o o o o GOVERNMENT OFPAKISTAN MINISTRY OF COMIVIUNICATION National Highway Authority 28-Mauve Area, G-9 I l, Islamabad Phone: 051-9032727 - Fax 051-92604t9 F|[rro'-Y rt$r.-Ars SPECIF'ICATIONS For tT'f:::3*d:A $otl!"=- Constructionof Lahore - Sialkot Motorway (LSM) Link Ilighwny (4 - Lane) ConnectingLSM to Narang Mandi and Narowal Q3 Krn. Approx.) Package - I From Krn. 00+000 to Km. 23+000 Total Length :23 KMs (SingleStage Two Envelope Bidding Procedure) January2018

Specifications for Package 1 - NHA

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

o

o

o

o

GOVERNMENT OFPAKISTANMINISTRY OF C OMIVIUNICATION

National Highway Authority28-Mauve Area, G-9 I l, Islamabad

Phone: 051-9032727 - Fax 051-92604t9

F|[rro'-Y rt$r.-Ars

SPECIF'ICATIONS

For tT'f:::3*d:A$otl!"=-

Construction ofLahore - Sialkot Motorway (LSM)

Link Ilighwny (4 - Lane) Connecting LSM toNarang Mandi and Narowal Q3 Krn. Approx.)

Package - IFrom Krn. 00+000 to Km. 23+000

Total Length :23 KMs

(Single Stage Two Envelope Bidding Procedure)January 2018

OContents

^ PARTICIJLARSPECIFICATIONS & SPECIALPROVISIONS........ .....................I

rTEM 100 GENBRAL... ..................7

ITEM 101 CLEARING&GRUBBING .................8

rTEM 103 STRIPPING ..........................................9

ITEM 104 COMPACTIONOFNATURALGROUND ............10

ITEM lO5 ROADWAY & BORROW EXCAVATION FOR EMBA}{KMENT ................. I 1

ITEM 106 BXCAVATION OF UNSUITABLE OR SURPLUS MATERIAL. ..................... 13

ITEM 107 STRUCTURAL D(CAVATION & BACKFILL .......................... 14

ITEM 108 FORMATIONOFEMBA}.IKMENT .......................19

ITEM 110 IMPROVED SUBGRADE ....,.,.......,,23

sP 117

sP-l l8

sP-l19

SUBBASE

ITEM200 GENERAL,.. .................36

ITEM2O1 GRANULAR SUBBASE.... ....,.,...,.....37

ITEM 202 AGGREGATE BASE...,....... .............38

rTEM 203 ASPHALTIC BASE COURSE PLAlrr MIX ............. ..................39

SIJRFACE COIJRSES AND PAVEMENT ...,.............42

ITEM300 GENERAL... ................42

ITEM 302 BITI]MINOUS PRrME CO4T........... .....................43

ITEM 305 ASPHALT CONCRETE WEARING COI]RSE-PI-ANT MIX.............. .............44

rrEM4o: coNcRETE. ................47

ITEM403 FORMWORK ........,.....52

ITEM4O4 STEELREINFORCEMENT .............53

ITEM4O4 STEELREINFORCEMENT .............55

rrEM 405 PRESTRESSED CONCRETE STRUCTUR8S.................... ..........57

ITEM406 JOINTS A].IDBEARINGDEVICES FORCONCRETE STRUCTIJRES...............................61

ITEM 407

sP-414

sP415

SOIL INVESTIGATIONS AT BRIDGE SITES, STI{U{IEpS Al{D EMBA}iIKIVIENT....; 63

CONSTRUCTION OF EMBA}IKMENT IN AREAS OF HIGH WATER LEVELS ANDSALTMTY CONDITIONS ..,...,,.,,....,25

ROCK FILL MATERIAL PLATFORM (WATER PONDTNG AREA) ................:..... .............29

REMOVAI/REPROCESSING AND REUSE AS SIJBBASE OF E)ilTINGWBIyI/AGGREGATEBASE COIIRSE & SIJB 3ASE CO1IRSE &BRING ITTO THEREQIJIRED SPECIFICATIONOF SUB BASE. ..........................31

oDRATNAGE AND EROSION WORKS ....:................ .......................76

ITEM 507 GABIONS.... .................76

rrEM 510 DISMANTLING OF STRUCTURES & OBSTRUCTIONS............ ...................77

ITEM 60? TRAFFIC ROAD SIGNS AND SAFETY DEVICES .................... 78

SP-614 GALVANIZED IRONDRAINPIPE,......,.... ..........83

sP-616 CONDIIrTS AND PTPES. ................... 84

SP.6I7 RCC NEW JERSEY BARRIERS INCL. REINFORCEMENT ........................... 87

sP4t8 CONCRETE PAVERS .......................89

sP-700 ESTABLISHMENT OF THE FACILITIES FOR EMPLOYER'S AND ENGINEER'SREPRESENTATIVE.............. ............93

ITEM 7OI PROVISIONOF SURVEYTEAMS A}ID INSTRUMENTS................... ..,,.,.,.,94

ITEM 702 PROVIDE, EQUIP AI{D MAINTAIN OFFICE FACILITY AND RESIDENCE FOR THEENGINEER AND CLIENTS REPRESENTATIVE............... ..,...,96

ITEM ?03 PROVIDE, EQTIIP AI\iD MAINTAIN LABORATORY FOR THE PROJ8CT..................... 111

ITEM 704 MAINTENANCE OF WORKS FOR ONE YEAR AFTER COMPLETION DEFECTLTABILITY PERIOD (PERIOD OF MAINTENAI.ICE) ................. .................124

SP-708 PROVIDE, RI.'N AND MAINTAIN TRANSPORT FOR EMPLOYER'S AND ENGINEER'SREPFGSENTATM......... ............... r2s

SP-712 DETOUR ROADS AND MAINTENAI.ICE OF TRr{]ryIC ............,..... ................127

sp-713 TRAFFTC CONTROLDEVTCES DLTRTNG CONSTRUC110N........... ...............129

sP-714 TRATNEEENGINEER. ........................ r31

' . '(?-"

tConEtruction of Lahore - Sialkot Motonray (LSM) Link Hlghway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx)

Packago-l FROM KM00+000TOKM23+000 (2BKils) Specifications | 1

SPECIFICATIONS

FOREWORD

PARTICULAR SPECIFICATIONS & SPECIAL PROVISIONS

The General Specifications (December, 1998) of National Highway Authority, Ministry ofGommunications is a part of the Contract documents, which shall be read in conjunction withthe Particular Specifications and Special Provisions. Where ever the General Specificationsare referred it will mean the General Specifications December 1998 of National HighwayAuthority. The tenderers are deemed to be in possession of their own copy of General

Specifications.

The following Particular Specifications and Special Provisions are amendments, conigenda,deletions 6nd additions to the General Specifications laid down in Volume ll, issued by theNational Highway Authority. ltems of particular application are presented by the correspondingitem number of the General Specifications to which an amendment, a conigenda, a deletion oran addition relates. When a new item has been considered forthe project it is preceded bytheletters SP followed by a three digit number which itself corresponds to the number next to thelast attributed number in the class of work series.

Wherever a reference is made in the Specifications to a Specification manual or a testdesignation either of the American Society for Testing and Materials, the AmericanAssociation of State Highway and Transportation fficials, Federal Highway Specification, or

any other rccognized national and/or international organization, it shall mean the latestspecification, manual on test designation in effect on the day the notice to proceed with theWorks is issued to the Contractor.

No separate items are provided for haul or transportation and these are deemed to be part ofthe relevant pay item of the Bill of Quantities.

Bidding DocumentVolume-lII

Special Provisions(Specifications)

O

o

/\/

awational Highway Authorig

tC.onetruction of Lahore - Slalkot Motoruay (LSM) Link Hlghway (4 - Lane)Connectlng LSM to Narang Mandt and Narowal (73 Km. Approx,)

llckacd FROM KH 00+{t00 To KM 23{00 {23 t{ttts)

GENERAL

Specifications | 2

1.1 INTRODUCTION

The section 1.'l Preamble of the General specification (December,1998), is deleted and replaced as below:

a) DESCRTPTTON OF THE WORKS

fhe project road is located in punjab. lt wiil connect LSM Motorway toNarrowal. The project road will be four lanes divided into two lanes elchdirection. The project is divided into foltowing three (3) packages:-

o From Km 0+000 to Km 23+000 (Package-l)' From Km 23+000 to Km 4g+000 (package-ft)o From Km 48+000 to Km 62+330 and Ring Road 10.3 km

{Package-lll)

These particular specifications and special provisions are pertaining tothe works for (Package-l).

b) MATERTALS SOURCES

Fill material and aggregates for use in the work shall be provided by thecontractor, where not available from excavation within'the work, iromsources to be identified and established by the Contractor who will beresponsible for surveying and testing to prove the extent and suitabilityof materials, for land and royalty/malkana costs, for access roads, sitefacilities, stripping overburden, separation of materials, processing andtransport of materials, reinstatement, insurance and all other cosis. Allcosts shall be considered as included within the rates inserted for theitems included in the Bill of Quantities.

Test results on materials, obtained bythe Engineerduring preparation ofthe Contrac't, are available for inspection, on application to theEmployer's Representative.

Man powgr i',' '.,'r't'r--, , ,t -':' ' " -

" l', tr

, ' i ()--- , A;,Delete and replace the paragraph as below:,

-- .'t ,' '{.Q

contractor shall provide skilled manpower iri.adequate number, whocan perform the work, with quality and workmanship, in accordance withthe requirements and scope of the work ltem, and as approved by theEngineer.

I

o

1.3

aiiidiiiiig bJcunieniYolume-III

Speciii-Pmvisidni(Specifications) National Highway Authority

aConstruction of Lahore - Slalkot Motorway (LSM) Llnk Hlghway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)

Package-l FROU KM 00+{100 TO KM 23+000 (23 KMc)

o

Specifications | 3

1.6 Storage of Material

Add at the endComplete record of the items stored and issued on the project orremoved from storage as per direction of the Engineer shall be recordedin stock register maintained exclusively for the purpose. This registeralong with the store shall be allowed for inspection as and when desiredby the Engineer.

{.8 Quarry/ Borrow MaterialsDelete the sub heading and replace with, "wherever Quarry Materialappears the same shall be read as Quarry / Borrow Materials."Delete first sentence of the first paragraph and replace with"Quarry / Borrow Materials i.e. rock, sand, gravel, earth, other mineralmaterials or selected material obtained for the Project."

1.11 Testing

In para 4, at end of first sentence in line 3, add the following:

", exe,ept as provided in ltem 1.2A1, Certificate of Compliance."

1.13 As-Built Drawings/Shop DrawingsAdd in 4h line of first paragraph "Thlee (03) printed copies, one compteteset on tracing paper on A-1 size and one complete set on CD" inbetween "Delivef' and "all".

1.18 Alternative Methods of Gonstruction

Delete the last paragraph and replace with:

The Contractor shall be responsible to execute the work according to themost feasible alternative as specified, and or as proposed by him to theEngineer for approval with equal or befter than the specified alternative,with no additional cost to the Employer.

. , . . . . : : . - ; ; . . : ,1,2O Trial Section ,,,;, ,;,,. ...... .. . ,, - " '.-..i.:.,,.,

At the end, add new items as below: jrtr '

:, lV ,:'" \ (\-- ,, KYA

1.20.1 Cert i f icateofCompl iance r , ' : . '1. . ; , . , l '. . . - '

A Certificate of Gompliance shall be furnish'bd'prior to the use of anymaterialwhere these Specifications wanant such certificate. In addition,where permissible under these Specifications, the Engineer may permitthe use of certain materials or assemblies prior to sampling and testing,if accompanied by a Certificate of Compliance. The Certificate ofCompliance shall be furnished with each lot, clearly identified in thecertificate.

o

a -niadi',g ii#"*""t

Yolume-IIIsi[iiii-i;rovGidni

(SpeciFcations) National Highway Authority

o

Conerruction of Lahore - Slalkot Motoruay (LSM) Llnk Hlghway (4 - Lane)Connecting LSM to Narang Mandl and Nqrowal {73Km. Approx)

Package-l FROM Kftt 00+000 TO KM 23.rO00 (23 Xltls)

Biddlng DocumentVolume-Ill

Specifications | 4

All material used on the basis of Certificate of Compliance may besampled and tested at any time as desired by the Engineer. A Certificateof Compliance however shall not relieve the Contractor of his otherobligations under the Contract for incorporating materials in the Work.Such materials shall conform to the requirements of the relevantContract Drawings and Specifications.

The Employer/Engineer ressrves the right to refuse the permission forthe use of materials on the basis of a Certificate of Compliance. The formof the Certificate of Compliance and its disposition shall be as directedby the Engineer.

1.20.2 lrrigation Canals, Channels, Water-courses, Drains and Sewersetc,

The Contractor shall conduct his operations so as to offer the leastpossible obstruction for maintaining flow in inigation canals, channels,watercourses, drains and sewers. The Contractor shall observe all rulesand regulations of appropriate authorities regarding the intenuption andmaintenance of flow in inigation canals, channels, watercourses, drainsand sewers and shall save harmless and indemnifu the Employer inrespect of all claims, demands, proceedings, damages, costs andexpenses whatsoever arising out of or in relation to any suchconstruction, operations or interferences with irrigation flows

The Contractor shall maintain alternate channels wherever temporaryrelocation of irrigation channels, water-courses, drains and sewers, isrequired or where his operations disrupt the inigation flow, without anycost compensation from the Employer.

1.20.3Access Roads

The Contractor shaff submit a plan for approval of the Engineer,indicating the road network to be used for haulage and other works.

The cost of maintaining all necessary safety measures and temporarystructures and making any necessary repairs, replacements or similaroperations and all or any other costs required by reason of his use ofsuch roads shall be bome by the Contractor. The Contractor shall saveharmless and indemnify the Employer and the Engineer and theirrepresentatives and employees in respect of all .cfai1ns,,.$emands,proceedings, damages, costs, charges and expenses:.whatsogver .arising out or in relation to any such operation or

' .rHi i r ' , : l ;

1 --

1,20.4Making Good Damage to Services, EarthworkS.etiB. . . ..

The Contractor shall make good, at his own cost, 'a'll

damages totelephone, telegraph and electric cables including undergroundinstallations or wires, sewers, water, gas or other pipes lines except

National flbh*"V nutf,oity

I

Constf,uction of Lahore - Sialkot Motoruay (LSM) Llnk Highway (4 - Lane)Connecting LSM to Narang Mandl and Narowal (73 Km. Approx.)

Package{ FROM KM 00{{00 TO Kft 23+000 (23 K}ls)

3.2

Bidding DocumentYolume-Ill

oNational Highway Authority

Specifications | 5

where Authority, Employeror Private Party owning or responsible forthesame elects to make good such damages.

All injury to the surface of the land, to the beds of water-courses,protection banks, riverbeds, etc. which are disturbed by the works (otherthan where specifically ordered by the Employer) shall be repaired bythe Contractor or the Authorities concerned at the Contractor's expense.All such making good shall be to the approval of the Employer.

1.20.5 Dangerous Materials

The Contractor and his sub Contractors shall convey, store and makeuse of all explosives, dangerous petroleum, acetylene, carbide ofcalcium and other similar material provided by them for use in or on theWorks in strict accordance with the provision of all laws, orders andregulations that are in force at the site or may be issued from time to timeby the Government.

I .20.6 Safety Precautions

The Contractor shall adequately provide for the safety, health andwelfare of persons and for the prevention of damage to works, materials,equipments for the purpose of or in connection with the Contract.

Abbreviations and Defi nltlons

The following headings and text therein, is replaced as below:

DEFINITIONS

Aggregates

Crushed rock, stone or processed/natural gravels (shingle) for use inroad construction.

Asphalt Consrete

A thoroughly controlled hot mixture to predetermined proportions ofaggregate, filler and bituminous binder (asphalt cement), prepared offthe road and usually placed by means of paving machine, and uniformlycompac'ted.

Special Provisions(Specifications)

I

j

i . :

aC-onstructlon of Lahore - Sialkot l\notorway (LSM) Link Hlghway (4 - Lane)Connectlng LSM to Narang Mandl and Narowal (23 Km. Approx.)Package'l FROM KM 00+000 TO KM 23+000 (23 Kits)

o

Base Course

The layer of specified thickness and materiat of defined dimensionsconstructed on top of the sub base, or in the absence thereof, on thesubgrade, and or immediately under the top surfacing.

Sub baseThe layer of specified thickness and materiaf of defined dimensionsplaced between the base course and sub grade.Sub gradeThe top surface of specified thickness of embankment, and or formation,located under the pavement structure and shoulders including curbs.

Surface CourseThe uppermost layer of specified thickness of asphalt concrete,pavement placed on top of the base course/asphaltic base course,called as the wearing course.

. i ,

Special Provisions(Specifications)

Specifications | 6

I

.-i *+

oHadi"g D;;u;.ni'Volume-III National Highway Authority

tCongtruction of Lahore - Slalkot Motorway (LSM) Llnk Hlghway (4 - Lane)Connectlng LSM to Narang Mandl and Narowal (73 Km, Approx)Package.l FROM KM 00{000 TO KM 23+000 (23 KMs)

EARTHWORK

ITEM 1OO GENERAL

Specifications I 7

o

100.{

100.2

100.4

Bidding DocumentVolurne-III

DESCRIPTION

ln line 2, delete "ealth" and insert "soil".

solL TNFoRMAT|oN

In para 2, line 2, delete "earthn and insert "goil".

In para 2, line 3, after "reguirements", add "in particular the borrowpits".

REMOVAL OF EXISTING OBSTRUCTIONS

i) ln line 4 before oconcrete" add "alltype of.

ii) ln line 5, after "bridges", add "walls, buildings and roads".

iii) In line 7, after "item", delete "exists" and add "appears in the Billof Quantities".

' t _ . : . i' : . , . ' '' i " " ' " - '

! )''

, : , 1 - ' . .' : ' l j

" '. ! ' ' 1 " . . . . . ' .

SpeiiaiijroviCibns(Specifications)

o

oNational Highway Authority

Crnstruction of Lahore - Sialkot Motorway (LSM) Link Highway (4 - Lane)Connectlng LSM to Narang Mandl and Narowal (73 Km. Approx.)Pacfleel FRolrt Klri 00+{100 To Kit 2.3+olll

fr ru{

ITEM 101 CLEARING & GRUBBING

Specifications I e

1A1s.2 Pavment

In line 4, after "originalo insert'level and".

National Highway Authority

Construction of Lahore - Sialkot Motorway (LSM) Link Hlghway (4 - Lane)Connectlng LSM to Narang Mandi and Narowal (73 Km. Approx.)

Packase-l FROM KM00+909ToIM 23+000 (23KMs)

ITEM 103 STRIPPING

Specifications | 9

{03.3.1 Measurement

Add the following sentence at the end:

The stripping and replacement of the top soil in the area, if required anddirected by the Engineer in the area clear€d and grubbed, no measurementshall be done for item clearing and grubbing for direct payment. The cost ofclearing and grubbing shall be deemed to be included in item of stripping.

fi3.3.2 Pavment

Add at the following at the end.

The cost of clearing and grubbing in the area where stripping is required shallnot be paid separately, and its price shall be deemed to be included in the costof stripping.

a

"biiding it"."-;iiiVolume-III

Special Provisions(Specifications) National Hlg hway Authority

oconetruction of Lahore - Sialkot Motonvay (LSM) Lhk Hlghway (4 - Lane)Connecllng LSM to Narang Mandi and Narowal (73 Km. Approx.)

Package.l FROM Kr,l 00+00{ TO- Kit 23+010 (23 KtJlsl

ITEM 104 COMPACTION OF NATURAL GROUND

Speciflcations I 10

I

104.1

104.2

104.2.1

'Refer to special provision SP 117 & SPrequirements under these conditions".

{04.3.1 i/leasurement

Delete complete paragraph number 1 and replaceWij,!'r is under:

Bidding DocumentYoIume-III

Special Provisions(Specifications)

pEscRrPfloN

Delete complete paragraph and replace as under:

The work shall consist of the compaction of the naturalloriginal ground,the cleared and grubbed surface (i.e. the surface after clearing and grubbing),stripped surface after stripplng and the excavated surface after excavation,priorto commencement of embankment construction in accordance with thesespecifications, as shown on the Drawings or as directed by the Engineer. Thecompaction shall be carried out through a written order by the Ergineer.

CONSTRUCTION REQUIREMENTS

Delete top paragraph and replace with:

The natural ground/cleared and grubbed surface/stripped surface/excavatedsurface shafl be broken up, pfoughed, scarified; all sods and vegetable mafterremoved to a depth of 200 mm and compacted to the specified degree as givenbelow:

Gompaction of oriolnal sround surfac€ i.n areas of hish walellevels& salinitv

Delete complete paragraph and replace with:

118 for materials and construc'tion

\,':

The quanti$ to be paid for shall be the number of square meters directed to becompacted and accepted by the Engineer for payment. The restoration oforiginalground levels with fill material priorto execution of ltem 104 shall not bepaid separately and shall be deemed to be included in this pay item.

The area determined as provided above shall be paid for at the contract unitprice for the pay item listed below and shown in the Bill of Quantities whichprice and payment shall constitute full compensation for all the costs necessaryfor the proper completion of the work prescribed in this Section.

&

Nationsl Highway Authority

oConstruction of Lahore - Slalkot Motonday (LSM) Link Hlghway (4 - Lane)Connectlng LSM to Narang Mandi and Narowal (73 Km. Approx.)

Package.l FROM KM 00+{t00 TO KM 23+1100 (23 KMe) Specifications | 11

ITEM 105 ROADWAY & BORROIfU EXCAVATION FOR EMBANKMENT

105.1

Add at the end:

'lt shall include only material suitable for fill, bacKill or for formation of theembankment. All unsuitable or surplus material is to be treated as detailed initem 106. Excavation for slructure(s) includes excavation for diverting/wideningof water-courses and is covered under item 107.

| 105.2.1 Road Wav Excavation

iii) q) Common ExcavatioE

In line 7, insert'silts'before usands."

105.2.2 Borrow Exc-avation

In para 3, add at the end:

105.3

Bidding DocumentVolume.III

iii)

a)

a

DESGRIPTION

ln line 4, after "all excavation" add 'after stripping of top soil (if required)'.

i) Delete "Road Waf'from the title and insert "Roadway."

'ln particular they will be left in a safe, free draining condition. In all areas anytopsoil previousfy removed shall be reinstated unless othenrvise instructed bythe Engineertt. ,....j,:i.., a.ii::..

. - , . , . . , r ' . ; i l i r . r . : ! l r ' . ' '

coNsrRucfl o[ REQU|RELENTS'r,-.:'i,,"""'"-*'"" ;

i j , ; i :i) fn para 4, addat the end: '.i,.,:,

l"i'' -- ,/---^-r.l*,r_;..._."1,- .- . .'Where appropriate drainage shall be reinstatild4-.i 1, , ' M4

In para I, delete first sentence and insert "Borrow material shall not beobtained less than 2 kilometers downstream of any hydraulic structure."

After last para insert the following:

The excavated material approved for fill under any item of theQuantities shall be used in the manner as described under the item ofwork.

Speclal Pmvisions(Specifications) National Highway Authority

IConstruction of Lahore - 9ialkot iiotorway (LSM) Link Highway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)

Package-l FROII KM 90+000

TO Kl, 23+0!0 (.'23 KM{

b)

c)

Specifications | 12

lf it is unsuitable material, it shall be disposed off at the designatedlocations in the manner as directed by the Engineer.

lf the material is surplus to the fill requirements of the whole of theProject, it shall be disposed of at the locations in a manner directed andapproved by the Engineer.

. . ' : rr . i . ' , ' ; i : . . ' . ,

. ' ' - . . . _ : . r .

Speclal Provisions(Specifications)

t

Bidding DocumentVolume-III National Highway Authority

construction of Lahore - Sialkot Motonray (LSM) Link Hlghway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73Km. Approx.)

Package-l FROM KIr'l 90+090

TO KM 23+000 (23 KMe)

ITEM 106 EXCAVATION OF UNSUITABLE OR SURPLUS MATERIAL

Sgecifigations | 13

106.1 DESCRTPTTON

a

I

i

II

II

iiidding oocumentYolume-IlI

oNational Highway Authority

At the end, add following para:

This also includes the material of existing structures and obstructions which arerequired to be removed as shown in drawings or as directed by the Engineer.

I

Construcdon of Lahore - Sialkot Motonlray (LSM) Llnk Highway (4 - Lane)Connectng LSM to Narang Mandl and Narowal (73 Km. Approx.)Packase.l FROI| KM

Tro0-0 TO KM 23+000

lzs rmsf

ITEM 107 STRUCTURAL EXCAVATION & BACKFILL

Specifications I 14

107.1

107.2.3

DESCRIPTION

Add the following at the end:

"Only excavation below originalground and filling with approved material shallbe paid under this item. Common Backfilling with approved material above thelevel of the original ground line proposed in the drawings or as asked by theEngineer shall be paid under relevant BOQ item as per approved shopdrawings".

Gommon Backfill

In line 2, between "allowed" and.subjec{" insert "on condition that the materialrequirements in item 108.2 are followed and".

Add the following after 107.2.4

107.2.3 Selected Fill (Selected Structural Fill)

Selected Fill (Selected Structural Fill) is a screened earthen material used tocreate a strong and stable base, if required as specified herein or as shown ondrawings at a site which may be too weak to support a structure, so the soil isreplaced by compacted selected structural filf to provide the needed structuralsupport. Selected Fill (Selected Structural Fill) may be used as fill forabutments, slabs, culverts andl structures, backfill for retaining structures, orfilling of trenches and other excavations that will support roadways or otherstructures when completed.

Selected Fill (Selected Structural Fill) shall be clean, well graded granular soil,free of clay lumps, organics, ice and other deleterious material, which isnon-expansive and non-collapsible. The material shall meet the followinggradation:

Speiiai-Fnii;isioiiJ(Speciflcations) Natlonal Hlghway Authority

o

)

c.onstruction of Lahore - Sialkot Motorway (LSM) Llnk Highway (4 - Lane)Connecting LSM to Narang Mandl and Narowal (73 Km. Approx,)

Paekage-l FROM KM 00+1,00 TO KM 23+000 (23 KMs)

No.60 15-65

No.200 5-12

The portion passing the #200 sieve shall be non-plastic (Pl<20 and LL<40).

The use of any proposed selected struc'tural fill having larger aggregate or agreater percentage of fines shall be evaluated and approved by the Engineer.Aggregate shall not exceed three inches in diameter.

Selected Structural Fill shall be environmentally clean and contain nocontamination exceeding the State requirements. Certification of complianceand, if requested, test results substantiating compliance shall be furnished tothe Engineer by the Contractor not less than one week priorto its intended use.

The Engineer may any time with written notice to the Contractor test off-site fillmaterial for conformance with these specif ications.

Any rejected imported fill material, whether in stookpiles or in-place, shall beremoved from the site and replaced with new, approved Selected structural Fillmaterial at no additional cost to the Owner.

107.3.1 CONSTRUCTION REQUIREMENTS

d) Preparatlon of Foundations of Footinss

In para (ii), line 2, delete "special, care' and replace with .

At the end, add para (iii) as follows:

Foundation material on which structure is to be placed shall becompacted to 9570 modified MSHTO T-180, unless otherwise directedby the Engineer. In case unsuitable rnaterial is encountered atfoundation level, it shall be removed to the depth and extent as directedand replaced with suitable material of the type as determined by theEngineer.

107.3.2

o

i )

i i )

o

Excavation in Embankments

fn para 3, line 2, after "paymenf, :add 'lexcept where granularspecified by the Engineef'.

107.3.3 Backfill

--i)- --Deletepara{.h)-and-slhstilutaas-uh

"No backfill shall be placed against any concrete or masonry structure untilpermission has been given by the Engineer and preferably not until theconcrete or masonry structure has been in place for fourteen (14) days, or untiltest cylinders show the strength to be 80o/o of the 28 days cylinder strength of

Speclal Provlslons(Specifications)

bldding o6cri-dniYolume-III

ONational Highway Authority

t5

- , . ' ' : ' -

M

oC-onstruction of Lahore - Sialkot Motorway (LSM) Link Hlghway (4 - Lano)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx,)

Packago-l FROIil XIrl 00+000 TO Kl{ 23{,00 (23 KMs)

iliih:in[-iioiri-"ni Sis;G-iit6ta;ionJ "

"t,]:.1.volume-ut tspecifications) ':,:;..r',,.

two directions performed at ninety degree angles to each oth€r. Areas noted to .;yield shall be over excavated and replaced with approved Selected F'il /)a(Selected Strustural Fill) materials to the satisfaatiOn of the Engineer. <*Q)'

,1'-i P;' '."':

Specifications | 16

o

concrete as per table 401-'1. The backfilling shall be carried out on both sides ofthe structure simultaneously. All buried concrete surfaces shall be bitumencoated, cost of which shall be Included in bacKilling".

ii) At the end, add para (i) as follows :

(i) Any temporary backfill or platform constructed by the Contractor forpiling purposes and/or for any other work item shall be subsequently removedby the Contractor, as required and /or directed by the Engineer. All this activityshall be without any payment.

