National Master Plan for Wastewater, Botswana (2003) Project Scope •Evaluate wastewater generation and disposal •Assess sanitation facilities and their impacts on environment •Develop strategies for wastewater management •Develop a master plan for planning horizon up to 2027 •Contract value US$ 1.35m Our Role •Assessment of flows and loads •Review of national wastewater guidelines and design criteria •Review of legislation on industrial effluent and trade waste •Preparation of draft Wastewater and Sanitation Act •Review of institutional framework •Development of master plan and preparation of staged 25-year implementation schedule

SMEC's Experince in Water Sector

Embed Size (px)

DESCRIPTION

This provides a broad picture of SMEC's recent experince in Water sector.

Citation preview

SMEC PowerPoint presentation template

National Master Plan for Wastewater, Botswana (2003)

Project ScopeEvaluate wastewater generation and disposalAssess sanitation facilities and their impacts on environmentDevelop strategies for wastewater management Develop a master plan for planning horizon up to 2027 Contract value US$ 1.35m

Our RoleAssessment of flows and loadsReview of national wastewater guidelines and design criteriaReview of legislation on industrial effluent and trade wastePreparation of draft Wastewater and Sanitation ActReview of institutional framework Development of master plan and preparation of staged 25-year implementation schedule

Lower Ruvu and Morogoro Water Supply, Tanzania (2009-2011)

Project ScopeExpand Lower Ruvu WTP capacityImprove and extend water supply services in Dar es Salaam Upgrade Morogoro water supply system WTP, pump station, transmission pipelines, water storage resevoirsContract value US$ 2.2m

Our RoleDesign and bidding documentsTopographic survey ands oil investigationHydraulic modelling, hydraulic testing and surveyEconomic and financial analysisEnvironmental and social impact assessment Updating of engineering designPreparation of pre-qual and tender documents

2Chimoio, Manica & Gondola Water Supply, Mozambique (2009-2012)

Project ScopeDesign review and construction supervision of Water intake extension, new water treatment plant, pump stations, water storage tanks and water transmission, distribution and reticulation systems for 3 cities

Our RoleReview of contractors design , drawings and equipments Management of design programme Assessment of environmental and social impactsMonitoring of construction progressQuality control and assurance Review of contractors interim payment statementsManagement of testing and commissioningAssistance to client during defects and liability period

Lilongwe Water Supply, Malawi (2013-2016)

Project ScopeInception study; Detailed Design of Raw Water Conveyance System (intake weir, sedimentation basin, 12km pipeline, etc)Construction SupervisionAdditional work included; Training of counterparts in hydraulic modelling.

Our Role / ServicesHydrology;Engineering;Geotechnical;Assistance to Client during Bidding ProcessConstruction Supervision;Project Management and client liaison

Nairobi Water & Sewerage Capacity Building, Kenya (07-08)

Project ScopeAssist in the institutional development aimed towards a modern, efficient and effective organization Establish modern management systemsProvide training and capacity buildingContract value US$ 1.4m

Our RoleManagement of institutional development activitiesOversight of implementation of financial management moduleAssistance in financial forecasting and budgetingEstablishment of environmental management plansProvision of training and transfer of knowledgeAssistance in management of the whole project procurement cycle

Integrated Catchment Management Project, Lesotho (2005-2010)

Project ScopeEstablish catchment management authorities for 5 catchmentsPrepare a natural resources inventoryDevelop integrated catchment management plansImplementation of the management plan on pilot areasContract value US$ 3.1m

Our RoleReview of organisational arrangement of stakeholders and recommendation of institutional structuresPreparation of resources inventories and GIS mappingPreparation of social/community development plansDevelopment of integrated catchment management plans and implementation of monitoring programmeProject management and reporting

6Integrated WRM&D Study for Pangani Basin, Tanzania (2012-2013)

Project ScopeConduct studies and prepare integrated water resources management and development plan for the Pangani BasinOur RoleHydrological studies and modelingGroundwater and conjunctive use studies and modelingRiver health and social/ environmental needs assessmentWater quality studies and modelingSector water plans (Hydropower, Irrigation, Mining, Livestock, Rural Water Supply, Urban Water Supply, etc)Flood and irrigation studiesArusha future water supply studyIntegrated Water Resources Management Basin PlanWater Resources Information Management SystemDecision Support SystemTransboundary Water ManagementClimate change assessmentInstitutional and legal frameworkCapacity building and training

7Integrated WRM&D Study for Lake Tanganyika Basin, Tanzania (2012-2013)

Project ScopeConduct studies and prepare integrated water resources management and development plan for the Lake Tanganyika BasinOur RoleHydrological studies and modelingGroundwater and conjunctive use studies and modelingRiver health and social/ environmental needs assessmentWater quality studies and modelingSector water plans (Hydropower, Irrigation, Mining, Livestock, Rural Water Supply, Urban Water Supply, etc)Lake Tanganyika Water Balance AssessmentIntegrated Water Resources Management Basin PlanWater Resources Information Management SystemDecision Support SystemTransboundary Water ManagementClimate change assessmentInstitutional and legal frameworkCapacity building and training

8Rajasthan Urban Water Supply Upgrading, India (10-12)

Project ScopeAssess performance and operational status of all 222 urban water supply schemes in Rajasthan to facilitate policy decision making for improvement in service delivery through judicious deployment of scarce resourcesPrepare Roadmap and investment plan for year 2045.

Our RolePreparation of web-based GIS water supply asset mapsHydraulic modelling of all 222 towns water supply systemEnergy audit of 650 pump stationsNRW assessmentConjunctive water use assessment including reuse of wastewaterDevelop time bound roadmap for meeting water demand in 2045

Increasing domestic, commercial and environmental water demandKuwait Stormwater Drainage Master Plan (07-10)

Phase 1: Data Collection and MappingPhase 2: Hydraulic ModellingPhase 3: Preparation of Master PlanTypical Project: Preparation of Basin Plans for Ghaghra Gomti System, Uttar Pradesh

Bhuwalpur Mr.Kishanpur Mr.

Developed Decision Support System Modelling of current/future scenarios Stakeholder consultation

Major Water Supply Projects in Australia

Sydney

2007 2010 250ML/d Independent Verifier Melbourne

2009 2012 550ML/d Proof Engineering Adelaide

2009 2012 275ML/d Designer

Thank YouChart1 (3)8554.86464201019779.31188134719904.4310798682

Gross Margin (Rs/per Ha CA)

Chart1 (2)21095.336843705522399.260843559622355.6316402953

Gross Margin (Rs/per Ha CA)

Chart18554.86464201019779.31188134719904.431079868211024.7984892451

Gross Margin (Rs/per Ha Sown Area)

Sheet1do nothing351703317738555main canal desilting402042180419779whole system desilting407186018349904whole system lining45324600309.060111025proposedmain canal desilting8672609406521095whole system desilting9208672121722399whole system lining9190735501822356net sown area- current411115ha65.1%net sown area - proposed411115ha76.1%

Sheet2