Annexure-A
Point no.(ii): The committee noted that the instant proposal is for expansion of Mining Project of China Clay from 5000 TPA(ROM) to 17, 58,163 TPA (ROM) i.e 350 times and Quartz from 2000 TPA(ROM) to 10829 TPA (ROM) i.e 5.4 times. The PP has earlier mined out very less quantity from the mines. In view of the above, the Committee is of the view that PP needs to submit the justification w.r.t. huge enhancement of the production capacity of China clay, PP may submit the revised application for reasonable expansion project.
Reply: Earlier the mine operation was semi-mechanized and maximum production of China Clay was 4940TPA (2014-2015 year).
Now we have proposed to enhance the production of China Clay from 5000 TPA(ROM) to 12,00,000 TPA (ROM) because existing China Clay mines in the District of Chittorgarh, Bhilwara have been discontinued /banned due to legal action taken by Rajasthan Govt. / Mining department. Due to closure of mines the scarcity of China Clay in the market and in present scenario the huge demand of China Clay from the Ceramic tiles, Sanitary ware, Pottery, and Electrical Insulation, Rubber, Paint, Medicine, Insecticides manufacturing Industries. We have surveyed/mapped the market and got very good response/assurance from the users of China Clay Industries for supply the China Clay used as raw material for their products. The details of Letter of Indent /purchase orders are given below as:
Sr.No Name of Industry Qty.(TPA)
1 Siyaram Mineral Suppliers 1,80,000
2 Sita Ram Mineral Supplier 1,80,000
3 M.J. Mineral Udhyog 2,40,000
4 Progressive and Popular Minerals Pvt. Ltd. 2,40,000
5 M.S Sawa Clay & Minerals. Pvt. Ltd 3,60,000
6 White Gold International 1,80,000
7 Soha Mineral Udhyog 1,44,000
Total 15,24,000
Above Purchase orders& LOI copies are attached as Annexure-A1 .
The modified mining scheme was approved by Superintendent Mining Engineer of mining department Kota circle Rajasthan vide memo no SME/KOTA/CC/2017/5235
Annexure-A
dated 21/12/2017. The geological and mineable reserve of china clay and quartz mineral are give as under.
Year wise annual programme of mining in the modified scheme is given as under for china clay and quartz: Table: Year wise production of China Clay
Year ROM (Tons) Recoverable
mineral china clay
90% of ROM (tons)
Waste 10% of
ROM china clay
(tons)
1/11/2017-18 2017-2018
1420565 1278506 142056
2018-19 1453176 1307858 145318 2019-20 1758163 1582347 175817 2020-21 1324113 1191702 132412
Total 5956017 5360413 595603
Table: Year wise production of Quartz.
Year ROM (tons) Recoverable Mineral
Quartz 100%
of ROM
2017-18 10829 10829 2018-19 8801 8801 2019-20 5395 5395 2020-21 1729 1729
Total 26754 26754
It is evident from the approved modified mining scheme that adequate geological and minable reserve is available and the highest level of annual production is approved for china clay is 1758163(ROM) tons in the year of 2019-2020 and the highest annual production is approved for quartz is 10829 (ROM) tons in 2017-2018 year. Now we are proposing the enhancement of production of china clay from 5000 TPA (ROM) to 12,00,000 (ROM) TPA and quartz from 2000 TPA (ROM) to 10829 TPA (ROM).
Reserves China Clay Quartz
Geological Reserve
496277 TPA (ROM)
24750000 TPA (ROM)
Mineable Reserve
372208 TPA (ROM)
20250000 TPA (ROM)
Annexure-1A
Annexure-1A
Annexure-1A
Annexure-1A
Annexure-1A
Annexure-1A
Annexure-1A
Annexure-B
Point no. (III): (a) PP needs to submit the details of machinery to be involved in the mining
operation.
Reply: Details of mining machineries proposed as:
Sr.no Name of Equipment Model Capacity Numbers
1 Excavator (PC-450) L&T/Tata 2.6 Cum 6 (4 +2 Stand by)
2 Dumper Tata/ Ashok
Leyland / MAN
25Tons 20(15+5Stand by)
3 Dozer L&T 200 HP 01
4 Jack Hammer +
Compressor
Kirloskar 32 mm 02
5 Water sprinkler Tata 10 KL 01
(b) Details of plantation done and type of plant species in the boundary of mine lease area.
