Southern Natural Gas Company 2013 Outage Review Meeting Customer con call and Webex June 19, 2013 1

Southern Natural Gas Company 2013 Outage Review Meeting

  • Upload
    isabel

  • View
    36

  • Download
    0

Embed Size (px)

DESCRIPTION

Southern Natural Gas Company 2013 Outage Review Meeting. Customer con call and Webex June 19, 2013. Welcome. Agenda. Review Unscheduled Outages (None at this time) Review of Upcoming Outages June/July & August North System South System South Louisiana - PowerPoint PPT Presentation

Citation preview

Page 1: Southern Natural Gas Company 2013 Outage Review Meeting

1

Southern Natural Gas Company2013 Outage Review Meeting

Customer con call and WebexJune 19, 2013

Page 2: Southern Natural Gas Company 2013 Outage Review Meeting

2

Welcome

Page 3: Southern Natural Gas Company 2013 Outage Review Meeting

Agenda

• Review Unscheduled Outages (None at this time)

• Review of Upcoming Outages– June/July & August

• North System

• South System

• South Louisiana

– Outages for the remainder of 2013• North System

• South System

• South Louisiana

• Contacts 3

Page 4: Southern Natural Gas Company 2013 Outage Review Meeting

Disclaimers

• Anticipated Impacts are estimates. Actual nominations, market demand, weather and pipeline conditions, etc. will determine if, and through what level, restrictions become necessary.

• Unless otherwise stated, all scheduled dates represent gas days as defined in the Southern Natural Gas Pipeline tariff to mean a period of twenty-four consecutive hours, beginning and ending at 9:00 a.m. (Central Clock Time).

• Scheduled dates are subject to change.

• Projects may be added, altered, delayed or cancelled.

• SNG will provide notice of such additions or changes via SoNet Premier postings.

• Dates as posted on SoNet should be deemed correct in the event of conflicts between SoNet posted dates and dates within this presentation.

4

Page 5: Southern Natural Gas Company 2013 Outage Review Meeting

Color Key for Maps

• Green– No Impact Anticipated

• Yellow– Restrictions are possible– With extended duration, restrictions could be

necessary from time to time– Meter(s) affected are denoted with (M)

• Red– Restrictions are probable

5

Page 6: Southern Natural Gas Company 2013 Outage Review Meeting

6

Southern Natural Gas Pipeline

LA

MS

AL

GA

FL

Enterprise

White Castle

Bear Creek

Muldon

Chattanooga

Atlanta

Thomaston

Albany

Elba

SCAiken

Elba Express

North System

South Louisiana

South System

Compressor Station

Storage FieldLNG

Pearl River

Franklinton

Gwinville

Page 7: Southern Natural Gas Company 2013 Outage Review Meeting

7

SNG North SystemMaintenance Review June/July & August

LA

MS

AL

GA

Logansport

Bienville

Bear Creek Storage

Onward

Pickens

Rankin

Louisville

Muldon Storage

Reform

McConnells

Providence

TarrantPell City

DeArmanville

Bell Mills

Rome

Compressor Station

Storage Field

Huntsville

Chattanooga

Atlanta

Southern will be conducting other general maintenance during this period

Bear Creek1 unit down startingJune 17 for 8 weeks

Muldon field outage starting7/15/13 to 7/19/13 and

7/22/13 to 7/26/13Storage restrictions possible

Receipt cuts on North system possible

Page 8: Southern Natural Gas Company 2013 Outage Review Meeting

8

SNG South SystemMaintenance Review June/July & August

MS

AL

GA

Enterprise

Gwinville

SelmaAuburn

Ellerslie

Thomaston

Ocmulgee

Hallgate

Wrens

Elmore

York

Gallion

Bay Springs

Compressor Station

Storage FieldLNG

Atlanta

Elba

Hartwell

Elba ExpressAiken

Holy Trinity

Albany

Pavo

Brookman

Riceboro

Pressure Test on the 30” South Main 2nd Loop and 24” South Main Loop

(one line at a time) 6/1/13 thru 7/31/13 Cap reduced up to 170 MMcf/d

Southern will be conducting other general maintenance during this period

Selma unit maintenance 6/3/13 thru 6/30/13

Cap reduced up to 200 MMcf/d

Elmore station outage 6/17/13 thru 6/27/13

Cap reduced up to 200 MMcf/d

Maintenance on the8” Demopolis Line

7/8/13 thru 7/25/13(M) 801400 Demopolis #1

(M) 801900 Citadel Cement

Auburn unit maintenance 6/24/13 thru 7/24/13

Enterprise Station Outage7/15/13 until sometime in

October Rose Hill (M) 504001

Cap reduced up to 400 MMcf/d

Rose Hill (504001 and 504002) Station shut-in 7/15/13 for 6

weeks.

