193
5-1 Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target The government has set the target of electrifying 100% of the barangays by 2006 and to achieve 90% household electrification by 2017. In accordance with this target, the Study team has set up a target of the total (100%) barangay electrification by 2006 in Palawan Province as well. In the next three (3) years up to 2006, barangay electrification will be the main focus of the Master Plan. After achieving entire barangay electrification, the focus will move on to the improvement of household electrification. Based on the present electrification level and information obtained through the Study including demand forecasts, capacity to pay, fund availability, the plan for improving household electrification will be determined. Figure 5.1.1 Electrification Target 5.1.2 Barangay Electrification Program There are 431 barangays in Palawan. The number of electrified barangays was 271 as of December 2003. The remaining 160 barangays will be targeted in the Study. 2003 2006 2015 100% ?% Barangay Electrification Ratio HH Electrification Ratio

Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

  • Upload
    others

  • View
    36

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-1

Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

The government has set the target of electrifying 100% of the barangays by 2006 and to achieve 90% household electrification by 2017. In accordance with this target, the Study team has set up a target of the total (100%) barangay electrification by 2006 in Palawan Province as well. In the next three (3) years up to 2006, barangay electrification will be the main focus of the Master Plan.

After achieving entire barangay electrification, the focus will move on to the improvement of household electrification. Based on the present electrification level and information obtained through the Study including demand forecasts, capacity to pay, fund availability, the plan for improving household electrification will be determined.

Figure 5.1.1 Electrification Target

5.1.2 Barangay Electrification Program

There are 431 barangays in Palawan. The number of electrified barangays was 271 as of

December 2003. The remaining 160 barangays will be targeted in the Study.

2003 2006 2015

100%

?%

Barangay Electrification Ratio

HH Electrification Ratio

Page 2: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-2

5.1.3 Prioritization of Barangay Electrification

It is impossible to electrify the 160 barangays all at once, due to the limitation of various resources. Therefore, some prioritization will be necessary. The Study has considered three factors for the prioritization; (1) Electrification cost and O&M cost

Electrification cost and O&M cost should be the most important factors to prioritize barangay electrification since the government development fund is limited and low electricity tariffs at present may not be able to cover the O&M cost. (2) Social and economic benefits

Social and economic benefits will be considered by putting higher priority on socially important areas and social and economical development areas among the un-electrified areas. This may not lead to the most affordable solution, but economical feasibility will be taken into consideration. (3) Social equity

One of the objectives of electrification is to target poverty alleviation and narrowing the poverty gap between areas. Electrification should contribute to well-balanced social and economical development in the province and improve living conditions in the areas.

In MEDP 2003, criteria and their weightings for the electrification projects for un-electrified

areas that are unviable have been determined. The cost factor is given the highest priority.

Table 5.1.1 MEDP Electrification Criteria

Source: 2003 MEDP 5.1.4 Electrification Method

Three electrification methods are considered in the study: (1) Extension of the existing

EC-grid, (2) a mini-grid system and (3) a stand-alone system. The appropriate electrification method for each un-electrified barangay will be selected from these three options. (1) Extension of the existing EC-grids: EElleeccttrriiffiiccaattiioonn ccoonnnneeccttiinngg ttoo tthhee eexxiissttiinngg ddiissttrriibbuuttiioonn lliinneess ooff EECCss,, mmoosstt ooff wwhhiicchh aarreeaass aarree pprroovviiddeedd wwiitthh 2244--hhoouurr eelleeccttrriicciittyy..

Criteria Indicator Weight 1) Low Level of Electrification Access to Electricity by Families by Province 20% 2) Economic Efficiency Connection Cost per Households 50% 3) Eradication of Poverty Poverty Incident of Families by Province 15% 4) Equity of Regional Development GRDP per Capita per Household 10% 5) Environment Friendly Technologies 5%

Page 3: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-3

(2) Mini-grid systems: There will be electrification by a power plant (micro hydro or diesel) that supplies power to the

households nearby, where grid expansion may be difficult, physically or economically. Its generation capacity will be above 30kW. (3) Stand-alone systems:

There will be electrification by SHS (Solar Home System), BCS (Battery Charging System) and a small-scale diesel generator (mini-diesel generator).

Table 5.1.2 Electrification Method Power system Capacity & Households Power sources

1) Extension of the EC grid Connection to the existing EC-grid with 24-hour supply

2) Mini-grid system Electrification by a power plant that supply power nearby

Cap.>30kW HH>300

• Diesel • Hydropower (Mini or Micro)

3) Stand-alone system Cap.<30kW HH<300

• SHS • BCS (Battery Charging System) • Mini-diesel generator

5.1.5 Methodology to Select an Appropriate Electrification Method

An appropriate electrification method is determined for each un-electrified barangay from the electrification methods described above. The methodology for determination is as follows: (1) Screening by restricted areas for development and on-going electrification programs

This screening eliminates barangays which are located in restricted areas of ECAN (refer to chapter 3.7.1 (1)) and barangays where electrification projects are already ongoing for a target barangay for electrification with the EC-grid extension and a mini-grid system.

A stand-alone electrification method is determined for these eliminated barangays by reason of ECAN restricted areas.

(2) Posibility of EC-grid extension

The possibility of an EC-grid distribution line extension will be examined. The long-run marginal cost (LRMC) of a mini-grid system (diesel or micro hydropower) with

the capacity for electrifying a barangay is compared to the LRMC of EC-grid extension (see Figure 5.1.2). When the LRMC of EC-grid extension is more economical than the LRMC of a mini-grid system, EC-grid extension is selected as the electrification method for a barangay.

Considering future extension of a distribution line, it is better for a barangay to use EC-grid extension. Therefore, although a barangay is already electrified by a mini-grid or stand-alone system, the possibility of EC-grid extension is examined for the electrified barangay.

Page 4: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-4

Fig.5.1.2 Annual Cost of Distribution Line Expansion & Diesel &Hydro

0

5

10

15

20

25

30

35

40

45

0 5 10 15 20 25 30 35

Distance from Tapping Point (km)

Annual

Cost

(P

hp/

kWh)

Distribution(Php/kWh)

Diesel(Php/kWh)

Hydro(Php/kWh)

Figure 5.1.2 Cost Comparison of EC-Grid Extension and Mini-Grid System

(3) Examine the possibility of a mini-grid system

The possibility of electrification by a mini-grid system is examined for barangays to which EC-grid extension is not applied above. A mini-grid system requires a minimum capacity of demand to become feasible. Diesel generators with a reliable power-supply-use would be more than 30kW in capacity. Micro hydropower also requires a capacity of 30kW from an economical point of view. According to the socio-economic survey (refer to Section 4.2) and the demand forecast (see Section 5.1.3 (4), forthcoming), average household power demand is estimated to be 106W in the target electrification area. Therefore, 30kW demand capacity translates into approximately 300 households. In the Study, barangays with more than or equal to 300 potential households will be suitable for electrification using a mini-grid system. LRMC of diesel and micro hydropower is compared and a power system with a lower LRMC is selected for the electrification of the barangay.

On the other hand, barangays with less than 300 potential households will not be feasible for electrification using a mini-grid system, and so consequently a stand-alone system will be considered.

(4) Stand-alone system

A stand-alone system has 3 candidate methods for electrification (SHS, BCS and a mini-diesel) and there is no determined way for the selection of each method. For example, we can select an appropriate method by comparing annual cost per household in each method.

An example shown in Figure 5.1.3 shows that a mini-diesel generator system would provide electricity at lower cost if more than 15 households are concentrated.

Long

-run

Mar

gina

l Cos

t (Ph

p/kW

h)

Distribution Line Extension

Mini-grid (Hydro)

Mini-grid (Diesel)

Page 5: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-5

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

0 5 10 15 20 25Number of Target Household

Pro

duction c

ost

(P

/H

ouse

hold

)

SHSMini-Diesel

SHS Mini-Diesel

Figure 5.1.3 Cost Comparison between SHS and Mini-Diesel 5.2 Power Demand Forecast 5.2.1 Target of Power Demand Forecast

There are two different approaches to power demand forecasts in general. One is the macro-method and the other is the micro-method. In the macro-method, future power demand is forecasted through the analysis of the historical correlation between power demand and an economic indicator such as GDP or a historical trend of power demand. In the micro-method, the components of power demand are estimated individually and future power demand is obtained by adding up the components.

Each method has its own advantages and disadvantages. For data collection, the macro-method needs time-series data over a long period. In contrast, the micro-method requires a wide variety of data. Therefore, the employed demand forecasting method depends on the target of the power demand forecast. The targets for the power demand forecast in the Study is classified into the three areas1 below in the electricity supply system.

(a) Electrified areas by NPC-SPUG and ECs (PALECO and BISELCO) (b) Electrified areas by SHS, BCS, BAPA, LGU, others (c) Un-electrified areas

NPC-SPUG and ECs make their own power demand forecasts every year. In the case of (b),

potential power demand is generally forecasted in advance of the implementation of an electrification project. However, it is not general to continue conducting power demand forecasts after electrification. Therefore, area (b) is the same (c) as un-electrified areas from the viewpoint of power demand forecast. 1 The number of Barangays in (a), (b), and (c) are 212, 59, and 160 respectively. (Dec. 31, 2003)

Ann

ual C

ost p

er H

ouse

hold

Page 6: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-6

For these reasons, the target of the power demand forecast in the Study was finally classified into two areas. In addition, the target year of the power demand forecast in the Study is 2015.

In this section, power demand forecasts in the area of (b) and (c) are discussed (see Chapter 6.1 for power demand forecast in the area of (a)). 5.2.2 Electrified Areas by SHS, BCS, BAPA, LGU and Un-Electrified Areas

Some barangays obtain electricity through stand-alone systems such as SHS, BCS or a

mini-grid system managed by BAPA, LGU and others. As mentioned above, potential power demand is generally forecasted in advance of the implementation of an electrification project and the feasibility of the project and the specifications of power equipment are examined. However, once the electrification takes place, it is usual for no further power demand forecasts to be conducted.

Consequently, there are no historical data on the actual demand of such electrified areas as well as un-electrified areas. Therefore, the micro-method is better than the macro-method for power demand forecasts for such areas. The process of the micro-method in the Study is shown below.

(a) Projection of population and potential households in 2015 (b) Estimation of target households for electrification (c) Estimation of unit energy consumption and peak demand (d) Estimation of potential power demand in 2015

(1) Projection of population and potential households in 2015

Population of each barangay is projected using the population growth rate based on the annual average growth rate of the municipality that includes the barangay in the CENSUS population 1995 and 2000.

An average household size is also projected by the same method as a population projection. Finally, the number of potential households in 2015 is calculated using the projected population and the average household size. Table 5.2.1 shows the number of potential households in 2015 estimated by using these methods.

Page 7: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-7

Table 5.2.1 Number of Potential Households in 2015 Present Municipality Barangaye-Status Name Name 2000(Base 2005 2006 2010 2015 2000(Base 2005 2006 2010 2015

PALECO Apoc-Apoc 974 1,149 1,187 1,351 1,583 204 241 250 284 334PALECO Apo-Aporawan 816 961 993 1,131 1,325 164 193 200 228 268PALECO Baraki 679 801 827 941 1,101 125 147 153 174 204PALECO Cabigaan 1,399 1,649 1,703 1,939 2,272 290 342 354 403 474PALECO Gogongan 487 574 593 674 790 111 131 136 154 181PALECO Iraan (a) 1,336 1,575 1,627 1,851 2,171 304 358 372 423 498PALECO Isaub 1,830 2,157 2,228 2,536 2,972 365 430 446 508 597PALECO Jose Rizal 1,242 1,464 1,512 1,721 2,016 246 290 301 342 402PALECO Mabini (a) 607 715 738 840 985 127 150 155 176 208PALECO Magbabadil 1,049 1,237 1,278 1,454 1,704 224 264 274 312 367PALECO Plaridel 2,390 2,818 2,911 3,313 3,882 507 598 620 705 829PALECO Poblacion (ABORLAN) 1,876 2,212 2,285 2,601 3,048 359 423 439 500 588PALECO Ramon Magsaysay 1,745 2,056 2,124 2,417 2,832 356 419 435 495 582PALECO San Juan (a) 2,214 2,611 2,697 3,071 3,598 464 547 567 646 760PALECO Tagpait 804 949 980 1,114 1,305 166 196 203 231 271PALECO Tigman 1,426 1,682 1,737 1,977 2,317 272 321 333 379 445

BCS Aporawan 2,522 2,972 3,070 3,494 4,095 509 600 622 708 833Un-Electrified Culandanum (a) 854 1,009 1,042 1,186 1,389 156 184 191 217 256Un-Electrified Sagpangan 1,238 1,459 1,507 1,716 2,011 287 338 351 399 470

PALECO Abagat (Pob) 347 498 535 710 1,006 85 122 132 175 248PALECO Bangcal (Pob) (a) 235 338 363 483 684 50 72 78 103 147PALECO Cambian (Pob) 350 502 539 717 1,018 87 125 134 179 255

Un-Electrified Algeciras 3,433 4,930 5,293 7,035 9,971 694 997 1,074 1,428 2,031Un-Electrified Conception (a) 2,743 3,939 4,229 5,621 7,968 505 725 781 1,039 1,477Un-Electrified Diit 1,417 2,034 2,184 2,902 4,114 257 369 398 528 752Un-Electrified Maracanao 219 314 337 449 636 34 49 53 70 99Un-Electrified Matarawis 181 261 280 373 529 30 43 47 62 88Un-Electrified Villafria 592 849 912 1,211 1,718 119 171 184 244 348Un-Electrified Villasol 896 1,287 1,382 1,836 2,603 179 257 277 368 524

PALECO Poblacion (Centro) 2,642 2,722 2,738 2,802 2,882 531 547 552 565 584PALECO Tinintinan 804 829 834 854 879 148 153 154 158 163PALECO Tudela (Calandagan) 1,822 1,877 1,888 1,932 1,987 325 335 338 346 357

Un-Electrified Balogo 517 532 535 547 562 96 99 100 102 105Un-Electrified Dagman 773 798 803 823 848 157 162 164 168 174Un-Electrified Dalayawon 418 430 432 444 459 79 81 82 84 87Un-Electrified Lumacad 656 676 680 696 716 102 105 106 109 112Un-Electrified Madoldolon 561 576 579 591 606 87 89 90 92 95Un-Electrified Mauringuen 743 763 767 784 806 145 149 150 154 158Un-Electrified Osmena (a) 684 704 708 724 744 144 148 150 153 158Un-Electrified San Jose De Oro 307 317 319 327 337 53 55 55 57 59Un-Electrified Santo Nino (a) 384 394 396 404 414 79 81 82 83 86Un-Electrified Taloto 559 574 577 589 604 104 107 108 110 113

PALECO Poblacion I (BALABAC) 184 216 223 253 295 39 46 47 54 63PALECO Poblacion II (BALABAC) 289 339 350 397 463 56 66 68 77 90PALECO Poblacion III (BALABAC) 321 377 389 441 515 66 78 80 91 107PALECO Poblacion IV (BALABAC) 400 470 485 551 643 87 102 106 120 141PALECO Poblacion V (BALABAC) 326 383 395 449 525 63 74 77 87 102PALECO Poblacion VI (BALABAC) 777 912 941 1,067 1,247 161 189 196 222 260

Un-Electrified Agutayan 482 566 584 663 775 109 128 133 150 177Un-Electrified Bancalaan 6,435 7,557 7,799 8,848 10,329 1,191 1,399 1,449 1,644 1,926Un-Electrified Bugsuk (New Cagayancillo) 882 1,037 1,070 1,214 1,417 173 203 211 239 280Un-Electrified Catagupan 1,189 1,396 1,441 1,635 1,908 275 323 334 380 445Un-Electrified Indalawan 925 1,085 1,120 1,270 1,483 168 197 204 231 271Un-Electrified Malaking Ilog 663 779 804 912 1,067 134 157 163 185 217Un-Electrified Mangsee 6,143 7,214 7,445 8,447 9,863 938 1,102 1,141 1,295 1,517Un-Electrified Melville 884 1,039 1,072 1,216 1,419 173 203 211 239 280Un-Electrified Pandanan 532 625 645 732 855 110 129 134 152 178Un-Electrified Pasig 294 346 357 405 473 75 88 91 104 122Un-Electrified Rabor 361 424 438 496 580 84 99 102 116 136Un-Electrified Ramos 1,381 1,622 1,674 1,899 2,219 265 311 322 366 429Un-Electrified Salang 1,977 2,323 2,398 2,721 3,177 402 472 489 555 651Un-Electrified Sebaring 786 923 953 1,083 1,264 154 181 187 213 249

PALECO Bono-bono 2,259 2,819 2,944 3,504 4,337 494 616 646 769 955PALECO Inogbong 2,740 3,420 3,572 4,251 5,262 560 699 733 872 1,083PALECO Marangas (Pob) 5,286 6,596 6,889 8,198 10,147 1,007 1,257 1,317 1,567 1,947

Un-Electrified Bulalacao (a) 1,477 1,843 1,925 2,290 2,834 281 351 368 437 543Un-Electrified Buliluyan 1,181 1,473 1,538 1,830 2,266 211 263 276 328 408Un-Electrified Culandanum (b) 2,788 3,479 3,634 4,324 5,352 605 755 792 942 1,170Un-Electrified Igang igang 945 1,180 1,232 1,466 1,816 213 266 279 332 412Un-Electrified Iwahig 1,623 2,026 2,116 2,518 3,118 357 446 467 556 691Un-Electrified Malihud 1,249 1,560 1,629 1,938 2,398 270 337 353 420 522Un-Electrified Malitub 377 471 492 586 726 99 124 130 154 192Un-Electrified Ocayan 1,412 1,762 1,840 2,189 2,709 289 361 378 450 559Un-Electrified Puring 594 741 774 921 1,141 142 177 186 221 275Un-Electrified Rio Tuba 7,619 9,508 9,930 11,816 14,625 1,471 1,836 1,924 2,290 2,845Un-Electrified Sandoval (a) 1,971 2,460 2,569 3,057 3,783 429 535 561 668 829Un-Electrified Sapa 951 1,186 1,239 1,474 1,824 240 299 314 373 464Un-Electrified Sarong 1,399 1,745 1,823 2,169 2,685 314 392 411 489 607Un-Electrified Sumbiling 1,808 2,258 2,358 2,805 3,472 426 532 558 663 824Un-Electrified Tabud 696 869 908 1,080 1,336 159 199 208 248 307Un-Electrified Tagnato 538 671 701 835 1,033 112 140 146 174 217Un-Electrified Tagolango 417 522 545 648 801 117 146 153 182 226Un-Electrified Taratak 1,422 1,774 1,853 2,205 2,729 297 371 388 462 574Un-Electrified Tarusan 2,662 3,323 3,471 4,130 5,113 565 705 739 880 1,093

PALECO Amas 1,472 1,718 1,771 1,999 2,319 310 362 374 423 492PALECO Aribungos 3,790 4,421 4,557 5,143 5,965 760 887 917 1,035 1,205PALECO Barong-barong 3,088 3,603 3,714 4,192 4,862 563 657 680 767 893PALECO Calasaguen 2,231 2,603 2,683 3,028 3,513 429 501 518 584 681PALECO Ipilan (a) 4,349 5,073 5,229 5,902 6,846 869 1,014 1,049 1,184 1,378PALECO Maasin (a) 2,744 3,201 3,299 3,723 4,318 559 652 675 761 886PALECO Mainit 1,974 2,304 2,375 2,680 3,109 418 488 505 570 663PALECO Malis 1,866 2,176 2,243 2,531 2,936 384 448 463 523 609

Potential Households ProjectionPupolation Projection

BATARAZA

ABORLAN

AGUTAYA

ARACELI

BALABAC

BROOKE'SPOINT

Page 8: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-8

Table 5.2.1 Number of Potential Households in 2015 (Continued) Present Municipality Barangaye-Status Name Name 2000(Base 2005 2006 2010 2015 2000(Base 2005 2006 2010 2015

PALECO Mambalot 1,830 2,135 2,201 2,485 2,882 355 414 429 484 563PALECO Oring-oring 1,470 1,714 1,767 1,994 2,314 287 335 346 391 455PALECO Pangobilian 6,145 7,169 7,389 8,339 9,673 1,073 1,252 1,295 1,461 1,701PALECO Poblacion I (Brooke's Point) 4,911 5,731 5,907 6,667 7,733 944 1,102 1,140 1,286 1,497PALECO Poblacion II (Brooke's Point 3,378 3,941 4,062 4,586 5,320 689 804 832 939 1,093PALECO Salogon 2,910 3,395 3,499 3,949 4,581 597 697 721 813 947PALECO Samarenana 1,986 2,316 2,387 2,694 3,125 412 480 497 561 653PALECO Saraza 2,170 2,531 2,609 2,945 3,416 442 516 533 602 701PALECO Tubtub 1,223 1,426 1,470 1,659 1,924 240 280 290 327 380

Un-Electrified Imulnod 1,363 1,590 1,639 1,849 2,145 303 353 366 413 480BISELCO Bogtong 620 725 748 846 984 123 144 149 168 197BISELCO Buluang 2,199 2,571 2,651 2,998 3,485 396 463 479 542 632BISELCO Conception (b) 855 1,000 1,031 1,165 1,355 171 200 207 234 273BISELCO New Busuanga 1,140 1,333 1,375 1,555 1,809 213 249 258 292 340BISELCO Old Busuanga 639 747 770 871 1,012 138 161 167 189 220BISELCO Sagrada 939 1,099 1,133 1,281 1,489 197 231 239 270 315BISELCO Salvacion (Pob) 2,023 2,365 2,439 2,757 3,205 377 441 456 516 602BISELCO San Rafael (a) 524 613 632 715 832 79 92 96 108 126BISELCO Santo Nino (b) 801 936 965 1,091 1,268 165 193 200 226 263

BCS Panlaitan 2,224 2,601 2,682 3,033 3,528 411 481 497 563 657BCS Quezon 1,106 1,293 1,333 1,508 1,754 207 242 250 283 331BCS San Isidro (a) 711 832 858 970 1,130 130 152 157 178 208

Un-Electrified Burabod 332 389 401 454 528 63 74 76 86 101Un-Electrified Cheey 1,893 2,213 2,282 2,580 2,999 345 403 417 472 551Un-Electrified Halsey 456 533 550 622 723 85 99 103 116 136Un-Electrified Maglalambay 931 1,091 1,125 1,271 1,478 154 180 187 211 246

PALECO Bantayan (Pob) 312 317 318 322 327 40 41 41 41 42PALECO Calsada (Pob) 201 206 207 211 216 28 29 29 30 30PALECO Convento (Pob) 318 323 324 328 333 45 46 46 47 47PALECO Lipot North 232 237 238 242 247 35 36 36 37 38PALECO Lipot South 181 186 187 191 196 20 21 21 21 22PALECO Tacas (Pob) 177 182 183 187 192 27 28 28 29 30PALECO Wahig (Pob) 298 303 304 308 313 41 42 42 43 43

BCS Santa Cruz (a) 1,016 1,031 1,034 1,046 1,061 152 154 155 157 160BCS Talaga 984 999 1,002 1,014 1,029 153 155 156 158 161

Un-Electrified Magsaysay (a) 1,464 1,489 1,494 1,514 1,539 232 236 238 241 246Un-Electrified Mampio 616 626 628 636 646 92 93 94 95 97Un-Electrified Nusa 540 550 552 560 570 82 84 84 85 87

BISELCO Barangay I (Pob) (CORON) 2,419 2,902 3,007 3,467 4,129 447 536 558 643 768BISELCO Barangay II (Pob) (CORON 712 852 883 1,018 1,213 140 168 174 201 240BISELCO Barangay III (Pob) (CORON 556 667 691 797 948 113 136 141 163 194BISELCO Barangay IV (Pob) (CORON 586 702 727 837 997 128 153 159 184 219BISELCO Barangay V (Pob) (CORON 2,246 2,693 2,791 3,219 3,835 463 555 577 666 796BISELCO Barangay VI 955 1,145 1,187 1,369 1,630 182 218 227 262 313BISELCO Bintuan 1,603 1,922 1,992 2,297 2,737 358 429 447 515 616BISELCO Borac 1,651 1,980 2,052 2,366 2,818 340 408 424 489 585BISELCO Decalachao 1,167 1,399 1,450 1,674 1,995 228 273 284 328 393BISELCO Guadalupe 1,468 1,760 1,824 2,104 2,506 297 356 370 427 511BISELCO San Nicolas (a) 1,707 2,046 2,120 2,446 2,913 290 348 362 417 499BISELCO Tagunpay (a) 4,779 5,730 5,938 6,848 8,156 881 1,056 1,099 1,267 1,515BISELCO Turda 1,885 2,261 2,343 2,702 3,219 346 415 432 498 595

BCS Bulalacao (b) 2,045 2,451 2,540 2,930 3,490 410 491 511 590 705BCS Banuang Daan 546 655 679 783 933 101 121 126 145 174BCS Buena Vista (a) 705 845 876 1,010 1,203 139 167 173 200 239BCS Cabugao 1,696 2,034 2,108 2,431 2,897 319 383 398 459 549BCS Decabobo 810 971 1,006 1,161 1,383 145 174 181 209 249BCS Lajala 1,233 1,479 1,533 1,769 2,107 264 317 329 380 454BCS Malawig 538 645 668 770 915 105 126 131 151 180BCS Marcilla 944 1,132 1,173 1,353 1,612 185 222 231 266 318BCS San Jose (a) 922 1,105 1,145 1,321 1,573 175 210 218 252 301BCS Tara 1,070 1,284 1,331 1,535 1,830 208 250 260 300 358

PALECO Balading 842 920 936 1,004 1,094 161 176 180 193 211PALECO Bangcal (Pob) (b) 1,114 1,218 1,240 1,330 1,449 242 265 270 290 317PALECO Cabigsing (Pob) 1,653 1,807 1,839 1,972 2,149 344 376 384 412 451PALECO Caburian 443 484 493 529 576 97 106 108 116 127PALECO Catadman (Pob) 995 1,088 1,107 1,188 1,295 193 211 216 231 253PALECO Funda 476 521 530 569 620 92 101 103 110 121PALECO Lagaoriao (Pob) 565 618 629 674 735 113 124 126 135 148PALECO Lungsod (Pob) 985 1,077 1,096 1,175 1,280 199 218 222 238 261PALECO Maringian 1,333 1,457 1,483 1,591 1,735 271 296 303 325 355PALECO Pawa 1,493 1,632 1,661 1,781 1,940 284 310 317 340 372PALECO San Carlos 1,322 1,446 1,472 1,578 1,719 249 272 278 298 326PALECO Suba 2,541 2,778 2,827 3,033 3,304 481 526 537 576 630PALECO Tenga-tenga (Pob) 816 892 908 974 1,061 168 184 188 201 220PALECO Tocadan 336 366 372 400 435 63 69 70 75 82

BAPA Manamoc 1,601 1,750 1,781 1,910 2,081 292 319 326 350 382Un-Electrified Caponayan 1,023 1,118 1,138 1,220 1,329 207 226 231 248 271Un-Electrified Lubid 715 782 796 854 931 153 167 171 183 201

BCS Bacao 1,086 1,290 1,334 1,528 1,804 209 248 258 295 350POPS Bohol 1,096 1,302 1,347 1,542 1,822 207 246 255 292 347

SHS/BCS Calasag 144 171 177 203 239 30 36 37 42 50SHS Catep 498 591 611 700 826 92 109 113 130 154BCS Culacian (a) 509 604 625 716 846 100 119 123 141 167BCS Danleg 1,521 1,806 1,868 2,139 2,526 268 318 330 378 448

BAPA Dumaran (Pob)* 1,235 1,467 1,518 1,738 2,053 243 289 300 343 407SHS Itangil 1,693 2,011 2,080 2,382 2,812 305 362 376 431 510SHS Magsaysay (b) 1,021 1,213 1,255 1,437 1,697 187 222 231 264 313

BAPA Santa Teresita* 1,758 2,089 2,161 2,474 2,920 319 379 394 451 534Un-Electrified Capayas 1,055 1,254 1,297 1,485 1,753 211 251 260 298 353Un-Electrified Ilian 1,336 1,588 1,643 1,883 2,224 248 295 306 351 416Un-Electrified San Juan (b) 723 858 888 1,018 1,202 146 173 180 206 245Un-Electrified Santa Maria 709 844 873 999 1,180 129 154 159 182 216

CUYO

BUSUANGA

CAGAYAN-CILLO

CORON

Pupolation Projection Potential Households Projection

BROOKE'SPOINT

DUMARAN

Page 9: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-9

Table 5.2.1 Number of Potential Households in 2015 (Continued) Present Municipality Barangaye-Status Name Name 2000(Base 2005 2006 2010 2015 2000(Base 2005 2006 2010 2015

Un-Electrified Santo Tomas 972 1,155 1,195 1,369 1,616 195 232 241 276 327Un-Electrified Tanatanaon 1,254 1,491 1,542 1,766 2,086 244 290 301 345 409

PALECO Buena Soerte (Pob) 1,761 2,170 2,261 2,663 3,255 344 424 443 522 640PALECO Corong-corong (Pob) 733 903 941 1,108 1,353 143 176 184 217 266PALECO Maligaya (Pob) 914 1,126 1,173 1,381 1,688 183 225 236 278 340PALECO Masagana (Pob) 921 1,134 1,181 1,391 1,700 210 259 270 318 391

SHS Aberawan 930 1,146 1,194 1,406 1,719 191 235 246 290 356SHS Bagong Bayan (a) 869 1,071 1,116 1,316 1,608 176 217 227 268 328

Un-Electrified Barotuan 1,708 2,104 2,192 2,582 3,156 341 420 439 517 635Un-Electrified Bebeladan 1,785 2,199 2,291 2,699 3,300 307 378 395 466 572Un-Electrified Bucana 3,945 4,860 5,063 5,964 7,290 740 912 953 1,123 1,378Un-Electrified Mabini (b) 937 1,154 1,202 1,415 1,729 178 219 229 270 331Un-Electrified Manlag 1,493 1,839 1,916 2,257 2,759 274 337 353 416 510Un-Electrified New Ibajay 2,355 2,902 3,023 3,561 4,353 413 509 532 627 769Un-Electrified Pasadena 1,214 1,496 1,559 1,837 2,245 231 285 298 351 430Un-Electrified San Fernando 1,445 1,781 1,855 2,186 2,672 282 348 363 428 525Un-Electrified Sibartan 1,214 1,496 1,559 1,837 2,245 236 291 304 358 440Un-Electrified Teneguiban 2,799 3,448 3,592 4,231 5,173 545 671 702 827 1,015Un-Electrified Villa Libertad 1,188 1,464 1,525 1,796 2,196 233 287 300 354 434Un-Electrified Villa Paz 818 1,007 1,049 1,237 1,513 164 202 211 249 306

BISELCO San Miguel (Pob) 2,526 3,188 3,337 4,006 5,013 500 631 663 796 1,000BCS Barangonan (Ilog) 541 683 715 858 1,073 110 139 146 175 220BCS Cabunlawan 567 716 750 900 1,125 95 120 126 151 190BCS Calibangbangan 654 826 865 1,037 1,298 121 153 161 193 242BCS Decabaitot 412 522 546 656 820 72 91 96 115 144BCS Maroyogroyog 1,129 1,425 1,492 1,791 2,241 195 246 259 311 390BCS New Culaylayan 652 823 862 1,034 1,294 126 159 167 201 252BCS Pical 870 1,098 1,149 1,380 1,726 172 217 228 274 344BCS San Nicolas (b) 580 732 766 920 1,150 116 146 154 185 232

Un-Electrified Nangalao 1,247 1,573 1,647 1,977 2,475 214 270 284 341 428PALECO Balaguen 1,700 1,726 1,731 1,751 1,776 334 339 341 345 351PALECO Danawan (Pob) 666 676 678 686 696 238 242 243 246 251PALECO Emilod 535 545 547 555 565 113 115 116 118 120PALECO Igabas 984 999 1,002 1,014 1,029 198 201 202 205 209PALECO Lacaren 425 430 431 435 440 80 81 81 82 83PALECO Los Angeles 930 945 948 960 975 189 192 193 196 200PALECO Lucbuan (a) 1,460 1,485 1,490 1,510 1,535 302 307 309 313 320PALECO Rizal (a) 1,880 1,910 1,916 1,940 1,970 391 397 400 405 413

Un-Electrified Alcoba 408 413 414 418 423 69 70 70 71 72Un-Electrified Canipo 1,045 1,060 1,063 1,075 1,090 189 192 193 195 199Un-Electrified Cocoro 850 865 868 880 895 166 169 170 172 176

PALECO Antipuluan 3,929 4,636 4,789 5,455 6,400 819 966 1,002 1,141 1,344PALECO Aramaywan (a) 3,073 3,627 3,747 4,268 5,006 603 712 738 841 990PALECO Bagong Sikat 1,596 1,883 1,945 2,215 2,599 308 363 377 429 505PALECO San Isidro (b) (Bato-bato) 1,607 1,897 1,960 2,232 2,618 318 375 389 443 522PALECO Burirao 2,250 2,656 2,744 3,126 3,667 452 534 553 630 742PALECO Calategas 3,892 4,594 4,746 5,405 6,340 729 860 892 1,016 1,196PALECO Dumaguena 3,191 3,767 3,892 4,433 5,199 640 756 784 892 1,051PALECO Elvita 812 957 989 1,127 1,323 155 183 189 216 254PALECO Estrella Village 979 1,155 1,193 1,358 1,592 194 229 237 270 318PALECO Ipilan (b) 1,195 1,410 1,457 1,659 1,946 248 293 303 346 407PALECO Malatgao (a) 1,945 2,296 2,372 2,701 3,167 378 446 463 527 620PALECO Malinao 2,375 2,803 2,896 3,299 3,870 506 597 619 706 831PALECO Narra (Pob) 10,818 12,769 13,191 15,023 17,621 2,261 2,669 2,767 3,151 3,710PALECO Panacan 6,644 7,841 8,100 9,226 10,822 1,360 1,605 1,664 1,896 2,232PALECO Princess Urduja 4,354 5,140 5,310 6,048 7,094 916 1,081 1,121 1,277 1,503PALECO Sandoval (b) 1,992 2,351 2,429 2,767 3,247 391 461 479 545 642PALECO Tacras 1,104 1,302 1,345 1,531 1,796 213 251 260 296 349PALECO Taritien 1,425 1,682 1,738 1,978 2,320 294 347 360 410 482PALECO Teresa 946 1,116 1,153 1,313 1,540 177 209 217 247 290PALECO Batang-batang 975 1,151 1,189 1,354 1,588 197 233 241 275 323PALECO Caguisan 1,045 1,233 1,274 1,451 1,702 223 263 273 311 366PALECO Tinagong Dagat 698 824 851 969 1,136 139 164 170 194 228PALECO Bacungan 3,386 4,260 4,456 5,336 6,657 766 964 1,012 1,212 1,517PALECO Bagong Pag-Asa (Pob) 2,075 2,611 2,731 3,271 4,082 416 523 549 658 824PALECO Bagong Sikat (Pob) 6,331 7,967 8,334 9,980 12,450 1,244 1,565 1,644 1,968 2,464PALECO Bagong Silang (Pob) 3,602 4,531 4,740 5,677 7,081 707 889 934 1,118 1,400PALECO Bancao-bancao 8,061 10,142 10,610 12,706 15,852 1,749 2,201 2,311 2,767 3,465PALECO Barangay ng mga Mangingis 2,694 3,390 3,546 4,246 5,297 579 729 765 916 1,147PALECO Inagawan 1,357 1,708 1,787 2,139 2,668 291 366 385 460 576PALECO Inagawan Sub-Colony 905 1,140 1,193 1,429 1,784 209 263 277 331 415PALECO Irawan 3,548 4,464 4,670 5,592 6,976 718 903 949 1,136 1,422PALECO Iwahig (Pob) 651 820 858 1,027 1,281 147 185 194 233 291PALECO Kalipay (Pob) 566 713 746 893 1,113 131 165 173 207 259PALECO Kamuning 1,419 1,786 1,868 2,237 2,792 313 394 414 495 620PALECO Liwanag (Pob) 1,572 1,978 2,069 2,477 3,090 388 488 513 614 768PALECO Lucbuan (b) 1,216 1,531 1,602 1,919 2,395 248 312 328 393 492PALECO Luzviminda 2,793 3,514 3,676 4,401 5,490 570 717 753 901 1,129PALECO Mabuhay (Pob) 1,073 1,350 1,412 1,691 2,109 208 262 275 329 412PALECO Magkakaibigan (Pob) 298 375 392 470 585 80 101 106 127 158PALECO Maligaya (Pob) 332 418 437 523 653 65 82 86 103 129PALECO Manalo 1,692 2,129 2,227 2,667 3,328 338 425 447 535 670PALECO Mandaragat (Pob) 8,422 10,596 11,084 13,274 16,558 1,773 2,231 2,342 2,805 3,511PALECO Manggahan (Pob) 1,332 1,677 1,754 2,102 2,622 305 384 403 483 605PALECO Maningning (Pob) 764 961 1,005 1,203 1,500 172 216 227 272 340PALECO Maoyon 994 1,251 1,309 1,567 1,955 189 238 250 299 374PALECO Maruyogon 1,381 1,737 1,817 2,177 2,715 265 333 350 419 525PALECO Masigla (Pob) 417 527 551 660 824 93 118 123 148 185PALECO Masikap (Pob) 879 1,105 1,156 1,384 1,726 194 244 256 307 384PALECO Masipag (Pob) 2,092 2,632 2,753 3,297 4,113 375 472 495 593 743PALECO Matahimik (Pob) 2,971 3,738 3,910 4,682 5,841 594 747 785 940 1,176PALECO Matiyaga (Pob) 321 404 423 506 631 77 97 102 122 152

NARRA

LINAPACAN

MAGSAYSAY

Pupolation Projection Potential Households Projection

DUMARAN

EL NIDO(BACUIT)

PUERTOPRINCESA

CITY(CAPITAL)

Page 10: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-10

Table 5.2.1 Number of Potential Households in 2015 (Continued) Present Municipality Barangaye-Status Name Name 2000(Base 2005 2006 2010 2015 2000(Base 2005 2006 2010 2015

