37
Smart Plant Approach to Increase Plant Profitability Donald J. Chmielewski Department of Chemical & Biological Engineering Illinois Institute of Technology Miguel J. Bagajewicz Department of Chemical Engineering University of Oklahoma 2009 Annual Meeting of the AIChE Nashville, TN

Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Embed Size (px)

Citation preview

Page 1: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Smart Plant Approach to Increase Plant Profitability

Donald J. Chmielewski

Department of Chemical & Biological Engineering

Illinois Institute of Technology

Miguel J. Bagajewicz

Department of Chemical Engineering

University of Oklahoma

2009 Annual Meeting of the

AIChE

Nashville, TN

Page 2: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Traditional Plant Operation

Plant Measured Data

Servo-

Loops

MPC

RTO

State

Estimator

Parameter

Estimator

Estimation Units

Set-points

Set-points

Page 3: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Smart Plant Operation

Plant Measured Data

Servo-

Loops

MPC

RTO

State

Estimator

Parameter

Estimator

Estimation Units

Set-points

Set-points

Smart Plant

Supervisor

Page 4: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Smart Plant Topics

• Scheduling and Supervision (Enterprise Wide)

• Fault Detection and Diagnosis (Plant Wide)

• Safe Parking and Emergency Management (Plant

Wide)

• Process Efficiency and Sustainable Operation

(Plant Wide)

Page 5: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Motivating Example (Surge Tank)

q

q(sp)

FT

FC

qin

V

Page 6: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Surge Tank Operating Scenario

q

q(sp)

FT

FC

qin

V

- Inlet flow (qin) is from a reactor and varies with time.

- Exit (q) to a separation unit which demands little variation.

- Tank should not over-flow or run dry.

Page 7: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Surge Tank Operating Scenario

q

q(sp)

FT

FC

qin

V

- Inlet flow: qin = 30 3 m3/min.

- Exit flow q = 30 1 m3/min.

- Tank volume V = 10 10 m3.

Page 8: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Open-Loop Operation

q

q(sp)

FT

FC

qin

V

- Inlet flow: qin = 30 3 m3/min.

- Exit flow q = 30 0 m3/min.

- Tank volume V = 10 10 m3.

Page 9: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Open-Loop Operation

0 10 20 30 40-5

0

5

10

15

20

25

30

35

time (minutes)

Ta

nk H

old

-up

(m

3)

or

Volu

metr

ic F

low

(m

3/m

in)

Vq

in

q

Page 10: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Open-Loop Operation (Disturbance Scenario b)

0 10 20 30 40-5

0

5

10

15

20

25

30

35

time (minutes)

Ta

nk H

old

-up

(m

3)

or

Volu

metr

ic F

low

(m

3/m

in)

Page 11: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Open-Loop Operation

0 10 20 30 40-5

0

5

10

15

20

25

30

35

time (minutes)

Ta

nk H

old

-up

(m

3)

or

Volu

metr

ic F

low

(m

3/m

in)

Vq

in

q

0 10 20 30 40-5

0

5

10

15

20

25

30

35

time (minutes)

Ta

nk H

old

-up

(m

3)

or

Volu

metr

ic F

low

(m

3/m

in)

(disturbance a) (disturbance b)

Page 12: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Closed-loop Surge Tank

q(sp)

FT

FC

q

qin

V(sp)

LT

LC

V

Page 13: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Closed-loop Level Control Surge Tank

+ -

qGp(s)Gc(s) +

+

qin Gd(s)

VV(sp)

ssGp /1)(

ssGd /1)(

s

KsGI

cc 11)(

2c

c

K

2I c

Page 14: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Closed-loop Level Control Surge Tank

+ -

qGp(s)Gc(s) +

+

qin Gd(s)

VV(sp)

s

KsGI

cc 11)(

2c

c

K

2I c

Tuning Scenarios:

Case 1: c = 1 min.

Case 2: c = 10 min.

Case 3: c = 50 min.

