32
Single Point Mooring Systems 24 Feb 2012 By. MA

SPM MA_DNV

  • Upload
    amlatas

  • View
    137

  • Download
    3

Embed Size (px)

Citation preview

Page 1: SPM MA_DNV

Single Point Mooring Systems

24 Feb 2012 By. MA

Page 2: SPM MA_DNV

Content

1. SPM Technical Description

2. Lesson Learnt

Page 3: SPM MA_DNV

Single Point Mooring (SPM )is used for loading\unloading of tankers, providing a weathervane mooring in open sea conditions

SPM Definition

SPM

Loading

Mooring

Page 4: SPM MA_DNV

Shore Terminal

Jetty Tanker

Pipeline

SPM

Why SPM?

Page 5: SPM MA_DNV

SPM Components

Pipeline

PLEM (Pipeline End Manifold)

Under Buoy Hoses

Buoy

Floating Hoses

Tanker

Mooring Hawser

Mooring Chains

Catenary Anchor Leg

Mooring (CALM) Buoy

Page 6: SPM MA_DNV

Buoy Components Central Pipe

Unit

Valves

Buoy Piping

Platform

Hose

Central Piping Unit (CPU)

Under Buoy Hose

Connection

Page 7: SPM MA_DNV

Above Water Components-1

Floating Hoses

Mooring Hawsers

Page 8: SPM MA_DNV

Rotation vs Fixed Parts

Fixed

Rotating

Page 9: SPM MA_DNV

Turntable Buoy: buoy with a geostatic fixed buoy body (moored to the seabed) and a rotating mooring table (Conventional Design)

Turret Buoy: buoy with a geostatic turret and a buoy body, which is rotating around the turret.

CALM Buoy Types

Page 10: SPM MA_DNV

Bearings

Main Bearing

Fixed

Rotating

Swivel Bearing

Central Piping Unit

(CPU) Electrical

Swivel

Page 11: SPM MA_DNV

Turret Buoy-Rectangular

Fixed

Rotating

Surge Tank

Central Piping Unit

Page 12: SPM MA_DNV

Turntable Buoy

Hose Connection

6m

12m

Page 13: SPM MA_DNV

Turret Buoy

Page 14: SPM MA_DNV

Moored Tanker

Mooring Hawser

Page 15: SPM MA_DNV

Mooring Hawser

Page 16: SPM MA_DNV

Floating Hose and Under Buoy Hose

Floating Hose Strings

Under Buoy Strings

Oil Companies International Marine Forum (OCIMF)

Page 17: SPM MA_DNV

Floating Hose Strings (Example)

MBC

Page 18: SPM MA_DNV

Floating Hose and Marine Break-away Coupling (MBC)

MBC

Page 19: SPM MA_DNV

Tanker Manifold Connection

Page 20: SPM MA_DNV

Under Buoy Hose Strings (Example)

Water Depth

15m

32

m

Floats

Buoy

PLEM (Pipeline End Manifold)

Page 21: SPM MA_DNV

PLEM (Pipeline End Manifold)

PLEM Barrel Valve (Under Buoy

Hose)

Plan View

Page 22: SPM MA_DNV

PLEM – Elevation View

Elevation View

Piled Foundation

Hydraulically Operated valve

Hose Connection

Page 23: SPM MA_DNV

PLEM Valves

Page 24: SPM MA_DNV

PLEM

Page 25: SPM MA_DNV

Buoy Anchoring Assembly

Anchor Chains

Seabed Anchor

Page 26: SPM MA_DNV

High Holding Power (Fluke Anchor)

Page 27: SPM MA_DNV

SPM Project Requirements

• Certification and Design Codes

• Navigation Depth and Dredging

• Survey (Bathymetirc, Geotechnic, Metocean, UXO)

• Pipeline Connection

• Flow Assurance

• Control \SCADA

• Operation\Support Vessels\Spill Clean-up

Page 28: SPM MA_DNV

Certification and Design Codes

• Det Norske Veritas (DNV)

• Bureau Veritas (BV)

• American Bureau of Shipping (ABS)

• Lloyds Register of Shipping.

Page 29: SPM MA_DNV

Navigation Depth and Dredging

Page 30: SPM MA_DNV

Survey (Bathymetirc, Geotechnic, Metocean, UXO)

Page 31: SPM MA_DNV

PLEM-Pipeline Spoolpiece

Page 32: SPM MA_DNV

Flow Assurance