PALECO Maunlad (Pob) 3,724 4,685 4,901 5,869 7,321 806 1,014 1,065 1,275 1,596PALECO Milagrosa (Pob) 2,406 3,027 3,167 3,793 4,732 509 640 673 805 1,009PALECO Model (Pob) 363 458 479 573 715 86 109 114 136 171PALECO Montible (Pob) 80 101 106 127 159 17 21 23 27 34PALECO Pagkakaisa (Pob) 1,740 2,190 2,291 2,745 3,425 360 453 476 570 714PALECO Princesa (Pob) 907 1,142 1,195 1,431 1,786 187 235 247 296 371PALECO Salvacion (a) 884 1,114 1,165 1,396 1,741 191 241 253 303 379PALECO San Jose (b) 5,209 6,553 6,855 8,210 10,242 1,058 1,331 1,398 1,674 2,096PALECO San Manuel 4,689 5,900 6,172 7,392 9,221 993 1,249 1,312 1,571 1,967PALECO San Miguel (a) 14,464 18,198 19,037 22,798 28,440 3,099 3,899 4,094 4,903 6,139PALECO San Pedro 12,127 15,258 15,961 19,114 23,844 2,469 3,106 3,261 3,906 4,890PALECO Santa Cruz (b) 580 730 764 915 1,140 140 176 185 222 277PALECO Santa Lourdes 3,365 4,234 4,429 5,304 6,617 735 925 971 1,163 1,456PALECO Santa Lucia (Pob) 81 102 107 128 160 16 20 21 25 32PALECO Santa Monica 8,076 10,161 10,629 12,729 15,880 1,707 2,148 2,255 2,700 3,381PALECO Seaside (Pob) 1,544 1,943 2,033 2,435 3,037 310 390 410 491 614PALECO Sicsican 4,341 5,462 5,714 6,843 8,535 846 1,064 1,118 1,339 1,676PALECO Tagburos 3,555 4,473 4,679 5,604 6,990 713 897 942 1,128 1,412PALECO Tagunpay (Pob) 1,079 1,358 1,421 1,703 2,124 230 289 304 364 456PALECO Tanglaw (Pob) 2,026 2,548 2,665 3,192 3,982 527 663 696 833 1,044PALECO Tiniguiban 6,496 8,173 8,550 10,238 12,773 1,336 1,681 1,765 2,114 2,646

POPS Babuyan 1,704 2,144 2,243 2,685 3,350 351 442 464 555 695BCS Napsan 1,911 2,404 2,515 3,012 3,758 406 511 536 642 804

Un-Electrified Bagong Bayan (b) 534 671 702 840 1,048 125 157 165 197 247Un-Electrified Bahile 1,932 2,431 2,543 3,045 3,798 382 481 505 604 756Un-Electrified Binduyan 855 1,075 1,125 1,347 1,682 159 200 210 251 315Un-Electrified Buena Vista (b) 780 981 1,026 1,228 1,532 144 181 190 228 285Un-Electrified Cabayugan 2,113 2,658 2,781 3,330 4,155 415 522 548 656 822Un-Electrified Conception (c) 1,031 1,297 1,357 1,625 2,027 204 257 270 323 404Un-Electrified Langogan 1,346 1,693 1,771 2,120 2,644 310 390 409 490 613Un-Electrified Macarascas 1,273 1,603 1,677 2,009 2,506 260 327 344 412 516Un-Electrified Marufinas 542 682 713 854 1,065 98 123 129 155 194Un-Electrified New Panggangan 542 682 713 854 1,065 109 137 144 172 216Un-Electrified San Rafael (b) 1,384 1,741 1,821 2,181 2,722 307 386 405 486 608Un-Electrified Simpocan 914 1,150 1,203 1,440 1,796 181 228 239 286 358Un-Electrified Tagabinit 1,169 1,471 1,539 1,843 2,298 228 287 301 361 451Un-Electrified Tanabag 412 517 541 648 808 88 110 116 139 174

PALECO Alfonso XIII (Pob) 6,735 7,617 7,803 8,594 9,674 1,356 1,534 1,577 1,737 1,962PALECO Panitian (a) 6,219 7,034 7,206 7,936 8,933 1,244 1,407 1,447 1,593 1,800PALECO Pinaglabanan 2,659 3,007 3,080 3,392 3,817 596 674 693 763 862PALECO Tabon 3,257 3,682 3,772 4,154 4,676 690 780 802 883 998

BCS Berong 1,614 1,824 1,869 2,059 2,318 340 384 395 435 492Un-Electrified Aramaywan (b) 2,988 3,378 3,461 3,813 4,292 566 640 658 725 819Un-Electrified Kalatagbak 1,351 1,527 1,564 1,722 1,937 291 329 338 372 420Un-Electrified Calumpang 1,710 1,935 1,982 2,183 2,457 355 402 413 455 514Un-Electrified Isugod 3,140 3,550 3,637 4,005 4,508 628 710 730 804 908Un-Electrified Maasin (b) 1,734 1,960 2,008 2,211 2,489 314 355 365 402 454Un-Electrified Malatgao (b) 2,124 2,402 2,461 2,711 3,052 430 486 500 551 622Un-Electrified Quinlogan 3,819 4,318 4,423 4,871 5,483 775 876 901 992 1,121Un-Electrified Sowangan 1,782 2,015 2,064 2,273 2,558 366 414 425 469 529Un-Electrified Tagusao 2,537 2,869 2,939 3,237 3,643 502 568 584 643 726

PALECO Abaroan 3,136 3,342 3,384 3,557 3,781 602 642 652 685 731PALECO Barangay I (Pob) (ROXAS) 3,059 3,260 3,301 3,469 3,688 597 636 647 680 725PALECO Barangay II (Pob) (ROXAS) 885 943 955 1,003 1,067 175 186 190 199 213PALECO Barangay III (Pob) (ROXAS 2,296 2,447 2,478 2,605 2,769 478 509 518 544 581PALECO Barangay IV (Pob) (ROXAS 4,324 4,607 4,665 4,904 5,213 849 905 919 966 1,031PALECO Magara 3,702 3,945 3,995 4,199 4,464 735 783 796 837 893PALECO Malcampo 1,320 1,407 1,425 1,498 1,592 256 273 277 292 311PALECO Minara 1,178 1,255 1,271 1,336 1,420 243 259 263 277 295PALECO New Cuyo 1,595 1,699 1,720 1,808 1,922 303 323 328 345 368PALECO Retac 1,923 2,050 2,076 2,182 2,320 369 393 400 420 448PALECO San Jose (c) 1,088 1,159 1,174 1,234 1,312 204 217 221 232 248PALECO Tagunpay (b) 2,232 2,379 2,409 2,532 2,692 466 497 505 531 566

Un-Electrified Antonino 801 854 865 909 966 156 166 169 178 189Un-Electrified Bagong Bayan (c) 812 866 877 921 979 160 171 173 182 194Un-Electrified Barangay V (Pob) (Porao Is) 12 13 13 14 14 3 3 3 3 4Un-Electrified Barangay VI (Pob) (Johnson 540 575 582 611 651 105 112 114 119 127Un-Electrified Caramay 2,163 2,305 2,334 2,453 2,608 445 474 482 507 540Un-Electrified Dumarao 2,242 2,389 2,419 2,543 2,703 432 460 468 492 525Un-Electrified Santo Tomas (Iraan) 702 747 756 795 845 140 149 151 159 170Un-Electrified Jolo 699 744 753 792 842 148 158 160 168 180Un-Electrified Mendoza 1,197 1,276 1,292 1,358 1,444 253 270 274 288 307Un-Electrified Nicanor Zabara 1,452 1,548 1,567 1,647 1,751 306 326 331 348 372Un-Electrified Rizal (b) 777 827 837 881 936 146 155 158 166 177Un-Electrified Salvacion (b) 532 567 574 602 641 122 130 132 139 148Un-Electrified San Isidro (c) 514 549 556 584 620 100 107 109 114 121Un-Electrified San Miguel (b) 785 836 846 890 946 172 183 186 196 209Un-Electrified San Nicolas (c) 678 723 732 769 818 130 139 141 148 158Un-Electrified Sandoval (c) 1,546 1,648 1,669 1,754 1,865 303 323 328 345 368Un-Electrified Taradungan 926 986 998 1,050 1,116 182 194 197 207 221Un-Electrified Tinitian 1,311 1,397 1,415 1,487 1,581 265 282 287 302 322Un-Electrified Tumarabong 2,794 2,978 3,015 3,169 3,369 590 629 639 672 717

PALECO Alimanguen 2,809 3,143 3,213 3,509 3,910 542 606 622 680 760PALECO New Agutaya 2,111 2,361 2,414 2,636 2,937 420 470 482 526 589PALECO San Vicente (Pob) 3,921 4,386 4,484 4,897 5,456 758 848 870 950 1,063PALECO San Isidro (d) 1,025 1,146 1,172 1,280 1,426 213 238 244 267 299

BAPA Port Barton* 4,140 4,632 4,735 5,171 5,760 814 911 934 1,021 1,141POPS Santo Nino (c) 951 1,065 1,089 1,189 1,325 169 189 194 212 237

Un-Electrified Binga 1,372 1,535 1,569 1,714 1,909 254 284 292 318 356Un-Electrified Caruray 3,526 3,946 4,034 4,406 4,908 672 752 772 843 942Un-Electrified Kemdeng 701 784 801 875 975 132 148 151 165 185Un-Electrified New Canipo 1,059 1,185 1,211 1,323 1,475 200 224 230 251 281

Pupolation Projection Potential Households Projection

QUEZON

ROXAS

SANVICENTE

PUERTOPRINCESA

CITY(CAPITAL)

Page 11: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-11

Table 5.2.1 Number of Potential Households in 2015 (Continued) Present Municipality Barangaye-Status Name Name 2000(Base 2005 2006 2010 2015 2000(Base 2005 2006 2010 2015

PALECO Abongan 3,757 4,284 4,396 4,874 5,531 702 800 824 914 1,041PALECO Bato 2,241 2,556 2,623 2,907 3,297 422 481 496 549 625PALECO Poblacion (TAYTAY) 6,608 7,534 7,731 8,570 9,725 1,339 1,527 1,572 1,743 1,985

BCS Banbanan 1,608 1,834 1,882 2,086 2,367 284 324 334 370 421BCS Beton 1,284 1,464 1,502 1,664 1,889 217 247 255 282 322SHS Busy Bees 892 1,017 1,044 1,157 1,313 159 181 187 207 236BCS Calawag 3,752 4,278 4,390 4,868 5,524 715 815 840 931 1,060BCS Casian 2,294 2,616 2,684 2,976 3,376 416 474 489 542 617SHS Cataban 760 866 889 985 1,118 154 175 181 200 228BCS Debangan 1,106 1,261 1,294 1,436 1,631 199 227 234 259 296

BAPA Liminangcong 4,058 4,628 4,749 5,264 5,973 747 852 877 973 1,108SHS Pularaquen (Canique) 1,359 1,549 1,589 1,762 1,999 265 302 311 345 393

Un-Electrified Alacalian 1,557 1,776 1,822 2,020 2,292 305 348 358 397 452Un-Electrified Bantulan 1,543 1,759 1,805 2,001 2,271 309 352 363 402 458Un-Electrified Baras 388 442 454 503 571 74 84 87 96 110Un-Electrified Batas 901 1,028 1,055 1,170 1,328 175 200 206 228 260Un-Electrified Depla 804 917 941 1,044 1,185 172 196 202 224 255Un-Electrified Libertad 1,635 1,864 1,913 2,121 2,407 295 336 346 384 437Un-Electrified Meytegued 867 989 1,015 1,125 1,277 167 190 196 218 248Un-Electrified Minapla 543 619 635 704 798 128 146 150 167 190Un-Electrified New Guinlo 3,150 3,592 3,686 4,086 4,637 570 650 669 742 845Un-Electrified Old Guinlo 659 751 771 855 970 123 140 144 160 182Un-Electrified Paglaum 1,713 1,954 2,005 2,223 2,522 309 352 363 402 458Un-Electrified Paly (Paly Is) 1,355 1,545 1,585 1,757 1,993 249 284 292 324 369Un-Electrified Pamantolon 1,165 1,329 1,364 1,512 1,717 202 230 237 263 300Un-Electrified Pancol 1,937 2,209 2,267 2,513 2,851 365 416 429 475 541Un-Electrified San Jose (d) 1,512 1,723 1,768 1,960 2,223 281 320 330 366 416Un-Electrified Sandoval (d) 1,008 1,150 1,180 1,308 1,483 182 208 214 237 270Un-Electrified Silanga 769 877 900 997 1,132 146 167 171 190 216Un-Electrified Talog 917 1,045 1,072 1,188 1,348 162 185 190 211 240Un-Electrified Tumbod 1,288 1,468 1,506 1,668 1,893 250 285 293 325 370

POPS KALAYAAN Pag-asa (Pob) 120 125 126 130 135 12 13 13 13 14BISELCO Balala 658 730 745 808 893 154 171 175 190 211BISELCO Baldat 434 481 491 532 588 88 98 100 108 120BISELCO Culango 265 295 301 326 361 45 50 51 56 62BISELCO Jardin 998 1,107 1,130 1,226 1,355 188 209 214 232 257BISELCO Libis 1,132 1,256 1,282 1,390 1,536 240 266 273 296 328BISELCO Malaking Ptag 1,335 1,480 1,510 1,638 1,810 250 277 284 308 341BISELCO Osmena 4,169 4,624 4,719 5,119 5,654 849 942 965 1,046 1,160BISELCO Tiza 939 1,041 1,062 1,152 1,273 211 234 240 260 288

BCS Galoc 1,174 1,303 1,330 1,442 1,593 220 244 250 271 301BCS Luac 1,091 1,210 1,235 1,339 1,479 505 560 574 622 690

Un-Electrified Binudac 2,034 2,255 2,301 2,495 2,755 332 368 377 409 453BCS Bunog 1,909 2,782 2,996 4,028 5,791 383 558 603 811 1,170BCS Campung-ulay 1,540 2,245 2,417 3,250 4,672 435 634 685 921 1,330BCS Candawaga 4,425 6,450 6,945 9,336 13,423 931 1,357 1,467 1,972 2,845

BAPA Punta Baja 7,253 10,573 11,385 15,307 22,009 1,529 2,229 2,409 3,239 4,674BCS Taburi 2,143 3,124 3,364 4,523 6,504 492 717 775 1,042 1,504

Un-Electrified Canipaan 1,749 2,550 2,746 3,692 5,309 392 572 618 831 1,199Un-Electrified Culacian (b) 1,488 2,171 2,338 3,143 4,520 307 448 484 651 939Un-Electrified Iraan (b) 4,509 6,574 7,079 9,517 13,685 941 1,372 1,483 1,994 2,877Un-Electrified Latud 1,129 1,645 1,771 2,381 3,423 267 389 420 565 815Un-Electrified Panalingaan 2,512 3,663 3,944 5,302 7,623 571 833 900 1,210 1,746Un-Electrified Ransang 3,040 4,432 4,772 6,417 9,226 668 974 1,052 1,415 2,042

PALECO Abo-abo 2,422 2,824 2,910 3,284 3,809 573 668 691 780 908PALECO Isumbo 1,794 2,092 2,156 2,432 2,819 385 449 464 524 610PALECO Panitian (b) 4,209 4,907 5,057 5,705 6,614 935 1,090 1,128 1,272 1,480PALECO Pulot Center 5,318 6,201 6,391 7,211 8,361 1,006 1,173 1,213 1,369 1,593PALECO Pulot Shore (Pulot I) 3,716 4,333 4,466 5,039 5,841 700 816 844 953 1,108

Un-Electrified Iraray 2,391 2,788 2,873 3,241 3,756 444 518 536 604 703Un-Electrified Labog 2,970 3,465 3,571 4,029 4,671 604 705 729 822 957Un-Electrified Pulot Interior (Pulot II) 1,736 2,024 2,086 2,354 2,730 370 431 446 504 586Un-Electrified Punang 2,170 2,531 2,608 2,942 3,411 462 539 557 629 732

753,118 899,020 931,440 1,075,595 1,289,683 151,190 180,814 188,095 217,542 262,303Total

Pupolation Projection Potential Households Projection

RIZAL(MARCOS)

SOFRONIOESPANOLA

TAYTAY

CULION

Page 12: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-12

(2) Estimation of target households for electrification The number of target households for electrification depends on a target household

electrification ratio. For example, if the target ratio is 90%, which is the DOE’s target in 2017, the target households for electrification in 2017 is 90% of potential households in 2017.

In estimating target households for electrification, the Study distinguishes between two types of target households. One is the target households for the whole barangay electrification, and the other is the target households for household electrification improvement (see Figure 5.2.1). The target households for the whole barangay electrification are estimated by the formula shown in Figure 5.2.1. The Study employs the “capacity to pay” factor and the “concentration ratio”, because not all potential households can afford to pay the electricity charge2 and not all potential households are located at one spot in a barangay. The “capacity to pay” factor refers to the share of potential households in the barangay that can afford to pay the electricity charge. The concentration ratio refers to the share of households that are expected to be located in the proximity of the barangay center 3 . According to the socio-economic survey, the “capacity to pay” factor and the concentration ratio are considered to be about 0.7 and 0.5 ~ 0.7 in Palawan, respectively (see Section 4.2). The Study employs the concentration ratio of 0.5.

Un-electrified Bgy. A

SitioBgy. Center

Target HH for 100% Bgy. Electrification

Target HH for HH Electrification Improvement

  = Potential HH x Capacity to Pay Factor x Concentration Ratio

= Potential HH x Target HH Electrification Ratio- Target HH for 100% Bgy. Electrification

Target HH in Bgy. A

= Target HH for 100% Bgy. Electrification+ Target HH for HH Electrification Improvement

Un-electrified Bgy. AUn-electrified Bgy. A

SitioBgy. CenterSitioBgy. CenterSitioBgy. Center

Target HH for 100% Bgy. Electrification

Target HH for HH Electrification Improvement

  = Potential HH x Capacity to Pay Factor x Concentration Ratio

= Potential HH x Target HH Electrification Ratio- Target HH for 100% Bgy. Electrification

Target HH in Bgy. A

= Target HH for 100% Bgy. Electrification+ Target HH for HH Electrification Improvement

Figure 5.2.1 Type of Target Households for Electrification

Table 5.2.6 shows the number of target households for the whole barangay electrification in

20064 and the number of target households for household electrification improvement in 2015 in the case of an 80% electrification target.

2 The minimum charge is assumed to be P150 / month, which is a general minimum monthly charge in BAPA. 3 The Barangay proper has the Barangay hall, the Barangay plaza, a Barangay day care center and other facilities. 4 The number of target households for 100% barangay electrification in 2006 is 35% of the potential households in each barangay.

Page 13: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-13

(3) Estimation of unit energy consumption and peak demand The Study assumes the two consumer types below in estimating unit energy consumption and

peak demand.

Low Use Consumer : Fluorescent Light (20 W) x 2 High Use Consumer : Fluorescent Light (20 W) x 4, Color TV (50 W) x 1,

Audio5 (20 W) x 1, Refrigerator (100 W) x 1, Electric Fan (30 W) x 1

In the case of electrification with SHS and/or BCS, however, the parameter of appliances to

install and supply hours are fixed at two fluorescent lights and 4-hour supply respectively in consideration of MEDP and existing SHS and BCS projects in Palawan.

Figure 5.2.2 shows the daily use patterns of each appliance.

Low Use ConsumerItem Qt. W WH MAX. W Hours in Use -1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 -24

Fluorescent Light 2 20 160 40 8 1 2 2 1 1 1160 40 8 1 2 2 1 1 1160 40 8 1 2 2 1 1 1120 40 6 1 2 2 1

High Use ConsumerItem Qt. W WH MAX. W Hours in Use -1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 -24

Fluorescent Light 4 20 300 80 15 2 4 4 2 2 1300 80 15 2 4 4 2 2 1300 80 15 2 4 4 2 2 1240 80 12 2 4 4 2

Color TV 1 50 250 50 5 1 1 1 1 1250 50 5 1 1 1 1 1200 50 4 1 1 1 1200 50 4 1 1 1 1

Refrigerator 1 100 2400 100 24 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11200 100 12 1 1 1 1 1 1 1 1 1 1 1 1600 100 6 1 1 1 1 1 1400 100 4 1 1 1 1

Audio 1 20 40 20 2 1 1(VCD, KARAOKE, 40 20 2 1 1

CASSETTE) 40 20 2 1 120 20 1 1

Electric Fan 1 30 360 30 12 1 1 1 1 1 1 1 1 1 1 1 1270 30 9 1 1 1 1 1 1 1 1 1120 30 4 1 1 1 1120 30 4 1 1 1 1

Figure 5.2.2 Daily Use Pattern of Electric Appliances

There are many options for the electricity supply hours. The Study uses a 6-hour supply as a base for power demand forecasting, which many existing mini-grid systems also employ. Figure 5.2.3 shows the daily load curve of each consumer type.

5 Karaoke, VCD, Cassette recorder, others

Page 14: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-14

Load Curve of Low Use Customer

0

50

100

150

200

250

300

17-18 18-19 19-20 20-21 21-22 22-23

Hour

WFluorescent Light

Load Curve of High Use Customer

0

50

100

150

200

250

300

17-18 18-19 19-20 20-21 21-22 22-23

Hour

W

Refrigerator Color TV Electric Fan Audio Fluorescent Light

Figure 5.2.3 Daily Load Curve of each Consumer Type (6-Hour Supply)

Table 5.2.2 shows the unit energy consumption and peak demand for each consumer type.

Table 5.2.2 Unit Energy Consumption and Peak Demand

Consumer Type Energy Consumption (Wh) Peak Demand (W) Low Use Consumer 160 Wh / day /HH = 4.8 kWh / Month /HH 40 W / HH High Use Consumer 1,260 Wh / day / HH = 37.8 kWh / Month /HH 260 W / HH Note: 6-hour supply

The share of low and high use consumer depends on the economical conditions of each

barangay. The Study assumes the two types of shares shown below.

Category I : The ratio of low use consumer and high use consumer is 90% to 10% Category II : The ratio of low use consumer and high use consumer is 70% to 30%

In Palawan, coastal barangays generally have better economical conditions than highland barangays. Table 5.2.3 shows the histogram of monthly energy consumption of consumers in Barangay. Port Barton BAPA, which provides a 6-hour supply to its consumers. Since about 30% of the consumers are ranked above 30 kWh, the economical condition of Barangay. Port Barton is considered to be close to Category II.

Page 15: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-15

Table 5.2.3 Monthly Energy Consumption in Port Barton BAPA Monthly Energy Consumption

(kWh) No. of Consumers Ratio

0 - 30 89 73.55 % 30 - 60 15 12.40% 60 - 90 4 3.31% 90 - 120 5 4.13% 120 - 150 2 1.65% 150 - 180 1 0.83% 180 - 210 2 1.65% 210 - 240 0 0.00% 240 - 270 1 0.83% 270 - 300 0 0.00% 300 - 2 1.65%

Total 121 100.00% Source: Port Barton BAPA Monthly Financial and Statistical Report, April, 2002

Ideally, the category for each barangay needs to be set individually considering their respective

economic conditions. The Study, however, set the category for all barangays at Category II. This is due to the fact that almost all of the barangays in Palawan are located along coastlines. Table 5.2.4 shows the annual unit energy consumption and peak demand for the given conditions.

Table 5.2.4 Annual Unit Energy Consumption and Peak Demand Barangay Category Unit Energy Consumption (kWh) Unit Peak Demand (W)

Category II 179 kWh / year / HH 106 W / HH Note: 6-hour supply

Table 5.2.5 shows the daily unit energy consumption and peak demand for reference.

Table 5.2.5 Daily Unit Energy Consumption and Peak Demand Category I Category II (SHS / BCS)

Supply Hours

Unit Energy Consumption (kWh / day / HH)

Unit Peak Demand (W / HH)

Unit EnergyConsumption(kWh / day / HH)

Unit Peak Demand (W / HH)

Unit Energy Consumption (kWh / day / HH)

Unit PeakDemand (W / HH)

24 479 62 1,117 106 - - 12 350 62 730 106 - - 6 270 62 490 106 - - 4 206 62 106 106 120 40

Page 16: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-16

(4) Estimation of potential power demand in 2015 Figure 5.2.4 shows the flow for estimating potential power demand on a sample barangay

(Barangay A) with 1,000 households.

Potential HHin 2015

Target HH for100%Bgy.

Electrification

(Bgy. A)Category II

6 hours

1,000 HH

350 HH

Potential HH forHH Electrification

650 HH

Target HH forHH Electrification

Un-Electrified HHin 2015

(Target Ratio of HH Electrification = 80%)

450 HH(= 1,000 x 0.8 –350)

200 HH

Target HH in Sitio A

Target HH in Sitio B

225 HH

225 HH

350 x 179 = 62.7 (MWh)

350 x 106=37.1 (kW)

225 x 179 = 40.3 (MWh)

225 x 106 = 23.9 (kW)

225 x 179 = 40.3 (MWh)

225 x 106= 23.9 (kW)

Total potential demand in Bgy.A = 143.3 (MWh)= 84.9 (kW)

Unit Energy Consumption = 179 kWh / year /HHUnit Peak Demand = 106 W / HH

Potential HHin 2015

Target HH for100%Bgy.

Electrification

(Bgy. A)Category II

6 hours

1,000 HH

350 HH

Potential HH forHH Electrification

650 HH

Target HH forHH Electrification

Un-Electrified HHin 2015

(Target Ratio of HH Electrification = 80%)

450 HH(= 1,000 x 0.8 –350)

200 HH

Target HH in Sitio A

Target HH in Sitio B

225 HH

225 HH

350 x 179 = 62.7 (MWh)

350 x 106=37.1 (kW)

225 x 179 = 40.3 (MWh)

225 x 106 = 23.9 (kW)

225 x 179 = 40.3 (MWh)

225 x 106= 23.9 (kW)

Total potential demand in Bgy.A = 143.3 (MWh)= 84.9 (kW)

Unit Energy Consumption = 179 kWh / year /HHUnit Peak Demand = 106 W / HH

Figure 5.2.4 Flow for Estimating Potential Power Demand Finally, potential power demand in the electrified and un-electrified barangays, except for the barangays supplied with electricity from NPC-SPUG and ECs, are shown in Table 5.2.6.

Table 5.2.6 Potential Power Demand Forecast in 2015 (Non NPC-SPUG and ECs Areas) Present Municipality Barangay Potential HH Target HH Energy Demand Target HH Energy Demand Target HH Energy Demande-Status Name Name 2015 (2006, 35%) (MWh) (kW) For 80%, 2015 (MWh) (kW) (Total, 2015) (MWh) (kW)

BCS Aporawan 833 286 51.19 30.32 365 65.51 38.8 651 116.7 69.12Un-Electrified Culandanum (a) 256 90 16.11 9.54 115 20.76 12.3 205 36.87 21.84Un-Electrified Sagpangan 470 165 29.54 17.49 211 37.95 22.47 376 67.49 39.96Un-Electrified Algeciras 2031 711 127.27 75.37 914 163.43 96.78 1625 290.7 172.15Un-Electrified Conception (a) 1477 517 92.54 54.8 665 92.54 54.8 1182 185.08 109.6Un-Electrified Diit 752 263 47.08 27.88 339 60.86 36.04 602 107.94 63.92Un-Electrified Maracanao 99 35 6.27 3.71 44 7.88 4.66 79 14.15 8.37Un-Electrified Matarawis 88 31 5.55 3.29 39 7.16 4.24 70 12.71 7.53Un-Electrified Villafria 348 122 21.84 12.93 156 27.92 16.54 278 49.76 29.47Un-Electrified Villasol 524 183 32.76 19.4 236 41.89 24.8 419 74.65 44.2Un-Electrified Balogo 105 37 6.62 3.92 47 8.59 5.09 84 15.21 9.01Un-Electrified Dagman 174 61 10.92 6.47 78 13.96 8.27 139 24.88 14.74Un-Electrified Dalayawon 87 30 5.37 3.18 40 7.16 4.24 70 12.53 7.42Un-Electrified Lumacad 112 39 6.98 4.13 51 9.31 5.51 90 16.29 9.64Un-Electrified Madoldolon 95 33 5.91 3.5 43 7.88 4.66 76 13.79 8.16Un-Electrified Mauringuen 158 55 9.85 5.83 71 12.89 7.63 126 22.74 13.46Un-Electrified Osmena (a) 158 55 9.85 5.83 71 12.89 7.63 126 22.74 13.46Un-Electrified San Jose De Oro 59 21 3.76 2.23 26 4.65 2.76 47 8.41 4.99Un-Electrified Santo Nino (a) 86 30 5.37 3.18 39 7.16 4.24 69 12.53 7.42Un-Electrified Taloto 113 40 7.16 4.24 50 8.95 5.3 90 16.11 9.54Un-Electrified Agutayan 177 62 11.1 6.57 80 14.32 8.48 142 25.42 15.05Un-Electrified Bancalaan 1926 674 120.65 71.44 867 155.37 92.01 1541 276.02 163.45Un-Electrified Bugsuk (New Cagayancillo) 280 98 17.54 10.39 126 22.55 13.36 224 40.09 23.75Un-Electrified Catagupan 445 156 27.92 16.54 200 35.44 20.99 356 63.36 37.53Un-Electrified Indalawan 271 95 17.01 10.07 122 21.48 12.72 217 38.49 22.79Un-Electrified Malaking Ilog 217 76 13.6 8.06 98 17.18 10.18 174 30.78 18.24Un-Electrified Mangsee 1517 531 95.05 56.29 683 95.05 56.29 1214 190.1 112.58Un-Electrified Melville 280 98 17.54 10.39 126 21.66 12.83 224 39.2 23.22Un-Electrified Pandanan 178 62 11.1 6.57 80 14.5 8.59 142 25.6 15.16Un-Electrified Pasig 122 43 7.7 4.56 55 10.02 5.94 98 17.72 10.5Un-Electrified Rabor 136 48 8.59 5.09 61 11.1 6.57 109 19.69 11.66Un-Electrified Ramos 429 150 26.85 15.9 193 34.37 20.35 343 61.22 36.25Un-Electrified Salang 651 228 40.81 24.17 293 52.63 31.16 521 93.44 55.33Un-Electrified Sebaring 249 87 15.57 9.22 112 19.87 11.77 199 35.44 20.99

ABORLAN

AGUTAYA

ARACELI

BALABAC

Page 17: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-17

Table 5.2.6 Potential Power Demand Forecast in 2015 (Non NPC-SPUG and ECs Areas) (Continued) Present Municipality Barangay Potential HH Target HH Energy Demand Target HH Energy Demand Target HH Energy Demande-Status Name Name 2015 (2006, 35%) (MWh) (kW) For 80%, 2015 (MWh) (kW) (Total, 2015) (MWh) (kW)

Un-Electrified Bulalacao (a) 543 190 34.01 20.14 244 43.5 25.76 434 77.51 45.9Un-Electrified Buliluyan 408 143 25.6 15.16 183 32.76 19.4 326 58.36 34.56Un-Electrified Culandanum (b) 1170 410 73.39 43.46 526 94.51 55.97 936 167.9 99.43Un-Electrified Igang igang 412 144 25.78 15.26 186 33.29 19.72 330 59.07 34.98Un-Electrified Iwahig 691 242 43.32 25.65 311 55.85 33.07 553 99.17 58.72Un-Electrified Malihud 522 183 32.76 19.4 235 42.24 25.02 418 75 44.42Un-Electrified Malitub 192 67 11.99 7.1 87 15.75 9.33 154 27.74 16.43Un-Electrified Ocayan 559 196 35.08 20.78 251 45.11 26.71 447 80.19 47.49Un-Electrified Puring 275 96 17.18 10.18 124 22.02 13.04 220 39.2 23.22Un-Electrified Rio Tuba 2845 996 178.28 105.58 1280 228.76 135.47 2276 407.04 241.05Un-Electrified Sandoval (a) 829 290 51.91 30.74 373 66.41 39.33 663 118.32 70.07Un-Electrified Sapa 464 162 29 17.17 209 37.59 22.26 371 66.59 39.43Un-Electrified Sarong 607 212 37.95 22.47 274 48.87 28.94 486 86.82 51.41Un-Electrified Sumbiling 824 288 51.55 30.53 371 66.23 39.22 659 117.78 69.75Un-Electrified Tabud 307 107 19.15 11.34 139 24.7 14.63 246 43.85 25.97Un-Electrified Tagnato 217 76 13.6 8.06 98 17.54 10.39 174 31.14 18.45Un-Electrified Tagolango 226 79 14.14 8.37 102 18.26 10.81 181 32.4 19.18Un-Electrified Taratak 574 201 35.98 21.31 258 46.54 27.56 459 82.52 48.87Un-Electrified Tarusan 1093 383 68.56 40.6 491 88.07 52.15 874 156.63 92.75Un-Electrified BROOKE'S Imulnod 480 168 30.07 17.81 216 38.66 22.9 384 68.73 40.71

BCS Panlaitan 657 223 39.92 23.64 283 50.84 30.1 506 90.76 53.74BCS Quezon 331 109 19.51 11.55 136 24.34 14.42 245 43.85 25.97BCS San Isidro (a) 208 66 11.81 7 80 14.32 8.48 146 26.13 15.48

Un-Electrified Burabod 101 35 6.27 3.71 46 8.23 4.88 81 14.5 8.59Un-Electrified Cheey 551 193 34.55 20.46 248 44.39 26.29 441 78.94 46.75Un-Electrified Halsey 136 48 8.59 5.09 61 11.1 6.57 109 19.69 11.66Un-Electrified Maglalambay 246 86 15.39 9.12 111 20.05 11.87 197 35.44 20.99

BCS Santa Cruz (a) 160 46 8.23 4.88 52 9.31 5.51 98 17.54 10.39BCS Talaga 161 46 8.23 4.88 53 9.67 5.72 99 17.9 10.6

Un-Electrified Magsaysay (a) 246 86 15.39 9.12 111 20.05 11.87 197 35.44 20.99Un-Electrified Mampio 97 34 6.09 3.6 44 7.88 4.66 78 13.97 8.26Un-Electrified Nusa 87 30 5.37 3.18 40 7.16 4.24 70 12.53 7.42

BCS Bulalacao (b) 705 229 40.99 24.27 285 51.37 30.42 514 92.36 54.69BCS Banuang Daan 174 54 9.67 5.72 65 11.64 6.89 119 21.31 12.61BCS Buena Vista (a) 239 77 13.78 8.16 94 17.54 10.39 171 31.32 18.55BCS Cabugao 549 185 33.12 19.61 234 41.89 24.8 419 75.01 44.41BCS Decabobo 249 80 14.32 8.48 99 17.9 10.6 179 32.22 19.08BCS Lajala 454 145 25.96 15.37 178 32.22 19.08 323 58.18 34.45BCS Malawig 180 56 10.02 5.94 68 11.81 7 124 21.83 12.94BCS Marcilla 318 104 18.62 11.02 130 23.63 13.99 234 42.25 25.01BCS San Jose (a) 301 98 17.54 10.39 123 21.48 12.72 221 39.02 23.11BCS Tara 358 118 21.12 12.51 148 26.49 15.69 266 47.61 28.2

BAPA Manamoc 382 107 19.15 11.34 122 22.2 13.14 229 41.35 24.48Un-Electrified Caponayan 271 95 17.01 10.07 122 21.84 12.93 217 38.85 23Un-Electrified Lubid 201 70 12.53 7.42 91 16.11 9.54 161 28.64 16.96

BCS Bacao 350 107 19.15 11.34 128 22.91 13.57 235 42.06 24.91POPS Bohol 347 86 15.39 9.12 92 23.27 13.78 178 38.66 22.9

SHS/BCS Calasag 50 11 1.97 1.17 9 15.75 9.33 20 17.72 10.5SHS Catep 154 47 8.41 4.98 56 34.37 20.35 103 42.78 25.33BCS Culacian (a) 167 43 7.7 4.56 46 1.79 1.06 89 9.49 5.62BCS Danleg 448 141 25.24 14.95 172 10.02 5.94 313 35.26 20.89

BAPA Dumaran (Pob)* 407 122 21.84 12.93 146 8.23 4.88 268 30.07 17.81SHS Itangil 510 172 30.79 18.23 216 30.43 18.02 388 61.22 36.25SHS Magsaysay (b) 313 103 18.44 10.92 127 26.31 15.58 230 44.75 26.5

BAPA Santa Teresita* 534 161 28.82 17.07 191 38.66 22.9 352 67.48 39.97Un-Electrified Capayas 353 124 22.2 13.14 158 28.64 16.96 282 50.84 30.1Un-Electrified Ilian 416 146 26.13 15.48 187 33.29 19.72 333 59.42 35.2Un-Electrified San Juan (b) 245 86 15.39 9.12 110 19.33 11.45 196 34.72 20.57Un-Electrified Santa Maria 216 76 13.6 8.06 97 17.18 10.18 173 30.78 18.24Un-Electrified Santo Tomas 327 114 20.41 12.08 148 26.31 15.58 262 46.72 27.66Un-Electrified Tanatanaon 409 143 25.6 15.16 184 32.94 19.5 327 58.54 34.66

SHS Aberawan 356 90 16.11 9.54 95 17.54 10.39 185 33.65 19.93SHS Bagong Bayan (a) 328 80 14.32 8.48 82 15.04 8.9 162 29.36 17.38

Un-Electrified Barotuan 635 222 39.74 23.53 286 51.55 30.53 508 91.29 54.06Un-Electrified Bebeladan 572 200 35.8 21.2 258 46.54 27.56 458 82.34 48.76Un-Electrified Bucana 1378 482 86.28 51.09 620 111.52 66.04 1102 197.8 117.13Un-Electrified Mabini (b) 331 116 20.76 12.3 149 26.49 15.69 265 47.25 27.99Un-Electrified Manlag 510 179 32.04 18.97 229 40.81 24.17 408 72.85 43.14Un-Electrified New Ibajay 769 269 48.15 28.51 346 61.22 36.25 615 109.37 64.76Un-Electrified Pasadena 430 151 27.03 16.01 193 34.37 20.35 344 61.4 36.36Un-Electrified San Fernando 525 184 32.94 19.5 236 42.24 25.02 420 75.18 44.52Un-Electrified Sibartan 440 154 27.57 16.32 198 35.44 20.99 352 63.01 37.31Un-Electrified Teneguiban 1015 355 63.55 37.63 457 81.62 48.34 812 145.17 85.97Un-Electrified Villa Libertad 434 152 27.21 16.11 195 35.08 20.78 347 62.29 36.89Un-Electrified Villa Paz 306 107 19.15 11.34 138 24.7 14.63 245 43.85 25.97

BCS Barangonan (Ilog) 220 70 12.53 7.42 86 15.39 9.12 156 27.92 16.54BCS Cabunlawan 190 60 10.74 6.36 72 12.89 7.63 132 23.63 13.99BCS Calibangbangan 242 78 13.96 8.27 96 17.72 10.49 174 31.68 18.76BCS Decabaitot 144 43 7.7 4.56 52 9.85 5.83 95 17.55 10.39BCS Maroyogroyog 390 130 23.27 13.78 162 29.54 17.49 292 52.81 31.27BCS New Culaylayan 252 81 14.5 8.59 101 17.54 10.39 182 32.04 18.98BCS Pical 344 113 20.23 11.98 142 25.78 15.26 255 46.01 27.24BCS San Nicolas (b) 232 74 13.25 7.84 92 15.75 9.33 166 29 17.17

Un-Electrified Nangalao 428 150 26.85 15.9 192 34.91 20.67 342 61.76 36.57Un-Electrified Alcoba 72 25 4.48 2.65 33 5.91 3.5 58 10.39 6.15Un-Electrified Canipo 199 70 12.53 7.42 89 16.11 9.54 159 28.64 16.96Un-Electrified Cocoro 176 62 11.1 6.57 79 14.32 8.48 141 25.42 15.05