Page 15: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Closed-Loop Operation (Case 1: c = 1 min )

0 10 20 30 40-5

0

5

10

15

20

25

30

35

time (minutes)

Ta

nk H

old

-up

(m

3)

or

Volu

metr

ic F

low

(m

3/m

in)

Vq

in

q0 10 20 30 40-5

0

5

10

15

20

25

30

35

time (minutes)

Ta

nk H

old

-up

(m

3)

or

Volu

metr

ic F

low

(m

3/m

in)

Vq

in

q

Page 16: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

0 10 20 30 40-5

0

5

10

15

20

25

30

35

time (minutes)

Ta

nk H

old

-up

(m

3)

or

Volu

metr

ic F

low

(m

3/m

in)

0 10 20 30 40-5

0

5

10

15

20

25

30

35

time (minutes)

Ta

nk H

old

-up

(m

3)

or

Volu

metr

ic F

low

(m

3/m

in)

Vq

in

q

Closed-Loop Operation (Case 1: c = 1 min )

(disturbance a) (disturbance b)

Page 17: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Closed-Loop Operation (Case 1: c = 10 min )

(disturbance a) (disturbance b)

0 10 20 30 40-5

0

5

10

15

20

25

30

35

time (minutes)

Ta

nk H

old

-up

(m

3)

or

Volu

metr

ic F

low

(m

3/m

in)

Vq

in

q

0 10 20 30 40-5

0

5

10

15

20

25

30

35

time (minutes)

Ta

nk H

old

-up

(m

3)

or

Volu

metr

ic F

low

(m

3/m

in)

Page 18: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Closed-Loop Operation (Case 1: c = 50 min )

(disturbance a) (disturbance b)

0 10 20 30 40-5

0

5

10

15

20

25

30

35

time (minutes)

Ta

nk H

old

-up

(m

3)

or

Volu

metr

ic F

low

(m

3/m

in)

Vq

in

q

0 10 20 30 40-5

0

5

10

15

20

25

30

35

time (minutes)

Ta

nk H

old

-up

(m

3)

or

Volu

metr

ic F

low

(m

3/m

in)

Page 19: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Extreme Cases

(Over Regulated) (Open-Loop)

0 10 20 30 40-5

0

5

10

15

20

25

30

35

time (minutes)

Ta

nk H

old

-up

(m

3)

or

Volu

metr

ic F

low

(m

3/m

in)

0 10 20 30 40-5

0

5

10

15

20

25

30

35

time (minutes)

Ta

nk H

old

-up

(m

3)

or

Volu

metr

ic F

low

(m

3/m

in)

Page 20: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Middle Ground

(Over Regulated) (Open-Loop)

0 10 20 30 40-5

0

5

10

15

20

25

30

35

time (minutes)

Ta

nk H

old

-up

(m

3)

or

Volu

metr

ic F

low

(m

3/m

in)

0 10 20 30 40-5

0

5

10

15

20

25

30

35

time (minutes)

Ta

nk H

old

-up

(m

3)

or

Volu

metr

ic F

low

(m

3/m

in)

(c = 10 min )

0 10 20 30 40-5

0

5

10

15

20

25

30

35

time (minutes)

Ta

nk H

old

-up

(m

3)

or

Volu

metr

ic F

low

(m

3/m

in)

Page 21: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

The Operator’s Plight

Possible scenario

• Shift starts with the following operation (c = 10 min).

0 10 20 30 40-5

0

5

10

15

20

25

30

35

time (minutes)

Ta

nk H

old

-up

(m

3)

or

Volu

metr

ic F

low

(m

3/m

in)

Vq

in

q

Page 22: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

The Operator’s Plight

• But, then the disturbance changes to

0 10 20 30 40-5

0

5

10

15

20

25

30

35

time (minutes)

Ta

nk H

old

-up

(m

3)

or

Volu

metr

ic F

low

(m

3/m

in)

Vq

in

q

0 10 20 30 40-5

0

5

10

15

20

25

30

35

time (minutes)

Ta

nk H

old

-up

(m

3)

or

Volu

metr

ic F

low

(m

3/m

in)

Page 23: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

The Operator’s Plight

• Should the operator re-tune the controller?

