SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
1
Resi urcesr
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
1
EXECUTIVE SUMMARY This report describes project status updates, financial data and observations of the Smart Columbus
Electrification Program over the time period from January – March 2018 (Q4). The report also includes Key
Progress Indicators and other information for Year 1 of the Electrification Program and therefore is
considered the annual report for April 2017 through March 2018. The reporting period for financial
expenditure data for the City of Columbus was through March 31, 2018. This includes anticipated additional
Year 1 expenditures from GPD Group and the Columbus Partnership.
PROJECT DESCRIPTION AND STATUS The overall goal of this project is to measurably decrease light-duty transportation greenhouse gas (GHG)
emissions expressed in equivalent metric tons of carbon dioxide (MTeCO2) as a result of grid
decarbonization, electric vehicle (EV) fleet adoption, transit, autonomous and multi-modal systems
(implemented via USDOT grant agreement), and consumer EV adoption during the grant period compared to
a baseline year (2016).
Priority 1: Decarbonization Objective: In partnership with power providers, by 2030, install 905 MW of utility scale renewable energy
generation capable of serving the Columbus region; procure a minimum of 1.2 million MWh of renewable
energy for the City of Columbus between 2017 and 2022 and save an additional 0.33% of MWh consumed
through energy efficiency and smart grid programs during the time period of the grant.
Q4 Key Highlights:
78,000+
ADVANCED METERING INFRASTRUCTURE (AMI) METERS
INSTALLED TO DATE
These meters provide accurate and timely energy usage information to customers, allowing them to make better decisions creating a potential for a reduction in
overall electricity consumption.
297
NEW LED STREET LIGHTS INSTALLED IN QUARTER 4 BY
THE CITY OF COLUMBUS DIVISION OF POWER
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
2
Priority 2: Fleet Adoption Objective: Work with public, private and academic sectors to place in operation 780 electric vehicles into
their fleets by the end of the grant period.
Q4 Key Highlights:
MORPC CONTRACTED
WITH GREEN COMMUTER TO PROVIDE DISCOUNTED EV VAN
COMMUTER OPTIONS. THIS INCLUDES
10 2018 TESLA MODEL X SUVs (SEVEN PASSENGER)
12 NEW LETTERS OF COMMITMENT FOR PUBLIC FLEETS IN QUARTER 4
PUBLIC FLEET VEHICLE PURCHASE COMMITMENTS TO DATE
Firm or Municipality Quantity Additional Expected
City of Columbus 93 107
Columbus Regional Airport Authority 2* 0
Mid-Ohio Regional Planning Commission 2* 0
City of Hilliard 2* 0
City of Dublin 4 6
Franklin County 11 0
The Ohio State University 2 35-50
City of Westerville 2* 0
City of Whitehall 2* 0
City of Worthington 2* 0
TOTAL 122 148-163
*indicates Q4 committment
5 NEW PRIVATE FLEET COMMITMENTS FOR
2018 EV PURCHASES HAVE BEEN SECURED.
American Electric Power (6 EVs)
Land Grant Brewing Company (5 EVs)
Columbus Zoo and Aquarium (5 EVs)
The Columbus Dispatch (3 EVs)
Alliance Data (5 EVs)
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
3
Priority 3: Transit, Autonomous and Multi-Modal Systems in the City Objective: Ensure a comprehensive, multi-modal approach to decarbonizing the Columbus region’s mobility
options.
Q4 Key Highlights:
COLUMBUS BECAME THE SIXTH CITY TO LAUNCH
SERVICE BY CHARIOT, A SUBSIDIARY OF
FORD SMART MOBILITY
Priority 4: Consumer EV Adoption
Objective: Increase electric vehicle market adoption (percentage of new registrations of new and used
vehicles) in Columbus and the surrounding seven county region to 1.8% by the end of the three-year grant
period, representing a 486% increase from 2015 baseline of 0.37%.
Q4 Key Highlights:
RIDE & DRIVE LAUNCH AT THE COLUMBUS AUTO SHOW – MARCH 15-18
10 PEV MODELS TO DRIVE
370 DRIVES AND 467 RIDES
1,300+ IN-CAR EV EXPERIENCES
2017 RIDE & DRIVE ROADSHOW RESULTS:
11 RIDE & DRIVE EVENTS
800+ TEST DRIVES
5,000+ ENGAGED
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
4
THE FEDERAL EV TAX CREDIT REMAINED INTACT
ANNOUNCED PLANS FOR THE
SMART COLUMBUS EXPERIENCE CENTER
CONSUMER EV ADOPTION RATE INCREASED TO 0.77%
Priority 5: Charging Infrastructure
Objective: Support the acceleration of electric vehicle adoption through installation of charging infrastructure,
with the goal of 925 new charging ports by the end of the grant period.
Q4 Key Highlights:
DEVELOPED THE MULTI-UNIT DWELLING (MUD) CONTRACT AND BEGAN EXECUTING AGREEMENTS
WITH THE RECIPIENTS
4 RECIPIENTS
11 LOCATIONS
48 NEW CHARGING PORTS
$167,998 DISTRIBUTED
THE FIELD STUDY OF EXISTING WORKPLACE CHARGING IDENTIFIED
25 WORKSITES IN THE ACCELERATION PARTNER PROGRAM,
WHICH INCLUDED 185 CHARGING PORTS
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
5
PROJECT BUDGET AND SCHEDULE REVIEW Q4 saw an increase in project expenditures as activities ramped up. The reporting period for financial
expenditure data for the City of Columbus was through March 31, 2018. This includes anticipated additional
Year 1 expenditures from GPD Group and the Columbus Partnership.
Activities within the schedule are progressing according to plan. Q4 saw an accelerated effort on Priority
5 with planning for the next rounds of charging infrastructure.
See Appendix B for comprehensive timelines.
$0
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
$3,000,000
$3,500,000
Quarter 1 Quarter 2 Quarter 3 Quarter 4 Year 1 Total
Year 1 Budget Analysis
Year 1 Spend:
$3,006,894
APR 17 – MAR 18
Priority 1 $ 170,294
Priority 2 $ 505,345
Priority 3 $ 2,351
Priority 4 $ 1,406,376
Priority 5 $ 816,751
Program $ 105,777
Management
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
6
YEAR 1 LESSONS LEARNED The Year 1 Lessons Learned repository, shown in Appendix F, details significant findings, recommendations
and new insights realized during Year 1 of the project and will be amended annually to reflect new
findings. The application of the Lessons Learned by the City of Columbus can potentially increase the
effectiveness of the Paul G. Allen Philanthropies’ (PGAPh) future capital investments and provide support for
EV adoption in cities worldwide. Smart Columbus is using the Lessons Learned tool to identity both
successes and/or shortcomings, and detail the resulting possible impacts and next steps. The list details the
lesson learned, resulting action, potential impact, and the pertinent references by Priority/Initiative.
A few key lessons learned include:
Conducting early learning sessions was key to developing rapport and introducing EV concepts to the
Smart Columbus team.
As a city or agency implements a program such as this, it is important to have a good understanding of
the scope and budget and to appropriate enough time for the planning phase to occur.
The Smart Columbus team underestimated the level of effort required to capture the right information:
o Certifying baseline data
o Quantifying impact of qualitative performance
o Valuating impressions
It is important to define specific details for data collection for each priority, initiative and strategy and
establish the GHG baseline earlier in the program. That said, the program is complex and has needed
to evolve to incorporate new learnings and capitalize on opportunities.
For more details on these and other lessons, see Appendix F – Year 1 Lessons Learned.
MAJOR ITEMS UPCOMING IN 2018 Finalize the Year 2 Smart Columbus Electrification Program with the Foundation.
Finalize all MUD contracts in the next quarter and begin construction.
Anticipated delivery of 73 City of Columbus public fleet vehicles.
Begin Phase 2 of the Ride & Drive Roadshow.
Start construction on the Smart Columbus Experience Center.
Identify the locations and number of charging ports at each location for the second round of fleet
charging.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
7
TABLE OF CONTENTS
EXECUTIVE SUMMARY ................................................................................................................................ 1
Project Description and Status ....................................................................................................................... 1
Project Budget and Schedule Review ............................................................................................................ 5
Year 1 Lessons Learned ................................................................................................................................. 6
Major Items Upcoming in 2018 ....................................................................................................................... 6
TABLE OF CONTENTS ................................................................................................................................. 7
ORGANIZATIONAL STRUCTURE ................................................................................................................ 9
QUARTER IN REVIEW ................................................................................................................................ 10
Priority Overview ........................................................................................................................................... 10
Priority 1 – Decarbonization ..................................................................................................................... 10
Priority 2 – Fleet Electric Vehicle Adoption ............................................................................................... 15
Priority 3 – Transit, Autonomous and Multi-Modal Systems in the City .................................................... 20
Priority 4 – Consumer Electric Vehicle Adoption ...................................................................................... 23
Priority 5 – Charging Infrastructure ........................................................................................................... 37
Contracts and Partner Agreement Status ..................................................................................................... 41
Implementation Plan ..................................................................................................................................... 41
Playbook ....................................................................................................................................................... 42
Risk Management and Policy Register ......................................................................................................... 47
Stakeholder Plans ......................................................................................................................................... 47
Budget and Cost Management ..................................................................................................................... 48
Smart City Schedule ..................................................................................................................................... 49
Performance Measurement Plan .................................................................................................................. 49
Year 1 Lessons Learned ............................................................................................................................... 49
ACTIVITY LOGS .......................................................................................................................................... 50
Priority 1 Activity Log .................................................................................................................................... 50
Priority 2 Activity Log .................................................................................................................................... 52
Priority 4 Activity Log .................................................................................................................................... 55
Priority 5 Activity Log .................................................................................................................................... 57
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
8
APPENDICES .............................................................................................................................................. 61
Appendix A – Quarterly Indicators and Metric Targets ................................................................................. 61
Appendix B – Schedule ................................................................................................................................ 70
Appendix C – Risk and Policy Register ........................................................................................................ 74
Appendix D – Polk Data ................................................................................................................................ 79
Appendix E – Communications and Publications ......................................................................................... 80
Appendix F – Year 1 Lessons Learned
Appendix G – Fleet Assessment Example – Alliance Data
Appendix H – EmpowerBus Overview
Appendix I – Consumer Awareness Survey Findings
Appendix J – Inventory Analysis Findings
Appendix K – Electrified Dealer Program Plan
Appendix L – Electrified Dealer Program Handout
Appendix M – Smart Columbus Buyers’ Guide
Appendix N – EV Quarter Sheets and EV Cards
Appendix O – Website Brief
Appendix P – Website Site Map
Appendix Q – Website Design Concepts – Homepage and Playbook Landing Page
Appendix R – Smart Columbus Experience Center Call for Partners
Appendix S – Smart Columbus Experience Center Overview/Design Direction
Appendix T – Acceleration Partner Program Board Meeting Agenda
Appendix U – Acceleration Partner Program Board Meeting Slide Deck
Appendix V – Acceleration Partner Profile Information
Appendix W – Mobility Ambassador Role Description
Appendix X – Mobility Ambassador Toolkit
Appendix Y – Mobility Ambassador Event Summary
Appendix Z – Ignite Action Fund – Workplace Program Charter Example
Appendix AA – 2017 Budget Analysis for Annual Report
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
9
ORGANIZATIONAL STRUCTURE Smart Columbus welcomed two new members of the team, each with Consumer Adoption responsibilities.
Zach McGuire joined Smart Columbus as the Smart Mobility/EV Adoption Team Manager on January 11, 2018. Zach holds a master’s
degree in Climate Science and Solutions from Northern Arizona University and has worked in the solar energy industry and solar and
energy efficiency financing. He has also worked as a sustainability consultant.
Alexandra (“Alex”) Slaymaker joined Smart Columbus as the Smart Mobility/EV Adoption Team Coordinator on March 5, 2018. Alex
holds a master’s degree in Sustainable Solutions from Arizona State University. Prior to joining Smart Columbus, Alex created an
outreach program for the Solid Waste Authority of Central Ohio (SWACO) focused on helping Franklin County organizations, residents,
events, and businesses make strides towards zero waste.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
10
QUARTER IN REVIEW This section will give an overview on items that happened during Q4 for each of the five project priorities,
program management, priority implementation and coordination items.
PRIORITY OVERVIEW Progress during Q4 is detailed below for the following priorities: Decarbonization; Fleet Electric Vehicle
Adoption; Transit, Autonomous and Multi-Modal Systems in the City; Consumer Electric Vehicle Adoption;
and Charging Infrastructure.
PRIORITY 1 – DECARBONIZATION
Initiative 1.1 – Utility-Scaled Renewables
Strategy 1.1.1 – AEP Solar and Wind Generation
Key Highlights:
AEP Ohio is currently monitoring the status of filings prior to proceeding with the development of
renewable resources. Once approved by the Public Utilities Commission of Ohio (PUCO), the
Electric Security Plan (ESP) III Extension Stipulation creates a Renewable Generation Rider (RGR)
enhancing transparency and better distinguishing the separate issues relating to new renewable
projects. For a renewable project owned by an AEP affiliate or other non-affiliate entity and
operated by AEP Ohio, AEP Ohio may propose that some or all of the project’s output be
purchased through a bilateral contract with a retail customer conditioned upon approval by the
Commission as a reasonable arrangement. AEP Ohio previously issued RFPs for renewable
development within the state of Ohio. These applications are currently under review and
consideration for potential inclusion in the RGR.
Next Steps:
Continue monitoring the approval status.
Strategy 1.1.2 – AEP Research and Development (R&D) to Advance Clean Energy
Key Highlights:
Jointly developed a Funding Opportunity Announcement (DE-FOA-0001808) application in
conjunction with Ford Motor Company, AEP, BTC Power Inc. (BTC), City of Columbus, The Ohio
State University (OSU), POETS (Stanford University and the University of Illinois – UC) for the
investigation of Extreme Fast Charging Systems for EVs.