Add the following after 107.3.3

1O7.2.3 Selected Fill (Selected Structural Filll

1. The Contractor shall furnish all labor, equipment and materials required toprepare the subgrade and place Selected Fill (Selected Structural Fill)materials, in a controlled manner to the lines and grades shown on thedrawings and as specified herein. The Contractor is required to accept theactual conditions existing at the site, and to obtain the finished subgrades andelevations in order to complete the conskuction for the work.

2. The Contractor shall give 48 hours advance notice to the Engineer of theimpending proof rolling of the excavation sufurade so as to allow the Engineertime to arrange for observation of the proof rolling process.

3. The Contractor shall provide 24 hour notice to the Engineer or theirrepresentative regarding the project schedule, start and stop of work.

4. Conkactor shall be responsible for the accurate placement of his work inaccordance with the location and elevations shown on the drawings andextended from the bench marks.

5. All debris, organic matter, and other unsuitable, over-sized or deleteriousmaterials shall be removed from excavation before backfilling or grading.

6. No fill material shall be placed over free standing water, ponded water orsnow, on saturated subgrade materials, on frozen subsoil areas, or on surfaceswhich have not been approved by the Engineer or their representative.

7. The integrity of the Selected Fill (Selected Structural Fill) surface shall bemaintained against the effects of weather, precipitation and the accumulationof water through surface grading, compac'tion or other methods as selected bythe Contractorto protect their work.

8. Priorto placement of the Selected Fill (Selected Structural Fill) materials theexcavation bottom shall be compacted to a firm and unyielding surface. Thesuitability of the prepared surface shall be demonstrated to the Enginee/srepresentative through proof rolling of the area. Proof rolling shall be performedthrough three passes of the specified roller, over the entire bottom surface; in.

o

a

tc-onsrrucdon of Lahore - Slalkot Motorway (LSM) Link Hlghway (4 - Lane)Connectlng LSM to Narang Mandl and Narowal (73 Km. Approx.)

Package-l FROM KM 00{000TOKM 23+000 (23KMs)

Selected Fill (Selected Struc'tural F.il$;

o

o

oBidding DocrrmentVolume.IIl

Special Prcvishhq(Specificalions),:

Speclflcations | 17

9. Selected Fill (Selected Structural Fill) shall be placed in level, uniform,maximum 30 cm loose lift thicknesses and compacted using the specified rollerto achieve the required compaction criteria specified herein. Lifts placedadjacentto existing side-slopes should be benched into the slope a minimum of30 cm.

10. Each lift shall be compacted to 95% of the material's maximum dry unitweight as determined by ASTM D 1557 (Modified Proctor). The water contentof the material at the time of compaction shall be within + 2 percentage pointsof its optimum water content as determined by ASTM D 1557.

11. Grain Size distribution (ASTM D 421 and D 422), Atterberg Limits tests(ASTM D 4318) and Modified Proctorcompaction tests (ASTMD 1557) shall bemade on representative samples of the Selected Fill (Selected Structural Fill)materials proposed for use by the Contractor. The Selected Fill (SelectedStructural Fill) material shall meet the requirements specified herein above.The Contractor shall be responsible for delivering the first samples ofrepresentative Selected Fill (Selected Structural Fill) materialto the Engineerfor approval a minimum of two weeks before placement of the materials in thefield or its intended use. Subsequent materialsubmittals shallbe submitted in amanner that accommodates approval by the Engineer prior to delivery andplacement in the field. No Selected Fill (Selected Structural Fill) material maybe placed prior to approval by the Engineer.

12. Selected Fill (Selected Structural Fill) material may not be blended in thefield or placed in a manner that allows the materialto be mixed during gradingoperations. Materials from different sources shall be stockpiled separately andplaced in the excavation in separate areas. Selected Fill (Selected StructuralFill) materials that are mixed or blended in the field shall be removed andreplaced at no cost to the Owner.

13. The compacted Selected Fill (Selected Structurat Fill) shall be subject toquality control testing performed on each lift thickness by the Engineer or theirrepresentative. A sufficient number of in-place density tests shall be performedon each lift of Selected Fill (Selected Structural Fill) to ensure that the specifiedcompaction is achieved throughout the height of the backfill. A minimum of onein-place density test shall be performed for approximately every 500 SM of liftarea and no fewer than 10 tests should be performed per each lift thickness.ln-place density tests shall be distributed randomly across the lift layer.

14. In-place density tests shall be recorded referencing lift elevation and testlocation within the excavation. Tests that fail to meet 95% of the materialsModified Proctor value shall be recorded as failed tests. The Selected Fill(Selected Structural Fill) lift shall then be re-compacted and or manipulatedwith respect to obtaining the required moisture content and densig andretested untilthe required field density is actrieved. Unsuitable materials shallbe removed and replaced immediately at no cost to the Owner.

16. Where completed or compacted areas are disturbed by subsequentconstruction operations or adverse weather conditions, the material;,shall beadjusted through removaland replacement, scarification and drying, regrading,and compaction to the required density p.r.ior., to the placement of additiohal

.Vt "

N"gonri "i1n*rorrnont,

Iconetructionof Lahore - Slalkot Motoruay (LSM) Unk Highway (4 - Lane)Connecting LSM to Nanng Mandl and Narowal (73 Km. Approx.)

Packagll FRoMKM9I:000roKM23+900 {23KMs)

'|-07,4.1 Measurement

Specifications | 18

a) Structurql Excavation

ii) In sub-para (1), line 4, add at the end:

'Neat lines of footings or foundations shall mean the outer faces offootings or foundations excluding lean concrete."

iii) At the end, add the following para:

No separate payment shall be made for compaction of excavatedsurface for foundation under structures,

Add the following after c)

dl Selected Fill (Selected Structural Fill)

The quantities of Selected Fill (Selected Structural Fill) to be paid for shall bethe number of cubic meters of material laid and oompacted, placed within thelines of structure and limits defined in item 107.4.1(a) above and accepted bythe Engineer.

107.4.2 Pavment

o

ln the table add 107f as under:

aBidding DocumentVolume-IlI

Spticiliisilviiiijns(Specifications) ll"tio*f

",nn*", O*onr,

Construction of Lahore - Stalkot Motorway (LSM) Link Htghway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)

O PT*g":, FRoM KM 00+000 To KM 23+000 (ze Kmsl

ITEM 108 FORMATION OF EMBANKMENT

Specifications | 19

o

108.1

108.2

108.3.1

niaaingbocumentVolume-III

f)

1)2)3)'4 )

5)

6)

ii) Delete para 5 "The compaction of the embankment .....and replace with :

Spect;iPbviid;(Specifications)

o

o

DESCRIPTION

At the end add the following:

"The work shall also include the compaction, trimming and shaping of the sideslopes as shown on the plans and removal of any excess fill as directed by theEngineer prior to placement of top soil on slopes of the embankment whererequired as directed by the Enginee/'.

MATERIAL REQUIREMENTS

Add the following

e) For the purpose of embankrnent and subgrade construction thefollowing shallbe considered as unsuitable materials:

Materialfrom soi|AASHTO classification group of AO and A7;Materialfrom swamps, marshes and bogs;Peat, logs, stumps and perishable materials;Material susceptible to spontaneous combustion;Materials having a moisture content greater than the maximurnpermifted for such materials in the contract or as directed by theEngineer.Organic Soils and containing all other deleterious substances.

The moisture content of the soil at the time of compaction shall beuniform and shall be such that the soil can be cornpacted to thespecified density and approved by the Engineer. The moisture contentshall be as directed by the Engineer as determined from a test sectionand moisture density test (AASHTO T-180 Method D) done on eachtype of soilto be used in the construction of the work to determine themaximum density, the optimum moisture content and the moisturerange required for the soil to achieve the desired compaction andapproved by the Engineer. The soil shall be compacted at optimumcontent with +1olo tolerance.

Formation of Embankments with Common Material

In the heading delete the word uBonou/' ,

In para 1, tast line, afier "approved" add 'Tor each materjalbonow area.'

"The compaction of the embankment shall be carried out at th'ia,,-designated optimum moisture content *;16 +1% tolerance consistentwith the available compacting equipment. In forming the embankment,the Contractor shall take steps to ensure that the surface can be

National Highway Authority

oConstruction of Lahore - Sialkot ltlotorway (LSM) Link Hlghway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)Package{ FROM KM 00+000TO KM 23+000 (23 KMs) Specifications | 20

drained free of rain water, and he shall make due allowance in theheight and width of the work for swelling or shrinkage,"

In para 6, line 6, after the word "disking" add .and scarifying".

iv) ln last para, add at the end:

"ln order to prevent erosion of the slopes the Contractor shall compactthe trimmed slopes to the required density prior to laying top soil, ifrequired and/or directed by the Engineer.

108.3,2 Formation of Embankments with Rock Material

ln para 2, Iine 2, delete "clean smallspells,".

In para 3, line 4 delete'fifteen (15)" and replace with "thirty (30)'

,|08.3.3 Formation of Embankmenb on Steep Slopes

Delete 1st para and replace with:

"Where an embankment is to be constructed against an existing slope, steeperslope, hill sides, existing shoulders or where new fill is to be placed andcompacted against existing pavement or where embankment is to be builtalong one half the width at a time, the existing slope shalf be benched. Thehorizontal dimension of benches shall be greater than half the width of thecompacting equipment in use except where this would result in a verticaldimension at the back of the bench of more than 60cms in which case thehorizontal dimension may be reduced.

The compaction of benches shall be as per Clause 108.3.1 of the GeneralSpecifications.

No measurement shall be made of the volume of material cut from the existingslope, re-compac'ted at the same place or reused elsewhere for benchingpurpose. Filling against the slope will be calculated on the volume of fill placedagainst the original slope. Existing slope in the context of this clause includes apartially constructed embankment but does not include the sides of trenchexcavation.

Existing slope in the context of this clause includes a partially co.nstrgctgdembankment but does not include the side of trench excavation.

' '

ii)t

o

o ' :National Highway Authority

Bidding DocumentVolume-III

oConstrucrion of Lahore - Sialkot Motorway (LSM) Link Hlghway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx)

Palkagen lRoi,

KM 00{000 To KM 23+01t0 (zs t<Msl

108.3.4 Formation of Embankments on Exlstins Roads

Delete from line 6 after the "Engineer" and replae with:

"The material declared suitable will be measured under relevant item as pertheir use and that declared unsuitable, will be measured under item 106, unlessa separate pay item appears in Bill of Quantities.

108.3.5 Formation of Embankments in Water Lossed Areas

Delete entire para and replace with:

This work shall be performed as stipulated in SP 117 and/or SP 118

108.3.6 General Requiremento

a

a

Specifications | 21

Defete entire 2nd Para and replace with:

When as a result of settlement, an embankment requires the addition ofmaterial up to 30cm in thickness to bring it up to the required grade level, thetop of the embankment shall be prepared as per requirements of Subgradepreparation stated in item No. 109, No separate payment shall be made toContractor for the scarification, removal and replacing or reworking of existingmaterial to a depth as directed by the Engineer, unless a separate pay itemappears in the Bill of Quantlties.

After the last paragraph, add the following:

Embankment filling shall be brought up and compacted over the full width of theembankment of one caniageway in one operation in layers parallel with thesubgrade level. At no time shall any part of the embankment width urder onecarriageway be left more than one layer lower than any other part of theembankment width in case at least two carriageways are being constructed atthe same time.

Shoulder construction shall be brought up simultaneously with the pavementconstruction.

ln order to prevent water penetration into the pavement layen*.,-du11gconstruction, shoulder and median construction shall be :blbught upsimultaneously with the pavement constructioq whenever the transverse slope:t6

IConstruction of Lahore - Sialkot Motonivay (LSM) Unk Highway (4 - Lane)Connectlng LSM to Narang Mandi and Narowal (73 Km. Approx.)

fackage-l FROM Kit 00+000 TO KM 23't000 (23 KMs.)

:ii) After item 108.3.6, add item 108.3.7 -Trial Section" as follows:

108.3.7 Tfial Section

Before starting the formation of the embankment the Contractor shall consbucttrial sections of 500 m or as directed by the Engineer in 2 layers depth for eachsoil type/sourc€ proposed for use as fill material. The soils used in the trialsshall be the same as those intended to be used for the formation of

O embankment and the compacting equipment shall be same equipment that theContractor will use for the main work.

The construction of embankment with any type oJ soif/material source shall besubject to written approval of the Engineer after the trial section made for thatparticular type of soil/material source.

The object of these trials shall be to determine the optimum moisture contentand the relationship between the number of passes of compacting equipmentand density obtained for the soil types under trial and for the verification of thesoil gpe itself. No separate payment will be made for this work, which shall berequired as a subsidiary obligation of the Contractor under Pay item Nos. '108,

as the case may be.

108.4,2 Pavment

ai )

ii)

oBiddingDocumentYolume-Ill

SpeciaiFrit'iisions(Specifications)

Specifications | 22

The fill behind abutments and wing walls of all bridges, pipe, slab and boxculverts shallbe deposited in well-compacted, horizontal layers not exceedingtwenty (20) cm in thickness to the density 100 percent of max. dry density aspeTAASHTO T180(D).

ln sub-clause c, Formation from Roadway Excavation, line 2, delete"fom" and replace with "from".

In sub clause c line 4 in between "rolling" and "labour'' add'compactingallto the requirement of the work and including all"

ln table of pay items, description of pay item 108a, line 2, delete'Torm"and replace wlth "from".

,iir;'"'l, i . i : ii'l i

National Highway Authority

aConetructlon of Lahore - Sialkot Motorway (LSM) Llnk Highway (4 - Lane)Conneoting LSM to Narang Mandl and Napwal (73 Km. Approx.)

fa1laso-t FRoM KM 00+000 To Kttl 23+{100 t23 K]||1]

ITEM 1{O IMPROVED SUBGRADE

Specifications | 23

o

110.2

110.3

110.3.1

u43.2

110.3.3

iii.i.ii"g-it""d;iVolume-III

MATE RIAL REQUlRElrlEryTs

Delete first para and replace with the following

The major component of improved subgrade shall consist of materialconforming to ltem 108.2 - "material requirements for embankment" blendedwith sand (blend Material) or any other approved material in appropriateproportion and shallinclude all lead and lift.

CONSTRUCTION REQUIREMENTS

Preparation

Delete first para and replace with the following

The surface of the roadbed on which the improved subgarde is to beconstructed and construction of improved subgrade shall be as specified underItem 108 and 109 including allpreparation and compaction.

P roportioni ns of Materials

Delete first para and replace with the following

Prior to start of this activity, the proportion of each material to be incorporatedfor improved subgrade shall be established by the Gontractor in the Laboratoryand shall then submit ttris mix formufa to the Engineer for approval. TheEngineer shallspecifo a single percentage of each materialto be blended andshall establish the gradation of the resulting mixture required to obtain

' i.-,,r.. , ,

The construction requirements shall conform to item 109 but with improvedCBR. The Engineer may direct for preparation of trial section of not less than500m length in fullwidth as specified priorto giving final approvalfor spreadingand constructing the improved subgrade. This trialsection shallnot involve anyextra cost. Further work cn this activity shalf onfy commence after writtenapproval of Engineer for spreading and construction of this improved subgarde.

Special Provisions{Specilications)

a

ONational Highway Authority

econstruction of Lahore - Sialkot Motorway (LSM) Llnk Highway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)

fackase-l FROttl Xlll 00+000 To KM

?3+000 (23 KM-s)

110.3.4

110.4

'110.4.2

Specifications I 24

Approval of Engineer in no case shall relieve the contractor for his sole

responsibility executing the quality work as per specifications.

a) Station3rv Plant Method

lnsert the word "approved" after the first word "The... ." of the first para.

Gompaction

Delete first para and replace with the following

Unless otherwise permitted by the Engineer based on the performance of thecompacting equipment used as determined from the trial section eactr layer ofimproved subgrade shall be placed in horizontal layers of uniform loosethickness not exceeding twenty (20) centimeters. Each layer shall becompacted to the density conforming to the subgrade requirements specified initem 110.2.

MEASUREMENT AND PAYMENT

Pavment

Delete the description of the item and replace with the following

o

o

*i"','"'.'iiij-r,

, 1 , ' , " t , - . .' - " - , ' : , ' ' . . ,

\-4-"i l : .

IBidding DocumentYolume-IlI

SpeiiiiProvisi6nJ(Speolfications) National Highway Authority

constructlon of Lahore - Sialkot Motorway (LSM) Link Hlghway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)

O Package-l FROM Kttt 00*000 TO Kl, 23+000 (23 KMs|

sP 117

Specifications 125

CONSTRUCTION OF EMBANKMENT IN AREAS OF HIGH WATERLEVELS AND SALINITY CONDITIONS

o

117.1 DESCRIPTION

This work shall consist of the formation of embankment in areas of softembankment foundation, high water levels, where compaction of naturalground is unable to achieve the density required in ltem 104 with the prescribedgeneral method. This would also include the wet areas which cannot be driedby scariffing or other rneasures and exhibit moderate to severe heaving ofsurface during proof-rolling.

The embankment shall consist of a working platform of the granular materialfollowed by the embankment fill material and earthen dowels provided at toe ofthe embankment, all placed in accordance with these specifications and thespecifications for other work items involved and in conformity with the lines,grades, sections and dimensions shown on the drawings or as directed by theEngineer.

MATERIAL REQUIREMENTS117.2

117.2.1 Subsrade/Embankment

The subgradelembankment material shall be as per Clause 109 and 108respectively of General Specifications.

117.2.2 Granular Material Platform

The material for the working platform shall consist of normal or processedgranular fill material obtained from borrow excavation or quarry waste. Thismaterialshall conform to the following Specifications:

O

Size oloagc of weight Passing Mesh Sieve AASHTO T-27

37.5 mm10 mm

#4#10#40# 100#200

10075 - 10060-8045-6525-400-150-5

atiiddil!D"cfi;;Volume-IlI

Special Provisions(Specifications)

aConstruction of Lahore - Slalkot Motorway (LSM) Link Hlghway (4 - Lane)Connecling LSM to Narang Mandi and Narowal (73 Km. Approx.)

Package-l FROM KM 00+000 TO KM 23+{100 (23 }t}ls)

D15 - (Granular Fill Material)

t 117.2.3

1 .

2.

o

117.2.4 Earthen Dowels

117.3

117.3.1

organic and other deleterious substances.

CoN$TRUCTTON REQUTREMENTS

Subsrade/Embankment

obiaaing oocum;tVolume^IlI

speciiipiiinisionJ(Specifications)

Speciflcations | 26

It shall also be checked that selected grading is such that intrusion into theworking platform rnaterial of subgrade or natural ground surface material is notallowed. For this condition to be met it will be required that the ralio as belowshall be checked and followed:

D85 - (NaturalGround Material)

D85 and D15 mean the practical diameters corresponding to 85% and 15%respectively, passing (by weight) in a grain size analysis.

SAND CUSHION IN.BED OF ROAD

The material to be used shall conform to the following specifications:

The Contractor shall use MSHTO class A-3 soil as specified in M-145with Plvalue zero (0).Materialshall have minimum soaked CBR value of 25o/o that obtained at95o/o of maximum dry density.The Contractor shall make his own armngement at his own cost for thesupply of this material from and around the site inespective of thedistance from the site.

The material for earthen dowels shall be any suitable soil obtained fromroadway excavation, bonow excavation or any other source as approved bythe Engineer having a plasticity index of 6 or more. The material shall conformto the requirements of clause 108 of the Specifications. lt should be free of

National Highway Authority

t-II

oConstruction of Lehore - Sialkot Motorway (LSM) Link Highway (4 - Lane)Cnnnectng LSM to Narang fMandl and Narowal (73 Km. Approx.)PackageJ FROM KM 00+!00 TO KM 23+000 (ZS XUsf

117.3,2 Granular Material Platform

117.3.3 SAND CUSHION IN BED OF ROAD

117.3.4

Bidding DocumentYolume-IlI

I

i l

l "

a(Specifications)

Speciflcations | 27

Prior to laying of granular material platform, the pond water of water loggedarea upon which embankment are to be placed, shall have been dried anddrained or kept drained of all surface water prior to commencing of filt and allclearing and grubbing shall have been performed, manually if necessary inaccordance with the relevant specifications.

Construction of the granular fill layer shall proceed from one end of the softarea by using the granular fill as a ramp for further granular fill transport. Thethickness of the granular fill working platform, as prescribed shall be as shownon the Project drawings or as directed by the Engineer and the width shall bethat of the embankment or part as directed by the Engineer. The placementand compaction of the working platform including boxing material shall becanied out by the use of appropriate light equipment, in layers, if necessary.The placement, spreading and compaction of the Granular Material Platformshall be canied out by using light equipment. The top 15 cm of the platformshall be compacted to at least 9070 MSHTO T - 180 density.

ln those areas of high water levels and safinity with soft subsoils and whereembankments are high such as approach fills to structures, special provisionsshall be made to measure and determine likelyfill settlements which may occur.These preconditions are necessary in order to specify parficular constructionprocedures which may be necessary and to establish the time at which thepavement structure can be placed to avoid cracks & subsidence of theselayers.

In particular, additional compaction of the fill material and its adequateprotection shall be required to prevent undersc,ore and the risk of "collapse"settlement.

No extra payment, under this item, shall be made to the Contractor forre-working, re-instratement, replacement of granular material which hasbecome slushy or replenishing of granular material for whatsoever reason.

tq

sides canlageway as shown on the drawings and/or as directed by theEngineer. The earthen dowels shall extend upto 2 meter from the toe of the

ttationat Highway Authority

oConstruction of Lahore - Sialkot Motonray (LSM) Link Hlghway (4 - Lane)Connecting LSM to Narang Mandl and Narowal (73 Km. Approx.)Package-l FROM KM 00+000 TO KM 23{{00 (23 Kftle)

117.4

Bidding DocumentYolume-lII

o

o

a

Specifications | 28

embankment as shown on the drawings. No density requirements are specifiedfor the earthen dowels, it shall be as directed by the Engineer. Preferably theyshall be graded & compacted with at least two passes of vibratory roller to thesatisfaction of the Engineer.

MEASUREMENT AND PAYMENT

The quantities measured against this item as shown on the drawings withrespect to line and grades shall be paid for at the contract unit price for the payitems listed below and shown in the Bill of Quantities. These prices andpayments shall constitute full payment and compensation for providingincluding hauling, processing, placing at site and compacting as specified,replen:shing granufar materialfor remedying loss of material due to traffic andsinking of granular material platform during construction due to whateverreason, including all equipment, labour, material and all other costs related tothe completion of works in all respects.

On first-time completion and approval of granular material platform, only 757opayment for pay item SP 117a shall be made to the Contractor. Balance 257opayment for pay item SP 117a shall be made to the Contractor only when thegranular material platform is no more required to serve as detour road and ithas been re-worked, re-instated or replaced as directed by the Engineer and isre-approved and ready to recelVe oncoming layer of embankment.

No separate payment shall be made for the Earthen Dowels. The cost shall bedeemed to be included in the item SP 117aor SP117b.

Special Provisions{Specifications)

National Highway Authorily

oConetructioa of Lahore - Slalkot Motoruay (LSM) Link Hlghway (4 - Lane)Connectlng LSM to Narang Mandl and Narowal (73 Km. ApproxJ

Package-l FROM Klrl 00+000 TO Kil 23lO00 (23 KMsl

o

Size6" (15.24 cm)3" (7.62cm)1" (2.54 cm)Sieve No. 10

1 18.3 CONSTRUCTION REQUIREMENTS

{ {8.3.{

(a)(b)

(c)(d)

118.3.2

(a)

(b)

(c)

(d)

ni.iaing iio"u'*.ntYolurne-Ill

o

a

Specifications | 29

sP-118 ROCK FILL MATERTAL PLATFORM (WATER PONDING AREA)

118.1 DescriptionThe work shall consist of placing Rock filll Boulders under the embankment in waterpond areas for a thickness of 600 mm in accordance with these specifications anddimensions shown on the drawings or as directed by the Enginee/s Representative.

118.2 Material RequirementThe materialshall conform to the following specifications:

Percentage Passing50 -70

20-4410-200-10

Before Gommencement of Work of Filling the Pond Area

A dimensioned plan of the area within the R.O.W. shall be prepared.Cross-tections in either direction shall be taken every 5 m, also marking thestanding water-level and the maximum water level determined from localenquiries.The volume of the Pond Area shall be calculated for a thickness of 600 mm.A sketch / drawing showing the Plan, Cross-sections and Volume of the Areashall be prepared, which shall be signed by the Contractor's Agent and theEngineer Representative in token of their check and countersigned by theEngineer and retained in permanent record as measurement sheets.

Filling of Pond and Embankment Gonstruc{ion

The initial layer of rock fill / boulders shall be placed into the pond manually orby end-tipping in the designated road area upto a level approximately 300 mmabove standing water, permitting the rock fillto take its natural side-slope. Therock fill shall be compacted by rollers to ensure proper settlement andcompaction, but not permitting the fill to go below the standing water level.A second layer of rock fill shall be placed which, after compaction, shall be 150mm to 200 mm above the standing water-level.Subsequent layers, not exceeding 200 mm each, shall then Oe plaeil. and

Special Provisions(Specifications)

proceed in accordance with the specificatio4qf,:Ji;:f.:

"l +l ./,1:; y'

, ? r t { \? i, i i i ) ^

aConatruction of Lahore - Sialkot Motonaay (LSM) Link Hlghway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)Package-l FR9M Kn 00+000 To

IM 23't{00

t23 KM:l

118.4 Measurement and Payment

Specifications | 30

The quantities to be paid for shall be the number of cubic meters in the volume ofembankment compacted in place as accepted by the Engineer's Representative.

The contract price shall constitute full compensation for all labour, tools, materials andother items incidental to the satisfactory / proper completion of the work prescribed inthis item.

a

I

oBidding DocumentVolume-IlI

Special Provisions(Specifications) National Highway Authority

oConstruction of Lahore - Slalkot Motonray (LSM) Link H(7hway (4 - Lane)Gonnectlng LSM to Narang Mandl and Narowal (73 Km. Approx.)

Packase'l FROM Klt 00+000 TO KM 23+{t00 (23 KMs)

SP-l19 REMOVAL/REPROCESSINGEXITING WBM/AGGREGATECOURSE & BRING IT TO THEBASE.

sregificafions 131

AND REUSE AS SUBBASE OFBASE COURSE & SUB BASE

REQUIRED SPECIFICATION OF SUB

a

l{9.1 Description

The work shall consist of removal of existing water bound I aggregate base andgranular subbase layers, stockpiling and reprocessing for reuse of the dismantled andremoved material as subbase in new pavement structure in conformity to the lines,grades and thickness shown on the Drawings or as directed by the Engineer.

119.2 Material

In the areas shown on the Drawings or as directed by the Engineer, the existing waterbound macadam base / subbase and / or existing granular sub base course shall beseparately removed to theirfulldepth and the resulting materials collected in piles andcarefully loaded and canied away to a stock pile area. All suitable removed materialsshall be properly blended and, if necessary, mixed with new materials and crushing theoversize if any in order to bring it to such proportions as required to meet the followinggrading requirements before being reused as sub base course in the construction ofthe new road structure. Before removal of the existing base / subbase, the bituminoussurfacing I surface dressing shall be separately broken up, carefully removed, andstock piled or disposed of in accordance with Section 209 of these Specifications.

Grading requirementsforsub base materialto be reused shall be eithergrading A or Bas given below as directed by the Engineer:

Fine aggregate (filler material or screenings) shall consist of natural sand or crushedstone screening free from clay lumps, dirt or other objectionable materialsl'Thg flneaggregate shallbe of the following gradation.

,.,,.;..1

I

cBidding DocumentVolume-IlI National Highway Authodty

75 mm (3")50 mm (2")

19 mm (314')9 mm (3/8")

10030 - 10010-305-200-10

10030 - 10015-6015-452-30

Percentage passing in all above gradings at # 200 sieve shall be limited to max. 15.

C>-rrll\[,

\ : , _ . 1 .speciai ProviCi6ni *-L*

(Specifications)

tc.onstruction of Lahore - Slalkot Motoruay (LSM) Llnk Hlghway (4 - Lane)Connecting LSM to Narang Mandl and Narowal (73 Km. Approx.)

Package-l FROM Kltl 00+000 TO KM 23+000 {23 KMs)

a

The material passing No. 40 sieve shall have a liquid limit of not more than 25 and aplasticity index of not more than 6.

The blended material should have a 4 days soaked CBR value of not less than 30%determined according to MSHTO T-193 at a density of 98%.

CBR testing will not apply where the grading of the material indicates less then 25%passing the 314" (19 mm) sieve.

