DESIGN DEVELOPMENT OF CONSTRUCTION PROJECT
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
SOCIETY OF MYANMAR CIVIL ENGINEERS (SINGAPORE)
S M C E S
SEMINAR (YANGON) 2015
PREPARED BY CHO CHO WIN
OBJECTIVE
• To understand civil & structural engineers work scope, role and responsibility
involving in the residential project starting from preliminary design stage to
completion stage
• Importance of coordination between consultant teams and builder which will
lead much implication on time and cost even design is safe, reliable and
structurally efficient
• To share the consideration of civil works (road, trees and plants, drainage and
sewerage
• To share authority rules and regulations, submissions and their concern on civil
and structural works
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
DESIGN DEVELOPMENT OF CONSTRUCTION PROJECT
DESIGN DEVELOPMENT CAN BE STATED AS
• PRELIMINARY DESIGN STAGE – CONCEPT DESIGN
• DETAIL DESIGN AND TENDER STAGE
• CONSTRUCTION STAGE
• COMPLETION STAGE
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
OWNER/DEVELOPERBUILDER
ARCHITECT LEAD CONSULTANT
CIVIL & STRUCTURAL MECHNICAL & ELECTRICAL
QUANTITY SURVEYOR
LANDSCAPE INTERIOR DESIGN
- Generally C&S consultant is selected by client (for government projects)
- Or engaged by contractor/builder (residential/ commercial/mixed development
projects- design and build)
CONSULTANT TEAM
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
RE/RTOQP’S REP
INVOLVEMENT OF C&S CONSTULTANT
PRELIMINARY DESIGN STAGE
• STRUCTURAL CONCEPT BASED ON CLIENT NEEDS, ARCHITECTURAL DESIGN
INTENT AND AUTHORITY CONSTRIANTS
- ENVIRONMENTAL HEALTH, SAFETY AND DESIGN RISK ASSESSMENT
- BUILDABILITY SCORE- ARCH, C&S, M&E
- GREEN MARK REQUIREMENT- ARCH, C&S, M&E
- CONSTRUTABILITY- BUILDER
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
ENVIRONMENTAL HEALTH, SAFETY AND DESIGN RISK ASSESSMENT
PRELIMINARY DESIGN STAGE
Choa Chu Kang Drive
Owner/Developer : CAMBORNE DEVELOPMENTS PTE LTD
Architect : ADDP ARCHITECTS LLP
C&S Consultant : PARSONS BRINCKERHOFF PTE LTD
M&E Consultant : SQUIRE MECH PTE LTD
Quantity Surveyor : RIDER LEVETT BUCKNALL
Landscape Consultant : ONG & ONG PTE LTD
Interior Design : INDEX DESIGN PTE LTD
Main Contractor : NAKANO SINGAPORE PTE LTD
THE PROJECT TEAM
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
Site Area 17,589.80m2
Plot Ratio 2.8
Max Allowable GFA 52,723.67 m2
Total No. of Blocks 8 Tower
Building Height 3-21 Storeys
Total No. of Units 466 units
Floor to Floor Height 2.95 m
N
SITE LOCATION AND PROJECT DATA
SITE
SITE
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
SITE PHOTOGRAPHS
PROPOSED DEVELOPMENT AREA
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
VIEW 2
VIEW 1
SITE
SITE
VIEW 1
VIEW 2
VIEW 2
SITE PHOTOGRAPHS
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
DEVELOPMENT INTRODUCTION
• 8 block of 4 units to core design ( 466 units )
• 3rd storey to 21st storey
• Basement
parking with covered parking at 1st st.
• Entrance from CCK Ave 3.
• North/ South Blocks planning
• Passive Architectural Green
Approach
• Design Concept: Inspire by nature habitation
.
357151621
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
N
RESERVE SITE
SIT
E
CCK Town
Park
Town Park
Extension
Lot 1 Mall
B
B
Public
Basketball
Court
B
Proposed Site
Park Land
Major
Vehicular Flow
Bus Stops
Pedestrian
Flow
SITE ANALYSIS
Strength & Opportunity
• Entrance away from
main road.
• North-South Orientation.
• Surrounded by Nature,
i.e.: Choa Chu Kang Park.
• Approx. 400m away from
CCK MRT and Lot 1 Mall.
Weakness & Threat
• Biodiversity Impact
• Low AMSL Building
Height Control
• Existing Sewer
• Overhead Bridge
Wooded Corridor
Low density –
less built up
area
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
BIODIVERSITY IMPACT
Eagle’s nest on Albizia tree
Old eagle’s nest
SITE ENTRANCE
Biodiversity Impact Assessment was carried by Prof Hugh Tan from onset of the project as part of the environment impact
assessment.