Next Steps:
AEP will be conducting research and development activites with Ohio-based universities.
Funding is accrued to conduct research. Timing of award subject to final management approval.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
11
Strategy 1.1.3 – AEP Distributed Generation Coordination of New Customer Installation
Key Highlights:
In Q4, there were 29 distributed energy projects placed into service within the Smart Columbus
footprint totaling 349 kW of capacity. Since January 2017, there have been 174 projects installed
with a total capacity of 5.1 MW. (Update: The Q3 report did not include projects completed in
December 2017.)
Next Steps:
Continue existing processes in accordance with regulatory policies.
Strategy 1.1.4 – Solar Generator Deployment (DC Solar)
Key Highlights:
Smart Columbus has re-engaged DC Solar, which will provide a mobile solar generator to Smart
Columbus to support EV charging during the 2018 Ride & Drive Roadshow. DC Solar is also in
discussions with the Columbus Zoo and Aquarium and the Land-Grant Brewing Company to
provide mobile solar technologies.
Next Steps:
Coordinate with DC Solar to provide solar EV chargers to the City of Columbus until permanent EV
chargers are installed at city facilities.
Strategy 1.1.5 – Columbus Division of Power (DOP) Green Power
Key Highlights:
In Q4, DOP consumed an estimated 10,000 MWh in green power. This is less than previous
quarters due to the reduction in generation at the Central Ohio BioEnergy (COBE) bio-waste plant.
The City of Columbus was able to negotiate a reduced price for the EcoSmart Choice program. The
price went from $5/MWh ($0.005/kWh) to $3/MWh ($0.003 kWh) effective January 1, 2018.
Next Steps:
Continue purchasing green power and promoting the EcoSmart Choice program.
Strategy 1.1.6 – City of Columbus Wastewater Treatment Plan, Co-Generation
Key Highlights:
The Department of Public Utilities (DPU) is still working through preliminary design and the project
schedule remains unchanged.
Next Steps:
DPU to complete the detailed design memos this summer, which will lock down all the tradeoff
choices and sizing, and a few other technical memos for each plant.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
12
Strategy 1.1.7 – Columbus Division of Power Hydroelectric Improvements
Key Highlights:
Crews are currently assessing the O’Shaughnessy Dam site for feasibility.
Next Steps:
Detailed design for the hydroelectric improvements at the O’Shaughnessy Dam is anticipated to be
completed in late 2018.
Anticipate construction will begin in early 2019 and the station should be back in service in early
2020.
Initiative 1.2 – Grid Modernization and Efficiency
Strategy 1.2.1 – AEP Energy Efficiency
Key Highlights:
AEP continues to run a series of television and radio commercials that discuss the benefits of
energy efficiency. The AEP Ohio website also provides tips, tools and information on incentives to
help customers calculate and reduce energy consumption. www.aepohio.com/save.
AEP conducted a soft launch of an automated benchmarking service for commercial customers that
helps customers load their electrical energy use into ENERGY STAR Portfolio Manager® for
benchmarking against similar buildings. Benchmarking is useful for determining energy utilization and
ranking buildings for savings opportunities.
On March 2, 2018, AEP met with City of Columbus Department of Neighborhoods staff and discussed
how a collaborative effort could benefit the Linden neighborhood through participation in Community
Energy Savers. AEP is examining the neighborhood’s historical participation in energy efficiency
programs.
Next Steps:
Continue Energy Efficiency initiatives.
Meet again with City of Columbus Department of Neighborhoods staff to continue exploring potential
benefits to the Linden neighborhood through participation in Community Energy Savers.
Issue the 2017 Energy Efficiency report in May/June 2018.
Strategy 1.2.2 – AEP Smart City Vehicle to Home Research
Key Highlights:
The ESP III Extension Stipulation provided a mechanism to conduct research needed to develop
and maintain the Smart City program for the four-year term. At this time, AEP has not identified the
subject matter or timing, as the Stipulation has yet to be adopted.
Next Steps:
Continue monitoring the approval status.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
13
Strategy 1.2.3 – AEP gridSMART 2.0 Advanced Metering Infrastructure (AMI) Deployment
Key Highlights:
In Q4, AEP Ohio installed just over 64,000 advanced meters in the Smart Columbus area. The total
AMI installs are over 78,000. Supporting network device installation is 100% complete.
Next Steps:
Continue to install AMI meters.
Strategy 1.2.4 – AEP Microgrids and Battery Storage
Key Highlights:
As part of the ESP III Joint Stipulation, the creation of a Smart City Rider has been recommended.
One component will be to establish one or more demonstration microgrid projects, funded at a
completed cost of no more than $10.5 million. These projects will target non-profit, public-serving
AEP Ohio customers such as fire and police stations, municipal facilities, medical facilities, social
service agencies, emergency shelters, and water and sewer infrastructure facilities. (The Smart City
Rider will sunset after four years.)
Next Steps:
Continue to monitor progress and approval status.
Strategy 1.2.5 – AEP Smart Lighting
Key Highlights:
In November 2016, AEP Ohio filed to install over 200,000 smart lights as part of the ESP III
Extension plan. This item was removed from settlement negotiations; however, AEP Ohio is
investigating potential pilot projects to gather information in preparation for future filings. Future
updates will be provided at a later date.
Next Steps:
AEP is working on their internal strategy moving forward.
Strategy 1.2.6 – Columbus Division of Power Grid Modernization
Key Highlights:
The DOP’s AMI project has been retitled to the Enhanced Metering Project (EMP).
The RFP for the EMP has been developed and reviewed by the evaluation committee. The project
manager will publish information on the project for 30 days prior to advertisement to meet the Ohio
Environmental Protection Agency (EPA) funding requirements (water). Currently awaiting approval
from the Department of Public Utilities Director’s Office to post the RFP.
Next Steps:
Issue the RFP. Responses will tentatively be due in May 2018.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
14
Strategy 1.2.7 – Columbus Division of Power Street Light Technology Conversion
Key Highlights:
In Q4, the DOP installed 297 new LED street lights.
Next Steps:
Prepare to bid Phase 1 of the LED street lights conversion project. The DOP determined that it
would be more beneficial to use capital funds for the LED street light conversion project, as
opposed to the Ohio Energy Loan fund. This decision is being reviewed by the city auditor and a
project start date will be determined upon approval.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
15
PRIORITY 2 – FLEET ELECTRIC VEHICLE ADOPTION
Initiative 2.1 – Public Fleets
Key Highlights:
In Q4, the city received 20 Ford Fusion Energi plug-in hybrid electric vehicles (PHEVs) out of the 93
procurred plug-in electric vehicles (PEVs) and they will be put into service in April 2018.
The Smart Columbus team continued its outreach, education, analysis, and technical assistance work
with public fleets. Team members planned, performed extensive outreach and hosted a Smart
Columbus EV Workshop for public fleets and transportation service providers on January 25, 2018.
The team engaged 85 individuals encompassing 40 different public fleets in the Central Ohio region,
including both public fleet operators and key transportation service providers (TSPs).
The Smart Columbus EV Workshop was hosted by the Mid-Ohio Regional Planning Commission
(MORPC), in partnership with Smart Columbus and the City of Columbus fleet. Sixty participants
represented public fleets from the Central Ohio region.
The event provided technical training and best practices for EV procurement, including detailed
information on the City of Columbus cooperative contract that allows other public fleets and TSPs to
participate in group purchasing discounts and incentives to spur public fleet and TSP EV adoption in
Central Ohio. The event also featured a Ride & Drive and resulted in multiple commitments for public
fleet EV purchases documented through letters submitted to the Smart Columbus office.
Smart Columbus is following up with public fleets to confirm EV purchase letters of commitment.
PUBLIC FLEET VEHICLE PURCHASE COMMITMENTS TO DATE
Firm or Municipality Quantity Additional Expected
City of Columbus 93 107
Columbus Regional Airport Authority 2* 0
Mid-Ohio Regional Planning Commission 2* 0
City of Hilliard 2* 0
City of Dublin 4 6
Franklin County 11 0
The Ohio State University 2 35-50
City of Westerville 2* 0
City of Whitehall 2* 0
City of Worthington 2* 0
TOTAL 122 148-163
* indicates Q4 commitments
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
16
Next Steps:
The city anticipates it will receive the additional 73 vehicles in mid-April.
Continue outreach, education, analysis, and technical assistance work with public fleets throughout
Year 2 of the performance period.
Continue working with all partners to facilitate vehicle rebates and incentives, provide administrative
tracking and reporting of activities and deliverables, and offer informational resources on lessons
learned and best practices.
Strategy 2.1.1 – Training and Technical Assistance Workshops
Key Highlights:
The Smart Columbus EV workshop for public fleets and TSPs, held on January 25, 2018, provided
technical training and best practices for EV procurement.
The team began planning an EV Technician Training in partnership with the City of Columbus,
Columbus State Community College (CSCC), National Automotive Parts Association (NAPA), Ford,
and Nissan, currently scheduled for May 14-16, 2018, at CSCC’s automotive training facilities. This
technical training is designed to provide more detailed information on the safety and maintenance
best practices for EVs in general, and provide hands on technician training on the Nissan Leaf and
Ford models that currently represent the majority of Central Ohio fleet EV purchases to date.
o Day 1 – Four-hour session for 100 people that provides an overview of EV history, theory,
operational best practices, and safety best practices. This session will be facilitated by NAPA
and CSCC instructors.
o Day 2 and 3 – Thirty to 40 certified public and private fleet mechanics will receive hands-on
service and maintenance training for the Ford and Nissan products, with instructors from Ford
and Nissan.
Next Steps:
Smart Columbus, CSCC, NAPA, Ford, and Nissan will conduct the EV technician training on May 14-
16, 2018, as described above. Partners will continue to plan additional quarterly technical trainings
throughout Year 2 of the grant period.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
17
Initiative 2.2 – Private Fleets
Key Highlights:
AEP has begun transitioning its fleet to electric with the confirmed order of nine vehicles to date. These
vehicles have an expected delivery date in the first half of 2018. An additional six vehicles are planned
for delivery in 2018 and there is not yet a confirmed delivery deadline.
The Smart Columbus team conducted a fleet assessment with Land-Grant Brewing Company, which
specifically focused on the highly-utilized salesforce fleet. As a result, Land-Grant is planning to order
five EVs in May 2018, which coincides with their normal purchasing window.
Nationwide Children’s Hospital has released an RFP for 25 vehicles, which will include a combination of
PEVs and PHEVs. The Smart Columbus team is in the process of working with Nationwide to ensure
the maximum number of these vehicles will be PEV, and those that need to be PHEV will utilize the
maximum number of electric miles driven. Smart Columbus is now awaiting confirmation on the status
of this RFP and the exact number of PEVs and PHEVs ordered. Extra attention has been given to this
partner due to the higher number of fleet vehicles to be purchased, and to maximize their engagement
in the program.
Five large fleet assessments have been completed to date including the following: Denison University,
Columbus Zoo and Aquarium, The Columbus Dispatch, Land Grant Brewing Company, and Columbus
Yellow Cab (see example below). An additional 15 fleets are currently in the process of collecting data
for fleet assessment. Many of these have historically collected little-to-zero data on vehicle operation,
which has caused delays in data collection and assessment. Smart Columbus has given extra attention
to these fleets to educate them about the necessary data required for informed fleet transition
decisions, which is beginning to help these fleets with their fleet electrification process. See Appendix G
for an example of a fleet assessment report.
Example EV Replacement Scenario: One-for-one replacement of a 2014 Honda Civic with a 2017
Chevy Cruze ICE vs a 2017 Nissan LEAF: 20,475 miles/year, full $7,500 federal tax credit
monetization.
The new ICE is 12.6% more expensive than the BEV model.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
18
Next Steps:
Priority Accelerator Partner fleets to be targeted for assessments and commitments in the next
quarter include: OhioHealth, Grange Insurance, Safelight, Cardinal Health, and Motorists Insurance.
We are also in the process of identifying non-Accelerator Partner fleets – national brands like Aetna,
Pepsi-Co, NAPA, Verizon, and more – which have a sizable presence in the Columbus region.
Strategy 2.2.1 – Secure Purchase Pledges
Key Highlights:
New private fleet commitments for 2018 EV purchases have been secured from the following:
o American Electric Power (6 EVs)
o Land Grant Brewing Company (5 EVs)
o Columbus Zoo and Aquarium (5 EVs)
o The Columbus Dispatch (3 EVs)
o Alliance Data (5 EVs)
Next Steps:
Private Fleets will be continuously cultivated for electrification pledges through engagement and fleet assessment services.
Strategy 2.2.2 – Network Development
Key Highlights:
No major activity to report.
Next Steps:
Educational events and engagement are being planned for Year 2.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
19
Initiative 2.3 – Transportation Service Providers (TSPs)
Key Highlights:
The January 25, 2018 workshop noted that TSPs are eligible to participate in group purchasing
discounts and grant incentives available to spur public fleet and TSP EV adoption in Central Ohio.
Columbus Yellow Cab owner and CEO, Morgan Kauffman, attended the Smart Columbus EV
Workshop along with four Yellow Cab staff to discuss the leasing and procurement options,
discounts, and incentives available for his large fleet. Yellow Cab has been working with Clean Fuels
Ohio (CFO) and the Smart Columbus Program Office to finalize a purchase order of 20 Chevy Bolt
EVs in 2018. Yellow Cab is the largest cab company in Central Ohio and is a designated
transportation network company (TNC) for the region. The company is looking to purchase additional
EVs in 2019 and 2020.