POPS Babuyan 695 208 37.23 22.05 248 44.39 26.29 456 81.62 48.34BCS Napsan 804 276 49.4 29.26 352 63.01 37.31 628 112.41 66.57

Un-Electrified Bagong Bayan (b) 247 86 15.39 9.12 112 20.05 11.87 198 35.44 20.99Un-Electrified Bahile 756 265 47.44 28.09 340 60.86 36.04 605 108.3 64.13Un-Electrified Binduyan 315 110 19.69 11.66 142 25.42 15.05 252 45.11 26.71Un-Electrified Buena Vista (b) 285 100 17.9 10.6 128 23.27 13.78 228 41.17 24.38

PUERTOPRINCESA

CITY(CAPITAL)

BATARAZA

BUSUANGA

CAGAYAN-CILLO

CORON

CUYO

DUMARAN

DUMARAN

EL NIDO(BACUIT)

LINAPACAN

MAGSAYSAY

Page 18: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-18

Table 5.2.6 Potential Power Demand Forecast in 2015 (Non NPC-SPUG and ECs Areas) (Continued) Present Municipality Barangay Potential HH Target HH Energy Demand Target HH Energy Demand Target HH Energy Demande-Status Name Name 2015 (2006, 35%) (MWh) (kW) For 80%, 2015 (MWh) (kW) (Total, 2015) (MWh) (kW)

Un-Electrified Cabayugan 822 288 51.55 30.53 370 66.23 39.22 658 117.78 69.75Un-Electrified Conception (c) 404 141 25.24 14.95 182 32.58 19.29 323 57.82 34.24Un-Electrified Langogan 613 215 38.49 22.79 275 49.4 29.26 490 87.89 52.05Un-Electrified Macarascas 516 181 32.4 19.19 232 41.35 24.49 413 73.75 43.68Un-Electrified Marufinas 194 68 12.17 7.21 87 15.22 9.01 155 27.39 16.22Un-Electrified New Panggangan 216 76 13.6 8.06 97 17.54 10.39 173 31.14 18.45Un-Electrified San Rafael (b) 608 213 38.13 22.58 273 49.05 29.04 486 87.18 51.62Un-Electrified Simpocan 358 125 22.38 13.25 161 22.38 13.25 286 44.76 26.5Un-Electrified Tagabinit 451 158 28.28 16.75 203 36.52 21.62 361 64.8 38.37Un-Electrified Tanabag 174 61 10.92 6.47 78 13.96 8.27 139 24.88 14.74

BCS Berong 492 167 29.89 17.7 212 37.95 22.47 379 67.84 40.17Un-Electrified Aramaywan (b) 819 287 51.37 30.42 368 65.87 39.01 655 117.24 69.43Un-Electrified Kalatagbak 420 147 26.31 15.58 189 33.83 20.03 336 60.14 35.61Un-Electrified Calumpang 514 180 32.22 19.08 231 41.35 24.49 411 73.57 43.57Un-Electrified Isugod 908 318 56.92 33.71 408 72.5 42.93 726 129.42 76.64Un-Electrified Maasin (b) 454 159 28.46 16.85 204 36.52 21.62 363 64.98 38.47Un-Electrified Malatgao (b) 622 218 39.02 23.11 280 51.19 30.32 498 90.21 53.43Un-Electrified Quinlogan 1121 392 70.17 41.55 505 90.22 53.42 897 160.39 94.97Un-Electrified Sowangan 529 185 33.12 19.61 238 41.89 24.8 423 75.01 44.41Un-Electrified Tagusao 726 254 45.47 26.92 327 58.71 34.77 581 104.18 61.69Un-Electrified Antonino 189 66 11.81 7 85 15.39 9.12 151 27.2 16.12Un-Electrified Bagong Bayan (c) 194 68 12.17 7.21 87 15.75 9.33 155 27.92 16.54Un-Electrified Barangay V (Pob) (Porao Is) 4 1 0.18 0.11 2 0.36 0.21 3 0.54 0.32Un-Electrified Barangay VI (Pob) (Johnson 127 44 7.88 4.66 58 10.38 6.15 102 18.26 10.81Un-Electrified Caramay 540 189 33.83 20.03 243 43.68 25.86 432 77.51 45.89Un-Electrified Dumarao 525 184 32.94 19.5 236 42.24 25.02 420 75.18 44.52Un-Electrified Santo Tomas (Iraan) 170 60 10.74 6.36 76 13.6 8.06 136 24.34 14.42Un-Electrified Jolo 180 63 11.28 6.68 81 14.68 8.69 144 25.96 15.37Un-Electrified Mendoza 307 107 19.15 11.34 139 25.06 14.84 246 44.21 26.18Un-Electrified Nicanor Zabara 372 130 23.27 13.78 168 30.07 17.81 298 53.34 31.59Un-Electrified Rizal (b) 177 62 11.1 6.57 80 14.32 8.48 142 25.42 15.05Un-Electrified Salvacion (b) 148 52 9.31 5.51 66 11.81 7 118 21.12 12.51Un-Electrified San Isidro (c) 121 42 7.52 4.45 55 10.02 5.94 97 17.54 10.39Un-Electrified San Miguel (b) 209 73 13.07 7.74 94 16.83 9.96 167 29.9 17.7Un-Electrified San Nicolas (c) 158 55 9.85 5.83 71 12.89 7.63 126 22.74 13.46Un-Electrified Sandoval (c) 368 129 23.09 13.67 165 29.71 17.6 294 52.8 31.27Un-Electrified Taradungan 221 77 13.78 8.16 100 17.9 10.6 177 31.68 18.76Un-Electrified Tinitian 322 113 20.23 11.98 145 26.13 15.48 258 46.36 27.46Un-Electrified Tumarabong 717 251 44.93 26.61 323 58 34.34 574 102.93 60.95

BAPA Port Barton* 1141 368 65.87 39.01 455 82.34 48.76 823 148.21 87.77POPS Santo Nino (c) 237 65 11.64 6.89 75 13.43 7.95 140 25.07 14.84

Un-Electrified Binga 356 125 22.38 13.25 160 29 17.17 285 51.38 30.42Un-Electrified Caruray 942 330 59.07 34.98 424 75.18 44.52 754 134.25 79.5Un-Electrified Kemdeng 185 65 11.64 6.89 83 15.04 8.9 148 26.68 15.79Un-Electrified New Canipo 281 98 17.54 10.39 127 22.55 13.36 225 40.09 23.75

BCS Banbanan 421 132 23.63 13.99 160 29 17.17 292 52.63 31.16BCS Beton 322 97 17.36 10.28 116 20.05 11.87 213 37.41 22.15SHS Busy Bees 236 76 13.6 8.06 93 16.47 9.75 169 30.07 17.81BCS Calawag 1060 364 65.16 38.58 464 83.06 49.18 828 148.22 87.76BCS Casian 617 200 35.8 21.2 249 35.8 21.2 449 71.6 42.4SHS Cataban 228 73 13.07 7.74 89 29.36 17.38 162 42.43 25.12BCS Debangan 296 88 15.75 9.33 104 16.11 9.54 192 31.86 18.87

BAPA Liminangcong 1108 283 50.66 30 303 18.62 11.02 586 69.28 41.02SHS Pularaquen (Canique) 393 131 23.45 13.89 163 54.42 32.22 294 77.87 46.11

Un-Electrified Alacalian 452 158 28.28 16.75 204 36.52 21.62 362 64.8 38.37Un-Electrified Bantulan 458 160 28.64 16.96 206 37.23 22.05 366 65.87 39.01Un-Electrified Baras 110 39 6.98 4.13 49 8.95 5.3 88 15.93 9.43Un-Electrified Batas 260 91 16.29 9.65 117 21.12 12.51 208 37.41 22.16Un-Electrified Depla 255 89 15.93 9.43 115 20.59 12.19 204 36.52 21.62Un-Electrified Libertad 437 153 27.39 16.22 197 35.44 20.99 350 62.83 37.21Un-Electrified Meytegued 248 87 15.57 9.22 111 15.57 9.22 198 31.14 18.44Un-Electrified Minapla 190 67 11.99 7.1 85 15.39 9.12 152 27.38 16.22Un-Electrified New Guinlo 845 296 52.98 31.38 380 68.02 40.28 676 121 71.66Un-Electrified Old Guinlo 182 64 11.46 6.78 82 14.68 8.69 146 26.14 15.47Un-Electrified Paglaum 458 160 28.64 16.96 206 36.87 21.84 366 65.51 38.8Un-Electrified Paly (Paly Is) 369 129 23.09 13.67 166 29.71 17.6 295 52.8 31.27Un-Electrified Pamantolon 300 105 18.8 11.13 135 24.34 14.42 240 43.14 25.55Un-Electrified Pancol 541 189 33.83 20.03 244 43.68 25.86 433 77.51 45.89Un-Electrified San Jose (d) 416 146 26.13 15.48 187 33.65 19.93 333 59.78 35.41Un-Electrified Sandoval (d) 270 95 17.01 10.07 121 21.84 12.93 216 38.85 23Un-Electrified Silanga 216 76 13.6 8.06 97 17.54 10.39 173 31.14 18.45Un-Electrified Talog 240 84 15.04 8.9 108 19.33 11.45 192 34.37 20.35Un-Electrified Tumbod 370 130 23.27 13.78 166 29.71 17.6 296 52.98 31.38

POPS KALAYAAN Pag-asa (Pob) 14 2 0.36 0.21 1 0.36 0.21 3 0.72 0.42BCS Galoc 301 98 17.54 10.39 123 22.2 13.14 221 39.74 23.53BCS Luac 690 235 42.07 24.91 297 53.34 31.59 532 95.41 56.5

Un-Electrified Binudac 453 159 28.46 16.85 203 36.52 21.62 362 64.98 38.47BCS Bunog 1170 399 71.42 42.29 507 227.33 134.62 906 298.75 176.91BCS Campung-ulay 1330 460 82.34 48.76 589 345.11 204.37 1049 427.45 253.13BCS Candawaga 2845 991 177.39 105.05 1270 117.78 69.75 2261 295.17 174.8

BAPA Punta Baja 4674 1541 275.84 163.35 1928 90.93 53.85 3469 366.77 217.2BCS Taburi 1504 516 92.36 54.7 657 105.61 62.54 1173 197.97 117.24

Un-Electrified Canipaan 1199 420 75.18 44.52 539 96.66 57.24 959 171.84 101.76Un-Electrified Culacian (b) 939 329 58.89 34.87 422 75.54 44.73 751 134.43 79.6Un-Electrified Iraan (b) 2877 1007 180.25 106.74 1295 231.98 137.38 2302 412.23 244.12Un-Electrified Latud 815 285 51.02 30.21 367 65.87 39.01 652 116.89 69.22Un-Electrified Panalingaan 1746 611 109.37 64.77 786 140.69 83.32 1397 250.06 148.09Un-Electrified Ransang 2042 715 127.99 75.79 919 164.68 97.52 1634 292.67 173.31Un-Electrified Iraray 703 246 44.03 26.08 316 56.56 33.5 562 100.59 59.58Un-Electrified Labog 957 335 59.97 35.51 431 77.33 45.79 766 137.3 81.3Un-Electrified Pulot Interior (Pulot II) 586 205 36.7 21.73 264 47.26 27.98 469 83.96 49.71Un-Electrified Punang 732 256 45.82 27.14 330 59.07 34.98 586 104.89 62.12

114826 37911 6786.15 4018.65 48224 8569.81 5074.93 86135 15355.96 9093.58

PUERTOPRINCESA

CITY(CAPITAL)

SANVICENTE

TAYTAY

TAYTAY

CULION

Total

RIZAL(MARCOS)

SOFRONIOESPANOLA

QUEZON

ROXAS

Page 19: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-19

5.3 Example of Barangay Electrification Selection Method (Model Barangay) The selection of an electrification method requires the estimation of electrification costs reflecting topographic conditions and power demand size of the target barangay.

This section describes the procedure and the details of electrification cost for each method by using a model barangay. 5.3.1 Model Barangay Table 5.3.1 shows the details of the model barangay.

Table 5.3.1 Details of Model Barangay Barangay Name Panalingaan, Rizal Potential Households in 2015 1,746 Households

(Concentration Ratio) (0.5) (Capacity to Pay Factor) (0.7)

Unit Energy Consumption 166 kWh / year / HH Unit Peak Demand 98 W / HH Maximum demand in 2015 59.9 kW ECAN condition Non- restricted area On-going electrification project No project

5.3.2 Assumptions of Electrification Methods (1) Diesel power (a) Mini-grid

The required level of reliability for a mini-grid system will be similar to that of the EC-grid. Therefore, diesel generators that can provide a high level of reliability are assumed to be used. Moreover, in order to maintain reliability, periodical overhauls will be necessary, as well as backup systems in the cases of machine failures. Therefore, it is assumed that two sets of diesel generators will be installed for a mini-grid system.

The capacity of diesel generator available on market with the acceptable level of reliability seems to be about 30kW output or more. Therefore, the capacity of a diesel generator for a mini-grid is set to 30kW or more.

The Study team assumes an interest rate of 12% and constant electricity consumption after 2015 for the calculation of the LRMC of the mini-grid system. Also these assumptions are used for EC-grid extension and hydropower. Additionally, since the condition of the secondary distribution line in a barangay center required in a mini-grid system is the same as that in an EC-grid extension, the electrification cost for selecting the system does not contain the cost of this secondary line.6 6 The cost of secondary distribution line is calculated in Section 5.4.5

Page 20: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-20

Table 5.3.2 Assumptions for Cost Estimation (Mini-grid, Diesel) Item Condition Remarks

Unit Capacity 60 kW No. of Unit 2 unit One extra unit for backup Diesel generator 14,400 Php/kW Estimated on the basis of the data from NPC-SPUG Maintenance Cost 1.41 Php/kWh Rectified value by comparing the standard expense in Japan with the

expense of NPC-SPUGLifetime 70,000 ope. Hours Assume 70% of standard lifetime for a middle speed engine Thermal efficiency 30% Value lower than standard Fuel Cost 27 Php/L The highest purchase price of NPC-SPUG in Palawan Labor Cost 8,000 Php/month 2 persons, actual salary from one BAPA in Palawan

(b) Stand-alone

For a stand-alone system, a diesel generator requires the similar reliability level of SHS. However, the crucial problem of an inexpensive diesel generator is its sustainability. In areas

electrified by inexpensive diesel generators, the maintenance is almost non-existent except for oil and filter changes. It seems difficult to expect sufficient maintenance in those areas. In most of these areas, diesel generators seem to break down within about four years of operation, with only make shift repairs that extend their life for very short periods before they are totally discarded. Therefore, the life of the diesel engine for a stand-alone system is presumed to be short, so that replacement can occur before failure or the need for major overhauls.

The assumptions related to a diesel generator for a stand-alone system are shown in Tables 5.3.4 and 5.3.5.

Considering the short lifetime of a diesel generator for a stand-alone system, replacement cost for the period of 20 years (same as lifetime of SHS) is included in the electrification cost.

Designing a diesel generator for a stand-alone system requires the assumed number of households to which electricity is supplied. The Study team set the number of 20 households for the system on the basis of the actual condition of areas electrified by private owned diesel generators (generally 20-30 households, refer to Section 3.4.2 (1)).

Table 5.3.4 Assumptions for Cost Estimation (Stand-Alone, Diesel) Item Condition Remarks

Unit Capacity 3 kW 20 households supply Diesel Generator 10,400 Php/kW Estimated on the basis of local cost and the data from NPC-SPUGMaintenance Cost 5,000 Php/year Oil filter change Lifetime 4,000 ope. Hours 4 ope.hours/day, replacement of engine every 3 years Thermal Efficiency 20% Value lower than standard Fuel Cost 27 Php/L The highest purchase price of NPC-SPUG in Palawan Labor Cost 4,000 Php/month 2 persons, actual salary from one BAPA in Palawan

Item Unit Cost

Project Cost Php 1,728,000 LRMC Php/kWh 14.81

Table 5.3.3 Electrification Cost (Mini-grid, Diesel)

Page 21: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-21

(2) Hydropower (a) The basic data for cost estimation

Since most of the works, especially civil construction works, will be conducted in Palawan, the project costs should be estimated using Palawan unit costs. The unit cost data was obtained from interviews with DPWH, PNCC, NIA, turbine and generator companies in Europe, consultant companies in Manila and local construction companies in Palawan Reports on past feasibility studies were also used. DOE does not have specific construction cost data since the DOE's main roles are to promote mini and micro hydropower and to support LGUs to plan and construct mini and micro hydropower facilities both technically and financially. DOE merely evaluates project proposals that LGUs, NGOs and other organizations submit to DOE, and does not estimate costs by themselves. The cost data used for the estimation is listed below. The details of cost estimation will be explained in the Annex.

The lifetime of a hydropower facility is generally set at 40 years including both civil structures

and mechanical-electrical equipment. This Study also uses 40 years. (b) Hydro project for the model Barangay

Based on the conditions of the model barangay, the Study team set a model hydropower project in order to make comparisons with other generation types. The basic concepts for setting a hydropower project for the model barangay are: 1) the nearest river that has enough water for generation during the dry season is chosen for a potential site in order to minimize the length of distribution lines and 2) the capacity should be enough for covering the demand of the target households in the barangay in 2015. The concept is outlined in the Figure 5.3.1, and the conditions and the costs of the micro-hydropower for the model barangay are shown in the Table 5.3.7 and Table 5.3.87.

7 There are no potential sites for micro-hydropower around the center of barangay Salogan. Therefore, for the model hydropower project, various

specifications for the civil structures were set using the Salogan project (newly identified by the Study team). The reasons for choosing the Salogan project were: (1) the data of civil structures are general, (2) the number of households in Barangay Samanñana and the nearest barangay from the Salogan power station are almost the same as the targets in the model barangay.

Item Unit Cost

Project Cost Php 69,872* Electrification Cost per HH Php/HH 3,494* Annual Cost per HH Php/year/HH 3,384*

Table 5.3.6 Unit Costs used in the StudyUnit Name Unit Cost

Concrete Work Common Concrete 3,134 PHP/m3 Rubble Masory Concrete 2,712 PHP/m3 Concrete Spray 13,622 PHP/m3 Invert Concrete 4,990 PHP/m3

Excavation Work Common Excavation 136 PHP/m3 Rock Excavation 314 PHP/m3

Hydrolic Work Gate 547,000 PHP/tonScreen 10,000 PHP/ton Penstock Conduit 480,000 PHP/ton

Others Reinforcement Bar 30,900 PHP/ton Access Road 239 PHP/m2

Table 5.3.5 Electrification Cost (Stand-Alone, Diesel)

* Including cost of diesel generator replacement for 20 years

Page 22: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-22

Table 5.3.7 Assumptions for Cost Estimation (Micro-Hydropower) Item Condition

Installed Capacity 60 kW Effective Head 40 m Maximum Discharge Water 0.181 m3/sec Flow Utilization Factor 90% Length of Distribution Line 3.7 km O&M Cost 2% of annualized construction cost Lifetime 40 years

(3) Distribution line extension Distribution line extension cost means expenses to construct distribution lines between the

center of the model barangay and the nearest tapping point of the existing distribution lines. In this connection, the cost excludes the expenses for installing secondary distribution lines between the tapping point of the center and each consumer in the model barangay.

Barangay Panalingaan is located far from the existing distribution line. It is about 34km from the PALECO distribution line in BATARAZA and 38km from the Rizal local government unit network. Neighbor barangays are located at less than 10km but have not yet been energized. This barangay is not feasible for EC-grid extension based on the actual situation. But in the model study calculation, the distance from the nearest tapping point is considered as a variable to generalize the calculation result.

Table 5.3.8 Electrification Cost (Micro-Hydropower) Item Unit Cost

Project Cost Php 15,819,000 Development Cost Php/kW 263,650 LRMC Php/kWh 28.72

Figure 5.3.1 Image of Hydropower for the Model Barangay

Page 23: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-23

Regarding unit construction cost, the Study employs the actual construction cost of PALECO and not NEA (see Table 3.4.7, 3.4.8, 3.4.9).

Lifetime for a wood pole is usually 15 years. But PALECO is installing exported wood poles that have lifetimes of 40 years in tropical conditions. In this calculation, lifetime is set at 40 years.

Usually distribution line facilities do not need periodic maintenance. The cost of lineman only for the tapping line is negligible. Only fuel costs for electric supply per kWh are considered as operation cost. Table 5.3.9 shows the assumptions for the distribution line extension.

Table 5.3.9 Assumptions for Cost Estimation (Distribution Line Extension)

Distance between the centers of Bgy. and the nearest tapping point Parameter of calculation

Unit cost for distribution line construction 817,473 Php/km Lifetime for distribution line 40 years Operation Cost 3.41 Php/kWh

The results of the calculation are shown in formulas 5.3.1 and 5.3.2.

Construction Cost = 817,473 x Distance (km) (Php/km) Formula 5.3.1 LRMC = 1.38 x Distance + 3.43 (Php/kWh) Formula 5.3.2

(4) Solar power

There are several design methods for solar power systems. Among these methods, the parametric design method was adopted in this Study since this method is simple and easy to understand. The parametric design method has been applied for many solar power projects and has a good track record for generating adequate results for formulating the Master Plan. Another method, such as the simulation design method, can offer more precise results, but this method is more suitable for assessments of larger scale projects.

As for the detailed of design method, refer to the Annex. (a) SHS

Table 5.3.10 shows the assumptions for cost estimation of the SHS system and Table 5.3.11 shows the cost of SHS.

Table 5.3.10 Assumptions for Cost Estimation (SHS)

Item Condition Remarks Design Parameter 0.6 Estimated on the basis of actual data and typical value Inclined solar radiation 4 kWh/m2/day PV module angle 15 degree

System Efficiency 60% Calculation result based on actual temperature and specification of equipments

Battery Voltage 12 V Availability of battery in rural area Depth of Charge 50% Performance of available battery of rural area Consecutive cloud day 3 days Based on the actual solar duration data System Cost 30,380Php/unit Based on the DOE project data, hearing with manufactures and websiteLifetime 20 years

Page 24: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-24

(b) BCS

Most of the parameters for BCS are identical to those for SHS. Table 5.3.12 shows additional parameters required to design BCS.

The detailed designing of BCS requires setting the number of target households to be electrified based on a more detailed socio-economic survey8. In the Study the number of target households is set at 15 households, based on the threshold defined by the comparison of economic features of SHS and a mini-diesel generator for a stand-alone system. Table 5.3.13 shows the cost of electrification by BCS.

Table 5.3.12 Assumptions for Cost Estimation (BCS)

Item Condition Remarks The number of target household to be electrified 15 Economic threshold between SHS and mini-diesel for

stand-alone system Maximum battery capacity 70 Ah Availability and portability in rural area Charging frequency 3 日/回 40Wh/day/HH

(c) PV Hybrid system

In the Master Plan a PV hybrid system is not considered as a candidate system for barangay electrification. The reasons are as follows. Assumptions

For the analysis of a hybrid system, the Study team assumes that a PV system is added on a diesel generator for a mini-grid system discussed in the above section.

Results

- High initial investment cost and high production cost. Investment Cost 27 million Php Production Cost 48 Php/kWh

- Less contribution of CO2 credit from reduction of GHG to saving investment cost Contribution of credit estimated based on the Proto-type Carbon Fund of the World Bank (US/t-CO2) is 0.1 Php/kWh, which cannot reduce the production cost to the level of diesel power for the mini-grid system discussed in the above section.

8 Evaluation of superiority of BCS to SHS and mini-diesel requires detailed socio-economic surveys of the target barangay to grasp its economic

conditions, the number of target households to be electrified and concentration level of households in the barangay. Therefore, field survey covering these aspects should be conducted in future FS.

Table 5.3.11 Electrification Cost (SHS) Item Unit Cost

System Cost Php 30,380 Electrification Cost per HH Php 30,380 Annual Cost per HH Php/year/hh 5,437

Table 5.3.13 Electrification Cost (BCS) Item Unit

System Cost Php 214,630

Electrification Cost per HH Php/HH 14,308

Annual Cost per HH Php/ year/HH 2,272

Page 25: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-25

(6) Wind power Available generation from wind power systems is calculated on the condition that the wind

speed used in the calculation is adjusted to the USAID level, and electrification cost is estimated. As a result, the investment cost and production cost is remarkably higher than with other

systems. Therefore, the Study team decided that wind power is out as a candidate system for barangay electrification in the Master Plan.

Table 5.3.14 shows the assumptions for the cost estimation of wind power and Table 5.3.15 shows the electrification cost of the system.

Table 5.3.14 Assumptions for Cost Estimation (Wind Power)

Item Condition Remarks Maximum Demand of each HH 40 WHH Data from demand forecast, demand same as SHS Daily Demand of each HH 120 Wh/day/HH Data from demand forecast, demand same as SHS Installed Capacity 7.5 kW High plant factor, less than 100kW in capacity Battery Voltage 12 V Availability of batteries in rural areas Depth of Charge 50% Performance of available batteries in rural areas Battery Capacity 10 days demand Availability of batteries in rural areas Continuance Supply Capacity 550 Wh/day Minimum number of 10 days SMA (Single Moving Average)No. of Target Electrified 4 HH/unit Based on demand per HH and continuance supply capacity

5.3.3 Selection of Electrification Method (Model Barangay) (1) Screening by restricted areas for development and on-going electrification programs

The model barangay has no restrictions on development activities or on-going electrification projects. Therefore, this screening is not used to identify an electrification method for the model barangay.

(2) Examine the possibility of EC-grid extension

As mentioned in Section 5.1.5 (3), firstly the LRMC of the EC-grid and the mini-grid system (diesel, and if suitable site is near the target barangay, micro-hydropower) is calculated to meet the demand of target households to be electrified.

The possibility of an EC-grid extension is examined, while comparing the LRMC of each system.

Figure 5.3.2 shows the comparison of the LRMC of each system.

Table 5.3.15 Electrification Cost (Wind Power) Item Unit Cost

System Cost Php 2,744 x 103 Electrification Cost per HH Php/HH 686 x 103 Production Cost Php/kWh 2,324

Page 26: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-26

Figure 5.3.2 LRMC Comparison of the EC-Grid Extension and Mini-Grid System (Model Barangay) As shown in Figure 5.3.2, in the case that the distance from the center of the model barangay to

the nearest tapping point is shorter than 8km, an EC-grid extension is selected as an appropriate method for the model barangay.

(3) Examine the possibility of a mini-grid system

In the case that the distance from the center of the model barangay to the nearest tapping point is longer than 8km, an EC-grid extension is not justified in the screening above, and so the possibility of a mini-grid system or another suitable type of system is examined.

As described in Section 5.1.5, a mini-grid system is not applied to barangays with the potential demand of less than 30kW due to the reliability of diesel power and the economical efficiency of hydropower for a mini-grid system.

In the case of the model barangay, the potential demand (59.9 kW) is larger than 30kW. Therefore, the barangay has the possibility of a mini-grid system. As for the type of the system, it is concluded that diesel power is more suitable than hydropower for the model barangay.

(4) Examine the possibility of a stand-alone system

A stand-alone system is not selected as an electrification method for the model barangay.

8km

Page 27: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-27

5.4 Scenario Options 5.4.1 Scenarios for Barangay Electrification

The scenario for barangay electrification in the Study is outlined below: (1) Base scenario (Least cost electrification)

Using the above methodology to select the appropriate electrification method, a plan to electrify all the un-electrified barangays by the year 2006 will be determined. The base scenario will be the electrification case involving the least cost, which selects the electrification method from economical point of view in accordance with the MEDP 2003 criteria, which places a high priority on economic efficiency. (2) Reliability-oriented scenario (Utilization of grid extension)

Reliability is different among various electrification methods. Extension of the existing grid provides 24-hour power supply, whereas a mini-grid system provides around 6 hours and a stand-alone system provides electricity that is barely sufficient for lighting alone. Therefore, in addition to the base scenario, the reliability-oriented electrification method will be studied as an alternative case.

For this scenario, special weight will be put on reliability by allowing double the cost for grid extension in selecting an electrification method. Timing of the implementation will be the same as the base scenario. (3) Environment-friendly scenario (Utilization of hydropower resources)

MEDP 2003 has a strategy to promote hydropower because hydropower is a renewable and domestic energy. Hydropower may enjoy low-interest funding because it is environmental friendly and so a special weight allowing quadruple the cost of diesel power will be applied in selecting the electrification method. Timing of the implementation will be the same as the base scenario.

5.4.2 Technical Study for Barangay Electrification Plan

(1) On-going electrification projects Only 1 barangay shall be electrified in 2004 by an on-going electrification project as of the end

of December in 2003. Table 5.4.1 shows the details of that barangay. The Study excluded it as a target for the whole barangay electrification.

Table 5.4.1 On-going Electrification Project (As of end of December in 2003)

Barangay Municipality Implementation Schedule Method Candawaga Rizal UNDP 2004 Stand-Alone

Page 28: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-28

(2) Technical study for EC-grid extension (a) Creation of the regression curve for screening EC-grid extension

The screening curve is created as shown below in order to choose barangays electrified with EC-grid extension.

(i) 4 barangays with different numbers of households are chosen. (ii) The distance from the tapping point to the point where the LRMC or EC-grid extension and

that of the diesel cross is computed for each barangay. (iii) A regression curve for screening, which shows the relation between potential households

and maximum distance from tapping point, is estimated from 4 cross points.

Table 5.4.2 Regression Curve Creation Distribution Line LRMC

Municipality Barangay Potential Household 5km 30km

Mini-grid* LRMC

(Php/kWh)

Cross Point(km)

Bataraza Bulalacao 190 23.28 123.26 17.75 3.59 Bataraza Tarusan 383 13.33 62.94 14.96 5.82

Rizal Panalingaan 611 10.33 44.95 15.03 8.39 Rizal Iraan 1,007 7.61 28.62 13.69 12.23

*LRMC of a diesel power for a mini-grid system

Figure 5.4.1 shows the results of the regression line. This figure shows that if a potential HH at 2015 and a distance from the tapping point of a barangay are located on the lower side of the line, that barangay should be electrified by distribution line extension.

Conversely, if potential households and the distance are located upper side of the line, that barangay should be electrified by a mini-grid system.

The formulas of the regression line are as below:

Base Scenario : Distance = 0.0106 x Potential HH + 1.7284 Formula 5.4.1 Reliability-Oriented Scenario : Distance = 2 x (0.0106 x Potential HH + 1.7284) Formula 5.4.2

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

0 500 1000 1500Potential HH at 2015

Dis

tance f

rom

tap

ping

poin

t (k

m)

Figure 5.4.1 Screening Line

Page 29: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-29

(b) Calculation of distance between barangay centers The location of the center of each barangay is determined with the GIS data. Using these data,

the distance in a straight line between barangays is created on an Excel sheet. With those distances and the results of potential household estimations, all barangays are checked by the above-mentioned Formulas 5.4.1 or 5.4.2.

(c) Checking the possibilities of EC-grid extension on the map

After checking with these formulas, distribution line routes are checked on the map. Even if a certain barangay has a suitable distance for an EC-grid extension, it still cannot be chosen if the neighbor/source barangay is not electrified or is not suitable for EC-grid extension. In other cases, when the source barangay is on the different side of a channel, the EC-grid extension also cannot be chosen. Finally only 6 barangays are selected as the barangays that are feasible to be electrified by EC-grid extension. (3) Mini-grid system (a) Diesel power plant for a mini-grid system

The Study team estimated development costs for installing a diesel power plant for a mini-grid system based on the cost data that is shown in the NPC-SPUG Development Plan 2002, and set the capacity of a diesel generator to meet the potential demand of each barangay. Table 5.4.3 shows development costs of a diesel power plant for a mini-grid system.

Table 5.4.3 Development Costs of a Diesel Power Plant for a Mini-Grid System Potential Demand Capacity9 Development Cost (Php)

30 kW – 34 kW 34 kW 979,200

– 50 kW 50 kW 1,440,000

– 63 kW 63 kW 1,814,400

– 87 kW 87 kW 2,505,600

– 108 kW 108 kW 3,110,400

(b) Micro hydropower plant for a mini-grid system

As shown in Table 4.1.14 and Figure 4.1.9, the Study team found only 1 site (Aramaywan in Mun. RIZAL) for micro hydropower in Palawan. Table 5.4.4 shows the development cost of the micro hydropower plant of Aramaywan.

Table 5.4.4 Development Cost of Micro Hydropower for Mini-Grid System

Name of Site Location Capacity Potential Demand in 2015 Development Cost (Php)

Aramaywan Bgy. Aramaywan 39 kW 30.42 kW 20,069,000

9 Assumed capacity of 90% of PERKINS’s plant capacity.

Page 30: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-30

(c) Selection of a power plant for a mini-grid system The power plant for a mini-grid system is selected by comparing the LRMC of power plants

for a target barangay. The Study team found only 1 micro hydropower site, therefore, compared both the LRMC of diesel power and micro hydropower for Bgy. Aramaywan.

Table 5.4.5 shows the LRMC of each power plant.

Table 5.4.5 LRMC Comparison of Micro Hydropower and Diesel Power for a Mini-Grid System

Plant Type Capacity Potential Demand in 2015 LRMC

Diesel power 34 kW 15.50 Php/kWh

Micro hydropower 39 kW 30.42 kW

61.22 Php/kWh

(4) Stand-alone system As a result of the screening (1)-(3) above, in the case that a stand-alone system is selected as the electrification method of a certain barangay, the type of the system is chosen from 3 options (SHS, BCS and a mini-diesel)

However, as discussed in Section 5.3.2, it is not adequate to compare the electrification cost of each type on an equal footing to evaluate superiority since the important parameters that affect the superiority are not determined and also their unit power demand assumptions vary from type to type.

Therefore, the Study team assumed the allocation ratio shown in Table 5.4.6 for the type of system. Also the number of households to be electrified for each barangay is assumed to be 20 households.

Table 5.4.6 Allocation of each Type of a Stand-Alone System and Electrification Cost

Item SHS BCS Mini-Diesel Weighted Average

Allocation Ratio 40% 30% 30% Electrification Cost per HH 30,380 Php/HH 14,308 Php/HH 3,494 Php/HH 17,493 Php/HH

5.4.3 Results of Barangay Electrification Screening

The results of barangay electrification screening in each scenario are outlined below: (1) Base scenario (Least cost electrification)

The EC-grid extension is selected for 6 barangays, a mini-grid for 23 barangays and a stand-alone system for 132 barangays.

Although one barangay, Bgy. Babuyan in Mun. PUERTO PRINCESA, has already been electrified by a stand-alone system as of the end of December in 2003, EC-grid extension is selected for this barangay because upgrading the electrification method from a stand-alone to an EC-grid is justified.

As for the timing of electrification, the Study team assumed that all mini-grid systems will be installed in 2006 in consideration of the construction period.

Page 31: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-31

EC-grid extension and stand-alone systems are allocated each year between 2004 and 2006 to level the annual costs per year.

Total investment costs up to 2006 are estimated to be 183.3 million pesos.

Table 5.4.7 Barangay Electrification Plan (Base Scenario) No. of Barangay Investment Cost (million Php)

Year Year Electrification Method Sub Total

2004 2005 2006 Sub Total

2004 2005 2006

EC-grid extension 6 3 2 1 **22.1 **9.5 **8.7 **3.9

Mini-grid 23 0 0 23 115.0 0 0 115.0

Stand-alone 132 60 60 12 46.2 21.0 21.0 4.2

Total *161 63 62 36 183.3 30.5 29.7 123.1

* No. of Barangays exceeds 160 because it includes grade-up electrification ** Includes countermeasure costs for voltage drops caused by EC-grid distribution line expansion (refer to Section 5.4.4)

Table 5.4.8 Number of Barangays Electrified (Base Scenario) Number of Barangay Electrification

Status Electrification

Method Electrification

Level As of the end of 2003 2015 LEVEL III 44 44 LEVEL II 111 117 LEVEL I 57 57

EC-grid extension

Sub Total ( 212) ( 218)LEVEL II 1 29 LEVEL I 5 0 Mini-grid

Sub Total ( 6) ( 29) LEVEL II 6 184 LEVEL I 47 0 Stand-alone

Sub Total ( 53) ( 184)

Electrified

Total ( 271) ( 431) Un-electrified ( 160) ( 0)

Grand Total 431 431

Table 5.4.9 Transition of Number of Households Electrified (Base Scenario)

As of the end of 2003 2015 Electrification

Status Electrification

Method Number of Household

Share in Electrified Bgy.

Number of Household

Share in Electrified Bgy.

EC-Grid extension 54,416 95.6 % 88,927 62.3 % Mini-Grid 870 1.5 % 11,745 8.2 % Stand-Alone 1,638 2.9% 42,186 29.5 %

Electrified

Total ( 56,924) (100%) (142,858) (100%) Number of Households in Palawan (167,391) (262,303)

Household Electrification Ratio in Palawan

34.0% 54.4%

Page 32: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-32

Table 5.4.10 List of Barangays Electrified by EC-grid Extension (Base Scenario)

Barangay Municipality Current Electrification Level

(Method) Source Barangay

Investment Cost (million Php)*

Babuyan Puerto Princesa LEVEL I (Stand-alone) Maoyon 3.6 Imulnod Brooke’s Point Un-electrified Mainit 2.0

Malatgao Quezon Un-electrified Panitian 3.6

Malihud Bataraza Un-electrified Bono Bono 4.8

Bulalacao Bataraza Un-electrified Malihud 3.9

Tarusan Bataraza Un-electrified Bulalacao 3.9

Total 22.1

*Including the cost of secondary distribution lines in the center of the barangay (refer to Section 5.4.4)

Table 5.4.11 List of Barangays Electrified by Mini-grid System (Base Scenario)

Barangay Municipality Demand of Target HH

Type of System

Capacity Investment Cost (million Php)*

Algeciras 75.4 kW Diesel 87 kW 3.7 Conception (a)

AGUTAYA 54.8 kW Diesel 63 kW 3.2

Bancalaan 71.4 kW Diesel 87 kW 4.6 Mangsee

BALABAC 56.3 kW Diesel 63 kW 4.1

Culandanum (b) 43.5 kW Diesel 50 kW 4.3 Rio Tuba 105.6 kW Diesel 108 kW 7.5 Sandoval (a) 30.7 kW Diesel 34 kW 5.2 Sumbiling

BATARAZA

30.5 kW Diesel 34 kW 3.6 Bucana 51.2 kW Diesel 63 kW 5.3 Teneguiban

EL NIDO 37.6 kW Diesel 50 kW 6.7

Cabayugan PUERTO PRINCESA 30.5 kW Diesel 34 kW 3.4 Aramaywan (b) QUEZON 30.4 kW Diesel 34 kW 5.2 Isugud 33.7 kW Diesel 34 kW 4.0 Quinlogan

41.6 kW Diesel 50 kW 4.5

Caruray SAN VICENTE 35.0 kW Diesel 50 kW 4.4 New Guinlo TAYTAY 31.4 kW Diesel 34 kW 4.3 Canipaan 44.5 kW Diesel 50 kW 4.7 Culacian (b) 34.9 kW Diesel 50 kW 3.0 Iraan (b) 106.7 kW Diesel 108 kW 9.3 Latud 30.2 kW Diesel 34 kW 6.5 Panalingaan 64.8 kW Diesel 87 kW 5.8 Ransang

RIZAL

75.8 kW Diesel 87 kW 6.9 Labog SOFRONO ESPANOLA 35.5 kW Diesel 50 kW 5.0

Total 115.0 *Including the cost of secondary distribution lines in the center of the barangay (refer to Section 5.4.4)

Page 33: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-33

Table 5.4.12 Results of Screening (Base Scenario) (Un-electrified Barangays: 160 Bgys.)

