  • 8/6/2019 Solar Heating Project

    1/20

    Presented ByLADAKH RENEWABLE ENERGY

    DEVELOPMENT AGENCY

    (LREDA)

    IMPLEMENTATION OF SOLAR WATER

    HEATING PROJECT IN LEH DISTRICT

  • 8/6/2019 Solar Heating Project

    2/20

    LADAKH RENEWABLE ENERGY INITIATIVE

    y Ladakh Renewable Energy Initiative was sanctioned by MNRE on 1st June 2010.

    y 15,000 m of Collector Area to be covered under this program.y Additional 3000 Systems of 100 LPD capacity (6000 m

    Collector Area)under JNNSM for 6 to 9 months period usage.(Insulated cold water tank and Insulated piping were excluded)y 28% of the civil population to be covered.y Subsidy of 50% for Domestic Use.y Subsidy of 90% for Govt. Buildings, Govt. Institutions and

    Hospitals.y Subsidy of 40% for Commercial Use.y Subsidy of 60% for all 100 LPD Systems under JNNSM

  • 8/6/2019 Solar Heating Project

    3/20

    Beneficiary Categories

    CATEGORY SUBSIDYDomestic Beneficiaries 50%

    Hotel & Commercial Establishments 40%

    Educational & Religious Institutions 50%

    Guest Houses 50%

    Governmental Buildings 90%

    100 LPD SYSTEMS 60%

  • 8/6/2019 Solar Heating Project

    4/20

    Customization of System for LadakhConditionsTender Formulation and InvitationE-Mail/Post/Telefax to MNREEmpanelled Manufacturers

    Receipt & Opening of BidsAcceptance of Lowest BiddedPrice

    All Bidders accepted thelowest price.Sample Testing of Systems atSolar Energy Centre

    PROJECT DEVELOPMENT

    Collection of Beneficiary Listfrom all112 Villages.Exhibition for Beneficiaries inLeh

    Form Filling and Submission.Receipt of Payment fromBeneficiaries.

    Dispatch of Supply Order.Installation of System

    COMPANY BENFICIARY

  • 8/6/2019 Solar Heating Project

    5/20

    All Bidders accepted to work at the lowest bidded price.LREDA decided to go through the Market Mode.5 Manufacturers for ETC Systems.3 Manufacturers for FPC Systems.

    Exhibition for Beneficiaries held in Leh.Companies Showcased their products3 Companies did not participate.1 Company backed out after the Exhibition.

    Beneficiary could choose any system at the approved priceElectrotherm Renewables offered free cold water tankwith 100 LPD systems.Marketing Efforts by the Companies.

    MARKET DEVELOPMENT

  • 8/6/2019 Solar Heating Project

    6/20

    P ROCESS

    Supply Orders

    Separate Orders for each Beneficiary Supply order to Dealers everyday

    Submission of Forms

    Cheque/DD Submission Form Checking/Filing

    Purchase of Forms

    Capacity Selection Company Selection

  • 8/6/2019 Solar Heating Project

    7/20

    Approved CompaniesEvacuated Tube Collector Based:y Electrotherm Renewables, Ahmedabad.y Neutech Solar Systems (P) Ltd, Bangalore.y Solarium Solar Power Systems, Ludhiana.

    Flat Plate Collector Based:y Solar Energizers (P) Ltd, Bangalore.y Neutech Solar Systems (P) Ltd, Bangalore.

  • 8/6/2019 Solar Heating Project

    8/20

    ETC DESIGN CUSTOMIZATION FOR LADAKH

    Hot Water Tank Insulated with 100mm PUF Cold Water Tank Insulated with 150mm Rockwool 150 mm Rockwool Insulation for PipesGate Valve 1 used for closing the connection pipe totubes.Gate Valve 2 used for draining water left in the tubesManifold insulated with 75mm PUF 1 ft Ground ClearanceNo part left exposed to External Environment

    Jacket/Cover that can withstand -25C.

    GATE VALVE 1

    GATE VALVE 2

    HOT WATER TANK 100mm PUF Insulated

    COLD WATER TANK 150mm Rockwool Insulated

    150mm Rockwool Insulated GI Pipe

    Thickness of Tank(SS):1 mm upto 500 LPD1 .6mm for 1 000LPD2mm for 2000 LPD/3000 LPD

  • 8/6/2019 Solar Heating Project

    9/20

    F P C DESIGN CUSTOMIZATION FOR LADAKH

    Hot Water Tank Insulated with 100mm PUF Cold Water Tank Insulated with 150mmRockwool 150 mm Rockwool Insulation for Pipes Anti-freezing Fluid for Winter usage

    Gate Valve 2 used for draining anti-freezing fluid in summers1 ft Ground ClearanceNo part left exposed to External Environment

    Jacket/Cover that can withstand -25C .