Findings:
• 67 species animals,
• 24 species Flora
• Eagle nesting
• Hornet Nest
Site Plan
Actual Site Photo showing Albizia tree
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
BIODIVERSITY IMPACT Recommendation:
• Existing tree housing the nest is not healthy and is likely to fall naturally in due time.
• Eagle pair appear to has migrated or completed the use of the nest due to seasonal change.
• Removal of the Tree and hornet to avoid potential danger to the public
• To plant more trees and shrubs quickly to keep the northern woodland corridor
• To have suitable planting of right species of flora to attract and retain some biodiversity for future
• To incorporate eco ponds to bring back wildlife such a dragonfly.
Site Plan
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
Hammock Court
LUSH LANDSCAPING APPROACH
• More trees and shrubs will be planted quickly particularly along the northern boundary of the site.
• emphasis on using indigenous flora to populate the landscape within the development. This will help in promoting and reintroducing the use of native species in the landscape design.
• integrated a bio-pond in the landscape which would not only add aesthetic value but contribute to the future biodiversity of this newly established landscape.
Design Implementation :
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
LEGEND
25M TO 80M AMSL BLDGHEIGHT CONTROL
VARIATION OF BUILDING HEIGHT CONTROL
Design Impact
1. High Plot ratio with height limitation poses site planning constraints
2. Stepping Roof design needs to review M&E screening with more care i.e. aesthetics and visual comfort.
3. Higher blocks viewing into the lower block roof may have indirect heat .
4. Structural beams/slab size have to be considered head room constraints
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
Mitigation
1. Design low
density and
open spaces
of at least
than half the
site to reduce
impact , to
create spatial
relief and
sufficient
building to
building
setback
VARIATION OF BUILDING HEIGHT CONTROL
25m
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
ROOF
TERRACE
Mitigation
2. Units design
with roof terrace
to encourage
green living and
help to reduce
the radiance
heat
3. Provide
screening for
M&E space
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
VARIATION OF BUILDING HIGH CONTROL
EXISTING SEWER LINE
CROSS-SECTION
S
1350 ø Existing Sewer Pipe
3m Kept free of Structures
BASEMENT
CARPARK
Basement setback
to safeguard the
sewer and allow
open cut
basement
construction
-TO SET BACK FROM EXISTING SEWER LINE
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
EXISTING SEWER LINE
Basement setback
more to mitigate
construction impact to
neighbouring
development.
EXISTING SEWER LINE AND BASEMENT DESIGN
Basement setback to
safeguard the sewer and
allow open cut basement
construction
2.8m high ceiling clear
path for loading/unloading
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
VIEW 2
SITE
VIEW 2
OVERHEAD BRIDGE
SITE
Overhead Bridge along
Choa Chu Kang Drive
Design Impact
1. Overhead bridge
need to consider
privacy and noise
issues .
Mitigation
1. Blk 341 setback
more than to
provide green buffer
for privacy and
noise mitigation.
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
S
LEGEND
MORE GREEN BUFFER AND BUILDING SETBACK ATBLK 341 NEAR OVERHEAD BRIDGE
OVERHEAD BRIDGE
About 4.1m more setback 10m building setback requirement
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
BUILDABILITY SCORE
• Buildability: The extent to which the design of a building facilitates ease of
construction as well as the extent to which the adoption of construction
techniques and processes affects the productivity level of building works.
• Buildable Design Score: The score for buildable design computed in
accordance with the Buildable Design Appraisal System (BDAS) as set out in
the Code of Practice.
• 3S Principles of Buildable Design
- Standardization - repetition of grids, sizes of components and connection details
- Simplicity - uncomplicated building construction systems and installation details
- Single integrated elements - those that combine related components together into a single element that may be prefabricated in the factory and
installed on site.
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
TABLE: MINIMUM BUILDABLE DESIGN SCORE FOR NEW WORK
CATEGORY OF BUILDING WORK
MINIMUN BUILDABLE DESIGN SCORE
2000m2≤GFA<5000m2
5000m2≤GFA,25000m2
GFA≥25000m2
RESIDENTIAL (LANDED)
63 68 71
RESIDENTIAL (NON-LANDED)
70 75 78
COMMERTIAL 72 77 80
INDUSTRIAL 72 77 80
SCHOOL 67 72 75
INSTITUTIONALAND OTHERS
63 69 72
GFA – GROSS FLOOR AREA DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
BUILDABILITY SCORE CALCULATION
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
BUILDABILITY SCORE CALCULATION
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
BUILDABILITY SCORE CALCULATION
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
GREEN MARK
- Lunched in January 2005
- BCA green mark is a green building rating system to evaluate a building for its environmental impact and performance.