Throughout Q4, the Smart Columbus team finalized content and formatting for a web-based TSP
survey designed to gather data on levels of interest, barriers and incentives needed to spur TSP EV
adoption throughout Central Ohio. While Columbus Yellow Cab, Central Ohio’s largest taxi fleet,
remains a committed partner, Smart Columbus is also working with Uber and Lyft to distribute this
survey among its seven-county Central Ohio drivers. More information on the data gathered from this
survey will be provided in future reports.
MORPC entered into contract with Green Commuter to provide discounted EV van commuter options
for Central Ohio residents through MORPC’s ride share program. Green Commuter is providing 10
Tesla Model X, seven-passenger SUVs for the Central Ohio region. MORPC is currently working with
employees at local public and private businesses to identify voluntary users for this service. MORPC
will provide subsidies to these voluntary EV van pool users, although the users themselves will also
have to pay a fee to use the vehicle services. In addition, van pool users will have access to use the
Model X for off-site meetings and trips during the business day while the vehicle is not being used for
work commuting.
The Central Ohio Regional Transit Authority (COTA) is currently working on plans to electrify one of
its major bus routes, with an expected purchase of up to 10 dedicated electric buses to serve the
route during the performance period of this grant.
Next Steps:
Continue to gather survey data from regional TSPs.
Continue to work with key regional TSPs, including Yellow Cab, COTA, and MORPC’s ride share
program to further EV purchase commitments and deployment of vehicles and charging.
Implement available TSP vehicle rebate programs to further catalyze deployment of EVs in additional
TSP fleets throughout the seven-county Central Ohio region.
Continue to work with public agencies to get EV commitments.
CFO to work with with the fleet group to provide EV Technician Training.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
20
PRIORITY 3 – TRANSIT, AUTONOMOUS AND MULTI-MODAL SYSTEMS IN THE CITY
Key Highlights:
Authorized the expenditure of PGAPh funds to create an expansive bank of imagery that will
motivate community members to use transit, autonomous and multi-modal systems in the city.
Next Steps:
Photo shoot will occur in early April 2018, and imagery will be refined and ready for use in marketing
materials and for PR/media opportunities beginning in May 2018.
6 Electric Autonomous Vehicles (EAVs)
Key Highlights:
Project details including scope, schedule and budget are being developed.
50 e-Bikes
Key Highlights:
The city of Columbus met with Motivate and discussed the proposal of adding Electric Bikes to their
infrastructure.
Next Steps:
Moving funds prior to releasing bid for e-bikes in Q5 City of Columbus Police.
City Bike Infrastructure
Key Highlights:
The city is looking into expanding beyond their CoGo Bike share program. The next wave of new
CoGo stations are scheduled to be installed in Q6/Q7, expanding the bike share system’s network
further from the Downtown core. Thirteen of the 26 new stations will be located in Columbus,
including new docks in Clintonville, Milo-Grogan, the University District and the Near East Side.
Next Steps:
Continue to coordinate with Columbus Recreation and Parks, the department leading this effort.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
21
Expanded Shared Mobility
Chariot Launch
In January 2018, Columbus became the sixth city to launch service by
Chariot, a subsidiary of Ford Smart Mobility. Columbus became the first
city where Chariot launched through a business-to-business (B2B)
model, rather than a business-to-consumer (B2C) model, through a
partnership with Chase, brokered by Smart Columbus. Based on an
analysis of employee ZIP codes, Chariot is running six routes from
residential centers to the Chase Polaris campus, north of Columbus.
Smart Columbus welcomed Chariot to Columbus by convening a series of events to introduce the
company to residents, partners, and businesses in the region starting with an event at Land-Grant
Brewing Company attended by more than 150 people and covered by the media. Smart Columbus
also hosted a private networking reception with civic leaders and Columbus Partnership members to
help Chariot network with potential corporate clients. Mayor Andrew J. Ginther spoke at the reception,
along with representatives from Chase, Chariot, Ford, and the Columbus Partnership. Nearly 100
people attended the reception.
CMAX Launch
CMAX, COTA’s new high-frequency, limited-stop service and Columbus’ first bus rapid transit line,
launched on January 1, 2018. CMAX travels along Cleveland Avenue between downtown Columbus
and the OhioHealth Westerville Medical Campus at Polaris Parkway and Africa Road. Between
downtown and SR-161, CMAX runs every 10 minutes during rush hour and every 15 minutes midday,
evenings and weekends. Service runs every 30 minutes north of SR-161 to Polaris Parkway and
Africa Road. CMAX syncs with traffic signals to keep buses running on time.
CMAX features enhanced passenger amenities, including specially-branded buses, upgraded
passenger stations with real-time information screens, and free on-board Wi-Fi and USB charging
ports. CMAX is only $2 per one-way trip.
Representatives from Smart Columbus participated in CMAX launch events, including an educational
ride with COTA leaders and a ribbon-cutting event.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
22
EmpowerBus Launch
EmpowerBus also launched in Columbus during Q4. EmpowerBus is a workforce solution focused on
strengthening the roads to social mobility by providing dignified, reliable, and on-time transportation to
and from work, education, and healthcare opportunities. The lack of convenient, reliable
transportation causes high workforce attrition and difficulty recruiting talent for the employers. Studies
show that replacing a full-time entry level (low/semi-skilled) worker paid $10-$12 per hour costs the
company between $3,000-$5,000 each time they lose just one worker. And the cost scales
exponentially as the skill level increases. EmpowerBus charges the employer a cost-efficient weekly
flat rate per bus and provides the shuttle bus and driver, organizes the routes, handles the logistics
and insurance, etc. so the employer can focus on running their business. For more information, see
Appendix H – EmpowerBus Overview or view the article in The Columbus Dispatch.
Multimodal Transit/Sharing Economy Expansion
Smart Columbus is currently courting Scoop, ReachNow, Zipcar, and Green Commuter to offer
services in the Columbus Region. Smart Columbus is working to schedule introductions to
Acceleration Partners and is including these services in educational materials for Acceleration Partner
Mobility Ambassadors and Executive Sponsors.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
23
PRIORITY 4 – CONSUMER ELECTRIC VEHICLE ADOPTION Key Highlights:
The consumer EV adoption rate increased to 0.77% from the 0.37% baseline. See Appendix D for
the Polk data.
Amidst the tax reform legislation that was ultimately passed by Congress, the Federal EV tax credit
was under serious threat of being cut. Its removal would have significantly and negatively impacted
the Smart Columbus program. The Columbus Partnership leveraged its legislative affairs staff to
engage Ohio elected officials on this critical issue. Ohio Senator Rob Portman was particularly
influential in preserving the EV tax credit, and The Columbus Partnership issued an op-ed piece in
The Columbus Dispatch to praise his leadership (Alex Fischer: Portman's work on Capitol Hill
benefits community).
Next Steps:
Adopt a reframed Consumer Adoption Portfolio for Year 2 to better align with the priority objectives
and reflect the growth in the scope of work.
Initiative 4.1 – Research and Assessment
Strategy 4.1.1 – Consumer Research
Key Highlights:
Navigant completed research to assess the initial state as well as the changes over time in
consumer awareness, perceptions, considerations, and attitudes towards EVs in Columbus and the
surrounding seven-county region. Navigant’s subcontractor, Blackstone, conducted 900 surveys in
February 2018. Blackstone provided the raw survey data to Navigant for analysis. A final
presentation of the data occurred on March 29, 2018. See Appendix I for the Consumer Awareness
Survey Findings.
Next Steps:
From the completed assessment, identify the baseline consumer awareness indicators that will be
measured against each intervention and at the conclusion of the program.
Consider conducting logic model research to better understand the connection between
interventions and EV sales.
Strategy 4.1.2 – Dealer and Sales Behavior Assessment
Key Highlights:
Heightened engagement with local dealers by new EV Adoption Manager.
Next Steps:
Pursue new opportunities for data sharing with dealers as a part of the proposed Smart Columbus
Electrified Dealer program.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
24
Strategy 4.1.3 – Product Availability
Key Highlights:
Two tools have been developed to project and track the current and future vehicle inventory needed
to reach the Smart Columbus goal of 1.8% EV market penetration by the end of the grant
period. First, a Columbus sales goal model was developed to determine quarterly inventory and sales
needed throughout the program. The quarterly goals for the Columbus market were determined by
taking national sales data and EV market trends to understand market projection of EVs, and then
transposing this against the Columbus market by controlling local factors, such as anticipated vehicle
supply and historic best-selling brands for the region. To monitor vehicle sales and inventory, a
monthly report is conducted of all PHEV and EV vehicles available in the region, based on online
inventory. This provides insight to the models with sufficient inventory and alerts the team on the
models and manufacturers that need additional inventory. This tool will be used to prioritize and focus
original equipment manufacturer (OEM) engagement efforts where we need the most help. See
Appendix J for the Inventory Analysis Findings.
Next Steps:
Move this strategy to a new initiative – Improving Consumer Sales Experience – for Year 2 of the
program due to the strategic connection between the availability and variety of product that is
available in Central Ohio, and its impact on a consumer’s buying experience.
Initiative 4.2 – Address Supply
Key Highlights:
The Prius Prime and Honda Clarity entered the market in Q4. These are some of the most affordable
PEV models available in the United States and are cars that will be critical to Smart Columbus
reaching its adoption goals.
The Smart Columbus team welcomed the Model 3 into the Columbus market by supporting Tesla in
hosting a VIP preview event. The Model 3 is being distributed as production allows to customers who
put in a reservation. The Model 3 will be on permanent display at the Tesla store in Columbus,
making us the sixth city in the world to get a Model 3 on display.
Next Steps:
Leverage the product supply inventory and analysis to focus continued outreach efforts with OEMs
in order to address issues and optimize strengths.
Based on current supply numbers, focus on increased product inventory from General Motors and
BMW.
Strategy 4.2.1 – Dealer and Original Equipment Manufacturers Engagement
Key Highlights:
In Q4, Smart Columbus increased engagement with dealers significantly with the hire of EV Adoption
Manager Zach McGuire. He has effectively engaged with 11 dealerships directly since starting in
January 2018, allowing Smart Columbus to acquire a multitude of vehicles for the Columbus Auto
Show and secure discounts at participating dealerships.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
25
Vehicles provided for the Columbus Auto Show by local dealers included:
(Asterick indicates vehicles not on test drive rotation)
o 2018 Chevy Bolt, provided by Dave Gill Chevrolet
o 2018 Chevy Volt, provided by Dave Gill Chevrolet
o 2018 Chrysler Pacifica, provided by Performance Chrysler Jeep Dodge Ram
o 2018 Honda Clarity, provided by Honda Marysville
o 2018 Mitsubishi Outlander, provided by Ricart Automotive
o 2018 Chrysler Pacifica, provided by Byers Chrysler Dodge Jeep*
o 2018 Honda Clarity, provided by Lindsay Honda*
o 2018 Mitsubishi Outlander, provided by Ricart Automotive*
o 2018 Nissan Leaf, provided by Ricart Automotive*
All dealers engaged in discussions during Q4 indicated support and eagerness to become a Smart
Columbus Electrified Dealer, which will improve the sales experience for customers buying a PEV at
a local dealership.
OEM engagement has continued to be successful. BMW, Daimler and Tesla leadership visited the
market for meetings with Smart Columbus.
The following vehicles have been donated on loaned leases for the Smart Columbus Ride & Drive
Roadshow:
o 2018 Nissan Leaf
o 2018 Honda Clarity (PHEV)
o 2018 Mercedes GLE
o 2018 BMW i3
o 2018 BMW x5
o 2018 Mini
Tesla has increased the size of their fleet from two to four to support the Ride & Drive Roadshow.
Next Steps:
Continue to engage with OEMs to make them aware of the Smart Columbus initiative and the
demand it is driving locally.
Continue to focus on dealer engagement to launch the Smart Columbus Electrified Dealer program.
Secure vehicles for the Smart Columbus Experience Center.
Strategy 4.2.2 – EV Sales Training
Key Highlights:
An evaluation of the existing EV Sales Training was conducted. An improved approach was agreed
upon for Year 2 in alignment with the Smart Columbus Electrified Dealers program.
Next Steps:
Promote and require dealer training as part of the Smart Columbus Electrified Dealers Program.
Develop materials to support the educational curriculum.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
26
Strategy 4.2.3 – Group Purchase Programs
Key Highlights:
Arranged and promoted special sales offerrings from local dealers for PEV models during the Smart
Columbus Auto Show.
Facilitated a Nissan incentive for AEP customers who purchase a Nissan Leaf, which will be
available during the next quarter of the grant period.
Met with BMW about including all Accelerator Partners into the corporate fleet buy progam.
Next Steps:
Promote the Nissan Leaf incentive.
Continue to pursue incentive opportunities with OEMs.
Facilitate relationships between Accelerator Partner companies and OEMs for employee discount
programs.
Strategy 4.2.4 – Dealer Sales Support
Key Highlights:
Smart Columbus designed a dealer recognition program, now called the ‘Smart Columbus Electrified
Dealer Program,’ which is aimed to motivate Central Ohio dealers to sell and promote EVs. Under the
program, local dealers can earn public recognition as a Smart Columbus ‘Electrified Dealer’ by:
1. Becoming EV-Ready
a. Actively selling PEVs and keeping them in sufficient inventory for test drives.
b. Installing EV charging on-site in prominent locations.
c. Having at least two sales staff trained on Smart Columbus and certified by OEMs on the
plug-in models offered.
2. Promoting EV Models they Sell
a. Actively advertising and marketing in local media outlets.
b. Distributing the Smart Columbus new owners package to new EV buyers.
c. Offering a charging solution to new EV buyers.
