SME/KOTA/CC/2017/5235environmentclearance.nic.in/writereaddata/Online/EDS/0_0...Sr.no Name of Equipment Model Capacity Numbers 1 Excavator (PC-450) L&T/Tata 2.6 Cum 6 (4 +2 Stand by)

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SME/KOTA/CC/2017/5235environmentclearance.nic.in/writereaddata/Online/EDS/0_0...Sr.no Name of Equipment Model Capacity Numbers 1 Excavator (PC-450) L&T/Tata 2.6 Cum 6 (4 +2 Stand by)
Page 2: SME/KOTA/CC/2017/5235environmentclearance.nic.in/writereaddata/Online/EDS/0_0...Sr.no Name of Equipment Model Capacity Numbers 1 Excavator (PC-450) L&T/Tata 2.6 Cum 6 (4 +2 Stand by)
Avi
Typewritten Text
Avi
Typewritten Text
Page 3: SME/KOTA/CC/2017/5235environmentclearance.nic.in/writereaddata/Online/EDS/0_0...Sr.no Name of Equipment Model Capacity Numbers 1 Excavator (PC-450) L&T/Tata 2.6 Cum 6 (4 +2 Stand by)

Annexure-A

Point no.(ii): The committee noted that the instant proposal is for expansion of Mining Project of China Clay from 5000 TPA(ROM) to 17, 58,163 TPA (ROM) i.e 350 times and Quartz from 2000 TPA(ROM) to 10829 TPA (ROM) i.e 5.4 times. The PP has earlier mined out very less quantity from the mines. In view of the above, the Committee is of the view that PP needs to submit the justification w.r.t. huge enhancement of the production capacity of China clay, PP may submit the revised application for reasonable expansion project.

Reply: Earlier the mine operation was semi-mechanized and maximum production of China Clay was 4940TPA (2014-2015 year).

Now we have proposed to enhance the production of China Clay from 5000 TPA(ROM) to 12,00,000 TPA (ROM) because existing China Clay mines in the District of Chittorgarh, Bhilwara have been discontinued /banned due to legal action taken by Rajasthan Govt. / Mining department. Due to closure of mines the scarcity of China Clay in the market and in present scenario the huge demand of China Clay from the Ceramic tiles, Sanitary ware, Pottery, and Electrical Insulation, Rubber, Paint, Medicine, Insecticides manufacturing Industries. We have surveyed/mapped the market and got very good response/assurance from the users of China Clay Industries for supply the China Clay used as raw material for their products. The details of Letter of Indent /purchase orders are given below as:

Sr.No Name of Industry Qty.(TPA)

1 Siyaram Mineral Suppliers 1,80,000

2 Sita Ram Mineral Supplier 1,80,000

3 M.J. Mineral Udhyog 2,40,000

4 Progressive and Popular Minerals Pvt. Ltd. 2,40,000

5 M.S Sawa Clay & Minerals. Pvt. Ltd 3,60,000

6 White Gold International 1,80,000

7 Soha Mineral Udhyog 1,44,000

Total 15,24,000

Above Purchase orders& LOI copies are attached as Annexure-A1 .

The modified mining scheme was approved by Superintendent Mining Engineer of mining department Kota circle Rajasthan vide memo no SME/KOTA/CC/2017/5235

Page 4: SME/KOTA/CC/2017/5235environmentclearance.nic.in/writereaddata/Online/EDS/0_0...Sr.no Name of Equipment Model Capacity Numbers 1 Excavator (PC-450) L&T/Tata 2.6 Cum 6 (4 +2 Stand by)

Annexure-A

dated 21/12/2017. The geological and mineable reserve of china clay and quartz mineral are give as under.

Year wise annual programme of mining in the modified scheme is given as under for china clay and quartz: Table: Year wise production of China Clay

Year ROM (Tons) Recoverable

mineral china clay

90% of ROM (tons)

Waste 10% of

ROM china clay

(tons)

1/11/2017-18 2017-2018

1420565 1278506 142056

2018-19 1453176 1307858 145318 2019-20 1758163 1582347 175817 2020-21 1324113 1191702 132412

Total 5956017 5360413 595603

Table: Year wise production of Quartz.

Year ROM (tons) Recoverable Mineral

Quartz 100%

of ROM

2017-18 10829 10829 2018-19 8801 8801 2019-20 5395 5395 2020-21 1729 1729

Total 26754 26754

It is evident from the approved modified mining scheme that adequate geological and minable reserve is available and the highest level of annual production is approved for china clay is 1758163(ROM) tons in the year of 2019-2020 and the highest annual production is approved for quartz is 10829 (ROM) tons in 2017-2018 year. Now we are proposing the enhancement of production of china clay from 5000 TPA (ROM) to 12,00,000 (ROM) TPA and quartz from 2000 TPA (ROM) to 10829 TPA (ROM).