- Towards more environment-friendly buildings
- Intended to promote sustainability in the built environment and raise environmental
awareness among developers, designers and builders when start project
conceptualisation and design, as well as during construction.
• The assessment criteria cover the following key areas:-
– Energy efficiency
– Water efficiency
– Environmental protection - This category focuses on the design, practices and selection of
materials and resources that would reduce the environmental impacts of built structures.
– Indoor environmental quality
– Other green features and innovation
- MOSTLY GREEN MARK REQUIREMENT IS CONTRIBUTER BY ARCH LAYOUT AND M&E SYSTEMS
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
ENVIRONMENTAL PROTECTION
(i) Use of precast toilets :
(ii) Provision of green roof and roof top garden :
(iii) Provision of vertical greening :
(iv) The provision of double refuse chutes for separating recyclable from non-recyclable
waste
(v) The use of non-chemical termite treatment system such as termite baiting system,
anti-termite mesh.
(vi) The provision of at least 5 nos. of compost bins to recycle organic waste.
(vii) Use of non-chemical water treatment system for swimming pools.
(viii) Fine and/or coarse aggregate used for concrete production of structural
application are replaced with recycled products from approved sources.
(viv) Concrete Usage Index (CUI)=Concrete Volume in m3/Constructed Floor Area in m2
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
GREEN MARK
OTHERS GREEN FEATURES AND ANNOVATION
(i) Provision of landscape drainage and infiltration trenches :
(ii) Provision of system to recycle surface runoff from the vertical green wall and
sky garden :
(iii) the use of siphonic rainwater discharge system at roof.
(iv) the provision of eco-pond.
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
GREEN MARK
PRECAST ELEMENTS:
Wall/column, Beam, Slab, Balcony, Parapet, AC ledge, Refuse chute
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
• C&D waste to RCA
GREN MARK- GREEN FEATURES-Recycled Concrete
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
STRUCTURAL SYSTEM
• Bored piles are adopted for foundation
• Bored pile length vary from 30m to 45m
• Faster with relatively less vibration and noise pollution
FOUNDATION
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
BASEMENT CONSTRUCTION
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
STRUCTURAL SYSTEM
• Open cut excavation highlighted in red
• Reduces construction time and costs
• Lean concrete for slope protection
• Ground monitoring and instrumentation
• Temporary sheet pile wall with temporary strutting in some areas
highlighted in blue
• Strutting required due to difference in level between basement and
adjoining sites
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
BASEMENT CONSTRUCTION
BASEMENT CONSTRUCTION
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
BASEMENT CONSTRUCTION
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
SECTION VIEW OF TYPICAL INSTRUMENTATION MONITORING
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
SUPERSTRUCTURE SCHEME
• Flat slab is adopted for
superstructure
• Only perimeter beams are
required therefore leaving the
living space beam free
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
SECTION VIEW OF TYPICAL BALCONY
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
STRUCTURAL ANALYSIS
SECTION VIEW OF TYPICAL BATHROOM & TOILET
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
SECTION OF BASEMENT AND E-DECK AT SWIMMING POOL AREA
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
SECTION VIEW OF RETAINING WALL AT EASTBOUND
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
SECTION VIEW OF RETAINING WALL AT WESTBOUND
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
TYPICAL FLOOR PLAN
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
STRUCTURAL ANALYSIS
ORION ANALYSIS MODEL
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
STRUCTURAL ANALYSIS
TYPICAL FLOOR SLAB DEFLECTION (ULTIMATE LOAD)
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
STRUCTURAL ANALYSIS
TENDER AND DETAIL DESIGN STAGE
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
TYPE OF CONTRACTS
• PUBLIC SECTOR STANDARD CONDITIONS OF CONTRACT FOR CONSTRUCTION
PROJECTS- PSSCOC
(FOR DESIGN AND BUILD)- MOSTLY PRIVATE PROJECTS-
• SINGAPORE INSTITUTE OF ARCHITECTS STANDARD FORMS OF CONTRACTS- SIA -- FOR
GOVERNMENT PROJECTS
• LTA CONTRACTS – LTA PROJECTS
CONTRACT DOCUMENTS ARE PREPARED BY QS.