Culandanum (a) 256 16.11 9.54 90 Stand-Alone Stand-AloneSagpangan 470 29.54 17.49 165 Stand-Alone Stand-AloneAlgeciras 2031 127.27 75.37 711 Mini-Grid Mini-GridConception (a) 1477 92.54 54.80 517 Mini-Grid Mini-GridDiit 752 47.08 27.88 263 Stand-Alone Stand-AloneMaracanao 99 6.27 3.71 35 Stand-Alone Stand-AloneMatarawis 88 5.55 3.29 31 Stand-Alone Stand-AloneVillafria 348 21.84 12.93 122 Stand-Alone Stand-AloneVillasol 524 32.76 19.40 183 Stand-Alone Stand-AloneBalogo 105 6.62 3.92 37 Stand-Alone Stand-AloneDagman 174 10.92 6.47 61 Stand-Alone Stand-AloneDalayawon 87 5.37 3.18 30 Stand-Alone Stand-AloneLumacad 112 6.98 4.13 39 Stand-Alone Stand-AloneMadoldolon 95 5.91 3.50 33 Stand-Alone Stand-AloneMauringuen 158 9.85 5.83 55 Stand-Alone Stand-AloneOsmena (a) 158 9.85 5.83 55 Stand-Alone Stand-AloneSan Jose De Oro 59 3.76 2.23 21 Stand-Alone Stand-AloneSanto Nino (a) 86 5.37 3.18 30 Stand-Alone Stand-AloneTaloto 113 7.16 4.24 40 Stand-Alone Stand-AloneAgutayan 177 11.1 6.57 62 Stand-Alone Stand-AloneBancalaan 1926 120.65 71.44 674 Mini-Grid Mini-GridBugsuk (New Cagayancillo) 280 17.54 10.39 98 Stand-Alone Stand-AloneCatagupan 445 27.92 16.54 156 Stand-Alone Stand-AloneIndalawan 271 17.01 10.07 95 Stand-Alone Stand-AloneMalaking Ilog 217 13.6 8.06 76 Stand-Alone Stand-AloneMangsee 1517 95.05 56.29 531 Mini-Grid Mini-GridMelville 280 17.54 10.39 98 Stand-Alone Stand-AlonePandanan 178 11.1 6.57 62 Stand-Alone Stand-AlonePasig 122 7.7 4.56 43 Stand-Alone Stand-AloneRabor 136 8.59 5.09 48 Stand-Alone Stand-AloneRamos 429 26.85 15.90 150 Stand-Alone Stand-AloneSalang 651 40.81 24.17 228 Stand-Alone Stand-AloneSebaring 249 15.57 9.22 87 Stand-Alone Stand-AloneBulalacao (a) 543 34.01 20.14 190 Grid-Expansion Grid-ExpansionBuliluyan 408 25.6 15.16 143 Stand-Alone Stand-AloneCulandanum (b) 1170 73.39 43.46 410 Mini-Grid Mini-GridIgang igang 412 25.78 15.26 144 Stand-Alone Stand-AloneIwahig 691 43.32 25.65 242 Stand-Alone Stand-AloneMalihud 522 32.76 19.40 183 Grid-Expansion Grid-ExpansionMalitub 192 11.99 7.10 67 Stand-Alone Stand-AloneOcayan 559 35.08 20.78 196 Stand-Alone Stand-AlonePuring 275 17.18 10.18 96 Stand-Alone Stand-AloneRio Tuba 2845 178.28 105.58 996 Mini-Grid Mini-GridSandoval (a) 829 51.91 30.74 290 Mini-Grid Mini-GridSapa 464 29 17.17 162 Stand-Alone Stand-AloneSarong 607 37.95 22.47 212 Stand-Alone Stand-AloneSumbiling 824 51.55 30.53 288 Mini-Grid Mini-GridTabud 307 19.15 11.34 107 Stand-Alone Stand-AloneTagnato 217 13.6 8.06 76 Stand-Alone Stand-AloneTagolango 226 14.14 8.37 79 Stand-Alone Stand-AloneTaratak 574 35.98 21.31 201 Stand-Alone Stand-AloneTarusan 1093 68.56 40.60 383 Grid-Expansion Grid-Expansion

BROOKE'S P. Imulnod 480 30.07 17.81 168 Grid-Expansion Grid-ExpansionBurabod 101 6.27 3.71 35 Stand-Alone Stand-AloneCheey 551 34.55 20.46 193 Stand-Alone Stand-AloneHalsey 136 8.59 5.09 48 Stand-Alone Stand-AloneMaglalambay 246 15.39 9.12 86 Stand-Alone Stand-AloneMagsaysay (a) 246 15.39 9.12 86 Stand-Alone Stand-AloneMampio 97 6.09 3.60 34 Stand-Alone Stand-AloneNusa 87 5.37 3.18 30 Stand-Alone Stand-AloneCaponayan 271 17.01 10.07 95 Stand-Alone Stand-AloneLubid 201 12.53 7.42 70 Stand-Alone Stand-AloneCapayas 353 22.2 13.14 124 Stand-Alone Stand-AloneIlian 416 26.13 15.48 146 Stand-Alone Stand-AloneSan Juan (b) 245 15.39 9.12 86 Stand-Alone Stand-AloneSanta Maria 216 13.6 8.06 76 Stand-Alone Stand-AloneSanto Tomas 327 20.41 12.08 114 Stand-Alone Stand-AloneTanatanaon 409 25.6 15.16 143 Stand-Alone Stand-AloneBarotuan 635 39.74 23.53 222 Stand-Alone Stand-AloneBebeladan 572 35.8 21.20 200 Stand-Alone Stand-AloneBucana 1378 86.28 51.09 482 Mini-Grid Mini-GridMabini (b) 331 20.76 12.30 116 Stand-Alone Stand-AloneManlag 510 32.04 18.97 179 Stand-Alone Stand-AloneNew Ibajay 769 48.15 28.51 269 Stand-Alone Stand-AlonePasadena 430 27.03 16.01 151 Stand-Alone Stand-AloneSan Fernando 525 32.94 19.50 184 Stand-Alone Stand-AloneSibartan 440 27.57 16.32 154 Stand-Alone Stand-AloneTeneguiban 1015 63.55 37.63 355 Mini-Grid Mini-GridVilla Libertad 434 27.21 16.11 152 Stand-Alone Stand-AloneVilla Paz 306 19.15 11.34 107 Stand-Alone Stand-Alone

LINAPACAN Nangalao 428 26.85 15.90 150 Stand-Alone Stand-AloneAlcoba 72 4.48 2.65 25 Stand-Alone Stand-AloneCanipo 199 12.53 7.42 70 Stand-Alone Stand-AloneCocoro 176 11.1 6.57 62 Stand-Alone Stand-Alone

PresentElectrification

Method

Mini-gridScreening

FinalResult

(Base Scenario)

EC-grid-expansionScreening

Restriction Screening(ECAN Zoning,

On-Going Project )

Potential Demand (6-hours, II)

AGUTAYA

Number ofPotential HH

2015No of HHto electrify

Peak(kW)

Energy(MWh)

ABORLAN

MunicipalityName

BarabgayName

DUMARAN

ARACELI

BALABAC

BATARAZA

CUYO

MAGSAYSAY

BUSUANGA

CAGAYAN-CILLO

EL NIDO(BACUIT)

Page 34: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-34

Table 5.4.12 Results of Screening (Base Scenario) (Continued)

Bagong Bayan (b) 247 15.39 9.12 86 Stand-Alone Stand-AloneBahile 756 47.44 28.09 265 Stand-Alone Stand-AloneBinduyan 315 19.69 11.66 110 Stand-Alone Stand-AloneBuena Vista (b) 285 17.9 10.60 100 Stand-Alone Stand-AloneCabayugan 822 51.55 30.53 288 Mini-Grid Mini-GridConception (c) 404 25.24 14.95 141 Stand-Alone Stand-AloneLangogan 613 38.49 22.79 215 Stand-Alone Stand-AloneMacarascas 516 32.4 19.19 181 Stand-Alone Stand-AloneMarufinas 194 12.17 7.21 68 ECAN(Stand-Alone) Stand-AloneNew Panggangan 216 13.6 8.06 76 ECAN(Stand-Alone) Stand-AloneSan Rafael (b) 608 38.13 22.58 213 Stand-Alone Stand-AloneSimpocan 358 22.38 13.25 125 Stand-Alone Stand-AloneTagabinit 451 28.28 16.75 158 Stand-Alone Stand-AloneTanabag 174 10.92 6.47 61 Stand-Alone Stand-AloneAramaywan (b) 819 51.37 30.42 287 Mini-Grid Mini-GridKalatagbak 420 26.31 15.58 147 Stand-Alone Stand-AloneCalumpang 514 32.22 19.08 180 Stand-Alone Stand-AloneIsugod 908 56.92 33.71 318 Mini-Grid Mini-GridMaasin (b) 454 28.46 16.85 159 Stand-Alone Stand-AloneMalatgao (b) 622 39.02 23.11 218 Grid-Expansion Grid-ExpansionQuinlogan 1121 70.17 41.55 392 Mini-Grid Mini-GridSowangan 529 33.12 19.61 185 Stand-Alone Stand-AloneTagusao 726 45.47 26.92 254 Stand-Alone Stand-AloneAntonino 189 11.81 7.00 66 Stand-Alone Stand-AloneBagong Bayan (c) 194 12.17 7.21 68 Stand-Alone Stand-AloneBarangay V (Pob) (Porao Is) 4 0.18 0.11 1 Stand-Alone Stand-AloneBarangay VI (Pob) (Johnson) 127 7.88 4.66 44 Stand-Alone Stand-AloneCaramay 540 33.83 20.03 189 Stand-Alone Stand-AloneDumarao 525 32.94 19.50 184 Stand-Alone Stand-AloneSanto Tomas (Iraan) 170 10.74 6.36 60 Stand-Alone Stand-AloneJolo 180 11.28 6.68 63 Stand-Alone Stand-AloneMendoza 307 19.15 11.34 107 Stand-Alone Stand-AloneNicanor Zabara 372 23.27 13.78 130 Stand-Alone Stand-AloneRizal (b) 177 11.1 6.57 62 Stand-Alone Stand-AloneSalvacion (b) 148 9.31 5.51 52 Stand-Alone Stand-AloneSan Isidro (c) 121 7.52 4.45 42 Stand-Alone Stand-AloneSan Miguel (b) 209 13.07 7.74 73 Stand-Alone Stand-AloneSan Nicolas (c) 158 9.85 5.83 55 Stand-Alone Stand-AloneSandoval (c) 368 23.09 13.67 129 Stand-Alone Stand-AloneTaradungan 221 13.78 8.16 77 Stand-Alone Stand-AloneTinitian 322 20.23 11.98 113 Stand-Alone Stand-AloneTumarabong 717 44.93 26.61 251 Stand-Alone Stand-AloneBinga 356 22.38 13.25 125 Stand-Alone Stand-AloneCaruray 942 59.07 34.98 330 Mini-Grid Mini-GridKemdeng 185 11.64 6.89 65 Stand-Alone Stand-AloneNew Canipo 281 17.54 10.39 98 Stand-Alone Stand-AloneAlacalian 452 28.28 16.75 158 Stand-Alone Stand-AloneBantulan 458 28.64 16.96 160 Stand-Alone Stand-AloneBaras 110 6.98 4.13 39 Stand-Alone Stand-AloneBatas 260 16.29 9.65 91 Stand-Alone Stand-AloneDepla 255 15.93 9.43 89 Stand-Alone Stand-AloneLibertad 437 27.39 16.22 153 Stand-Alone Stand-AloneMeytegued 248 15.57 9.22 87 Stand-Alone Stand-AloneMinapla 190 11.99 7.10 67 ECAN(Stand-Alone) Stand-AloneNew Guinlo 845 52.98 31.38 296 Mini-Grid Mini-GridOld Guinlo 182 11.46 6.78 64 Stand-Alone Stand-AlonePaglaum 458 28.64 16.96 160 Stand-Alone Stand-AlonePaly (Paly Is) 369 23.09 13.67 129 Stand-Alone Stand-AlonePamantolon 300 18.8 11.13 105 Stand-Alone Stand-AlonePancol 541 33.83 20.03 189 Stand-Alone Stand-AloneSan Jose (d) 416 26.13 15.48 146 ECAN(Stand-Alone) Stand-AloneSandoval (d) 270 17.01 10.07 95 Stand-Alone Stand-AloneSilanga 216 13.6 8.06 76 Stand-Alone Stand-AloneTalog 240 15.04 8.90 84 Stand-Alone Stand-AloneTumbod 370 23.27 13.78 130 Stand-Alone Stand-Alone

CULION Binudac 453 28.46 16.85 159 Stand-Alone Stand-AloneCanipaan 1199 75.18 44.52 420 Mini-Grid Mini-GridCulacian (b) 939 58.89 34.87 329 Mini-Grid Mini-GridIraan (b) 2877 180.25 106.74 1007 Mini-Grid Mini-GridLatud 815 51.02 30.21 285 Mini-Grid Mini-GridPanalingaan 1746 109.37 64.77 611 Mini-Grid Mini-GridRansang 2042 127.99 75.79 715 Mini-Grid Mini-GridIraray 703 44.03 26.08 246 Stand-Alone Stand-AloneLabog 957 59.97 35.51 335 Mini-Grid Mini-GridPulot Interior (Pulot II) 586 36.7 21.73 205 Stand-Alone Stand-AlonePunang 732 45.82 27.14 256 Stand-Alone Stand-Alone

Grid-Extension 5Mini-Grid 23

Stand-Alone 132Total 160

PresentElectrification

MethodPeak(kW)

# of HHto electrify

Mini-gridScreening

EC-grid-expansionScreening

Restriction Screening(ECAN Zoning,

On-Going Project )

FinalResult

(Base Scenario)

BarabgayName

Number ofPotential HH

2015

Potential Demand (6-hours, II)

Energy(MWh)

RIZAL(MARCOS)

SANVICENTE

TAYTAY

MunicipalityName

QUEZON

ROXAS

PUERTO PRINCESACITY (CAPITAL)

SOFRONIOESPANOLA

Page 35: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-35

Table 5.4.12 Results of Screening (Base Scenario) (Continued) (Bgys. electrified by SHS, BCS, BAPA, LGU and others: 59 Bgys.)

(2) Reliability-oriented scenario (utilization of EC-grid extension)

EC-grid extension is selected for 56 barangays, the number is about 9 times that of the base scenario. On the other hand, the number of barangays electrified by a mini-grid system and a stand-alone system decreased to 15 barangays for a mini-grid and 94 barangays for a stand-alone system due to the increase in the number of barangays electrified by EC-grid extension.

As for the upgrading of the electrification method, in this scenario EC-grid extension is selected for 5 barangays electrified previously as of the end of December in 2003.

Total investment cost up to 2006 is estimated to be 427.3 million pesos, which is more than double that of the base scenario.

ABORLAN Aporawan 833 51.19 30.32 286 Mini-Grid Stand-Alone Stand-AlonePanlaitan 657 39.92 23.64 223 Stand-Alone Stand-Alone Stand-AloneQuezon 331 19.51 11.55 109 Stand-Alone Stand-Alone Stand-AloneSan Isidro (a) 208 11.81 7.00 66 Stand-Alone Stand-Alone Stand-AloneSanta Cruz (a) 160 8.23 4.88 46 Stand-Alone Stand-Alone Stand-AloneTalaga 161 8.23 4.88 46 Stand-Alone Stand-Alone Stand-AloneBulalacao (b) 705 40.99 24.27 229 Stand-Alone Stand-Alone Stand-AloneBanuang Daan 174 9.67 5.72 54 Stand-Alone Stand-Alone Stand-AloneBuena Vista (a) 239 13.78 8.16 77 Stand-Alone Stand-Alone Stand-AloneCabugao 549 33.12 19.61 185 Stand-Alone Stand-Alone Stand-AloneDecabobo 249 14.32 8.48 80 Stand-Alone Stand-Alone Stand-AloneLajala 454 25.96 15.37 145 Stand-Alone Stand-Alone Stand-AloneMalawig 180 10.02 5.94 56 Stand-Alone Stand-Alone Stand-AloneMarcilla 318 18.62 11.02 104 Stand-Alone Stand-Alone Stand-AloneSan Jose (a) 301 17.54 10.39 98 Stand-Alone Stand-Alone Stand-AloneTara 358 21.12 12.51 118 Stand-Alone Stand-Alone Stand-Alone

CUYO Manamoc 382 19.15 11.34 107 Stand-Alone Mini-Grid Mini-GridMagsaysay (b) 313 18.44 10.92 103 Stand-Alone Stand-Alone Stand-AloneBacao 350 19.15 11.34 107 Stand-Alone Stand-Alone Stand-AloneBohol 347 15.39 9.12 86 Stand-Alone Stand-Alone Stand-AloneSanta Teresita* 534 28.82 17.07 161 Stand-Alone Mini-Grid Mini-GridCalasag 50 1.97 1.17 11 Stand-Alone Stand-Alone Stand-AloneCatep 154 8.41 4.98 47 Stand-Alone Stand-Alone Stand-AloneCulacian (a) 167 7.7 4.56 43 Stand-Alone Stand-Alone Stand-AloneDanleg 448 25.24 14.95 141 Stand-Alone Stand-Alone Stand-AloneDumaran (Pob)* 407 21.84 12.93 122 Stand-Alone Mini-Grid Mini-GridItangil 510 30.79 18.23 172 Stand-Alone Stand-Alone Stand-AloneAberawan 356 16.11 9.54 90 Stand-Alone Stand-Alone Stand-AloneBagong Bayan (a) 328 14.32 8.48 80 Stand-Alone Stand-Alone Stand-AloneBarangonan (Ilog) 220 12.53 7.42 70 Stand-Alone Stand-Alone Stand-AloneCabunlawan 190 10.74 6.36 60 Stand-Alone Stand-Alone Stand-AloneCalibangbangan 242 13.96 8.27 78 Stand-Alone Stand-Alone Stand-AloneDecabaitot 144 7.7 4.56 43 Stand-Alone Stand-Alone Stand-AloneMaroyogroyog 390 23.27 13.78 130 Stand-Alone Stand-Alone Stand-AloneNew Culaylayan 252 14.5 8.59 81 Stand-Alone Stand-Alone Stand-AlonePical 344 20.23 11.98 113 Stand-Alone Stand-Alone Stand-AloneSan Nicolas (b) 232 13.25 7.84 74 Stand-Alone Stand-Alone Stand-AloneBabuyan 695 37.23 22.05 208 Grid-Expansion Stand-Alone Grid-ExpansionNapsan 804 49.4 29.26 276 Stand-Alone Stand-Alone Stand-Alone

QUEZON Berong 492 29.89 17.70 167 Stand-Alone Stand-Alone Stand-AlonePort Barton* 1141 65.87 39.01 368 Mini-Grid Mini-Grid Mini-GridSanto Nino (c) 237 11.64 6.89 65 Stand-Alone Stand-Alone Stand-AloneBanbanan 421 23.63 13.99 132 Stand-Alone Stand-Alone Stand-AloneBeton 322 17.36 10.28 97 Stand-Alone Stand-Alone Stand-AloneBusy Bees 236 13.6 8.06 76 Stand-Alone Stand-Alone Stand-AloneCalawag 1060 65.16 38.58 364 Mini-Grid Stand-Alone Stand-AloneCasian 617 35.8 21.20 200 Stand-Alone Stand-Alone Stand-AlonePularaquen (Canique) 393 23.45 13.89 131 Stand-Alone Stand-Alone Stand-AloneCataban 228 13.07 7.74 73 Stand-Alone Stand-Alone Stand-AloneDebangan 296 15.75 9.33 88 Stand-Alone Stand-Alone Stand-AloneLiminangcong 1108 50.66 30.00 283 Mini-Grid Mini-Grid Mini-Grid

KALAYAAN Pag-asa (Pob) 14 0.36 0.21 2 Stand-Alone Stand-Alone Stand-AloneGaloc 301 17.54 10.39 98 Stand-Alone Stand-Alone Stand-AloneLuac 690 42.07 24.91 235 Stand-Alone Stand-Alone Stand-AloneCandawaga 2845 177.39 105.05 991 UNDP(Stand-Alone) Stand-AlonePunta Baja 4674 275.84 163.35 1541 Mini-Grid Mini-Grid Mini-GridTaburi 1504 92.36 54.70 516 Mini-Grid Stand-Alone Stand-AloneBunog 1170 71.42 42.29 399 Mini-Grid Stand-Alone Stand-AloneCampung-ulay 1330 82.34 48.76 460 Mini-Grid Stand-Alone Stand-Alone

Grid-Expansion 1Mini-Grid 6

Stand-Alone 52Total 59

EC-grid-expansionScreening

Restriction Screening(ECAN Zoning,

On-Going Project )

FinalResult

(Base Scenario)

Mini-gridScreening# of HH

to electrify

BarabgayName

Number ofPotential HH

2015

Potential Demand (6-hours, II)

EL NIDO(BACUIT)

CULION

BUSUANGA

RIZAL(MARCOS)

SANVICENTE

PUERTO PRINCESACITY (CAPITAL)

LINAPACAN

CORON

MunicipalityName

TAYTAY

CAGAYAN-CILLO

DUMARAN

PresentElectrification

MethodEnergy(MWh)

Peak(kW)

Page 36: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-36

Table 5.4.13 Barangay Electrification Plan (Reliability-Oriented Scenario) No. of Barangay Investment Cost (million Php)

Year Year Electrification Method Sub Total

2004 2005 2006 Sub Total

2004 2005 2006

EC-grid extension 56 21 17 18 **321.1 **112.1 **111.5 **97.5

Mini-grid 15 0 0 15 73.3 0 0 73.3

Stand-alone 94 40 40 14 32.9 14.0 14.0 4.9

Total *165 61 57 47 427.3 126.1 125.5 175.7

* No. of Barangays exceeds 160 because it includes grade-up electrification ** Includes countermeasure cost for voltage drops caused from EC-grid distribution line expansion (refer to Section 5.4.4)

Table 5.4.14 Number of Barangays Electrified (Reliability-Oriented Scenario) Number of Barangay Electrification

Status Electrification

Method Electrification

Level As of the end of 2003 2015 LEVEL III 44 44 LEVEL II 111 167 LEVEL I 57 57

EC-grid extension

Sub Total ( 212) ( 268)LEVEL II 1 21 LEVEL I 5 0 Mini-grid

Sub Total ( 6) ( 21) LEVEL II 6 142 LEVEL I 47 0 Stand-alone

Sub Total ( 53) ( 142)

Electrified

Total ( 271) ( 431) Un-electrified ( 160) ( 0)

Grand Total 431 431

Table 5.4.15 Transitin of Number of Households Electrified (Reliability-Oriented Scenario)

As of the end of 2003 2015 Electrification

Status Electrification

Method Number of Household

Share in Electrified Bgy.

Number of Household

Share in Electrified Bgy.

EC-Grid extension 54,416 95.6 % 98,927 67.2 % Mini-Grid 870 1.5 % 8,289 5.7 % Stand-Alone 1,638 2.9% 39,907 27.1 %

Electrified

Total ( 56,924) (100%) (147,123) (100%) Number of Households in Palawan (167,391) (262,303)

Household Electrification Ratio in Palawan

34.0% 56.1%

Page 37: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-37

Table 5.4.16 List of Barangays Electrified by EC-grid Extension (Reliability-Oriented Scenario) Barangay Municipality Current Electrification Level

(Method) Source Barangay Investment Cost (million Php)*

Villa Libertad El Nido Un-electrified Poblacion 5.0 Pasadena Un-electrified Villa Libertad 7.4 Barotuan Un-electrified Pasadena 7.1 Bucana Un-electrified Barotuan 5.5 Teneguiban Un-electrified Bucana 9.3 San Fernando Un-electrified Teneguiban 8.3 Sibartan Un-electrified San Fernando 4.8 New Guinro Taytay Un-electrified Bato 6.6 Old Guinro Un-electrified New Guinro 4.2 Libertad Un-electrified Abongan 5.3 Paglaum Un-electrified Bato 5.8 Talog Un-electrified Paglaum 3.6 Calawag LEVEL I (Stand-alone) Paglaum 8.7 San Nicolas Roxas Un-electrified Minara 5.1 Sandoval Un-electrified San Nicolas 6.9 Iraan Un-electrified Sandoval 5.5 Dumarao Un-electrified Iraan 3.6 Mendoza Un-electrified Iraan 10.7 Tumarbong Un-electrified Mendoza 7.6 San Isidro Un-electrified Mendoza 8.2 Caramay Un-electrified Magara 7.0 Salvacion Un-electrified Caramay 4.0 Rizal Un-electrified Salvacion 4.0 NicanorZabala Un-electrified Caramay 10.7 San Miguel Un-electrified Nicanor Zabara 5.3 Babuyan Puerto Princesa LEVEL I (Stand-alone) Maoyon 3.6 San Rafael Un-electrified Babuyan 4.8 Tanabag Un-electrified San Rafael 2.8 Conception Un-electrified Tanabag 5.3 Binduyan Un-electrified Conception 4.7 Langogan Un-electrified Binduyan 10.2 Bahile Un-electrified Salvacion 4.9 Macarascas Un-electrified Bahile 1.1 Sagpangan Abolran Un-electrified Iraan 2.9 Pulot Interior Sofronio Espanola Un-electrified Pulot Center 1.6 Labog Un-electrified Panitian 6.0 Punang Un-electrified Labog 9.4 Iraray Un-electrified Punang 4.2 Malatgao Quezon Un-electrified Panitian 3.6 Kalatagbak Un-electrified Pinaglabanan 8.7 Sto. Nino San Vicente LEVEL I (Stand-alone) Alemanguan 2.0 Imulnod Brookes Point Un-electrified Mainit 2.0 Malihud Bataraza Un-electrified Bono Bono 4.0 Bulalacao Un-electrified Malihud 3.9 Tarusan Un-electrified Bulalacao 3.9 Culandanum Un-electrified Tarusan 12.2 Sandoval Un-electrified Tarusan 3.5 Ocayan Un-electrified Sandoval 4.5 Rio Tuba Bataraza Un-electrified Ocayan 6.4 Taratak Un-electrified Rio Tuba 9.2 Sumbiling Un-electrified Taratak 3.0 Iwahig Un-electrified Sandoval 5.9 Igang Igang Un-electrified Iwahig 8.4 Sarong Un-electrified Igang Igang 7.4 Marcilla Coron LEVEL I (Stand-alone) Borac 5.9 San Jose LEVEL I (Stand-alone) Decalachao 4.4

Total 320.6 *Including the cost of secondary distribution lines in the center of the barangay (refer to Section 5.4.4)

Page 38: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-38

Table 5.4.17 List of Barangays Electrified by Mini-grid System (Reliability-Oriented Scenario)

Barangay Municipality Demand of Target HH

Type of System

Capacity Investment Cost (million Php)*

Algeciras AGUTAYA 75.4 kW Diesel 87 kW 3.7 Conception (a) 54.8 kW Diesel 63 kW 3.2 Bancalaan BALABAC 71.4 kW Diesel 87 kW 4.6 Mangsee 56.3 kW Diesel 63 kW 4.1 Cabayugan PUERTO PRINCESA 30.5 kW Diesel 34 kW 3.4 Aramaywan (b) QUEZON 30.4 kW Diesel 34 kW 5.2 Isugud 33.7 kW Diesel 34 kW 4.0 Quinlogan 41.6 kW Diesel 50 kW 4.5 Caruray SAN VICENTE 35.0 kW Diesel 50 kW 4.4 Canipaan RIZAL 44.5 kW Diesel 50 kW 4.7 Culacian (b) 34.9 kW Diesel 50 kW 3.0 Iraan (b) 106.7 kW Diesel 108 kW 9.3 Latud 30.2 kW Diesel 34 kW 6.5 Panalingaan 64.8 kW Diesel 87 kW 5.8 Ransang 75.8 kW Diesel 87 kW 6.9

Total 73.3 *Including the cost of secondary distribution lines in the center of the barangay (refer to Section 5.4.4)

Page 39: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-39

Table 5.4.18 Results of Screening (Reliability-Oriented Scenario) (Un-electrified Barangays: 160 Bgys.)

Culandanum (a) 256 16.11 9.54 90 Stand-Alone Stand-AloneSagpangan 470 29.54 17.49 165 Grid-Expansion Grid-ExpansionAlgeciras 2031 127.27 75.37 711 Mini-Grid Mini-GridConception (a) 1477 92.54 54.80 517 Mini-Grid Mini-GridDiit 752 47.08 27.88 263 Stand-Alone Stand-AloneMaracanao 99 6.27 3.71 35 Stand-Alone Stand-AloneMatarawis 88 5.55 3.29 31 Stand-Alone Stand-AloneVillafria 348 21.84 12.93 122 Stand-Alone Stand-AloneVillasol 524 32.76 19.40 183 Stand-Alone Stand-AloneBalogo 105 6.62 3.92 37 Stand-Alone Stand-AloneDagman 174 10.92 6.47 61 Stand-Alone Stand-AloneDalayawon 87 5.37 3.18 30 Stand-Alone Stand-AloneLumacad 112 6.98 4.13 39 Stand-Alone Stand-AloneMadoldolon 95 5.91 3.50 33 Stand-Alone Stand-AloneMauringuen 158 9.85 5.83 55 Stand-Alone Stand-AloneOsmena (a) 158 9.85 5.83 55 Stand-Alone Stand-AloneSan Jose De Oro 59 3.76 2.23 21 Stand-Alone Stand-AloneSanto Nino (a) 86 5.37 3.18 30 Stand-Alone Stand-AloneTaloto 113 7.16 4.24 40 Stand-Alone Stand-AloneAgutayan 177 11.1 6.57 62 Stand-Alone Stand-AloneBancalaan 1926 120.65 71.44 674 Mini-Grid Mini-GridBugsuk (New Cagayancillo) 280 17.54 10.39 98 Stand-Alone Stand-AloneCatagupan 445 27.92 16.54 156 Stand-Alone Stand-AloneIndalawan 271 17.01 10.07 95 Stand-Alone Stand-AloneMalaking Ilog 217 13.6 8.06 76 Stand-Alone Stand-AloneMangsee 1517 95.05 56.29 531 Mini-Grid Mini-GridMelville 280 17.54 10.39 98 Stand-Alone Stand-AlonePandanan 178 11.1 6.57 62 Stand-Alone Stand-AlonePasig 122 7.7 4.56 43 Stand-Alone Stand-AloneRabor 136 8.59 5.09 48 Stand-Alone Stand-AloneRamos 429 26.85 15.90 150 Stand-Alone Stand-AloneSalang 651 40.81 24.17 228 Stand-Alone Stand-AloneSebaring 249 15.57 9.22 87 Stand-Alone Stand-AloneBulalacao (a) 543 34.01 20.14 190 Grid-Expansion Grid-ExpansionBuliluyan 408 25.6 15.16 143 Stand-Alone Stand-AloneCulandanum (b) 1170 73.39 43.46 410 Grid-Expansion Grid-ExpansionIgang igang 412 25.78 15.26 144 Grid-Expansion Grid-ExpansionIwahig 691 43.32 25.65 242 Grid-Expansion Grid-ExpansionMalihud 522 32.76 19.40 183 Grid-Expansion Grid-ExpansionMalitub 192 11.99 7.10 67 Stand-Alone Stand-AloneOcayan 559 35.08 20.78 196 Grid-Expansion Grid-ExpansionPuring 275 17.18 10.18 96 Stand-Alone Stand-AloneRio Tuba 2845 178.28 105.58 996 Grid-Expansion Grid-ExpansionSandoval (a) 829 51.91 30.74 290 Grid-Expansion Grid-ExpansionSapa 464 29 17.17 162 Stand-Alone Stand-AloneSarong 607 37.95 22.47 212 Grid-Expansion Grid-ExpansionSumbiling 824 51.55 30.53 288 Grid-Expansion Grid-ExpansionTabud 307 19.15 11.34 107 Stand-Alone Stand-AloneTagnato 217 13.6 8.06 76 Stand-Alone Stand-AloneTagolango 226 14.14 8.37 79 Stand-Alone Stand-AloneTaratak 574 35.98 21.31 201 Grid-Expansion Grid-ExpansionTarusan 1093 68.56 40.60 383 Grid-Expansion Grid-Expansion

BROOKE'S P. Imulnod 480 30.07 17.81 168 Grid-Expansion Grid-ExpansionBurabod 101 6.27 3.71 35 Stand-Alone Stand-AloneCheey 551 34.55 20.46 193 Stand-Alone Stand-AloneHalsey 136 8.59 5.09 48 Stand-Alone Stand-AloneMaglalambay 246 15.39 9.12 86 Stand-Alone Stand-AloneMagsaysay (a) 246 15.39 9.12 86 Stand-Alone Stand-AloneMampio 97 6.09 3.60 34 Stand-Alone Stand-AloneNusa 87 5.37 3.18 30 Stand-Alone Stand-AloneCaponayan 271 17.01 10.07 95 Stand-Alone Stand-AloneLubid 201 12.53 7.42 70 Stand-Alone Stand-AloneCapayas 353 22.2 13.14 124 Stand-Alone Stand-AloneIlian 416 26.13 15.48 146 Stand-Alone Stand-AloneSan Juan (b) 245 15.39 9.12 86 Stand-Alone Stand-AloneSanta Maria 216 13.6 8.06 76 Stand-Alone Stand-AloneSanto Tomas 327 20.41 12.08 114 Stand-Alone Stand-AloneTanatanaon 409 25.6 15.16 143 Stand-Alone Stand-AloneBarotuan 635 39.74 23.53 222 Grid-Expansion Grid-ExpansionBebeladan 572 35.8 21.20 200 Stand-Alone Stand-AloneBucana 1378 86.28 51.09 482 Grid-Expansion Grid-ExpansionMabini (b) 331 20.76 12.30 116 Stand-Alone Stand-AloneManlag 510 32.04 18.97 179 Stand-Alone Stand-AloneNew Ibajay 769 48.15 28.51 269 Stand-Alone Stand-AlonePasadena 430 27.03 16.01 151 Grid-Expansion Grid-ExpansionSan Fernando 525 32.94 19.50 184 Grid-Expansion Grid-ExpansionSibartan 440 27.57 16.32 154 Grid-Expansion Grid-ExpansionTeneguiban 1015 63.55 37.63 355 Grid-Expansion Grid-ExpansionVilla Libertad 434 27.21 16.11 152 Grid-Expansion Grid-ExpansionVilla Paz 306 19.15 11.34 107 Stand-Alone Stand-Alone

LINAPACAN Nangalao 428 26.85 15.90 150 Stand-Alone Stand-AloneAlcoba 72 4.48 2.65 25 Stand-Alone Stand-AloneCanipo 199 12.53 7.42 70 Stand-Alone Stand-AloneCocoro 176 11.1 6.57 62 Stand-Alone Stand-Alone

PresentElectrification

Method

Mini-gridScreening

FinalResult

(Reliability Scenario)

EC-grid-expansionScreening

Restriction Screening(ECAN Zoning,

On-Going Project )

MunicipalityName

BarabgayName

Potential Demand (6-hours, II)

AGUTAYA

Number ofPotential HH

2015# of HH

to electrifyPeak(kW)

Energy(MWh)

ABORLAN

ARACELI

BALABAC

BATARAZA

CUYO

MAGSAYSAY

EL NIDO(BACUIT)

BUSUANGA

CAGAYAN-CILLO

DUMARAN

Page 40: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-40

Table 5.4.18 Results of Screening (Reliability-Oriented Scenario) (Continued)

Bagong Bayan (b) 247 15.39 9.12 86 Stand-Alone Stand-AloneBahile 756 47.44 28.09 265 Grid-Expansion Grid-ExpansionBinduyan 315 19.69 11.66 110 Grid-Expansion Grid-ExpansionBuena Vista (b) 285 17.9 10.60 100 Stand-Alone Stand-AloneCabayugan 822 51.55 30.53 288 Mini-Grid Mini-GridConception (c) 404 25.24 14.95 141 Grid-Expansion Grid-ExpansionLangogan 613 38.49 22.79 215 Grid-Expansion Grid-ExpansionMacarascas 516 32.4 19.19 181 Grid-Expansion Grid-ExpansionMarufinas 194 12.17 7.21 68 ECAN(Stand-Alone) Stand-AloneNew Panggangan 216 13.6 8.06 76 ECAN(Stand-Alone) Stand-AloneSan Rafael (b) 608 38.13 22.58 213 Grid-Expansion Grid-ExpansionSimpocan 358 22.38 13.25 125 Stand-Alone Stand-AloneTagabinit 451 28.28 16.75 158 Stand-Alone Stand-AloneTanabag 174 10.92 6.47 61 Grid-Expansion Grid-ExpansionAramaywan (b) 819 51.37 30.42 287 Mini-Grid Mini-GridKalatagbak 420 26.31 15.58 147 Grid-Expansion Grid-ExpansionCalumpang 514 32.22 19.08 180 Stand-Alone Stand-AloneIsugod 908 56.92 33.71 318 Mini-Grid Mini-GridMaasin (b) 454 28.46 16.85 159 Stand-Alone Stand-AloneMalatgao (b) 622 39.02 23.11 218 Grid-Expansion Grid-ExpansionQuinlogan 1121 70.17 41.55 392 Mini-Grid Mini-GridSowangan 529 33.12 19.61 185 Stand-Alone Stand-AloneTagusao 726 45.47 26.92 254 Stand-Alone Stand-AloneAntonino 189 11.81 7.00 66 Stand-Alone Stand-AloneBagong Bayan (c) 194 12.17 7.21 68 Stand-Alone Stand-AloneBarangay V (Pob) (Porao Is) 4 0.18 0.11 1 Stand-Alone Stand-AloneBarangay VI (Pob) (Johnson) 127 7.88 4.66 44 Stand-Alone Stand-AloneCaramay 540 33.83 20.03 189 Grid-Expansion Grid-ExpansionDumarao 525 32.94 19.50 184 Grid-Expansion Grid-ExpansionSanto Tomas (Iraan) 170 10.74 6.36 60 Grid-Expansion Grid-ExpansionJolo 180 11.28 6.68 63 Stand-Alone Stand-AloneMendoza 307 19.15 11.34 107 Grid-Expansion Grid-ExpansionNicanor Zabara 372 23.27 13.78 130 Grid-Expansion Grid-ExpansionRizal (b) 177 11.1 6.57 62 Grid-Expansion Grid-ExpansionSalvacion (b) 148 9.31 5.51 52 Grid-Expansion Grid-ExpansionSan Isidro (c) 121 7.52 4.45 42 Grid-Expansion Grid-ExpansionSan Miguel (b) 209 13.07 7.74 73 Grid-Expansion Grid-ExpansionSan Nicolas (c) 158 9.85 5.83 55 Grid-Expansion Grid-ExpansionSandoval (c) 368 23.09 13.67 129 Grid-Expansion Grid-ExpansionTaradungan 221 13.78 8.16 77 Stand-Alone Stand-AloneTinitian 322 20.23 11.98 113 Stand-Alone Stand-AloneTumarabong 717 44.93 26.61 251 Grid-Expansion Grid-ExpansionBinga 356 22.38 13.25 125 Stand-Alone Stand-AloneCaruray 942 59.07 34.98 330 Mini-Grid Mini-GridKemdeng 185 11.64 6.89 65 Stand-Alone Stand-AloneNew Canipo 281 17.54 10.39 98 Stand-Alone Stand-AloneAlacalian 452 28.28 16.75 158 Stand-Alone Stand-AloneBantulan 458 28.64 16.96 160 Stand-Alone Stand-AloneBaras 110 6.98 4.13 39 Stand-Alone Stand-AloneBatas 260 16.29 9.65 91 Stand-Alone Stand-AloneDepla 255 15.93 9.43 89 Stand-Alone Stand-AloneLibertad 437 27.39 16.22 153 Grid-Expansion Grid-ExpansionMeytegued 248 15.57 9.22 87 0Minapla 190 11.99 7.10 67 ECAN(Stand-Alone) Stand-AloneNew Guinlo 845 52.98 31.38 296 Grid-Expansion Grid-ExpansionOld Guinlo 182 11.46 6.78 64 Grid-Expansion Grid-ExpansionPaglaum 458 28.64 16.96 160 Grid-Expansion Grid-ExpansionPaly (Paly Is) 369 23.09 13.67 129 Stand-Alone Stand-AlonePamantolon 300 18.8 11.13 105 Stand-Alone Stand-AlonePancol 541 33.83 20.03 189 Stand-Alone Stand-AloneSan Jose (d) 416 26.13 15.48 146 ECAN(Stand-Alone) Stand-AloneSandoval (d) 270 17.01 10.07 95 Stand-Alone Stand-AloneSilanga 216 13.6 8.06 76 Stand-Alone Stand-AloneTalog 240 15.04 8.90 84 Grid-Expansion Grid-ExpansionTumbod 370 23.27 13.78 130 Stand-Alone Stand-Alone

CULION Binudac 453 28.46 16.85 159 Stand-Alone Stand-AloneCanipaan 1199 75.18 44.52 420 Mini-Grid Mini-GridCulacian (b) 939 58.89 34.87 329 Mini-Grid Mini-GridIraan (b) 2877 180.25 106.74 1007 Mini-Grid Mini-GridLatud 815 51.02 30.21 285 Mini-Grid Mini-GridPanalingaan 1746 109.37 64.77 611 Mini-Grid Mini-GridRansang 2042 127.99 75.79 715 Mini-Grid Mini-GridIraray 703 44.03 26.08 246 Grid-Expansion Grid-ExpansionLabog 957 59.97 35.51 335 Grid-Expansion Grid-ExpansionPulot Interior (Pulot II) 586 36.7 21.73 205 Grid-Expansion Grid-ExpansionPunang 732 45.82 27.14 256 Grid-Expansion Grid-Expansion

Grid-Expansion 51Mini-Grid 15

Stand-Alone 93Total 159

Peak(kW)

# of HHto electrify

PresentElectrification

Method

Restriction Screening(ECAN Zoning,

On-Going Project )

FinalResult

(Reliability Scenario)

EC-grid-expansionScreening

Mini-gridScreening

BarabgayName

Number ofPotential HH

2015

Potential Demand (6-hours, II)

Energy(MWh)

RIZAL(MARCOS)

SANVICENTE

TAYTAY

MunicipalityName

ROXAS

PUERTO PRINCESACITY (CAPITAL)

QUEZON

SOFRONIOESPANOLA

Page 41: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-41

Table 5.4.18 Results of Screening (Reliability-Oriented Scenario) (Continued) (Barangays electrified by SHS, BCS, BAPA, LGU.and others: 59 Bgys.)