119.3 CONSTRUCTION REQUIREMENTS

119.3.1 Spreading

The material (subbase) shall be delivered to the roadbed as a uniform mixture.Segregation shall be avoided during spreading and the final compacted layer shall befree from concentrations of coarse or fine materlals. Before spreading the sub basematerial, the exposed surface after the removal of water bound base I subbase shallbe scarified watered and compacted to the required density and the payment for suchcompaction shall not be made separately and is included under this section.

The material shall be deposited on the roadbed in a quantity which will provide therequired compacted thickness without resorting to spotting, picking up or otherwiseshifting the sub base material.

Where the required thickness is 15 cm or less, the aggregates may be spread andcompacted in one layer. Where the required thickness is more than 15 cm, theaggregates shall be spread and compacted in 2 (two) or more layers of approximatelyequal thickness, and the maximum compacted thickness of any one layer shall notexc,eed 15 cm. All subsequent layers shall be spread and compacted in a similarmanner.

The material shall be spread with equipment that will provide a uniform.Shape to thespecifled section both transversely and longitudinallywithin the toteranc,ei.aCSOe..,cinqOin relevant 'Table for Tolerances" for sub base courses provided in thes.eSpecifications. A(,

i' '"r.or 4 _ - l

Special Provisions(Specilications) !

Specifications | 32

a

oBidding DocunentYolume-III

National Highway Authority

oConetruction of Lahor€ - Slalkot Motorway (LSM) Link Highway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)

Package-l FROII KM00+000TOKil23+000 (23KMs)

119.3.2

Specifications 133

CompactingThe moisture content of sub base material shall be adjusted prior to oompaction bywatering with approved sprinklers mounted on trucks or by drying out, as required, inorder to obtain the required compaction.

The sub base material shall be compacted by means of approved vibrating rollers orsteel wheel rollers (rubber tire rollers may be used as a supplement), progressinggradually from the outside towards the centre, except on superelevated curves, wherethe rolling shall begin at the low side and progress to the high side. Each succeedingpass shall overlap the previous pass by at least one third of the roller width. While therolling progresses, the entire surface of each layer shall be properly shaped anddressed wlth a motor grader, to attain a smooth surface conforming to the requiredlines and grades.

Following the initial rolling, dry screenings shall be applied uniformly over the surface.Dry rolling shall be continued while screenings are being applied. The surface shall beswept with mechanical or hand brooms to aid spreading of the screenings.

When the interstices in the coarse aggregate are fillwith screenings, the surface shallbe sprinkled with water until it is saturated. The rolling, sprinkling and application ofadditional screenings shall continue until a grout is formed that fills all the voids andforms a wave of grout in front of the roller.

Any areas inaccessible to rolling equipment shall be compacted by means ofmechanical tampers,

The compaction of the sub base layer shall be continued untilthe result is satisfactoryto the Engineer.

lf the layer of sub base material, or part thereof does not conform to the required finish,the Conkactor shall, at his own expense, rework, water, and recompact the materialbefore the nexl layer of the pavement structure is oonstruoted.

lmmediately prior to the placing of the first layer of base oourse, the sub base layer(both under the travelled way and the shoulders) shall be to the required level andshape. Any watering and reshaping of the surface of the sub base will be at theContractor's expense.No material for construction of the base shall be laid until theapproved by the Engineer. ,7'.-,,,,'.,n

119.3.3 Construction Gontrol Testing

o

t

sub;basg'hgs. been.M/4,L)

/

ISpecial Provisions

(Specifications)

Tests for compliance with the requirements of Sub;.Ssptienilikwill be made as oftenas deemed neoessary and to the satisfaction of the Engineer.

Bidding DocumentVoIume-III National Highway Authonty

oConstruetion of Lahore - Slalkot Motorway (LSM) Llnk Hlghway {4 - Lane)Connecting LSM to Narang Mandi and Napwal (73 Km. Approx.)

Package-l FROM l(ltt 00+000 TO KM 23+{100 (23 KMs} Specifications | 34

119.3.4 Trlal Sectlons

At least 10 days before the main work of sub base construction is started theContractor shall spread and compact a trial section as directed by the Engineer. Theobject of the trlal sections is to check the suitability of the materials and the efficiency ofthe equipment and construction methods which is proposed to be used by theContractor. Therefore, the Contractor shall use the same material, equipment andprocedures that he proposes to use for the main work. One trial section of about 500square meters shall be made for every type of material and / or constuction equipment/ procedure proposed for use.

119.3.5 Tolerance

The sub base shall be compacted to the desired leveland cross slope as shown on theDrawings. The tolerances shall be according to "Table for Allowable Tolerances"provided in these Specifications.

119.4 Measurement and Payment

Existing bituminous base course, surfacing and surfaoe dressing shall beremoved in accordance with Section 209 of the Specifications and thequantities for this item shall be measured and paid under the pay item includedin Section 209.After the execution of above operation in accordance with section 209, theremoval of existing water bound macadam / aggregate base course / subbaseand its reuse as sub base in the new pavement structure shall be measuredand paid as detailed below:

The quantity of the sub base to be paid for shall be measured in cu.m. of thevolume of the material derived from the existing base / subbase as shown onthe Drawings or approved by the Engineer. Any wastage / losses of thematerial due to over excavation during the removal of surfacing / surfacedressing and other losses in deriving, transportation and stockpiling of theexisting material for reuse as sub base shall be replaced with additio-nql newmaterial, without any payment for this additional material. ...': .- .-;:'.; ,|,'.lb

KIGThe payment of this item will be deemed to include the cost ot remov.aligy'existing water bound / aggregate base / subbase, transpor.t'ation, stoqkpiling,blending and mixing with addltional coarse or fine materials and crushing theoversize if required to bring it within the specified gradation and to cover up anywastage or losses during deriving of the existing materials, placing andcompacting in accordance with the Specification requirements. The payment ofthis item also includes the compaction of exposed surface after removal of

o

(i)

(ii)

t

| )-

onfi,iilcb;;fi;aYolume-IlI

Sft;Eiiin;visionC -

(Specifications) National Hig hway Authority

oCongtruction of Lahore - Slalkot lvlotoruay (LSM) Unk Hlghway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx,)Package.l FROM Kil00+000TOKM23+000 (23KMs)

t

Specifications | 35

aggregate base course / water bound macadam / subbase in accordance withthe specification req uirement.

The quantities determined as provided above shall be paid for at the Contractunit price, for the pay item listed below and shown in the Bill of Quantities,which price and payment shall be full compensation for all the costs necessaryfor proper completion of the work prescribed in this Section.

The quantities paid for under this Section shall be the quantities actuallymeasured from the existing pavement $ection before deriving and reuse in thenew pavement as described above.

The difference in the quantity of the material placed, laid and compactedbetween total volume of sub base and the volume of the existing base /subbase material derived, laid and compacted shall be paid for under the payitem included in Section 201.

o

aSrieiiiiFroviiionl

(Specifications)

; : ' : '

National Highway AuthorityBidding DocumentYolume-III

oConstruction of khore - Sialkot Motonrvay (LSM) Link Hlghway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)

Packags-l FROM KM 00+000 TO KM 23+000 (23 KMs)

SUBBASE AND BASE

ITEM 2OO GENERAL

Specifications | 36

200.1

20a.2.1

Special Provisions(Specifications)

DESGRIPTION

In para 1, line 2, delete ", base," and insert ", crushed aggregatebase course,".

Samplinq and Testinq

ln para 3, line 5, after "...... Testing and Material (ASTM)', insert thewords "or, for particutar materials or procedures, the British Standardslnstitution,".

National Highway Authority

oConstruction of Lahore - Slalkot Motoruay (LSM) Llnk Hlghway (4 - Lane)Connectng LSM to Narang Mandi and Narowal (73 Km. Approx.)

Packase-l fROM

KM 90+000

TO KM 23+000 t23 KMs)

ITEM 201 GRANULAR SUBBASE

Specifications | 37

201.2 MateriafRequirements

In para (a):

i) fn second line, delete " A, B and C" and repface with "B".

ii) In the table of Grading Requirements for Subbase Material,delete

"grading A ".

a

, j t t ' t ' r ' ' i' t - ; t i : . : '

' :','. 1-S__-r-=.,;

' l . ' ' r : : r . t - ' - - t t ' '

Btdding DocumentYolume-Ill

Special Prcvisions(Specifications) National Highway Authority

oconstruction of Lahore - Slalkot Motorway (LSM) lJnk Hlghway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)

Packagei FROM KM 00+1109 TO KM 23{100 (23 KMs}

ITEM 202 AGGREGATE BASE

Specifications | 38

o

202.1

242.2

202.3

2423.1

DESCRIPTION

Add at the end:

The word'Aggregate Base" wherever appeailng in ltem 202 should beread as "Crushed Aggregate Base Course".

Material Requirements

i) In para (a):

(1) In line 2, delete " or 8".

(2') In the table of Grading Requirements for Aggregate BaseMaterial, delete "gradang B'.

In para (e), line 2, aller "the material" add the following:

"and the portion of filler, including any blended material, passingNo. 40 mesh sieve"

qoNSTRUCT|ON REQUTREMENTS

Preparation of surface for Aggreqate base course

Add the following at the end of para2

It shall be mandatory upon the Contractor to lay the aggregatebase course in specified thickness, line and grade on approvedsurface using mechanical paver. The paver shall be powerpropelled unit, provided with automatically controlled screeds andfeed controls capable of spreading the aggregates andmaintaining specified thickness and grade. The paver shall beequipped with receiving hoppers having sufficient capacity for auniform spreading operatlon. The paver shall be operated at aspeed to give best results. The mechanical paving machine has tobe approved by the Engineer prior to start of spreading aetivity.

ii)

National Highway Authority

o

l-

construction of Lahore - Slalkot Motorway (tSM) Llnk Hlghway (4 - Lane)Connecting LSM to Narang Mandl and Narowal (73 Km. Approx.)

Pacfaell FRoM KM 00+{,00 To KM 23{100 (21 KHs)

ITEM 203 ASPHALTIC BA$E COURSE PLANT MIX

Specifications | 39

i)i i)

2O3.2.4 Job-Mix Formula

o

o

oBidiling DocumentVolume-III

203.2.2 Asphattic Material

ln line 2, delete '40-50, 60-70 or 80-100" and replace with '60-70'.

203.2.3 Asphalt Concrete Base Course Mixture

In line 2, delete "Class A andlof'.ln the table of Combined Aggregate Grading Requirements(Table 203-l), delete grading for "Class A".

After para 3, add the following:

The combined gradation should produce a smooth curye approximatelyparalleling grading band limits for designated mix. The job-mix formulawith allowable tolerances for a single test then becomes the job controlgrading band. lf application of job-mix tolerances results in a job controlgrading band outside the master grading band, the full tolerances shallstill apply.

Prior to final approval, the proposed job mix, with a bitumen content atthe permissible upper percentage limit determined in JMF, shall becompacted to refusal (750 to 900 blows) and the resulting air voids in themix shall not be less than 3%.

203.3.7 Spreading and Finishins

Defete para 2 and replace with the following:

Care shall be taken to ensure that material is properly compacted up tojoint positions. lf this is not done or results in misshapen surface on alayer, the Engineer may instruct unacceptable material to be cut backbefore laying the adjacent material. Joints in superimposed layer ofasphaltic material must be offset longitudinally by at least 2m andtransversely by at least 30 cms. Longitudinal joints shall, after cuttingback, be of good alignment and preferably coincident with the p-osi,tiop ofcarriageway markings. Except where laying in echefon, joints shall becut back to a vertical face and Tack coated:-K_erb faces, ironwork and;thelike in contact shall be tack coated prioqf6 faying. ,r li,f.,

oConstruction of Lahore - Sialkot Mototway (LSM) Llnk Hlghway (4 - Lane)Connecling LSM to Narang Mandi and Narowal (73 Km. Approx.)

Package'l FROM KM 00+000TO KM 23+000 (23 KMs) Specifications I rtO

The outer edges of wearing course shall be cut back to a good alignment,parallel with the road alignment. This may require a small additionalwidth to be laid.

The Contractor should allow, within his bid rates, for this additional widthand for all cutting back which will not be measured for payment. Tackcoating of vertical faces will not be measured for payment.

203.3.9 SurfaceTolerances

At the end, add the following:

Base Course layer tolerances shall be as given in Table 4.7. lftolerances are exceeded, the full extent of the area which does notcomply with the Specification shall be determined by further samplingand testing and then made good. Unacceptable areas shall have the fulldepth of layer removed and replaced with fresh material. The arearectified shall be the full width of the paving laid in one operation and atleast 15m long for the top layer, and 5m long for lower layers. Areas tobe removed shall have their edges saw cut. Cut faces shall be coatedwith hot bitumen immediately before laying the new material.

Construction Tolerances for Base Gourse

Property Limit Action

Thickness of layer 3mm deficiency

3-1Omm deficiency

> 10mm deficiency or (15%

of design thickness)

Full payment

85olo palment

Replace

Surface irregufarity(3m straioht edoe)

> 5mm Replace (minimum 30mlenoth of road)

Surface level >6mrn Replace (minimum 20mlenoth of road)

The smoothness requirements shall be supplementaf with followings.

The surface irregularities will also be tested by a contractor provided,and approved by the Engineer rolling straight edge of the type designedby Transport Research Laboratoryof UK, along any line or lines pargllg[to the edge of pavement on sections of 300m selected by the Engr1n86f,

a

o

o

tC.onstruction of Lahore- Sialkot Motoruay (LSM) Link Highway (4 - Lane)Conneoting LSM to Narang Mandl and Narowal (73 Km. Approx.)

Package.l FROM KM 00+000 TO KM 23+000 (23 KMs)

203.4.2 Pavment

number of irregularities for a 300m length prorata to the nearest wholenumber. Where the total length of pavement is less than 300m themeasurements shall be taken on 75m length. No irregularity exceeding10mm shall be permitted.

Maximum Permitted Number of Suface lrregularities

t

a

Delete the ltem and replace with:

The quantities for Asphaltic base course will be measured by volume inCu.m. compacted in place. Measurements shall be based on thedimension as shown on plans or as otherwise directed or authorized bythe Engineer. No measurement shall be made of unauthorized areas orfor extra thickness. These items shall include the furnishing of allequipment labor and materials including asphalt additive or anti-strippingagent, if allowed by the Engineer to meet requirements of JMF; thedrying and screening of aggregates; the mixing of bituminous materialwith the aggregates and the placing, furnishing and compaction of themixed material.

Quantities of asphalt concrete mixed, wasted or disposed of in a mannernot called for under the specifications or remaining on hand aftercompletion of the work will not be paid for. The quantities determined asmeasured above shall be paid for at the Contract unit price for theparticular pay items listed below and shown in the Bill of Quantities,which prices and payment shall constitute full compensation for all costsnecessary for proper completion of the work presgribed in the item andapproved by the Engineer:

Speclal Provislons(Specifications)

aBidding DocumentVolume-III

ueing a Rolling Straight Edge

Surface under test lrregularity4mm 7mm

Length 300m 75m 300m 75mAsphaltic Base 36 I 3 1

course

Specifications | 41

k"., :*iJ '

i r.i:i:.r ..dv'f 1

,",i: i i ,! l , :'i.:{ti i '

:.a:i ..r i, \

National Highway Authority

tConetruction of Lahore - Sialkot Nlotonrrray (LSM) Llnk Hlghway (4 - Lane)Connectlng LSM to Narang Mandi and Narowal (73 Km. Approx.)Packase-l FROM KM 00+000 TO KM 23+000 (23 KMs) Specifications 142

ITEM 3OO GENERAL

iiiaaing'D"."ori"iVolume-III

Speclal Provlsions(Specifications)

In para 1, line 5, after "...... Testing and Material (ASTM)', insertthewords "or, for particular materials or procedures, the British standardsInstitution,".

a '/w

National Hlghway Authorlty

IConetruction of Lahore - Sialkot Motorway (LSM) Link Highway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Apprcx.)

PalkaSll FROM KM 00+000 TO Kirt 23+000 (2S Xtrts.)

ITEM 302 BITUMINOUS PRIME COAT

302.3 CONSTRUCTION REQUIREMENTS

In para 1, delete sentences 1 to 3 and replace with:

Prior to the application of prime coat loose material, dirt and otherobjectionabte materiat shall be removed from the surface and thesurface shall be cleaned by mechan:cal sweepers, blowerssupplemented with hand brooms. The application is prohibited when theweather is foggy or rainy or when the atmospheric temperature is belowfifteen (15) degree C unless otherwise directed by the Engineer. On asoil surface or sub base or base course, the cleaned surface shall begiven a light application of water and allowed to dry to a surface drycondition before prime coat is applied.

o

o

IBidding DocumentVolurne-IlI

Special Provisions(Specifications)

Specifications | 43

*.0o"", High*ay editority

Construction of Lahore - Slalkot Motoruay (LSM) Link Highway (4 - Lane)Connectlng LSM to Narang Mandi and Narowal (73 Km. Approx.)

O Package.t FROMKM0O+000TOKM23+{t0O{23Klls} Specifications I 44

ITEM 305 ASPHALT CONCRETE WEARING COURSE.PLANT MIX

345.2.2 Asphaltic Material

Delete entire para and replace with:

"Asphalt binder to be mixed with the aggregate to produce asphalticconcrete shall be asphalt cement penetration grade 60-70 or a gradeapproved by the Engineer. Generally it will meet the requirements ofAASHTO M-20'.

305.2.3 Asphalt Concrete Wearins Gourse Mixture

ai)

i i)

i i i)and

In line 2, delete " and/or Class 8".

ln the table of Asphalt Concrete Wearing Course(Table 305-1), delete grading of "Class B'.

In Marshal Test Criteria, Percent air voids in mix,replace with "3.5 - 5.5".

Requirements

defete "4 - 7"

o

305.2.4 Job-Mix Formula

After para 4, add the following para:

Prior to the final approval, the proposed job mix, with a bitumen contentat the permissible upper percentage limit determined in JMF, shall becompacted to refusal (400 to 600 blows) and the resulting air voids in themix shall not be less than27o.

Add the following at the end:

When the Engineer is satisfied that JMF proposed by the Contractorconforms to all the requirements of the specifications, he shall order theContractor to construct a two hundred (200) meter long field control strip.The Engineer shall evaluate the control strip as to its constructability andcompactability and the mix for conformance to the laboratory tested JMFwithin the tolerances. lf the Engineer is not satisfied with the results ofthe control strip, he shall state his objections in writing and request a

a

oConstruction of Lahore - Sialkot Motorway (LSM) Link Highway (4 - Lane)Connecting LSM lo Narang Mandi and Narowal (73 Km. Approx.)

Package-l FROM KM 00+000 TO KIrl 23+000 (23 KMs)

results are acceptable, he will issue written acceptance to the Contractorto begin producing the mixes proposed.

Production of bituminous concrete mixtures shall not begin until theEngineer has given written acceptance of the Job Mix Formula.

Acceptance of the JMF by the Engineer does not relieve the Contractorof his obligation to produce bituminous concrete mixtures conforming toall specifled requirements.

305.3.2 Pavement Thickness and Tolerances

At the end, add the following:

The surface irregularities will also be tested by, contractor provided, andapproved by the Engineer rolling straight edge of the type designed byTransport Research Laboratory of UK, along any line or lines parallel tothe edge of pavement on sections of 300m selected by the Engineer,whether or not it is constructed in shorter lengths. Sections shorter than300m forming part of a longer pavement shall be assessed using thenumber of inegularities for a 300m length prcrata to the nearest wholenumber. Where the totallength of pavement is less than 300m the measurements shall be takenon 75m length. No irregularity exceeding Smm shall be permitted.

Maximum Permitted Number of Surface lrregularitiesUsing a Rolling Straight Edge

Surface underTest lrregularity

5.0mmLengthrring course

300m20

75m5

In addition to meeting the other conditions as specified hereinabove andin General Specifications the Contractor shall be responsible to ensuresatisfactory riding quality of Asphaltic wearing course in terms of lRl(lnternational Roughness lndex). The riding quality shall be checked atthe time of making measurements of the item, handing over andsubseguently at the end of one year period or at any intermediateinterval as deemed necessary by the Engineer.

The Contractor shall perform roughness evaluation in terms of lRl forsmoothness of the surface. The Contractor shall arange all the

o

o

oBiddingDocumentYolume-IlI

Special Provisions(Specifications)

Specifications | 45

National Hi,ghway Authority

IConstruction of Lahore - Sialkot Moton^/ay (LSM) Llnk Hlghway (4 - Lane)Connecting LSM to Narang Mandl and Narowal (73 Km. Approx.)

Package.l FROU KM 00+000 TO Khl 23+1t00 (23 KMsl Specifications | 46

o

equipment including profilometer of acceptable model and make for thispurpose. The equipment shall be calibrated as perinstructions/recommendations of the manufacturer and to thesatisfaction of the Engineer. The testwith this calibrated equipment shallbe performed in presence of the Engineer and the results shall beapproved by the Engineer. Shall there be any disagreement on anyportion of the test reach and/or results, the test shall be repeated. TheContractor shall not be paid for arrangement(s), performance and anyincidentrals required for satisfactorily performance and/or any remedialmeasures required to bring the surface conditions within the acceptablelimits (< 1.5 m/km). The cost shall be deemed to be included in the unitrate for the item.

The test surface shall be cleaned, if required, and shall generally bepeformed in the both wheel paths of the lanes/cariageway or as perdirections of the Engineer. The lRlshall have limiting values as shown intable below. These values are in meters per kilometer computed onbasis of 200 meter section. The Contractor is required to make thesurface conditions within the acceptable limits. The price adjustment, ifrequested in writing by the contractor and approved by the Engineer, forany particular section, for item unit rates approved in bid shall beadjusted/evaluated in each section as per limiting values shown in thetable below:

Table: Limitinq values for the (lRl) for Ridinq Qualitv

o

lRl m/kms1.5

1.50 - 1.901.9A - 23A2.30 -2.70

>2.70

Deduction (7o)0101525100

305.4.2 Pavment

o

Para 2 of Price Adjustment

Delete 3d line from "or the Contractor may opt to place an additionallayer of wearing course asphalt, grading with a minimum thickness of35mm".

( x -

speiiii'ProvisionJ(Specifications)

':.t .i-

'--.' : : ^ 1 a r 1 - - - , - - -

t" .i..;-..'-.",

biaailgila;;tVolume-llI Netional Highway Authority

aConstruction of Lahore - Slalkot Motorway (LSM) Llnk Hlghway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx,)

Package-l FROM KM 00+000TOKll23+000 {23KMa)

STRUCTURES

ITEM 401 CONCRETE

Specifications I 47

A

A.1

CONCRETE DESCRIPTION

Between "aggregates" and "all in accordance", add "and chemicaladmixtures

as may be required".

Tolerances on dimeneions and settins out

Concrete structures in their final state must present the same dimensions asshown on dxawings and compfy with the following tolerances:

Tolerances (TL) on every dimension (d), (length, width, diagonal or thickness) willbe given by the formula:

TL = 0.25 (d)tr2 where TL and d are given in mmThe tolerances (TL)will have to be within:

- a minimum of 10mm-andamaximum of 70mm

Tolerances of_plumb (TA) for a height h is given by the following formula:TA = 0.5 (h)"'where TA and h are given in mm

Tolerances of flatness

Ordinary surface form finish

- Unit flatness built up by a 2 m ruler shoufd allow spaoe less than 15mmbetween the concrete and the ruler.

- Local flatness buiH up by a ruler of 0.20m should allow a space less than6mm between the concrete and the ruler.

Class 1: Surface form finish

- Unit flatness buift up by a 2m ruler will allow a space less than 7mmbetween the concrete and the ruler.

- Local flatness built up by a ruler of 0.20m will allow a space less than2mm between the concrete and the ruler.

4.4 Setting out and leveling tolerances

4.4.1

All tolerances for topography will be controlled by extemal conbol.

In pfan, at the edges, the tolerances are:- 30 mm forfootings- 30 mm for piers

401.1

4.2

4.3

A.3.1

A.3.2

Fid.iingix;.il-i'"tVolume-IlI

a

o

oSpecial Provisions

(Specifications) Nationel ftighway euthority

oconstrucdon of Lahore - Sialkot Motonrvay (LSM) Llnk Hlghway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)

Package-l FROM KM 00+999 19 KM 23+1100 (23 KMs)

20 mm for decks

4.4.2 In elevation, the tolerances are:

30 mm forfootings

20 mm for the top of a pier

3 mm for the top of a bearing pad

25 mm for a slab intrados

25 mm fora slab extnados

The Gontrac{or will take all the provisional measures to achieve these values; forinstance:

- Camber for false work due to its settlement and deformation, taking intoaccount the schedule of concreting / prestressing.

- Stiffeneni on formworks.

In case of dimensions exceeding the tobrances, the Contractor will make aproposal for conections to the Engineer. lf accepted by the Engineer, repairs willbe made as soon as possible. lf not accepted, the Engineer can require partial ortotal demolition of unsatisfactory structures, and reconstruction will have to takeplace without any extra payment.

Grackinq

Reinforced concrete structures must not show cracks larger than 0.3 mm.Therefore, cracks of width larger than 0.3 mm will be injected by a suitableepoxy - resin in a way approved by the Engineer.

lf cracks are due to improper materials, wokmanship etc., the Engineer can stopthe concreting until investigations and testing, at the cost of the Contractor, havebeen completed.

lf necessary, the Engineer can demand demolition and reconstruction of thestructure, without any extra-payment.

Add the following to 401.2..1

401.2.1 PortlandGement

a

B

a

In saline areas or under contions (stretches) where concrete is exposed to therisk of deterioration due to sulphate aftack sulphte resistrance cement (SRC) shallbe used as per the direction of the Engineer., rSRC:c€ment shall meet the

IBidding DocumentVolume-IlI

Sd6ciai Provtltons(Specifications)

Specifications I 48

National Highway Authority

aconstuction of Lahore - Slalkot Motorway (LSM) Link Highway (4 - Lane)Connecting LSM to Narang Mandl and Narcwal (73 Km. Approx,)

Package-l FROM Kiil 001000 TO Klt 23{000 (23 Ktils)

The C3A content in SRC cement must not exceeds 3.5% and shall has alkalicontent below 0;670.

Add the following to 4Q1.2.2

4A1.2.2 Fine Aqqreoate

All concrete surfaces shall be considered as exposed to humid conditions. So,fine aggregates used in the preparation of concrete shall be tested for alkali-aggregate reaction, by ASTM-C-289.

Add the following to 401.2,3

401.2.3 Coarse Assresate

All concrete surfaces shall be considered as exposed to humid conditions.Therefore, coarse aggregate used in the preparation of the concrete shall testas perASTM-C-289.

Add thefollowing to 401.3.5:

401.3.5 Handlinq and placino concrete

a) General

"Before concreting in any section, reinforcement shall have to be completelycleaned and free from all contaminations, including concrete which may havebeen deposited on it from previous operations. Concreting will take place onlyafter the Engineer has inspected the placing of the reinforcement and given hisapproval.

The Contractor will allow the Engineer eight (8) working hours after thereinforcement is in place to conduct the inspection.

The Engineer should check the records of concrete placing as stated below:

Records, in a form as agreed to by the Engineer shall be kept by theContractor containing all details of every pour of concrete plaoed. Theserecords shall include Class of concrete, location of pour, weather conditions,date of pour, ambient temperature and concrete temperature at time of placing,moisture content of aggregates, details of mixes, batch numbers, cement batchnumber, results of all tests undertaken, location of test cylinder sample pointsand details of any cores tiaken.

The Contractor shall supply to the Engineer two copies of these recqrds.eachweek covering work canied out the preceding week. In addition, n",$'ltiJt$pBty,to the Engineer monthly histograms of all 28 days cylinder strengths togother. .with accumulative and monthly standard deviations and qny otngl,intogattTnffiwhich the Engineer may require conceming the concrete placdrnent'in the r- /Works".

iiidaii'g n""u-;;tVolune-III

O

a

aSpecial Provisions

(Specifications)

Specifications | 49

National Hiighway Authority

aConstruction of Lahore - Slalkot Moton^,ay (LSM) Llnk Highway (4 - Lane)Connecling LSM to Narang Mandi and Narowal (73 Km, Approx.)

Packase.l FRotrl KIrl 09+900 To Kit 23+000 t 1*$l

Add the following to 401.3.6:

401.3.6 Gastins Sections and Construction Joints

Specifications | 5O

a

e) Gonstruction Joints

"The Contractor may require a different location of construction joints which are

not shown in the drawings. lf so, this requirement shall be subjected to the

Engineer's agreement. lf the stresses distributions in the structure are changed

by the new construction joints, new calculations can be asked from the

Contractor for checking the reinforcement. lf the quantities of steel and

formwork are increased, no extra payments shall be made. Elsewhere, on

visible faces, aesthetical treatment of construction joint will be provided without

any extra payment.

Modify 401.3.7 as follows:

401.3.7 Concrele Surface Finishins/Renderinq

Delete and substitute 401.3.7d with:

Ordinarv Surface Form Finish

"Ordinary surface form finish will follow AASHTO-SS-8.',2.2.Non-shrinkable mortar will be used.