Pipeline relocation work related to DOT highway

relocation 7-29-13 thru 8-13-13

10-25-13 thru 11-9-13Capacity reductions may occur

Anomaly digs on the 10” mainlinePavo C/S to end of line

AugustPressure reduction could impact capacity

Selma unit maintenance 7/29/13 thru 8/7/13

Page 9: Southern Natural Gas Company 2013 Outage Review Meeting

9

SNG South Louisiana System Maintenance Review June/July & August

Shadyside

White Castle

Franklinton

Toca

Gwinville

LAMS

Compressor Station

Storage Field

West Leg

East Leg

Pressure Test 24” WC-Franklinton LoopUnder way through the end of June

Cap reduced up to 400 MMcf/d(M) 601400 Sugar Bowl #6

White Castle, ShadysideUnit Maintenance

Scheduled During Pipeline Outage

Pearl River

Southern will be conducting other general maintenance during this period

Page 10: Southern Natural Gas Company 2013 Outage Review Meeting

10

SNG North System Maintenance Review remainder of 2013

LA

MS

AL

GA

Logansport

Bienville

Bear Creek Storage

Onward

Pickens

Rankin

Louisville

Muldon Storage

Reform

McConnells

ProvidenceTarrant

Pell City

DeArmanville

Bell Mills

Rome

Compressor Station

Storage Field

Huntsville

Chattanooga

Atlanta

Bear Creek Fall Shut-in Test 10/15/13 thru 10/21/13

DIQ and DWQ allocated 64%

Muldon Fall Shut-in Test 10/01/13 thru 10/07/13

DIQ and DWQ allocated 36%

Pressure Test 2nd North MainEast of Louisville

9/12/13 thru 10/8/13North system receipts may be reduced

Muldon inj & w/d may be limitedSouthern will be conducting other general

maintenance during this period

Pressure Test 2nd North MainEast of Reform

10/13 thru 11/13Capacity reduced significantly

Impact being evaluated

Pipe replacement North Main loop line West of Dearmanville

OctoberNo Capacity reductions anticipated

Page 11: Southern Natural Gas Company 2013 Outage Review Meeting

11

SNG South SystemMaintenance Review remainder of 2013

MS

ALGA

Enterprise

Gwinville

SelmaAuburn

Ellerslie

Thomaston

Ocmulgee

Hallgate

Wrens

Elmore

York

Gallion

Bay Springs

Compressor Station

Storage FieldLNG

Atlanta

Elba

Hartwell

Elba ExpressAiken

Holy Trinity

Albany

Pavo

Enterprise Station Outage7/15/13 until sometime in October

Rose Hill (M) 504001Cap reduced up to 400 MMcf/d

Brookman

Riceboro

Maintenance on the 16” South Main Loop 4 weeks in OctoberCap reduced up to 50 MMcf/d

Southern will be conducting other general maintenance during this period

Selma unit maintenance

In October

Auburn unit maintenance

In November

Page 12: Southern Natural Gas Company 2013 Outage Review Meeting

12

SNG South Louisiana SystemMaintenance Review remainder of 2013

Shadyside

White Castle

Franklinton

Toca

Gwinville

LA

MS

Compressor Station

Storage Field

West Leg

East Leg

Pearl River

White Castle, ShadysideUnit Maintenance

Mid September - mid October

Southern will be conducting other general maintenance during this period

Page 13: Southern Natural Gas Company 2013 Outage Review Meeting

13

Gas Control Contacts • Nancy Barton – Manager

(713) – 420 – 6191 (office) (713) – 204 – 4815 (cell) [email protected]

• Kalman (Kal) Dankovich – Outage Coordinator (713) – 420 – 7522 (office) (205) – 325 – 7305 (Gas Control) [email protected]

• Jerry Peterson – Operations Analyst (205) – 325 – 7345 (office) (205) – 325 – 7305 (Gas Control) [email protected]

• Paul Reed – Operations Analyst (205) – 325 – 7655 (office) (205) – 325 – 7305 (Gas Control) [email protected]

Page 14: Southern Natural Gas Company 2013 Outage Review Meeting

14

Questions?