0 10 20 30 40-5

0

5

10

15

20

25

30

35

time (minutes)

Ta

nk H

old

-up

(m

3)

or

Volu

metr

ic F

low

(m

3/m

in)

(c = 10 min )

Page 24: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

The Operator’s Plight

• Should the operator re-tune the controller?

0 10 20 30 40-5

0

5

10

15

20

25

30

35

time (minutes)

Ta

nk H

old

-up

(m

3)

or

Volu

metr

ic F

low

(m

3/m

in)

(c = 10 min )

0 10 20 30 40-5

0

5

10

15

20

25

30

35

time (minutes)

Ta

nk H

old

-up

(m

3)

or

Volu

metr

ic F

low

(m

3/m

in)

(c = 50 min )

Page 25: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Operator’s Plight Re-Examined

• Broader perspective on the process will yield solution.

q(sp)

FT

FC

q

qin

V(sp)

LT

LC

V

Page 26: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Operator’s Plight Re-Examined

• Broader perspective on the process will yield solution.

• Reconsider the separation unit downstream:

q(sp)

FT

FC

q

qin

V(sp)

LT

LC

V Separation

Unit

Nominal Throughput:

30 m3/min

Page 27: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Operator’s Plight Re-Examined

• Broader perspective on the process will yield solution.

• Reconsider the separation unit downstream:

q(sp)

FT

FC

q

qin

V(sp)

LT

LC

V Separation

Unit

Nominal Throughput:

30 m3/min

Maximum Throughput:

31 m3/min

Page 28: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Operator’s Plight Re-Examined

• Broader perspective on the process will yield solution.

• Reconsider the separation unit downstream:

q(sp)

FT

FC

q

qin

V(sp)

LT

LC

V Separation

Unit

Nominal Throughput:

30 m3/min

Maximum Throughput:

31 m3/min

Exit flow q = 30 1 m3/min.

Page 29: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Operator’s Solution

0 10 20 30 40-5

0

5

10

15

20

25

30

35

time (minutes)

Ta

nk H

old

-up

(m

3)

or

Volu

metr

ic F

low

(m

3/m

in)

(c = 10 min ) • Reselect to the nominal

throughput.

• From 30 m3 / min

to 29 m3 / min

• Obtain guidance from

)( nom

design

nom

actual qqKP

Page 30: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Operator’s Plight

V

EDOR

* *

OSSOP

3129

20

0

Original

Operating Point

q

Page 31: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Operator’s Solution

V

EDOR

*

OSSOP

3129

20

0New BOP

q

*

Page 32: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Operator’s Solution

V

EDOR

* *

OSSOP

3129

20

0

Original

Operating Point

q

V

EDOR

*

OSSOP

3129

20

0New BOP

q

*

Page 33: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Operator’s Solution

V

EDOR

* *

OSSOP

3129

20

0

Original

Operating Point

q

V

EDOR

* *

OSSOP

3129

20

0

New BOP

q

Page 34: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Model Predictive Control

LT

q(sp)

V(nom)

MPC

q(no

m)

V FT

FC

q

FTqin

Page 35: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Operator’s Perspective

• Disturbance characteristics will impact the controller’s ability to meet operational criteria.

• In some cases, adjustment of the controller (re-tuning) will recover performance.

• In other cases, only recourse is modification of nominal operating conditions.

Page 36: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Impact on Smart Plant Operation

• Evolution of disturbance characteristics necessitates the ability to retune controllers.

• To enable such retuning, two technologies are needed:

1. A method to characterize disturbances.

2. A profit focused tuning method that is responsive to disturbance modeling.

Page 37: Smart Plant Approach to Increase Plant Profitabilitymypages.iit.edu/~chmielewski/presentations/2009/AIChE2009_Smart... · Smart Plant Approach to Increase Plant Profitability Donald

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Profit View of Smart Plant Operation

Plant Measured Data

Servo-

Loops

MPC

RTO

State

Estimator

Parameter

Estimator

Estimation Units

Set-points

Set-points

Disturbance

Characterization

Reselection of nominal

operating conditions

Retuning

of

controller