Ordinary surface form finish shall be applied to all concrete surfaces,except those of Class 1 form finish which are defined hereaftef'.

Delete and substitute 401.3.7e with :

Class 1 Surface Form Finish

"Class 1 surface form finish willfollow the AASHTO-SS-8.12.3.

Metal, fiber or plywood forms in good conditions will be usedexclusively.

"Class 1 surface finish shall systematically be required to be applied asthe final finish for the following surfaces, unless otherwise dife.gteO bythe Enginee ;;'.. .'-

/t6i) All form finish surfaces of bridge super-strugtures, except ihJ

under surfaces between girders.

d)

oe)

Bldding DocumentVolunre.IlI

Speclal Prcvlslons(Specifications)

a

oConstmctlon of Lahore - Sialkot Motorway (LSM) Link l'lighway (4 - Lane)Connecting LSM to Narang Mandl and Narowal (73 Km. Approx,)

Package-l FROI, Kl, 00+000 TO KM 23+000 (23 KMs)

401.3.10

401.4

Specifications | 51

ii) All surfaces of bridge piers, columns and abutments, and

retaining walls above finished ground and to at least three tenth(0,3) meter below finished ground.

iii) All surfaces of baniers".

Add the following to 401.3.10

Iestlnq of Gompressive Strenqth

"Equipment used for trial batches will have to be the one that would beused on that specific job".

Modify 401.4 as follows

MEASUREMENT AND PAYMENT

Add the following to 401.4.1

In case SRC cement is used, it shall be measured in tons used toprepare the respective class of concrete.

Add the following to 401.4.2

between "also fot'' and "such work", add "all materials and"

Add the following to 401.4.2

In case the pier piles are extended upto the transom of the longitudinalbeams by a pier of the same diameter, the limit of measurement for pilesand therefore for the grade of concrete is assumed to be the naturalground level or waterway bed.

In casb, SRC cement is used, lt shall be paid as the difference of costusing SRC cement in place of OPC c,ement for respective concrete classforthe specificwork in addition to BOQ rates of the conesponding class ofconcrete.

Add the following pay item

Speclal Provislons(Specificalions)

a

o

(\...---t - o

National Highway Authodty

JBidding DocumentVolumo-lII

Difference of cost using SRC Cement in place ofOPC Cementfor Concrete A3 Under Ground (Piles)works in addition to BOQ rates.

Icrnstructioh of Lahore - Slalkot Motorway (LSM) Link Highway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)

Palkaee-t FRoI Klt 90+10.9 ro.KM 23+000 (23 1M:)

ITEM 403 FORMWORK

Specifications | 52

Add the following to 4O3.1

Alternative

The Contractor may require for formwork of "insitu" concreted slabs, the use ofthe altemative (not shown on drawings) solution "lost formwork" such as pre-castreinforced concrete slabs or fiber-cement planks. In that case, he will have tosubmit the materials and way of placing to the Engineer for approval. Thisrequirement will be accompanied by a calculation note. Any extra steel orextra-foundation to be added due to this proposal should be canied out withoutany extra payment to the Contractor.

o

/k6

National Hlghway Authority

aConstruction of Lahore - Slalkot Motoruay (LSM) Link Hlghway (4 - Lane)Gonnecting LSM to Narang tvlandl and Narowal (73 Km. Approx.)

Package-l FROM Kil 00+(100 TOKM 23+000 (23 KMs)

ITEM 404 STEEL REINFORCEMENT

Specifications | 53

Modify 404.3.1 as follows:

404.3,1 Fabrication of Bent Bars

Add the following to 404.3.1:

a) Order teste

b)a

Project shop drawings for bar lists and bending diagrams will beprovided to the Engineer for approval, according to AASHTO-SSSection ll-9.3. These documents shall be given to the Engineerat leastone month before placing the steel.

Fabfication

For deformed bars grade 60, bending will be made only mechanically".

Delete in 404.3.1.c from the word: "Stiffups" to the end, and substitutewith:

- "- Stirrups and column tie bars: D= 4d for d < 16mm

- Other bars having d < 32 mm

- Grade 60: D=8 x d

- Grade 40: D=5 x d

Add the following to 404.3.1

Shippino

Allgrade 60 bars will be shipped to the site in straight bars.

Modify 404.3.2asfol lows: . , ia, : , j : . ,

4A43.2 PlacinE and Fastenins

Add the following to 404.3.2:

b) Placins and Fastening

Toferances

Tolerances on bars placing will be +20mm in any directionparallel to a concrete face, and 11Omm at right angle to a face.

- Control of formwork before placing the steel:

No reinforcement shall be placed before the Engineer has

inspected the formwork and given his approval. The contractor

c)

a

aBidding DocumentYolume-III

Special Prcvisions(Specifications) National Highway Authority

oConstruction of Lahore - Sialkot Mobrway (LSM) Llnk Hlghway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)

Package-l FROiI Kl,l 00+009IO KM 23+1100 (23 KMs) Specifications | 54

I

shall allow the Engineer at least four (4) working hours afier theform is finished to conduct the inspection".

Delete in 404.3.2.e from the words 'Top of slab" to the end and replaceit by:

e) Goverins

- For DIA < or = 20mm

The minimum cover will be 30mm except for the faces in contactwith soilwhere a minimum cover of 40mm is reouired.

- For DIA > 20mm

The minimum cover will be4Omm everywhere except for thefaces in contact with soil where a minimum cover of 50mm isrequired.

ftG

siCCiai pr6viCions(Specifications)

a

odidai;s it;c"-;,1Volume-III National Highway Authority

oConstruction of Lahore - Sialkot Motorway (LSM) Llnk Highway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)

Packase-! FROMKM00+000TOKM21+000 (23KMs)

ITEM 404 STEEL REINFORCEMENT

Specifications | 55

o

Modify 404.3.1 as follows:

404.3.1 Fabrication gf Hent Bars

Add the following to 404.3.1:

a) Order tests

Project shop drawings for bar lists and bending diagrams will beprovided to the Engineer for approval, according to AASHTO-SSSection ll -9.3. These documents shall be given to the Engineerat least one month before placing the steel.

b) Fabrication

For deformed bars grade 60, bending wifl be made onlymechanically".

Delete in 404.3.1.c from the word: "Stirrups" to the end, andsubstitute with:

- "- Stirrups and column tie bars: D= 4d for d < 16mm

- Other bars having d s 32 mm

- Grade 60: D=8 x d

- Grade 40: D=5 x d

Add the following to 404.3.1

c) Shippins

Allgrade 60 bars will be shipped to the site in straight bars.

Modify 404.3.2 as follows:

404.3.2 Placins and Fastenins

Add the following to 404.3.2:

b) Placins and Fastenins- Tolerances

Tolerances on bars placing will be t20mm in.anyparallel to a concrete face, and 11Omm at right angle toface.

r -

Controlof formwork before placing the steel: i'; I

c

+6a

liia.iii'!- b"".i-""iVolurne-III

Special Prcvisions{Specifications)

f.lafionat Hbf'r*"y ;uthority

oC.onstruction of Lahore - Slalkot Motonvay (LSM) Llnk Hlghway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Appox.)

Package-l FROilKM00+000ToKM23+000 (23KMs)

e)

Specifications I 56

No reinforcement shall be placed before the Engineer hasinspected the formwork and given his approval. Thecontractor shall allow the Engineer at least four (4) workinghours after the form is finished to conduct the inspection".

Defete tn 404.3.2.e from the words "Top of slab" to the end andreplace it by:

Covering

- For DIA < or = 20mm

The minimum cover will be 30mm except for the faces incontact with soil where a minimum cover of 40mm isrequired.

- For DIA > 20mm

The minimum cover will be4Omm everywhere except forthe faces in contact with soilwhere a minimum cover of50mm is required.

Special Provisions(Speciftcations)

a

I

,ffir i . r ; . ; , . . . - ; '

f : i'1 , - i

, : 1

. . . : ,'iir,,'

onia-ai"g n".urnetiiVoIume-[Il National Highway Authority

aConstruction of Lahore - Slalkot Motorway (LSM) Link Hlghway (4 - Lane)Connecffng LSM to Narang Mandi and Narowal (73 Km. Approx.)

Pa:T9e-l FRoM KM 00+009 To KM 23+000 t23 KMs)

ITEM 405 PRESTRESSED CONCRETE STRUCTURES

Specifications | 57

o

405.3

405.3.1

405.3.3

405,3.4

BiddingDocumentYolume-III

Co-N$TRUCTTON REQU IREMENTS

Add the following to 405.3.1:

Prestressinq Method

In his submittal, the Contractor will also describe techniques he intendsto use for:

- Placing ducts and stands.

- Marking ducts completely tight against accidental entrance oflaitance during concreting.

- Prestressing operations and measurement of elongation.

- Injection.

Cutting of tendons surplus, and filling anchorage recesses.

He will also ensure that all provisions will be taken for the protection ofprestressing steel, ducts, anchorages, jacking and grouting equipments and allmiscellaneous items. Protection will be on storage areas, and also at everystage of construction until injection by grouting and concreting of anchoragesrecesses.

Alltype of protections will be described in details (methodology and materials)by the Contractor in his submittal. As for the "storage of materials on site" hewill follow AASHTO-SS Division ll 10.3.1.6.

It is assumed that all these provisions will be sufficient to ensur€ that the frictioncoefficient of strands/ducts will be included between 0.20 and 0.24 and no- .oxidation on steel (ducts and strands) will occur.

Add the following to 405.3.2

Prestressino Eouipmqnt

At least three (3) jacks will be provided on the job in good conditiohs,accompanied by certified calibration curve.Add the following to 405.3.4

Placino Steel

Density of supports, their stiffness and accuracy of position are parameters thataffect the loss of tension in cables due to wobbling. The Contractorwilltake allsuitable provisions to reduce this "wobbling effect".

In particularly, the space between two supports will be less than 1mm.

Speclal Provislons(Specifications)

a

/t'

i}-t

aNational Highway Authority

oConsiruction of Lahore - Sialkol Motorway (LSM) Llnk Hlghway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)

Package-l FROM KM 00+000 TO KM 23+{100 (23 KMs}

405.3.7

405,3.8

Specifications I 58

Add the following to 405.3.7

Post Tensioninq

A record shall be kept of the Jacking forses and elongations atevery stage, in aform that will be submitted by the Contractor and accepted by the Engineer.

- After cufting surplus length of cables, recess will be filled by concrete typeY.

Delete 405.3.8 and substitute by:

Groutinq of Bonded Steel

All ducts used for post-tensioning will be filled by injection of grout.

a) Grout

lt shall be a mixture of cement, water and, eventually, admixtures.Composition shall be submifted to the Engineer for approval, alongwith thefollowing informations:

The nature, quality and origin of the constituents.

- Measure by weight of each constituent,

- Sequence of Mixing

The cement wlll be Portland cement that does not exhibit phenomenon of "falsesetting" (Test of TUSSCHENBROOK), without any sulphur ions S--, with achloride ions Cl' less than 0.05o/o, and without any element susceptible toinduce conosion of steel.

- The water will not contain chloride ions Cl- more than 500 mg/1, sulphateions SO more than 400 mg/|, and no detergent

- Type of admixtures.

The submittal will include the chemical composition of the grout and results oflaboratory tests for the following features:

I

SweatingFluidityMechanical Strength

Sweatlnq

during three (3) hours must be less than 2o/o of the volume of the grout; thiswater must be totally re-absorbed twenty-four (24) hours after the mixing.

Fluiditv

Special Provisions(Specffications) National Highway Authority

Coustnrction of Lahore - Slalkot Motorway (LSM) Link Hlghway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Apptox.)

Package-l FROM KM 00+000 TO KM 23+000 (23 KMs)

405.3.9

(b)

Specifications 159

The flow-out time through the MARSH cone with a 10 mm hole diameter, will beincluded between 13 and 25 seconds during the time foreseen for the grouting,and at least for t hour, at a temperature of 32oC.

Mechanical Strenqth

At 28 days, cylinder strength will be more than 300 kglSq cm.

Grouting Operation

AASHTO - Division ll - 10.6 will be followed.

Note that mixing water will have to be cooled in summer whentemperature of concrete will be above 32oC'

Quality Control:

Laboratory tests

They will be made to veriff the suitability of the grout composition to theintended basic features here above specified.

Checking tests on site

Checking for sweating and fluidity will be made 24 hours before beginning ofthe injections at the conditions that will really prevail at the injection time; samematerials and equipments will be used for the purpose.

Results of test wilt be transmitted to the Engineer.

c.3 Tests during grouting operations

For each operation, three series of fluidity tests will be made. Each seriesconsist of one test on the grout at the entry vent and one test on the grout at theexit vent. Results of test will be transmitted to the Engineer as well asquantities of grout actually consumed for each duct.

Delete and substitute 405.3.9 by:

Handlino - La!.rnching - Placino:

Working Shop Drawings of handling and all operations to the final positioning of'girders will be submitted to the Engineer.

lf permanent displacements of the piers/abutments or of the neoprene bearingsare induced as a result of Contractofs methodology, these displacements willbe calculated by the Contractor and provisions, like jacking, will be provided byhim at his own cost to relieve the structure of these displacements.

Calculations notes showing that stability of beams, inclusive lateral buckling,are ensured at every stage until transverse prestressing will be provided. Thissubmittal does not relieve the Contractor of his full responsibility duringhandling, transport, placing, and attached operations like jacking or slimmings.

Delete 405.4 and substitute by:

Speclai Pnivisloni(Specifications)

(c)

c.1

c.2

*",'on"i t,nn*", or*"n,,

tConatruction of Lahore - Sialkot Motorway (LSM) Link Hlghway (4 - Lane)Connectlng LSM to Namng Mandl and Narowal (73 Km. Approx.)

P?ckls:-l FRoM Kll 00+000 ro KM 23+0.00 t23

lws)

405.4

405.4.1

405.4.2

405.4.2.1

o

o

oiiidaiiig ri"cdiitVolume-IIl

Si,sCiii P-bvisioni(Specifications)

Speciflcations | 60

MEARUREMENT AND PAYMENT

Measurement

Measurement for the prestressed conc€rt girder (complete in all respects) shallbe made for number of girders of various types actually installed at site.

Pavment

Delete entirely after para 1 and insert the following:-

Nation;l Hi;wav nuuroritv

tCongtrucdon of Lahore - Slalkot Motorway (LSM) Link Hlghway (4 - Lane)Connectlng LSM to Narang Mandl and Narowal (73 Km. Approx)Pad<age-t FROM KM 00+000 TO Kit 23+000 (23 KM3)

o

406.2.5 Elastomeric Bearlns Pads

Add at the end of znd line, para 3; "and shall be of imported type'.

Pavmgnt

Add following Pay ltems as follows:

iiia.iing if"."-""tVolume-llI

a

o

Specifications | 61

ITEM 406 JOINTS AND BEARING DEVICES FOR CONCRETE STRUCTURES

M

M

sq.m

sq.m

,,*(,

/ A +

Special ProMsions(Specifications)

. ' t "

National Highway Authority

aIII

Con*ructlon of Lahore - Sialkot Motorway {LSM) Llnk Highway (4 - Lane)Connectlng LSM to Narang Mandi and Narowal (73 Km. Approx.)

P€cl:so-l FROM KM 00+000 To KM 23+000 (23 KMs)

ITEM 407 PILING

o

a

oBiddingDocumentYolume-III

Specifications | 62

Add foffowing para after para. 407.3.12

407.3.13 Pile (Sonic) lnteEritv Test

All working piles shall be subjected to Pile (Sonic) Integrity Testing (SlT) by a specialistagency engaged by the Contrac'tor. The SIT equivalent like FPDS (Foundation Pile DiagnosticSystem) or equivalent, as approved by the Employer's Representative, shall be used for thispurpose. The testing shall be done as per ASTM D5882-07. Before starting this testing, theContractor shall submit his Method staternent for approval of the Engineer's Representative.

The Contractor shall arrange perfornance and interpretation of these tests by the specialistagency like TNO Netherlands or equivalent. The interpretation velocity and defects likenecking / honey combing etc. a separate report shall be submitted for SIT carried out on pilesby the Contractor.

406.4.2 Pavment

Add items as follows:

Special Provisions(Specifications) National Highway Authority

oConstruction of Lahore - Sialkot Motorway (LSM) Link Highway (4 - Lane)Connecting LSM to Narang Mandl and Narowal (73 Km. Approx,)

fackaec.l FROllt KM 00+000 TO KM 23{100 (23 Kfrs)

sP-414S AT BRIDGE SITES, STRUCTURES AND EMBANKMENT

Specifications | 63

a

414.1

414.1.1

414.1.2

414.1.3

Bfddi;C"D;fid;Yolume-III

t

o

Scope of Work

The Contractor shall carry out boring at bridge sites and test pits atlocations marked on the drawings or as indicated by the Engineer.

The purpose of the work specified herein is to determine the type, nature,arrangement, thickness and texture of the various subsurface strata, theconditions and the Engineering characteristics of the subsurfacematerials as they exist to the depth and atthe locations specified. This isto be accomplashed by means of drilling, in-situ testing, collection ofdisturbed and undisturbed soil samples and water samples andlaboratory testing.

The Contractor shall carry out the specified works under the supervisionof the Engineer.

Plant and Equipment

The Contractor shall keep on the site at least one rotary drill machineand one percussion winch along with accessories to meet therequirements of the work. The plant and equipment shall be in goodoperating condition and capable of efficiently performing the Work as setforth.

Drillers and Suoervisorv Stafl

The Contractor shall have on site, at all times, qualified, experienced,orderly and thoroughly competent persons including geotechnicalengineers or engineering geologists who shall conduct and supervisedrilling, sampling, logging and in-situ testing. The Contractor shallremove from the site any of his employees that in the opinion of theEngineer do not meet these reguirements.

The Contractor shall make his own arrangements for housing of hispersonnel, security and storage of the equipment and supplies at thesite.

Settins up at each Hole

The Contractor shall make all the necessary arrangements for setting-upat each location, everything necessary for carrying out the workspecified and for the preparation and reinstatement of the work areas,improvement to access routes and all other temporary works.

I

National Highway Authority

aConstruction of Lahore - Sialkot Motorway (LSM) Llnk Hlghway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx)

Pagkasel FRoM [M

00+{00 To KM 23+{100 tz3

xme)

414.1.4 Measurement of Quantities

414.1.5

414.1.6

414.2

414.2.1

414.2.2

I

The quantities shown in the Bill of Quantities are only approximate. Thepayment shall be made on the basis of actual work performed inaccordance with the Specifications.

Submission of Fie-ld and Laboratgrv Data

The Contractor shall supply complete field and laboratory investigationdata to the Engineer within the time set-forth for completion of works.This data shall include copies of all the approved logs and test recordsprovided during the course of the Contract including any alterations oramendments required by the Engineer.

Location of llrvestisation Poinls

The locations of the investigation points are shown on drawings.However, the actual locations of shall be established in the fieldby the Contractor on the basis of the drawings to be provided tohim later or as directed by the Engineer. Locating the boreholesaccurately in the field shall be sole responsibility of theContractor.

It is to be understood thai further drawings may be issued by theEngineer showing the revised locations of investigation points.

All the investigation points shall be located by field survey to anaccuracy of 1 m in plan and 0.05 m in ground elevation by theContractor.

Methods of Workinq

Areas to be Investisated

The location of the boreholes are as marked on the drawings. TheEngineer will specify from time to time during the contract period theexact location and reference number of all holes. To locate the holesaccurately in the field shall however be the Contractor's responsibility.

Casins

A hole shall be cased in any stratum which is friable or not sufficientlystrong to stand unsupported, or when directed by the Engineer.

The Contractor shall ensure that casings are of a suitable size and areinserted in such a manner as to render them recoverable. The ContractRates for drilling shall be deemed to include the supply, insertion and.. X1-lecovery of casing and any damage, loss or delay caused by difficuls 91'/dGfailure in recovering casing. :, ': ; r .J.'it,t, r " i

i ! I

Speclal Provisions(Speclfications)

a)

b)

c)

a

a 'riiading ii6criii6nt

Volume.Ill

Specifications | 64

t

414.2,3

414.2,4

414.2.5

414.2.6

Bidding DocumentYolume-III

a

conshuction of Lahore - Slalkot Motoruay (LSM) Llnk Hlghway (4 - Lane)Connec-ting LSM to Narang Mandl and Narowal (73 Km. Approx.)

e Packase-r FROM KM 00+rlOO TO 1!r

23{00 (23 Kr{rf Specifications | 65

Removal of Casino

Casing shall not be removed from any hole nor anyfilling introduced intoa hole until permission is given by the Engineer. This permission willnormally be given as soon as work in the hole is completed and thegroundwater level has been measured.

As far as possible the Contractor shall avoid leaving a hole overnightafter he has begun to withdraw the casing and before he has finished.

Supplementarv Holes

Holes that are abandoned shall be supplernented by the other holesadjacent to the original location. Also holes from which unsatisfactorysamples have been obtained and/or in which unsatisfactory field testshave been performed due to the negligence of the Contractor shall besupplemented by other holes adjacent to the original location. The exactlocation of such supplementary holes shall be specified by the Engineerin the field.

Penetration to the depth where the unacceptable holes were abandonedor lo the depths where unsatisfactory samples were obtained orunsatisfactory field testlng was performed may be made by any methodselected by the Contractor that in the opinion of the Engineer will permitsatisfactory field testing and sampling below those depths at whichoriginal hole was abandons shall be canied out using only the specifiedmethod of advancing the hole.

No payment will be made for that portion of the supplementary holeabove the depth paid for in the unacceptable hole.

Groundwater Level

The groundwater level in holes shall be determined, after completion ofthe hole or when required by the Engineer, as follows.

BackfillinE Holes

Boreholes shall be backfilled with grout as directed'Uy tn" Engineer..

Grouting for bacKilling holes shall consist of a mud formed by mixingone part by weight of bentonite with 10 parts of water, to which shall beadded two parts by weight of cement after the bentonite and water havebeen thoroughly mixed. Alternatively, holes may be backfilled with

t purpose-made pellets of bentonite or bentonite/cement, provided theySpecial Provisions

(Specifications) National Highway Authority

aConstructlon of Lahore - Sialkot Motorway (LSM) Link Highway (4 - Lane)Connecting LSM to Narang Mandl and Narowal (73 Km. ApproxJ

Package.l FROtil KM 00+1100 TO KIrl 23'rO00 (23 KMa) Specifications | 66

are of a size which, in the opinion of the Engineer is compatible with thesize of hole. lf there is no standing water in the hole, grout may bepoured in ftom the top. lf there is standing water in the hole, the groutshall be fed into the boftom of the hole by a tremie pipe, the end of whichshall always be below the groundwater junction while grouting is beingcarried out.

Grout backfill shall be taken up to 30 cm below the original ground fevel.Any apparent loss of grout due to leakage or consolidation within oneweek shall be made-up with fresh grout and then the remaining depth ofthe hole shall be filled with concrete.

414.2.7 Loss

a

414.2.8

414.2,9

Logs of boreholes shall be provided on an approved specimen. Theseshall include descriptions of all strata including details of the soilmacrofabric (such as frequency, orientation and nature of fissures) anddetails of samples taken, and an account of all observations and fieldtests. Logs of boreholes shall include notes on the nature, quantity andcolour of the drilling fluid retums. All logs shall be subjectto the approvalof the Engineer and two draft copies shall be submitted to the Engineer,not more than two days after the hole is backfifled. Soil descriptions shallconform to ASTM designation D 2488 and classified according to ASTMdesignation D 2487. All depths and thicknesses of topsoil and stratashall be recorded in meters and all reduced levels shall be reoorded inmeters with reference to Survey of Pakistan datum. Accuratedetermination of ground levels at aff the hole points is the Contractor'sresponsibility for which no extra payment shall be made.

Gontractor's Res oonsi bilitv for Records

The presence of the Engineer or any of his staff and their keepingseparate drilling records shall not relieve the Contractor of any of hisresponsibilities for keeping records.

Order of Work

The order in which the work is to be accomplished shall be detenninedand approved in the field by Engineer.

Drillins

Depth of Drillins

Drilling would generally be required upto a minimum of 30 meters depthor at least 3m below the pile tip level, as shown.on the Drawings or as

Special Provisions(Specifications)

414.3

414.3.1

IConstruction of Lahore - Slalkot Motorway (LSM) Link Hlghway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)Package.l FROMKiI 00+000TOKM23+000 (23KMe)

414.3.2

414.3.3

414.3.4

414.3.5

Specifications | 67

Accuracv of Alisnment of Holes

Boreholes will be within 2 degrees of the vertical unless the Engineer'sRepresentative has ordered the drilling of an angled hole in which casethe hole angle shall be within 5 degrees of the angle specified.

Drillins Plant

The drilling plant and ancillary equipment to be mobilized at the siteshould be adequate to advance the boreholes in an efficient manner, tothe required depths.

Rotary drifling rlgs shall be of the hydraulic feed type equipped with sidedischarge type fish tial and tricone bits for drilling. Bits and casing shallconform to B.S. 4019: Part l; 1974 or an approved equivalent.

Drilling bits shall be of side discharge type designed to preventunnecessary disturbance of soil at boftom of the hole by flow of driltingfluid, unless the Engineer directs othenruise.

Drillins Procedure

The method of drilling shall be of any approved standard and acceptedmethod by means of which a hole of specified diameter is extended tothe desired depth. The normal method of drilling shall be rotary unlessgravelly strata are encountered where percussion may be used.

During drilling the Contractor shall regulate the drilling operation whichensures minimum disturbance in the underlying material in which thein-situ testing and sampling is to be carried out.

In rock, core drilling shall be canied out in such a mannerand using suchsizes of bits, that the maximum core is recovered. This requires closesurveillance of the flushing media, drilling pressures, lengths of runs, useof appropriate core barrels and other factors relevant to the nature of thematerial drilled. The drill bit shall be withdrawn and core removed asoften as may be necessary to secure the maximum possible amount ofcore. In soft or friable formation, dry drilling techniques may be requiredusing single tube core banel with tungsten carbide bits as directed by theEngineer. The cores would be placed in core boxes in a proper manner.

Stabilizino of Holes

Drilling mud of suitable consistency shall be used during rotary cumwash boring to stabilize the walls of boreholes by preventing caving-inand to avoid disturbance of the sampling horizons. The drilling mud shallbe a mixture of bentonite and water with approved chemical additives

I

a

I

being used, if required, to assist in modifying its density and viscosjfu;, A.The density and viscosity shall be selected.gn5itlEriqtg such fae-tet$_lE5 ':ilf{(2hole stability, cutting operation and undi$rped samphs iecove.ry,,.,, " /

-riiaaingbocument speciaipr6visionc ti='.;\. Q:a .':..,; -

i,,j '. , 'vorume-rrr i#;licJ##i-

\l ,,NaitlonaiHighwaiAutho-rtv

,

Construction of Lahore - Slalkot Motorway (LSM) Llnk Hlghway (4 - Lane)Connecting LSM to Narang Mandl and Narowal (73 Km. Approx,)Package-l FROM Kl, 00+000 TO KM 23+0.00 (Za XUs.)

414.4

414.4.1

414.4.2

414.4.3

414.4.4

Specifications I 68

Where drilling mud is not effective, casing of appropriate size andstrength may be used subject to the approval of the Engineer. lt will beresponsibility of the Contractor to use appropriate means to stabilize thewalls of the boreholes.

It shall be ensured that there is no jetting action of the drilling fluid. Theminimum amount of drilling fluid necessary to carry away the cuttingsshall be used. During drilling the Contractor shall regulate the pressureof the drilling fluid to ensure minimum disturbance to the underlyingmaterial in which the in-situ testing and sampling is to be canied out.

Samplins

General

The Contractor shall take disturbed or undisturbed samples from anyborehole when ordered to do so by the Engineer. This shall include theprovision of all necessary sampling equipment, tubes and containers,crates and boxes, as wellas handling and transportation to the approvedlaboratory or store at site.

Approvql of Equipment

No equipment or containers shall be used unless and until approved bythe Engineer.

Care qf Samples

The Contractor shall be responsible for the safe keeping of samples ofall kinds untilthese have been handed overto the designated laboratoryor disposed-off on the Engineer's instruction as the case may be. Anysample lost, damaged or showing signs of deterioration while in theGontractor's care shall be replaced by the Contractor at no expense.

Labellino Samples

All disturbed and undisturbed soil samples and water samples takenfrom holes shall be clearly labelled. Each labelshallinclude the followinginformation

a) Name of Contract 'l ' ,'1.j.,,.. ''- 'b) Reference number of the hofes n--- ,. ,t.,c) Referencenumberofsample - \-( /

- : : , i , i .d) Date of samplinge) Brief description of the sample (e.g. stiff brown silty clay)0 Depth of the top and bottom of the sample below ground levelg) Number of the sampler tube

Tubes and crates for undisturbed samples shall be labelled "Do not jar orvibrate" and Hauland transport in a horizontal position.