    Heat Exchanger

    GATE VALVE 2

    HOT WATER TANK 100mm PUF Insulated

    COLD WATER TANK 150mm Rockwool Insulated

    150mm Rockwool Insulated GI Pipe

    Thickness of Tank(SS):1 mm upto 500 LPD1 .6mm for 1 000LPD2mm for 2000 LPD/3000 LPD

  • 8/6/2019 Solar Heating Project

    10/20

    CAPACITY BEFORE SUBSIDY AFTER SUBSIDY

    100 LPD ETC Rs. 17,145 Rs.6,858

    200 LPD ETC Rs. 43,225 Rs. 21,613FPC Rs. 57,216 Rs. 28,608

    300 LPD ETC Rs. 65,148 Rs. 32,574FPC Rs. 75,395 Rs. 37,698

    500 LPD ETC Rs. 93,560 Rs. 46,780 FPC Rs. 1,22,859 Rs. 61,430

    1000 LPD ETC Rs. 2,08,488 Rs. 1,25,093FPC Rs. 2,30,700 Rs. 1,38,420

    2000 LPD ETC Rs. 3,68,225 Rs. 2,20,935FPC Rs. 4,03,240 Rs. 2,41,944

    3000 LPD ETC Rs. 5,39,360 Rs. 3,23,616 FPC Rs. 6,05,984 Rs. 3,63,591

  • 8/6/2019 Solar Heating Project

    11/20

    TERMS AND CONDITIONSy 5 Year Warranty on all parts (except glass tubes and glass

    frames).y Electrical Backup strictly prohibited.y

    Payment Terms to Companies:40% in advance30% receipt of material at site.25% after installation.5% to be released each year in equal parts for the warrantyperiod.

    y Beneficiaries to pay their share in advance.

  • 8/6/2019 Solar Heating Project

    12/20

    P RESENT STATUSy Beneficiary Part of funds collected for 60,000 litres capacity

    within 30 days of the exhibition amounting to Rs.70 lacs.y Total project cost has crossed 1.5 Cr.y

    On an average 60-100 Beneficiaries visit our office everydayto submit forms/cheques/DD.

    y Expected Installations: 6,00,000 Litres by October 201111,00,000 Litres by August 2012

    y SWHS has become the talk of the Town in Leh and is slowlyspreading to Villages.

  • 8/6/2019 Solar Heating Project

    13/20

    P RESENT MARKET SHARE

    53%

    32%

    6% 10%

    COMPANY MARKET SHARE

    Electrotherm

    Neutech

    Solarium

    Solar Energizers

  • 8/6/2019 Solar Heating Project

    14/20

    F P C/ETC DISTRIBUTION

    30%

    70%

    FPC-ETC DEMAND

    FPC ETC

  • 8/6/2019 Solar Heating Project

    15/20

    0.00

    5000000.00

    10000000.00

    15000000.00

    20000000.00

    BENEFICIARY SHARE

    Rs. 76,49,116 MNRE SHARERs.74,52,832

    Rs. 1,51,01,949

    FUNDS DISTRIBUTION

    100LPD 200LPD 300LPD 500LPD 1000LPD 2000LPD 3000LPD

    0.00

    500000.00

    1000000.00

    1500000.00

    2000000.00

    2500000.00

    3000000.00

    3500000.00

    4000000.00

    DEMAND DISTRIBUTION

  • 8/6/2019 Solar Heating Project

    16/20

    Market P enetration Strategiesy Interest Rate Subsidy on Loans for Commercial

    Institutions.

    y 90% Subsidy for Religious Institutions( Monasteries, Mosques and Churches).

    y

    90% Subsidy for Community Run Schools.

  • 8/6/2019 Solar Heating Project

    17/20

    SOLAR WIND HYBRID SYSTEM GROUND SOURCE HEAT PUMPSPARABOLIC TROUGH TECHNOLOGY

    SOLAR SPACE HEATING

    RESEARCH & DEVELO P MENT P ROJECTS

  • 8/6/2019 Solar Heating Project

    18/20

    SOLAR WIND HYBRID SYSTEMS

    Installation work for 6 Systems of 10 Kw have started at:y Khaltsi Residential Schooly Disket Residential Schooly Nyoma Residential Schooly Puga Residential Schooly Tangtse Residential Schooly LAHDC Energy Park

    All systems to be commissioned by end of July.Data Logging system for collection of wind data in all systems.

  • 8/6/2019 Solar Heating Project

    19/20

    GROUND SOURCE HEAT PUMPS y Data Collection and Designing underway.y Demonstration System expected to be installed by October

    2011.

    PARABOLIC TROUGH

    TECNOLOGY DEVELOPMENT P roposal sent to MNRE for sanction of 1 MWP ower P lant on pilot basis in Leh.

    SOLAR SPACE HEATING

    P rojectP roposal sent to MNRE for sanction of 10,000 LP D system for heating 1 hospital block.

  • 8/6/2019 Solar Heating Project

    20/20

    THANKYOU