ABORLAN Aporawan 833 51.19 30.32 286 Mini-Grid Stand-Alone Stand-AlonePanlaitan 657 39.92 23.64 223 Stand-Alone Stand-Alone Stand-AloneQuezon 331 19.51 11.55 109 Stand-Alone Stand-Alone Stand-AloneSan Isidro (a) 208 11.81 7.00 66 Stand-Alone Stand-Alone Stand-AloneSanta Cruz (a) 160 8.23 4.88 46 Stand-Alone Stand-Alone Stand-AloneTalaga 161 8.23 4.88 46 Stand-Alone Stand-Alone Stand-AloneBulalacao (b) 705 40.99 24.27 229 Stand-Alone Stand-Alone Stand-AloneBanuang Daan 174 9.67 5.72 54 Stand-Alone Stand-Alone Stand-AloneBuena Vista (a) 239 13.78 8.16 77 Stand-Alone Stand-Alone Stand-AloneCabugao 549 33.12 19.61 185 Stand-Alone Stand-Alone Stand-AloneDecabobo 249 14.32 8.48 80 Stand-Alone Stand-Alone Stand-AloneLajala 454 25.96 15.37 145 Stand-Alone Stand-Alone Stand-AloneMalawig 180 10.02 5.94 56 Stand-Alone Stand-Alone Stand-AloneMarcilla 318 18.62 11.02 104 Grid-Expansion Stand-Alone Grid-ExpansionSan Jose (a) 301 17.54 10.39 98 Grid-Expansion Stand-Alone Grid-ExpansionTara 358 21.12 12.51 118 Stand-Alone Stand-Alone Stand-Alone

CUYO Manamoc 382 19.15 11.34 107 Stand-Alone Mini-Grid Mini-GridMagsaysay (b) 313 18.44 10.92 103 Stand-Alone Stand-Alone Stand-AloneBacao 350 19.15 11.34 107 Stand-Alone Stand-Alone Stand-AloneBohol 347 15.39 9.12 86 Stand-Alone Stand-Alone Stand-AloneSanta Teresita* 534 28.82 17.07 161 Stand-Alone Mini-Grid Mini-GridCalasag 50 1.97 1.17 11 Stand-Alone Stand-Alone Stand-AloneCatep 154 8.41 4.98 47 Stand-Alone Stand-Alone Stand-AloneCulacian (a) 167 7.7 4.56 43 Stand-Alone Stand-Alone Stand-AloneDanleg 448 25.24 14.95 141 Stand-Alone Stand-Alone Stand-AloneDumaran (Pob)* 407 21.84 12.93 122 Stand-Alone Mini-Grid Mini-GridItangil 510 30.79 18.23 172 Stand-Alone Stand-Alone Stand-AloneAberawan 356 16.11 9.54 90 Stand-Alone Stand-Alone Stand-AloneBagong Bayan (a) 328 14.32 8.48 80 Stand-Alone Stand-Alone Stand-AloneBarangonan (Ilog) 220 12.53 7.42 70 Stand-Alone Stand-Alone Stand-AloneCabunlawan 190 10.74 6.36 60 Stand-Alone Stand-Alone Stand-AloneCalibangbangan 242 13.96 8.27 78 Stand-Alone Stand-Alone Stand-AloneDecabaitot 144 7.7 4.56 43 Stand-Alone Stand-Alone Stand-AloneMaroyogroyog 390 23.27 13.78 130 Stand-Alone Stand-Alone Stand-AloneNew Culaylayan 252 14.5 8.59 81 Stand-Alone Stand-Alone Stand-AlonePical 344 20.23 11.98 113 Stand-Alone Stand-Alone Stand-AloneSan Nicolas (b) 232 13.25 7.84 74 Stand-Alone Stand-Alone Stand-AloneBabuyan 695 37.23 22.05 208 Grid-Expansion Stand-Alone Grid-ExpansionNapsan 804 49.4 29.26 276 Stand-Alone Stand-Alone Stand-Alone

QUEZON Berong 492 29.89 17.70 167 Stand-Alone Stand-Alone Stand-AlonePort Barton* 1141 65.87 39.01 368 Mini-Grid Mini-Grid Mini-GridSanto Nino (c) 237 11.64 6.89 65 Grid-Expansion Stand-Alone Grid-ExpansionBanbanan 421 23.63 13.99 132 Stand-Alone Stand-Alone Stand-AloneBeton 322 17.36 10.28 97 Stand-Alone Stand-Alone Stand-AloneBusy Bees 236 13.6 8.06 76 Stand-Alone Stand-Alone Stand-AloneCalawag 1060 65.16 38.58 364 Grid-Expansion Stand-Alone Grid-ExpansionCasian 617 35.8 21.20 200 Stand-Alone Stand-Alone Stand-AlonePularaquen (Canique) 393 23.45 13.89 131 Stand-Alone Stand-Alone Stand-AloneCataban 228 13.07 7.74 73 Stand-Alone Stand-Alone Stand-AloneDebangan 296 15.75 9.33 88 Stand-Alone Stand-Alone Stand-AloneLiminangcong 1108 50.66 30.00 283 Mini-Grid Mini-Grid Mini-Grid

KALAYAAN Pag-asa (Pob) 14 0.36 0.21 2 Stand-Alone Stand-Alone Stand-AloneGaloc 301 17.54 10.39 98 Stand-Alone Stand-Alone Stand-AloneLuac 690 42.07 24.91 235 Stand-Alone Stand-Alone Stand-AloneCandawaga 2845 177.39 105.05 991 UNDP(Stand-Alone) Stand-Alone Stand-AlonePunta Baja 4674 275.84 163.35 1541 Mini-Grid Mini-Grid Mini-GridTaburi 1504 92.36 54.70 516 Mini-Grid Stand-Alone Stand-AloneBunog 1170 71.42 42.29 399 Mini-Grid Stand-Alone Stand-AloneCampung-ulay 1330 82.34 48.76 460 Mini-Grid Stand-Alone Stand-Alone

Grid-Expansion 5Mini-Grid 6

Stand-Alone 48Total 59

PresentElectrification

Method

EC-grid-expansionScreening

Restriction Screening(ECAN Zoning,

On-Going Project )

FinalResult

(Reliability Scenario)

Mini-gridScreeningEnergy

(MWh)Peak(kW)

# of HHto electrify

BarabgayName

Number ofPotential HH

2015

Potential Demand (6-hours, II)

RIZAL(MARCOS)

SANVICENTE

PUERTO PRINCESACITY (CAPITAL)

LINAPACAN

CORON

MunicipalityName

EL NIDO(BACUIT)

CULION

TAYTAY

CAGAYAN-CILLO

DUMARAN

BUSUANGA

Page 42: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-42

(3) Environment-friendly scenario (utilization of hydropower resources) The selected electrification methods are the same as those in the Base Scenario. This scenario

gives priority to the development of hydropower. Therefore, micro-hydropower for a mini-grid system is selected for 1 barangay (Bgy. Aramaywan in Mun. QUEZON).

Total investment cost up to 2006 is estimated to be 202.4 million pesos.

Table 5.4.19 Barangay Electrification Plan (Environment-Friendly Scenario) No. of Barangay Investment Cost (million Php)

Year Year Electrification Method Sub Total

2004 2005 2006 Sub Total

2004 2005 2006

EC-grid extension 6 3 2 1 **22.1 **9.5 **8.7 **3.9

Mini-grid 23 0 0 23 134.1 0 0 134.1

Stand-alone 132 60 60 12 46.2 21.0 21.0 4.2

Total *161 63 62 36 202.4 30.5 29.7 142.2

* No. of Barangays exceeds 160 because it includes grade-up electrification ** Includes countermeasure cost for voltage drops caused by EC-grid distribution line expansion (refer to Section 5.4.4)

Table 5.4.20 List of Barangays Electrified by Mini-grid System (Environment-Friendly Scenario)

Barangay Municipality Demand of Target HH

Type of System

Capacity Investment Cost (million Php)*

Algeciras 75.4 kW Diesel 87 kW 3.7 Conception (a)

AGUTAYA 54.8 kW Diesel 63 kW 3.2

Bancalaan 71.4 kW Diesel 87 kW 4.6 Mangsee

BALABAC 56.3 kW Diesel 63 kW 4.1

Culandanum (b) 43.5 kW Diesel 50 kW 4.3 Rio Tuba 105.6 kW Diesel 108 kW 7.5 Sandoval (a) 30.7 kW Diesel 34 kW 5.2 Sumbiling

BATARAZA

30.5 kW Diesel 34 kW 3.6 Bucana 51.2 kW Diesel 63 kW 5.3 Teneguiban

EL NIDO 37.6 kW Diesel 50 kW 6.7

Cabayugan PUERTO PRINCESA 30.5 kW Diesel 34 kW 3.4 Aramaywan (b) QUEZON 30.4 kW Micro Hydro 39 kW 24.3 Isugud 33.7 kW Diesel 34 kW 4.0 Quinlogan

41.6 kW Diesel 50 kW 4.5

Caruray SAN VICENTE 35.0 kW Diesel 50 kW 4.4 New Guinlo TAYTAY 31.4 kW Diesel 34 kW 4.3 Canipaan 44.5 kW Diesel 50 kW 4.7 Culacian (b) 34.9 kW Diesel 50 kW 3.0 Iraan (b) 106.7 kW Diesel 108 kW 9.3 Latud 30.2 kW Diesel 34 kW 6.5 Panalingaan 64.8 kW Diesel 87 kW 5.8 Ransang

RIZAL

75.8 kW Diesel 87 kW 6.9 Labog SOFRONO ESPANOLA 35.5 kW Diesel 50 kW 5.0

Total 134.1 *Including the cost of secondary distribution lines in the center of the barangay (refer to Section 5.4.4)

Page 43: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-43

5.4.4 Check of Selected EC-Grid Extension and Mini-Grid System (1) Supply voltage check

Voltage drops in each distribution feeder are calculated based on the estimated demand at 2015. There is no definite criterion for 13.2kV distribution line voltage drop in PALECO. In this study, a voltage drop criterion is set to 5% of nominal voltage. If it exceeds 5%, supply voltage for the tail end low voltage customer is less than 90% of nominal voltage. As impedances are used for the calculation of each feeder’s voltage drops, and not the value of NEA BULLETIN DX3430 and Table 3.4.2 of this report, and so the value shown in the Table 5.4.21 is adopted so that a power-factor may be reflected.

In the voltage calculations of PALECO’s feeder, it is considered that the main distribution lines are AWG2/0. But in the calculation of BISELCO’s feeder, actual sizes obtained from their line maps are used.

The demand is computed in proportion to the number of households in 2015, and measurement values, which PALECO holds, are rectified. And information on new big customers is also considered. The power factor is set up to 90%. The results of calculation are shown in Table 5.4.22. Calculation data sheets are shown in Tables 5.4.23 to 5.4.27.

Table 5.4.22 Results of Calculation on Voltage Drop Power/Sub Reliability-Oriented Scenario Base Scenario

Station Feeder /Circuit 2015 2006 2015 2006

San Jose Exceed 5% at Bacungan

Exceed 5% at Bacungan -- Exceed 5%

at Bacungan Puerto Princesa City

Iwahig OK -- -- --

Aborlan Exceed 5% at Isaub OK Exceed 5%

at Kamuning OK Narra

Quezon Exceed 5% at Calategas -- -- Exceed 5%

at Ipilan To East OK -- -- --

Brooke’s Point Bataraza Exceed 5% at Bono Bono

Exceed 5% at Ocayan OK --

Coron Busuanga OK -- -- --

The feeder that has more than a 5% voltage drop needs a voltage regulator or capacitor on the feeder to compensate voltage. The Narra-Aborlan feeder will have a voltage drop exceeding 5% at Barangay Kamuning. However, since the Puerto Princesa-Iwahig feeder has a margin in its voltage drop, barangays Kamuning, Inagawan and Inagawan Sub-colony will be able to be supplied by the Iwahig feeder. The Narra substation will not have enough capacity to meet demand in the near future. Therefore, NPC-SPUG is planning the construction of a new substation under the way of the backbone transmission line near Barangay Abo-Abo. After this construction, the Narra-Quezon feeder will be divided into two feeders.

Table 5.4.21 Impedance

Conductor SizeACSR

Resistance R(Ohms/km)

Reactance X(Ohms/km)

AWG 2/0 0.418 0.448 AWG 1/0 0.524 0.457 AWG #2 0.834 0.474

Page 44: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-44

Tabl

e 5.

4.23

Vol

tage

Dro

p of

Abo

rlan

Circ

uit i

n 20

15

Rel

iabl

ity

Orien

ted

Cas

e20

15N

arra

Abo

rlan

Bac

k Im

peda

nce

12.1

6

Bra

ngay

Sec

tion

Cum

ulat

ive

Con

e.D

eman

dB

ig C

stm

r.C

urre

ntC

um. C

ur.

Sec

tion

Cum

ulat

ive

Vol

tage

Dro

p(V

)V

olta

geD

rop

Rat

ioSho

rt C

urfr

omto

(km

)(k

m)

HH

(kW

)(k

W)

(A)

(A)

R(O

hm)

X(O

hm)

R(O

hm)

X(O

hm)

Sec

tion

Cum

ula

(V)

(%)

(kA

)Sub

stat

ion

Pob

laci

on0.

000.

003,

710

360

15.7

62.1

0.00

00.

000

0.00

00.

000

00

13,2

000.

00.

63A

ntip

ulua

n4.

504.

5062

461

2.6

39.9

1.88

12.

016

1.88

12.

016

178

178

13,0

221.

30.

53El V

ita

1.20

5.70

586

0.2

37.2

0.50

20.

538

2.38

32.

554

4422

212

,978

1.7

0.51

Tar

etie

n1.

256.

9511

111

0.5

37.0

0.52

30.

560

2.90

53.

114

4626

812

,932

2.0

0.49

Mal

atga

o2.

008.

9515

815

0.7

36.5

0.83

60.

896

3.74

14.

010

7234

012

,860

2.6

0.46

T1

3.00

11.9

50

0.0

35.8

3.74

14.

010

034

012

,860

2.6

0.46

San

dova

l1.

0012

.95

406

391.

735

.60.

418

0.44

84.

159

4.45

835

375

12,8

252.

80.

44T2

2.00

14.9

50

0.0

32.7

4.15

94.

458

037

512

,825

2.8

0.44

Pla

ndel

2.00

16.9

556

054

2.4

30.8

0.83

60.

896

4.99

55.

354

6143

612

,764

3.3

0.42

Mag

says

ay3.

5020

.45

156

150.

726

.61.

463

1.56

86.

458

6.92

292

528

12,6

724.

00.

38T3

3.50

23.9

50

0.0

25.9

6.45

86.

922

052

812

,672

4.0

0.38

Pob

laci

on(A

borlan

)2.

5026

.45

588

572.

525

.31.

045

1.12

07.

503

8.04

263

591

12,6

094.

50.

35M

abin

i0.

7527

.20

818

0.3

21.2

0.31

40.

336

7.81

78.

378

1660

712

,593

4.6

0.35

San

Jua

n0.

7527

.95

677

6628

015

.120

.90.

314

0.33

68.

130

8.71

415

622

12,5

784.

70.

34Iraa

n3.

2531

.20

145

140.

65.

71.

359

1.45

69.

489

10.1

7018

641

12,5

594.

90.

31Is

aub

4.50

35.7

028

227

1.2

4.4

1.88

12.

016

11.3

7012

.186

2066

012

,540

5.0

0.28

Kam

unin

g5.

0040

.70

228

221.

03.

22.

090

2.24

013

.460

14.4

2616

676

12,5

245.

10.

26In

agaw

an2.

5043

.20

404

391.

72.

31.

045

1.12

014

.505

15.5

466

682

12,5

185.

20.

24In

agaw

an S

ubco

lony

0.10

43.3

061

60.

30.

50.

042

0.04

514

.546

15.5

900

682

12,5

185.

20.

24T1

Tin

agon

g D

agat

3.75

15.7

068

70.

30.

31.

568

1.68

05.

309

5.69

01

341

12,8

592.

60.

41San

dova

lB

agon

g Sik

at3.

7516

.70

264

261.

11.

11.

568

1.68

05.

727

6.13

84

379

12,8

212.

90.

40T2

Est

rella

Vill

age

4.25

19.2

092

90.

41.

51.

777

1.90

45.

936

6.36

26

382

12,8

182.

90.

39D

uman

guen

a3.

0022

.20

269

261.

11.

11.

254

1.34

47.

190

7.70

63

385

12,8

152.

90.

36P

land

elJos

e R

izal

4.25

21.2

024

123

1.0

1.2

1.77

71.

904

6.77

27.

258

544

112

,759

3.3

0.37

Apo

c A

poc

3.50

24.7

046

40.

20.

21.

463

1.56

88.

235

8.82

61

442

12,7

583.

30.

34P

land

elTig

man

4.00

20.9

516

316

0.7

0.7

1.67

21.

792

6.66

77.

146

343

912

,761

3.3

0.37

T3

Tag

pait

1.50

25.4

511

211

0.5

0.5

0.62

70.

672

7.08

57.

594

152

912

,671

4.0

0.36

T3

Gog

ogna

n1.

7525

.70

172

0.1

0.1

0.73

20.

784

7.19

07.

706

052

812

,672

4.0

0.36

Pob

laci

on(A

borl

Mab

ini

1.00

27.4

581

80.

31.

70.

418

0.44

87.

921

8.49

02

593

12,6

074.

50.

34M

agba

badi

l4.

0031

.45

155

150.

71.

31.

672

1.79

29.

593

10.2

825

598

12,6

024.

50.

31C

abig

aan

3.00

34.4

592

90.

40.

41.

254

1.34

410

.847

11.6

261

599

12,6

014.

50.

29M

agba

badi

lB

arak

e2.

5033

.95

616

0.3

0.3

1.04

51.

120

10.6

3811

.402

159

812

,602

4.5

0.29

Iraa

nSag

pang

an4.

7535

.95

165

160.

70.

71.

986

2.12

811

.474

12.2

983

644

12,5

564.

90.

28P

obla

cion

(Nar

raP

anac

an3.

003.

0015

2114

86.

56.

51.

254

1.34

41.

254

1.34

419

1913

,181

0.1

0.56

T2

Apo

Apo

raw

an3.

5018

.45

808

0.3

0.3

1.46

31.

568

5.62

26.

026

137

612

,824

2.9

0.40

*A

gric

ultire

Uni

vers

ity-

-San

Jua

n

5-44

Page 45: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-45

Tabl

e 5.

4.24

Vol

tage

Dro

p of

Bat

araz

a C

ircui

t in

2015

R

elia

bili

ty O

riente

d C

ase

2015

Bro

oke

's P

oin

tB

atar

aza

Circuit

13.8

6

Bra

nga

ySection

Cum

ula

tive

Cone.

Dem

and

Curr

ent

Cum

. C

ur.

Section

Cum

ula

tive

Voltag

e D

rop(V

)V

oltag

eD

rop R

atio

Short

Cir

from

to(k

m)

(km

)H

H(k

W)

(A)

(A)

R(O

hm

)X(O

hm

)R

(Ohm

)X(O

hm

)Section

Cum

ula

(V)

(%)

(A)

Subst

atio

nTub T

ub

4.3

04.3

060

60.3

23.3

1.7

97

1.9

26

1.7

97

1.9

26

99

99

13,1

01

0.7

0.4

8O

ring

Oring

2.4

06.7

023

20.1

23.0

1.0

03

1.0

75

2.8

01

3.0

02

55

154

13,0

46

1.2

0.4

5A

mas

1.5

08.2

0147

14

0.6

22.9

0.6

27

0.6

72

3.4

28

3.6

74

34

188

13,0

12

1.4

0.4

3Sar

aza

1.9

010.1

041

40.2

22.3

0.7

94

0.8

51

4.2

22

4.5

25

42

230

12,9

70

1.7

0.4

0Sam

arin

ana

2.6

012.7

0108

10

0.5

22.1

1.0

87

1.1

65

5.3

09

5.6

90

57

286

12,9

14

2.2

0.3

8Sal

ogo

n4.1

016.8

0116

11

0.5

21.6

1.7

14

1.8

37

7.0

22

7.5

26

88

374

12,8

26

2.8

0.3

4M

alis

4.5

021.3

064

60.3

21.2

1.8

81

2.0

16

8.9

03

9.5

42

94

468

12,7

32

3.5

0.3

0In

ogb

ong

2.2

023.5

056

50.2

20.9

0.9

20

0.9

86

9.8

23

10.5

28

45

514

12,6

86

3.9

0.2

9B

atar

aza(

Mar

an3.9

027.4

0840

81

3.6

20.6

1.6

30

1.7

47

11.4

53

12.2

75

80

594

12,6

06

4.5

0.2

7B

ono B

ono

4.7

032.1

0286

28

1.2

17.1

1.9

65

2.1

06

13.4

18

14.3

81

79

673

12,5

27

5.1

0.2

4M

alih

ud

4.0

036.1

0183

18

0.8

15.9

1.6

72

1.7

92

15.0

90

16.1

73

63

736

12,4

64

5.6

0.2

3B

ula

lacao

4.0

040.1

0191

19

0.8

15.1

1.6

72

1.7

92

16.7

62

17.9

65

60

796

12,4

04

6.0

0.2

1Tar

usa

n4.0

044.1

0383

37

1.6

14.3

1.6

72

1.7

92

18.4

34

19.7

57

57

852

12,3

48

6.5

0.2

0T1

5.8

049.9

00

00.0

12.7

2.4

24

2.5

98

20.8

58

22.3

55

73

925

12,2

75

7.0

0.1

8San

dova

l4.0

053.9

0291

28

1.2

8.4

1.6

72

1.7

92

22.5

30

24.1

47

33

958

12,2

42

7.3

0.1

7O

cay

an4.2

058.1

0196

19

0.8

7.1

1.7

56

1.8

82

24.2

86

26.0

29

30

988

12,2

12

7.5

0.1

6T2

2.8

060.9

00

00.0

6.3

1.1

70

1.2

54

25.4

56

27.2

83

17

1005

12,1

95

7.6

0.1

6Tar

atak

10.0

070.9

0201

19

0.9

2.1

4.1

80

4.4

80

29.6

36

31.7

63

21

1026

12,1

74

7.8

0.1

4Sum

bulin

g3.0

073.9

0289

28

1.2

1.2

1.2

54

1.3

44

30.8

90

33.1

07

41029

12,1

71

7.8

0.1

4T1

Iwah

ig6.0

055.9

0242

23

1.0

2.5

2.5

08

2.6

88

23.3

66

24.8

63

15

940

12,2

60

7.1

0.1

7Ig

ang

Igan

g9.0

062.9

0145

14

0.6

1.5

3.7

62

4.0

32

27.1

28

28.8

95

14

954

12,2

46

7.2

0.1

5Sar

ong

8.0

066.1

0213

21

0.9

0.9

3.3

44

3.5

84

30.4

72

32.4

79

7961

12,2

39

7.3

0.1

4T1

Cula

ndan

um

6.1

056.0

0410

40

1.7

1.7

2.5

50

2.7

33

23.4

08

25.0

88

11

935

12,2

65

7.1

0.1

7T2

Rio

Tuba

5.2

066.1

0996

97

4.2

4.2

2.1

74

2.3

30

27.6

30

29.6

13

22

1027

12,1

73

7.8

0.1

5

5-45

Page 46: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-46

Tabl

e 5.

4.25

Vol

tage

Dro

p of

San

Jose

Circ

uit i

n 20

06

Ta

ble

5.4.

26 V

olta

ge D

rop

of Q

uezo

n C

ircui

t in

2006

BA

SE C

ASE

200

6P

uert

o P

rinces

a S

AN

JO

SE C

IRC

UIT

Bac

k Im

peda

nce

Bra

nga

ySect

ion

Cum

ula

tive

Cone

.D

em

and

Big

Cst

mr.

Curr

ent

Cum

. C

ur.

Section

Cum

ulat

ive

Voltag

e D

rop(

V)

Vol

tage

Dro

p R

atio

from

to(k

m)

(km

)H

H(k

W)

(kW

)(A

)(A

)R

(Ohm

)X(O

hm

)R

(Ohm

)X(O

hm

)Section

Cum

ula

(V)

(%)

Subs

tation

City

Centr

e1.0

01.0

0755

33.0

89.7

0.418

0.448

0.41

80.

448

89

89

13,1

11

0.7

San

Jose

1.0

02.0

01,0

94106

4.6

56.7

0.418

0.448

0.41

80.

448

56

145

13,0

55

1.1

Tag

buro

s3.0

05.0

0573

56

2.4

52.0

1.254

1.344

1.67

21.

792

155

299

12,9

01

2.3

Sta

. Lourd

es2.5

07.5

0422

41

250

12.7

49.6

1.045

1.120

2.71

72.

912

123

422

12,7

78

3.2

Bac

unga

n10.0

017.5

0303

29

750

34.1

36.9

4.180

4.480

6.89

77.

392

365

787

12,4

13

6.0

Sta

. C

ruz

7.0

024.5

055

50.2

2.8

2.926

3.136

9.82

310.

528

19

807

12,3

93

6.1

Sal

vaci

on

9.0

033.5

075

70.3

2.6

3.762

4.032

13.

585

14.

560

23

830

12,3

70

6.3

Man

alo

4.5

038.0

0134

13

0.6

2.2

1.881

2.016

15.

466

16.

576

10

840

12,3

60

6.4

Mar

uyo

gon

5.0

043.0

0105

10

0.4

1.7

2.090

2.240

17.

556

18.

816

884

812,3

52

6.4

Lucb

uan

2.5

045.5

098

10

0.4

1.2

1.045

1.120

18.

601

19.

936

385

112,3

49

6.4

Mao

yon

3.0

048.5

075

70.3

0.8

1.254

1.344

19.

855

21.

280

285

312,3

47

6.5

Bab

uya

n3.5

052.0

0118

11

0.5

0.5

1.463

1.568

21.

318

22.

848

285

512,3

45

6.5

*C

itra

Min

a Food

Cor

pora

tion-

-B

acunga

n(D

ay T

ime P

eak

1500

kW)

*San

itar

y Fie

ld--Sta

. Loud

es(

Day

Tim

e P

eak

500kW

)

BA

SE C

ASE

2006

Nar

raQ

uezo

n C

ircuit

Bac

k Im

peda

nce

Bra

nga

ySection

Cum

ula

tive

Cone.

Dem

and

Big

Cst

mr.

Curr

ent

Cum

. C

ur.

Section

Cum

ula

tive

Voltag

e D

rop(

V)

Voltag

eD

rop

Rat

iofr

om

to(k

m)

(km

)H

H(k

W)

(kW

)(A

)(A

)R

(Ohm

)X(O

hm

)R

(Ohm

)X(O

hm

)Section

Cum

ula

(V)

(%)

Subs

tation

Mal

inao

4.5

04.5

0297

29

1.3

24.1

1.8

81

2.0

16

1.8

81

2.0

16

107

107

13,0

93

0.8

Princess

4.5

09.0

0637

62

2.7

22.4

1.8

81

2.0

16

3.7

62

4.0

32

100

207

12,9

93

1.6

San

Isid

ro4.7

513.7

5121

12

0.5

19.3

1.9

86

2.1

28

5.7

48

6.1

60

91

298

12,9

02

2.3

Cal

atega

s9.2

523.0

0386

37

1.6

18.8

3.8

67

4.1

44

9.6

14

10.3

04

172

470

12,7

30

3.6

Ara

may

wan

3.7

526.7

5214

21

0.9

17.1

1.5

68

1.6

80

11.1

82

11.9

84

64

534

12,6

66

4.0

Tac

ras

3.7

530.5

0112

11

0.5

16.2

1.5

68

1.6

80

12.7

49

13.6

64

60

594

12,6

06

4.5

Brira

o3.0

033.5

0137

13

0.6

15.8

1.2

54

1.3

44

14.0

03

15.0

08

47

641

12,5

59

4.9

T1

3.2

536.7

50

0.0

15.2

1.3

59

1.4

56

15.3

62

16.4

64

49

689

12,5

11

5.2

Ipila

n3.0

039.7

543

40.2

12.6

1.2

54

1.3

44

16.6

16

17.8

08

37

727

12,4

73

5.5

T2

3.5

043.2

50

0.0

12.4

1.4

63

1.5

68

18.0

79

19.3

76

43

770

12,4

30

5.8

Pin

agla

banan

4.6

047.8

562

60.3

12.4

1.9

23

2.0

61

20.0

01

21.4

37

57

827

12,3

73

6.3

Quezo

n P

ob.

8.5

056.3

51,5

77

153

100

11.1

12.2

3.5

53

3.8

08

23.5

54

25.2

45

102

929

12,2

71

7.0

T3

7.2

063.5

50

0.0

0.8

3.0

10

3.2

26

26.5

64

28.4

70

6935

12,2

65

7.1

Pan

itia

n2.7

066.2

5198

19

0.8

0.8

1.1

29

1.2

10

27.6

92

29.6

80

2937

12,2

63

7.1

T1

Abo

Abo

0.6

037.3

5200

19

0.8

2.6

0.2

51

0.2

69

15.6

12

16.7

33

2691

12,5

09

5.2

Isum

bo1.8

039.1

568

70.3

1.7

0.7

52

0.8

06

17.3

68

18.6

14

3694

12,5

06

5.3

Pan

itia

n6.2

045.3

5338

33

1.4

1.4

2.5

92

2.7

78

20.6

70

22.1

54

99

13,1

91

0.1

Mal

inao

Cag

uis

an3.0

07.5

0109

11

0.5

0.5

1.2

54

1.3

44

3.1

35

3.3

60

1109

13,0

91

0.8

Princess

Bat

angB

atan

g3.7

512.7

596

90.4

0.4

1.5

68

1.6

80

5.3

30

5.7

12

2209

12,9

91

1.6

Quezo

n P

ob.

Tab

on

3.0

059.3

561

60.3

0.3

1.2

54

1.3

44

24.8

08

26.5

89

1930

12,2

70

7.0

*Ic

e P

lant-

-Q

uezo

n P

obl

acio

n

5-46

Page 47: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-47

Tabl

e 5.

4.27

Vol

tage

Dro

p of

Bus

uang

a C

ircui

t in

2015

R

elia

bilit

y O

riente

d C

ase

2015

Coro

nB

usu

anga

Circuit

Bra

nga

ySection

Cum

ula

tive

Cone.

Dem

and

Big

Cst

mr.

Curr

ent

Cum

. C

ur.

Section

Cum

ula

tive

Voltag

e D

rop(

V)

Voltag

eD

rop

Rat

iofr

om

to(k

m)

(km

)H

H(k

W)

(kW

)(A

)(A

)R

(Ohm

)X(O

hm

)R

(Ohm

)X(O

hm

)Section

Cum

ula

(V)

(%)

Subs

tation

T1

1.0

01.0

00

00.0

10.7

0.5

24

0.4

57

0.5

24

0.4

57

12

12.3

913,1

88

0.1

T2

3.0

04.0

00

00.0

10.2

1.5

73

1.3

71

2.0

97

1.8

28

36

47.9

013,1

52

0.4

Sta

. M

onic

a5.5

09.5

00

00.0

5.6

2.8

84

2.5

14

4.9

81

4.3

42

36

83.4

413,1

17

0.6

Bin

tuan

10.0

019.5

061

640

2.0

5.6

5.2

43

4.5

70

10.2

24

8.9

12

65

148.0

613,0

52

1.1

Sto

. N

ino

4.0

023.5

035

30.1

3.6

3.3

37

1.8

96

13.5

61

10.8

08

24

171.6

213,0

28

1.3

Concept

ion

4.0

027.5

0164

16

0.7

3.4

3.3

37

1.8

96

16.8

98

12.7

04

23

194.1

913,0

06

1.5

Sag

rada

2.0

029.5

057

60.2

2.7

1.6

69

0.9

48

18.5

67

13.6

52

9203.1

712,9

97

1.5

Kiw

it3.0

032.5

00

00.0

2.5

2.5

03

1.4

22

21.0

70

15.0

74

12

215.4

312,9

85

1.6

Bugt

ong

2.0

034.5

058

60.2

2.5

1.6

69

0.9

48

22.7

38

16.0

22

8223.6

112,9

76

1.7

Sal

vacio

n4.5

039.0

0213

21

0.9

2.2

3.7

54

2.1

33

26.4

93

18.1

55

17

240.1

712,9

60

1.8

Old

Busa

nga

4.5

043.5

048

50.2

1.3

3.7

54

2.1

33

30.2

47

20.2

88

10

249.9

812,9

50

1.9

San

Raf

ael

3.0

046.5

046

40.2

1.1

2.5

03

1.4

22

32.7

50

21.7

10

6255.5

112,9

44

1.9

New

Busu

anga

3.5

050.0

089

90.4

0.9

2.9

20

1.6

59

35.6

70

23.3

69

5260.8

312,9

39

2.0

Bulu

ang

2.5

052.5

016

20.1

0.5

2.0

86

1.1

85

37.7

56

24.5

54

2263.0

612,9

37

2.0

T1

Bar

anga

y 6

3.5

04.5

0111

11

0.5

0.5

2.9

20

1.6

59

3.4

44

2.1

16

315.1

213,1

85

0.1

T2

Guad

alupe

3.0

07.0

0109

11

0.5

4.6

2.5

03

1.4

22

4.6

00

3.2

50

23

70.9

113,1

29

0.5

San

Nic

ola

s2.0

09.0

0117

11

0.5

4.2

1.6

69

0.9

48

6.2

69

4.1

98

14

84.7

213,1

15

0.6

Bora

c15.0

024.0

0148

14

0.6

1.4

12.5

15

7.1

10

18.7

83

11.3

08

34

119.1

313,0

81

0.9

Turd

a6.5

030.5

067

60.3

0.3

5.4

23

3.0

81

24.2

06

14.3

89

3122.1

913,0

78

0.9

Bora

cM

arcill

a4.0

028.0

0111

11

0.5

0.5

3.3

37

1.8

96

22.1

20

13.2

04

3122.2

513,0

78

0.9

San

Nic

ola

sYKR

10.5

019.5

00

30

1.3

2.3

8.7

60

4.9

77

15.0

29

9.1

75

40

124.4

913,0

76

0.9

Deka

lachao

6.0

025.5

0124

12

0.5

1.0

5.0

06

2.8

44

20.0

35

12.0

19

10

134.1

613,0

66

1.0

San

Jose

4.5

030.0

0105

10

0.4

0.4

3.7

54

2.1

33

23.7

89

14.1

52

3137.4

813,0

63

1.0

5-47

Page 48: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-48

(2) Grid expansion plan (a) Base scenario Based on the plan of the new substation by NPC-SPUG, and the results of voltage calculation, the distribution line extension plan in the Base scenario is decided as follows.