SidlaiProtlsiona(Specifications)

I

a

A ' I '

otilidiiig itocii;i"iVolume-III National H ighway Authority

tConstruction of Lahore - Slalkot Motorway (LSM) Link Hlghway (4 - Lane)Connec'ting LSM to Narang Mandi and Narowal (73 Km. Apprcx.)

Package'l FROM Kil 00+000 TO KM 23+000 (23 KMs)

414.4.5

414.4.6

414.4.7

414.4.8

414.4.9

Specifications | 69

Disturbed Samples

In allthe boreholes, smalldisturbed samples shall be taken at the top ofeach stratum, and at intervals as directed by the Engineer. Materialfromthe cutting shoes of open drive undisturbed samples, and from the splitspoon sampler used for Standard Penetration Tests shall also be takenas disturbed samples.

Undisturbed Samplins

Undisturbed sampling from boreholes shall be done by Shetby tube orPitcher/Denison sampler or as directed by the Engineer. Theundisturbed samples should be properly sealed and preserved asdirected by the Engineer.

Gores

The cores obtained from boreholes shall be carefully removed from thecore barrel and placed in the boxes in the correct sequence, withincreasing depth from left to right and top to bottom in the box. Colouredphotographs of cores should be taken at site.

Where the core is contained in an expandable triple tube liner, the endsof the tube shall be sealed and waxed as directed by the Engineer.

Each core run shall be segregated by labelled wooden blocks 25 mmthick and the depth of the bottom of each run shall be marked on thepartitions in the core box with paint.

No box shall contain more than 3 meters of core.

Gor.e 9amples

Selected cores, preferably not less than 30 cm in length, shall bepreserved as core samples. The preservation would consist of clearanceof any loose sludge, waxing of cores, packing in wooden boxes usingsawdust and labelling before transportation to the testing laboratory.

Water Samples

The Contractor shall take water samples from holes when directed bythe Engineer before the addition of water to the hole unless it isunavoidable. lf necessary, the hole shall be bailed-out before taking thesample to ensure that any potential contaminant is removed. No fuelorother potential contaminant shall be allowed to enter the hole. Themethod of sampling shall be as approved.,by th6, Engineer. $bmples

Special Provisions(Specifications) National Highway Authorily

I

o

onid.iiiig-o"cu;;.tVolume-IlI

tconstruction of Lahore - Slalkot tVlotorway (LSM) Link Highway (4 - Lane)Conneoting LSM to Narang Mandi and Narowal (73 Km. Approx.)

Packase-l FRorl KM 0o*9.910 In 2.3+000 (]s xuel

414.4.10 TransportationofSamples

414.5

414.5.1

414.6

414.6.1

414.6.2

I

All samples shall be shifted to the store at the site, the day they arecollected. Samples in tubes shall be kept and transported with the tubesin a horizontal position.

The samples shall be continuously transported to the testing laboratoryon conclusion of every borehole and on the instructions of the Engineer.The laboratory for testing shall be approved by the Engineer.

ln-Situ Tests

Standard Penetration Tests (SPTs)

When directed by the Engineer the Contractor shall carry out StandardPenetration Tests (SPTs) in boreholes and test pits. The penetrationresistance 'N' shall be expressed as the number of btows of a 63.5 kghammer freely dropping 76.2 cm required to force the standard split tubesampler 30.5 cm into the soil.

Standard Penetration Test (SPTs) shall be conducted in the boreholes inaccordance with ASTM 1586 generally at 1 meter depth interval or asdirected by the Engineer at the site.

Laboratorv Testins

General

The samples are to be tested in a laboratory approved by the Engineer.The Engineer shall have access to the laboratories to supervise andcheck the laboratory testing of the samples. The testing shall be caniedout in accordance with ASTM, BSS or AASHTO Standards or asdirected by the Engineer. The Contractor shall arrange to carry out thefollowing laboratory tests on the specified samples of the subsoilmaterials. The samples to be tested and the tests to be carried out foreach sample shall be specified by the Engineer.

Tvpe of Tests

l .l t .

i i i .iv.

Name Of Test

Grain size analysisLiquid limit, plastic limitSpecific gravityUnit Weight of SoilUnconfined compression (soil)

Unconfi ned Compression (rock)

Natural Moisture ContentStildalPrcng;n;

(Specifications)

o

Sr.No.

o

v.

vi.

vii.bidailailcu"";aYolume-IlI

Specificatiorc | 70

ASTM D 2216

ASTM D &,..ASTM D 43{S.ASTM D 854',r-

nsr-rtr .g) ''riiau

1y,ASTM 'i D 2938

National Highway Authority

tCongtruction of Lahore - Sialkot Motorway (LSM) Link Hlghway (4 - Lane)Conneotlng LSM to Narang Mandi and Narowal (73 Km. Approx.)Package-l FROttl KM 00+fi,0 TO KM 23+{100 (23 KMs}

vil. ConsolidationDirect Shear

Triaxial Compression Test

Sulphate content of SoilOrganic matter content of soil

Total dissolyed salts of soilChloride content of soil

Chemical Analysis of Wateri) Sulphate oontent of waterii) Total dissolved salts of water

iii) Chloride content of wateriv) pH of water

spgcificalions t 71

ASTM D 2435ASTM D 3O8O

ASTM D 4767

BS 1377BS 1377

BS 1377BS 1377

BS 1377

x.

xi.xii.

xiii.xiv.

xv.

I

414.7

414.7.1

Records and Reports

Records

a) The Contractor shall keep accurate logs and records of all workaccomplished under this item. All such records shall be preserved ingood condition and order by the Contractor until these are delivered andaccepted by the Engineer. The Engineer shall have the right to examinesuch records at any time prior to their delivery to him. Separate logs shallbe made for each borehole. The following information shall be includedon the logs or in the records for boreholes.

i) Borehole number or designation and elevation of top of borehole.ii) Method of drilling holes.iii) Dates and time by depths when hole was performed.iv) Type of drilling fluid used.v) Depths atwhich sampleswere re@vered or attempts made to collect

samples along with designation, thickness and type.vi) Record of SPT on borehole log.vii) The classification or description by depth of the materials samples

including a description of condition of compactness or stiffness of soilmateriaf s encountered and rnoisture conditions

viii)Depth of groundwater level if encountered.ix) Depth of bottom of borehole.

b) Thespecifiedof each

,'r;ji,

c) The presence of Engineer or the keeping of separatelibiclebords bythe Engineer shall not relieve the Contractor of the responsibillty'for thework specified in this Section. Payment shafl not be made f<ininy workfor which the records have not been furnished by the Contractoi.

National Highway Authority

construction of Lahore - Slalkot Motorway (LSM) Llnk Hlghway (4 - Lane)Gonnecling LSM to Namng Mandi and Narowal (73 Km' Approx')

I Package-l FROM KM0O{OOOTOKM 23+000 {23l(Ms)

414.7.2 Repo$$

414.8

Specifications | 72

a) The results of each borehole, and the field tests carried out shall becommunicated to Engineer as follows:

Oral reports as the work procedsThree sets of complete data of the work within two (2) days of thedate of completion of borehole.

The data shall comprise:

A site plan showing the position of the boreholes and giving their mapreferenceThe borehole logsComplete results of field testsComments on any pointwhich the Engineer has putto the Contractorfor inquiry and investigation during the works.

c) Complete results of laboratory tests shall be cornmunicated to theEngineer within seven (07) days of the data of completion of borehole.

Measurement and Pavment

The measurement and payment for the work specified in the Contract fordrilling of bore holes, excavation of test pits, collection of disturbed,undisturbed and rock core samples, pedorming the standard penetrationtests, laboratory testing and compilation and subrnission of results shallbe done and paid as per the pay item given in the BOQ, which paymentshall be full compensation for furnishing all labour, material, tools,equipment and incidentals and for performing all the work involved in thisitem as mentioned above in this specification.

i)i i)

b)

i)

ii)iii)iv)

o

Items Description

SP-a1 (a) 4" dia drilling rotary wash boring includingback filfing of holes from NSL upto 42m depthor as desired by the Engineer

SP-414(b) Performance of SPT yC collection,preservation & Transportation of disturbedsamples to an approved Laboratory.

SP-ala(c) Collection of undisturbed soil samples fromboreholes using Shelby Pitcher/denisonsampler l/C preservation and transportation ofsamples to an apProved Laboratory.

SP-414(d) Performance of FDT in test pits through sandreplacement'method l/C moisture contentdetermination.

SP-41a(e) Excavation of test pits upto 1.0m depth andconduct SPT upto a depth of 5m at the

6iadils"il;d;"d SftAaihi,,iiilonisYolume-III (Specifications)

Unit

L.M.

QTY

260

{15M

National Hig h\daiy Aq.tt'ority

C-onetrucdonof Lahore - Sialkot Motomay (LSM) Link Highway (4 - I-ane)Connecting LSM to l.larang Mandl and Narowal (73 Km. Approx.)

Packasel Flo! Kil 00+090 To |M

23r{10 (23 KMs}

location of structures and at minimum 1 perkm all along the embankment.

SP-414(A Collection of undisturbed block samples fromtest pits at appropriate location decided by theEngineer.

SP-a1 (g) Collection & Preservation of water samplesfrom bore holes & transportation to anapproved Laboratory.

SP-414(h) LaboratoryTesting

i. Grain size analysis

ii. Hydro meter analysis.

iii. Atterberg limits

iv. Speciflc gravity

Natural moister contents

Bulk density

Direct shear test

Consolidation test

Unconfined compression test

Chemical analysis of soil.

Chemical analysis of water.

Triaxial Test

Subm ission of investigation report (Triplicate)

Specifications I 73

No. 115

No. 20

a

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

150

60

150

150

150

150

60

60

45

135

135

30

10

v.

vi.

vii.

viii.

ix.

x.

xi.

xii.

xiii.

o

oBidding DocumentVolume-III

Special Provisions(Specifications)

tConrtnrction of l-ahore - Slalkot Motorway (LSM) Link Hlghway (4 - Lan€)Conneoting LSM to Narang Mandi and Narowal (73 Km. Approx.)

Packagel FRotl KM 90t{!9

To,Kl,l 23+000 (23 KMs)

SP-415 MANUFACTURED TRADE MARK EXPANSION

Sgecifications | 74

JOINTS

1. Generaf

Expansion joints will follow Specifications of AASHTO-SS-Division ll-section19 "Bridge deck joints seals'

The Gontractor shall submit to the Engineer, complete documentation aboutthe Expansion joints he intends to use for the movements shown on thedrawings, including references of the last 10 years, materialspecifications formetal, rubber and bonding between them, fixations, and test certificates fromauthorized laboratories showing that the proposed joints meet thespecifications.

Elsewhere the submittalwill be accompanied by samples of at least 0.50 m,with its fixations.

The expansion joints shall satisfy the following functional requirements:

1. lt shall withstand traffic loads of the highway, and accommodatemovements between the deck and abutment or the adjacent deck.

2. lt shall have good riding quality and shall not cause any inconvenienceto road user.

3. lt will not cause skidding hezard.4. lt will not generate excessive noise or vibration during the passage of

vehicles.Parts liable to wear out shall be easily replaceable.It will be watertight and will have provision for carrying away water andsilt.It will be easy to inspect and maintain.It will be resistant in hot and very sunny climate.

Gonstruction ReEu i rements

The methodology of placing the expansion joint will be clearly described by theContractor with a complete set of draWngs.

Connection or overlapping between roadway and walkway expansion joints willbe clearly shown.

Connection with water proofing of the deck will be detailed.

Alf necessary provisions in deck reinforcement will be indicated.

Initialgap at the time of placing will be clearly indicated and justified.

I

5.6.

7.8.

2.

I

The second stage reinforced concrete for fixations,concrete and will be included in pay items SP a to b.

if any, will be Class Y

3. Measurement And Pavment ()--

3.1 Moasurement. . . . . : . , . . , , . , , , . , , :

The length of computed joints for roadway is measured in linear metre betweenthe faces of the kerbs, plus 150 mm height on each bridge railing.

Eiiiaiiig'il.u-i"l 'SiecdiF7ptta16a,J -

Volume-III (Specifications)

tNational Highway Authority

aConstructioaof Lahore - Slalkot Motorway (LSM) Link Hlghway {4- l-ane)Connecting LSM to Narang Mandl and Narowal (73 Km. Approx')

PackageJ FROM KM 00+000 TO Kl$ 23*000 (23 KMs)

a

3.2 Pavment

The accepted quantity measured as provided above shall be paid for at thecontract unit price respectively for the pay items listed below and shown in thebill of quantities which price and payment shall be full compensation forfurnishing all materials, labour, equipment, tools and incidentals and any workpertaining to expansion joints and which is not paid for separately, necessary tocomplete the item.

' ' : l l - , i '

Sielibi"Provisions(Spaciflcalions)

Soeglflcations t 75

I

abia?ing biiu^e"ltVolume.lll

National Highway Authority

oConstruction of Lahore - Sialkot tvbtorway (LSM) Link Highway (4 - Lane)Connecdng LSM to Narang Mandi and Narowal (73 Km. Apptox.)

Packase-l FRotl KM 00+000 TO 1(M

23+000 €9 rusf

DRAINAGE ANp EROSION yVSIRKS

lTEtr,t 507 GABIONS

Sgecificalio1s | 76

I

507.3

Bidding DocumentYolume-IlI

CONSTRUCTION REQUIREMENTS

Add at the end:

"Working drawings" according to AASHTO-SS-Divlsion L-22.2 will besubmitted to the Engineer for approval, prior to fabrication and installation.

',r ., I "'.,] . . ! . , . ' ,

Speclal Provlsions(Specifications)

a

oNational Highway Authority

oconstruction of Lahore - Sialkot Motorway (LSM) Link Highway (4 - Lane)Connectlng LSM to Narang Mandl and Narowal (73 Km. ApproxJ

fackaee] FRorl KI 11+009 ro Ktrl 23+000 (za rMsl

ITEM.slO DISMANTLING OF STRUCTURES & OBSTRUCTIONS

Specifications | 77

o

510.1

510.2

510.3.2.

bi.iai"g-i;dmi'tYolume-Ill

Description

Insert in line 2 after " disposal"

"and or if required by the Engineer/Employer depositing the designateddismantled material in employe/s store, and maintenance of respectivecomplete stock register duly approved by the Engineef.

lnsert in line 2 after ubridges", "parapeyrailing, kerb, concrete of all types, stoneor brack masonary, pipe culverts"

Constr,uction Requirementg

General

Defete paragraph 2 and replace as under:-

Salvaged material, shall be entered in proper stock registers as approved bythe Engineer, and shall be the property of the Client. Salvaged material shallbe transported to and got received by Client's store as directed by the Engineer.Contractor shall maintrain complete record of the salvaged material. Engineershall have acoess to the stock registers as and when deemed necessary byhim. Dismantling shall be canied out either manually, using chisels or othertools or with approved equipment's as directed by Engineer. Structures to bedismantled may include plain, reinforced, pre cast ooncrete, brick, stonemasonary, fences, parapeUrailing (pipe, concrete, steel) or any other suchconstruction item and or obstruc{ion as shown on drawings and or as directedby the Engineer.

Pavment

lnsert in line 3 after "Material"

"and or transportation of all designated salvaged material to client's store"a

aNational Highway Authority

aConrtruction of Lahore - Sialkot Motorway (LSM) Link Highway (4 - Lane)ConnecUng LSM to Narang Mandl and Narowal (73 Km. Approx.)Package.l FROMKm00+000TOKU23+000 (23KMsl

ITEM 607

Specifications | 78

ANCTLLARY WORKS

TRAFFIC ROAD SIGNS AND SAFETY DEVICES

o

607.1

607.2

607.2.1

607.2.6

Bidding DocurnentVolume-III

On topOn Bottom

3mm2mm

Spedal Provisions(Specifications)

DESCRIPTION

Add at the end of Para:

Unless otherwise shown on the Drawings, all signs shall be lettered in bothUrdu and English. In case of any discrepancy between NTRC reguirementsand these General Specifications, the requirements of NTRC shallgovern.

MATERIAL REQUIREMENTS

Add the following at the end:

Materials shall be of new stock unless otherwise shown on the Drawings orordered by the Engineer and shall conform to the following requirements:

Sisn Panels

In line 1, delete "regulato/' and replace with "regulatory".

Rubber Washer

Add at the end 'Thickness of rubber washer is as given below:

o6A7.2.9 ConcreteFoundationBlocks

i) ln line 1, delete "Class A" and replace with "Class A'1".

ii) In line 3, after ommo, add oor as shown on the drawings or as directed

by the Engineer.".

607.2.10 Road Posts and Hazard ilarkers ,,,....,

In line 6, delete "with standing" and replace with 'withstanding'. , '" . "' - r':'1

607.3.{ Excavation and Backfillinq

Add at the end of para 3:

/1 .--/ zl-

Concrete shatl be placed against the undisturbed excavated faces, except thatthe top fifteen (15) centimeters of each footing shall be formed. Forming of the

t . , , : ji i l , : ii i ' F \' i - ;

\.ii,i., ,..

o

aConetruction of Lahore - Sialkot Motonray (LSM) Link Highway (4 - Lane)Connectlng LSM to Narang Mandl and Narowal (73 Km. Approx.)

Package-l FROM Kt/l 00+000 TO KM 23+000 (23 Kills)

entire footing will not be permitted unless approved by the Engineer. Concreteshall be thoroughly rodded and spaded so as to eliminate all voids. Tops offootings shall be finished with a wood float and all exposed edges shall berounded with an edger.

Backfillshall be thoroughty compacted by mechanicaltampers, and care takento prevent darnage to the finished concrete. Backfill shall be brought up levelwith the finished ground line. Pipe post bases and/or posts set in concrete shallbe firmly supported, plumb, verticaland at the proper elevation.

In case precast concrete foundations are used, these shall be of the concreteclass 'A1' and of the sizes as shown on the drawings and/or as directed by theEngineer.

607,3.2 Erection of Posts

ln line 3, delete "the'written in between "to" and "prevent".

607.3.5 Installations of Safetv Devices

In [ine 11, delete "a" wriften in between "fof' and 'prohibiting".

607.3.6 Sisn Faces

a) Design

i) In serial No. 3, line 1, delete "italics" and replace with "Smalls".

ii) ln serial No. 4, delete "21 cm" and replace with "35 cm".iii) ln serial No. 5, delete "17 cm" and replace with "25 cm".iv) In serial No. 5, delete "italics'and repface with'Small'.

v) In serial No. 6, delete "3.5 cm" and replace with'10 cm".vi) ln serial No. 10, delete'4 cm" and replace with "2.3 cm".vii) ln serial No. 11, delete o23 cmo and replace with '35 cm".

viii) In serial No. 13, delete "Size of letter for km. Heighf' and replace with"Height of letter for km'.

607.3.7 Storage of Sisns

At the end, add the following:

607.3.8 Paintins

The rear sign face of all signs shall bepigmented with chromates of chromes (excluding lead chromes) plus two (2)coats of weather-resisting dull silver gray paint. Where connection of largealuminium sheet signs to a steel stiffening frame is required, the studs orscrews, bolts and washers shall be painted to properly match the color of thesurounding material.

nioai"g o".u-""t *

SpijciiipbviCionsYolume-III (Specifications)

a

Specifications I 79

.; - -,, :',

two'(2) coats priming paint

National Highway Authority

OConetruction of Lahore - Sialkot Motorway (LSM) Link Hlghway (4 - Lane)Connecllng LSM to Narang Mandl and Narowal (73 Km. Appox)

Packago.l FROM KM 00+{,00 TO Ki|| 23+000 (23 KMs) Specifications I 80

Al! painting shall conform to the requirements of Section 413 of GeneralSpecifications.

607.3.9 Placement and Orientation

The Engineer will approve and mark the longitudinal location of each sign onthe working drawings submitted by the Contractor.

The sign shall be laterally positioned from the shoulder or curb as shown on theapproved drawings or as directed by the Engineer.

The Contractor shall stake the location of each sign support and shall get itsapproval from the Engineer prior to carrying out excavation for foundations.The Engineer may order change in location due to site constraints. No separatepayment shall be made to the Contractor on account of such change if thechange is made before fixing of the sign support in concrete block.

The Contractor shall be responsible for the proper elevation, off-set, level andorientation of all signs he erects. He shall exercise due care on thepreservation of stakes for his and the Enginee/s use. lf any stakes are lost,damaged, displaced, or removed, the Contractor shall have them reset at hisown expense.

Unless otherwise shown on the Drawings all signs shall be erected so that theedge and face of the sign are truly vertical and face is at an angle of ninetythree (93) degrees to the centerline; that is, facing slightly away from thecenterline of the lane which the sign serves. Where lanes divide or are on sharpcurves, the Contractor shall orient sign faces as indicated on the Drawingsand/or as directed by the Engineer so that they will be most effective both inday and night and so as to avoid reflection and glare. All sign supports shall beplumbed.

007.3.10 Sisn Posts

Lengths of posts shown on the Drawings for signs are for bidding purposesonly. When progress of the Work permits, the Engineer will authorize thelocation of each sign, with the station and offset distance from the edge ofpavement. The Contrac'tor shall be responsible for detemtination of Foe!.,..,lengths to provide the vertical clearance shown on,ttte'Drawings. Field c iriif :.

of posts shall be performed by sawing.

o

a

o

aConstruction of Lahore - Siialkot Motorway (LSM) Link Highway (4 - Lane)Connecling LSM to Narang Mandi and Narowal (73 Km. Approx.)

Package.l FRO[$ KM 00+000 TO Ktril 23+000 (23 l(}le)

damaged in transporting, handling, or erection will be rejected or may, with theapproval of the Engineer, be repaired in the field by the zinc alloy stick method.Required field welds and adjacent areas on which the Galvanizing has beendamaged shall be galvanized by this same method. The zinc atloy stick shall becast from zinc, tin, and lead in combination with fluxing ingredients. Thecompound shall be completely liquid at a temperature not lower than twohundred and forly six (24.6) degrees C. The area to be re-galvanized shall bethoroughly cleaned, including the removal of slag on welds. The surface shallbe heated with an oxyacetylene torch to approximately three hundred andfifteen (315) degrees C, and the alloy stick rubbed over the surface to fix adeposit. While the alloy is still liquid, a clean wire brush shall be used to smooththe deposit evenly over the entire area being regalvanized. lf a heavy depositor build-up is required to match the original coating, more alloy shall be added

t immediately to the initial bond deposit and spread with a paddle or brush untilthe required thickness is obtained. Edges of drilled holes shall be coated withcommercially available zinc-rich paint. Shop drawings will not be required forpipe posts.

The Contractor shall furnish to the Engineer, fabricators' certifications intriplicate certiffing that the material supplied conforms to all of therequirements specified.

607.3.11 Fastenins Sians to Slqn Pocts

Signs shall be fastened to sign supports in accordance with the requirements ofthe Drawings, the recommendations of the sign manufacturer and to thesatisfaction of the Engineer.

After installation of signs on their supports all bolt heads, screw heads, andO washers which are exposed on the face of the sign shall be painted. The color

of the paint used shall be as nearly as practic€ll the same as the color of thebackground or message area at the point where the bolt, screw, or washer isexposed.

Where steel signs are mounted with aluminum hardware or on steel posts,approved asghalt, nylon, or neoprene insulation shatl be installed at all pointswhere dissimilar metals might come in contact

607.3.12 Erection of Delineators and Marker Posts

Delineators shall be erected at locations shown on the Drawings and" set atelevations such that the Delineator reflectors will be at the indicated heightabove the ground surfaces. Unfess otherwise noted in the Drawings orauthorized by the Engineer, holes for posts shall be of the depth and size

O shown on the Drawings. Posts shall be set plumb and to the established linesBidding DocumentVolume-III

Speciii Proviiions(Specifications)

Specifications | 81

National Highway Authodty

oC.onstruction of Lahore - Slalkot Motorway (LSM) Link Highway (4 - Lane)Connecling LSM to Narang Mandi and Narowal (73 Km. ApproxJ

Package-l FROM KM 00+000 TO KM 23{00 (23 KMc) Specifications | 82

o

and grades and shall be encased in concrete class "B' unless otherwise shownon the Drawings. The cost of all excavation and concrete will be consideredsubsidiary to the bid item (s) for Delineators.

When noted on the Drawings or authorized by the Engineer, the posts shall beerected by driving, either by hand or with approved mechanical devices. Themethod of driving shall not substantially alter the cross- sectional dimensions ofthe posts or materially damage the coating. Battered tops will not be permitted.Posts which, in the opinion of the Engineer, are bent or otherwise damagedduring or after erection shall be removed from the site and replaced at theContractot's expense. After driving, the portion of the posts above ground shallbe plumb and the posts shallbe firm in the ground.

Reflectors shall be attached to the posts as detailed on the Drawings oraccord ing to the manufaclu re/s specifi cations.

607.4.2 Pavment

At the end of para add the following:

For category 3 road signs where the number of post assemblies may be morethan one, additional post assemblies shall not be measured separately andtheir cost is deemed to be included in the cost of traffic signs.

Add the following pay items at the end of table:

a

oBidding DocumentVolume-III

Special Provisions(Specifications)

Delineators (Type 1)

Delineators (Type 2)

Delineators (Type 3)

Reflector (Type 1)

Reflector (Type 2)

Guard Rail Reflector - Butterfly (Type 3)

National H lghway Authorlty

la

Construction of Lahore - Sialkot Motorway (LSM) Link Highway (4 - Lane)Connectlng LSM to Narang Mandl and Narowal (73 Km. Approx.)

1""99._:, FRon KM 09+090 To KM_2s+o_oo (zr xuef

SP,814 GALVANIZED IRON DRAIN PIPE

Specifications | 83

614.1

814.2

6{4.3

614.4

614,5

MATERIALS

The Galvanized lronDesignation A120.

CONSTRUCTION

pipe

o

o

oiliddils-b;;m;;tVolume-III

Galvanized iron drain pipe, 75 mm dia

Galvanized iron drain pipe, 100 mm dia

Galvanized iron drain pipe, 200 mm dia

DESCRTRTTON

The Contractor shall furnish and place galvanized iron drain pipe (AASHTOStandards M 1118-80 (1930) in accordance with the plan of Bridge deck,specifications and/or as ordered by the Engineer.

shall conform to the requirements of ASTM

Where the pipe is used for bridge drains it shall be cast in the deck and shall beflush with the deck surface.

MEASUREMENT

The quantity to be paid for under this iGm will be the number of linear meter ofpipe incorporated in the work in accordance with the plans and specificationsand as directed by the Engineer.

PAYMENT

The unit price bid per linear meter shall include the cost of fumishing andplacement including all labor, materials and equipment necessary to completethe work.

M.

National Highway Authority

f

oConetruction of Lahore - Sialkot Motorway (LSM) Unk Highway (4 - Lane)Connecting LSM to Narang Mandl and Narowal (73 Km. Apptox.)

Package-l FROM KM 00+000 TO KM 23+000 (23 KMs) Specifications | 84

o

SP.616 CONDUITS AND PIPES

616.1 DESCRIPTTON

The work consists of supplying, installing, and commissioning of all material andservices of the complete conduits and pipes as specified herein; shown on the TenderDrawings and/or as directed by the Engineer.

The Contractor shall get the prior approval of the layout from the Engineer at Site forexact route, location and position of the conduits and pipes.

616.2 GENERAL

The edent of work shown on the Drawings does not indicate the exact position ofconduits and pipes. The Contractor shall ensure exact location and route of conduitand pipes in coordination with other services on drawings, as per site requirementsand get the approval of Engineer prior to execution of the work.

6{6.3 APPLICABLE STANDARD'CODES

Latest editions of the following standards/codes shall be applicable for the materials inscope of this Section:

616.4

4.1

BS 6099

BS 3595

BS 4346

MATERIAL

PVC conduits and accessories

PVC pipes & accessories

Cement Solvent for jointing

Sbddiitritv6ktnJ(Specifications)

o

PVG Conduits and Accessories

The heavy gauge PVG conduits and accessories conforming to 836099 shallbe generally used. The PVC conduits and accessories of light gauge may beused on the project with the ooncurrence of the Engineer.

The PVC bends, sockets, elbows, ouplings etc. shall conform to the samespecifications as for the conduits. The PVC bends shall have enlarged ends toreceive conduit without any reduction in the intemal diameter at joint.Manufactured smooth bends shall be used where conduit chan[e€ direction;Bending of conduits by heating or otherwise will not be allowed,inefil.i.:'qituatiori, lBending of conduits by heating or otherwise will.notbe allowed'jn.f1y,)eiThe use of sharp 90-degree bends and tees will not be

movement of heavy duty vehicles such as trucks, cranes, forklift, etc. Wherepipe changes direction, manufactured smooth bends shallbe used. Bending ofpipes by heating or otherwise will be allowed ln special cases only. Bending ofpipes by heating shall be canied out byfirstfilling the plpe with sand inside andthen immediately removing the sand. The use of sharp g0-degree bends ando

biaaiiigitocr;iiit" '

VoIume-IIINational Highway Authority

aConstructlon of Lahore - Slalkot Motonaray (LSM) Link Highway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)ea3*ase'l FloM KM 00{00 ro Ktl23(t00 (23 KIT)

tees will not be allowed. The bends shall conform to same speciflcations asgiven for PVC conduits. For joining of pipe all precautions and proceduresrecommended by manufucturer shall be followed.