3. Partnering with Smart Columbus to Grow the EV Market
a. Sharing historical sales data and ongoing sales data by month and model.
b. Participating in Smart Columbus co-marketing and education opportunities (i.e. Smart
Columbus Ride & Drives).
c. Co-developing new initiatives with Smart Columbus to drive adoption.
See Appendices K and L for the Electrified Dealer Program plan and handout.
A great deal of effort and time has been spent in Q4 planning enhancements to the dealer-directed
interventions to be deployed in Year 2. The following efforts have been developed and addressed:
o Continued effort to improve sales lead generation – Authorized development of an FTP site to
transfer contacts to OEMs from the Ride & Drive events. Developing improved follow up for
participants of the Ride & Drive events to direct them to area dealerships.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
27
o Roll out of the Smart Columbus Electrified Dealer Program, formally known as the recognition
program.
o Cleaned up and revised data measurement for tracking dealer franchise engagement in the
Smart Columbus program.
o Reframed the approach to the Smart Columbus dealer training in alignment with the Electrified
Dealer Program.
Smart Columbus is working to design a new owner’s gift for individuals who purchase an EV in the
Central Ohio region. Since EV owners stand to influence the buying decisions of their friends and
neighbors, Smart Columbus is creating the gift to deepen the affinity of new EV owners and engage
them in Smart Columbus, in order to encourage future EV advocacy. The gift is also an opportunity to
generate social media activity about EV ownership and Smart Columbus.
New EV owners will receive a Smart Columbus branded water bottle and blanket in a recyclable bag
that is placed in the car at the dealership upon point of sale when they leave the lot. Each gift will be
accompanied by a suite of critical education materials and resources for new EV owners including
information about charging installation from utility partners. The gifts will be given away by dealers
during Year 2 of the grant program, with collateral referring EV owners to Smart Columbus to learn
about owner-exclusive volunteer and advocacy opportunities.
Next Steps:
Roll out of the Smart Columbus Electrified Dealer Program.
Complete production of the marketing and promotion kit for local dealers.
Distribute new EV owner’s gifts for giveaway at local dealerships.
Initiative 4.3 – Increase Demand for EVs
Strategy 4.3.1 – EV Awareness Campaign
Key Highlights:
Smart Columbus has formed a partnership with the Columbus College of Art and Design (CCAD) to
sponsor two branding classes that will design EV charging wraps, helping to create awareness of the
presence of EV charging.
o The spring course will develop wraps for workplace charging stations and will enable the
stations to be co-branded with the Smart Columbus and workplace logos.
o The fall course will design public art for the Mound Street fast charging stations.
Smart Columbus commissioned a graphic design effort to apply noticeable branding and indication of
EVs within a fleet. A Smart Columbus logo with an EV icon will be applied to all City of Columbus fleet
vehicles and one vehicle will be fully wrapped with Smart Columbus branding to raise heightened
awareness of the Smart Columbus movement and EV campaign.
During Q4, Smart Columbus refreshed its EV education materials for the 2018 Ride & Drive kickoff.
The EV Buyer’s Guide was refreshed with new vehicle models, and also re-designed to organize
vehicles by models available in-market and vehicles nationwide, rather than grouping models by
BEVs and PHEVs, as the Buyer’s Guide was organized in the past.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
28
Smart Columbus also developed EV “baseball cards”—
quarter sheet fliers that provide information on each EV
model available in the Columbus region. See Appendices M
and N for the Smart Columbus Buyers’ Guide and the EV
Quarter Sheets and Cards.
Smart Columbus, along with website development partner
Fahlgren Mortine, made significant progress on the Smart
Columbus website (to be smart.columbus.gov). In January
2018, the team developed a site map and wireframes. In
February 2018, the team developed text content for the site
and initial designs, which were presented to the Paul G.
Allen Philanthropies. In March 2018, the team progressed
into development and quality assurance.
Phase One of the site is slated to launch in mid-April 2018.
It will include general information about Smart Columbus,
consumer EV adoption content such as an EV101 page and
a Buyer’s Guide, an overview of Smart Columbus projects,
and a Contact Us page.
Phase Two is slated to launch in mid-May 2018 and will
include the Playbook and a gated portal that Acceleration
Partners may use to report on their participation in the
program.
See Appendices O, P and Q for the Website Brief, Site Map and Design Concepts.
Next Steps:
Receive and review final design proposals from the CCAD Spring course at the end of April 2018.
Phase One homepage
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
29
Strategy 4.3.2 – Consumer Education Showroom
Key Highlights:
Smart Columbus signed the lease,
began construction, initiated
experience design, and publicly
announced the plans for the Smart
Columbus Experience Center,
formerly known as the Smart
Columbus Showroom. The
construction is expected to be
completed in June 2018. The target
date for the public opening is
Friday, June 8, 2018 during the
Columbus Arts Festival.
Smart Columbus worked with IBM iX on the experience design. The three messaging platforms for
the space will be:
What the future of mobility will look like;
What Smart Columbus is doing to adopt technology and improve equity; and,
What you, the resident, can do to get involved.
The Columbus Partnership also issued a Call for Partners to seek donations of technology and
vehicles to be exhibited in the space. Smart Columbus hosted two webinars to elaborate on the Call
for Partners and answer questions from prospective partners.
Smart Columbus announced plans for the Smart Columbus Experience Center to the public via a news
release on March 13, 2018.
http://www.govtech.com/fs/transportation/Smart-Columbus-to-Open-an-EV-Showroom.html
https://www.columbusnavigator.com/smart-columbus-experience-center/
https://mobility21.cmu.edu/smart-initiative-education-center-to-open-in-columbus-oh/
https://weare.techohio.ohio.gov/2018/03/16/smart-columbus-plans-1m-hq-with-electric-vehicle-test-driving-along-scioto-mile/
http://614now.com/2018/news/technology/wth-is-smart-technology-find-out-at-learning-center-opening-soon
https://www.columbusunderground.com/smart-columbus-launching-experience-center-downtown-we1
http://www.dispatch.com/news/20180314/smart-columbus-relocating-to-new-1-million-downtown-digs
https://www.bizjournals.com/columbus/news/2018/03/13/smart-columbus-plans-1m-hq-with-electric-vehicle.html
See Appendices R and S for the Smart Columbus Experience Center Call for Partners and the Smart
Columbus Experience Center Overview/Design Direction.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
30
Next Steps:
Complete the build out of the Smart Columbus Experience Center.
Secure partners and vehicles for display in the Smart Columbus Experience Center.
Complete and launch the Experience Center opening events and promotion.
Strategy 4.3.3 – Workplace Electric Vehicle Adoption Campaign
Key Highlights:
Acceleration Partners Meeting – February 21, 2018
Smart Columbus hosted a meeting of Acceleration Partner Companies’ Executive Sponsors on
February 21, 2018 to provide an update on program progress and goals. Forty companies were in
attendance.
During the session, Smart Columbus introduced a program dashboard, which outlined each of the
overarching program goals, accompanied by red/yellow/green status indicators for each goal. Smart
Columbus also introduced a partner matrix, which assigned each partner red/yellow/green status
against each individual corporate goal. The reporting framework proved successful, with several
partners coming forth indicating that they wanted to improve their status quickly.
The session also included presentations from Chase and
CoverMyMeds, which shared early case studies on “Drive
Less” programming that they are developing. Chase
provided an overview of the launch of Chariot on the
Polaris campus, and CoverMyMeds discussed their
forthcoming mobility incentive package to share initial best
practices and successes with peer organizations. A
representative from Battelle also shared a preview of a
reporting framework that Acceleration Partners may
leverage in the future to measure their impact on single
occupant vehicle commute reduction.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
31
The session proved a good opportunity to re-engage the
partners, and the matrix framework triggered an increase in
reporting. Smart Columbus believes that the Ignite Action Fund
proposed for Year 2 will further provide incentive and a sense of
urgency for Acceleration Partners to provide reporting to Smart
Columbus and to implement more significant internal policies to
increase employee adoption. See Appendices T, U and V for the
Acceleration Partner Board Meeting Agenda, Presentation, and
Partner Profile Information.
Mobility Ambassadors Training – March 28, 2018
Over 30 Mobility Ambassadors, hand selected by Accelerator Partner Company leaders, participated
in a day-long training to kick-off efforts to deploy a workplace campaign that increases EV adoption
and grows the sharing economy. The Ambassadors engaged directly with Smart Columbus staff,
service providers and expert partners on how to create, launch and evaluate an impactful and
aggressive campaign for their employees. Ambassadors were introduced to resources like the Ignite
Action Fund and tools custom designed to help meet their business commitments like a survey and
site assessments. Each Ambassador was provided an opportunity to experience the Ride & Drive in
preparation for hosting their own Ride & Drive events at their campus(es). The event was hosted by
Chemical Abstract Services (CAS), a model partner company featuring charging stations directly in
front of their main entrance. See Appendices W, X, Y, and Z for the Mobility Ambassador Role
Description, Mobility Ambassador Toolkit, Mobility Ambassador Event Summary, and the Ignite Action
Fund – Workplace Program Charter Example.
Columbus Partnership Board Meeting – February 22, 2018
Smart Columbus provided an update to the board of the Columbus Partnership during Q4. Smart
Columbus demonstrated how the movement is growing, with significant progress made against all
goals, particularly within the Acceleration Partners program. The presentation generated great
excitement, with chief executives of Columbus Region employers continuing to voice their support for
the initiative.
Columbus Chamber of Commerce Annual Meeting – February 8, 2018
Smart Columbus exhibited at the Columbus Chamber of
Commerce’s Annual Meeting, which is attended by over 1,000
members of the business community. The Smart Columbus
exhibit featured the displays from the Ride & Drive Roadshow
and a Tesla Model X. Participating in the event helped to
promote the Acceleration Partner program to the business
community at large and company prospects.
Next Steps:
Host the next Accelerator Partner meeting in June 2018.
Host the next Mobility Ambassador meeting focused on communications campaigns in June 2018.
Turn focus to re-engagement of inactive partners and recruitment plan to add new companies in
advance of Q7 of the grant period.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
32
Strategy 4.3.4 – Ride and Drive Roadshow
Key Highlights:
Smart Columbus invested time and effort in Q4 to improve the Ride & Drive Roadshow and plan for
the 2018 tour. An evaluation of the 2017 launch phase was conducted and improvements were
implemented for the 2018 roadshow. Improvements include:
o Refresh and addition of digital display content;
o Addition of new collateral and product specification cards;
o Better integration and communication with utility, OEM and mobility partners;
o Improving the diversity of the EV Specialist staff;
o Adding more EV Specialists to the event staff;
o Simplifying the survey and migrating it onto another platform for better data export and
evaluation;
o Improved test drive routing and PHEV rotation management;
o Improved EV specialist training and evaluation;
o Introduced public event processes and scenario plans; and,
o Introduced supporting event curriculum to be offered alongside the test drive opportunity.
Presentation topics will include EV101 and an overview of Smart Columbus.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
33
Ride & Drive Roadshow Launch at the Columbus International Auto Show – March 15-18, 2018
10 PEV MODELS TO DRIVE
370 DRIVES
AND 467 RIDES
1,300+ IN-CAR EV EXPERIENCES
Smart Columbus was the star of the four-day Columbus Auto Show, facilitating the largest EV test drive event
ever in Ohio. Occupying a 40,000 square foot footprint (10%), we facilitated in-car EV experiences for 1,300
residents.
450 residents took an electric Smart Car for a spin on an indoor test track.
370 residents drove and 467 residents rode in a PEV for a full test drive experience on Columbus roadways.
Residents could choose from 1 of 10 different PEV models: Nissan Leaf, Chevy Bolt, Chevy Volt, Honda Clarity,
Mercedes 350e, Mercedes GLE 550e, BMW i3s, Mitsubishi Outlander, Chrysler Pacifica, or Toyota Prius Prime.
In addition to the test drive, six PEV models were on display (Nissan Leaf, Mitsubishi Outlander, Mini PHEV,
Honda Clarity, Chrysler Pacifica, and BMW x5 PHEV SUV). Smart Columbus showcased, for the first time in
Columbus Auto Show history, shared mobility services such as Chariot, COTA, car2go, and CoGo. During the
event, 671 Smart Car photo booth pictures were printed, 1,200 Smart Columbus balloons were given to
children, 2,500 branded car air fresheners were distributed, and 3,000 branded tote bags were given to
visitors. Since this was the first public Ride & Drive event, the Civitas Now and Smart Columbus team
debriefed and made a strategic plan and timeline for specific improvements.
Columbus Auto Show Media:
Good Day Columbus Video Interview - http://myfox28columbus.com/sponsored/good-day-marketplace/gdm-at-the-auto-show-the-smart-cars
Government Technology - http://www.govtech.com/fs/transportation/Columbus-Ohios-Smart-City-Initiative-Shows-Off-EVs-at-Auto-Show.html
Columbus Business First (Video and Article) - https://www.bizjournals.com/columbus/news/2018/03/14/columbus-auto-show-features-more-ride-and-drives.html
Columbus Dispatch - http://www.dispatch.com/business/20180316/smart-columbus-electric-vehicles-join-traditional-rides-at-columbus-auto-show
Capital University Paper - http://cuchimes.com/03/2018/auto-show-opens-this-weekend-showcases-the-future-of-transportation-in-columbus/
Newark Advocate - https://www.newarkadvocate.com/story/news/2018/03/15/columbus-international-auto-show-kicks-off-today/429751002/
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
34
Facebook live was used to share the Smart Columbus Ride & Drive Roadshow experience at the 2018
Columbus International Auto Show. In addition to the metrics below, we had great user interaction with
attendees logging on to share their experiences with us on our page. We had six visitor page mentions as
well as comments and shares.