Figure 5.4.2 EC-Grid Expansion Plan (Base Scenario)

The expense of a project is calculated using the distance of the required distribution line investigated by ECs, and the unit price mentioned in Table 3.4.9.

Table 5.4.28 Project Cost of EC-Grid Extension (Base Scenario) KMS. Of Line Year Municipality Barangay Tapping Point 3Ph 1Ph OS UB

Cost Php‘000

(Voltage Regulator) - - - - 264 Puerto Princesa Babuyan Maoyon 3.50 0.75 1.00 3.00 3,633 Brooke’s Point Imulnod Minit 2.00 1.00 1.00 2,004 2004

Quezon Malatgao Panitian 3.00 1.00 1.75 4.00 3,613 Malihud Bono Bono 5.00 0.75 1.00 2.00 4,807 2005 Bataraza Bulalacao Malihud 4.00 0.50 1.00 2.00 3,890

2006 Bataraza Tarusan Bulalacao 4.00 0.50 0.75 3.00 3,864 Total 21.5 3.5 6.5 15.0 22,075

Tub TubO

ring Oring

Am

asSaraza

Samarinana

SalogonM

alisInogbongB

atarazaB

ono Bono

San Jose

Tagburos

Sta. Lourdes

Bacungan

Sta. Cruz

Salvacion

Page 49: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-49

(b) Reliability-oriented scenario In this scenario, a voltage regulator is needed also for Bataraza. A voltage drop will not become a problem if there is a new substation for supply in the Bataraza area. There is actually a plan for a new substation in the area, since transmission line construction is required. It may take a long time to complete, so the installation of a voltage regulator is considered as measure for the time being.

Figure 5.4.3 EC-Grid Extension Plan (Reliability-Oriented Scenario)

Page 50: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-50

Figure 5.4.3 EC-Grid Extension Plan (Reliability-Oriented Scenario) (Continued)

San Nicolas

Tay TayPower Station

Bato

New Guinlo

Abongan

Paglaum

Talog

Old Guinlo Calawag

Libertad

El NidoPower Station

Villa Libertad

Pasadena

Barotuan

Teneguiban

Sibaltan

San FernandoBucana

CoronPower Station

Guadalupe

YKR

Decalachao

San Jose

Bintuan

Sta. Monica To Busuanga

Borac

Marcilla

Page 51: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-51

COST3Ph 1Ph OS UB P'000

MALIHUD BONO BONO 4.00 0.75 1.00 2.00 3,989BULALACAO MALIHUD 4.00 0.50 1.00 2.00 3,890TARUSAN BULALACAO 4.00 0.50 0.75 3.00 3,864CULANDANUM TARUSAN 14.00 0.50 1.40 3.00 12,244SANDOVAL TARUSAN 4.00 4.00 3,480OCAYAN SANDOVAL 4.20 1.20 1.50 3.00 4,542VILLA LIBERTAD POBLACION 5.00 0.75 1.50 3.00 5,017PASADENA VILLA LIBERTAD 8.00 0.75 1.20 3.00 7,375BAROTUAN PASADENA 7.50 0.80 1.50 4.00 7,134

264BABUYAN MAOYON 3.50 0.75 1.00 3.00 3,633SAN RAFAEL BABUYAN 5.00 0.50 0.60 5.50 4,765MALATGAO PANITIAN 3.00 1.00 1.75 4.00 3,613KALATAGBAK PINAGLABANAN 9.00 1.20 1.50 7.50 8,703SAN NICOLAS MINARA 5.00 1.00 1.50 3.00 5,117SANDOVAL SAN NICOLAS 7.00 1.20 1.50 5.00 6,936ST. TOMAS(IRAAN) SANDOVAL 5.00 1.50 2.00 3.00 5,473DUMARAO ST. TOMAS 3.50 2.00 2.00 3,599PULOT INTERIOR PULOT CENTER 1.00 1.50 0.50 1.00 1,624LABOG PANITIAN 6.00 1.50 1.00 3.00 5,975NEW GUINRO BATO 8.00 0.25 0.35 6,637OLD GUINRO NEW GUINRO 4.00 1.00 1.20 3.00 4,204

SUB TOTAL 114.70 16.90 24.65 67.35 112,079

264RIO TUBA OCAYAN 5.00 3.50 0.80 12.50 6,389TARATAK RIO TUBA 10.00 0.80 1.60 3.00 9,156

BROOKES POINT IMULNOD MAINIT 2.00 1.00 1.00 2,004BUCANA BAROTUAN 5.00 2.00 1.50 3.00 5,514TENEGUIBAN BUCANA 10.00 1.00 1.50 5.00 9,309TANABAG SAN RAFAEL 2.55 0.65 0.90 3.20 2,796CONCEPTION TANABAG 5.00 1.20 1.75 3.00 5,275BINDUYAN CONCEPTION 5.00 0.50 0.75 2.50 4,655LANGOGAN BINDUYAN 10.00 3.00 0.60 12.00 10,188MENDOZA ST. TOMAS 11.50 1.50 0.50 10.00 10,681TUMARBONG MENDOZA 8.00 1.00 1.50 3.00 7,569SAN ISIDRO MENDOZA 9.00 1.00 1.20 2.00 8,239CARAMAY MAGARA 7.00 1.50 1.50 3.50 6,977

SAN VINCENTE STO NINO ALEMANGUAN 2.00 0.80 2.00 1,993SOFRONIO ESPANOLA PUNANG LABOG 9.00 1.00 5.00 2.00 9,440

LIBERTAD ABONGAN 5.00 2.00 1.00 2.50 5,330PAGLAUM BATO 5.76 1.50 1.00 2.78 5,767

SUB TOTAL 111.81 22.15 22.90 72.98 111,546ABORLAN SAGPANGAN IRAAN 7.00 0.20 2.00 2,949

SUMBILING TARATAK 3.00 0.50 0.75 2.00 2,993IWAHIG SANDVAL 6.00 1.00 1.50 2.00 5,882IGANG IGANG IWAHIG 9.00 1.20 1.30 3.00 8,403SARONG IGANG IGANG 8.00 0.75 1.20 3.00 7,375MARCILLA BORAC 6.00 1.10 1.25 3.70 5,932SAN JOSE DECALACHAO 4.50 0.80 0.90 2.80 4,428SAN FERNANDO TENEGUIBAN 8.50 1.50 2.00 3.00 8,335SIBARTAN SAN FERNANDO 5.00 0.75 1.00 2.00 4,807BAHILE SALVACION 5.00 0.50 1.30 4.00 4,908MACARASCAS BAHILE 1.00 0.80 1.00 1,123SALVACION CARAMAY 4.00 0.80 1.00 1.50 3,983RIZAL SALVACION 4.00 0.75 1.00 1.50 3,963NICANOR ZABALA CARAMAY 11.50 1.50 0.50 10.00 10,681SAN MIGUEL NICANOR ZABALA 5.50 0.50 1.50 2.00 5,274

SOFRONIO ESPANOLA IRARAY PUNANG 4.00 1.00 1.20 3.00 4,204TALOG PAGLAUM 3.00 1.50 1.00 4.50 3,601CALAWAG PAGLAUM 9.00 2.00 1.00 4.00 8,678

SUB TOTAL 97.00 23.15 19.40 55.00 97,519323.51 62.20 66.95 195.33 321,144

TAY TAY

TOTAL

QUEZON

ROXAS

SOFRONIO ESPANOLA

TAY TAY

2006

Voltage RegulatorPUERTO PRINCESA

BATARAZA

EL NIDO

Voltage Regulator

EL NIDO

PUERTO PRINCESA

ROXAS

Year

2004

TAY TAY

BATARAZA

2005

BATARAZA

CORON

EL NIDO

PUERTO PRINCESA

ROXAS

KMS. OF LINEMUNICIPALITY BARANGAY TAPPING POINT

Project cost of the EC-grid extension is shown as Table 5.4.29.

Table 5.4.29 Project Cost of EC-Grid Extension (Reliability-Oriented Scenario)

(c) Environment-friendly scenario

The results of the environment-friendly scenario are the same as those of the base case.

Page 52: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-52

(3) Mini-grid system plan The estimates for a distribution line extension plan by ECs are used in construction expense

calculations for the distribution line of a mini-grid system in the same manner as the expense calculations for an EC-grid extension plan. However, most planned three-phase distribution line lengths are the portions needed for connection with the next/source barangay. For this reason, halves of the values, which ECs planned, are added up as three-phase distribution line lengths in a mini-grid system.

Project costs for mini-grid systems are shown in Table 5.4.30 for the base scenario, Table 5.4.31 for the reliability-oriented scenario and Table 5.4.32 for the environment-friendly scenario.

Table 5.4.30 Project Cost of Mini-Grid System (Base Scenario)

Table 5.4.31 Project Cost of Mini-Grid System (Reliability-Oriented Scenario)

2000 2006 2015 3Ph 1Ph OS UBALGECIRAS 694 1,074 2,031 Diesel 2,505,600 1.50 0.50 1.00 1.50 1,206,810 3,712,410

CONCEPTION 505 781 1,477 Diesel 1,814,400 2.00 0.40 0.90 1.50 1,339,842 3,154,242

BANCALAAN 1,191 1,449 1,926 Diesel 2,505,600 3.00 0.80 1.25 2.00 2,044,440 4,550,040

MANGSEE 938 1,141 1,517 Diesel 1,814,400 3.50 1.20 1.00 2.00 2,328,676 4,143,076

CULANDANUM 605 792 1,170 Diesel 1,440,000 5.00 0.50 1.40 3.00 2,842,797 4,282,797

RIO TUBA 1,471 1,924 2,845 Diesel 3,110,400 5.00 3.50 0.80 12.50 4,344,945 7,455,345

SANDOVAL 429 561 829 Diesel 979,200 9.00 10.00 4,205,029 5,184,229

SUMBILING 426 558 824 Diesel 979,200 5.00 0.50 0.75 2.00 2,584,678 3,563,878

BUCANA 740 953 1,378 Diesel 1,814,400 5.00 2.00 1.50 3.00 3,470,280 5,284,680

TENEGUIBAN 545 702 1,015 Diesel 1,440,000 10.00 1.00 1.50 5.00 5,221,995 6,661,995PUERTO PRINCESA CABAYUGAN 415 548 822 Diesel 979,200 4.00 0.50 1.50 3.00 2,465,673 3,444,873

ARAMAYWAN 566 658 819 Diesel 979,200 8.00 0.75 1.00 6.00 4,199,789 5,178,989

ISUGOD 628 730 908 Diesel 979,200 6.00 0.50 0.80 3.00 3,061,860 4,041,060

QUINLOGAN 775 901 1,121 Diesel 1,440,000 4.50 1.00 1.20 7.50 3,010,708 4,450,708SAN VINCENTE CARURAY 672 772 942 Diesel 1,440,000 3.50 1.50 2.00 5.00 2,921,892 4,361,892TAYTAY NEW GUINLO 570 669 845 Diesel 979,200 8.00 0.25 0.35 3,367,347 4,346,547

CANIPAAN 392 618 1,199 Diesel 1,440,000 5.75 0.75 1.20 5.00 3,290,717 4,730,717

CULASIAN 307 484 939 Diesel 1,440,000 2.00 0.50 1.25 3.00 1,569,169 3,009,169

IRAAN 941 1,483 2,877 Diesel 3,110,400 12.00 1.00 1.25 10.00 6,223,638 9,334,038

LATUD 267 420 815 Diesel 979,200 8.00 2.00 3.50 6.00 5,486,653 6,465,853

PANALINGAAN 571 900 1,746 Diesel 2,505,600 6.00 0.50 1.60 2.50 3,288,438 5,794,038

RANSANG 668 1,052 2,042 Diesel 2,505,600 8.00 1.00 1.80 3.00 4,394,079 6,899,679

SOFRONIO ESPANOLA LABOG 604 729 957 Diesel 1,440,000 6.00 1.50 1.00 3.00 3,522,332 4,962,332

14,920 19,899 31,044 38,620,800 76,391,782 115,012,582

Project Cost(Php)

BarangayPower Station

Cost (Php)DistributionLine Cost

MUNICIPALITYDistribution Line(km)No of Households

QUEZON

RIZAL

AGUTAYA

BALABAC

BATARAZA

EL NIDO

Type ofSystem

TOTAL

2000 2006 2015 3Ph 1Ph OS UBALGECIRAS 694 1,074 2,031 Diesel 2,505,600 1.50 0.50 1.00 1.50 1,206,810 3,712,410

CONCEPTION 505 781 1,477 Diesel 1,814,400 2.00 0.40 0.90 1.50 1,339,842 3,154,242

BANCALAAN 1,191 1,449 1,926 Diesel 2,505,600 3.00 0.80 1.25 2.00 2,044,440 4,550,040

MANGSEE 938 1,141 1,517 Diesel 1,814,400 3.50 1.20 1.00 2.00 2,328,676 4,143,076PUERTO PRINCESA CABAYUGAN 415 548 822 Diesel 979,200 4.00 0.50 1.50 3.00 2,465,673 3,444,873

ARAMAYWAN 566 658 819 Diesel 979,200 8.00 0.75 1.00 6.00 4,199,789 5,178,989

ISUGOD 628 730 908 Diesel 979,200 6.00 0.50 0.80 3.00 3,061,860 4,041,060

QUINLOGAN 775 901 1,121 Diesel 1,440,000 4.50 1.00 1.20 7.50 3,010,708 4,450,708SAN VINCENTE CARURAY 672 772 942 Diesel 1,440,000 3.50 1.50 2.00 5.00 2,921,892 4,361,892

CANIPAAN 392 618 1,199 Diesel 1,440,000 5.75 0.75 1.20 5.00 3,290,717 4,730,717

CULASIAN 307 484 939 Diesel 1,440,000 2.00 0.50 1.25 3.00 1,569,169 3,009,169

IRAAN 941 1,483 2,877 Diesel 3,110,400 12.00 1.00 1.25 10.00 6,223,638 9,334,038

LATUD 267 420 815 Diesel 979,200 8.00 2.00 3.50 6.00 5,486,653 6,465,853

PANALINGAAN 571 900 1,746 Diesel 2,505,600 6.00 0.50 1.60 2.50 3,288,438 5,794,038

RANSANG 668 1,052 2,042 Diesel 2,505,600 8.00 1.00 1.80 3.00 4,394,079 6,899,679

28,293 37,597 58,985 26,438,400 46,832,382 73,270,782

バランガイMUNICIPALITYProject Cost

(Php)No of Households Power Station

Cost (Php)Distribution Line(km) Distribution

Line Cost

QUEZON

RIZAL

Type ofSystem

TOTAL

AGUTAYA

BALABAC

Page 53: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-53

Table 5.4.32 Project Cost of Mini-Grid System (Environment-Friendly Scenario)

5.5 Sensitivity Analysis on Household Electrification Improvement

All barangays in the province will be electrified by an appropriated method up to 2006, and then barangay electrification of Palawan is expected to be 100%.

After the barangay electrification target is achieved by 2006, the focus will then shift to the improvement of household electrification.

MEDP 2003 has the target of 90% household electrification (entire Philippines) by 2017. Therefore, a study targeting the household electrification level is needed for Palawan.

In the Study, two cases for the sensitivity analysis of a household electrification ratio are prepared.

5.5.1 Setting Target Household Electrification Ratio

The improvement of household electrification requires electrification in areas (e.g. sitio) far from a tapping point in a barangay. A stand-alone system is assumed to be the electrification method for the electrification of such areas in the Study10.

Figure 5.5.1 shows the image of improvement of household electrification in a barangay.

10 It is assumed that the number of connected households will increase to keep a constant household electrification ratio in a barangay electrified by

EC-grid or Mini-grid.

2000 2006 2015 3Ph 1Ph OS UBALGECIRAS 694 1,074 2,031 Diesel 2,505,600 1.50 0.50 1.00 1.50 1,206,810 3,712,410CONCEPTION 505 781 1,477 Diesel 1,814,400 2.00 0.40 0.90 1.50 1,339,842 3,154,242BANCALAAN 1,191 1,449 1,926 Diesel 2,505,600 3.00 0.80 1.25 2.00 2,044,440 4,550,040MANGSEE 938 1,141 1,517 Diesel 1,814,400 3.50 1.20 1.00 2.00 2,328,676 4,143,076CULANDANUM 605 792 1,170 Diesel 1,440,000 5.00 0.50 1.40 3.00 2,842,797 4,282,797RIO TUBA 1,471 1,924 2,845 Diesel 3,110,400 5.00 3.50 0.80 12.50 4,344,945 7,455,345SANDOVAL 429 561 829 Diesel 979,200 9.00 10.00 4,205,029 5,184,229SUMBILING 426 558 824 Diesel 979,200 5.00 0.50 0.75 2.00 2,584,678 3,563,878BUCANA 740 953 1,378 Diesel 1,814,400 5.00 2.00 1.50 3.00 3,470,280 5,284,680TENEGUIBAN 545 702 1,015 Diesel 1,440,000 10.00 1.00 1.50 5.00 5,221,995 6,661,995

PUERTO PRINCESA CABAYUGAN 415 548 822 Diesel 979,200 4.00 0.50 1.50 3.00 2,465,673 3,444,873ARAMAYWAN 566 658 819 Micro Hydro 20,269,200 8.00 0.75 1.00 6.00 4,199,789 24,468,989ISUGOD 628 730 908 Diesel 979,200 6.00 0.50 0.80 3.00 3,061,860 4,041,060QUINLOGAN 775 901 1,121 Diesel 1,440,000 4.50 1.00 1.20 7.50 3,010,708 4,450,708

SAN VINCENTE CARURAY 672 772 942 Diesel 1,440,000 3.50 1.50 2.00 5.00 2,921,892 4,361,892TAYTAY NEW GUINLO 570 669 845 Diesel 979,200 8.00 0.25 0.35 3,367,347 4,346,547

CANIPAAN 392 618 1,199 Diesel 1,440,000 5.75 0.75 1.20 5.00 3,290,717 4,730,717CULASIAN 307 484 939 Diesel 1,440,000 2.00 0.50 1.25 3.00 1,569,169 3,009,169IRAAN 941 1,483 2,877 Diesel 3,110,400 12.00 1.00 1.25 10.00 6,223,638 9,334,038LATUD 267 420 815 Diesel 979,200 8.00 2.00 3.50 6.00 5,486,653 6,465,853PANALINGAAN 571 900 1,746 Diesel 2,505,600 6.00 0.50 1.60 2.50 3,288,438 5,794,038RANSANG 668 1,052 2,042 Diesel 2,505,600 8.00 1.00 1.80 3.00 4,394,079 6,899,679

SOFRONIO ESPANOLA LABOG 604 729 957 Diesel 1,440,000 6.00 1.50 1.00 3.00 3,522,332 4,962,33214,920 19,899 31,044 57,910,800 76,391,782 134,302,582

No of Households Power StationCost (Php)

Distribution Line(km) DistributionLine Cost

Project Cost(Php)

BALABAC

MUNICIPALITY

BATARAZA

EL NIDO

バランガイ

AGUTAYA

QUEZON

RIZAL

TOTAL

Type ofSystem

20,069,000 24,268,789

134,102,382

Barangay2000 2006 2015 3Ph 1Ph OS UB

ALGECIRAS 694 1,074 2,031 Diesel 2,505,600 1.50 0.50 1.00 1.50 1,206,810 3,712,410CONCEPTION 505 781 1,477 Diesel 1,814,400 2.00 0.40 0.90 1.50 1,339,842 3,154,242BANCALAAN 1,191 1,449 1,926 Diesel 2,505,600 3.00 0.80 1.25 2.00 2,044,440 4,550,040MANGSEE 938 1,141 1,517 Diesel 1,814,400 3.50 1.20 1.00 2.00 2,328,676 4,143,076CULANDANUM 605 792 1,170 Diesel 1,440,000 5.00 0.50 1.40 3.00 2,842,797 4,282,797RIO TUBA 1,471 1,924 2,845 Diesel 3,110,400 5.00 3.50 0.80 12.50 4,344,945 7,455,345SANDOVAL 429 561 829 Diesel 979,200 9.00 10.00 4,205,029 5,184,229SUMBILING 426 558 824 Diesel 979,200 5.00 0.50 0.75 2.00 2,584,678 3,563,878BUCANA 740 953 1,378 Diesel 1,814,400 5.00 2.00 1.50 3.00 3,470,280 5,284,680TENEGUIBAN 545 702 1,015 Diesel 1,440,000 10.00 1.00 1.50 5.00 5,221,995 6,661,995

PUERTO PRINCESA CABAYUGAN 415 548 822 Diesel 979,200 4.00 0.50 1.50 3.00 2,465,673 3,444,873ARAMAYWAN 566 658 819 Micro Hydro 20,269,200 8.00 0.75 1.00 6.00 4,199,789 24,468,989ISUGOD 628 730 908 Diesel 979,200 6.00 0.50 0.80 3.00 3,061,860 4,041,060QUINLOGAN 775 901 1,121 Diesel 1,440,000 4.50 1.00 1.20 7.50 3,010,708 4,450,708

SAN VINCENTE CARURAY 672 772 942 Diesel 1,440,000 3.50 1.50 2.00 5.00 2,921,892 4,361,892TAYTAY NEW GUINLO 570 669 845 Diesel 979,200 8.00 0.25 0.35 3,367,347 4,346,547

CANIPAAN 392 618 1,199 Diesel 1,440,000 5.75 0.75 1.20 5.00 3,290,717 4,730,717CULASIAN 307 484 939 Diesel 1,440,000 2.00 0.50 1.25 3.00 1,569,169 3,009,169IRAAN 941 1,483 2,877 Diesel 3,110,400 12.00 1.00 1.25 10.00 6,223,638 9,334,038LATUD 267 420 815 Diesel 979,200 8.00 2.00 3.50 6.00 5,486,653 6,465,853PANALINGAAN 571 900 1,746 Diesel 2,505,600 6.00 0.50 1.60 2.50 3,288,438 5,794,038RANSANG 668 1,052 2,042 Diesel 2,505,600 8.00 1.00 1.80 3.00 4,394,079 6,899,679

SOFRONIO ESPANOLA LABOG 604 729 957 Diesel 1,440,000 6.00 1.50 1.00 3.00 3,522,332 4,962,33214,920 19,899 31,044 57,910,800 76,391,782 134,302,582

No of Households Power StationCost (Php)

Distribution Line(km) DistributionLine Cost

Project Cost(Php)

BALABAC

MUNICIPALITY

BATARAZA

EL NIDO

バランガイ

AGUTAYA

QUEZON

RIZAL

TOTAL

Type ofSystem

20,069,000 24,268,789

134,102,382

Barangay

Page 54: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-54

Figure 5.5.1 Image of Household Electrification Improvement

Table 5.5.1 shows these cases for sensitivity analysis.

Table 5.5.1 Cases for Analysis on Household Electrification Improvement Electrification Method

Year EC-Grid Mini-Grid Stand-Alone

2006 Target : Barangay Electrification Ratio = 100% 2007

2015

Case 1 50 35 35 Target of HH Electrification Ratio

(%) Case 2 80 35 35

5.5.2 Results of Sensitivity Analysis Tables 5.5.2 to 5.5.4 show the results of the sensitivity analysis. Table 5.5.2 Results of Sensitivity Analysis on Household Electrification Ratio (Electrification Ratio)

Scenario / CASE 2003 2006 2010 2015no Target of HH e-Ratio 40.4% 41.6% 41.3%Case 1 40.4% 48.3% 54.5%

Base Scenario

Case 2 34.0%

40.4% 53.7% 65.1%no Target of HH e-Ratio 42.5% 42.4% 42.1%Case 1 42.5% 50.0% 56.1%

Reliability-Oriented Scenario

Case 2 34.0%

42.5% 57.7% 70.0%no Target of HH e-Ratio 40.4% 41.6% 41.3%Case 1 40.4% 48.3% 54.5%

Environment-Friendly Scenario

Case 2 34.0%

40.4% 53.7% 65.1%

EC-Grid Stand-alone Mini-Grid Stand-alone

Improvement of HH Electrification Ratio

Improvement of HH Electrification Ratio

Improvement of HH Electrification Ratio

Stand-alone

- 2006 2007 - 2015

Barangay Center(Electrification with EC-Grid

Extension or Mini-Grid System)Sitio B

Sitio A Sitio C

Barangay Center(Electrification with EC-Grid

Extension or Mini-Grid System)Sitio B

Sitio ASitio C

Household Electrification Improvement

Concentration Ratio: ConstantCapacity to Pay Factor: Constant

Household electrified with EC-Grid Extension or Mini-Grid System

Household electrified with Stand-Alone System

Page 55: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-55

Table 5.5.3 Results of Sensitivity Analysis on Household Electrification Ratio (Investment Cost) (Unit: million Php)

Scenario/Case Barangay Electrification

Phase (2004 to 2006)

Household Electrification Improvement Phase

(2007 to 2015)

Total Investment Cost (million Php)

no Target of HH e-Ratio 0.0 183.3 Case 1 665.2 848.5

Base Scenario

Case 2 183.3

1,155.0 1,338.3 no Target of HH e-Ratio 0.0 427.3 Case 1 640.5 1,067.8

Reliability-Oriented Scenario

Case 2 427.3

1,280.1 1,707.4 no Target of HH e-Ratio 0.0 202.4 Case 1 665.2 867.6

Environment-Friendly Scenario

Case 2 202.4

1,155.0 1,357.4 *Investment cost in the household electrification phase is calculated by No. of target households * 17,492.00 Php/HH

Table 5.5.4 Results of Sensitivity Analysis on Household Electrification Ratio (No. of Target Household)

(Base Scenario) ( unit : households )Case 2007 2008 2009 2010 2011 2012 2013 2014 2015 合計

no Target HH e-Ratio 0 0 0 0 0 0 0 0 0 0Case 1 4,300 4,377 4,419 4,572 4,328 4,387 4,418 4,509 2,718 38,028Case 2 7,377 7,277 7,277 7,400 7,432 7,575 7,271 7,410 7,010 66,029

(Reliability-Oriented Scenario) ( unit : households )

Case 2007 2008 2009 2010 2011 2012 2013 2014 2015 合計

no Target HH e-Ratio 0 0 0 0 0 0 0 0 0 0Case 1 4,100 4,217 4,239 4,100 4,186 4,337 4,229 4,307 2,904 36,619Case 2 8,097 8,543 8,609 8,200 8,200 8,205 8,633 8,662 6,031 73,180

5.6 Scenario and Case for the Master Plan In Section 5.4 the reliability-oriented scenario and environment-friendly scenario are studied

as alternatives to the base scenario (least expensive electrification scenario). In the reliability-oriented scenario, the investment cost will be 427.3 million pesos, which is more than double the cost for the base scenario. And for the environment-friendly scenario, one site for micro hydropower will be feasible even when an incentive is given.

The least expensive method will be the optimum electrification method for achieving the whole barangay electrification target, considering the finances that are available. Therefore, the Study team decided to employ the base scenario for the Master Plan.

On the other hand, 2 cases for sensitivity analysis on household electrification ratio are studied

in the Section 5.5. For case 1 under the base scenario, total investment cost will be 848.5 million pesos and it will be 1,338.3 million pesos for case 2 under the base scenario.

Considering the target household electrification level in MEDP, funding availability and villagers’ capacity to pay for electricity, the Study team decided to select case 1 for the Mater Plan.

The summary of the Base Scenario (Case 1) is shown as the Master Plan in Chapter 7.

Page 56: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-56

5.7 Economic and Financial Analysis of Palawan Rural Electrification 5.7.1 Economic Benefits

This section deals with the economic benefits of the current rural electrification plans. (1) The Methodology

There are numerous uses for electricity with varying kinds and levels of benefits. However, as the socio-economic survey in the study has revealed, the largest use of electricity in rural electrification is lighting, followed by radio and TV.

For lighting, the majority of the un-electrified households use kerosene lamps. Compared to kerosene, electric lighting provides more light with less cost per lumen. The consumer surplus from that difference is the economic benefit from electrification.

Source; Barnes et al.11

Figure 5.7.1 Economic Benefits from Electrification

The actual lumens from the lamps in use have not been measured directly by the current study,

but there are numerous existing studies. The household expenditure for lighting has been determined to be 350-400 pesos. The power demand of the households is considered to be the same with the standard households in this study. Based on these assumptions, the surpluses for various electrification methods have been determined and are shown in Table 5.7.1.

11 Barnes et al. “Quantitative Measures of Benefits from Rural Electrification in the Philippines” 2000,

http://www.rsvp.nrel.gov/vpconference/vp2000/vp2000_conference/ ensuring_aleta_domdom.pdf

Page 57: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-57

Table 5.7.1 Household Benefits from Electrification

MiniGrid DieselConsumed Lumen Cost

klmh/month php/lm hParafin Lamp 5 16.2Fluorescent Lamp 126 0.21(20W Fluorescent lamp x 2, 6h/day supply)Consumer Surplus= 1,959 php/month HH

SHSConsumed Lumen Cost

klmh/month php/lm hParafin Lamp 5 16.2Fluorescent Lamp 81 2.36(120W/day)Consumer Surplus= 1,219 php/month HH

Stand Alone DieselConsumed Lumen Cost

klmh/month php/lm hParafin Lamp 5 16.2Fluorescent Lamp 86.4 0.30(20W Fluorescent lamp x 2, 4h/day supply)Consumer Surplus= 1,317 php/month HH

If the electrification proceeds as expected and the households can enjoy the expected amount

of power, there will be significant benefits regardless of the electrification method. Even in the lowest case of SHS, the monthly benefit will amount to 1,219 pesos per household. In the highest case of a mini-grid system, this will amount to 2,000 pesos12.

In another survey (Barnes et al. 2000), the monthly household benefits per household is calculated to be US$36.75. This corresponds with the mini-grid benefit calculated above13.

Based on these figures, the economic benefits of the electrification program have been calculated for each of the electrification methods. Assumptions for each method are basically identical to those employed in the method selection. Also, the following assumptions are made for the operation; (i) EC-grid extension

It is assumed that the current PALECO/BISELCO operations will continue. Based on the financial analysis of these two ECs, they maintain stable operations. The cost has been contained except for the purchased power cost which they have no control over, and the operations suggest a reliable level in terms of technical competence.

12 The case for grid extension has not been calculated, although it will obviously produce a higher benefit due to lower cost and longer supply. 13 There is criticism of this method, which points out that the light itself seldom provides any direct benefits. Also, not all the light will be actually

“consumed”, and the consumed light will also be subject to significant diminishing marginal utility. Due to these criticisms, Barnes 2000 and others have attempted to calculate the benefit in a more direct manner. They measured benefits from TV viewing, increased education and employment. These cannot be added to the benefits from the increased lumen consumption, since that would overlap. However, the results suggest that the direct benefits are comparable or even higher than the lumen based benefits, which suggests that benefits measured by this manner cannot be overvalued.

Page 58: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-58

(ii) Mini-grid system For mini-grids, it is assumed that operations similar to the existing mini-grids will be

undertaken. For investment, the units used for method selection has been employed. For operational costs, figures similar to those of Port Barton have been used, where operations have continued long enough and have stabilized. (iii) Stand-alone system

In this calculation, half of the stand-alone systems will use SHS, and the rest will use stand- alone diesel generators. The units are based on the assumptions used for the method selection.

Table 5.7.2 Economic Analysis of the EC-Grid Extension Grid Extension Unit; HH, million Peso

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017Newly Electrified HH 0 692 1,153 1,384 2,193 3,002 3,811 4,620 5,429 6,238 7,047 7,856 8,665 9,474 10,283Economic Benefit 0.0 16.3 35.2 42.3 67.0 91.7 116.5 141.2 165.9 190.7 215.4 240.1 264.8 289.6 314.3

Investment 19.2 14.4 9.0 5.3 5.7 4.6 4.6 4.6 4.6 4.6 4.6 4.6 4.6 4.6 4.6Cost

Power 4.5 7.4 8.9 14.2 19.4 24.6 29.8 35.1 40.3 45.5 50.7 56.0 61.2 66.4Subsidy 0.7 1.1 1.3 2.1 2.9 3.7 4.5 5.3 6.0 6.8 7.6 8.4 9.2 10.0O&M 1.2 2.0 2.4 3.7 5.1 6.5 7.9 9.3 10.7 12.0 13.4 14.8 16.2 17.6Total Operation Cost 6.3 10.5 12.6 20.0 27.4 34.8 42.2 49.6 57.0 64.4 71.8 79.2 86.6 93.9

Total Outlay 19.2 20.7 19.5 18.0 25.7 32.0 39.4 46.8 54.2 61.6 68.9 76.3 83.7 91.1 98.5

Net Benefit -19.2 -4.5 15.7 24.3 41.3 59.7 77.1 94.4 111.8 129.1 146.4 163.8 181.1 198.4 215.7EIRR= 82%

Table 5.7.3 Economic Analysis of the Mini-Grid System Mini Grid Unit; HH, million Peso

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017Newly Electrified HH 0 0 0 10,865 10,865 10,865 10,865 10,865 10,865 10,865 10,865 10,865 10,865 10,865 10,865Economic Benefit 0.0 0.0 0.0 255.4 255.4 255.4 255.4 255.4 255.4 255.4 255.4 255.4 255.4 255.4 255.4

Investment 115.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Cost

Fuel 0.0 0.0 14.4 14.4 14.4 14.4 14.4 14.4 14.4 14.4 14.4 14.4 14.4 14.4Subsidy 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0O&M 0.0 0.0 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7Total Operation Cost 0.0 0.0 23.1 23.1 23.1 23.1 23.1 23.1 23.1 23.1 23.1 23.1 23.1 23.1

Total Outlay 0.0 0.0 115.0 26.1 26.1 26.1 26.1 26.1 26.1 26.1 26.1 26.1 26.1 26.1 26.1

Net Benefit 0.0 0.0 -115.0 229.3 229.3 229.3 229.3 229.3 229.3 229.3 229.3 229.3 229.3 229.3 229.3EIRR= 199%B/C= 5.72

Table 5.7.4 Economic Analysis of Stand-Alone System (SHS) Stand Alone SHS Unit; HH, million Peso

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017Newly Electrified HH 0 609 1,218 1,340 1,814 2,288 2,762 3,237 3,711 4,185 4,659 5,133 5,607 6,081 6,556Economic Benefit 0.0 8.9 17.8 19.6 26.5 33.5 40.4 47.4 54.3 61.2 68.2 75.1 82.0 89.0 95.9

Investment 31.9 31.9 6.4 6.4 24.9 24.9 24.9 24.9 24.9 24.9 24.9 24.9 24.9 24.9 24.9Cost

Battery 2.0 4.0 0.8 4.1 6.0 3.3 6.7 8.7 6.0 9.4 11.3 8.6Charge 0.0 0.0 0.0 0.0 0.0 3.5 3.5 0.7 0.7 2.7 2.7Lamp 2.5 2.5 0.5 0.5 1.9 1.9Total Operation Cost 2.0 4.0 0.8 4.1 6.0 3.3 12.7 14.7 7.2 10.6 16.0 13.3

Total Outlay 31.9 31.9 6.4 8.4 28.9 25.7 28.9 30.9 28.2 37.6 39.5 32.0 35.4 40.8 38.1

Net Benefit -31.9 -23.0 11.4 11.2 -2.3 7.8 11.5 16.5 26.1 23.7 28.7 43.1 46.6 48.1 57.8EIRR= 23%B/C= 1.27

Page 59: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-59

Table 5.7.5 Economic Analysis of Stand-Alone System (Diesel) Stand Alone Grid Unit; HH, million Peso

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017Newly Electrified HH 0 609 1,218 1,340 1,814 2,288 2,762 3,237 3,711 4,185 4,659 5,133 5,607 6,081 6,556Economic Benefit 0.0 9.6 19.3 21.2 28.7 36.2 43.7 51.2 58.7 66.1 73.6 81.1 88.6 96.1 103.6

Investment 4.6 4.6 0.9 6.4 8.1 8.1 4.5 9.9 11.7 11.7 8.0 13.5 15.2 15.2 11.6Cost

Fuel 0.8 1.6 1.8 2.4 3.0 3.7 4.3 4.9 5.6 6.2 6.8 7.4 8.1 8.7Subsidy 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0O&M 0.1 0.2 0.3 0.4 0.5 0.6 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3Total Operation Cost 0.9 1.9 2.0 2.8 3.5 4.2 4.9 5.7 6.4 7.1 7.8 8.6 9.3 10.0

Total Outlay 4.6 5.5 2.8 8.4 10.9 11.6 8.7 14.9 17.3 18.1 15.1 21.3 23.8 24.5 21.6

Net Benefit -4.6 4.1 16.5 12.7 22.4 29.1 35.9 42.7 49.4 56.2 63.0 69.7 76.5 83.3 90.1EIRR= 187%B/C= 3.42

In all cases, it is obvious that there are significant economic benefits to be gained from rural

electrification. 5.7.2 Financial Analysis

It has been determined that there will be significant economic gains from electrifying the rural areas, provided that the intended target households will use the expected amount of power. This will depend largely on the tariff. The standard households in this study will use 166 kWh annually. Socio-economic surveys suggest that the energy expenditure of these households is 350-400 pesos per month. If we assume that this entire amount will be allocated for electricity, the tariff should be 32 Php/kWh. This should provide considerably higher benefits, due to the difference in the quality of the energy. On the other hand, the tariff of the EC grid system is 5.6 Php/kWh and the tariffs for BAPAs is 15 Php/kWh. Therefore, 30 Php/kWh will be considered to be unfairly high and unacceptable.

Here, we shall determine the level of necessary tariff without any subsidy (i.e., the necessary level of tariff to achieve 12% IRR). Next, the level of necessary subsidy for the initial investment will be determined. (1) EC-grid extension

The financial analysis for the grid extension is shown in the next table.

Table 5.7.6 Financial Analysis of the EC-Grid Extension Grid Extension Tariff= 11.5 php/kWh Unit; HH, million Peso

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017Newly Electrified HH 0 692 1,153 1,384 2,193 3,002 3,811 4,620 5,429 6,238 7,047 7,856 8,665 9,474 10,283Revenue 0.0 2.9 4.9 5.9 9.3 12.7 16.1 19.6 23.0 26.4 29.8 33.3 36.7 40.1 43.6

Investment 19.2 14.4 9.0 5.3 5.7 4.6 4.6 4.6 4.6 4.6 4.6 4.6 4.6 4.6 4.6Cost 9.5 8.7 3.9

Power 1.1 1.8 2.1 3.4 4.6 5.9 7.1 8.4 9.6 10.9 12.2 13.4 14.7 15.9Subsidy 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0O&M 0.2 0.3 0.3 0.5 0.7 0.9 1.1 1.3 1.4 1.6 1.8 2.0 2.2 2.4Total Operation Cost 1.2 2.1 2.5 3.9 5.3 6.8 8.2 9.7 11.1 12.5 14.0 15.4 16.9 18.3

Total Outlay 19.2 15.6 11.1 7.8 9.6 9.9 11.3 12.8 14.2 15.7 17.1 18.5 20.0 21.4 22.9

Net Benefit -19.2 -12.7 -6.2 -1.9 -0.3 2.8 4.8 6.8 8.8 10.7 12.8 14.7 16.7 18.7 20.7FIRR= 11.6%

Page 60: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-60

In order to achieve 12% IRR, the necessary tariff level would be 11.5Php/kWh, significantly higher than the current 5.6Php/kWh. One reason for the higher tariff is the limited level of demand that the model assumes, although since most of the new connections are assumed to be households, this is not an unreasonable condition. Obviously, this level is rather high. It is difficult to achieve sufficient returns with a large amount of investment.