HOWEVER, EACH CONSULTANT NEED TO PROVIDE SPECIFICATIONS FOR BUILDERS
• MAIN TENDER SPECIFICATIONS – NATIONAL PRODUCTIVITY AND QUALITY
SPECIFICATIONS (NPQS)
• PARTICULAR SPECIFICATION –
- SCOPE OF WORK, STANDARDS AND REGULATION, SITE PROTECTION, SITE ACCESS
USAGE, MAINTENACE AND PREPARATION, SITE SUPERVISION, VERIFICATION OF INFORMATION,
TEMPORARY WORKS & SITE EXCAVTION, UTILITIES AND SERVIVES WORKS, PEST AND POLLUTION
CONTROL, FIRE PREVENTION, SECURITY, TIME FOR COMPLETION, GREEN MARK REQUIREMENT,AS
BUILD SITE SURVEY
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
AUTHORITY CLEARANCE
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
SCHEMATIC DIAGRAM OF THE INTERDEPENDENCE OF THE VARIOUS ASPECTS OF
REGULATORY CONTROL SYSTEMS AND TECHNICAL CLEARANCE
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
AUTHORITY SUBMISSIONS
• BUILDING CONTROL SYSTEM- STRUCTURAL WORK
- BUILDING CONSTRUCTION AUTHORITY (BCA) FOR STRUCTURAL CLEARANCE
• TECHNICAL DEPARTMENT CLEARANCE- CIVIL WORK
- BUILDING PLAN (BP) SUBMISSION TO
– LAND TRANSPORT AUTHORITY (LTA)
– NATIONAL PARKS (NPARKS)
– PUBLIC UTILITY BOARD (PUB) –DRAINAGE DEPARTMENT, SEWERAGE DEPARTMENT
– CENTRAL BUILDING PLAN UNIT (CBPU)
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
BCA SUBMISSION
• STRUCTURAL PLAN SUBMISSION (ST 01, 02,…)
- FOUNDATION, EARTH RETAINING OR STABILIZING STRUCTURE (ERSS),
SUBSTRUCTURE, SUPERSTRUCTURE Submissions
- Can be submitted before tender awarded/contractor on board
- QP (STRUCTURE), QP (GEO), AC (STRUCTURE), AC (GEO) ARE APPOINTED
BY DEVELOPER/OWNER OR BUILDER
- Design calculation by QP (DESIGN), Checking by AC
• PERMIT TO COMMENCE WORK
• NOTIFICATION OF APPOINTMENT OF SITE STAFF (QP/RE/RTO)
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
TECHNICAL DEPARTMENT CLEARANCE- CIVIL WORK
BUILDING PLAN SUBMISSIONS- EXTERNAL WORK IS UNDER C&S
• BP Clearance- Based on architects approved BP plan, QP(structure) has to submit another BP plan to LTA, NPARKS, PUB, CBPU-
• As-built submissions for CSC clearance
• End of DLP (defects liability period) submissions
LTA – Land transport Authority
- Enlarge site plan, Longitudinal and Cross sectional profile of proposed road showing Ingress, egress, boxed culvert, approach slab, road curves, road site drains, footpath, lamp post, scupper pipes etc… according to code of practice,
- Traffic Plan
- Swept path analysis and plan
- Traffic impact assessment if necessary
Nparks – National Parks
- Tree/ plants arrangement plan showing tree species with sizes of tree, distance between M&E services
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
PUB – Public Utility Board
- Longitudinal & cross sectional profile of external road side drains, sump
pits, cut off drains, etc…
- Pre-condition survey – CCTV submission has to be conducted by contractor if
proposed building/piling work is within the 25m corridor of sewer or/and
the 36m corridor of DTSS Tunnel
- Pre-condition survey plan and report endorsed by a registered surveyor showing
the position, sizes, top and invert levels of the sewers and manholes (horizontal and
vertical) in relation to the existing buildings/structures (including wall, drains, etc) and
boundary lines.
- Post- condition survey plan and report after piling done.
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
ENLARGED SITE PLAN SHOWING ROAD ELEMENTS AND TREE LOCATIONS
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
TYPICAL CROSS SECTION OF ROAD
ROAD SIDE DRAIN, SIDE TABLE & PLANTING VERGE
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
LONGITUDINAL SECTION OF ROAD SIDE DRAIN
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
TRAFFIC PLAN
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
SWEPT PATH ANALYSIS
Swept Path Analysis is the calculation and analysis of the movement and path of different parts of a vehicle when that vehicle is undertaking a turning maneuver.