21 NEW INSTAGRAM FOLLOWERS
5,167 REACHED ON FACEBOOK
5,467 ORGANIC IMPRESSIONS ON
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
35
Next Steps:
The 2018 Smart Columbus Ride & Drive Roadshow will tour the Columbus area, hosting 70 events.
This year’s roadshow will introduce the first multi-day workplace events for larger employers and host
events for the public. To date, there are 30 event days scheduled at the following locations:
DATE LOCATION
March 15-18 Columbus Auto Show
April 10 Dispatch Media Group
April 18 and April 27 L Brands
April 19-20 Huntington Building Downtown (Huntington, Squire Sanders, JobsOhio)
April 21* Land Grant Brewing Company Earth Day
April 22* Earth Day Celebration at COSI
April 25 Westerville Chamber of Commerce
April 26 Rev1 Ventures
May 1 Huntington (Gateway)
May 5* Green on the Green in Worthington
May 7-8 Chase Easton
May 16 CAS
May 17-20* Steiner
May 24-25 Alliance Data
June 21 NiSource (downtown)
July 23-27 Chase Polaris
* indicates public event
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
36
Strategy 4.3.5 – Executive Electric Vehicle Adoption
Key Highlights:
Executive adoption of EVs grew from 13 to 26 during Q4. New executives purchasing EVs include:
COMPANY NAME TITLE VEHICLE
PURCHASED
Cardinal Health Kathryne Reeves SVP and GM of Medical Services
Tesla
CAS Nenki Rao CTO Tesla
Columbus Zoo & Aquarium Tom Stalf President and CEO Mitsibishi Outlander
Donatos Jim Grote Founder Tesla
EMH&T Sandy Doyle-Ahern President Tesla S
InnoSource Chad Delligati President and CEO BMW 740e xDrive
Mid-Ohio Regional Planning Commission
William Murdock President and CEO Chevy Volt
NCT Ventures Rich Langdale Partner Plug-in Mini
OhioHealth Terri Meldrum Senior Vice President and General Counsel - Smart Columbus Senior Liaison
Tesla
Safelite Tim Spencer CFO Tesla
Safelite Tom Feeney CEO Tesla
State Auto Greg Tacchetti SVP Chief Information & Strategy Officer
Tesla and Nissaf Leaf
Alliance Data Erick Carter SVP Chief of Staff Tesla Model S
Next Steps:
Continue active messaging and celebration of executives who purchase EVs.
Continue to apply peer pressure in the Columbus Partnership Boardroom.
Strategy 4.3.6 – EV Owners Engagement
Key Highlights:
Smart Columbus engaged CFO in the Columbus Auto Show Ride & Drive event by involving their
active members of the EV owners group as volunteers throughout the weekend and promoting the
Drive Electric Ohio owners group to existing owners who visited the Smart Columbus space.
Next Steps:
Adopt Year 2 reporting framework with inclusion of new owners gift in this section.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
37
PRIORITY 5 – CHARGING INFRASTRUCTURE
Initiative 5.1 – Residential Charging
Strategy 5.1.1 – Develop Multi-Unit Dwelling (MUD) Infrastructure Plan
Key Highlights:
CFO has been scoped to administer the MUD program on behalf of the city. In Q4, the model contract
between MUD developers and CFO was created, with input and guidance from Smart Columbus.
CFO received approval from the City of Columbus for the template contract on January 25, 2018 and
distributed individual contracts to each of the awarded project recipients.
DEVELOPER CONTRACT SIGNED AND
RETURNED
CONTRACT UNDER REVIEW
WITH LEGAL DEPARTMENTS
Casto (Riverside Sunshine LLC) X
The Champion Companies X (2 sites)
Nationwide Energy Partners (NEP) X
SPPlus, Inc X
Smart Columbus and CFO modified the MUD agreement to allow developers to charge EV charging
station users a rate between the cost that the developer’s property pays for electricity and no more than
three-quarters (3/4) of the cost per mile of gasoline for a comparable vehicle. The agreements had
previously stated a rate between the cost that the developer’s property pays for electricity and no more
than one half (1/2) of the cost per mile of gasoline for a comparable vehicle. The agreement was also
modified to state that the terms and requirements of the agreement will only remain in effect until 2021.
Afterwards, the recipients will own the equipment outright; however, they will be required to report on
usage and utilization until 2023.
Due to the changes made in SPPlus’ agreement, CFO has issued addendums to the agreements
previously executed with Casto (Riverside Sunshine LLC) and The Champion Companies.
Next Steps:
Final execution of the remaining contracts and addendums are anticipated to occur in April 2018.
Rebate recipients that have finalized agreements have been given the go-ahead to begin work on
their projects. Planning, ordering and installation will begin next quarter.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
38
Initiative 5.2 – Public Access Charging
Key Highlights:
Developed, compiled and submitted comments for the Ohio EPA Draft Beneficiary Mitigation Plan
about the money allocated to Ohio from the Volkswagen (VW) Mitigation Trust Fund.
Next Steps:
Begin implementing city and AEP public access charging programs in order to begin installing
chargers early in Year 2.
Strategy 5.2.1 – 30 City Level 2
Key Highlights:
Continued developing the Public Access Charging Pilot RFP at Mound and Fulton streets with
plans to finalize it during the beginning of the next quarter.
Began coordinating a preliminary layout for two high-powered 350 kW and two 150 kW DC Fast
Charging units adjacent to the future Smart Columbus Experience Center.
Next Steps:
Continue working to install charging infrastructure adjacent to the Smart Columbus Experience
Center.
Review the existing public charging network available to EV owners in the seven-county region.
Update GIS mapping to include chargers installed during the program and future planned chargers.
Coordinate with regional and state-wide charging initiatives to ensure siting study overlaps are
taken into account.
Research and apply for public access charging funding opportunities.
Strategy 5.2.2 – AEP 90 Level 2 and 75 DC Fast Chargers
Key Highlights:
As part of the ESP III Joint Stipulation, the creation of a Smart City Rider has been recommended
that will sunset after four years. One component will be providing an incentivized rebate for 300
Level 2 and 75 DC Fast Chargers with costs not to exceed $9.5 million. While the Stipulation has
not been approved, AEP Ohio has been in the process of developing plans for executing upon this
commitment once approved.
Next Steps:
Continue to monitor progress and approval status.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
39
Initiative 5.3 – Workplace Charging
Key Highlights:
In Q4, there was an applied focus on getting a
better inventory of the current large workplace
sites that make charging available to their
employees. To ensure an accurate count of
available workplace charging in the region, site
visits were conducted to all known and anticipated
workplace charging. The Electrification Coalition
conducted this assessment, which will contribute
to a full documentation of all sites, confirmation of
their functionality and tracking of the number of
employees being served. Some such sites
included in this field study are Steiner and
Associates, OhioHealth and The Ohio State
University. This field study also ensures all workplace charging stations are connected to Smart
Columbus to further increase EV adoption through the use of our program’s cohesive branding.
The field study confirmed there were 25 large worksites within the Acceleration Partner program. Of
these sites, 185 ports were counted for use across DC Fast Chargers, Level 2 and Level 1 chargers.
While some of these chargers are publicly accessible, all were installed with the intention of providing
workplace charging access and are accessible by employees.
Next Steps:
Further develop the workplace baseline study and articulate individual company goals.
Determine the best way to track workplace charging using the maps already available.
Work with AEP on roll out of the workplace charging rebate program upon PUCO approval.
Initiative 5.4 – Fleet Charging
Key Highlights:
The Smart Columbus Program Management Office issued a request for proposals to install EV charging stations that will support the new city fleet vehicles:
o Installation of 50 EV charging stations, new feeder, transformer and electric panel at 141 North Front Street;
o Installation of 16 EV charging stations, new feeder, transformer and electric panel at 1355 McKinley Avenue; and
o Installation of 20 EV charging stations, a new utility transformer, an electric panel and feeders at 3639 Parsons Avenue.
These new chargers will support Building & Zoning Services, the Columbus Fire Academy and
Finance. The team is exploring the use of solar powered generators from DC Solar to supplement
charging for the city fleet EVs until charging stations are installed.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
40
Bid opening for the first City of Columbus fleet charging project occurred on March 16, 2018. Smart
Columbus will recommend to Columbus City Council that the low bidder, ProLine Electric, install
these charging stations.
The Scope of Improvements was developed for Part 2 fleet charging for fleet vehicle procurement
phases 2 and 3.
Eight chargers will be installed for city fleet EV maintenance at the 4211 Groves Road Fleet
Management Facility.
Next Steps:
Begin construction for Part 1 fleet charging in April 2018 and complete construction by May or June
2018.
Finalize the Scope of Improvements and begin the design process for Part 2 fleet charging.
Initiative 5.5 – Building and Zoning Changes to Support EV Charging
Key Highlights:
Reduced the City of Columbus Building and Zoning Services standard permitting process from 20
days to 10 days.
Developed a city permit process flow chart to outline each permitting step and provide an estimated
cost and timeline for each item.
Next Steps:
Add EV parking policy into City of Columbus code to allow an EV parking space to count equally as
a standard parking space in minimum parking space counts.
Add EV parking policy into City of Columbus code to count one EV space as two standard spaces
in minimum parking space counts or allow an additional standard space for maximum parking
counts. This applies to specific types of locations where this code will not interfere with existing
incentives on dense urban development.
Example: A large office park attempting to obtain a variance to exceed the maximum parking limit
could use EV spaces as a way to increase their total parking spaces on-site without exceeding their
allotted total.
Meet with the City of Columbus building group from Building and Zoning Services to develop
specifications for including electrical build-outs for EV readiness in new development. This may
include requiring panels to have an individual circuit for electric vehicle supply equipment (EVSE),
installing outlets capable of Level 2 charging in single family residences, and/or providing
underground conduit and pull boxes at MUD sites.
Continue working to reduce timelines for the remaining permits in the permitting process by working
to develop supplemental specifications and standards for charging infrastructure.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
41
CONTRACTS AND PARTNER AGREEMENT STATUS
IMPLEMENTATION PLAN Implementation plans were submitted in prior quarters. No new implementation plans will be submitted.
PARTNER CONTRIBUTION Q4 STATUS UPDATE
American Electric Power (AEP) $22.8M
The Ohio State University (OSU) $7.5M
Columbus Partnership $7.5M
DC Solar $3.6M
Mid-Ohio Regional Planning Commission (MORPC) $600,000
MORPC contributed $518,455 in
Q4 to be encumbered for the
installation of fleet charging
infrastructure to support the City of
Columbus’ purchase of 93 EVs.
FleetCarma $900,000
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
42
PLAYBOOK
Smart Columbus Showroom
See Strategy 4.2.3 for information on the Smart Columbus Experience Center. In addition, Smart Columbus
concluded the Smart Columbus Live program at the end of March 2018. To date, 1,526 people attended a
Smart Columbus Live session achieving Smart Columbus’ goal to host at least 1,500 participants.
COMPANIES AND ORGANIZATIONS HOSTING PRIVATE SESSIONS OR SENDING GROUPS
76 SESSIONS
482 ATTENDEES
1,526 TO DATE
JANUARY: 69 attendees | 7 sessions
FEBRUARY: 128 attendees | 8 sessions
MARCH: 285 attendees | 15 sessions
AEP Operations Team
Alliance Data Services
Capital Crossroads/Downtown Special Improvement
District
CDW and Tech Data Economic Development Visit
Columbus State Community College
Automotive/Logistics Students
Columbus Zoo and Aquarium
Commercial Vehicle Group
Dispatch Media Group
Ford Greenfield Labs
Georgetown Student Alternative Break Program Cohort
Grange Insurance
Huntington Bancshares Inc.
JPMorgan Chase
Leadership Columbus
MORPC, Department of Energy and Air Quality
OhioHealth
Ohio State College of Engineering, Advancement Office
PNC Executive Leadership Team
Tech Life Columbus (2 private sessions)
White Castle Inc.
Vorys, Sater, Seymour and Pease LLP
SPECIAL EVENTS
February 22: Federal Highway Administration (50)
March 6: Westerville City Schools, Business Logistics
Students (30)
March 12: Data Technical Working Group Reception
(32)
March 27: OSU Smart Campus Student Session (11)
VISITS FROM CITIES / COUNTRIES
March 20: Gainesville Chamber of Commerce (38)
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
43
Airport Activation The John Glenn Columbus International Airport branding is up for a refresh by Experience Columbus
and Columbus 2020. Smart Columbus conducted photo shoot for new photography that conveys the
work of the Electrification Program. The Smart Columbus team is working to include Smart Columbus
imagery in the updated material in the airport.
Attending and Presenting at EV-related and OEM Dominated Conferences
Roadmap 11, June 19-20, 2018
A Smart Columbus speaking proposal to Roadmap 11 was accepted:
“Electrifying Columbus: How America’s Smart City is Approaching Electric Vehicle Adoption”
Columbus is America’s "ultimate test market." Fast food chains test burgers there. Politicians test ideas
there. And as America’s Smart City, city leaders will test how to radically increase electric vehicle
adoption there. In 2015, electric vehicles made up just 0.37% of vehicles sold in the seven-county Columbus
region. As the winner of the US Department of Transportation’s first-ever Smart City Challenge co-sponsored
by the Paul G. Allen Family Foundation (Vulcan, Inc.), Columbus aims to increase EV purchases by 480%,
which would make it a leader among non-ZEV states. During this keynote panel, Smart Columbus leaders
will share the strategies Columbus is employing to increase consumer and fleet EV purchases, deploy
charging infrastructure and decarbonize its electric grid, and discuss how the programs being piloted in
Columbus can be applied in other cities.