If we maintain the current tariff, the initial investment needs to be subsidized. Based on the model, the investment amount needs to fall to 11% of the current level, which means that 89% of the investment needs to be subsidized. (2) Mini-grid systems

In the case of mini-grids, the tariff needs to become 23 Php/kWh. Compared to the current BAPA rate of 15Php/kWh, this is high. The difference reflects the fact that the current tariff is made possible only by PGP covering the initial investment.

Table 5.7.7 Financial Analysis of the Mini-Grid System Mini Grid Tariff= 23 php/kWh Unit; HH, million Peso

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017Newly Electrified HH 0 0 0 10,865 10,865 10,865 10,865 10,865 10,865 10,865 10,865 10,865 10,865 10,865 10,865Revenue 0.0 0.0 0.0 41.5 41.5 41.5 41.5 41.5 41.5 41.5 41.5 41.5 41.5 41.5 41.5

Investment 115.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Cost 115.0

Fuel 0.0 0.0 14.4 14.4 14.4 14.4 14.4 14.4 14.4 14.4 14.4 14.4 14.4 14.4Subsidy 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0O&M 0.0 0.0 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7 8.7Total Operation Cost 0.0 0.0 23.1 23.1 23.1 23.1 23.1 23.1 23.1 23.1 23.1 23.1 23.1 23.1

Total Outlay 0.0 0.0 115.0 23.1 23.1 23.1 23.1 23.1 23.1 23.1 23.1 23.1 23.1 23.1 23.1

Net Benefit 0.0 0.0 -115.0 18.4 18.4 18.4 18.4 18.4 18.4 18.4 18.4 18.4 18.4 18.4 18.4FIRR= 12%

For the 15 Php/kWh tariff to prevail, similar arrangements need to be made to decrease the

initial investment. The initial investment needs to become1/5 of the current level. This means that 80% of the initial investment needs to be subsidized in some way. (3) Stand-alone systems (Diesel)

For stand-alone systems (diesel), the necessary tariff will become 41 Php/kWh. Since the facility is small in scale, and the efficiency is lower, the unit cost (i.e. tariff) necessarily becomes higher.

Table 5.7.8 Financial Analysis of the Stand-Alone System (Diesel) Stand Alone Grid Tariff= 41.1 php/kWh Unit; HH, million Peso

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017Newly Electrified HH 0 609 1,218 1,340 1,814 2,288 2,762 3,237 3,711 4,185 4,659 5,133 5,607 6,081 6,556Revenue 0.0 2.4 4.9 5.3 7.2 9.1 11.0 12.9 14.8 16.7 18.6 20.5 22.4 24.2 26.1

Investment 4.6 4.6 0.9 6.4 8.1 8.1 4.5 9.9 11.7 11.7 8.0 13.5 15.2 15.2 11.61.0 4.6 4.6 0.9 6.4 8.1 8.1 4.5 9.9 11.7 11.7 8.0 13.5 15.2 15.2 11.6

CostFuel 0.5 0.9 1.0 1.4 1.8 2.1 2.5 2.9 3.2 3.6 4.0 4.4 4.7 5.1Subsidy 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0O&M 0.1 0.1 0.2 0.2 0.3 0.3 0.4 0.4 0.5 0.5 0.6 0.7 0.7 0.8Total Operation Cost 0.5 1.1 1.2 1.6 2.0 2.5 2.9 3.3 3.7 4.2 4.6 5.0 5.4 5.9

Total Outlay 4.6 5.1 2.0 7.6 9.7 10.2 6.9 12.8 15.0 15.4 12.2 18.1 20.2 20.6 17.4

Net Benefit -4.6 -2.7 2.9 -2.2 -2.5 -1.0 4.1 0.1 -0.2 1.3 6.4 2.4 2.1 3.6 8.7FIRR= 11.9%

Page 61: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

5-61

Of course, there are cases where users pay higher tariffs. However, such high rates are only borne by those who are willing to pay that amount. The situation should differ for cases where the electrification ratio will be increased as a pseudo-universal access policy. The extreme difference among electrification methods will not be easily justified.

If we were to achieve the current BAPA tariff level of 15 Php/kWh, the investment must come down to 18% of the current level. This means that more than 80% of the investment needs to be subsidized for each generator. (4) Stand-Alone Systems (SHS)

For stand-alone systems (SHS), it is difficult to apply a tariff structure since the usage cannot be monitored and the users will virtually own the unit. Here, we will assume a loan that would include future battery replacements.

In this case, with a 10% (4000 pesos) down payment, a monthly fee of about 400 pesos will be required, which is similar to the current energy expenditure of 350-400 pesos. However, the 10% down payment will be difficult for most users. Some method will be needed to ease this burden. 5.7.3 Necessary Funds

Based on the analysis, it is obvious that the current scheme cannot be self-financed. In order to achieve an acceptable tariff level, the funds that can be generated internally will be only 11% of the necessary investment for grid extension, 20% for mini-grids, and 18% for the stand alone diesel systems. Also with stand-alone systems (SHS), some form of down payment assistance will be needed, which should amount to 2 million pesos annually.

This means that for the 220 million pesos investment that would be necessary before 2006, 130 million pesos will need to be financed from outside, and of the 310 million pesos required before 2015, 250 million will need to be financed from some outside source.

Page 62: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target
Page 63: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-1

Chapter 6 EC-Grid Power Development Plan 6.1 EC-Grid Power Demand Forecast

As mentioned in Section 5.2, there are two general methods for making power demand forecasts, one is a macro-method and the other one is a micro-method. The macro-method is a rational method if it is possible to collect time-series data on economic indicators and power demand in the long run, because the data used in this method is objective information, and this method is also simple.

In the case of employing this method for a small power system like the Palawan system, however, enough attention should be paid to the future development plan in the commercial and industrial sectors, because such demand greatly affects the future power demand. Such demand should be estimated individually and be added to the forecast made by the macro-method.

According to “Medium-term Development Plan 2003 - 20121,” the development plan in the trade and industry sector is focused on tourism and agriculture, and there is no development plan for large commercial or industrial facilities. Therefore, the study does not cover the development of such large demand until 20122.

The Study employs a historical trend analysis for the EC-grid power demand forecast in Palawan. This is because the major industries in Palawan are agriculture3 and service (see Table 6.1.1), and there are little correlations between power demand and Gross Provincial Domestic Products (GPDP). In addition, there is a close correlation between population and residential demand in general. However, the only official data on population is “The Census of Population and Housing” conducted by the National Statistics Office every five years. Therefore, it is impossible to analyze a correlation of power demand with population or the number of households adequately.

Table 6.1.1 Gross Provincial Domestic Products (at current prices) (Unit: 1,000 Pesos)

Year 1997 1998 1999 2000 2001 Agriculture 5,124,609 5,642,324 6,519,442 6,942,708 7,436,959 Industry 1,992,295 2,010,145 2,082,237 2,152,962 2,269,395 Services 4,684,787 5,146,604 5,228,192 5,781,076 6,702,551

Total 11,801,691 12,799,073 13,829,871 14,876,746 16,408,905 Source: PPDO

1 Prepared by the provincial development council, Province of Palawan, October 2, 2003 2 According to the interview with PALECO, a cannery (1,500 kW) and sanitary land (500 - 750 kW) will be in operation in Puerto Princesa City

in 2004. 3 Agriculture includes fishery and forestry.

Page 64: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-2

6.1.1 Energy Sales Forecast

Table 6.1.2 shows the historical data on energy sales of ECs and an annual average growth rate (AAGR) by consumer type. Though the ratio of industrial consumers was about 20 % until 1997, the ratio has been under 10 % since 1998.

Table 6.1.2 Energy Sales by Consumer Type in Palawan (Unit: MWh)

PALECO Y1995 Y 1996 Y 1997 Y 1998 Y 1999 Y 2000 Y 2001 AAGRResidential 19,511 22,135 26,980 32,468 33,034 35,776 38,843 12.16%Commercial 7,350 8,498 10,390 19,761 20,396 21,980 21,278 19.38%Industrial 10,963 10,912 12,085 6,153 6,762 6,995 7,158 5.17%4

PublicBldg. 6,340 6,788 7,702 6,787 7,570 8,599 8,927 5.87%Others 1,187 1,245 1,445 1,511 1,486 1,935 1,885 8.01%

Sub Total 45,351 49,578 58,602 66,680 69,248 75,285 78,091 9.48%BISELCO

Residential 901 1,043 1,289 1,354 1,467 1,758 1,819 12.42%Commercial 457 475 547 633 756 886 882 11.58%Industrial 222 263 325 68 104 110 174 36.78%PublicBldg. 96 110 128 143 193 204 226 15.34%Others 14 12 12 72 17 30 37 17.58%

Sub Total 1,690 1,903 2,301 2,270 2,537 2,988 3,138 10.86%Total 47,041 51,481 60,903 68,950 71,785 78,273 81,229 9.53%

Source: NEA

Table 6.1.7 shows the energy sales forecast from 2004 to 2015 for each consumer type in Palawan, which is estimated by the actual energy sales of each consumer type in 2001 and the annual average growth rate of each consumer type shown in Table 6.1.2.

Next, energy sales for each consumer type are allocated to each municipality on the basis of the historical share of each municipality. Table 6.1.3 shows the 6-year average share of the energy sales in each municipality from PALECO. Puerto Princesa City is the top municipality in terms of energy sales with an average share of over 70% for all consumer types. The second is Narra, and the third is Brooke’s Point. These three municipalities, which are connected together through the backbone-grid, consume 90% of the total electric energy supplied by PALECO. When Roxas and Taytay connect to the backbone-grid in 2005, the share of energy sales in the five municipalities connected to the backbone-grid will reach nearly 95%.

4 Even though the actual annual average growth rate for industrial consumers from 1995 to 2001 was negative, the study employs the annual

average growth rate for the four years from 1998 to 2001, because industrial consumers are still in business.

Page 65: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-3

Table 6.1.3 Share of PALECO Energy Sales for each Municipality Residential Commercial Industrial PublicBuildings Others PPC 70.09% 71.78% 79.42% 75.56% 75.56%Narra 13.14% 12.75% 17.15% 7.90% 11.53%Brooke’s Point 6.38% 8.93% 2.22% 4.72% 1.71%Cuyo 4.15% 2.01% 0.48% 1.76% 4.96%Roxas 3.16% 2.75% 1.95% 1.57% 1.81%Taytay 0.67% 0.44% - 0.51% 2.53%Araceli 0.30% 0.21% - 0.15% 0.71%El Nido 0.55% 0.65% - 0.16% 0.70%San Vicente 0.33% 0.31% - 0.31% 0.42%Bataraza 0.42% 0.34% - 0.13% 0.25%

Source: PALECO Data

The Study assumes that energy sales for each consumer type in Balabac, Cagayancillo and Agutaya are as much as 1, 1/2, 1/3 times the energy sales in Araceli, respectively in terms of peak demand and supply hours in each municipality. The Study also uses the municipality share for 1998 in all consumer types in the BISELCO service areas, because the fluctuation of the municipality share in energy sales is small, as shown in Table 6.1.4.

Table 6.1.4 Share of Energy Sales for each Municipality by Consumer Type PALECO Area Residential Commercial Industrial Public Bldg. Others

Puerto Princesa City 70.28% 71.38% 78.46% 82.57% 74.47%Narra 13.18% 12.68% 16.94% 7.87% 11.36%Brooke’s Point 6.39% 8.88% 2.19% 4.71% 1.68%Cuyo 4.16% 2.00% 0.48% 1.76% 4.89%Roxas 3.17% 2.74% 1.93% 1.57% 1.78%Taytay 0.67% 0.43% 0.00% 0.51% 2.50%Araceli 0.30% 0.21% 0.00% 0.15% 0.70%El Nido 0.55% 0.65% 0.00% 0.16% 0.69%San Vicente 0.33% 0.31% 0.00% 0.31% 0.41%Bataraza 0.42% 0.34% 0.00% 0.13% 0.24%Balabac 0.30% 0.21% 0.00% 0.15% 0.70%Cagayancillo 0.10% 0.07% 0.00% 0.05% 0.24%Agutaya 0.15% 0.11% 0.00% 0.07% 0.34%

BISELCO Area Residential Commercial Industrial Public Bldg. Others Busuanga 7.87% 7.87% 7.87% 7.87% 7.87%Coron 76.82% 76.82% 76.82% 76.82% 76.82%Culion 11.75% 11.75% 11.75% 11.75% 11.75%Linapacan 3.55% 3.55% 3.55% 3.55% 3.55%

Table 6.1.8 shows the energy sales forecast from 2004 to 2015 for each municipality in Palawan, which is estimated by the energy sales forecast by consumer type and the share of energy sales for each municipality shown in Table 6.1.4.

Page 66: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-4

6.1.2 Gross Generation Forecast

Gross generation is calculated using the formula below. The Study uses the system loss rate that NPC-SPUG uses in demand forecasting (see Table 6.1.5). Table 6.1.9 shows the gross generation forecast from 2004 to 2015 by municipality.

Table 6.1.5 System Loss Rate by Municipality

PALECO Area Y 2004 Y 2005 - Y 2015

BISELCO Area Y 2004 Y 2005 - Y 2015

Puerto Princesa City 12% 12% Busuanga 13% 13% Narra 12% 12% Coron 13% 13% Brooke’s Point 12% 12% Culion 10% 10% Cuyo 10% 10% Linapacan 10% 10% Roxas 10% 12% Taytay 10% 12% Araceli 10% 10% El Nido 10% 10% San Vicente 10% 10% Bataraza 12% 12% Balabac 10% 10% Cagayancillo 3% 3% Agutaya 3% 3%

Source: NPC-SPUG Note: Including station use, transmission and distribution loss.

Rate Loss System1(MWh) SalesEnergy (MWh) Generation Gross

−= 

Page 67: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-5

6.1.3 Peak Demand Forecast

Peak demand is calculated using the formula below. The Study uses the load factor for each system in 2001, which was calculated on the basis of actual gross generation and peak demand (see Table 6.1.6). Table 6.1.10 shows the peak demand forecasts from 2004 to 2015 per system.

Table 6.1.6 Load Factor of each System

PALECO Area Load Factor BISELCO Area Load Factor Backbone Grid 0.62 Busuanga* 0.54 Cuyo* 0.37 Coron* 0.54 Roxas* 0.52 Culion** 0.21 Taytay** 0.22 Linapacan** 0.16 Araceli*** 0.24 El Nido** 0.20 San Vicente** 0.13 Balabac**** 0.24 Cagayancillo**** 0.24 Agutaya**** 0.24

Source: NPC-SPUG, PALECO, BISELCO Backbone Grid: Puerto Princesa City*, Narra*, Brooke’s Point*, Bataraza* *24-hour supply **12-hour supply ***8-hour supply ****6-hour supply

(hours) 8760Factor Load(MWh) Generation Gross (MW) DemandPeak

×=

Page 68: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-6

AA

GR

12.1

6%

19.3

8%

5.17

%

5.87

%

8.01

%

14.2

8%

AA

GR

12.4

2%

11.5

8%

36.7

8%

15.3

4%

17.7

5%

18.2

5%

14.4

7%

2015

193,

670

254,

152

14,5

00

19,8

38

5,54

5

487,

705

2015 9,37

1

4,08

9

13,9

79

1,66

7

368

29,4

74

517,

179

2014

172,

673

212,

889

13,7

87

18,7

38

5,13

4

423,

221

2014 8,33

6

3,66

5

10,2

20

1,44

5

313

23,9

79

447,

200

2013

153,

952

178,

325

13,1

09

17,6

99

4,75

3

367,

838

2013 7,41

5

3,28

5

7,47

2

1,25

3

266

19,6

91

387,

529

2012

137,

261

149,

373

12,4

64

16,7

18

4,40

0

320,

216

2012 6,59

6

2,94

4

5,46

3

1,08

6

226

16,3

15

336,

531

2011

122,

379

125,

121

11,8

51

15,7

91

4,07

4

279,

216

2011 5,86

7

2,63

8

3,99

4

942

192

13,6

33

292,

849

2010

109,

111

104,

807

11,2

68

14,9

16

3,77

2

243,

874

2010 5,21

9

2,36

4

2,92

0

817

163

11,4

83

255,

357

2009

97,2

81

87,7

91

10,7

14

14,0

89

3,49

2

213,

367

2009 4,64

2

2,11

9

2,13

5

708

139

9,74

3

223,

110

2008

86,7

34

73,5

38

10,1

87

13,3

08

3,23

3

187,

000

2008 4,12

9

1,89

9

1,56

1

614

118

8,32

1

195,

321

2007

77,3

30

61,5

99

9,68

6

12,5

70

2,99

3

164,

178

2007 3,67

3

1,70

2

1,14

1

532

100

7,14

8

171,

326

2006

68,9

46

51,5

98

9,21

0

11,8

73

2,77

1

144,

398

2006 3,26

7

1,52

5

834

461 85

6,17

2

150,

570

2005

61,4

71

43,2

21

8,75

7

11,2

15

2,56

5

127,

229

2005 2,90

6

1,36

7

610

400 72

5,35

5

132,

584

2004

54,8

06

36,2

04

8,32

6

10,5

93

2,37

5

112,

304

2004 2,58

5

1,22

5

446

347 61

4,66

4

116,

968

PALE

CO

AR

EA

Res

iden

tial

Com

mer

cial

Indu

stria

l

Publ

ic B

ldg.

Oth

ers Su

b To

tal

BIS

ELC

O A

REA

Res

iden

tial

Com

mer

cial

Indu

stria

l

Publ

ic B

ldg.

Oth

ers Su

b To

tal

Tot

al

(in M

Wh)

Tabl

e 6.

1.7

Ene

rgy

Sale

s For

ecas

ts fr

om 2

004

to 2

015

by C

onsu

mer

Typ

e (N

PC-S

PUG

and

EC

s Are

a)

Page 69: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-7

AA

GR

14.1

6%

14.3

1%

15.5

0%

13.7

7%

14.5

4%

13.7

9%

14.2

7%

15.5

0%

14.6

4%

14.9

0%

14.2

7%

14.2

5%

14.3

6%

14.2

8%

AA

GR

18.2

5%

18.2

5%

18.2

5%

18.2

5%

18.2

5%

14.4

7%

2015

349,

415

62,3

88

36,3

05

13,8

16

13,7

78

2,64

1

1,17

8

2,78

8

1,49

8

1,72

2

1,17

8

394

602

487,

705

2015 2,33

2

22,7

58

3,34

3

1,04

1

29,4

74

517,

179

2014

303,

431

54,1

36

31,2

23

12,0

77

11,9

45

2,30

6

1,02

4

2,40

0

1,29

8

1,49

1

1,02

4

343

523

423,

221

2014 1,89

7

18,5

15

2,72

0

847

23,9

79

447,

200

2013

263,

928

47,0

48

26,8

85

10,5

68

10,3

70

2,01

5

892

2,06

8

1,12

6

1,29

2

892

299

455

367,

838

2013 1,55

8

15,2

04

2,23

3

696

19,6

91

387,

529

2012

229,

953

40,9

51

23,1

80

9,25

8

9,01

5

1,76

4

778

1,78

4

978

1,12

0

778

260

397

320,

216

2012 1,29

1

12,5

97

1,85

0

576

16,3

15

336,

531

2011

200,

693

35,7

02

20,0

12

8,12

0

7,84

8

1,54

6

679

1,54

1

850

973

679

227

346

279,

216

2011 1,07

9

10,5

26

1,54

6

482

13,6

33

292,

849

2010

175,

463

31,1

76

17,3

00

7,13

0

6,84

1

1,35

7

593

1,33

3

741

846

593

199

302

243,

874

2010 90

9

8,86

6

1,30

2

406

11,4

83

255,

357

2009

153,

677

27,2

69

14,9

76

6,26

8

5,97

2

1,19

2

519

1,15

4

646

736

519

174

264

213,

367

2009 77

1

7,52

3

1,10

5

344

9,74

3

223,

110

2008

134,

839

23,8

93

12,9

83

5,51

6

5,22

1

1,04

9

455

1,00

0

564

641

455

152

231

187,

000

2008 65

8

6,42

5

944

294

8,32

1

195,

321

2007

118,

526

20,9

70

11,2

71

4,85

9

4,57

1

925

399

868

494

560

399

134

203

164,

178

2007 56

6

5,51

9

811

253

7,14

8

171,

326

2006

104,

381

18,4

36

9,79

9

4,28

5

4,00

8

816

351

754

432

489

351

118

178

144,

398

2006 48

8

4,76

6

700

218

6,17

2

150,

570

2005

92,0

96

16,2

37

8,53

3

3,78

4

3,51

9

721

308

656

379

427

308

103

156

127,

229

2005 42

4

4,13

5

607

189

5,35

5

132,

584

2004

81,4

10

14,3

26

7,44

2

3,34

4

3,09

5

638

272

571

333

374

272 91 138

112,

304

2004 36

9

3,60

1

529

165

4,66

4

116,

968

PALE

CO

AR

EA

Puer

to P

rince

sa C

ity

Nar

ra

Bro

oke's

Poi

nt

Cuy

o

Rox

as

Tayt

ay

Ara

celi

El N

ido

San

Vic

ente

Bat

araz

a

Bal

abac

Cag

ayan

cillo

Agu

taya Su

b To

tal

BIS

ELC

O A

REA

Bus

uang

a

Cor

on

Cul

ion

Lina

paca

n

Sub

Tota

l

Tot

al

(in M

Wh)

Tabl

e 6.

1.8

Ene

rgy

Sale

s For

ecas

ts fr

om 2

004

to 2

015

by M

unic

ipal

ity (N

PC-S

PUG

and

EC

s Are

a)

Page 70: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-8

AA

GR

14.1

6%

14.3

1%

15.5

0%

13.7

6%

14.7

7%

14.0

2%

14.2

6%

15.5

0%

14.6

5%

14.8

9%

14.2

6%

14.2

3%

14.3

5%

14.2

9%

AA

GR

18.2

5%

18.2

5%

18.2

4%

18.2

5%

18.2

5%

14.4

8%

2015

397,

063

70,8

95

41,2

56

15,3

51

15,6

57

3,00

2

1,30

9

3,09

8

1,66

4

1,95

7

1,30

9

406

621

553,

588

2015 2,68

0

26,1

58

3,71

4

1,15

7

33,7

09

587,

297

2014

344,

808

61,5

18

35,4

81

13,4

18

13,5

74

2,62

0

1,13

8

2,66

7

1,44

2

1,69

4

1,13

8

353

540

480,

391

2014 2,18

1

21,2

81

3,02

2

941

27,4

25

507,

816

2013

299,

918

53,4

63

30,5

52

11,7

42

11,7

84

2,29

0

991

2,29

8

1,25

1

1,46

8

991

308

469

417,

525

2013 1,79

1

17,4

76

2,48

1

773

22,5

21

440,

046

2012

261,

310

46,5

35

26,3

41

10,2

87

10,2

45

2,00

4

864

1,98

3

1,08

6

1,27

3

864

268

409

363,

469

2012 1,48

4

14,4

80

2,05

6

641

18,6

61

382,

130

2011

228,

060

40,5

70

22,7

40

9,02

3

8,91

8

1,75

7

754

1,71

2

945

1,10

6

754

234

357

316,

930

2011 1,24

0

12,0

99

1,71

8

535

15,5

92

332,

522

2010

199,

390

35,4

28

19,6

59

7,92

2

7,77

4

1,54

2

659

1,48

1

823

961

659

205

312

276,

815

2010 1,04

4

10,1

91

1,44

7

451

13,1

33

289,

948

2009

174,

633

30,9

88

17,0

18

6,96

4

6,78

7

1,35

5

577

1,28

2

718

837

577

179

272

242,

187

2009 88

6

8,64

7

1,22

8

383

11,1

44

253,

331

2008

153,

226

27,1

51

14,7

53

6,12

8

5,93

3

1,19

2

506

1,11

1

627

729

506

157

238

212,

257

2008 75

7

7,38

5

1,04

9

327

9,51

8

221,

775

2007

134,

689

23,8

29

12,8

08

5,39

9

5,19

5

1,05

1

444

964

548

636

444

138

209

186,

354

2007 65

0

6,34

4

901

281

8,17

6

194,

530

2006

118,

615

20,9

50

11,1

36

4,76

2

4,55

5

927

390

838

480

555

390

121

183

163,

902

2006 56

1

5,47

8

778

242

7,05

9

170,

961

2005

104,

654

18,4

52

9,69

7

4,20

4

3,99

9

819

343

729

421

485

343

107

161

144,

414

2005 48

7

4,75

3

675

210

6,12

5

150,

539

2004

92,5

11

16,2

79

8,45

6

3,71

6

3,43

9

709

302

635

370

425

302 94 142

127,

380

2004 42

4

4,13

9

588

183

5,33

4

132,

714

PALE

CO

AR

EA

Puer

to P

rince

sa C

ity

Nar

ra

Bro

oke's

Poi

nt

Cuy

o

Rox

as

Tayt

ay

Ara

celi

El N

ido

San

Vic

ente

Bat

araz

a

Bal

abac

Cag

ayan

cillo

Agu

taya Su

b To

tal

BIS

ELC

O A

REA

Bus

uang

a

Cor

on

Cul

ion

Lina

paca

n

Sub

Tota

l

Tot

al

(in M

Wh)

Tabl

e 6.

1.9

Gro

ss G

ener

atio

n Fo

reca

sts f

rom

200

4 to

201

5 by

Mun

icip

ality

(NPC

-SPU

G a

nd E

Cs A

rea)

Page 71: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-9

AA

GR

14.6

6%

13.7

6% - -

14.2

9%

15.5

0%

14.6

4%

14.2

9%

14.2

6%

14.4

1%

14.1

4%

AA

GR

18.2

3%

18.2

5%

18.2

3%

18.2

7%

18.2

5%

14.4

0%

2015

96,8

28

4,75

8

- - 630

1,76

1

1,41

2

630

195

299

106,

513

2015 56

8

5,55

2

2,04

5

817

8,98

2

115,

495

2014

84,0

11

4,15

9

- - 548

1,51

6

1,22

4

548

170

260

92,4

36

2014 46

3

4,51

7

1,66

4

664

7,30

8

99,7

44

2013

73,0

05

3,63

9

- - 477

1,30

6

1,06

2

477

148

226

80,3

40

2013 38

0

3,70

9

1,36

6

546

6,00

1

86,3

41

2012

63,5

45

3,18

8

- - 416

1,12

7

922

416

129

197

69,9

40

2012 31

5

3,07

3

1,13

2

452

4,97

2

74,9

12

2011

55,4

02

2,79

7

- - 363

973

802

363

113

172

60,9

85

2011 26

3

2,56

8

946

378

4,15

5

65,1

40

2010

48,3

85

2,45

5

- - 317

842

698

317 99 150

53,2

63

2010 22

1

2,16

3

797

318

3,49

9

56,7

62

2009

42,3

29

2,15

8

- - 278

729

609

278 86 131

46,5

98

2009 18

8

1,83

5

676

270

2,96

9

49,5

67

2008

37,0

96

1,89

9

- - 244

632

532

244 76 115

40,8

38

2008 16

1

1,56

7

578

231

2,53

7

43,3

75

2007

32,5

68

1,67

3

- - 214

548

465

214 66 101

35,8

49

2007 13

8

1,34

6

496

198

2,17

8

38,0

27

2006

28,6

44

1,47

6

- - 188

476

407

188 58 88

31,5

25

2006 11

9

1,16

3

428

171

1,88

1

33,4

06

2005

25,2

39

1,30

3

- - 165

414

357

165 51 77

27,7

71

2005 10

3

1,00

9

372

148

1,63

2

29,4

03

2004

21,5

05

1,15

2

758

373

145

361

314

145 45 68

24,8

66

2004

90 878

324

129

1,42

1

26,2

87

PALE

CO

AR

EA

Bac

kbon

e G

rid*

Cuy

o

Rox

as**

Tayt

ay**

Ara

celi

El N

ido

San

Vic

ente

Bal

abac

Cag

ayan

cillo

Agu

taya Su

b To

tal

BIS

ELC

O A

REA

Bus

uang

a

Cor

on

Cul

ion

Lina

paca

n

Sub

Tota

l

Tot

al*T

he b

ackb

one-

grid

incl

udes

Pue

rto P

rince

sa C

ity, N

arra

, Bro

oke's

Poi

nt, a

nd B

atar

aza.

**R

oxas

and

Tay

tay

will

be

conn

ecte

d to

the

back

bone

-grid

in 2

005.

(in k

W)

Tabl

e 6.

1.10

Pea

k D

eman

d Fo

reca

sts f

rom

200

4 to

201

5 by

Mun

icip

ality

(NPC

-SPU

G a

nd E

Cs A

rea)

Page 72: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-10

Demand Forecast (NPC-SPUG and ECs Area)

0

100,000

200,000

300,000

400,000

500,000

600,000

700,000

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

MW

h

0

20,000

40,000

60,000

80,000

100,000

120,000

140,000

kW

Energy Sales Gross Generation Peak Demand

Energy Sales: 517,179 MWh

Gross Gen: 587,297 MWh Peak Demand: 115,495 kW

Historical Forecast

Figure 6.1.1 Results of Power Demand Forecast (NPC-SPUG and ECs Area)

6.1.4 Demand Forecast Adjustment based on Results of Screening

The results of the screening of electrification methods mentioned in Section 5.4.3 identified that it is optimum for the barangays listed below to employ an EC-grid expansion method.

Table 6.1.11 and Table 6.1.12 show the barangays electrified with EC-grid expansion using the Base scenario and the Reliability-oriented scenario5. Regarding the supply hour conditions for estimating potential demand of these barangays, a 24-hour supply is assumed instead of a 6-hour supply, because these barangays are supplied with electricity from EC-grids that offer a 24-hour electricity supply.

Table 6.1.11 List of Barangays Electrified by EC-grid Extension (Base Scenario)

Municipality Barangay Potential HH Target HH Demand Energy Sales Gross Gen. EC-Grid

Name Name 2015 (Center, 2006) (kW) (MWh) (MWh) NameMalihud 522 183 19.4 74.66 84.84Bulalacao (a) 543 190 20.14 77.52 88.09Tarusan 1093 383 40.6 156.26 177.57

BROOKE'S POINT Imulnod 480 168 17.81 68.54 77.89PUERTO PRINCESA CITY (CAPITALBabuyan 695 209 22.15 85.27 96.9QUESON Malatgao (b) 622 218 23.11 88.94 101.07BACK BONE GRID TOTAL ADD 3955 1351 143 551 627

BACK BONE

BATARAZA

5 The result of the environment-friendly scenario is the same as the base scenario.

Page 73: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-11

Table 6.1.12 List of Barangays Electrified by EC-Grid Extension (Reliability-Oriented Scenario) Municipality Barangay Potential HH Target HH Demand Energy Sales Gross Gen. EC-Grid

Name Name 2015 (Center, 2006) (kW) (MWh) (MWh) NameABORLAN Sagpangan 470 165 17.49 67.32 76.5

Malihud 522 183 19.4 74.66 84.84Bulalacao (a) 543 191 20.25 77.93 88.56Tarusan 1093 383 40.6 156.26 177.57Culandanum (b) 1170 410 43.46 167.28 190.09Sandoval (a) 829 291 30.85 118.73 134.92Ocayan 559 196 20.78 79.97 90.88Rio Tuba 2845 996 105.58 406.37 461.78Taratak 574 201 21.31 82.01 93.19Sumbiling 824 289 30.63 117.91 133.99Iwahig 691 242 25.65 98.74 112.2Igang igang 412 145 15.37 59.16 67.23Sarong 607 213 22.58 86.9 98.75

BROOKES POINT Imulnod 480 168 17.81 68.54 77.89Babuyan 695 209 22.15 85.27 96.9San Rafael (b) 608 213 22.58 86.9 98.75Tanabag 174 61 6.47 24.89 28.28Conception (c) 404 142 15.05 57.94 65.84Binduyan 315 111 11.77 45.29 51.47Langogan 613 215 22.79 87.72 99.68Bahile 756 265 28.09 108.12 122.86Macarascas 516 181 19.19 73.85 83.92Malatgao (b) 622 218 23.11 88.94 101.07Kalatagbak 420 147 15.58 59.98 68.16San Nicolas (c) 158 56 5.94 22.85 25.97Sandoval (c) 368 129 13.67 52.63 59.81Santo Tomas (Iraan) 170 60 6.36 24.48 27.82Dumarao 525 184 19.5 75.07 85.31Mendoza 307 108 11.45 44.06 50.07Tumarabong 717 251 26.61 102.41 116.38San Isidro (c) 121 43 4.56 17.54 19.93Caramay 540 189 20.03 77.11 87.63Salvacion (b) 148 52 5.51 21.22 24.11Rizal (b) 177 62 6.57 25.3 28.75Nicanor Zabara 372 131 13.89 53.45 60.74San Miguel (b) 209 74 7.84 30.19 34.31Pulot Interior (Pulot II) 586 206 21.84 84.05 95.51Labog 957 335 35.51 136.68 155.32Punang 732 257 27.24 104.86 119.16Iraray 703 247 26.18 100.78 114.52New Guinlo 845 296 31.38 120.77 137.24Old Guinlo 182 64 6.78 26.11 29.67Libertad 437 153 16.22 62.42 70.93Paglaum 458 161 17.07 65.69 74.65Talog 240 84 8.9 34.27 38.94Calawag 1060 364 38.58 148.51 168.76

BACK BONE GRID TOTAL ADD 26754 9341 990 3811 4331Marcilla 318 105 11.13 42.84 49.24San Jose (a) 301 99 10.49 40.39 46.43

BUSUANGA GRID TOTAL ADD 619 204 22 83 96Villa Libertad 434 152 16.11 62.02 68.91Pasadena 430 151 16.01 61.61 68.46Barotuan 635 223 23.64 90.98 101.09Bucana 1378 483 51.2 197.06 218.96Teneguiban 1015 356 37.74 145.25 161.39San Fernando 525 184 19.5 75.07 83.41Sibartan 440 154 16.32 62.83 69.81

EL NIDO GRID TOTAL ADD 4857 1703 181 695 772SAN VICENTE ADD Santo Nino (c) 237 66 7 27 30 SAN VICENTE

SOFRONIO ESPANOLA

BACK BONE

BUSUANGA

EL NIDO

PPC

QUEZON

ROXAS

TAYTAY

BATARAZA

CORON

EL NIDO

Tables 6.1.13 through 6.1.18 show the revised EC-grid demand forecasts that consist of the

demand forecasts of Section 5.2.2 and the potential power demand of the barangays electrified by EC-grid extension mentioned above. In this connection, the potential demand is allocated between twelve years from 2004 to 2015.

Page 74: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-12

AA

GR

14.1

6%

14.3

2%

15.5

1%

13.7

7%

14.5

4%

13.7

9%

14.2

7%

15.5

0%

14.6

4%

15.9

2%

14.2

7%

14.2

5%

14.3

6%

14.2

9%

AA

GR

18.2

5%

18.2

5%

18.2

5%

18.2

5%

18.2

5%

14.4

8%

2015

349,

500

62,4

77

36,3

74

13,8

16

13,7

78

2,64

1

1,17

8

2,78

8

1,49

8

2,03

0

1,17

8

394

602

488,

256

2015 2,33

2

22,7

58

3,34

3

1,04

1

29,4

74

517,

730

2014

303,

509

54,2

18

31,2

86

12,0

77

11,9

45

2,30

6

1,02

4

2,40

0

1,29

8

1,77

4

1,02

4

343

523

423,

727

2014 1,89

7

18,5

15

2,72

0

847

23,9

79

447,

706

2013

263,

999

47,1

22

26,9

42

10,5

68

10,3

70

2,01

5

892

2,06

8

1,12

6

1,55

0

892

299

455

368,

298

2013 1,55

8

15,2

04

2,23

3

696

19,6

91

387,

989

2012

230,

017

41,0

18

23,2

31

9,25

8

9,01

5

1,76

4

778

1,78

4

978

1,35

2

778

260

397

320,

630

2012 1,29

1

12,5

97

1,85

0

576

16,3

15

336,

945

2011

200,

750

35,7

61

20,0

57

8,12

0

7,84

8

1,54

6

679

1,54

1

850

1,18

0

679

227

346

279,

584

2011 1,07

9

10,5

26

1,54

6

482

13,6

33

293,

217

2010

175,

513

31,2

28

17,3

39

7,13

0

6,84

1

1,35

7

593

1,33

3

741

1,02

7

593

199

302

244,

196

2010 90

9

8,86

6

1,30

2

406

11,4

83

255,

679

2009

153,

720

27,3

13

15,0

09

6,26

8

5,97

2

1,19

2

519

1,15

4

646

892

519

174

264

213,

643

2009 77

1

7,52

3

1,10

5

344

9,74

3

223,

386

2008

134,

875

23,9

30

13,0

10

5,51

6

5,22

1

1,04

9

455

1,00

0

564

771

455

152

231

187,

230

2008 65

8

6,42

5

944

294

8,32

1

195,

551

2007

118,

555

20,9

99

11,2

93

4,85

9

4,57

1

925

399

868

494

664

399

134

203

164,

362

2007 56

6

5,51

9

811

253

7,14

8

171,

510

2006

104,

403

18,4

58

9,81

5

4,28

5

4,00

8

816

351

754

432

567

351

118

178

144,

536

2006 48

8

4,76

6

700

218

6,17

2

150,

708

2005

92,1

11

16,2

51

8,54

4

3,78

4

3,51

9

721

308

656

379

479

308

103

156

127,

321

2005 42

4

4,13

5

607

189

5,35

5

132,

676

2004

81,4

18

14,3

33

7,44

7

3,34

4

3,09

5

638

272

571

333

400

272 91 138

112,

350

2004 36

9

3,60

1

529

165

4,66

4

117,

014

PALE

CO

AR

EA

Puer

to P

rince

sa C

ity

Nar

ra

Bro

oke's

Poi

nt

Cuy

o

Rox

as

Tayt

ay

Ara

celi

El N

ido

San

Vic

ente

Bat

araz

a

Bal

abac

Cag

ayan

cillo

Agu

taya Su

b To

tal

BIS

ELC

O A

REA

Bus

uang

a

Cor

on

Cul

ion

Lina

paca

n

Sub

Tota

l

Tot

al

(in M

Wh)

Tabl

e 6.

