Specialized Testing Focus in Agile Specialized Testing Focus in Agile 1 Harleen Bedi Sujatha Badri Narayanan

Specialized Testing Focus in Agile 01 [Read-Only]minisites.qaiglobalservices.com/stc2012/Conference... · • Risk Based testing for iterative development methodology • QA validation

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Specialized Testing Focus in Agile 01 [Read-Only]minisites.qaiglobalservices.com/stc2012/Conference... · • Risk Based testing for iterative development methodology • QA validation

Specialized Testing Focus in AgileSpecialized Testing Focus in Agile

1

Harleen Bedi

Sujatha Badri Narayanan

Page 2: Specialized Testing Focus in Agile 01 [Read-Only]minisites.qaiglobalservices.com/stc2012/Conference... · • Risk Based testing for iterative development methodology • QA validation

Agenda

� Testing in Agile vs Traditional

� Need to plan for Specialized Testing

� Unbalanced Agile Testing Quadrants

� Focused Approach of Implementation

� Example - Performance Testing � Example - Performance Testing

� Potential Benefits

� Challenges in Implementation

� Key Success Factors

2

Page 3: Specialized Testing Focus in Agile 01 [Read-Only]minisites.qaiglobalservices.com/stc2012/Conference... · • Risk Based testing for iterative development methodology • QA validation

Testing in Agile vs Traditional

Story Identific

ation

Design

Deploy or Review

from Stakeholder

sSprintSprint

Traditional Waterfall Model Agile Model

Requirement

System Design

Coding

System Testing

3

DevelopTest Release

� Sequential phases

� Requirements are clearly defined and documented

� Mostly, independent testing team

� Test Manager – enough time to plan for testing

� Testing phase is planned

� Iterative phases

� Limited documented requirements

� Testers integral part of team

� Very less testing time available in each sprint

Page 4: Specialized Testing Focus in Agile 01 [Read-Only]minisites.qaiglobalservices.com/stc2012/Conference... · • Risk Based testing for iterative development methodology • QA validation

Specialized Testing

Pa

cka

ge

Pe

rfo

rma

nce

Te

stin

g

DW

/BI

Mo

bil

e

SO

A

Co

mp

lia

nce

4

� More than functional testing

� Requires technology focus

� Validates non-functional aspects

� Need People with “niche” skill set

Page 5: Specialized Testing Focus in Agile 01 [Read-Only]minisites.qaiglobalservices.com/stc2012/Conference... · • Risk Based testing for iterative development methodology • QA validation

Need to plan for Specialized Testing

� Agile is development centric?

� Agile is ad-hoc testing/ exploratory?

� Rarely articulate non-functional criteria in user stories

� Rarely have tests designed for these aspects

5

� Failed to implement appropriate testing strategies

� Specialized Testing is postponed until product is fully integrated

But! Its often too late into the project cycle. “Defects¨ found here may go directly into

the backlog for the next release or cause a feature to be pulled from a release.

Page 6: Specialized Testing Focus in Agile 01 [Read-Only]minisites.qaiglobalservices.com/stc2012/Conference... · • Risk Based testing for iterative development methodology • QA validation

Unbalanced Agile Testing Quadrants

Functional Tests

Story tests

Exploratory Testing

Usability

UAT

Business FacingManual &

AutomatedManual

Q2 Q3

Q1 Q4

Su

pp

ort

ing

th

e t

ea

m

Cri

tiq

ue

Pro

du

ct

6

Unit Tests

Component Tests

Performance and Load Testing

Security Testing

ility Tests

Technology Facing

ToolsAutomated

Q1 Q4

Su

pp

ort

ing

th

e t

ea

m

Cri

tiq

ue

Pro

du

ct

Quadrant 3 & 4 in particular require focused effort that is not directly related to individual features built during sprints

** Source : Agile Testing Quadrants from Brian Marick

Page 7: Specialized Testing Focus in Agile 01 [Read-Only]minisites.qaiglobalservices.com/stc2012/Conference... · • Risk Based testing for iterative development methodology • QA validation

Agile development aims to deliver a

feature that can be independently

evaluated and used by customers…

and what will to be delivered to

customers…needs to be customers…needs to be

TESTED THOROUGHLY!

7

Page 8: Specialized Testing Focus in Agile 01 [Read-Only]minisites.qaiglobalservices.com/stc2012/Conference... · • Risk Based testing for iterative development methodology • QA validation

Focused Approach of Implementation…

� Sprint Zero or release planning –

� include Specialized testing member on project team

� Involve the tester in sizing and estimates

Story Ide

Deploy or Review from Stakeholders

Agile Project Lifecycle

SprintSprint

8

� Identify the type of testing required

Test

Agile Project Lifecycle

Page 9: Specialized Testing Focus in Agile 01 [Read-Only]minisites.qaiglobalservices.com/stc2012/Conference... · • Risk Based testing for iterative development methodology • QA validation

Specialized Testing that should get into Agile

Performance TestingDesign / Code Tuning defects found at

this stage are less costlier to fix

Usability TestingEnd users get to see the product

earlier in the lifecycle

Security TestingMore open source / third party

components

Maintainability TestingCode gets churned out every other

sprint and should be easily maintainable over several sprints and

releases

Data warehouse TestingTesting Efficiency will be better as more samples can be taken. More

opportunities for automation

9

Web Services TestingTesting as and when they are developed reduces Integration

issues

Page 10: Specialized Testing Focus in Agile 01 [Read-Only]minisites.qaiglobalservices.com/stc2012/Conference... · • Risk Based testing for iterative development methodology • QA validation