Reserves China Clay Quartz

Geological Reserve

496277 TPA (ROM)

24750000 TPA (ROM)

Mineable Reserve

372208 TPA (ROM)

20250000 TPA (ROM)

Page 5: SME/KOTA/CC/2017/5235environmentclearance.nic.in/writereaddata/Online/EDS/0_0...Sr.no Name of Equipment Model Capacity Numbers 1 Excavator (PC-450) L&T/Tata 2.6 Cum 6 (4 +2 Stand by)

Annexure-1A

Page 6: SME/KOTA/CC/2017/5235environmentclearance.nic.in/writereaddata/Online/EDS/0_0...Sr.no Name of Equipment Model Capacity Numbers 1 Excavator (PC-450) L&T/Tata 2.6 Cum 6 (4 +2 Stand by)

Annexure-1A

Page 7: SME/KOTA/CC/2017/5235environmentclearance.nic.in/writereaddata/Online/EDS/0_0...Sr.no Name of Equipment Model Capacity Numbers 1 Excavator (PC-450) L&T/Tata 2.6 Cum 6 (4 +2 Stand by)

Annexure-1A

Page 8: SME/KOTA/CC/2017/5235environmentclearance.nic.in/writereaddata/Online/EDS/0_0...Sr.no Name of Equipment Model Capacity Numbers 1 Excavator (PC-450) L&T/Tata 2.6 Cum 6 (4 +2 Stand by)

Annexure-1A

Page 9: SME/KOTA/CC/2017/5235environmentclearance.nic.in/writereaddata/Online/EDS/0_0...Sr.no Name of Equipment Model Capacity Numbers 1 Excavator (PC-450) L&T/Tata 2.6 Cum 6 (4 +2 Stand by)

Annexure-1A

Page 10: SME/KOTA/CC/2017/5235environmentclearance.nic.in/writereaddata/Online/EDS/0_0...Sr.no Name of Equipment Model Capacity Numbers 1 Excavator (PC-450) L&T/Tata 2.6 Cum 6 (4 +2 Stand by)

Annexure-1A

Page 11: SME/KOTA/CC/2017/5235environmentclearance.nic.in/writereaddata/Online/EDS/0_0...Sr.no Name of Equipment Model Capacity Numbers 1 Excavator (PC-450) L&T/Tata 2.6 Cum 6 (4 +2 Stand by)

Annexure-1A

Page 12: SME/KOTA/CC/2017/5235environmentclearance.nic.in/writereaddata/Online/EDS/0_0...Sr.no Name of Equipment Model Capacity Numbers 1 Excavator (PC-450) L&T/Tata 2.6 Cum 6 (4 +2 Stand by)

Annexure-B

Point no. (III): (a) PP needs to submit the details of machinery to be involved in the mining

operation.

Reply: Details of mining machineries proposed as:

Sr.no Name of Equipment Model Capacity Numbers

1 Excavator (PC-450) L&T/Tata 2.6 Cum 6 (4 +2 Stand by)

2 Dumper Tata/ Ashok

Leyland / MAN

25Tons 20(15+5Stand by)

3 Dozer L&T 200 HP 01

4 Jack Hammer +

Compressor

Kirloskar 32 mm 02

5 Water sprinkler Tata 10 KL 01

(b) Details of plantation done and type of plant species in the boundary of mine lease area.

Reply: (b) Plantation details: Approx 6000 plants were planted in and around the vicinity of mine

and nearby villages areas. The main species planted were Neem, Babul, Piple, Shisham,

Karanj,Ber, Neem, Gulmohar, Khejri, Bud, Amla. Apart from mine lease area Plantation has also

been done outside the mine lease area i.e village - Lohari Khurd, Devi Khera, Devali, Pach ke

Bawari, Umar and Baasni. Mostly plantation done in Govt buildings (school, Community center,

road sides).

Photographs of Plantation and map for the same is enclosed.

