Automelec is a company specialized in consulting,

study, programming, erection and commissioning in

tradesof:

�Electrical engineering.

�Automation and industrial computing.

�Instrumentation and control.�Instrumentation and control.

Our activity

Electrical Studies.

Automation & instrumentation

studies.Training.

Functional Analyzes.

ProgrammingPLC &

Centralized Control.

Maintenance.

�Audit

�Preliminarystudy

�Detail Engineering

�Expertise, analysis,

improvement and optimization…

�Typical electrical diagrams

�Single Line Diagram

�PLC Programming�PLC Programming

�Network architecture

�SCADA System

� Electrical.

� Automation.

� Instrumentation.

� Maintenance.

�Corrective Maintenance

�PreventiveMaintenance

�Scheduled Maintenance

�Hotline 24/24

� Process Instrumentation:

� Temperature.

� Pressure.

� Flow.

� Electronicear.

� …

� HV Equipments.

� MV Switchgear.

� Transformer.

�Equipments Instrumentation:

� Equipments instrumentation

� Speed Sensor

� DriftSwitch

� Rope Switch

�Analyzers Gas, Dust …

�Proces Cameras

�Scanner

�TV System

�…

� Transformer.

� Motors.

� MCC.

� LVPanels.

� UPS.

� Variable speed drives and starters .

� Lightcabinets.

� Power cables.

� Control cables.

�Telephone system.

� Grounding.

�Capacitor banks.

� Lightning.

�...

�Listening to our customers.

� Experience.

�Skills.

�Efficiency.

�Availability.

Experience

Efficiency

�Efficient and competent partner who accompanies you in the success of your projects.

�Being close to your needs through relationship of proximity, trust and transparency.

� Master the choices and challenges throughout the life cycle of your projects you entrust to us.

�RequireSecurity.

Time

Quality

Cost

Projet N0 Client Lieu A B C D E F G Observation Année

1 Lafarge Ciment Bouskoura Maroc x x x x x Electrical & Automation Revamping of the raw material

sampling station

2008

2 Ciment du Maroc Ait Baha Maroc x x New plant CNC Control System programming (Raw Materials,

Raw Mill, Kiln Upstream, Kiln Downstream, Clinker Silos)

2009

3 Lafarge Ciment Bouskoura Maroc x x x x x Electrical & Automation of new bulk loading at Silos 5&6 2010

4 Lafarge Plâtre Safi Maroc x x x x x Automation & Electrical Installation of belt safety equipment 2010

5 Cimenterie de Ain El Kebira Algérie x x Automation & Electrical Installation of new kiln cooler 2010

6 Lafarge Plâtre Safi Maroc x x x x x Separation of the Silos Plastre common equipment (Loading &

extracting silos)

2011

7 Ciment du Maroc Marrakech Maroc x x x x x Electrical & Automation revamping of raw crushing 2011

8 Cimenterie de Beni Saf Algérie x x Automation & Electrical Installation of new kiln cooler 2011

Major references Automelec 1/4

9 Cimenterie de Saida Algérie x x Automation & Electrical Installation of new Raw Mill Filter 2011

10 Cimenterie de Hamma Bouziane Algérie x x Automation & Electrical Installation of new kiln cooler 2011

11 Lafarge plâtres Maroc x x x x x x Electrical & Automation of new Plastre Plant (Crusher, Mill,

Kiln, and Packing and Bulk loading workshops)

2012

12 Cimenterie de ZAHANA Algérie x x Automation & Electrical Installation of new Raw Mill Filter 2012

13 Cimenterie de ZAHANA Algérie x x Moist Clinker Production CNC Control System Revamping 2012

14 Cimenterie de ZAHANA Algérie x x Automation & Electrical Installation of new kiln Exhaust Fan -

1200KW (MT Cell + Transformator + Speed Controler)

2012

15 Cimenterie de Saida Algérie x x Automation & Electrical Revamping of 03 stacker machines 2012

16 Cimenterie de Hamma Bouziane Algérie x x Automation & Electical Revamping of Raw material & Additive

Crushing and storage workshops

2012

Projet N0 Client Lieu A B C D E F G Observation Année

17 Cimenterie de Hamma Bouziane Algérie x x New Raw Mill MCC 2012

18 Cimenterie de Beni Saf Algérie x x New Raw Material Storgae and Cement Loading MCCs 2012

19 Cimenterie de Beni Saf Algérie x x Automation & Electrical Installation of new kiln cooler 2012

20 FCB (Mordov Cement Russie) Mordov x Handling systems and Introduction of woodchip in Kilns (1-9-

10-5 and 6-7 and8)

2013

21 CIMAR MRK Maroc x x x x x Installation of new Low Voltage Capacitor Banks for the total

electrical workshop

2013

22 Lafarge Ciment Bouskoura Maroc x x x x x Automation & Electrical Installation of new waste and tires

Crusher workshop

2013

23 Ciment du Maroc Safi Maroc x x x x x Raw Mill Filter Input/Output Marshalling Panel Revamping 2013

24 Lafarge Ouganda Ouganda x x Automation & Electrical Installation of new Raw Mill Filter 2013

Major references Automelec 2/4

24 Lafarge Ouganda Ouganda x x Automation & Electrical Installation of new Raw Mill Filter 2013

25 Lafarge Liban Liban x x Automation & Electrical Installation of new Raw Mill Filter 2013

26 Cimenterie de ZAHANA Algérie x x Dry Clinker Production CNC Control System Rewamping 2013

27 Cimenterie de ZAHANA Algérie x x Revamping of the main MV Swichgear which feeding the

different workshops

2013

28 Cimenterie de ZAHANA Algérie x x Cement Mill MV Swichgear Revamping 2013

29

30 Lafarge EL Khroub Algérie x x Loading and Transport Cement Revamping 2013

31 Lafarge Bouskoura Maroc x x x x x Transporters and Elevators VCS Installation 2013

32 Lafarge Tanger Maroc x x x x x Electrical Consumption calculation and monitoring 2013

33 Lafarge Oggaz Algérie x x Automation & Electrical Installation of new mixing cement

workshop (white and grey cement)