610.5 INSTALLATION

6{6.5.1 PVC Pipe

Rigid PVG pipes shall be installed under roads and paved areas, at crossingwith,other services as shown on the Drawings and/or as directed by theEngineer. The depth of the plpe shallvary according to the conditions at site,and approval of Engineer shall be obtained prior to installation. In general thepipes shall be installed underground at the following depths measured from thetop of the pipe:

a)

b)o

Under roads and paved surface

When crossing other seMcesfor the crossing length

Spriiiii Provtiioni(Specifications)

800 mm below the finishedsurface

250-mm vertical clearance500 mm horizontal clearancewith CC protective cover

t

The trench of required dimensions shall be excbvated and the bottom of trenchcleaned and leveled. A four-inch thick bed of fine sand shall be provided overwhich the PVC pipes installed after proper alignment. Where two or more pipesare installed in the same trench the clearance between pipes shall not be lessthan two inches. After laying of pipe the trench shali be backfilted withclean-screened earth in layer of four inches. Each layer shall be properlycompacted. Ali joints shall be sealed adequately to prevent entry of foreignelements.

The installation of pipes shall be completed in all respects including its fixing atterminations, before cabling work is started. Allsharp edges and burrs shall beremoved by using reamer or any approved device. The pipe shall be thoroughlycleaned of dirt and dust from inside. The pipes shall be installed in properco-ordination with other works.

III EASUREMENT AN D PAYM ENT

Meaeurement

Measurement shall be made for the number of running meterc ofacceptably supplied and installed by the Conkactor.

Payment .a)-" -Payment shall be made for the total numbers of meters measure.d,as provid€d.above, at the Gontract unit price. The payment shall constitute fullcompensation for supplying, Installing and completion of the laying of the PVCpipes includlng jointing materials and accessories and all incidentals forcompletion of the work.

o

616.8

iidaing ir6cu-il1il- - -

Volume-IIINational Hig hway Authority

Specifications | 85

aconstruction of Lahore - Sialkot lvtotorway (LSM) Llnk Highway (4 - Lane)Connectng LSM to Narang Mandi and Narowal (73 Km. Approx.)

Package.l FROM KM 00+000TO KM 23+000 (23Klils)

SP - 616a

sP - 616b

SP - 616c

sP - 616d

SP - 616e

Speclal Provlslons(Specifications)

Specifications | 86

LM

LM

LM

LM

LM

o

iliddiiis'dCril;"IVolume-IlI National Highway Authority

Cnstructior of Lahore - Shlkot Motorway (LSM) Link Highway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km, Approx.)

a PackageJ FROM KM 00+000 TO KM 23+000 (23 KMs)

SP- 617 RCC NEW JERSEY BARRIERS INCL.

Specifications I g7

REINFORCEMENT

a

617.1 pESGR|PT|ON

This work shall consist of construction of New Jersey Barrier in accordance with thesespecifications and the specifications for other work items involved, and in conformitywith the lines, grades, and dimensions shown on the drawings or as ordered by theEngineer.

617.2 MATERIAL REQUIREMENTS

6{7.2.1@rh

Formwork shall be "Slipformn.

617.2.2Concrete

Types of concrete shown on the drawings or as directed by the Engineer shall be inaccordance with item 401.

617.2.3 Steel

Steel reinforcement shall be in accordance with item 404.

6123 CONSTRUCNON RESUIREMENTS

617.3.1 Excavatlon

Excavation within the design line and grade, where necessary shaltbe carried out upto the designated levels.

017.3.2 Goncrete

The concrete shall be Class A-1 as perthe following Mix Design or as specified on thedrawings and shall be according to all lines, grades and dimensions mentioned ondrawings. The concrete specifications shall c.onfirm Min. with the Following MixDesign and / or as directed by the Engineer.

o

CementAggregate 19 mmAggregate 12 mmSandAdmixtureFree WaterAggregate AbsoptionTotalWaterWater Cement RatioSlump:

Special Provisions(Specifications)

PlantSite

617.4 MEASUREMENT AND PAYMENT

617.4.1

niaaiiig'iiii"i.imintVolume-III

t Measurement

430Kg214K9837 Kg895 Kg3 Liters (0.7 o/o Sikka PR 150)142 Liters17.8 olo142+ 17.8= 159.8 Liters0.420/o

tConstructlon of Lahore - Slalkot Motorway (LSM) Link Highway (4 - Lane)Connecllng LSM to Narang Mandl and Narowal (73 Km. Approx,)

Package-l FROM KM 00+000 TO KM 23+000 (23 Kfrle)

The unit of measurement for New Jersey Banier shall be linear meter when laid andfinished to the required grade and line and acceptd by the Engineer.

No extra payment shall be made for excavation.

617.4.2 Pavment

The amount of completed and accepted work as measured shall be payed for at theunit price specified in the bill of quantities. This price shall be full compensation forexcavation, formwork, materials, labor, equipment including reinforcement and otherincidentals to complete the work in all respects.

Special Provlslons(Specifications)

Specifications | 88

o

a

h_Lrl1 l ( \. . ' " . 1

a i

I i " l

l t . .

, ,! !,,r"'. i

"

.,i-1.. '. ''

, i , l :, j t

lit+ l{ . , , i ;1,

"-4,,'.

oBidding DocumentVolume-III

SP - 617a

National Highway Authority

aConstructionof Lahor€ - Sialkot Motonvay (LSM) Link Highway (4 - Lane)Conneoting LSM to Narang Mandi and Narowal (73 Km. Approx.)

Package-l FROM KM 00+000 TO KM 23+{t00 (23 KIrs} Specifications I 89

1 .

SP-6{8 CONGRETE PAVERS

The work shall consist of provision and fixing of Precast Goncrete Pavers at thelocations as mentioned on drawings. This item includes cost of specified thick precastconcrete pavers including 100mm thick sand cushion over 150 mm Lean Concfete(optional as directed by the Engineer), installation and all relevant items for paverpedormance as persupplier's specification/method statement complete in all respects.

Material Requirement

Thickness of concrete pavers varies according to the application:. For Pedestrian areas, walkways are paved with units 60 mm thick.

. For parking, Streets and area subject to vehicular use are paved with units 80mm thick.

Precast concrete pavers shall conform to the following standards, which states that:. An average compressive strength of 7,000 psi

. An average absorption no greater than 5olo

. Resistance to at least 50 freeze-thaw cycles with average material loss notexceeding 1%

. Conformance to abrasion resistance testsGonstruction Requ irement

Proper leveling of base course shall be done before placing 100mm thick fullycompacted coarse sand cushion layer over 150 mm lean concrete layer (optional).Lean Concrete shall be required to prohibit the growth of weeds etc. through thepavers and shall also be required areas subject to vehicular loads. Selection of pavermanufacturer shall be made and verified by the Engineer as per above mentionedstandards and approved by the Employer. All works are to be completed as perdrawings, specifications and as directed by the Engineer.

Measurgment and Favments

The measurement and payment for the paver shall be the number of square metersprovided, fitted and fixed in position except Lean concrete which shall be paid as perthe relevant items 401. The accepted quantity measured as provided above shgfl,bepaid at the contract unit price as listed in the BOQ, which price and paymer$;Slj,allonstitute full compensation for provision and fixing of concrete pavers, ijtipor,equipment and incidentals along with 100mm thick coarse sand cushion undep6athnecessary to complete the item in all respects. $,t:.,1 t,

SP - 618a

sP - 618b SM

a

2.

a 3.

N.

onEE"8"il;li;6aVolume-III

Special Provisions(Specifioations) National Highway Authority

Conetruction of Lahore - Slalkot li4otorway {LSM) Llnk Hlghway (4 - Lane)Connectng LSM to Narang Mandi and Narowal (73 Km. Approx.)

, Package-l FROII KM 00+000 TO Klrl 23+000 (23 KMe)

I

Specifications l90

SP.619 MA.NUFACTURE & INSTALLATION OF GANTRY SIGNS' OVERHANGER EXIT SIGN I OVER HEAD GUIDE SIGN

6,r9.f DESCRTPTTON

Gantry signs / Over Hanger Exit Sign / Over Head Guide Sign at suitable locationsshall be required to be installed to provide the road users information about theimportant places and the intersecting roads. The work shall consist of providing,installing and satisfactory completion of Gantry Signs for guidance of vehicles over thehighway, as per directions of the Engineer. All the Ganty signs shall be approved byNHA prior to the installation.

619.2 CONSTRUCTION REQUIREI'ENTS.

The shop drawings will be prepared by the contractor with all details as per instructionsof the Engineer. The Shop drawings shall be based on the Tender drawings. TheContractor will submit the design calculations along with the shop drawings. Afterapproval of the drawings, the contractor will start the fabrication and installation ofGantry Sign.

The Gantry signs / Over Hanger Exit Sign / Over Head Guide Sign shall bemanufactured and installed in accordance with the details shown in the Gantry signs /Over Hanger Exit Sign / Over Head Guide Sign Drawings or approved shop drawingsand as directed and approved by the Engineer.

The Sign shall be designed suiting the situation/location and approved bythe Engineerbefore its manufacture.

619.3 MEASUREMENT AND PAYMENTS

a) Measurement

The quantity to be paid for shall be in Nos. of Gantry signs / Over Hanger ExitSign / Over Head Guide Sign and Sign Panels installed in accordance withapproved design and approved shop drawings by the Engineer and acceptedby the Engineer.

b) Payments

The quantity as measured above shall be paid for at the contract price pernumber of the Gantry signs / Over Hanger Exit Sign / Over Head Guide Signand Sign Panels. The payment shall constitute full compensation for designing,making foundations, posts, truss, connections, all other' strucfuralitemslincidentals with materials, sign sheets and otheraccessories as,.ghowh :nthe approved shop drawing necessaryforcompletion of the Gantrysi{'plf OoerHanger Exit Sign / Over Head Guide Sign. All measurements shall {#i{greedby the Engineer before payment is made. {i1'".- (

\ - . : '

SP - 619a

sP - 619b

Speciaii;roviiloriJ(Specifications)

Each

Over Head Guide SignSP - 619c

National Highway Authority

IConstruction of Lahore - Sialkot Motorway (LSM) Link Htghway (4 - Lane)Connecting LSM to Narang Mandl and Naowal (73 Km. Approx.)Package-l FROM KM 00+009 T3 KM 23+000

I2-s KMsJ

SP-620 HEAD LIGHT GLARE.SHIELD FACILITIES

Specifications I 91

I

620.1

920.2

iiieailc'b;d;;tYolume-lIl

DESCRIPTIONHead light glare -shield facilities (head light blocking blades) at suitable location,positioned on the top of median baniers shall be installed to block out the headlightglgF_ of oncoming traffic. The work shall consist of providing, installing andgatisfactory completion of Head light glare -shield facilities, as pei directionsbf theEngineer and shall be approved by Engineer prior to the instariation.

The Glares-Shield (Glare screen) is a vertical blade headlight blocking anddelineator (optional) system that is used to block out headlight glare of oncomingtraffic and also to delineate both temporary and permanent medians. lt is made o1polymeric materials; the blades are flexible and durable, and fit into aspeciallydesigned plastic base and base spacer system. The entire systemqoynts to the top of median barriers and guardrail to create a shietd for the iengthof the median. Reflective sheeting may be added to the blades.

CONSTRUCNON REQUIREMENTS.The Glares-Shield (Glare screen) is a vertical blade headlight blocking anddelineator (optional) system that is used to block out headlight glare of on$mingtraffic and also to delineate both temporary and permanent medians. lt is made olpolymeric materials, the blades are flexible and durable, and fit into aspecially-designed plastic base and base spacer system. The entire systemqounts to the top of median baniers and guardrail to create a shield for the i'engthof the median. Reflective sheeting may be added to the blades as an option.

The Glare - Shield shall have the following features:-

r lt blocks out headlight glare.. lt shall also serves as a delineator providing greater visibility and creates a

clear navigation channel.r lt shall be rebound able and durable able to withstand multiple impacts from

overhanging loads.o lt shall reduce traffic jams in work zones by limiting cross-median visibility.o lt shall be modular design adapts to most sizes of banier, temporary or

permanent.r lts installation and replacement shall be fast and easy. lt allows easy access to both sides of highway.for'rnaintenance or emergency

CfgWS. i:,:.-,:,.)"',--' ' ..

Blade Base shall be High-impact polymer, black of size +914" diameter x 1-719,,tafland weighs 0.58 lbs.

o

Ac

ISpeii'tiproviJi6ni

(Specifications) National Highway Authority

tconerruction of Lahore - Slalkot Motonvay (LSM) Llnk Hlghltny (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)

Package-l FRoM Kll00+000ToKM23+009 !21KMBI

620.3

-biaailgDocundni

Yolume-III

a

Modular Blade Spacer Track Sections shall be high impact polymer of sizeeither 5-112" x24" x 5/8" forfull spacer sections and weighs 1.50 lbs. or HalfSpacer Sections 5-112" x 11" x 5/8".

Hardware for attachmenUconnections shall be Galvanized or StainlessSteel as approved by the Engineer.

The shop drawings including will be prepared by the contractor with all detailsas shown on drawings and as specified herein this specifications as perinstructions of the Engineer.

MEASUREMENT AND PAYMENTS

a) Measurement

The quantity to be paid for shall be inaccordance with approved constructionaccepted shop drawings by the Engineer.

b) Payments

The quantity as measured above shall be paid for at the contract price pernumber of meters. The payment shall constitute full compensation forproviding, submitting, constructing and installation complete in all respectsincluding all other itemsllncidentals with materials and other accessories asshown in the approved shop drawing necessary for completion of theWaming indented strips. All measurements shall be agreed by the Engineerbefore payment.

t

I

Glare-shield facilities, inshlled on theJersey Barrier to prevent glaring and ensure

Sgecifjcatiol? t e2

nos. of meters constructed indrawings and approved and

National Highway Authority

tConrtrucrion of Lahore - Slalkot Motorway (LSM) Link Highway (4 - lrne)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)Package-l FR9M XM 00+000 TO KM 23{t00 (23 KMs)

sP-700

Specifications I 93

MIS.CELLANEOUS

ESTABLISHMENT OF THE FACILITIES FOR EMPLOYER'S ANDENGINEER'S REPRESENTATIVE

o

The contractor shall provide Employer's and Engineer's representative thefacilities as detailed herein after and as Der the contract.

Within 07 days of receiving the Contractor's construction proposals for facilitiesfor Engineer's representative, the Engineer's Representative will approve theContractods proposals with necessary modifications, if any and the Contractorwill be instructed to proceed.

The offices, resldences and laboratory shall be erected and installed w1hFumishing, equipment and fixtures and all shall be in full working order, bythe contractor, to the satisfaction of Enginee/s Representative within aperiod of forty five calendar days after the availability of land to the Contractorfor construction of these facilities.

The Engineer may decide/approve in writing to establish all or part of thefacilities stated above, on the written request of the contractor, in a rented place,provided rented place is not less than in standard and arca as required in thespecifications and at a suitable location with respect to the project.

Gontractor shall be fully responsible to furnish, equip, provide all the fixturesand maintain these facilities, as stated herein after throughout the contractperiod.

The contractor shall be responsible for, and take all necessary measures toensure the securityand daily cfeanliness of these facilities and thelr oontents atall times and shall employ necessary staff and watchmen for this purpose.

Allvehicles as per contract agreement shall be provided by the contractor andshall be completely maintained by him throughout the contract period.

Special Provisions(Specifications)

o

tiiidAinsnidm;tVolume.III National Highway Authority

IConstruction of Lahore - Sialkot Motorway (LSM) Llnk Hlghway (4 - Lane)Connectlng LSM to Narang Mandi and Narowal (73 Km. Approx.)

Package.l FROM Klt 00+000 To KM 23{'00 (23 KMs)

ITEM 701 PROVISION OF SURVEY TEAMS AND INSTRUMENTS

Specifications I 94

o

701.1

701.2

Bidding DocumentYolume-IlI

10 Nos.

12 Nos.

6 Nos.

4 Nos.

10 Nos.

12 Nos.

12 Nos.

4 Nos.

4 Nos.

50 Nos.

I Nos.

3 Nos.

DESCRIPTION

Delete the entire Para and replace with the following:

The Gontractor shall provide and maintain survey equipment for the sole use ofthe Engineer/Employer. All surveying equipment shall be new and shall bemaintained throughout the Contract period and replaced by the Contractorfreeof charge in case of damage or loss. The survey equipment shall be supplied tothe Engineer within thirly calendar days from the Engineer's order tocommenoe the Works.

Upon completion of the Contract, the suryeying instruments and equipmentshall become the property of the Employer and shall be handed over to himcomplete, and in a state of good repair, taking into account fair wear and tear.

The Contractor shall provide qualified surveyors and helpers along with theirtransport and equipment, to the Engineer/Enginee/s representative to assisthim for carrying out the field works.

EXTENT OF PROVISJON ANp GFI.|ERAL REq9IREMENT

Delete the entire para and replace with the following:

The Contractor shall provide and maintain at his own cost at least the followingsurveying equipment and any other surveying equipment deemed essentialforthe Work by the Enginee/s Representative for the sole use of the Enginee/sRepresentative:

2 No. - Total Station, Power sets latest with tripod

6 Nos. - Precise Levels (Automatic type), with tripod, magnification 34X

oPrisms with Targets and rods

Levelling Staff with graduations in metric units

Steel measuring tapes 100 m long

Steel measuring tapes 20 m long

Hand tapes 3 m. (lockable in pocket)

Measuring rods (4 m)

Ranging rods with tripods

Club hammers 2 kg.

Sledge hammer4 kg.

Traffic Cones

Survey Umbrellas

Aluminum Straight Edges, 3.0m long

Speciai Fr6i;iCi6ns(Specifications)

4O

o , . 1 " . i "

tttationat ff igh*"V Autnority

ICongtf,uction of Lahore - Sialkot Motomay (LSM) Link Highway (4 - Lane)Connectlng LSM to Narang Mandi and Narowal (73 Km. Approx.)

Pad(age-l FROM Klrl 00+000 TO KM 23+000 (23 K]tls) Specifications | 95

3 Nos. - Aluminum Straight Edges,5.0m long

4 Nos. - Spirit Levels, 3ocm long

- All miscellaneous tools, equipment and materials required insurveying in numbers as determined by the Enginee/sRepresentative.

- Adequate supplies of expendable materials i.e. level books,pencils, erasers and inks, drawing papers, pegs, nails, flags,brushes and paints etc. as required by the Engineer'sRepresentative.

All surveying equipment shall be new. The quantity of all survey equipmentshall be maintained throughout the Contract Period and replaced at his owncost by the Contractor in case of damage or loss.

The Contractor shall make available three (03) qualified surveyors and twelve(12) Survey helpers along with theirtransportfor checking and incorporation asand when required by the Engineefs Representative. Salaries will be paid bythe Contractor at market rates, however stafi will be hired by the Engineer /Employer.

The survey equipment shall be placed at the disposal of the Engineer'sRepresentative during the Contract period and shall be returned to theEmployer, complete and in a good state, taking into account fair wear and tearon completion of the Contract.

701.3.2 Pavment

Delete the entire para and replace with the following:

Payment shall constitute full cornpensation for all costs of provision and maintenance ofequipment, furnishing survey teams, supplies of expendable materials and necessarylabour/helpers, materials and maintenance and all other incidentals for the propercompletion of the work as stated herein above and as directed by the EngineefsRepresentative.

BiddingDocumentVolume-III

Speclal Provlslons(Specifications)

I

o

t

701(a)

National Highway Authority

ICongtruction of Lahore - Sialkot Motorway (LSM) Llnk Hlghway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)PackageJ FROilKn00+000ToKit23+000 {23Kite} Specifications I 96

a

ITEM 702 PROVIDE, EQUIP AND MAINTAIN OFFICE FA,CILITY ANDRESIDENCE FOR THE ENGINEER AND CLIENTSREPRESENTATIVE

All equipment, furniture and fixtures provided shall be arid maintained by theContractor throughout the Contract period to of

In the title:

i) In line 2, delete "ENGINEER' and replace with "ENGINEER'SREPRESENTATIVE'.

ii) In line 3, delete "GLIENTS" and replace with*EMpLOYER'S,.

Delete entire item and replace as below:

702.1 DESCRTPTTON

The Contractor shall provide, furnish and properly maintain and service during thewhole contract period, air conditioned facilities for the Engineer's Representative andhis staff including offices and bachelor housing accommodations as specifiedhereinafter for the exclusive use of the Enginee/s Representative and his staff at thelooation as approved in writing by the Engineer/Engineer's representative.

The Contractor shall provide all consumable items and pay for all utilities/services andother incidental or running costs and provide continuous supply (24hrs) for all utilitieswhich include power, gas, water supplies, STD telephone and fax and/or other meansof communication (mobile phone) within and off the site and shall pay its total capitaland operative cost for utilization of the facilities for the project. The Contractor shattalso provide and maintrain staff, such as messengers, tea boys, chowkidars andsweepers. The consumable items shall include stationery and such other items asrequired.

702.2 GENERAL

Camp shall be completed by the Contractor and land will be provided by the Employer.Temporary facili$ for base camp office of equal area and standard shall be proviiedby the Contractor elsewhere during the constuction of the Base Camp without anycharge; however, maintenance of such temporary facility shall be paid to th6Contractor at the quoted rate, provided such facilities are acceptable to the Engineer,sRepresentative.

The Contractor shall be responsible for, and trake all necessary measures to ensurethe security and cleanliness of these facilities and their contents at all times and shallemploy necessary staff and watchmen for this purpose.

t

representative. Repair/replacement of theseContractor at his own cost.

be carriedEngineer's

out by the

I

All equipment, furnlture and fixtures shall become thecompletion of the Works.

Employer qn

lf the operations of the Contractor are such that additional staff of Engineefs

volumi-lll (Specmcatonsl National H(;hway Authority

aConstructionof Lahore - Slatkot Motorway (LSM) Unk Highway (4 - Lane)Connectlng LSM to Narang Mandi and Narowal (73 Km. Approx.)

Package{ FROM KItl 00+{100 TO KM 23+000 (23 KMs) Speciflcations | 97

Representative are required in accordance with clause 8.6, the Contractor shallprovide and maintain additional facilities for aocommodation, office, laboratory,

- furnishing, equipment and transport as directed by the Engineer's Representative as ofthe same standard as of the original staff. No separate measurement or payment shallbe made for providing and maintaining these additionalfacilities and its cost shall be

- deemed to be included in the rates entered in the Bill of Quantities for other pay items.

The permanent offices shall be handed over to the Employer within four (04) monthsafter the completion of the contract, or such early date as instructed by the Engineer.

The Contractor's site offices will be situated at a reasonable distance from the officesof the Engineefs Representative.

702.3 CONSTRUCTION AND FURNISHING REQUIREMENTS

.- Before commencing construction of permanent office building, the Contractor shallI prepare and submit to the Engineer's Representative for approval detailed layout,

li,ii,lllil; jl?:':Tff ';*:[53:.9:g#"':li':XHlfi,:j j:?:.l:.i",:::J,ffl',lpurchasing materials for mnstruction.

702.3.1 Office Facilities

i) For Engineer's Representative

The overallcovered area of the office of Engineer's Representative shall not befess than approximately 372 square meters and partitioned into roomsr aconference room, store, toilets with washing facilities, kitchen. Parking sheds inthe Enginee/s Representative premises shall also be provided forthe requirednumber of vehicles as approved by the Engineer in addition to the overallcovered area of the office as above.

lD For Employer's Representatlve

The overall covered area of the office of Employers's Representative shall notbe less than approximately 372 square meters and partitioned into rooms, aconference room, store, toilets with washing facilities, kitchen. Parking sheds inthe Employer's Representative premises shallalso be provided forthe requirednumber of vehicles as approved by the Engineer in addition to the overallcovered area of the office as above.

I

702.3.2

a)

biddins li;"nmilaVolume-Ill

Residential Facilities i'l '

i) For Engineer's Representative ;:,,t '

(>___-

t

The residential facilities for the Engineer's Representative shall be erected bythe Contractor as approved by the Engineer. The Contractor shall providefacifity for 28 persons as described below or as approved by the Enginee/sRepresentative:

At least approx. 600 square meters floor area conslsting of rooms withett:g!99 9_e!lTo9.n_"_,199T9, flg ?99q$t_e_ bathroo.q"ng 9lgjt"t"legi!i!":

Special Pmvisions(Specifications) National Highway Authorig

aConslruction of Lahore - Sialkot Motorway (LSM) Link Highway (4 - Lane)Connecting LSM to Narang Mandi and Narowel (73 Km. Approx,)Packag-e.l FROM KM 00+000TO KM 23+000 (23 KMs)

702.3.3

Layout

b)

i i)

a)

b)I

o

C

c)

d)

e)

0

s)h)

i)

tiidding iiocu;unrYolume-III

source.

Specifications 198

for the remaining staff as approved by the Engineer.

Recreation and Dining Centre of approx. 7f square meters with netfloor area consisting of a kitchen with store, communal dining room,lounge, toilet and room for tea boy/cook with toilet and a laundry room.

For Employer's Representative

The residential facilities for the Employers Representative shall beerected by the contractor as approved by the Engineer. The Gontractorshall provide facility as described below or as approved by theEngineer's Representative:

At least approx. 300 square meters floor area consisting of rooms withattached bathrooms, rooms, and adequate bathrooms & toilets facilitiesfor the remaining staff as approved by the Engineer.

Recreation and Dining Centre of approx. 72 square meters with netfloor area consisting of a kitchen with store, communar dining room,lounge, toilet and room for tea boy/cook with toilet and a laundry room.

Lavout and Conetruction

The general layout and construc'tion of the Engineer's facilities, offices andresidences shallat least conform to the following:

The layout of all sites, which have to be approved by the Engineer'sRepresentative, should take into account at least the following generalrequirements:

a) Convenient access from the public road to all necessary points.

b) Paved areas and covered areas for vehicle movement and convenientpafting.

Dust suppression in unpaved areas.

Grading of the site to provide drainage.,rJ.l. _,".

Standby generating capacity located and glfected to avoid noisenuisance in the occupied buildings. il, , , r-,

l, \ / - -

A suitable and convenient covered area for samp_le,gto;_qge:" ; . ' . : .

Ducts, cables, pipes and sewers for services and drainage.: - .

A car washing area with water sourc€.t t I r r I r tg lv l gvv t w.'

, ', - ,i :t\l '.

Some area of visual amenity, flower beds, shrubs etc., with watef

Special Provisions(Specifications) *"r,on, tt*t Or,i"nt,

construction of Lahore - Slalkot Motorway (LSM) Link Hlghway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)

Package.l FROftI Kit 00+000To KM 23+000 (23 KMs|

i )

i i )

a

a)

b)

c)

d)

e)

t -

ro

placement of furniture within rooms and anyair conditioners. In case the Engineer'sprovide locations, the Contractor shouldproposals to the Engineei's Repiesentativeany changes, wifl reply within two weeks.

Special Provisions(Specifications)

Bidding DocumentVolume-lII

Specifications | 99

Security comprising perimeter fencing/walls, gates, guard housesapproximate to the agreed site.

Gonstruction

The Camp Facility for permanent structure shall be constructed of suchmaterials and fixtures which shall be new and approved by the Engineer'sRepresentative. The clear height of the building from floor to ceiling shall not beless than 3.70 meters. The finished floor level shall be at least 60 cms abovenaturalground level. The walls shall be of first class bricks or concrete blocks ofstandard size with water proof cement mortar plastering. One layer of dampproof course shall be provided. The floor shall have a Tile Finished aboveconcrete (Class B) flooring, or equivalent as approved by the Enginee/sRepresentative. Sun shades shall be provided on doors and windows and a 4mx 7m porch roof of similar consbuction to the car port, at the main entrance. Theroofs shall have parapet railings all around. The building is to contain requiredexpansion joints, outlets etc.

The building shall be constructed to avoid severe summer/winter seasons.Special measures shall be taken in selec{ion of construction material andorientation of the buildings.

Details of elements of construction should be as follows:

Floors shall be of concrete tiled with tiling to suit the purpose of theroom.

Walls shall be plaster on masonry or filled. Finish to the painting ofcolor(s) to be agreed with the Engineefs Representative. Splash areasof bath-rooms and kitchen walls are to be ceramic-tiled

Ceilings shall be plastered concrete, finished in white distemper.

Roof construction shall be reinforced concrete, suitably waterproofedand insulated and be constructed to drain to collection points providedwith full-height discharge pipes to gullies at ground level.

