Upload
himanshu-jhamb
View
212
Download
0
Embed Size (px)
Citation preview
8/19/2019 Solaris Power Experts Pvt
http://slidepdf.com/reader/full/solaris-power-experts-pvt 1/2
Finatics
1. Project Size:The Proposed project is of 1.0 MW capacity.
2. Project Location:
The Project will be located in our Solar Park spread across 500 Acres of Land
situated in Gajner, Bikaner,
Rajasthan. 4 Acres of project land will be transferred in your name.
3. Project Generation:
The annual generation from Proposed 1 MW Solar PV Plant is 16.50 lac units perannum per MW at 100% grid availability, with a degradation of 1% every year.
4. Generation Guarantees:
The generation estimated above is guaranteed for 25 years against the Bank
Guarantee provided by Solaris Power Experts calculated at 10% of the Guaranteed
Generation per year multiplied by average sale of power, if operation and
maintenance scope is awarded to us.
5. Operation & MaintenanceThe Project will be operated and maintained by Solaris Experts for 25 years.
All Project Plant and Machinery is guaranteed for 25 years. Complete repairs,
replacements along with spares, maintenance, security etc. will be taken care by us
at our costs.
The Investor is only liable to pay annual O&M charges @ Rs. 7.0 Lacs per MW per
annum escalating at 5% per annum.
6. Completion period
Within 4 months from commercially clear order, subject to opening of L/C for
modules within 1 month from the order date.
7. Our Steps towards Higher Generation
We will provide seasonal tilt for higher generation output from the plant. This will
increase the Generation by over 6% from the expected generation.
8/19/2019 Solaris Power Experts Pvt
http://slidepdf.com/reader/full/solaris-power-experts-pvt 2/2
Finatics
8. Government Approvals & Clearances
We shall take responsibility in getting all Government Approvals and Clearances
required for the project. The official fees towards the several approvals shall be
extra.
9. Power Evacuation System:
The Power will be evacuated at 33 KV overhead Transmission Line up to nearest
Government Substation.
10. Project Cost:
The Project Cost for complete design, engineering, erection, Land Acquisition and
Power Evacuation for Proposed 1 MW Solar PV Plant is Rs. 625.00 Lakhs.
11. Key Differentiators
SCADA System and CCTV to ensure round the clock real-time monitoring.
6 Ft high Boundary Wall.
Compliance and Follow up with Government Agencies for various Annual
Statutory Compliances/clearances required for the Project.
Bank Guarantee for generation
Billing and payment follow up
Security of the plant
Life time O&M
Seasonal tilt for Higher Generation
Watch towers for security
BOM 1.0 MW
S.No. Product Description Make
1. P.V. Crystalline Modules of 300Wp.
3333 Modules Quantity
Canadian Solar
2. SCBs Trinity Touch/Jackson
3. Inverter Hitachi/TBEA/Toshiba
4. Transformer Vardhman /Royal/Universal
5. Cables Apar / Havells / Polycab
6. Meters Elster