Reply: (b) Plantation details: Approx 6000 plants were planted in and around the vicinity of mine
and nearby villages areas. The main species planted were Neem, Babul, Piple, Shisham,
Karanj,Ber, Neem, Gulmohar, Khejri, Bud, Amla. Apart from mine lease area Plantation has also
been done outside the mine lease area i.e village - Lohari Khurd, Devi Khera, Devali, Pach ke
Bawari, Umar and Baasni. Mostly plantation done in Govt buildings (school, Community center,
road sides).
Photographs of Plantation and map for the same is enclosed.
Annexure-B
Annexure-B
Toposheet / OSM No:G43P5, G43P6, G43P9 & G43P10
Project Area
MAP SHOWING PLANTATION DONEIN AND AROUND PROJECT AREA
! !
!
!
!
!
!
!
! E
G
F
H B
CD
AI
M/s. B.R. Minerals
Proposed China Clay & Quartz(ML No: 27/1995)
Vardan Environet
Prepared By:Mr. Ankur Agarwal
Approved By:Mr. R.S. Yadav
Graphical Scale:
Project:
Project Proponent:
Environment Consultant:
õôóõôóõôóõôó õôóõôó
õôóõôóõôó
õôóõôó
õôóõôóõôóõôó
õôóõôó
õôóõôó
õôóõôóõôó
õôó
õôóõôó
õôóõôó
õôóõôóõôó
õôóõôó
õôó
õôóõôóõôó õôóõôó õôó
õôó
õôóõôóõôóõôó
õôóõôóõôó
õôóõôóõôóõôó
õôóõôóõôóõôó
õôóõôó
õôó
õôó
õôóõôó
õôóõôó
õôóõôóõôó
õôóõôóõôóõôóõôó
õôóõôóõôóõôó
õôóõôóõôó
õôó
õôóõôó
õôóõôó
õôó
õôóõôóõôóõôóõôó
õôó
õôóõôó
õôóõôóõôó
õôóõôó
õôóõôóõôó
õôóõôóõôó
õôó
õôóõôóõôó
õôó õôóõôó
õôóõôó
õôóõôóõôóõôó
õôó
õôóõôóõôó
õôóõôóõôóõôóõôó
õôóõôó
õôó
õôóõôóõôó
õôóõôó
õôó
õôóõôó
õôó
õôóõôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó õôó
õôóõôóõôóõôóõôóõôó
õôó
õôó
õôóõôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôóõôó
õôóõôó
õôó
õôó
õôóõôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó õôóõôó
õôóõôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôóõôó
õôó
õôóõôóõôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôóõôó
õôó
õôó
õôóõôó õôóõôó
õôó
õôóõôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôóõôóõôóõôó
õôóõôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôóõôó
õôóõôóõôóõôó õôó
õôó
õôó
õôóõôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó õôó õôó
õôó
õôóõôó
õôó
õôóõôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôóõôó
õôó
õôóõôóõôó
õôó
õôó
õôó
õôóõôó
õôóõôóõôó
õôó
õôó
õôóõôó
õôó
õôó õôóõôó
õôó
õôóõôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôóõôó
õôóõôó
õôó
õôó
õôó
õôó õôóõôó
õôó
õôó õôó
õôóõôó
õôó
õôó
õôó
õôó
õôó
õôó
õôóõôó
õôó
õôó
õôó
õôóõôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôóõôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôóõôó
õôó
õôó
õôó
õôó
õôó
õôóõôó
õôó
õôó
õôó
õôó
õôóõôó õôóõôóõôó õôó
õôó
õôóõôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó õôó
õôóõôó
õôó õôó
õôó
õôóõôó
õôóõôó
õôó
õôóõôó
õôó
õôó õôó
õôó
õôó
õôó
õôóõôó
õôó
õôó
õôó
õôó
õôó
õôó õôó õôó õôó
õôóõôó
õôó
õôó
õôóõôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôó
õôóõôóõôóõôó õôó
õôó
õôó
õôó
õôó
õôó
75°28'0"E
75°28'0"E
75°27'0"E
75°27'0"E
75°26'0"E
75°26'0"E
75°25'0"E
75°25'0"E25
°41'0
"N
25°4
1'0"N
25°4
0'0"N
25°4
0'0"N
25°3
9'0"N
25°3
9'0"N
µ
0 300 600 900 1,200 1,500 m
Village: Luhari Khurd, Tehsil: Hindoli, District: Bundi, Rajasthan
QCI-NABET Accredited Environment ConsultantCertificate No. NABET/EIA/1619/RA0037To Hindoli
Project Site
NH-116A
To Devli
LegendPlantationProject Site
ProtectedForest
Waterbody
õôó
Lohari Khurd
DevaKa Khera
Umar
Pach KeBawari
Basni