Doors and windows will be of solid, tight-fifting construction. Theirlocations will depend upon the actual room layout agreed, the intended

to be provided forttative does not

.riwittenwishes lo'i*rake

Window sizes shall generally be 1.3 m x Lz ml#"{fulBen,ab6 ptainglass in frames, except for special purpose rooms. Fiames may bealuminum or timber. Timberframes shall be painted. Allwindows sHallbe lockable and provided with fly screens on opening panels.

National Highway Authority

tcon$f,uction of Lahore - Slalkot Motoruay (LSM) Unk Hlghway (4 - Lane)Conneotlng LSM to Narang Mandi and Narowal (73 Km. Approx)

Package{ FROM KM 00+000TO KM 23+{100 (23 KMs)

s)

h)

Specifications | 1O0

lnternal doors shall be of plywood in timber frames. Good quality doorfurniture with lever handles will be provided and fixed. Two keys foreach lock will be handed over to the Engineer's Representative.

External doors may be glazed aluminum or exterior quality timber withframes to suit. Good quality door furniture will be provided includingseourity locks and two keys for each lock. Additionalfly-screen doorsshall be fitted on the outside of extemal doors.Wooden doors and frames shall be finished and painted or vamished tosuit their location.

Lighting, heating, air-conditioning, fans, ventilation, waste disposal,electric heater, water, gas and electricity installations and supply shallbe provided as appropriate to the rooms of the office and residences.

Lighting shall be proMded to office standards by fluorescent fittings,placed as agreed with the Engineer's Representative,

Back-up power supply by diesel generator shall be provided. Theback-up generator shall have automatic cut-in in case of failure of themain supply. The power circuit shall be equipped with voltageregulation to protect electrical equipment from overload and to ensureproper operation of computers and the like.

The generator shall be housed in a separate room for noise reductionand it shall be used solely for the facilities for Engineer'sRepresentative.

A continuous water supply shall be available for normal use asindicated on the plans.

Required numbers of double walled, insulated RCC etevated storagetank, having a minimum capaoity of ten thousand (10,000) liters, shallbe constructed each for Enginee/s and Employer's RepresentativeFacilities.

The Contractor shall provide test results and appropriate certification toshow the water suppty is potable. Tests shall be repeated periodically.In case the water supply is not potable the Contractor shall provide aseparate source of drinking water and shall labelall non-potable watertaps as "not for drinking.

Required number of septic tanks are to be provided which shall be adual chamber structure with an intemal wall forming a high level weiroverflow separatlng the two chambers. Access to each chamber shallbe provided by airtight inspection covers. Inlet pipes shall be into thefirst chamber level with the overflow weir wall and the outlet shall be atthe sarne level at the opposite end of.the seeond charnber. The outletfrom each septic tank shall be a 200 mm diameter pjpe, leading into anexcavated soakage pit of a size depending on sgil'popsity, which shallbe backfilled with rock containing less than of 20 mm sizg,orsmaller material, topped with 150 mm clayseptic tanks shall be emptied as required.

150 mm topsoR The

()--

Continuous supplies of water, gas, electricity"-- - Si;ial-FiiiiaGicinJ" *-" -'-

(Specifications)

i )

k)

r)a

m)

t

n)

a o)iiiading n;cun;na.Yolume-lll

fuel..for generqtors

ttG

IC.onsrruction of Lahore - Slalkot Motorway (LSM) Link Highway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Appmx.)

Package-l FROM KM00+000TOKM23+(100 (23KMs} Specifications I 101

shall be provided by the Conkactor who shall be responsible for, andpay all costs ol installation, connection and maintenance.

p) The Contractor shall arange to provide and install communicationsfacilities. Four operational STD telephone lines as required with allappurtenances shall be provided to the office of EngineefsRepresentative. An appropriate UHFA/HF wireless system shall beananged and installed with base station at the vehacles of Engineer'sRepresentative. In case telephone lines are not available, the wirelesssystem (mobile phone) may be expanded to provide necessarycommunications for the Engineer's Representative and the Employer.

q) Intercom facility shall be proMded between the rooms of the office andthe laboratory.

r) The Contractor shall take appropriate measures to discourage thepresence or entry to the buildings of termites, cockroaches and the like.Such measures may include chemical treatment of foundations andsealing of joints in construction.

s) The Contractor shall provide free of cost sufficient power supply forEngineer's and Employer's Camp power requirements. The powersuppty shall be 220 volts, 50 cycles. Power outlets as required shall beprovided in the office and houses. Gas supply shall be provided asappropriate to the equipment.

0 Temporary Field Offices at locations depending upon any major fieldactivity and/or as approved and directed by the Engineer'sRepresentative are also to be provided without any extra cost.

7A23.4 Furniture and Equipment forthe OfficGs

The Contractor shall provide for the office, furnishings and equipmentcomplying at least to the following list and as per the direction and approvalofthe Engineer. All furnishings and equipment are for the exclusive use of theEngineer/Engineeds representative and Employeds Representative.

The Contractor shall maintain the offices in good condition to the satisfaction ofthe Engineer's Representative and as long as it is required for the purpose ofthe Contmct. The Contractor shall provide full supplies of stationery and otherconsumable items to ofiices during the complete currency of the Contract. TheContractor shall also provlde not less than four number messengers/tea Boysfor the office during the contract period.

t

o

All equipment, furniture and fixtures and staff shall be providgd gnd maintainedthroughout the contract period and repaired/r:eplaced byr{e;9lntractor at hisown cost in case of damage or loss.

li-,:ti'i1".. ,i ̂

i) For office of Engineey's Representative ftb\ t-n- ' '

\(,r,..All fumishings and equipment are for the effiusiv,g. -{lsei'of theEngineer's Representative. The following list shallat least be provided.

&\ t

o -iiinaing'bocdbnt

Volume-IlI

: SiieilatitriivisTdns

(Specifications) t taiionat ftighway Authority

Construction of Lahore - Sialkot Motorway (LSM) Link Highway (4 - Lans)Connecilng LSM to Narang Mandl and Narowal (73 Km. Approx.)

Package-l FROM KM 00+000 TO KM 23+000 (23 KMs)

a)

4

No. Item

Office

- Lockable metal filing cabinets for drawings (1.0x0.80x0.75) mwith 4 no drawers.

- Waste baskets- Standard office desks with lockable drawers- Executive desk with lockable drawers & glass top- Executive type upholstered desk chair- Computer operator desk with chair and matching computer

table35 - Standard office chairs6 - Book cases with two shelves1 - Desk lamp executive type15 - Desk lamp, fluorescent, 20 watts3 - Display boards10 - Standard size staplers2 - Heavy duty stapler12 - Paper cutters (l{nife type)As Reqd - Pencil Sharpeners1 - Pencil Sharpener, desk mounted

- Set of drawing triangles, 600 & 450 (Large)- Set of drawing triangles, 600 & 450 (Small)- Electic water cooler- Eleclric desk calculator with printer- Calculators, Casio FX-880P (SUPER FX) or similar- Webster collegiate English dictionary- English - Urdu dictionary- File cabinets- Lockable metal cabinets- Fire extinguishers (C02) wall hung- Xerox photocopier including enlargemenUreduction etc. and

automatic voltage stabilizerAs Reqd. Continuous supply of blueprint, batteries for clocks,

calculators, and other office supplies as required.As Reqd. Curtains on allwindows14 - Air conditioner (cooling & heating) 18,OOO pT.Uor.as required10 Electric heaters11 Wallclock1 - Conference table with standard office

persons.

3 - Plastic trash contalners, 500 mmmm high

Special Provisions(Specffications)

2015112

o

1141611424'l

tBidding DocumentYolume-III

Specifications | 102

for TwefVe (12)' t

. , , , . . " - , . r t ' , "

' .

,

ffiniriiirm by 750

National Highway Authority

aCongtructlon of lahore - Sialkot Motorway (LSM) Link Hlghway (4 - Lane)Gonnecting LSM to Narang Mandi and Narowal (73 Km. Approx.)

Package-l FROM KM 00+000 TO KM 23+{100 {23 KMs)

1

126

1

I1

- Exhaust fan.

Toilet

Bidding DocumentVolune-IlI

o

52

bl

11

o

1

c)

433o

Specifications | 1O3

- Binding machine, Model No. 212 PB by General Binding Corp.or similar

- Set of AASHTO Specifications, Asphalt Institute manualsrASTM Standards (Latest editions as required)

-Zea2500 w Voltage regulatorComputer, Model IBM or compatible (P4) including 17 inch

colour monitor, key board and other accessories includingvoltage stabilizer as approved by the Engineer.

- Laser Printer of Hewlett Packard or equivalent, with allnecessary connecting cables.

- Software (Latest Versions)i) Micro Soft Excelii) Microsoft Wordiii) Time Line, Project Management softwareiv) MS Dos Ver. 6.2 or latestv) Windowsvi) Lotus 123vii) AutoCad Rel 14 and the latest version.viii) M/S Project

- Room cooler- Exhaust fans in conidor

Kitchen

- Double Stainless Steel Sink with Draln board- Electric Refrigerator, 0.50 m3 capacity with separate freezer

compartment, self defrost type.- Table top gas stove with 3 bumers with gas cylinders as

required- Set of kitchen cabinets, lockable, with Formica top for working

space.- Tea Kettle- Electric hot water heater, wall mounted, 15 gallons

As Reqd. - Cups, saucers, water glasses, spoons and servingtrays (adequate for 24 persons).

- Complete Dinner set for 24 personsAs Reqd. - Tea towels with towel rar

pans, knives, foks, spoons etc.Tea towels with towelrack and fniscelleneous cooking

- Wash basins with hot and cold- Stainless steel toilet paper holders- Paper towel dispensers

National Highway Authority

tConstruction of Lahore - Slalkot Motoruay (LSM) Link Hlghway (4 - Lane)Connecting LSM to Narang Mandl and Narowal (73Km. Approx.)

Package-l FROM KM 00+000 TO Ktl23'H100 (23 KMs) Specifications | 1O4

- Mirrors, 40 cm x 50 cm- Ceramic urinals-Exhaust fan, with screen, 112 Hp, 22A Volt also for printingroom-Towelholder- Electric hot water heater, wall mounted, 20 gallonsEnglish Commodes

For Employer's Representative Office

The Contractor shall arrange one operational STD telephone line asrequired with all apparatus shall be provided. All furnishings andequipment are for the exclusive use of the Employeds Representative.

No. Item Description

- Executive desk with lockable drawers & glass top- Executive type upholstered desk chair- Standard Office desks with lockable drawers- Lockable metal filing cabinets (1.0 x 0.80 x 0.75) m with4 No. drawers.- Computer operator desk with chair and matching computer

table10 - Standard ofiice chairsI - Book cases with two shelves1 - Desk lamp executive type1 - Display board4 - Waste baskets4 - Standard size staplers4 - Paper oufters (Knife type) -i:-.,,r,

:i' 1: ',':i'i

As Reqd. - Pencil Sharpeners ,l' ' ,-"*--"-.', .-, '

1 - Pencil Sharpener, desk mounted i,',r. i i:

2 - Calculator Scientific ';;:'*--)..--.- '

1 - Webster collegiate English dictionary j,tE--.-, -.,1 - English - Urdu dictionary \*J,.,: .:

As Reqd. - Continuous supply of batteries for clocks, calculators, and otheroffice supplies as required.

- Curtains on allwindows- Ait conditioner (cooling & heating) 18,000 BTU or

as required- Computer, Model IBM (P4) including 17 inch colormonitor, key

board and othet accessories including voltage stabilizer.- Laser Printer of Hewlett Packard or equivalent, with all

necessary connecting cables.

Spedal Provlslons(Specificalions)

434

314

.D

o

1123

o

As Reqd.4

2

1

ariidaing D".duntVolume-IIl

n"tiln"f H'rghway Rutfrority

acrnstruction of Lahore - Sialkot Motorway (LSM) Llnk Highway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)

Package-l FROM KM 00+000TO Ktl 23{100 (2ilKMs} Specifications | 105

32

Toilets

No.

- Software (Latest Versions)i) Micro Soft Excelii) MicrosoftWordiii) Time Line, Project Management softwareiv) MS Dos Yer.6.2 or latestv) Windowsvi) Lotus 123vii) AutoCAD Rel 14 and the latest version.viii) M/S Project

WallClock.Electric heater

Item

Wash basin with hot and cold waterStainless steel toilet paper holderPaper towel dispensersMirror 40 cm x 50 cmCeramic urinalsExhaust fan with Screen y2HP,220 voltTowel HolderElectric hot water heater wall mounted 10 gallons

702.3.5 Furniture and Equlpment for the Resldences

The furniture and Equipment shall be provided by the oontractor. Theaocommodations shall be provided with efficient drainage and sanitationpotable water, gas, electricity and STD telephone available throughout24-hours of each day.

The Contractor shall maintain the residential accommodationscondition to the satisfaction of the Engineer's Representative asrequired for the purpose of the Contract.

Bidding DocumentVolume-III

o

21-1 -221-1 -1 -

o

in good

long as

o

Alf equipment, furniture and fixtures shall be maintained throughout the fuContract period and repaired/replaced by the Contractor at his own cost in case ; 1 lL]

of damage or loss.

The Contractor shall produce and present to the Engineer's Representativeand for approval a complete set of dispositions concerning recreational andlaundry services within a month of the receipt of the letter of acceptance.

Speciii'priwiCione(Specifications) National Highway Authority

Icrnstruction of Lahore - Slalkot Motorway (LSM) Llnk Hlghway (4 - Lane)Connecting LSM to Narang Mandl and Naowal (73 Km. Approx.)

Package-l FROM KM 00+000 TO Klrl 23+000 (23 KMs)

a

O

bid.ii;sb;"-;;Yolume-III

Speclal Provisions(Specifications)

tNational Highway Authority

Specifications | 1O6

The Contractor shall provide necessary staff for the daily cleanliness andmaintenance of accommodations including running of kitchen i.e. cook andhelpers etc. At least the following furniture and equipment is to be provided bycontractor.

For Residence of Engineer's Reprcsentatlve

All furnishings and equipment are for the exclusive use of theEng ineer's Representative.

Item ResidentialAccommodatio

n

Recreation andDiningCentre

Beds plus mattresses (single) & pillows 28

Bedside tables 28

Dressing tables with mirror and stools 15

Wardrobes 20

Bedroom chairs 30

Writing tables & chairs 12

Table Lamps 12

Dinning table and chairs (to seat 20persons)

1 Set

Sofa Setfor five persons 4 Sets

Rest Ghairs 12 Nos.

Room Heater 15 2

Kitchen cuDboards and tables or fitted units 1 Set

Refrigerators (0.50 m3) 2

Deep Freezer (0.50 m3) 2

Water Coolers 15

Sink with hot water system 2

Electric or qas oven with four bumers 1

Ventilatins Fans 18 4

Pressure Cookers 2 :Bathroom wall mirror, shelf, medicinecabinet and towel rails

As Required es',.',"d.\Requir}&r

Glassware, cutlery, crockery, kitchenutensils etc.

AsRequired

Washing machine 2

lron with lronino stand 2

Blankets 40

oCongtruction of Lahore - Sialkot Motorway (LSM) Link Hlghway (4 - Lane)Connec{ing LSM to Narang Mandi and Narowal (73 Km. Approx.)P.11kase.l FROM Klil00+000 To KM 23*0oo (23 t<rrts)

ii) For Residence of Employer's Representative

All furnishings and equipment are for the exclusive use of theEmployer's Representative.

Special Provisions(Specifications)

Specifications | 1OZ

National HBhway Authority

I

o

oiii.iaiiig'b;.;-i'tYolume-III

Linen, towels etc. As Required AsRequired

Tefevision 24lnch -1 1

lqg|qng Table 1Air Conditioners 15 4Generators 1 1

Item ResidentialAecommodati

on

Recreationand Dining

CentreBeds plus mattresses (single) & pillows 10Bedside tables 10Dressing tables with minor and stools 10Wardrobes 10Bedroom chairs 20Writing tables & chairs 10Table Lamps 20Dinning table and chairs (to seat 20!grsqqs)

1 Set

Sofa Set for five persons 2 SetsRest Chairs 12 Nos.Room Heater 10 2Kitchen cupboards and tables or fitted units 1 SetRefiigerators (0.50 m3) 1Deep Freezer (0.50 m3) 1Water Coolers 10 2Sink with hot water system 2, . ,Electric or gas oven with four burnors .t,i iVentilating Fans 10Pressure Cookers

--:a- -::q'

2 '*'*r,

Bathroom wall mirror, shefi medicinecabinet and towel rails

As Required

Glassware, cutlery, crockery, kitchenutensils etc.

Washing machine 2

consrructton of Lahore - Slalkot Motonrnay (LSM) Link Hlghway (4 - Lane)_ Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)

O Package-t FROM KM O0+ll0O TO KM 23+000 (23 Klrts)

a

702.4

702.4.1

702.4.2

742.4.3

Specifications | 1OB

MAINTENANCE REQUIREMENTS

Maintenance Repairs, Replacement & Supply

The Contractor shall maintain these facilities throughout the contract period,including the repair andlor repla@ment of any item contained therein and inaddition shall supply all materials as stipulated herein, including toilet paper,light bulb, fluorescent tubes, supply of water and electricar power, gas, fuel,telephone and other services as hereinafter specified.

Work by the Contractor under this Section shall be performed and provided forby the contractorfrom the date of taking over of the premises by the Engineer,sRepresentative to the completion of the works or such date as instructed bythe Engineer's Representative.

Security

The Contractor shall provide guard servtces for these facilities on a twenty-four(24) hour per day basis. The total number and schedule of all guard personnelshall be approved by the Engineer's Representative.

Janitorlal Services

The Contractor shall provide all necessary janitorial services and suppties forallthe facilities for the Engineer/ Enginee/s representative. The services shallinclude floor cleaning, servicing and cleaning toilets, windows washing etc.Janitorial services shall be performed on a daily basis with personnel andprogramming of the work as approved ano. 01191$'..;Qy the

,Enstller's

a

eq

o

lron with lroning stand 2Blankets 20Linen, towels etc. As Required As

RequiredLED's 36 inch 5 1

Ping Pong Table 1Air Gonditioners 10 4Generators 1 1

702.4.4

Representative.

oconstruction of Lahore - Slalkot Motorway (LSM) Link Highway (4 - Lane)Connectng LSM to Narang Mandi and Narowal (73 Km. Appox.)

Package-l FROM KM 00*000 TO KM 23+{100 (23 Klr{s}

702.4.5

702.4.6

702.5

Speciflcation: | 1Og

Air Gonditioners & Fire Extinguisher Maintenance

The Contractor shall maintain all fire extinguishers and air conditioners asrecommended by the manufacturer and shall clean/or replace all filters atregular intervals as prescribed by the manufacturer.

Services

The Contractor shall provide cook, helpers and messenger in the premises ofeach residential accommodation. The Contractor shall keep supplied theservices of water, power and gas and pay for all the bills for connection andconsumption. One telephone connection in premises/portions of eachresidential accommodation shall be installed. Allthe calls in connection with theWorks shall be paid by the Contractor.

MEASUREMENT AND PAYMENT

The cost of providing, office and residential accommodations for Engineefsand Employer's Representative, including recreational and dining centrequantified in bill of quantities and as herein specified, shall be measured andpaid for at the Contract unit price for the respective Pay ltem listed below andincluded in the Bill of Quantities, which price and payment shall b€ fullcompensation for all costs of constructing, painting, provision of fixtures,furniture and necessary equipment and providing all services, equipment,utilities, installations and access/service roads and for all materials, labour,equipment and all other incidentals for the proper completion of the workprescribed in these Specifications.

The maintenance and servicing of the facilities for Engineer's and Employe/sRepresentative as prescribed herein will be paid for monthly at the Contractunit prie,e for the respective Pay ltem listed below and included in the Bill ofQuantities, commencing ftom the date of occupancy of the premises by theEng ineer's Representative.

ln case of a Contract extension, maintenance and servicing will be paid for onthe same monthly basis, provided that il has been approved by the EnglneefsRepresentative or Employer in accordange:,1ryHr.S9 Conditions of Conbact.

a

o

oiiidai"g o"""-.'itVolume-IlI

Specia! Provisions(Specifications)

+g

ttationat Hgn*"V nutiority

oConetruction of Lahore - Slalkot lulotonrtray (LSM) Llnk Hlghway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)Packaee] FRorrl KM 00+090 ro l{il

13+000 !]t Tu"l

Speclal Provlsions(Specifications)

Specifications I 11O

biaAins tl;l.d;;;Volume-III National Highway Authority

aConstructiou of Lahore - Sialkot Motorway (LSM) Link Highway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)

Package.l FROM KM 00'H100 TO KM 2iH{,90 (23 KMs) Specificatlons | 111

ITEM 703 PROVIDE, EQUIP AND MAINTAIN LABORATORY FOR THEPROJECT

709.1

Delete the complete ltem and replace with:

GENERAL

As part of the Engineerrs facilities, the Contractor shall provide, erect, furnish,run and maintain laboratory for the sole use on the Project in accordance withprovisions of these specifications and as directed and approved by theEngineer. On completion of the contract period, Laboratory building, laboratoryequipment, fixtures and furniture shall be handed over to the Employer in aclean and acceptable condition, keeping in view the normal wear and tearduring the contract period.

The Contractor shall also provide service utilities such as electric power, gas,water and sanitation to the buildings and maintain these services for theduration of the Contract.

The laboratory shall be run by the Contracto/s personnel under the supervisionof the Engineer's Representative to carry out joint testing for quality control ofthe Works in accordance with the Specifications. The Enginee/sRepresentative may permit the use of the laboratory for the Gonhactor,s owntesting work on the Project, provided it does not intedere with the program oftesting of Engineefs Representative and provided that test results of all testscarried out in the laboratory are made available to the Engineer'sRepresentative. The laboratory shall be located near the office of Engineer'sRepresentative. The minimum covered area of laboratory shall be 100 Sq.meterc.

Outside the buildings, tanks shall be constructed to the satisfaction of theEngineer's Representative for curing of concrete samples. The size andlocation of tanks shall be determined by the Engineer's Representative on thebasis of estimated daily production to different classes of concrete as per therequircment of the specifications. These tanks shall be eovered andconstructed with a temperature controlled system for curing of concrete moldsamples, of size and location approved by the EngineefsTanks shall also be prepared for soaking cBR specimens. (.?*

The laboratory shall be provided with electricity, gas; water, one nirmiirtelephone and intercom Facility with the Engineer's office, and shall be fullyair-conditioned. lt shall have a regular and dependable supply of utilitiesavailable throughout 24 hours of each day. Contractor shall make his ownarangements to accommodate his own material Engineer.

Special Provisions(Specifications)

t

National Highway Authority

oConatruction of Lahore - Sialkot Motorway (LSM) Link Hlghway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)

Package'l FROiI KM 00.H100 TO KM 23+000 (23 l(Ille)

All sections including the toilets shall be provided with exhaust fans, locatedparticularly over fume cupboards and the like.The water supply shall be maintained by elevated or pressure tanks ofadequate capacity. The toilets shall be connected to septic tanks of adequatecapacity with a 20 cm dia. sanitary pipe and ventilation pipe stack.

The Engineer's Representative may, require certain tests to be performed inany other laboratory designated by him. All the transportation and the testingcost shall be bome by the Contractor.

The Contractor shall maintain the Laboratory Equipment in good working orderfor the duration of the Contract, or till such time as directed by the Engineer'sRepresentative.

oThe Contractor shall provide his own qualified Material Engineers, qualifiedlaboratory technicians/helpers as well as skilled laborers as deemed necessaryby the Engineer's Represeatative, to operate the laboratory as required by theContractot's proposed program of work. All costs necessary for the provisionand upkeep of these perconnel shall be the full responsibility of the Contractorand shall be considered subsidiary to the appropriate pay ltems in the Bill ofQuantities.

o703.2

Bidding DocumentYolume-IlI

The technicians and helpers once assigned to the laboratory shall not beremoved from the laboratory unless approved/directed by the Engineer'sRepresentrative.

MAINTENANGE

The Contractor shall maintain the laboratory and testing equipment for fieldcontrol in a satisfactory working condition at alltimes to enable the Engineer'sRepresentative to test the materials and workmanship of the Works duringconstruction. Whenever required, damaged testing equipment shall berepaired/replaced by the Contractor at his own cost and consumable goodsshall be supplied in sufficient quantities, when ordered by the Engineer'sRepresentative for the sole use of testing the Works. All operating expensesshall be met by the Contractor. Janitorial and other services as specified shallalso be provided for the maintenance of the laboratory facilities.

Sr;ia"Pri;t66nJ(Specifications)

o

Specifications | 112

t6

National Highway Authority

oConstructlon of l-ahore - Slalkot Motomay (LSM) Unk Hlghway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)

Packase-l FRoM,Kfrl 01+000IoKM23fll00 (2lKMq

703.3 SAMPLING

Specificatigns t 113

I

It shall be the responsibility of the Contractor to take samples as and whererequired by the EngineeCs Representative and to provide all necessary labour,tools, containers, wrappings, for uplifting and dispatching of samples to theproject laboratory and any other designated laboratory.

703.4 LABOBATORY FURNTSHTNGS

The following laboratory equipment and furniture shall at least be provided bythe contractor.

703.4.1 For the Laboratorv

Furniturc & Stationery Gluantihr Reouired

1. Office Table and Chair for Material Engineer 1 Set + 4 chairs

I

2. Office Tables and Chairs for Technicians

3. Working Tables large size

4. Laboratory Bench

5. Side Racks

6. MetalFiling Cabinet

7. Air Conditioners 18000 BTU

8. Butler Sink with Hot & Cold Water

9. Fire Extinguishers

10. Water Cooler (Electric)

11. Cafculators

12. Office Stationery

13. Standard Office Chairs

14. Generator

15 Latest Computerwith laser printer

Manuale , i a=-1. MSHTO Standard Testing & Specifications

Part I & ll (Latest editions)

2. ASTM Standards Parts 4 and 14 (Latest edition)

Special Provisions(Specifications)

4Se ts+4cha i r s

6

2

3

1

4

4

4

1

6

As Required

10

. : , 1

J,set

1 soft & hard copy

1 soft& hard copy

National Highway AuthorityBidding DocumentVolume-III

o

ICons&uction of Lahore - Slalkot Motorway (LSM) Link Highway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx,)Packase-l FRoM Krti 09+o09 Jo IM 1*019 e]1I")

3. Asphalt Institute Test Manuals (MS-1 to MS-22)

4. Printed Blank Data Sheets(as direc{ed by the Engineer's Representative)

5. Printed Blank Laboratory Testing Proforma(as directed by the Engineer's Representative)

703.5 LABORATORY EQUIP]YIENT REQUIREMENTS

Soggificalions ! 114

1 soft & hard copy

As Required

As Required

I

703.5.1.1 Laboratory Tests

The laboratory shall be fully equipped to perform at least the following tests:

Sr.No.

Test AASHTO orother

t

1 .

2.

3.

4.

5.

6.

7.

8.

9.

12.

13.

14.

15 .

iiialing'uociimiintVolume-III

Natural Moisture Contenttest by oven drying method.

Classification T-89, T-90 and M-14S

Moisture-density relationship of soils T-99

Moisture-density relation ship T-1S0of soils (Modified method) Method B&D

Specific Gravityof soils T-100

C.B.R. Test & Swelling T-193

Sieve Analysis of soils and T-88,T-27aggregates and mineral filler T11,T-97 and M-G

Specific Gravlty and waterabsorption of fine aggregates T-8/

Specific Gravity and water absorptionof coarse aggregates T-85

Unit weight of aggregates T-19

Los Angeles Abrasion testfor Aggregates . ;'',..,''.'.,',', 'T-96 ,:,,',:u,-'-*- ' -

, " !

Amount of material passing No. 200 sieveijl { , ',.F,;11.

'i.';i,'li .' L- "

Soundness of aggregates by NazSOa SolutQn: i ' '

T:1M

Flat and Elongated partictes egitz part tosirgCs):

Curing concrete compressive test specimens T-29

Siieiiaiproviiionsi s p e c i f i c a r i o n s ) N a t i o n a | H | g h w a y A u t h o r | t y

10.

11 .

e6

o

Iconstruction of Lahore - Slalkot Motorway (LSM) Llnk Hlghway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)

Package-l FROM KM 00+{100 TO KM 23+000 (23 KMc)

16 . Compressive strength ofcylinder concrete specimens

Quality of water to be used in concrete

Making and curing concrete testspecimens in the laboratory

Plastic fines in gradedaggregates and soils by useof sand equivalent test

Sampling bituminous materials

Marshalltest and Loss in Stability

Specific gravity of compactedbituminous mixtures

Quantitative extraction ofbituminous paving mixtures

Viscosity of Bitumen

Penetration of Bitumen

Flash & Fire Points

Coating and stripping ofBitu men-Aggregate Mixture

Max, Specific gravity of Bituminous paving mixture

Slurnp test

17 .

18 .

19.

20.

21.

22.I

23.

24,

25.

26.

27.

28.

29.