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
CONSTRUCTION STAGE
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
- CONSTRUCTION ACCESS
- INTERNAL DRAIN AND BIO-SWALE
- BUILDING MAINTANANCE UNIT (BMU) –GONDOLAR SYSTEM
- QUALITY MANAGEMENT
VIEW 2
VIEW 1
SITE
VIEW 2
CONSTRUCTION ACCESS
SITE
2 March 2012-16 March 2012
Erect Hoarding in order not to
disrubt eagle/nest
Protected zone not to disrupt
birds hatching process until
July 2012
Existing eagle nest on
Albizia tree
9 March 2012-30 March 2012
Construct new access. Keep
work activities outside
protected zone
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
VIEW 2
VIEW 1
SITE
VIEW 2
SITE FACILITIES
SITE
Existing eagle nest on
Albizia tree
May 2012
Build site facilities to
complete before end May
2012
2 April 2012-21 May 2012
Mobilize machinery for
ultimate test pile 3 nos.
Protected zone not to disrupt
birds hatching process until
July 2012
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
VIEW 2
VIEW 1
SITE
VIEW 2
PILING WORK
SITE 14 May 2012-29 June 2012
Zone 1 piling work
31 Aug 2012-2 Nov 2012
Zone 3 piling work
Existing eagle nest on
Albizia tree to be removed
after birds hatching process
2 July 2012-31 Aug 2012
Zone 2 piling work
commences after birds
hatching process
Zone 1
Zone 2
Zone 3
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
INTERNAL DRAIN PLAN
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
1ST STOREY (ENVIRONMENTAL DECK)
BI0SWALESWIMMING POOL
TOWER BLOCK (TRANSFER PLATE)
CARPARK
BIOSWALE – EVERY DEVELOPMENT HAS TO COMPLY PUB REQUIREMENT UNDER
ABC SCHEME AND TO COMPLY GREEN MARK REQUIREMENT
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
ROOF PLAN WITH
BRACKETING SYSTEM
INSTALLATION
BUILDING MAINTANANCE UNIT- GONDOLA ACCESS FOR CLEANING
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
BUILDING MAINTANANCE UNIT- GONDOLA ACCESS FOR CLEANING
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
QUALITY MANAGEMENT
• STRUCTURAL QP (PE) APPOINTED RE/RTO AS QP REPRESENTATIVE FOR
STRUCTURAL TO MAKE SURE TO CONSTRUCT ACCORDING TO QP DESIGN
• BCA INSPECTIONS
• CONSTRUCTION QUALITY ASSESSMENT SYSTEM
CONQUAS – MORE THEN CERTAIN PERCENTAGE BONUS WILL BE GIVEN BY
CLIENT
• RI (REGISTERED INSPECTOR) INSPECTION – M&E AND ARCHI ITEMS
• QUALITY MARK (QM) SYSTEM
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
CONQUAS
• The Construction Quality Assessment System (CONQUAS), introduced in
Singapore since 1989, serves as a standard assessment system on the quality
of building projects.
• The Assessment consist of 3 main components
- Structural Works
- Architectural Works
- M&E Works
• Each component is further divided into different items for assessment. The sum
of the 3 components will give the CONQUAS score for the project.
- base on workmanship standards through site inspection.
- done throughout the construction process for Structural and M&E
Works and on the completed building for Architectural Works.
- includes tests on the materials and the functional performance of
selected services and installation.
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
• The QM scheme measures the quality of workmanship in each newly completed
residential unit.
• The assessment covers all internal finishes like floor, wall and ceiling finishes,
architectural components and fittings like doors, windows, wardrobes, kitchen
cabinets, vanity tops, bathtubs, water closets, shower screens and basins, and M
& E fittings and switches.
• In addition the assessment will include water ponding test for bathrooms. Water –
tightness tests on windows are optional.
QUALITY MARK (QM)
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
COMPLETION STAGE
• BCA SUBMISSION
- As-built structural plan submissions
- Certificate of supervision of piling work/superstructure work
- TEMPORARY OCCUPATION PERMIT (TOP)
• TECHNICAL CLEARANCE
- As-Built External work submission
- Application of clearance from LTA, NPARKS, PUB, CBPU
• CERTIFICATE OF STATUTORY COMPLETION (CSC) CLEARANCE
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
AS-BUILT SITE OBSERVATIONS-LTA
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
AS-BUILT SITE OBSERVATIONS-LTA
DESIGNMENT DEVELOPNMENT OF CONSTRUCTION PROJECT BY CCW
THANK YOU