Moderator: Loreana Marciante, Paul G. Allen Philanthropies
Panelists:
Brandi Braun, City of Columbus Jordan Davis, Columbus Partnership Beth Snoke, The Ohio State University
Connected Cities USA 2018, May 31 - June 1, 2018
Smart Columbus was accepted to speak at Connected Cities USA on electrification:
When Columbus beat out 77 other cities to become the winner of the USDOT Smart City Challenge, we
knew it would take all of “US” to bring about a culture shift in transportation. For the past 100 years, mobility
has been defined by the individually owned, combustion-engine vehicle. In Columbus, we can see the effects
of this in our day-to-day lives. As we face growing equity, safety, environmental, and efficiency concerns with
mobility today, industry and thought leaders alike agree disruption is coming. Columbus plans to not only
participate in this disruption but lead it – inspiring a culture shift that embraces C.A.S.E – the Connected,
Autonomous, Shared and Electric mobility ecosystem of the future. Foundational to the success of this future
is the electric powertrain, which is better equipped to sustain, and support connected, autonomous, and
shared technologies.
In 2015, electric vehicles made up just 0.37% of vehicles sold in the seven-county Columbus region. As the
winner challenge, co-sponsored by the Paul G. Allen Family Foundation (Vulcan, Inc.), Columbus aims to
increase EV purchases by 480%, which would make it a leader among non-ZEV states. As America’s
“ultimate test market” and first Smart City, we will test how to radically increase electric vehicle adoption and
share our case study with cities around the world.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
44
Smart Columbus will share the strategies Columbus is deploying to increase consumer and fleet EV
purchases, deploy charging infrastructure and decarbonize its electric grid, and discuss how the programs
being piloted in Columbus can be applied in other cities.
Speaker: Jordan Davis, Director, Smart Cities, Columbus Partnership/Smart Columbus
Transportation Research Board National Conference and the Consumer Electronics Show
Members of the Smart Columbus team represented the program at the Transportation Research Board
(TRB) National Conference and the Consumer Electronics Show (CES). At TRB, Jordan Davis presented on
the Acceleration Partners program as a part of a panel on economic development and partnerships in Smart
Cities initiatives. Mark Patton, Brandi Braun, Jordan Davis, and Alex Fischer attended CES in Las Vegas.
Alex Fischer spoke on a keynote panel for the Smart Cities track. The team met with several existing OEM
partners and made new connections with Nissan and TransDev. Additionally, the team was joined by about
10 other Columbus community leaders for a site visit to Hyperloop One's test facility just outside of Las
Vegas.
3 Revolutions, February 26-27, 2018
Smart Columbus went to the 3 Revolutions
conference at UC Davis to interact with experts
on relevant topics such as how to include TNCs
in EV adoption efforts. The visit also included a
visit to the DC Solar facility and a Tesla plant
visit with representatives of the San Francisco
Airport.
Other Events
Smart Columbus applied to speak on
electrification at EVS31 in Kobe, Japan.
Develop an International Advisory Committee
The Columbus Partnership will be doing this in alignment with the grant, with the intent to identify
and convene this group in Year 2. It will be paid for separately and will be wider in scope.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
45
Multimedia Storytelling
Smart Columbus kicked off production of six video case studies on key programs and lessons learned
during Year 1 of the Electrification Program. Topics for the videos include:
o Decarbonization: DC Solar/Ohio Dominican University partnership to deploy $3.6 million in
mobile solar technologies.
o Fleet: The City of Columbus’ electrification efforts, including creation of the Universal Term
Contract, procurement of 93 EVs, installation of charging, and initial public entities to leverage
the Universal Term Contract.
o Consumer Adoption: How Smart Columbus educated 1,500 residents and city leaders on
smart mobility through Smart Columbus Live.
o Consumer Adoption: The development, launch and early successes of the Acceleration
Partners program.
o Charging: The Multi-Unit Dwelling rebates program.
Each video will feature interviews from Smart Columbus program managers and Smart Columbus
partners and will seek to relay transferrable learnings to peer cities and entities.
Smart Columbus planned a photo shoot to take place in April to capture branded photography for the
Electrification Program. The shoot will capture more images of people charging and driving electric
vehicles, charging stations, alternative transit and more. Imagery will be used on Smart Columbus
collateral, on the website and with media.
Develop a Webinar Series
Purchased a subscription to a webinar platform.
Tested the platform with Experience Center potential partners.
Organize Communications and Publications about Electric Vehicle Programs
Smart Columbus was featured in 60 articles during Q4. See Appendix E for the list of publications.
Create Best Practices Documents
Atlas Public Policy finished the Public Fleet Case Study.
Atlas Public Policy is under development with a Multi-Unit Dwelling Rebate Case Study.
The City has completed mapping the process for the Permit Requirements for Charging Installations
and is currently looking at ways to improve the process to reduce the amount of time needed for
permitting. This is dependent on the complete development of charging standards within the City of
Columbus.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
46
Update Communications Plan
Smart Columbus presented the communications approach to the Foundation and Edelman on
February 7, 2018. The Communications activities have now been incorporated throughout the Year
2 Smart Columbus Electrification Program.
Listening Tours of Smart Columbus with Other Cities
March 13: 40 members of the Japanese business leadership group, Kankeiren, visited Columbus
on a learning trip and spent a significant portion of their agenda learning about Smart Columbus.
March 20: Gainesville, Florida brought 38 leaders from their community, including their Mayor and
City Manager, for a learning trip in Columbus and attended a full Smart Columbus Live
presentation.
March 27: Japan’s Counsel General visited Columbus with an automotive-focused Japanese
delegation of 25 participants and spent a day learning about Smart Columbus.
Knowledge Transfer Partnerships
Bud Braughton interacted with officials from the San Francisco, California area during his
attendance at the 3 Revolutions Conference.
Jordan Davis traveled to Cleveland, Ohio to present to the Leadership Cleveland cohort during their
retreat.
Brandi Braun participated in the Midwest – U.K. Governance of Future Cities delegation trip, which
visited and engaged with city officials in London, Glasgow, and Bristol.
Attendees in the Midwest-U.K. Delegation:
o Brandi Braun, Deputy Innovation Officer, City of Columbus
o Lisa Camp, Associate Dean, Strategic Initiatives, Case Western Reserve University
o Brian Donoghue, Director of Civic Innovation, City of South Bend
o Katy Getsie, Associate Program Officer, MetroLab Network
o Lee Haller, Director, Department of Innovation and Performance, City of Pittsburgh
o Ben Levine, Executive Director, MetroLab Network
o Herb Sih, Managing Partner and Co-Founder, ThinkBig Partners, Kansas City, MO
o Bill Skerpan, Innovation and Analytics Manager, City of Boulder
o Emily Silverman, Technical Program Manager, Smart Cities, City and County of Denver
o Catherine Tkachyk, Chief Innovation Officer, Cuyahoga County
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
47
Additional Local Engagements of Note
Columbus College of Art and Design
Workplace EV Charging Studio/Course (Spring 2018)
CCAD upper class students are tasked with creating and designing a visual language for Smart Columbus
EVSEs for workplace charging campaigns. Students have teamed up within the class to provide a menu of
options for Smart Columbus, which will investigate different chargers, workplaces, brands, and surrounding
environments. The deliverable will be ready for production concepts for Smart Columbus.
The Ohio State University
Buckeye Undergraduate Consulting Club (BUCC) Project
Smart Columbus worked with a team of student consultants to research and develop a report on best
practices for corporate mobility benefits and campaigns. BUCC’s deliverable report created metrics for
measuring impact and ease of implementation for mobility and sustainability benefits as well as researched
tactics and use-cases from around the U.S.
Capstone: EEDS007 This project involves multiple data analysis opportunities related to the Smart Columbus initiatives. All data
categories are derived from the Smart Columbus project, the City of Columbus’ initiative intended to improve
access to jobs through expanded mobility options and connect Columbus residents to safe, reliable
transportation that is accessible to all. Each student group will be responsible for carefully developing a
research plan, revising the scope, executing the research, and communicating results and recommendations
through a written report and a final presentation to the Smart Columbus program management team.
RISK MANAGEMENT AND POLICY REGISTER Smart Columbus made significant progress on the Risk and Policy Register during Q4. See Appendix C for
the document.
STAKEHOLDER PLANS Nothing to report at this time.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
48
BUDGET AND COST MANAGEMENT Q4 saw an increase in project expenditures as activities ramped up. The reporting period for financial expenditure data for the City of Columbus
was through March 31, 2018. This includes anticipated additional Year 1 expenditures from GPD Group and the Columbus Partnership. See
Appendix AA – 2017 Budget Analysis for Annual Report for more information.
$0
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
$3,000,000
$3,500,000
Quarter 1 Quarter 2 Quarter 3 Quarter 4 Year 1 Total
Year 1 Budget Analysis
98%of Year 1 Budget Spent (Adjusted)
Year 1 Spend:
$3,006,894
APR 17 – MAR 18
Priority 1 $ 170,294
Priority 2 $ 505,345
Priority 3 $ 2,351
Priority 4 $ 1,406,376
Priority 5 $ 816,751
Program $ 105,777
Management
$0
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
$3,000,000
$3,500,000
Year 1 Spend vs. Original Budget
Year 1 Spend Year 1 Original Budget
$0
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
$3,000,000
$3,500,000
Year 1 Spend vs. Adjusted Budget
Year 1 Spend Year 1 Adjusted Budget
91% of Year 1 Budget
Spent (Original)
Year 1 Adjusted Budget:
$3,073,248
Year 1 Original Budget:
$3,321,328
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
49
SMART CITY SCHEDULE Activities within the schedule are progressing according to plan. Q4 saw an accelerated effort on Priority 5
with planning for the next rounds of charging infrastructure. See Appendix B for the schedule.
PERFORMANCE MEASUREMENT PLAN The Smart Columbus team made significant progress on the Performance Measurement Plan during Q4.
The plan will be finalized and submitted during the next quarter once more research data from partners is
obtained for GHG calculations.
YEAR 1 LESSONS LEARNED The Year 1 Lessons Learned repository, shown in Appendix F, details significant findings, recommendations
and new insights realized during Year 1 of the project and will be amended annually to reflect new
findings. The application of the Lessons Learned by the City of Columbus can potentially increase the
effectiveness of the Paul G. Allen Philanthropies’ (PGAPh) future capital investments and provide support for
EV adoption in cities worldwide. Smart Columbus is using the Lessons Learned tool to identity both
successes and/or shortcomings, and detail the resulting possible impacts and next steps. The list details the
lesson learned, resulting action, potential impact, and the pertinent references by Priority/Initiative. See
Appendix F for the Year 1 Lessons Learned document.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
50
ACTIVITY LOGS
PRIORITY 1 ACTIVITY LOG
ITEM TASK LEAD STATUS NOTES
Initiative 1.1 Utility-Scaled Renewables
Q4 Activities
1
AEP will identify and
interview consultants for
implementing the Utility
Scale Renewables
projects.
Ryan Houk, AEP
Ohio In Progress
Consultant engaged to review RFP
responses. Renewable Generation Rider
proposed in Joint Stipulation that would
provide a mechanism to recovery costs
associated with development. Further
clarification still required prior to
proceeding with project selection and
timing.
2
AEP will obtain
management approval and
funding for the research
project on advance clean
energy technologies.
Ryan Houk, AEP
Ohio Completed
Funding of proposed research projects is
being accrued. Anticipate award sometime
in 2018.
3
AEP will continue program
for customer driven
distributed generation
projects and report on new
distributed generation
projects.
Mark
Gundelfinger,
AEP Ohio
Completed Website being maintained and monitored
for projects proposed by customers.
4
Continue to collect and
analyze data on
deployment of 10 solar
generators from DC Solar.
Bud Braughton,
City of Columbus In Progress
DC Solar is providing energy data from 23
of their deployed generators on a quarterly
basis. This data is included in the SCC-P7-
Quarterly Indicators and Metric
Targets.xlsx spreadsheet.
5
Continue to develop plans
for using biogas from City
wastewater treatment
plants as fuel for Combined
Heat and Power.
Patti Austin,
Department of
Public Utilities
In Progress Working on preliminary design.
6
Columbus Division of
Power to finalize plans and
specifications for
rehabilitation of
hydroelectric plants.
Patti Austin,
Division of Power In Progress Working on finalizing design plans.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
51
ITEM TASK LEAD STATUS NOTES
Initiative 1.2 Grid Modernization and Efficiency
Q4 Activities
1
AEP to continue running
Community Energy Savers
program.
Sherry Hubbard,
AEP Ohio In Progress
Actively recruiting interested communities
to participate in this program. Several have
expressed interest; however, formal kick-
off has yet to occur.
2
AEP will contract with
research partner on Vehicle
to Home research.
Ryan Houk,
AEP Ohio In Progress
Participated in funding opportunity
announcement on proposed research
supporting Extreme Fast Charging.
3 AEP to develop final AMI
deployment plan.
Steve James,
AEP Ohio Completed
Deployment plan completed with active
roll-out of meters within Central Ohio. To
date, over 90,000 meters have been
installed across the state.
4
Columbus Power to
execute agreements with
vendors for Advanced
Metering Infrastructure.
Kristian Fenner,
Division of Power In Progress RFP has been reviewed and will be issued.
5
Select team and refine
scope for Street Light
Technology Conversion.
Patti Austin,
Division of Power In Progress
Waiting on funding to be finalized to
proceed with the project.
6 All new street lights
installed to be LED.
Patti Austin,
Division of Power Completed
Published specifications require all new
street lights to be LED.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
52
PRIORITY 2 ACTIVITY LOG
ITEM TASK LEAD STATUS NOTES
Initiative 2.1 Public Fleets
Q4 Activities
1
Continue work with other
regional governments/
institutions to identify
electric fleet acquisition
opportunities.
Andrew Conley,
CFO In Progress
Outreach performed to 85 individuals
encompassing 40 unique public fleets.
