINGS PLAN FOR FILLS

PAVEMENT TO BE DRAINED

CONCRETE PIPE CLASS 4, Ø100

SLOTTED FIBRE-REINFORCED

GEOTEXTILE

SELECTED MATERIAL

NO FINES CONCRETE

300

MIN

100

MIN

100

ROAD LONGITUDINAL GRADE ROAD LONGITUDINAL GRADE

SELECTED MATERIAL