…Focused Approach of Implementation

� Requirements -

� Add specialized Testing requirements in Product backlog

� Definition of Done

� Infrastructure set up –

10

� Infrastructure set up –

� Identify specific needs for environment of Infrastructure required to perform these

tests

� Use Appropriate tools –

� Wherever required plan for usage of tools

Page 11: Specialized Testing Focus in Agile 01 [Read-Only]minisites.qaiglobalservices.com/stc2012/Conference... · • Risk Based testing for iterative development methodology • QA validation

Performance Testing Approach for Agile

NFR Gathering Design Development System Testing Performance Testing

Testability Analysis

Testability Analysis

Traditional Waterfall Model

Agile Model

11

NFR Modeling

Early Validation

Scripting & Execution

Bottleneck Analysis

Analysis

NFR Modeling

Early Validation

Scripting & Execution

Bottleneck Analysis

End to End PT

Execution

Bottleneck Analysis

Sprint 1 Sprint n

Page 12: Specialized Testing Focus in Agile 01 [Read-Only]minisites.qaiglobalservices.com/stc2012/Conference... · • Risk Based testing for iterative development methodology • QA validation

Performance Testing Approach in detailNon Functional

Requirements Modeling Early Validation Service Virtualization

12

Using service virtualization, various systems can be tested even if the dependent components are not available. For example:

• Mainframes

• Platforms - ORACLE, Siebel, TIBCO

• Services - SOAP, CORBA

Design Phase:

� Static Review of application Design

� Performance Modeling

Build Phase:

� Dynamic code profiling

� Static Code Review

� Non Functional RequirementsModeling Framework assists increating Component level NFRs forComplex Systems

� Business Requirements, SystemAppreciation documents and takinginputs from Business Analysts /Component owners

Page 13: Specialized Testing Focus in Agile 01 [Read-Only]minisites.qaiglobalservices.com/stc2012/Conference... · • Risk Based testing for iterative development methodology • QA validation

A Case Study

Drivers/ Objectives

• Client as the part of their customer strategy, envisioned the launch of

online shopping eCommerce site with objective to enhance customer

shopping experience with the entire product catalog.

• The concept-to-launch time for the website was 6 months.

• Iterative development methodology was adopted in order to achieve

Testing Solution Approach• Risk Based testing for iterative development methodology

• QA validation strategy aligned with the development tracks earlier in

program and converging to end to end business process testing in the

final phase. This helped in detecting defects in individual modules

earlier in the life cycle thus improving testing turn around time at the

later phase

Back ground and Brief ContextClient is a World leader in Healthcare with business spread across 50 countries and revenues of more than $2 Billion. With a presence in more than 59

countries, the client has more than 1,000,000 distributors This system supports the core business model including Customer management System,

Order management system and Compensation Management System

13

• Iterative development methodology was adopted in order to achieve

time to market

• The implementation was a critical success measure of the new

business model envisioned by the organization.

later phase

• Implement Keyword driven framework of functional test automation in

parallel to manual test planning

• Non functional testing - Compatibility, Security, Performance, usability

scheduled inline with release dates and prioritization based on criticality

• Implementation & Customization of Quality Center for test management

Accomplishments and Business Benefits• Focus on non functional testing at an earlier stage preempted major flaws in the areas of performance and compatibility

• Better communication with all stakeholders resulted in lesser turn around time for defect fixes

• Knowledge management Portal with Training materials and induction kits helped in facilitating quick ramp up of new team members

• Comprehensive Validation strategy for the eCommerce implementation on new platform ensured seamless integration with the existing Order

management backend framework. Product was delivered with no major issues and on time to market

Page 14: Specialized Testing Focus in Agile 01 [Read-Only]minisites.qaiglobalservices.com/stc2012/Conference... · • Risk Based testing for iterative development methodology • QA validation

Potential Benefits

� Reduces Business Risk, improves quality

� Delivers business value early

� Reduces Total cost of ownership

� Stays competitive

14

Page 15: Specialized Testing Focus in Agile 01 [Read-Only]minisites.qaiglobalservices.com/stc2012/Conference... · • Risk Based testing for iterative development methodology • QA validation

Challenges in Implementation

� Stakeholder’s buy in (due to intangible benefits)

� Availability of stakeholders to derive Non Functional requirements

� Very limited time for developing specialized testing scripts

� Highly skilled talent� Highly skilled talent

� High Collaboration with development team

� Constant involvement of business

15

Page 16: Specialized Testing Focus in Agile 01 [Read-Only]minisites.qaiglobalservices.com/stc2012/Conference... · • Risk Based testing for iterative development methodology • QA validation

Key to Success…

� Shift in mind set of team

� Right People on the team - People with focus on specialized testing

� Early involvement of testers and not pushing specialized testing till system testing

� Carefully plan sprints in such a way that addresses the need to test all non-functional

/specialized testing/specialized testing

� Collaboration, Communication, Integration

16

Page 17: Specialized Testing Focus in Agile 01 [Read-Only]minisites.qaiglobalservices.com/stc2012/Conference... · • Risk Based testing for iterative development methodology • QA validation

17

Sujatha Badri Narayanan , PMP®

Senior Project Manager, Infosys Ltd.

Harleen Bedi, PMP®

Senior Project Manager, Infosys Ltd.

Page 18: Specialized Testing Focus in Agile 01 [Read-Only]minisites.qaiglobalservices.com/stc2012/Conference... · • Risk Based testing for iterative development methodology • QA validation

THANK YOU

www.infosys.com

The contents of this document are proprietary and confidential to Infosys Limited and may not be disclosed in whole or in part at any time, to any third party without the prior written consent of Infosys Limited.

© 2011 Infosys Limited. All rights reserved. Copyright in the whole and any part of this document belongs to Infosys Limited. This work may not be used, sold, transferred, adapted, abridged, copied or reproduced in

whole or in part, in any manner or form, or in any media, without the prior written consent of Infosys Limited.