2013

Projet N0 Client Lieu A B C D E F G Observation Année

34 Lafarge plâtres Maroc x x x x x Automation & Electrical Installation of new Crusher Filters and

Transporters

2014

35 CIM EQUIPEMENT (CORAF) Congo x x Electrification of New Plant Control Building ( Lighting, Power

Sockets, and Auxiliairy voltage distribution)

2014

36 CIMAR MARRAKECH Maroc x x x x x Automation & Electrical Installation of new kiln feeding kiln by

tires workshop

2014

37 Lafarge CERELAG Jijel Algérie x x Loading and Transport Cement Revamping 2014

39 Lafarge Bouskoura Maroc x x x x x Automation & Electrical Installation of additive silo at Cement

Mill 4 (BK4)

2014

40 Lafarge Arzew Algérie x x Loading and Transport Cement Revamping 2014

Major references Automelec 3/4

41 Ciment du Maroc Marrakech Maroc x x x x x Electrical Consumption calculation and monitoring 2014

42 Ciment du Maroc Marrakech Maroc x x x x x Monitoring the start & Stop of compressors according to the

air consumption

2014

43 Ciment du Maroc Marrakech Maroc x x x x x Kiln upstream Electrical and Instrumentation Revamping 2014

44 Lafarge plâtres Maroc x x x x x Automation & Electrical Installation of new fuel Oil skid and

burner (Fuel Oil or Gaz Burner)

2014

45 CIMAR Marrakech Maroc x x x x x Electrical Installation of New CARICAMAT machine 2014

46 CIMAR Marrakech Maroc x x x x x Control Cement Mill Feeding 2014

47 LAFARGE CEMENTOS TANGER Maroc x x x x x VCS Electrical Installation 2014

48 Cimenterie de Sour El Gouzlane Algérie x x Electrical & Automation Revamping of Packing and Bulk loading

Workshop

2015

49 Cimenterie de Saida Algérie x x Cement Plant CNC Control System Revamping 2015

50 Cementerio de Ein El Kebira Algérie x x Cement Plant CNC Control System Migration from CEMAT V6.1

to CEMAT V8.0

2015

51 Cementerio de Ein El Kebira Algérie x x Automation & Electrical Revamping of Raw material crushing

and transport, Water Utilities, and Packing and Bulk Loading

workshops

2015

52 Centrale Gypse Maroc x x x x Electrical Installation of new Plastre Plant (Crusher, Mill, Kiln,

and Paking workshops)

2015

53 CIMAR Marrakech Maroc x x x x Electrical Installation of wheiting bags at Packing machnines 1,

2 & 3

2015

54 CIMAR Marrakech Maroc X X X X X Kiln Upstream MCC Revamping 2015

55 HAMMA Bouziane Algérie X X Automation & Elelctrical Revamping of Packing and Bulk

loading Cement Workshop

2015

56 Cimenterie de Meftah Algérie X X Automation & Electrical Installation of new Raw Mill Filter 2015

57 CIMAR Marrakech Maroc X X X X X VCS Electrical Installation 2015

58 CIMAR Marrakech Maroc X X X X X Crusher WINCC Control System Migration from V5.0 à V6.2 2015

59 Amina Brique Maroc X X X X X Electrification of new Brick Plant (Main 22KV distribution, MV

Transformers, and Main LV Boards)

En cours

60 Lafarge Cementos Tanger Maroc X X X X X Automation & Elelctrical Installation of New Additive silo at 2016

Major references Automelec 4/4

60 Lafarge Cementos Tanger Maroc X X X X X Automation & Elelctrical Installation of New Additive silo at

BK5

2016

61 CEMENTOS FORTALEZA

ELEMENTIA GROUP TULA 2

Mexique X Electrical Studies of Marshalling Panels and Auxiliary Voltage

Distribution Cabinet

En cours

A B C D E F G

Studies (Electro-Tech and

Automation)

X

Material supply X

Installation Supervision X

Assembling X

Commissioning X

Spare parts X

Renting X

Depending on the needs and constraints of our customers, we can consider

cooperation in various ways, including:

� Inclusive execution according to your tender.

� Cooperation with our Partners.

� Technical assistance.

We can also consider any other form of cooperation according to your needs.

We remain at your disposal for any further information, please contact us, we will be happy to

meet yourneed.

Trade name: Automelec

Headquarters: 13 Rue Lesparre 5ème Etage Apt 17 Quartier La Gironde

Casablanca MarocCasablanca Maroc

Phone: +212 5 22 44 90 05

Fax: +212 5 22 44 91 38

Site: http://www.automelec-ma.com

[email protected]

[email protected]