7A3.5.1.2 Field Testinq

Sr.No.

Test

Specifications | 115

T-22

7-26

T-126

T-176

T-40

T-24,7-245

T-166Method B

T-130,T-164

T-201,T-2A2

T-49

T-48

T-182

T228, T-209

T-119

The following tests will be carried out for field control/spot checking purposesas the Works proceed:

AASHTO or otherDesignation

1 .

2.

In-place density by Sand Cone Method(with 15.25 cm and 30.5 cm Cone)

In-place Density of compactedbase courses containing largesizes of coarse Aggregates

Sampling fresh concrete

SrieciaiitroviCi6ns(Specifications)

4r"' j , ' '

T-1Bl

T-191

T-141

,r, ,,.,1r,j .

,ii /l i i i j f

V;:' 2-.."'.i.i'*.1 , '

National Highway Authority

IConstruction of Lahore - Slalkot Motorway (LSM) Llnk Highway (4 - Lane)Connecting LSM to Narang Mandl and Narowal (73 Km. Approx.)

PackageJ FROM KM 00+000 TO KM 23+000 {23 Kils)

4. Slump of Portland cement concrete

Sampling bituminous materials

Determining the temperature ofbituminous paving mixtures

Coring and determination of BulkSpeciflc Gravity of compactedbituminous mixtures

6.

7.

I

703.5.{.3 Equipment

Description

a) General Equipment

Laboratory Oven, Capacity, 240 Lit.Laboratory Oven, Capacity 115 Lit.Mammert or equivalentHoi Plate (max. Temp. 350oC)Burner (Gas) Two Flames

Bunsen Bumer with Tripod

Sensitivity of 1 gm balanceSensitivity of 0.1 gm balanceElectric Balance of 0.01 gm

Platform Balance (115 Kg)

WallClockStopWatchVernier CalipersElectronic Thermometer General 0-200o CMax. & Min. Thermometer

Sampling Tools Complete

TongsDessicatorBeaker (Pyrex) 250 ml

Beaker (Pyrex) 500 ml

Beaker(Pyrex) 1000 ml

Funnel 250 ml

I

oBidding DocurrentYolume-III

SOecifig3tions I 116

T-119

T-40

T-116

The following Laboratory Equipment shall be at least provided and maintainedby the contractor as per approvalof the Engineer's Representative.

Quantity

L-158L-6

L-236

L-s00L-410L-817L-855M

Lt-475

L-,,roG-61

G-5

G-8

G-9

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

National Highway Authority

conatrucdon of Lahore - Sialkol hflotorway (LSM) Link Hlghway (4 - Lane)Connecting LSM to Narang Mendi and Narowal (73 Km. Approx.)Package-l FROM Kil 00+000 TO KM 23fl100 (23 KMs)

Equipment Description

Funnel 500 mlVolumetric Flask Stoppered, 100m1Volumetric Flask Stoppered, 250m1Volumetric Flask Stoppered, 500m1Volumetric Bottle Flask, 250 mlVolumetric Bottle Flask, 500 mlWash Boftle, 100 mlWash Bottle, 250 mlWash Bottle, 500 mlGraduated Cylinder, 100 mlGraduated Cylinder, 250 mlGraduated Cylinder, 1000 mlReagent Bottle Stoppered, 2lit.-Aluminum Cans with Cover, 2" Dia.Aluminum Cans with Gover, 4" Dia.ScoopBrush (Fine)

Wire Brush (Coarse)

Wire Brush (Fine)

Bucket, 12lit.TrolleyShovel(Large)PickaxSample Splitter (Coarse)

Sample Splitter (Fine)

Sieve Shaker for 8" Dia.Sieve (Motorized)

Sieve Shaker for 12"118" DiaSieve (Motofized)

Tin Pan/Tray 12"x1 2"x2"Tin Pan/Tray 16"x12"x3"Tin Pan/Tray 20"x1 6"x3"Tin Panffray 20"x16"x4"Mortar Porcelain 200 mmRubber covered pestle

b) Sieve Analysis for GoanEe & FineAggregates

Sieve Set 12'118" Dia

BiddingDocumentVolurne-III

Speciai-iir6vi6ioni(Speciflcalions)

Specifications | 117

Quantity

G-40G-26G-27G-41

G-42G-l0G-l0G-10G-18G-19G-21EachLT.3OLT.3OcN-502

cL-375cL-316

DR.26

"r-rwcL-280cL-300A

Each

22222244

24

8

As Reqd.

As Reqd.444

43

224221 '

cL-343Local Made

Local Made

LocalMade

Locat Made

cL-281cL-282

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

2

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

n"tion"f ",ft

*", Or*onr,

oConstructioa of Lahore - Slalkot Motorway (LSM) Link Highway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)

Package-l FROM Kil 00+000 TO Kftl 23+000 (23 KMs)

Equipment Description

Specifications | 118

Quantityuired

a

3 inch (75 mm)

2-112inc\'r (63 mm)2 inch (50 mm)

1-112inch (38 mm)1 inch (25 mm)

3/4 inch (19 mm)ll2inch (12.5 mm)3/8Inch (9.5 mm)No. 4 (4.75 mm)Sieve Set 8" Dia.

3/4 inchll2inch3/8 inchNo. 4 (4.75 mm)No. I (2.36 mm)No. 10 (2.00 mm)No. 16 (1.18 mm)No. 30 (0.60 mm)No. 40 (0.425 mm)No. 50 (0.300 mm)No. 80 (0.180 mm)No. 100 (0.150 mm)No. 200 (0.075 mm)WetWashing No. 200PanCoverc) Atterberg LimitsLiquid Limit Test Set (with all accessories)Plastic Limit Test Set (with all accessories)

Shrinkage Limit Test Set (with allaccessories)d) Sand Equivalent TestSand Equivalent Test SetStock Solutione) Unlt Weight & Specific Gravity Tests

for Goarse and Fine AggregateDensity Basket (Brass)

Sand Absorflion Cone & Tamper

Pycnometer 25 ml

cAW-18300cAW-18250cAW-18200cAW-18150

cAW-18100cAW-18075cAW-18050cAW-18037cAW-184

cBG1875cBc.8050cBG8037cB-84cB-88cB-810cBG816cB-830cB-830cB-850cB-880cB-8100cB-8200cL-38scB-8500cB-3506

cL-209cL-257cL-256

c1230

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

3336643

346334333

22224

4444

1

1

1

1

As Reqd.

221

Set

Each

Each

Each

k)G-340G-325G-341

tiiddii'g ii;"*L;iVolume-III

Slieciai itrotiJionC(Specifications)

IConstruction of Lahore - Sialkot Motorway (LSM) Link Hlghway (4 - Lane)Connecdng LSM to Narang Mandl and Narowal (73 Km. ApproxJPackage-l FROMKM00+000TOKM23+000 (23KMs)

Equipment Description

Pycnometer 50 ml

Pycnometer 100 ml

0 Abrasion Test for Coarse AggregateLos Angeles Abrasion Machine withAbrasion Charges Setg) Soundness Test for Goarse & Fine

AggregateDistilled Water

Sodium Sulphate Solutionh) Modified Compaction Test

Straight edgeScoopScoopMixing SpoonsSample EjectorModified CompactionHammers 10lbs.Modified Compaction Mold 6" DiaModified Compaction Mold 4'DiaPreparation KnifeRubber MalletMixing Trays 24'x24"x3"il GBR Laboratory TestSoaking Tank 60"x1 20"x24"AdditionalCBR Mold 6" Dia.

Filter ScreensSwellPlates

Surcharge Weights (Circular)

Surcharge Weights (Slotted)

Tripod AttachmentDiallndicatorSpacer, DiscCBR Loading Press (Electronic)

Proving Ring 2,000 lbs.Proving Ring 6,000 lbs.Proving Ring 10,000 lbs.j) Field Density TestNuclear Gauge (Troxller)

Iiiddins it;;;;'aYolume-III

Srieciiii;rcviCioni(Specifications)

Specifications | 1J9

Quantity

o

G-342G-343

M-502

cN-838cN-505cN-502AcN-995

P-103

cN-416cN-403cN-406P-89

luitn "ou"rs,plate,

screws etc.cN-556cN-400

cN-558cN-401LC-8cN-393cN-472PR-60

1

Kg

Each

Each

Each

Each

Each

Each

Each

Each

Each

=l'n

EachN-450

PacketEach

cN-557EachEachEachEachEachEachEachEach

As Reqd.As Reqd.

2444

2

2222

4As Reqd.

1Each

As Reqd.12Each121212211.

"1i,, '"

oConsrruction of Lahore - Sialkot Motorway (LSM) Link Highway (4 - Lane)Conneoting LSM to Narang Mandi and Narowal (73 Km. Approx.)

Package-l FROM Klt 00+000 TO KM 23{,00 (23 KMs}

Equipment Description

Sand Boftle

Density PlatePlastic Jug for SandReplacement JugSpoonPlastic Bags

Chisel 12"Hammer 2,5 lbsField Balance (Etectronic)

Speedy Moisture TesterSieve No. 30 (0.60 mm)Sieve No. 16 (1.18 mm)k) Asphalt Cement Test

Saybolt Viscometer

Bitumen Penetrometerl) Asphalt Concrete Mix TestMarshall Stability Compressive Machine 6'&4" diaMarshall Specimen Mold Assembly 6' & 4"diaBase Plate for Compressive Mold 6" & 4" diaMarshall Compaction HammerMarshall Specimen Mold Holder 6' & 4" diaMarshalBreaking HeadMarshall Ring DynamometerMarshall Flow meterMechanical Mixing ApparatusWater Bath (Thermostatic) Controlled to 60ocGlass Plates 15x15x0.5 cmBitumen Extractor Apparatus, Gomplete(lmported)Filter DiscMixing Dowel(Steel)Asphall Oven (115 Lit.) lmpMiCrometer (for measuring Galvausingthickness in microns on guardrailetcExtruder for Stability Mold 6' & 4" diaStability Mold 6" & 4" diaCollar for stability mold and Base plate 6' &4" dia

Bidding DocumentVolurne-IlI

SpeCiai itr6viildns(Specifications)

Specifications I 12o

Quantity

t*-nn,

L-7708

MG-320

cB-830

cBc-816

AP-122

AP-243

AP-170A

AP-166

AP-166

AP-165

AP-167

AP-169

AP-171

G l10

AP-I60

AP-l70

AP-177

AP-190-191

AP-290

AP-l68

AP-l69

cN-994

Each

cN-993

cN-995

Each

Each

Each

Each

Each

Each

Each

Set

Set

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

I

Each

Each

As Reqd.

4

4

4

4

4

4

1

1

124222421

As Reqd.2

As Reqd.1

3,l

aNationalHighway

eConetructlon of Lahore - Slalkot Motorway (LSM) Llnk Hlghway (4 - Lane)Connectlng LSM 1o Narang Mandi and Narowal (73 Km. Approx.)

Paekage-l FROY KM 10+0-00TOKM23+000

(23KMs)

Description

Compaction PedestalPavement Core Drill machine with 6' & 4" diacoreAdditional core cutting cylinders for machine6' ,& 4 'd iaCarbon Tetra ChlorideVacuum ExtractorExtractor Repair KitsThermometer Metallic 350o CDigital Dial ThermometerMuffle FurnaceHabhard Canuck Sp. Gr, BottleStop Watch for MarshallTestAdditional core cutting cylinders for machine6 '& 4 'd iaCarbon Tetra ChlorideVacuum ExtractorExtractor Repair KitsThermometer Metallic 350o CDigital Dial Thermometer

Muffle Furnace

Habhard Caruck Sp. Gr. BottleStop Watch for MarshallTestComplete equipment for determination ofunit weight and slability test etc. of asphalticbase oourse having maximum size ofaggregate 1.5' using 6" mould as per ASTMDesignation D5581-96 including mechanicalcompactorm) Concrete & CementTest

Electrically-operated Compressive StrengthMachine Heavy Duty (250,000 lb.)Lab. Concrete MixerVibratorConcrete TrayGloves (Asbestos) local

Gloves (Rubber) local

Spatula Large 8" sizeFilter Paper 6' & 4, dia (lmpofted)

Scoop (Large, Medium & Small)Sample Splitter 2' size localMixing Tr.ay (2tu24"x3)

Bidding DocumentVolume-IlI

SpeCEi isrovisions(Specifications)

Specifications | 121

Quantity

AP-172DR-1304

AP-178AP-520aP-174

AP-178AP-520AP-174

cT-755

cT-30cT-106

Each

Each

Each

DrumEach

Each

Each

Each

Each

Each

Each

Each

DrumEachEachEachEach

EachEaohEachSet

2

1

As Reqd.

As Reqd.

1

1

6

6

1

1

1

As Reqd.

As Reqd.

1

1

6

6

1

1

1

1

Each

Each

Each

cT-58Pair

Each

Each

Each

Each

Each

2

11Each12Pair6 Nosl ;'. l

10!o,: ; l r ' ' '

2 Sets .,.: *'.:.

aCnnstruction of Lahore - Sialkot Motorway (LSM) Link Highway (4 - Lane)Connecting LSM to Narang Mandl and Narowal (73 Km. Approx)

Pad<age.l FROM KM 00+000 TO KIU 23+{,00 (23 Kttis)

Equipment Description

Steel(Large)Cylinder Mold Heavy Duty 6" dia.Gylinder Capping Apparatus SetConcrete Capping CompoundSlump Test Apparatusn) Soil Investigation and SamplingPost-hold Auger, 4 in

cT-35cT-56-4cT-s5cT-69

DR-34

Speciflcatlons I t22

Quantity

2 Nos362 + 1(4")As Reqd.6

1

Each

Each

Each

Kg

Set

I

7 03,5.1.4 Weather Recording EquipmentThe contractor shall furnish and maintain in good working conditionsthroughout the duration of the contract instruments and theirs necessaryappurtenances to the use of the Engineer for reoording the daily weather data.Location and modelshall be approved by the Engineer's representative.

a) One (1) rain gaugeb) One (1) thermometerc) One (1) recording barometerd) One (1) Maximum - minimum thermometer

703.5.2.3 Equipment

All Laboratory Equipment shall be maintained throughout the Contract periodand repaired/replaced by the Contractor at his own cost in case of damage orloss. As and when requlred by the Enginee/s Representative, the Contractorshall perform any specified test, at no additional cost to the Employer:

Upon completion of the contract the laboratory equipment and furniture shall behanded over to the employer complete and in good state, taking into accountfair wear and tear.

MEASUREMENT AND PAYMENT

The cost of providing shall be lump sum and furnishing these facilities forEngineer's Representative as hereinabove specified shafl be measured andpaid from provisional sum and maintenance of these shall be paid in monthlypayments at the Conkact unit price for the Pay ltem listed below and includedin the Bill of Quantities, which price and payment shall be fullcompensation forall costs of providihg, fumishing and maintainihg, of buildings, equipment,utilities, erection and maintenance of equipment, installations, acces_9/_s.qqqiceroads and for all materials, labour and incidentals for the proper @ffteti.on otthe work prescribed in these Specifications.

d

eqI

Bidding DocumentVolume-III

Siieiiiii i5rdviiioni(Specifications)

Ic-onstruction of Lahore - Slalkot Motorway (LSM) Llnk Highway (4 - Lane)Connectlng LSM to Narang Mandl and Narowal (73 Km. Appror)

Package'l FROM Kil 00+000TO Kil 23+000 (23 KMs) Specifications | 123

ln case the Contraotor does not maintain the specified equipment and testingfacilities, cost of testing plus 100 per cent overheads shall be recovered fromhis bills.

The Contractor shall provide all consumable items and Payfor all services andother incidentals on running costs and provide and pay all utilitieswhich includepower, gas, water supplies, telephone and/or other means of communicationwithin and off the site. The Contractor shall also provide maintenance staffsuch as messengers, tea boy, Chowkidars and sweepers. The consumableitems shall include stationery and such other items as required.

t

o

'r'' ftG

BiddingDocumentVolume-III

Speciii itroviCioni(Specifications) National Highway Authority

oconrtruction of Lahore - Sialkot Motorway (LSM) Link Highway (4 - Lane)Connec{lng LSM to Narang Mandi and Narowal {73 Km. Approx.)

Package-l FROI'I KM 00+000 To KM 23+000 (23 Kttls) Specifications | 124

ITEM 704 MAINTENANGE OF WORKS FOR ONE YEAR AFTER COMPLETION,pEFECT L|ABTL|TY PERTOD (pERtOp OF MATNTENANCE)

ln title, delete', DEFEGT LIABILIW PERIOD'

704.4.1 Measurement

Defete Para2 and replaoe with:

Howeverany specialworkwhich is not in approved scope of work, if carried outat the written instruction of the Engineer, during the defect liability period, shallbe measured separately under applicable item of Works of the B.O.O.

I

o

aBidding DocumeatVolume-III

Speciai i;rovilii,ni(Specifications) National Hlghway Authority

Construction of Lahore - Slalkot Motoruay (LSM) Unk Highway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)

a Package{ FROMKMOlt+0O0TOKit23{tO0 (23KMs} Specifications I 125

SP 708 PROVIDE, RUN AND MAINTAIN TRANSPORT FOR EMPLOYER'SAND ENGINEER'S REPRESENTATIVE

I

General

The Contractor shall procure, fumish new vehicles for the use of theEmployer's dnd Engineer's Representative and maintain these :il: thecompletion of the project afterwhich time they shall becomethe property of theEmployer. The Contractot's Insurance, according to Clause 21 of the GeneralCondition of Gontract shall also cover the vehicles provided for the Employefs/ Engineer's Representative. The Insurance policy shall be comprehensive.

lf the Contractor fails to provide the vehicles within the time allowed, the cost ofhiring alternative vehicles, used for the work shall be deducted from theContractor's Bill.

The Contractor shall provide and fumish to the Employer's / Enginee/sRepresentative, not later than tharty (30) days after the receipt of Notice toproceed, the of new vehicles latest model as listed in the item 708.1

The vehicles shall be trax-paid, comprehensively insured, fueled, repaired,serviced and completely maintained by the Contractor for the full duration ofthe Contrac't and temporarily replaced if any vehicle is not in a roadworthycondition and until such vehicle is repaired and retrained for use. TheContractor shall provide competent drivers who shall be responsible for thevehicle allocated to them for the duration of the Contract.

lf the Contractor fails to maintrain the vehicles to the satisfaction of theEmployefs / Engineefs Representative or otherwise fails to comply fully withthese provisions, the Enginee/s Representative may get the vehiclesmaintained through some alternate arangement. The Contractor shall bear allcosts that may arise including delays due to failure of the Contractor to complywith these provisions.

PAYMENT FOR VEHICLES

Payment for the provision and maintenance of the transport for the Employer's/ Engineer's Representative shall be made lor the respective pay items listedbelow which price and payment shall be the full compensation for the provisionof the vehicles and their maintenance, including drivers, fuel, lubricants, tires,tools, all repairs, all insurances, taxes and everything necessary to satisff therequirements of these provision:

SiieCi6iFriivisibiiC(Specifications)

o 708.1

SP-708a

o

Provide Employeds Transport

Toyota Double Cabin 4 Wheel Drive - REVO

Provide Engineer's Representative Transport

Toyota Double Cabin 4 Wheel Drive - REVO

SuzukiJimny (4Wheel Drive, 3 Door)

sP-708b

Construction of Lahore - Slalkot Motoruay (LSM) Llnk Hlghway (4 - Lane)Connecting LSM to Narang Mandi and Narowal (73 Km. Approx.)

Package.l FROfrl KM 00+000 To KIrl 23+000 (23 KMs)

SP - 708 ci

SP - 708 cii

Toyota Hilux AC Single Cabin with AC Hood (marks)fitted: 4 wheel Drive

Running and Maintenan@ of Employer's Transport alongwith Drivers

Running and Maintenance of Engineer's Transport alongwith Drivers

Bidding DocumentVolume-III

Speclal Provisions(Speclfications)

Specifications | 126

Vehicle Month

Vehicle Month

National Highway Authority

oConstruction of Lahore - Sialkot Motorway (LSM) Unk Hlghway (4 - Lane)ConnecUng LSM to Narang Mandi and Narowal (73 Km. Approx.)

Package-l FROM Ki,l 00+000 TO Kl, 28+000 (23 KMs) speciflcatlgns t 127

OF TRAFFICSP.712 DETOUR ROADS AND MAINTENANCE

1. GeneralThe Contractor shall conduct his operations so as to offer the least possible obstruction andinconvenience to the public all in accordance with item 705 and 706 of General Specificationsand Special Provisions and he shall have under construction no greater length or amount ofWork that he can execute properly with due regard to the right of the public.

Unless otherwise directed by the Engineer, all public traffic shall be permitted to pass throughthe Work with as liftle inconvenience and delay as possible.

Two-way traffic flow must be provided at all times whether within the existing road or by use ofdetour roads or by a combination of both, free of cost to the Employer.

The temporary bridge if required for detour shall be properly designed, substantially built andmaintained for the load it will bear. The Contractor shall prepare and submit the temporarybridge drawings to the Engineer for approval. Approval of the Contractor's drawings shall notbe considered as relieving him of any responsibility for safe designing and constructing thetemporary bridge and detour.

2. Maintenance of Existing TrafficThe Contractor will coordinate with the Traffic Police and shall be responsible for the safetyand convenience of the public traffic in and around the operations during construction. Trafiiccontrol devices as outlined in Special ProMsions SP-3 shall be provided and maintained ingood working condition throughout the period required.

Roadway excavation, construction of embankments and widening of pavement shall beconducted in such a manner as to provide a reasonably smooth and even surface satisfactoryfor use by public traffic at all times. During rainy seasons special surface treatment such asbituminous single surface treatment or other method approved by the Engineer shall beexecuted free of cost. The riding surface shall be maintained smooth and dense by regulargrading, sprinkling and rolling operations.

The Public shall not be expected to run within the limits of active construction operations andthe Contractor shall so programmed and carry out his Work as to allow an adequate width ofunobstructed roadway for the safe passage of the Public.

- - I ::. ;l -:: :i:

Alternative traffic maintenance proposals by the Contractore'hiijrir€ aminimum of 6 m travelway may be submitted for the approrral of the Engineer. ,l "ji'

'', ,

::i i' G*-' ' .'The Contractor shall so schedule and carry out his work tftetpqdestrian and vehicb,?qg€qs toadjoining premises shall be maintained at all times, excupi''Witti..ftF written agregp?nt of fl1elowner / occupier of the premises.

-"'' ' ' tlr,,,t ' ' -

Bidding DocarmentYolume-III

Special Provisions(Specifications)

I

a

tNational Highway Authority

Iconstruction of Lahore - Slalkot Motonray (LSM) Link Hlghway (4 - Lane)Conneoling LSM to Narang Mandi and Narowal (73 Km, Approx.)

Package.l FROM KM 00+000 TO KM 23+000 (23 KMs) Specifications | 128

3. Measurement and PaymentThe costs of the Work involved in detour and maintenance of traffic as specified herein shallnot be measured fordirect payment and its cost shall be deemed to have included in the otheritem rates of Works.

4. Deduc.tionln case the Contractor fails to maintain the traffic with a reasonably smooth and dust free ridingsurface, to the satisfaction of the Engineer, the Engineer may so certify in writing to theEmployer and the Employer may thereupon Employ any other persons to carry out the sameand recover all expenses consequent thereon and incidental thereto from the Contractorwithout avoiding the Contract or releasing the Contractor from any of his obligations orliabilities under the Contract or affecting the rights and power conferred on the Empfoyer or theEngineer by the Contract.

Bidding DocumentVolume.III

o

t

e6,

oNational Highway Authority

IConstructioa of Lahore - Slalkot Motoruay (LSM) Llnk Hlghvray (4 - Lane)Connecting LSM to Narang Mandl and Narowal (73 Km. Approx.)

Package-l FROM KM 00+tt00 TO Kll| 23+{,00 (23 KMs) Specifications I 129

SP-713 TRAFFIG CONTROL DEVICES DURING CONSTRUCTION

1 . GeneralThe Contractor shall provide for the passage of traffic along the Road at all times inand around the construction sites all in accordance with item 706 of GeneralSpeoifications and these special provisions. During critical activities the Contractormay, with the approval of the Engineer, provide for one way movement for selectedand short sections of the highway.For the control of traffic during construction, the Contractor shall furnish install andmaintain such signs, delineators, barricades, flashers and flagmen as are necessaryfor proper execution, free of cost. Prior to initiation of one way traffic controls, theContractor shall prepare and submit to the Engineer for approval a diagram or sketchoutlining in detail the area or areas affected and the location, type and number of signs,delineators, barricades, flashers and flagmen he proposes to use.

Since the traffic flow patterns may vary from hour to hour or location to location, thefollowing guidelines are established.

Gonstruc'tion SignsNominal size 1.2m x 1.2m diamond or square shaped of steel sheet with black letterspainted on a yellow background. Letter size shall be minimum 12 cm in height. Signsshall be placed at 100 m intervals commencing 500 m from the Work site. The signsshall be placed approximately 2 m right and 1.5 m above the edge of pavement facingoncoming traffic. Typical sign wordings to be used are : DETOUR AHEAD, FLAGMENAHEAD, ONE LANE ROAD AHEAD, ROAD CONSTRUCTION AHEAD, ROADCLOSED AHEAD, MEN WORKING, SLOW AND STOP.

ln addition, other warning or regulatory signs shall be developed and located, as theEngineer may direct to facilitate the flow of traffic.

BarricadesSteef sheet cross bars, nominally 25bV 2 cms and 1.2 m wide shall be painted in 15-45 cms diagonal black and white altemating stripes and mounted on 15 cms posts, 1.2m high, fastened to a suitable base platform. lf necessary for stability, the base shall beweighted with sand bags, rocks or other materials, Banicades shall be located on theroadway no more than 100 m from each end of the restriction.

4. DelineatorsElelineators shall be reflective red or yellow plastic cones or plastic pipe with aminimum height of 45 cms and mounted on a suitable base. Delineators shall bespaced at 20 m intervals alongside the traffic side of the restricted Work area. . ,'

I

2.

)

3.

aBidding DocumentVolume-lII

Siieciiiitiovilic,hJ(Specifications)

aConstnrctionof Lahore - Slalkot Motonflay (LSM) Link Hlghway (4 - Lane)Connecting LSM to Narang Mandl and Narowal (73 Km. Approx.)

Package-l FROM KM 00+000 TO Kll 23+000 (23 KMs) Specifications | 13O

6.

5. Warning LightsWarning lights shall be electric flashers with a bidirectional two lens head assembly.The lenses shall be a minimum 15 cms in diameter. The intensity of the warning lightsshall be at least 4 candle power and the flash rate shall be between 50 - 75 flashes perminutes. Normally, warning lights shall be placed on all barricades and the adjacentconstruction sign. The Engineer may direct the placement of additional warning lightsat other locations.

FlagmenFlagmen shall be provided with a vest of reflective red material and construction typehard hat and have two hand signs at all times. The hand signs shall be of thepaddle-type, 30 cms in diameter; one painted STOP/GO and the other painted SLOW.Flagmen shall be posted at the beginning and end of the restricted section and atintervals of 500 m within the zone.

The Contractor shall install signs, lights, delineators banicades and furnish flagmen asspecified above or as directed by the Engineer and shall maintain all such devlces ingood condition. Should the Contractor appearto be neglectful or negligent in furnishingwarning and protective measures as stated herein, the Engineer may direct attentionto the existence of a hazard and necessary warning measures and devices shall befurnished and/or installed by the Contractor without hesitation?

The Contractor shall not be relieved from his responsibility for public safety throughoutthe Contract duration.

Measurement and PaymentThe Cost of furnishing, installing and maintaining the necessary waming andprotective measures including the furnishing of competent flagmen shall not bemeasured and paid for separately and shall be deemed to be included in the otheritems of work entered in the Bill of Quantities.

Bidding DocumentYolume-III

Sp6ciiiiPiovis]diJ ''

(Specifications)

o

7.

o

ONational Highway Authority

oConstruction of Lahore - Sialkot Motorway (LSM) Link Highway (4 - Lane)Connecting LSM to Narang Mandl and Narowal (73 Km. Approx.)

Palkase.r ,fRoM

lot 00{oft0 To Kilt 23{000 123

KmeJ

SP.714 TRAINEE ENGINEER

Speclfications I 131

714.1 General

This item shall consist of employing Trainee Engineers having Bachelor degree in CivilEngineering. This item shall cover the payment of stipend of minimum Rs. 50,000/- perTrainee Engineer. In addition the Contractor shall also be responsible for providinggood quality boarding, lodging and messing for the Trainee Engineer. The period oftraining of each trainee will be one year. The Contractor will prepare a comprehensivetraining program and get it approved from the Employer.

714.2 Measurement and Pavment

Paymentforthe employing of Trainee Engineerand Boarding & Lodging shall be madefor the respective pay items listed below

a

t

ryo

ildaiiis"bdcuiii;iiiYolume-llI

Special Provisions(Specifications) National Highway Authority