Stainless steelsfor bridges
In co-operation with
Duplex stainless steel for bridges
Structural design:• Modern design rules &
design guidance for duplex grades
Fabrication:• Material suitabe for
cutting, forming and welding using common techniques
Durability:• High Corrosion
resistance • Less maintenance• Longer service life
Economics:• High strength steel
minimises initial cost • Low Life Cycle Cost
Environment:• Long term aesthetics• Recycling & re- use
Experience: • Many references
available
In co-operation with
High Strength Duplex Stainless Steels
| September 15, 20203
Grade Bulk Composition, % (remainder is iron) Strength Fymin (MPa)
Corrosion Resistance Class (Eurocode)
Chromium Nickel Molybdenum
316L 17 10 2 220 IIIDX 2205 22 5 3 460 IV
LDX 2101 21 1.5 0.3 450 III
LDX 2101• Similar corrosion
resistance to 316L, higher strength than 316L
• Good fabrication characteristics
DX 2205• Better corrosion
resistance than 316L, higher strength than 316L
• Good fabrication characteristics
In co-operation with
Design codes & design guidance
http://www.steel-stainless.org/designmanual
In co-operation with
Environmental benefits
| September 15, 20205
• 85% recycled content Outokumpu stainless steel
• 100% recyclable at end of life• No use of paint, or repair blasting & repainting
during service• No run-off of pollutants into water courses• High strength duplex minimises weight, and
thus minimises use of resources
• Long Life material, long life structure: • Engineering resources, materials, labour,
construction and disruption only needed once for 100+ years
LDX2101 Footbridge, rural Norway
In co-operation with
Environmental Product DeclarationsAudited & published by Institut Bauen und Umwelt e.V. (IBU)
All necessary data for calculating environmental impact.
Download link
Marina Bay Bridge, Singapore DX 2205
In co-operation with
Millennium Bridge
Millennium Bridge
York, UK
Forta DX 2205
Completed in 2001, the first major use of fabricated stainless plate as a structural bridge material .The inclined arch is made from Duplex DX2205; it performs and looks as good as the day it wasinstalled having had no maintenance for nearlytwo decades.
In co-operation with
Celtic Gateway Bridge Holyhead
Celtic Gateway Bridge Holyhead
Wales, UK
Forta DX 2205
Duplex structure close to the harbour in North Wales.
In co-operation with
Critical bridge components using hidden duplex
Countess Wear Road Bridge (1774)
Exeter, UK
Forta DX 2205
…to be ‘sympathetically’ widened.
In co-operation with
Duplex cantilevered supportsfor footbridge extension
In co-operation with
Completed pedestrian/cycleway
• Long Life• Minimal maintenance required in a
difficult access area• “Transparent” duplex balustrade/railing
In co-operation with
New Pooley Road Bridge, UK
New Pooley Road Bridge
Cumbria, UK
Forta LDX 2101
Replacement needed for historical stone bridge swept away during storms and flooding in 2015.
In co-operation with
New Pooley Road Bridge, UK
New Pooley Road Bridge
UK
Forta LDX 2101
• Forta LDX2101 Duplex stainless steel actingcompositely with concrete deck
• Bridge design and material selected to bemore resistant to extreme rainfall/floodingevents
• Aesthetics important in a in a tourist region• Opening Summer 2020
In co-operation with
New Pooley Road Bridge, UK
• UK’s first stainless steel composite road bridge using duplex LDX 2101
• Opening early summer 2020
In co-operation with
Söderström Bridges, Stockholm
Söderström Bridges
Stockholm, Sweden
Forta LDX 2101
Four bridges carrying metro trains, each 174m long.Built in 1957 with carbon steel super structure.Today:• Carrying 340,000 people per day• One train every 3 minutes• But extensive corrosion attack
In co-operation with
Söderström Bridges, Stockholm
In co-operation with
Replacement bridge
Life Cycle Costing & Life Cycle Analysis carried out for Trafikverket (Swedish Traffic Authority) by engineering consultants Bostek AB.
Possible materials for a 120 year design life:• S355 Carbon Steel & painted, with
maintenance • Duplex Stainless Steel, no maintenance
In co-operation with
Construction costs
Duplex stainless structure
EUR
1million
| September 15, 202018
Painted carbon steel structure
EUR
0.5Million
Life cycle cost summary
In co-operation with
Life Cycle Costing summary
Construction CostsDuplex Forta LDX 2404 structure EUR 1 millionPainted carbon steel structure EUR 0.5 million
Additional cost for Forta LDX 2404 (Total of 4 structures needed ) EUR 2 million
Total Project cost EUR 300 million
Carbon Steel re-painting required every 30 yearsCost for first re-painting EUR 20 millionEvery 30 Years for 120 year life EUR 60 million
In co-operation with
Fabrication
| September 15, 202020
In co-operation with
Thank you!ContactKloeckner Metals UKValley Farm RoadLeeds, LS10 1SD
Barrie SalterDirectorM: +44(0)7825 754 311E: [email protected]: www.kloecknermetalsuk.com
In co-operation with
Outokumpu Stainless LtdEuropa Link Sheffield S9 1ZT
Andy BackhouseLead Technical ManagerBA EuropeM: +44(0)7595 609 152E: [email protected]: www.outokumpu.com/