Social Action Plan of the GMS North-South Economic Corridor Project. Introduction. Funded by ADB 2004 to 2008 Implemented by the Lao PDR’s government in 3 districts To reduce poverty. North-South Economic Corridor. Louang Namtha district Vieng Phoukha district Houayxay district. - PowerPoint PPT Presentation

Citation preview

Page 1: Social Action Plan  of the GMS  North-South Economic  Corridor Project

Social Action Plan

of the GMS North-South

Economic Corridor Project

Page 2: Social Action Plan  of the GMS  North-South Economic  Corridor Project

Introduction

• Funded by ADB• 2004 to 2008• Implemented by the

Lao PDR’s government in 3 districts

• To reduce poverty

Page 3: Social Action Plan  of the GMS  North-South Economic  Corridor Project

North-South Economic Corridor

Louang Namtha districtVieng Phoukha districtHouayxay district

Page 4: Social Action Plan  of the GMS  North-South Economic  Corridor Project

Findings

• Income restoration

Fishpond

Pig Raising

Increasing Agriculture Productivities

Page 5: Social Action Plan  of the GMS  North-South Economic  Corridor Project

Findings (cont.)

• Improvement of water and sanitation

Page 6: Social Action Plan  of the GMS  North-South Economic  Corridor Project

Findings (cont.)

• Improvement of water and sanitation (cont.)

A dog can’t use latrine, but you can.

Page 7: Social Action Plan  of the GMS  North-South Economic  Corridor Project

Findings (cont.)

• Improvement of water and sanitation (cont.)

DistrictNumber of villages

Water system Latrine• Houayxay 12 37

• Vieng Phoukha 8 20

• Louang Namtha

12 18

Total 32 75

Page 8: Social Action Plan  of the GMS  North-South Economic  Corridor Project

Findings (cont.)

• Community infrastructure and rural access roads (72.51 km)

BEFORE AFTER

Page 9: Social Action Plan  of the GMS  North-South Economic  Corridor Project

Conclusion

• Income generation

– New technology to

increasing productivity

– Fishpond

– Pig rising

• Community road &

infrastructure

• Water system & latrine

NEW HOPE&

NEW LIFE

Page 10: Social Action Plan  of the GMS  North-South Economic  Corridor Project

Recommendations

Local government of Lao PDR should play as an important role in set up community regulations in order to maintain all community facilities.