Page 13: SME/KOTA/CC/2017/5235environmentclearance.nic.in/writereaddata/Online/EDS/0_0...Sr.no Name of Equipment Model Capacity Numbers 1 Excavator (PC-450) L&T/Tata 2.6 Cum 6 (4 +2 Stand by)

Annexure-B

Page 14: SME/KOTA/CC/2017/5235environmentclearance.nic.in/writereaddata/Online/EDS/0_0...Sr.no Name of Equipment Model Capacity Numbers 1 Excavator (PC-450) L&T/Tata 2.6 Cum 6 (4 +2 Stand by)

Annexure-B

Page 15: SME/KOTA/CC/2017/5235environmentclearance.nic.in/writereaddata/Online/EDS/0_0...Sr.no Name of Equipment Model Capacity Numbers 1 Excavator (PC-450) L&T/Tata 2.6 Cum 6 (4 +2 Stand by)

Toposheet / OSM No:G43P5, G43P6, G43P9 & G43P10

Project Area

MAP SHOWING PLANTATION DONEIN AND AROUND PROJECT AREA

! !

!

!

!

!

!

!

! E

G

F

H B

CD

AI

M/s. B.R. Minerals

Proposed China Clay & Quartz(ML No: 27/1995)

Vardan Environet

Prepared By:Mr. Ankur Agarwal

Approved By:Mr. R.S. Yadav

Graphical Scale:

Project:

Project Proponent:

Environment Consultant:

õôóõôóõôóõôó õôóõôó

õôóõôóõôó

õôóõôó

õôóõôóõôóõôó

õôóõôó

õôóõôó

õôóõôóõôó

õôó

õôóõôó

õôóõôó

õôóõôóõôó

õôóõôó

õôó

õôóõôóõôó õôóõôó õôó

õôó

õôóõôóõôóõôó

õôóõôóõôó

õôóõôóõôóõôó

õôóõôóõôóõôó

õôóõôó

õôó

õôó

õôóõôó

õôóõôó

õôóõôóõôó

õôóõôóõôóõôóõôó

õôóõôóõôóõôó

õôóõôóõôó

õôó

õôóõôó

õôóõôó

õôó

õôóõôóõôóõôóõôó

õôó

õôóõôó

õôóõôóõôó

õôóõôó

õôóõôóõôó

õôóõôóõôó

õôó

õôóõôóõôó

õôó õôóõôó

õôóõôó

õôóõôóõôóõôó

õôó

õôóõôóõôó

õôóõôóõôóõôóõôó

õôóõôó

õôó

õôóõôóõôó

õôóõôó

õôó

õôóõôó

õôó

õôóõôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó õôó

õôóõôóõôóõôóõôóõôó

õôó

õôó

õôóõôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôóõôó

õôóõôó

õôó

õôó

õôóõôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó õôóõôó

õôóõôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôóõôó

õôó

õôóõôóõôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôóõôó

õôó

õôó

õôóõôó õôóõôó

õôó

õôóõôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôóõôóõôóõôó

õôóõôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôóõôó

õôóõôóõôóõôó õôó

õôó

õôó

õôóõôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó õôó õôó

õôó

õôóõôó

õôó

õôóõôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôóõôó

õôó

õôóõôóõôó

õôó

õôó

õôó

õôóõôó

õôóõôóõôó

õôó

õôó

õôóõôó

õôó

õôó õôóõôó

õôó

õôóõôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôóõôó

õôóõôó

õôó

õôó

õôó

õôó õôóõôó

õôó

õôó õôó

õôóõôó

õôó

õôó

õôó

õôó

õôó

õôó

õôóõôó

õôó

õôó

õôó

õôóõôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôóõôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôóõôó

õôó

õôó

õôó

õôó

õôó

õôóõôó

õôó

õôó

õôó

õôó

õôóõôó õôóõôóõôó õôó

õôó

õôóõôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó õôó

õôóõôó

õôó õôó

õôó

õôóõôó

õôóõôó

õôó

õôóõôó

õôó

õôó õôó

õôó

õôó

õôó

õôóõôó

õôó

õôó

õôó

õôó

õôó

õôó õôó õôó õôó

õôóõôó

õôó

õôó

õôóõôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôó

õôóõôóõôóõôó õôó

õôó

õôó

õôó

õôó

õôó

75°28'0"E

75°28'0"E

75°27'0"E

75°27'0"E

75°26'0"E

75°26'0"E

75°25'0"E

75°25'0"E25

°41'0

"N

25°4

1'0"N

25°4

0'0"N

25°4

0'0"N

25°3

9'0"N

25°3

9'0"N

µ

0 300 600 900 1,200 1,500 m

Village: Luhari Khurd, Tehsil: Hindoli, District: Bundi, Rajasthan

QCI-NABET Accredited Environment ConsultantCertificate No. NABET/EIA/1619/RA0037To Hindoli