Upload
masato
View
106
Download
0
Tags:
Embed Size (px)
DESCRIPTION
SMART PCA. SUMMARY. Smart Airport The Passenger The Comfort PCA System Smart PCA. Smart Airport. Airports are, like living beings, in constant movement, adapting their facilities and creating new services according to the needs of their passengers. - PowerPoint PPT Presentation
Citation preview
SMART PCA
SUMMARY
Smart Airport The Passenger The Comfort PCA System Smart PCA
Smart Airport
Airports are, like living beings, in constant movement, adapting their facilities and creating new services according to the needs of their passengers.
Airports function to meet the needs of passenger mobility.
The objective is to offer the passenger the best experience during their journey.
Smart Airport
Smart Airport: Existing airports have to interconnect their systems, to be able to adapt and respond to specific requirements at any time.
ACA is the carbon management certification for airports.
AIRPORT MANAGEMENT
ANALYSIS OF INFORMATION
SERVICE IMPROVEMENT
ENERGY SAVING
ISO 50001 - Energy management
The Passenger
The Passenger, the most important airport user
Thousands of passengers are using these services daily to move around for business, for work, for pleasure
Heavy BaggageLarge QueueSuffer for TirednessRaces along the hall
“AVOID DISCOMFORT”
The Passenger
Our main goal is to supply the best passenger experience
The Passenger SATISFACTION produces Passenger LOYALTY.
A comfortable atmosphere from the Terminal to the Aircraft is necessary for an enjoyable journey.
The Comfort
Thermal comfort is the state of mind that expresses satisfaction with the thermal environment and is assessed by subjective evaluation (ANSI/ASHRAE Standard 55). Maintaining this standard of thermal comfort for occupants of buildings or other enclosures is one of the important goals of HVAC design engineers.
The Comfort
Factors influencing thermal comfort Air temperature Operative temperature Relative humidity Metabolic rate Clothing insulation Mean radiant temperature Air speed
0.76 met 1 met 1,6 met 2,5 met 6.9 met0.76 met 1 met 1,6 met 2,5 met 6.9 met
GRADIENT VERTICAL DE
ASYMETRIE
DE RAYONNEMENT
LA TEMPERATUREDU SOL
SENSATIONDE COURANT D’AIR
GÊNE ACOUSTIQUE
The Comfort
GLOBAL COMFORT: From arrival to departures
Due to the fact that all airport zones are different in volume, use and occupancy… to achieve a sense of comfort in all areas, combined with low energy consumption, it is necessary to have smart air conditioning with high versatility and accurate measures of control.
The Comfort
Passenger Comfort in Boarding Bridges The last step before boarding the aircraft (Stress) High Solar radiation High gradient of temperature (infiltrations) Air speed
The Comfort
Passenger Comfort inside the Aircraft Maintain constant the same level of passenger Comfort between boarding and disembarking. High Occupancy Latent Capacity High Humidity
ANSI/ASHRAE Standard 161-2007 Air Quality within Commercial Aircraft
Cabin PressureAir temperatureHumidityAir SpeedVentilationOzoneBleed Air contaminant MonitoringAddressing Contamination EventsMeasurements for specific Variables
PCA System
PRE-AIR CONDITIONED FOR AIRCRAFTS
APU (Auxiliary Power Unit)
High maintenance cost High CO2 emissions. High noise level High kerosene consumption
PCA System
Ground Power (400 Hz)Pre Conditioned Air (PCA)
Solution
An air conditioning system specific for Aircrafts
PCA System
Less costs of maintenance Less CO2 emissions. Less noise level Less kerosene consumption
AIRLINES
AIRPORTS
ENVIRONMENTAL
HANDLING STAFF
A beneficial solution for
PCA System
Cooling Capacity (W)
Energy Consumption
EER
CO2 Emmission
1000 W
6000 W
-
1,08 Tons
1000 W
500 W
2
0,09 Tons
PCA system
Energy Balance
Aircraft Heat Loads (kW)Internal Loads caused by Occupancy, Conduction,
Solar and Electrical loads.Depending on the inlet TºC it determines the airflow
LossesDistribution losses such
as ducts, hoses…)
PCA Capacity (kW)Net Cooling Capacity: the unit has to reduce the temperature from
the ambient air to supply the same airflow at the
required outlet temperature
The heat load in an aircraft cons ists of 4 components:
Occupancy loadsConduction loadsSolar loadsElectrical loads
PCA system
What cooling air do we need ? Psensible (Kw)= Qm x C x (aircraft inlet T° - cabin T°)
with:
- Qm = mass air flow in Kg/s (Note: In PCA business, most of the time the flow is in Kg/min)- C = specific heat of air: 1 KJ/(kg x °C)- Aircraft inlet Temperature °C(Note: unit discharge T° + loss or gain of T° in the ducting),- Cabin Temperature °C
PCA system
SMART PCA
SMART PCA: An air conditioning unit for maintain the quality of the air inside the aircraft cabin interrelating external parameters such as Aircraft model, environmental conditions, installation and specific airport characteristics.
Manage the systems during the operation.• Adjustment depending on the external factors• Analyze Consumptions and costs • Optimize the system for improvement the
performance.• Improve the Reliability of the system
SMART PCA
Smart PCA CONTROL Must be able to manage all internal parameters for
supply really that is demanded.
Must be able to manage all external parameters that are taking part of the system:
Airport Building Management System Maintenance systems Passenger Boarding Bridges Flexible Hose retriever Pits system 400Hz Visual Docking Guidance
SAMART BLOWER SYSTEM Measure and guarantee the
correct supplied airflow. Reduce the energy
consumption Adapt itself to the installation
losses
SMART PCA
SMART COMPRESSIVE SYSTEM Guarantee the Cooling Capacity demanded by the
system. Flexible components for adjusting itself to the
demand. Inverter compressors with oil level management
integrated. EC Axial fans Electronic expansion valve.
Improve efficiency (Save Energy). Improve the reliability.
ENERGIA RENOVABLE
Directive 2009/28/CE
SMART PCA
SMART PCA MAINTENANCE Failure analysis Electrical consumption measurement High Reliability design for a long life time Ramp VISOR PRO: Maintenance Supervision Software
Availability (Ai) Availability is in fact the probability that a
component will be available for operate in a determinate time. Taking in consideration the unavailability time due to its proper faults.
CONCLUSION
CIAT SMART SOLUTION The CIAT Smart PCA has been developed for
covering the most airports exigencies.
The CIAT Smart PCA is able to adapt itself to the demand increasing the features, increasing the efficiency, increasing the reliability and reducing the pay off.
The CIAT Smart PCA guarantee the Passenger Comfort inside the Aircraft