See SCC-Q4 Activity Report for more
details.
2
Continue receiving
commitments from regional
governments/institutions for
electric fleet acquisition.
Andrew Conley,
CFO In Progress
New fleet letters of commitment for
2018 EV purchases have been
secured from:
Columbus Regional Airport
Authority (2)
Mid-Ohio Planning Commission (2)
City of Hilliard (2)
City of Westerville (2)
City of Whitehall (2)
City of Worthington (2)
3 Continue EV technical and
safety training.
Andrew Conley,
CFO In Progress
Smart Columbus Fleet EV Workshop
procurement training hosted in
conjunction with MORPC and Smart
Columbus. Three-day May EV
technician training planned with
Columbus State Community College,
NAPA, Nissan, and Ford.
4
Continuing assisting other
regional government
entities with EV technical
and safety training.
Andrew Conley,
CFO In Progress
CFO continues efforts with numerous
public fleets to provide analysis,
training and other resources to support
EV deployment.
Initiative 2.2 Private Fleets
Carryover Activities
1
Coordinate with Consumer
Adoption on Group
Purchase programs and
OEM dealer engagement
strategies.
Zach McGuire,
Columbus Partnership In Progress
Finalized the dealership recognition
program for implementation.
Continuing meetings with OEMs and
dealers on available incentives for
group purchase programming.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
53
ITEM TASK LEAD STATUS NOTES
Q4 Activities
1
Continue assisting private
entities with installing
charging infrastructure.
Matt Stephens-Rich,
Electrification Coalition In Progress
Continued efforts with numerous
private fleets to provide assessment of
charging need for fleet deployment.
2
Continue assisting private
fleet managers with EV
technical and safety
training.
Matt Stephens-Rich,
Electrification Coalition In Progress
Continued efforts with numerous
private fleets to provide analysis,
training and other resources to support
EV deployment.
3 Continue receiving private
fleet pledges.
Matt Stephens-Rich,
Electrification Coalition In Progress
New private fleet commitments for
2018 EV purchases have been
secured from:
AEP (6)
Land Grant Brewing (5)
Columbus Zoo and Aquarium (5)
Columbus Dispatch (3)
Alliance Data (5)
Initiative 2.3 Transportation Service Providers
Carryover Activities
1
Coordinate with other fleet
and consumer adoption
programs to ensure
competitive pricing for
Group Purchase Programs.
Andrew Conley, CFO
Kevin McSweeney,
City of Columbus
In Progress
The City of Columbus has worked with
Mike Albert Leasing to secure a
Universal Term Contract (UTC) that
offers competitive direct purchase
pricing from Central Ohio EV dealers,
as well as establishes pathways for
lease-to-own financing models which
pass on available tax credits to public
and TSP fleets. CFO held a workshop
on Jan. 25 for public fleets and TSPs
to provide more information on
competitive pricing and available
financing models. To date, Columbus
Yellow Cab has placed an order for 10
vehicles off of this UTC.
Q4 Activities
1
Develop detailed strategy
and associated timelines
for TSP EV adoption.
Andrew Conley, CFO
Kevin McSweeney,
City of Columbus
In Progress
Working with Columbus Yellow Cab on
procurement of 20 EVs in 2018, COTA
on procurement of 10 EV transit buses,
and MORPC on identifying 50-70
users/riders for the Green Commuter
EV van pooling services.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
54
ITEM TASK LEAD STATUS NOTES
2
Continue making contact
with TSP fleet managers
and assessing
opportunities.
Andrew Conley, CFO
Kevin McSweeney,
City of Columbus
In Progress
Working with Yellow Cab, Uber and
Lyft to survey drivers and gather more
information on level of interest in EVs,
perceived barriers and needed
incentives to spur adoption.
3
Continue assisting TSP
fleet managers with EV
technical and safety
training.
Andrew Conley, CFO
Kevin McSweeney,
City of Columbus
In Progress
Jan. 25, 2018 EV Procurement training
hosted in conjunction with MORPC
and Smart Columbus. Three-day May
EV technician training planned with
Columbus State Community College,
NAPA, Nissan, and Ford.
4
Continue marketing
consumer EV incentives to
TSP contract drivers.
Andrew Conley, CFO
Kevin McSweeney,
City of Columbus
In Progress
Staff plan to market incentives in Year
2 when final details on process and
amounts are available.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
55
PRIORITY 4 ACTIVITY LOG
ITEM TASK LEAD STATUS NOTES
Initiative 4.1 Research and Assessment
Q4 Activities
1 Conduct audit on product
availability in market.
Ben Prochazka,
Electrification
Coalition
In Progress
Initial assessment conducted. Data
definitions developed and forecast
delivered on the product deficiencies that
need to be addressed.
Initiative 4.2 Address Supply
Q4 Activities
1
Assess current dealership
engagement and make
necessary adjustments.
Zach McGuire,
Columbus
Partnership
In Progress
Met with 11 dealers. Significant increase in
time and attention was paid to engaging
this important demographic in Q4.
2
Continue assessing and
tracking success of
Dealership Recognition
Program.
Zach McGuire,
Columbus
Partnership
In Progress
Reframing of the Dealer Recognition
Program and program plan provided in Q4
report.
3
Continue assessing and
tracking success of Dealer
Training Program.
Zach McGuire,
Columbus
Partnership
In Progress
No new dealer trainings were conducted
this quarter, but a reframed approach to
dealer training was introduced and
adopted internally.
4
Continue cultivating
pledges/partnerships with
local dealership owners and
OEM leadership.
Zach McGuire,
Columbus
Partnership
In Progress
Active efforts to cultivate deeper and new
relationships with OEMs and dealers.
Great progress in relationship with Tesla
and successful visit by Daimler was
conducted.
5
Continue to educate dealers
about EVs and how to
increase sales.
Zach McGuire,
Columbus
Partnership
In Progress Ongoing engagement and information
share with dealers.
6
Negotiate group purchase
rates for fleet and consumer
purchases of new and used
vehicles.
Zach McGuire,
Columbus
Partnership
In Progress
Secured three deals by local dealers to
extend at the Columbus Auto Show.
Nissan and AEP formed an alliance to
extend the group purchase rate for the new
Nissan Leaf.
7
Secure commitments for
providing models for EV
showroom.
Zach McGuire,
Columbus
Partnership
In Progress
Secured Mercedes GLE. Ongoing
conversations with OEMs to secure other
models.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
56
ITEM TASK LEAD STATUS NOTES
Initiative 4.3 Increase Demand for EVs
Q4 Activities
1 Execute Ride and Drive
Roadshow.
Alex Slaymaker,
Columbus
Partnership
In Progress
Kicked off the 2018 Ride & Drive
Roadshow with a successful four-day
event at the Columbus Auto Show.
2 Cultivate new pledges for
workplace engagement.
Jordan Davis,
Columbus
Partnership
In Progress
Stalled progress on this front to focus on
onboarding consumer adoption team,
planning for Year 2, and kicking off the
Mobility Ambassador programming.
3
Remain opportunistic about
integrating EV promotion
into large scale events
throughout City.
McKinzie
Harper,
Columbus
Partnership
In Progress
Incorporated EV promotion into the
Columbus Chamber Annual Meeting and
the city’s Greenspot event.
4 Schedule dates for Ride and
Drives for Year 2.
Alex Slaymaker,
Columbus
Partnership
In Progress
30 Ride & Drive events scheduled for
2018. Almost half of the goal is booked
out.
5
Develop Year 2 adoption
campaign goals and work
plan.
Jordan Davis,
Columbus
Partnership
In Progress
The Year 2 program plan was revised with
significant reframing of the Partnership
portfolio and greater clarity of the KPIs.
6
Continue providing extended
test drives to Columbus
Partnership members.
Zach McGuire,
Columbus
Partnership
In Progress
Secured agreement from Tesla to provide
overnight test drives for executives in
advance of corporate Ride & Drive events.
7 Continue pilot showroom in
the form of gallery walks.
McKinzie
Harper,
Columbus
Partnership
In Progress
Completed the Smart Columbus Live
program in March and hit the goal of 1,500
total attendees.
8
Prepare Smart Columbus
Showroom for opening in
Year 2.
Jordan Davis,
Columbus
Partnership
In Progress
Additional funding was secured, the space
lease was signed, creative design and
direction for the showroom component of
the experience center was completed, and
the public announcement and call for
partners was released.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
57
PRIORITY 5 ACTIVITY LOG
ITEM TASK LEAD STATUS NOTES
Initiative 5.1 Residential Charging
Q4 Activities
1
Develop a decision-
making criterion for L1
and L2 station
installations.
Megan Stein, CFO (MUD) In Progress
(MUD)
Chargers must be capable of capturing
"charging episodes," must be capable
of accepting a demand response (DR)
signal, facilities may install "smart"
chargers, recommended that facilities
install authentication system (MUD).
2
Begin installation of
MUD EV charging
infrastructure.
Megan Stein, CFO In Progress
Developers have been given the go-
ahead to start installation. As of now,
no developers have broken ground on
their EVSE infrastructure.
3
Columbus Power will
study rates for EV
charging as part of
larger utility rate update.
Patti Austin, DOP In Progress
The DOP is in the process of reviewing
all rates, including potential EV
charging, with an outside contractor.
4
AEP and Columbus
Power will research
successful smart
charging integration and
off peak charging
programs or demand
response programs.
Ryan Houk, AEP Ohio
Patti Austin, DOP In Progress
AEP launched an R&D program in
2017 to investigate charging behavior
of EV owners. DOP will work with
AEP’s guidance on smart charging
integration. However, it has been
determined DOP cannot participate in
time of use (off peak) charging
programs based on purchase power
contracts through 2025.
5
Installation of up to
(pending on PUCO
approval) 250 Level 2
residential charging
ports (AEP).
Ryan Houk, AEP Ohio Adjusted /
In Progress
PUCO did not approve the single
family home charging program, so this
activity no longer applies. An adjusted
target of 60 L2 MUD charging ports to
be installed by LOP through the EVSE
Rebate Program is currently under
development in anticipation of PUCO
approval.
6
Assist developers in
installing signage
consistent with city
recommendations.
Megan Stein, CFO In Progress
Developers have been provided with
signage in their individual contracts per
guidance from the City.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
58
ITEM TASK LEAD STATUS NOTES
Initiative 5.2 Public Access Charging
Carryover Activities
1 Utilization Tracking
Mechanism Bud Braughton, CoC In Progress
Data requirements for EVSEs are
included in RFPs for projects at this
time and will be coordinated with the
development of the Smart Columbus
Operating System.
2
Continue to develop
partnerships with site
hosts and secure
commitments.
Bud Braughton, CoC
Ed Ungar, HNTB
Dr. Stan Young, NREL
In Progress
Coordination is underway with Electrify
America to install EVSEs adjacent to
the future site of the Smart Columbus
Experience Center.
3
Streamline any city
permitting and planning
to minimize costs and
time.
Bud Braughton, CoC In Progress
Efforts continue to reduce plan review
times for permits in coordination with
Initiative 5.5.
4
Design and
specifications for sites
completed.
Bud Braughton, CoC In Progress
"Charger Ready" site design is
complete for the pilot project.
Specifications are now included in the
RFP for charger installation. Design
and specifications will need to be
updated on a per site and charger level
basis.
5
Determine highest
market needs for
charging sites in the
region, apply best
practices to develop lists
of owners/hosts of
public access charging
sites.
Bud Braughton, CoC
Ed Ungar, HNTB
Dr. Stan Young, NREL
In Progress
Highest market needs have been
determined in coordination with the
NREL report. Best practices
methodology to develop lists of
owners/hosts of public access
charging sites has been finalized, but
not fully implemented.
Q4 Activities
1
Develop additional
EVSE needs for future
years.
Bud Braughton, CoC Complete
The 2018 SCEP targets have been
updated based on the NREL report
and potential funding sources.
2 Construct first 5 fast
charging projects (AEP). Ryan Houk, AEP In Progress
The Public Access Charging Rebate
Program is in development in
anticipation of PUCO approval.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
59
ITEM TASK LEAD STATUS NOTES
Initiative 5.3 Workplace Charging
Q4 Activities
1
Continue discussions
with potential site hosts
and secure
commitments.
Zach McGuire,
Columbus Partnership
Matt Stephens-Rich,
Electrification Coalition
Ryan Houk, AEP
In Progress
Workplace charging is a key topic
discussed with workplaces. A field
study was conducted to identify sites
that still need charging.
2
Provide facility
managers with any
needed training and
assistance.
Zach McGuire,
Columbus Partnership
Matt Stephens-Rich,
Electrification Coalition;
Ryan Houk, AEP
In Progress
Providing support upon request.
Awaiting proactive approach until
greater clarity about the AEP rebate
program process is shared.
3
Provide education
materials and
communications
assistance to support
efforts with employees.
Zach McGuire,
Columbus Partnership
Matt Stephens-Rich,
Electrification Coalition
Ryan Houk, AEP
In Progress
Continuing to distribute workplace
charging guide to workplaces and
private site owners.
Initiative 5.4 Fleet Charging
Q4 Activities
1
Begin installation of
charging ports for
Columbus Fleet.
Bud Braughton, CoC In Progress
Awaiting legislation for the notice to
proceed. Construction will begin early
next quarter.
Initiative 5.5 Building and Zoning Changes to Support EV Charging
Carryover Activities
1 Common Charging
Payment System. Bud Braughton, CoC In Progress
USDOT is working on a common
payment system Concept of
Operations for May and system
requirements will be completed by the
end of 2018. Coordination will continue
between the two projects in order to
align methodologies.
2 Charging station
specifications complete. Bud Braughton, CoC In Progress
Specifications have been developed in
the RFPs for the public access pilot
project and the fleet charging projects.
Minimum charging requirements have
also been included in the MUD
charging contracts.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
60
ITEM TASK LEAD STATUS NOTES
Q4 Activities
1
AEP and Columbus
Power will research
successful smart
charging integration and
off peak charging
programs.
Ryan Houk, AEP
Patti Austin, DOP In Progress
AEP launched an R&D program in
2017 to investigate charging behavior
of EV owners. DOP will work with
AEP’s guidance on smart charging
integration. However, it has been
determined DOP cannot participate in
time of use (off peak) charging
programs based on purchase power
contracts through 2025.
2
Develop budget,
activities and milestones
for 2018.
Bud Braughton, CoC
Kevin McSweeney, CoC Complete
Completed as part of Year 2 updates
to the 2018 SCEP, KPIs and budget.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
61
APPENDICES Included below are key components of the appendix for updates that happened during Q4. The Year 1 Lessons Learned document and all other
appendices are included as supplemental documents. Please refer to the SharePoint site for these files. The documents are labeled according
to their appendix number.
APPENDIX A – QUARTERLY INDICATORS AND METRIC TARGETS The Quarterly Indicators and Metric Targets spreadsheet is used as a way to track actual indicator progress against the established
targets/goals for each priority of the project on a quarterly basis. The indicators are provided at the Project, Priority and Initiative level.
Performance indicators are addressed at three levels:
1. The overall project level;
2. The five project priorities (grid decarbonization; fleet EV adoption; transit, autonomous and multi-modal systems in the city; consumer
EV adoption; and EV charging infrastructure); and
3. The specific initiatives under each priority area.
The project, priority and initiative indicators are hierarchical. Priority indicators contribute directly to a project indicator, and similarly, initiative
indicators contribute directly to one of their respective priority indicators. Progress indicators are also defined. Progress indicators encompass
anything that can be numerically evaluated and reflect progress towards objectives, but do not contribute directly to higher level indicators.
Methods and data sources for estimating indicators and tracking progress towards targets are described in the Performance Measurement Plan.
The ‘Adjusted Targets’ spreadsheet outlines the current goals that have been established by the project working groups for each indicator. The
‘Progress’ spreadsheet reports the actual progress of each indicator toward the established targets. The ‘Progress_Y1_P4’ spreadsheet reports
the progress specifically for Year 1 Priority 4 Indicators. This has been separated out due to Priority 4 future program development changes
having been included in the main ‘Progress Tab’.
The ‘Progress’ spreadsheet includes highlighted cells to help clarify how the spreadsheet functions. Cells that are yellow are direct inputs. Cells
that are orange are calculations that are either summing values or converting values to a common unit. Cells that are green are calculations that
are converting the appropriate values into MTeCO2 used to calculate overall GHG emission reductions.
Timelines for indicators that are contingent upon PUCO approval will be adjusted as approval is received.
See the attached Appendix A – SCC-P7-Quarterly Indicators and Metric Targets-Q4.xlsx for more detail.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
62
Adjusted Targets
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
63
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
64
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
65
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
66
Progress
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
67
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
68
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
69
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
70
APPENDIX B – SCHEDULE Snapshots of each of the priorities are located below. See the Smart Columbus Q4 Schedule Update.pdf for the full schedule.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
71
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
72
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
73
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
74
APPENDIX C – RISK AND POLICY REGISTER Risk is an uncertain event or condition that, if it occurs, has a positive (opportunity) or negative (threat) effect on a project’s objectives. The Risk
Register is used to identify, rate, rank and mitigate risks prior to the start of a project. It assists the team by focusing attention on higher ranking
items requiring more analysis and mitigation strategies. The Risk Register is a living document to be updated on a periodic basis and reviewed
during the Monthly Project Review meeting. See the Q4 Risk and Policy Register.xlsx spreadsheet in addition to the snapshots included.
Risk Terminology
DEFINITION EXAMPLES
Risk: An uncertain event or condition that, if it occurs, has a positive or
negative effect on one or more project objectives.1
Risk Acceptance: A risk response strategy whereby the project team decides
to acknowledge the risk and not take any action unless the risk occurs. 1
A potential change is design standards; reacting when and if it is
incorporated into the project objectives.
Risk Avoidance: A risk response strategy whereby the project team acts to
eliminate the threat or protect the project from the risk impact. 1
Usually involves change the project plan to eliminate the threat entirely.
Could include extending the schedule; reducing scope, changing the
strategy or approach. 1
Risk Mitigation: A risk response whereby the project team acts to reduce the
probability of occurrence or impact of a risk. 1
Taking early actions such as conducting workshops, partnering, draft
reviews, and other pre-emptive or non-conventional activities to lower the
likelihood of occurrence
Risk Transference: A risk response strategy whereby the project team shifts
the impact of a threat to a third party, together with the ownership of the
response. 1
When a Contractor has capabilities that the A/E does not possess,
transferring scope and responsibility contractually to the Contractor.
Risk Exploitation: A (opportunity) risk response strategy whereby the project
team seeks to eliminate the uncertainty associated with an upside risk by
ensuring the opportunity definitely happens. 1
Assigning an organization’s most talented resources to reduce the time to
completion or using new technologies or technology upgrades to reduce
cost and duration required to realize project objectives. 1
Risk Sharing: A (opportunity) risk response strategy whereby the project
team seek allocate some or all of the ownership of the opportunity to a third
party who is best able to capture the opportunity for the benefit of the project. 1
Forming risk sharing partnerships, teams, special-purpose companies, or
joint ventures, which can be established with the express purpose of
taking advantage of the opportunity so that all parties gain from their
actions. 1
Risk Enhancement: A (opportunity) risk response strategy whereby the
project team seeks to increase the probability and/or the positive impacts of an
opportunity. 1
Adding more resources to an activity to finish early. 1
1. Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK ® Guide) – Fifth Edition
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
75
Priority 1 – Decarbonization
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
76
Priority 2 – Fleet Electric Vehicle Adoption
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
77
Priority 4 – Consumer Electric Vehicle Adoption
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
78
Priority 5 – Charging Infrastructure
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
79
APPENDIX D – POLK DATA Polk data is listed below through program Q3 (Q4 2017). Due to the report timing, Polk data is only
available through January 2018. For consistency, this data will continue to be provided one quarter
behind the report.
TIMEFRAME (2017)
EV PHEV TOTAL (EV+PHEV)
TOTAL SALES %
Jan 21 18 39 7,281 0.54%
Feb 14 15 29 8,786 0.33%
Mar 24 23 47 10,030 0.47%
Q1 Total 59 56 115 26,097 0.44%
Apr 19 13 32 8,659 0.37%
May 32 21 53 9,704 0.55%
Jun 42 36 78 8,587 0.91%
Q2 Total 93 70 163 26,950 0.60%
Jul 32 25 57 8,254 0.69%
Aug 18 23 41 9,026 0.45%
Sep 25 15 40 8,758 0.46%
Q3 Total 75 63 138 26,038 0.53%
Oct 44 19 66 8,005 0.79%
Nov 18 28 46 8,097 0.57%
Dec 49 32 81 8,540 0.95%
Q4 Total 111 79 190 24,642 0.77%
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
80
APPENDIX E – COMMUNICATIONS AND PUBLICATIONS
DATE TITLE SOURCE
January 3, 2018 Columbus job growth to remain strong in 2018, helped by Smart City projects 'about to pop'
Columbus Business First
January 3, 2018 New CMAX Bus Line Offers Quicker Commute On Cleveland Avenue
WOSU Public Media
January 3, 2018 Smart building tech yields utility savings up to 18% Construction Dive
January 9, 2018 CES 2018: Making Smart Cities Responsive Government Technology
January 9, 2018 Bosch Targets Huge Smart Cities Market Wards Auto
January 11, 2018
Study Asks: How Will Driverless Cars Change
Downtown Columbus?
Columbus Underground
January 16, 2018 Rickenbacker International Airport installing new equipment that improves air quality
Circleville Herald
January 17, 2018 JP Morgan Chase employees, your Chariot awaits starting Monday The Columbus Dispatch
January 17, 2018 Chariot expands to Columbus, Ohio with JPMorgan Chase commuter shuttle
TechCrunch
January 18, 2018 Amazon narrows list of cities for new headquarters to 20 CNBC
January 18, 2018 Gov. Kasich Launches DriveOhio with Executive Order DriveOhio
January 18, 2018 Ford starting shuttle service for JPMorgan Chase workers in Smart Columbus initiative
Columbus Business First
January 18, 2018 Ford: How Chariot, in concert with Chase and Smart Columbus, is working to reduce congestion in central Ohio
Automotive World
January 22, 2018 Intelligent Intersection Tech Coming to Columbus HDT Trucking Info
January 22, 2018 How Chariot, In Concert with Chase and Smart Columbus, Is Working to Reduce Congestion in Central Ohio
WebWire
January 22, 2018 Editorial: Cbus on Amazon list? Of course! The Columbus Dispatch
January 24, 2018 State lawmakers vote to regulate "e-bikes" The Columbus Dispatch
January 24, 2018 COTA Celebrates Opening of CMAX with Ribbon
Cutting and Panel Discussion
COTA
January 25, 2018 Smart Columbus got a shout out from Carla Bailo in a Senate Hearing that examines Energy Technology and Auto Industry Innovations. Mentioned at the 1 hour, 25 minute mark.
C-Span
January 30, 2018 Columbus building technological 'heartbeat' of future smart cities The Columbus Dispatch
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
81
DATE TITLE SOURCE
January 30, 2018 CIO Tomorrow: Widening the Talent Pool: A Call to Action Columbus Business First
January 31, 2018 Smart Columbus Initiative Seeks Open-Source Data-Sharing Infrastructure
FutureStructure
February 1, 2018 Interview: Shannon Hardin on Development, Transit & the Densification of Columbus
Columbus Underground
February 2, 2018 Columbus Issues RFP for the Operating System to Run its Smart City Systems
Government Technology
February 2, 2018 Columbus Seeking Big Data gurus to build Smart City transportation data hub
Columbus Business First
February 2, 2018 Columbus building technological 'heartbeat' of future smart cities The Columbus Dispatch
February 2, 2018 Columbus issues RFP for smart city data hub SmartCities Dive
February 6, 2018 Columbus builds its smart city operating system GCN
February 8, 2018 Report: Internet sector has strong presence in all major US cities SmartCities Dive
February 8, 2018 Columbus’ internet sector lauded in report as ‘punching above its weight’
The Columbus Dispatch
February 8, 2018 Columbus, Ohio, Recognized as Internet Powerhouse Government Technology
February 12, 2018 Ohio State University, Partners Develop 'Smart Paint' to Help the Visually Impaired Navigate Cities
Government Technology
February 12, 2018 Columbus delegation impressed by visit to Hyperloop One testing grounds
Columbus Business First
February 14, 2018 Smart City Initiatives Present New Frontier For Transportation Rights Struggles
WOSU
February 21, 2018 Columbus taking steps to secure future Hyperloop route The Columbus Dispatch
February 22, 2018 Smart City grant: Columbus buys first electric vehicles, adding more charging stations
Columbus Business First
February 22, 2018 PUCO chairman: PowerForward initiative laying the groundwork for a modern electric grid
Columbus Business First
February 23, 2018 Columbus, OH to buy first EV fleet with smart cities grant Smart Cities Dive
February 26, 2018 Tesla wants space for charging stations in Columbus The Columbus Dispatch
February 27, 2018 Accenture to create innovation hub in Columbus, add 200 jobs The Columbus Dispatch
February 27, 2018 COSI, North Market, Westerville police memorial get pieces of $2.6B capital budget
The Columbus Dispatch
February 28, 2018 4 Way Cities Can Foster a Better Internet Economy StateTech
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 4 ACTIVITY REPORT: JAN – MAR 2018
82
DATE TITLE SOURCE
March 5, 2018 Smart Cities Talk shows the future role of a connected campus The Ohio State University
March 6, 2018 How Ohio State is helping to make Columbus a 'Smart City': BTN LiveBIG
Big Ten Network
March 6, 2018 Winning the smart cities challenge with equity, inclusion Policy Options Politiques
March 8, 2018 Smart Columbus awards rebates for apartment condo charging stations
The Columbus Dispatch
March 8, 2018 Rethinking Smart City: Pause in 2017 helped Columbus shift focus to do the most good
Columbus Business First
March 11, 2018 Group Giving Rebates for Installing Car Charging Stations U.S. News & World Report
March 11, 2018 Battery-powered buses could propel COTA into the future The Columbus Dispatch
March 12, 2018 Ohio Capital City Plans Electric Bus Test, with an Eye Toward Converting its Fleet in the Future
FutureStructure
March 13, 2018 Smart Columbus plans $1M HQ - with electric vehicle test driving - along Scioto Mile
Columbus Business First
March 14, 2018 COTA expected to name transportation engineer Joanna Pinkerton as new CEO
The Columbus Dispatch
March 14, 2018 Columbus Auto Show features more ride-and-drives, including 15 electric vehicles
Columbus Business First
March 14, 2018 Smart initiative education center to open in Columbus, OH SmartCities Dive
March 14, 2018 Smart Columbus relocating to new $1 million Downtown digs The Columbus Dispatch
March 16, 2018 Smart Columbus electric vehicles join traditional rides at Columbus Auto Show
The Columbus Dispatch
March 19, 2018 Columbus, Ohio's Smart City Initiative Shows Off EVs at Auto Show
Government Technology
March 20, 2018 Smart Columbus Launching Experience Center Downtown Columbus Underground
March 21, 2018 Short North to test garage and Lyft discounts to ease parking concerns
Columbus Business First
March 23, 2018 Smart Columbus to Open an EV Showroom FutureStructure