1.13

Ene

rgy

Sale

s For

ecas

ts fr

om 2

004

to 2

015

by M

unic

ipal

ity (N

PC-S

PUG

and

EC

s Are

a, B

ase

Scen

ario

)

Page 75: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-13

AA

GR

14.1

6%

14.3

2%

15.5

1%

13.7

6%

14.7

7%

14.0

2%

14.2

6%

15.5

0%

14.6

5%

15.9

3%

14.2

6%

14.2

3%

14.3

5%

14.3

0%

AA

GR

18.2

5%

18.2

5%

18.2

4%

18.2

5%

18.2

5%

14.4

8%

2015

397,

160

70,9

96

41,3

34

15,3

51

15,6

57

3,00

2

1,30

9

3,09

8

1,66

4

2,30

8

1,30

9

406

621

554,

215

2015 2,68

0

26,1

58

3,71

4

1,15

7

33,7

09

587,

924

2014

344,

896

61,6

10

35,5

52

13,4

18

13,5

74

2,62

0

1,13

8

2,66

7

1,44

2

2,01

5

1,13

8

353

540

480,

963

2014 2,18

1

21,2

81

3,02

2

941

27,4

25

508,

388

2013

299,

998

53,5

46

30,6

17

11,7

42

11,7

84

2,29

0

991

2,29

8

1,25

1

1,76

0

991

308

469

418,

045

2013 1,79

1

17,4

76

2,48

1

773

22,5

21

440,

566

2012

261,

382

46,6

09

26,4

00

10,2

87

10,2

45

2,00

4

864

1,98

3

1,08

6

1,53

6

864

268

409

363,

937

2012 1,48

4

14,4

80

2,05

6

641

18,6

61

382,

598

2011

228,

124

40,6

36

22,7

93

9,02

3

8,91

8

1,75

7

754

1,71

2

945

1,33

9

754

234

357

317,

346

2011 1,24

0

12,0

99

1,71

8

535

15,5

92

332,

938

2010

199,

446

35,4

86

19,7

05

7,92

2

7,77

4

1,54

2

659

1,48

1

823

1,16

5

659

205

312

277,

179

2010 1,04

4

10,1

91

1,44

7

451

13,1

33

290,

312

2009

174,

681

31,0

38

17,0

58

6,96

4

6,78

7

1,35

5

577

1,28

2

718

1,01

1

577

179

272

242,

499

2009 88

6

8,64

7

1,22

8

383

11,1

44

253,

643

2008

153,

266

27,1

93

14,7

86

6,12

8

5,93

3

1,19

2

506

1,11

1

627

874

506

157

238

212,

517

2008 75

7

7,38

5

1,04

9

327

9,51

8

222,

035

2007

134,

721

23,8

63

12,8

34

5,39

9

5,19

5

1,05

1

444

964

548

752

444

138

209

186,

562

2007 65

0

6,34

4

901

281

8,17

6

194,

738

2006

118,

639

20,9

75

11,1

56

4,76

2

4,55

5

927

390

838

480

642

390

121

183

164,

058

2006 56

1

5,47

8

778

242

7,05

9

171,

117

2005

104,

670

18,4

69

9,71

0

4,20

4

3,99

9

819

343

729

421

543

343

107

161

144,

518

2005 48

7

4,75

3

675

210

6,12

5

150,

643

2004

92,5

19

16,2

88

8,46

2

3,71

6

3,43

9

709

302

635

370

454

302 94 142

127,

432

2004 42

4

4,13

9

588

183

5,33

4

132,

766

PALE

CO

AR

EA

Puer

to P

rince

sa C

ity

Nar

ra

Bro

oke's

Poi

nt

Cuy

o

Rox

as

Tayt

ay

Ara

celi

El N

ido

San

Vic

ente

Bat

araz

a

Bal

abac

Cag

ayan

cillo

Agu

taya Su

b To

tal

BIS

ELC

O A

REA

Bus

uang

a

Cor

on

Cul

ion

Lina

paca

n

Sub

Tota

l

Tot

al

(in M

Wh)

Tabl

e 6.

1.14

Gro

ss G

ener

atio

n Fo

reca

sts f

rom

200

4 to

201

5 by

Mun

icip

ality

(NPC

-SPU

G a

nd E

Cs A

rea,

Bas

e Sc

enar

io)

Page 76: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-14

AA

GR

14.6

7%

13.7

6% - -

14.2

9%

15.5

0%

14.6

4%

14.2

9%

14.2

6%

14.4

1%

14.1

5%

AA

GR

18.2

3%

18.2

5%

18.2

3%

18.2

7%

18.2

5%

14.4

1%

2015

96,9

71

4,75

8

- - 630

1,76

1

1,41

2

630

195

299

106,

656

2015 56

8

5,55

2

2,04

5

817

8,98

2

115,

638

2014

84,1

43

4,15

9

- - 548

1,51

6

1,22

4

548

170

260

92,5

68

2014 46

3

4,51

7

1,66

4

664

7,30

8

99,8

76

2013

73,1

25

3,63

9

- - 477

1,30

6

1,06

2

477

148

226

80,4

60

2013 38

0

3,70

9

1,36

6

546

6,00

1

86,4

61

2012

63,6

53

3,18

8

- - 416

1,12

7

922

416

129

197

70,0

48

2012 31

5

3,07

3

1,13

2

452

4,97

2

75,0

20

2011

55,4

98

2,79

7

- - 363

973

802

363

113

172

61,0

81

2011 26

3

2,56

8

946

378

4,15

5

65,2

36

2010

48,4

69

2,45

5

- - 317

842

698

317 99 150

53,3

47

2010 22

1

2,16

3

797

318

3,49

9

56,8

46

2009

42,4

01

2,15

8

- - 278

729

609

278 86 131

46,6

70

2009 18

8

1,83

5

676

270

2,96

9

49,6

39

2008

37,1

56

1,89

9

- - 244

632

532

244 76 115

40,8

98

2008 16

1

1,56

7

578

231

2,53

7

43,4

35

2007

32,6

16

1,67

3

- - 214

548

465

214 66 101

35,8

97

2007 13

8

1,34

6

496

198

2,17

8

38,0

75

2006

28,6

80

1,47

6

- - 188

476

407

188 58 88

31,5

61

2006 11

9

1,16

3

428

171

1,88

1

33,4

42

2005

25,2

63

1,30

3

- - 165

414

357

165 51 77

27,7

95

2005 10

3

1,00

9

372

148

1,63

2

29,4

27

2004

21,5

17

1,15

2

758

373

145

361

314

145 45 68

24,8

78

2004

90 878

324

129

1,42

1

26,2

99

PALE

CO

AR

EA

Bac

kbon

e G

rid*

Cuy

o

Rox

as**

Tayt

ay**

Ara

celi

El N

ido

San

Vic

ente

Bal

abac

Cag

ayan

cillo

Agu

taya Su

b To

tal

BIS

ELC

O A

REA

Bus

uang

a

Cor

on

Cul

ion

Lina

paca

n

Sub

Tota

l

Tot

al*T

he b

ackb

one-

grid

incl

udes

Pue

rto P

rince

sa C

ity, N

arra

, Bro

oke's

Poi

nt, a

nd B

atar

aza.

**R

oxas

and

Tay

tay

will

be

conn

ecte

d to

the

back

bone

-grid

in 2

005.

(in k

W)

Tabl

e 6.

1.15

Pea

k D

eman

d Fo

reca

sts f

rom

200

4 to

201

5 by

Mun

icip

ality

(NPC

-SPU

G a

nd E

Cs A

rea,

Bas

e Sc

enar

io)

Page 77: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-15

AA

GR

14.1

7%

14.3

3%

15.5

6%

13.7

7%

14.9

5%

15.4

5%

14.2

7%

16.8

3%

14.7

7%

17.5

2%

14.2

7%

14.2

5%

14.3

6%

14.3

4%

AA

GR

18.2

5%

18.2

6%

18.2

5%

18.2

5%

18.2

6%

14.5

3%

2015

349,

985

62,6

04

36,8

00

13,8

16

14,3

24

3,09

9

1,17

8

3,48

3

1,52

5

3,24

8

1,17

8

394

602

492,

238

2015 2,33

2

22,8

41

3,34

3

1,04

1

29,5

57

521,

795

2014

303,

956

54,3

35

31,6

78

12,0

77

12,4

43

2,72

3

1,02

4

3,03

8

1,32

0

2,89

5

1,02

4

343

523

427,

379

2014 1,89

7

18,5

92

2,72

0

847

24,0

56

451,

435

2013

264,

407

47,2

29

27,3

00

10,5

68

10,8

18

2,39

0

892

2,64

8

1,14

6

2,57

4

892

299

455

371,

618

2013 1,55

8

15,2

74

2,23

3

696

19,7

61

391,

379

2012

230,

386

41,1

15

23,5

55

9,25

8

9,41

3

2,09

7

778

2,30

6

996

2,27

9

778

260

397

323,

618

2012 1,29

1

12,6

60

1,85

0

576

16,3

78

339,

996

2011

201,

080

35,8

48

20,3

47

8,12

0

8,19

6

1,83

7

679

2,00

5

866

2,01

0

679

227

346

282,

240

2011 1,07

9

10,5

82

1,54

6

482

13,6

89

295,

929

2010

175,

804

31,3

05

17,5

95

7,13

0

7,13

9

1,60

6

593

1,73

9

755

1,76

0

593

199

302

246,

520

2010 90

9

8,91

5

1,30

2

406

11,5

32

258,

052

2009

153,

972

27,3

80

15,2

31

6,26

8

6,22

0

1,40

0

519

1,50

2

658

1,52

7

519

174

264

215,

635

2009 77

1

7,56

5

1,10

5

344

9,78

5

225,

420

2008

135,

087

23,9

87

13,1

98

5,51

6

5,42

0

1,21

5

455

1,29

0

574

1,30

9

455

152

231

188,

890

2008 65

8

6,46

0

944

294

8,35

6

197,

246

2007

118,

728

21,0

46

11,4

46

4,85

9

4,72

0

1,05

0

399

1,10

0

502

1,10

5

399

134

203

165,

690

2007 56

6

5,54

7

811

253

7,17

6

172,

866

2006

104,

537

18,4

95

9,93

4

4,28

5

4,10

7

899

351

928

438

911

351

118

178

145,

532

2006 48

8

4,78

7

700

218

6,19

3

151,

725

2005

92,2

06

16,2

78

8,62

8

3,78

4

3,56

8

763

308

772

383

726

308

103

156

127,

985

2005 42

4

4,14

9

607

189

5,36

9

133,

354

2004

81,4

73

14,3

50

7,49

7

3,34

4

3,09

5

638

272

629

335

550

272 91 138

112,

682

2004 36

9

3,60

8

529

165

4,67

1

117,

353

PALE

CO

AR

EA

Puer

to P

rince

sa C

ity

Nar

ra

Bro

oke's

Poi

nt

Cuy

o

Rox

as

Tayt

ay

Ara

celi

El N

ido

San

Vic

ente

Bat

araz

a

Bal

abac

Cag

ayan

cillo

Agu

taya Su

b To

tal

BIS

ELC

O A

REA

Bus

uang

a

Cor

on

Cul

ion

Lina

paca

n

Sub

Tota

l

Tot

al

(in M

Wh)

Tabl

e 6.

1.16

Ene

rgy

Sale

s For

ecas

ts fro

m 2

004

to 2

015

by M

unic

ipal

ity (N

PC-S

PUG

and

EC

s Are

a, R

elia

bilit

y-O

rient

ed S

cena

rio)

Page 78: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-16

AA

GR

14.1

7%

14.3

3%

15.5

6%

13.7

6%

15.1

8%

15.6

9%

14.2

6%

16.8

3%

14.7

8%

17.5

4%

14.2

6%

14.2

3%

14.3

5%

14.3

5%

AA

GR

18.2

5%

18.2

7%

18.2

4%

18.2

5%

18.2

6%

14.5

4%

2015

397,

711

71,1

41

41,8

18

15,3

51

16,2

78

3,52

2

1,30

9

3,87

0

1,69

4

3,69

1

1,30

9

406

621

558,

721

2015 2,68

0

26,2

54

3,71

4

1,15

7

33,8

05

592,

526

2014

345,

403

61,7

44

35,9

98

13,4

18

14,1

39

3,09

2

1,13

8

3,37

1

1,47

0

3,29

0

1,13

8

353

540

485,

094

2014 2,18

1

21,3

69

3,02

2

941

27,5

13

512,

607

2013

300,

461

53,6

69

31,0

24

11,7

42

12,2

92

2,71

5

991

2,93

8

1,27

6

2,92

4

991

308

469

421,

800

2013 1,79

1

17,5

56

2,48

1

773

22,6

01

444,

401

2012

261,

801

46,7

21

26,7

67

10,2

87

10,6

97

2,38

2

864

2,55

9

1,10

8

2,58

9

864

268

409

367,

316

2012 1,48

4

14,5

52

2,05

6

641

18,7

33

386,

049

2011

228,

499

40,7

36

23,1

20

9,02

3

9,31

4

2,08

8

754

2,22

4

964

2,28

2

754

234

357

320,

349

2011 1,24

0

12,1

63

1,71

8

535

15,6

56

336,

005

2010

199,

776

35,5

74

19,9

94

7,92

2

8,11

4

1,82

6

659

1,92

9

839

1,99

7

659

205

312

279,

806

2010 1,04

4

10,2

47

1,44

7

451

13,1

89

292,

995

2009

174,

967

31,1

14

17,3

07

6,96

4

7,07

0

1,59

2

577

1,66

6

731

1,73

4

577

179

272

244,

750

2009 88

6

8,69

5

1,22

8

383

11,1

92

255,

942

2008

153,

508

27,2

57

14,9

97

6,12

8

6,16

0

1,38

1

506

1,43

1

637

1,48

6

506

157

238

214,

392

2008 75

7

7,42

5

1,04

9

327

9,55

8

223,

950

2007

134,

919

23,9

15

13,0

06

5,39

9

5,36

5

1,19

3

444

1,22

0

556

1,25

4

444

138

209

188,

062

2007 65

0

6,37

6

901

281

8,20

8

196,

270

2006

118,

793

21,0

16

11,2

89

4,76

2

4,66

8

1,02

2

390

1,03

0

486

1,03

3

390

121

183

165,

183

2006 56

1

5,50

2

778

242

7,08

3

172,

266

2005

104,

779

18,4

98

9,80

5

4,20

4

4,05

6

867

343

857

425

823

343

107

161

145,

268

2005 48

7

4,76

9

675

210

6,14

1

151,

409

2004

92,5

84

16,3

05

8,51

9

3,71

6

3,43

9

709

302

699

372

624

302 94 142

127,

807

2004 42

4

4,14

7

588

183

5,34

2

133,

149

PALE

CO

AR

EA

Puer

to P

rince

sa C

ity

Nar

ra

Bro

oke's

Poi

nt

Cuy

o

Rox

as

Tayt

ay

Ara

celi

El N

ido

San

Vic

ente

Bat

araz

a

Bal

abac

Cag

ayan

cillo

Agu

taya Su

b To

tal

BIS

ELC

O A

REA

Bus

uang

a

Cor

on

Cul

ion

Lina

paca

n

Sub

Tota

l

Tot

al

(in M

Wh)

Tabl

e 6.

1.17

Gro

ss G

ener

atio

n Fo

reca

sts fr

om 2

004

to 2

015

by M

unic

ipal

ity (N

PC-S

PUG

and

ECs

Are

a, R

elia

bilit

y-O

rient

ed S

cena

rio)

Page 79: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-17

AA

GR

14.7

2%

13.7

6% - -

14.2

9%

16.1

0%

14.7

0%

14.2

9%

14.2

6%

14.4

1%

14.2

1%

AA

GR

18.2

3%

18.2

8%

18.2

3%

18.2

7%

18.2

7%

14.4

7%

2015

97,8

18

4,75

8

- - 630

1,94

2

1,41

9

630

195

299

107,

691

2015 56

8

5,57

4

2,04

5

817

9,00

4

116,

695

2014

84,9

24

4,15

9

- - 548

1,68

1

1,23

0

548

170

260

93,5

20

2014 46

3

4,53

7

1,66

4

664

7,32

8

100,

848

2013

73,8

35

3,63

9

- - 477

1,45

6

1,06

7

477

148

226

81,3

25

2013 38

0

3,72

7

1,36

6

546

6,01

9

87,3

44

2012

64,2

92

3,18

8

- - 416

1,26

2

926

416

129

197

70,8

26

2012 31

5

3,08

9

1,13

2

452

4,98

8

75,8

14

2011

56,0

66

2,79

7

- - 363

1,09

3

805

363

113

172

61,7

72

2011 26

3

2,58

2

946

378

4,16

9

65,9

41

2010

48,9

66

2,45

5

- - 317

947

700

317 99 150

53,9

51

2010 22

1

2,17

5

797

318

3,51

1

57,4

62

2009

42,8

27

2,15

8

- - 278

819

610

278 86 131

47,1

87

2009 18

8

1,84

5

676

270

2,97

9

50,1

66

2008

37,5

11

1,89

9

- - 244

707

532

244 76 115

41,3

28

2008 16

1

1,57

5

578

231

2,54

5

43,8

73

2007

32,9

00

1,67

3

- - 214

608

465

214 66 101

36,2

41

2007 13

8

1,35

2

496

198

2,18

4

38,4

25

2006

28,8

93

1,47

6

- - 188

521

407

188 58 88

31,8

19

2006 11

9

1,16

7

428

171

1,88

5

33,7

04

2005

25,4

05

1,30

3

- - 165

444

357

165 51 77

27,9

67

2005 10

3

1,01

1

372

148

1,63

4

29,6

01

2004

21,5

88

1,15

2

758

373

145

376

314

145 45 68

24,9

64

2004

90 879

324

129

1,42

2

26,3

86

PALE

CO

AR

EA

Bac

kbon

e G

rid*

Cuy

o

Rox

as**

Tayt

ay**

Ara

celi

El N

ido

San

Vic

ente

Bal

abac

Cag

ayan

cillo

Agu

taya Su

b To

tal

BIS

ELC

O A

REA

Bus

uang

a

Cor

on

Cul

ion

Lina

paca

n

Sub

Tota

l

Tot

al*T

he b

ackb

one-

grid

incl

udes

Pue

rto P

rince

sa C

ity, N

arra

, Bro

oke's

Poi

nt, a

nd B

atar

aza.

**R

oxas

and

Tay

tay

will

be

conn

ecte

d to

the

back

bone

-grid

in 2

005.

(in k

W)

Tabl

e 6.

1.18

Pea

k D

eman

d Fo

reca

sts fr

om 2

004

to 2

015

by M

unic

ipal

ity (N

PC-S

PUG

and

ECs

Are

a, R

elia

bilit

y-O

rient

ed S

cena

rio)

Page 80: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-18

6.2 Technical Study on the EC-Grid Power Development Plan 6.2.1 Basic Policy for the EC-Grid Power Development Plan

The EC-grid Power Development Plan will be established based on the demand forecasts including not only existing grid demand but also newly connected demand coming from the barangay electrification plan.

The EC-grid defined here contains the backbone grid (Brooke’s Point – Narra - Puerto Princesa City – Roxas – Taytay) and 10 isolated grids.

The system capacity of the backbone grid accounts for more than 80% of all grid demand in Palawan. Furthermore, it consists of several power plants and transmission facilities. Therefore, the power development planning method applied in the Philippine main grid should also be adopted for the planning in the backbone grid.

On the other hand, each of the isolated grids will have kept the same power supplying style, which composes of only a generator and distribution lines for the time being. Therefore, only a generation development plan to meet the forecasted demand should be needed for the isolated grids.

It is technically possible to interconnect between the backbone grid and other isolated grids, for example with a submarine cable. However, it is obvious that such a project is only a dream when considering the extremely expensive costs that are associated. Instead of an interconnection project, the transfer of a generator in the backbone grid system may become a good option, because a small generator in the backbone grid system tends to be more useful in a small isolated grid.

For this reason, the power development plan for the EC-grids shall be separated for the backbone grid and for isolated grids. In addition, the possibility of transferring generators to the isolated grids from the backbone grid shall be studied as one option for the optimal power development plan. (1) Basic policy for the generation development plan of the backbone grid

In order to formulate an optimal generator development plan, the study shall be conducted based on the following basic policies. (i) Optimization function should be “Least Cost”

Several different scenarios can be applied as an objective function for the optimal master plan. But the basic policy should be "least cost", under the LOLP target, environmental or other such restrictions. In the detailed study, "WASP-IV" is used for the optimization of the generation development plan, since this software is able to consider those restrictions sufficiently.

(ii) Only diesel and hydropower should be considered as a candidate plant types

A diesel generator is still the most applicable generator type in Palawan. According to the mini and micro hydropower potential survey, several potential sites seem to be listed as

Page 81: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-19

candidates. But other generator types popular in the Philippine main grid, such as a gas turbine, may have no chance even if this Master Plan covers considerations up to 2015. Because the power system capacity will still be small and the infrastructure of fuel transportation may still be restricted.

Therefore, only diesel and hydropower generators should be treated as candidates to be developed in this Master Plan.

Incidentally, the locations of the potential sites can be specified, while the locations of diesel power plants to be developed are not specified even in the generation development plan of NPC-SPUG. This derives from the political matter that a new generator should be basically developed by the private sector. Therefore, some typical locations suitable for a diesel power plant shall be studied in the transmission development plan. (iii) Bunker C fuel is prohibited in the base scenario.

Though SOx emission issues affect not only this Master Plan, but also the master plan all over the Philippines, diesel generation using bunker C fuel cannot be adopted as a candidate due to the resulting violation of environmental laws. Therefore, the fuel for newly developed generators is assumed to be 'diesel' in the base scenario. However, the impact of using bunker C fuel shall be studied as a sensitive analysis in the Master Plan. (2) Basic policy for the transmission development plan of the backbone grid

Taking into account the issues regarding transmission facilities and their operations described in Section 3.5.6, a basic policy for the transmission development plan of the backbone grid should include the following direction. (i) Technical study on the grid expansion of the existing backbone grid

The existing backbone grid including on-going projects (Brooke’s Point – Narra - Puerto Princesa City – Roxas - Taytay) will have power system demand of around 97MW and a maximum power flow around 20MW between Irawan S/S and Narra S/S in 2015.

Since the transmission capacity of the 69kV transmission line is 54MW, the existing transmission line may have enough capacity until the final year of the Master Plan, and a voltage increase from 69kV to 138kV may not be proposed.

On the other hand, the total capacity of the existing transformers in 69/13.8kV substations is 40MVA, which is smaller than the total demand in 2015. Therefore, some additional transformers will be needed especially at Irawan, Narra, and Brooke’s Point S/Ss. Other technical issues may emerge from the detailed study such as voltage, reactive power and short circuit capacity. There is the possibility that those issues demand a further transmission expansion. To cope with those issues, the power system simulation software named "PSS/E" will be used for the technical study. PSS/E is well-known software around the world for power system analysis and it is also used in TRANSCO or DOE for the purpose of formulating the transmission development plan in the Philippine main grid.

Page 82: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-20

(ii) Technical study on the new extension of the backbone grid According to the NPC-SPUG transmission development plan, two projects for extending the

backbone grid are planed. One is the southern extension to Bataraza and the other is the northern extension to El Nido. Moreover, a new substation between Narra S/S and Brooke’s Points S/S was proposed from PALECO for the purpose of supporting stable power supply. In this study, the necessity of those projects shall be verified mainly from the technical viewpoints.

Regarding a grid extension to a new power plant, a transmission extension project for a hydropower plant shall be studied concretely because its location can be specified. However a transmission extension project for a diesel power plant shall be examined based on a typical location because its location cannot be estimated as explained in the policy for a generation development plan. (iii) Technical study on existing system improvement

As pointed out in Section 3.5.6, the existing backbone grid has two pressing issues. The first is the need to improve the power system configuration around Puerto Princesa City, and the second is the need to improve the capacity limitation of the Power Barge. The second issue will disappear after the transfer of the Power Barge in 2004.

To solve the first issue, an improvement project shall be planed in consideration of other transmission expansion plans, not within the issue itself, because transmission expansion around Puerto Princesa City will be essential to meet the increase in power demand in the near future. So it is supposed to be a more economical way to study this issue in cooperation with those projects. (3) Basic policy of the power development plan for isolated grids

In the ten isolated grids, the basic configuration in which a power plant sends electricity to distribution directly will not be changed until the final year of the Master Plan. For this reason, only a generation development plan shall be studied for those areas.

Incidentally, the transfer of existing generators may become a good option because the worth of an existing small generator in the backbone grid becomes lower after an interconnection. Therefore, the transfer option of existing generators from the backbone grid to isolated grids will be considered in the planning. 6.2.2 Procedure of the EC-Grid Power Development Plan (1) Procedure of the power development plan for the backbone grid

The procedure of the power development plan for the backbone grid will be applied basically in the same method as for the Philippine main grid. However, such an orthodox planning procedure has not been applied to the formulation of the power development plan for Palawan until now. This means that there is no example data for power development planning.

Therefore this study starts from the collection of primary data and proceeds along the workflow described in Figure 6.2.1. At the same time, the data arranged through the study will be transferred to the related organizations as one of the outcomes.

Page 83: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-21

Figure 6.2.1 Workflow for the Power Development Plan of the Backbone Grid

In the generation development plan, the load duration curve and target reliability (LOLP)

shall be determined as the basic parameters of the Master Plan based on the demand forecasts studied in Section 6.1.3. After that, an optimal generation development plan shall be studied using the power development simulation software “WASP-IV”.

In the transmission development plan, power demand by region needed for power flow analysis is estimated based on the demand forecasts. Then an optimal transmission development plan shall be examined using the power system simulation software “PSS/E”.

Finally, a generation and transmission development plan shall be merged into the optimal power development plan.

The main procedures adopted for this study are as follows. (2) Procedure for the estimation of a load duration curve

In a generation development plan, the economics are changeable due to the hourly or seasonal fluctuation of power demand. WASP-IV is able to analyze the production costs for each power plant by modifying power demand features into a seasonal load duration curve.

Unfortunately, power demand data of the backbone grid, which has no computer system such as SCADA or EMS, has been recorded in handwriting. So the Study team built up a load duration curve based on operation records from January to December of 2003.

Data Collection for Existing Generator

Data Collection for Candidate Generator

Load Duration Curve Estimation

Determination of Reliability Target (LOLP)

Simulation of Power Development

Optimal Generation Development Plan

Generation Development Plan

Data Collection for Existing Grid

Data Collection for Expanding

Criteria for Grid Expansion

Regional Power & Load Balance

Simulation of Power System Analysis

Optimal Transmission Development Plan

Transmission Development Plan

Optimal Power Development Plan

Barangay Electrification Plan

Demand Forecast in the EC-gridPeak Demand & Gross Generation (System Total)

Regional Peak Demand

Page 84: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-22

The actual records of power demand include blackout or brownout incidents. Moreover, the load factor of the actual records is unequal to the estimated one for the future.

In order to use a generation development plan, a load duration curve is arranged from the original data using the following procedure. (i) Correction to avoid the influence of blackout

After examining the power demand records of daily load curves, records affected by blackouts were corrected from the previous and later weeks’ data.

An example of a daily load curve before and after correction is shown in Figure 6.2.2.

Figure 6.2.2 Result of Correction to Avoid the Influence of Blackouts (ii) Correction to adjust the load factor to the forecasted demand

In the demand forecast, peak demand is estimated with gross generation and a load factor. However the load factor of the actual records is not always the same as the forecasted one. That's the reason why this correction was necessary to adjust the load factor.

The load factor after the correction in (i) was 58.58% in 2003, while the forecasted one was 62.5%. The load duration curve after the adjustment by the load factor is shown in Figure 6.2.3.

Figure 6.2.3 Result of Correction to Adjust the Load Factor

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

After adjustment

Before adjustment

-

2

4

6

8

10

12

14

16

18

20

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23-

2

4

6

8

10

12

14

16

18

20

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Before Correction After Correction

Page 85: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-23

(iii) Formulation of the seasonal load duration curve WASP-IV has a function to simulate a power development plan with less than 12 terms in

each year. In this study, dividing the load duration curve into 2 terms per year is supposed to be reasonable, taking into account the power demand features of the water flow characteristics.

The final result of the load duration curve for the generation development plan is shown in Figure 6.2.4.

Figure 6.2.4 Seasonal Load Duration Curve for the Generation Development Plan

(3) Procedure for the determination of the target reliability (LOLP)

In order to apply an orthodox planning procedure in the Philippine main grid to the backbone grid, consensus of the optimal system reliability, which has been unclear in the missionary electrification area, is seen as being essential.

In this section, the procedure for the determination of the target reliability and its trial calculation results are discussed. (i) Procedure for the determination of the LOLP target

In consideration of additional cost for upgrading reliability, benefits to the community and economic conditions of Palawan, optimal system reliability is studied for the transmission and distribution network of the Palawan main island.

In general, power system reliability is divided into two components; namely the sufficiency (Adequacy) of regular power generation and transmission and distribution capacity, and the stability (Security) of the network at the time of failure.

Both components are important in a highly developed power system. However, since the electric power system of the province of Palawan is still expanding, the sufficiency of installed generation capacity becomes the more important component. For this reason, the Study team will make an assessment using the following steps, based on the viewpoint of optimum installed capacity (reserve capacity).

Load Duration Curve (1st Harf)

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Load Duration Curve (2nd Harf)

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Page 86: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-24

(a) Analysis of reserve capacity and LOLP (Loss-of-Load Probability) The correlation between the reserve capacity (margin) and LOLP is analyzed quantitatively

by using the recent data of the generator maintenance interval, generator tripping probability, annual power duration curve and other pertinent data. (b) Analysis of MC and LOLP

After making the quantitative analysis concerning incremental capacity and its marginal cost with the data of fixed cost and variable cost for generator, the correlation between MC and LOLP is analyzed quantitatively in accordance with the result of (a). (c) Analysis of the optimal power system reliability

The optimal power system reliability can be estimated through a comparison between the MC-LOLP curve and the benefit from the reliability improvement if the benefit can be ascertained. In this Study, the opportunity cost named “Energy Not Served (ENS)” in WASP is used as this benefit. The ENS is normally 0.5 to 2.0 $/kWh in Southeast Asian countries. However as these countries decide the optimal LOLP firstly from a political viewpoint, and so the basis of the ENS value is not clear. Therefore, the Study team decides the optimal system reliability in collaboration with the related counterparts in consideration of the result of the sensitivity analysis about the ENS or the standard level of the LOLP in the Philippine grid. (ii) Assumptions for trial calculation

The assumptions used for the trial calculation of LOLP are shown in Table 6.2.1.

Table 6.2.1 Assumptions for the Trial Calculation of LOLP Item Assumption for LOLP Analysis

Year 2006 Peak Demand 28.644MW Generation Capacity 30.22MW (Existing) +0-7MW (Expansion)

(0.5MW Step Variable) Load Duration Curve Record in 2003 (Jan-Dec) Forced Outage Rate 4%(NPC-SPUG) - 7%(IPP) Maintenance Day 22 days/year (Mid. Speed) – 37 days/year (High Speed) Spinning Reserve 10%, 1MW Energy Not Served Cost 0.5$/kWh Exchange Rate 55PHP/$ Calculation Software WASP-IV

In this trial, the target year for the assessment is 2006, when additional capacity will become

necessary. In order to evaluate the relationship between the reliability and capacity reserves, expansion capacity is changed from 0 to 7MW by 0.5MW increments.

In these assumptions, a forced outage rate (FOR) is one of the key factors for the system reliability. FOR is very difficult to estimate, because it is changeable by year or by maintenance conditions. The typical FOR figure is applied to this trial calculation.

Page 87: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-25

(iii) Trial calculation result of LOLP (a) Analysis of reserve capacity and LOLP (Loss-of-Load Probability)

The trial calculation result for LOLP is shown in Figure 6.2.5. If the reserve ratio goes up, LOLP becomes lower. This relationship is easily conveyed in this graph.

The main concern is what target number should be applied to the backbone-grid. In the Philippine main grid, the LOLP target is set at 1day/year, while the target for the reserve margin is also set at 13.2%. According to the study results for the Philippine main grid, which was carried out by another JICA project, 1 day/year of LOLP is equivalent to around 11% in a reserve margin.

If the LOLP target is set at 1 day/year in the backbone grid, around 18% in a reserve will be needed, since the required reserve becomes higher when the grid is smaller.

Figure 6.2.5 Trial Calculation Result for Relationship between LOLP and Reserve Ratio (b) Analysis of MC and LOLP

In order to estimate the optimal system reliability, the trial analysis is studied from an economical approach. Figure 6.2.6 shows the relationship between incremental benefit and loss for a different LOLP.

In this figure, additional cost includes additional capacity cost, additional operation cost and smaller increase in sales revenue. On the other hand, recovered un-served loss is the worth of recovered social loss, and it is calculated with “recovered un-served energy” multiplied by “Energy Not Served Cost”. In this trial study 0.5$/kWh is applied for the “Energy Not Served Cost”.

From this graph, it can be seen that the most economical target for LOLP is around 6 days/year. The figure of 6 days/year is equivalent to approximately 7% of the reserve ratio. This, however, seems to be too low.

0

1

2

3

4

5

6

7

8

9

0% 5% 10% 15% 20% 25% 30%

Reserve Ratio (%)

LOLP

(D

ay/Y

ear)

Target of Philippine Main Grid LOLP: 1 day/year Reserve Ratio: 13.2%

Page 88: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-26

Objective Function: B = SUM (I-S+F+M+U)

in discounted net present valueI : Capital Cost S : Salvage Value F : Fuel Cost M : O&M Cost (Operation & Maintenance)U : Un-served Energy Cost

(c) Analysis of the optimal power system reliability Generally speaking, a LOLP target is decided from a political viewpoint, not from an

economical viewpoint. Taking into account the limited missionary electrification budget, a LOLP target in the backbone-grid will be more than 1 day/year. However, if the target exceeds 3 days/year, significant brownout will be observed.

In conclusion, 2 days/year is recommended for the LOLP target in the backbone-grid. Therefore the technical study hereafter is progressed based on the LOLP target of 2 days/year. Figure 6.2.6 Trial Calculation Result of Optimal LOLP from the Viewpoint of Cost & Benefit (4) Simulation method of the generator development plan

In order to formulate an optimal generation development plan, WASP-IV used all over the world is adopted as the simulation software in this study. WASP-IV can determine the optimal solution by using a dynamic programming method. Furthermore, as it was already introduced to the Department of Energy through another JICA Development Study, the power development plan can be studied with the common software in the Philippines.

The feature of the calculation method in WASP-IV is as follows.

(i) Object function The object function inside of WASP-IV is "Least

Cost" with restrictions on target reliability. The cost considered in the object function consists

of capital cost, fuel cost, O&M cost and also un-served energy cost.

Regarding the capital cost, the Salvage Value defined as the remaining worth of the remaining lifetime makes it possible add considerations for depreciation.

0

200

400

600

800

1000

1200

1400

1600

1800

0 1 2 3 4 5 6 7 8 9

LOLP (day/year)

Incr

emen

tal B

enef

it &

Los

s(1

00

0$

/Yea

r)

Additional Cost

Recovered Unserved Loss

Page 89: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-27

(ii) Power demand The power demand inside of WASP-IV is expressed with the load duration curve, not with

the chronological load curve. By using this load duration curve and the forecasted peak demand, the power demand characteristics for the simulation are generated. The merit ordered dispatching similar to the actual operation is simulated by taking the variable cost of each power plant into consideration.

Moreover WASP-IV can make simulations with different load duration curves for each term of the year, because the power demand feature or the water flow characteristics are sometimes different from term by term.

Figure 6.2.7 Data Input Image of Power Demand in WASP-IV (iii) Generator characteristic

WASP-IV can simulate every type of generator, such as hydropower, thermal and nuclear power plants. As for a hydropower plants, the probability of the generator output is expressed with the seasonal data of water flow rate, average output and minimum output. In regards to thermal plants, cost data such as heat value, heat rate, O&M cost (fix, variable) and probabilistic output data (for example forced outage rate, spinning reserve ratio and maintenance day) are input into WASP-IV to calculate an optimal solution for the generation development plan. (iv) Optimization

Firstly, WASP-IV calculates the merit order of each existing power plant based on the variable cost. Secondly, the merit order of candidate plants is calculated in the same way. Finally, the optimal generation development pattern including capital cost of a candidate plant is calculated automatically by using a dynamic programming method.

(5) Simulation method of the transmission development plan

In the transmission development plan, the power system simulation software PSS/E is applied for this study. PSS/E is very famous around the world and can calculate every type of power system analysis such as power flow, short-circuit capacity and dynamic stability. PSS/E is also introduced to TRANSCO and DOE. Therefore the result of the transmission development plan in Palawan may be used commonly in the Philippines.

load curve

0

200

400

600

800

1,000

1,200

1 13 25 37 49 61 73 85 97 109 121 133 145 157hour

dem

and(

MW

)

Load Duration

0

200

400

600

800

1000

1200

1 13 25 37 49 61 73 85 97 109 121 133 145 157

Hours

load

(M

W)

Visayas demand forecast

0

500

1000

1500

2000

2500

3000

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

year

peak

dem

and

Daily CurveDaily Curve

Peak Demand Forecast Peak Demand Forecast

Duration CurveDuration Curve

WASP Data InputWASP Data Input

Page 90: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-28

6.2.3 Technical Study on the Generation Development Plan for the Backbone Grid (1) Scenario of the generator development plan

The scenario of the generation development plan is studied here based on the basic policy described in Section 6.2.1, taking into account the demand forecasts determined in accordance with the three scenario of the barangay electrification plan in Section 5.1.2. (i) Base scenario

The base scenario is defined as the generation development plan based on "Least Cost", which is the same policy as the barangay electrification plan. In the base scenario, the forecasted demand consists of the existing EC-grid demand and newly electrified demand in 6 barangays where the distribution line is extended.

Incidentally, only one pattern for the forecasted demand is considered in the EC-grid study, because there is no difference for the EC-grid demand, even if the electrification ratio is changed in the barangay electrification plan after 2006. (ii) Reliability-oriented scenario

The reliability-oriented scenario corresponds to "Reliability-oriented electrification method (Alternative Case 1)" in the barangay electrification plan. In this case, the power demand is slightly bigger than the base scenario, as the number of electrified barangay by distribution line extension becomes 56.

Other conditions are the same as those in the base scenario. (iii) Environment-friendly scenario

The environment-friendly scenario corresponds to "Environment-friendly electrification method (Alternative Case 2)" in the barangay electrification plan. In the barangay electrification plan, it is assumed that hydropower and renewable energy are given special weightings in selecting the electrification method, while soft loans are applied only to hydropower in the EC-grid power development plan. Some case studies will be carried out on condition that the discount rate is lower than the NEDA standard of 12%.

Other conditions are the same as those in the base scenario. (iv) Environment deregulation scenario

As discussed in the policy for the generation development plan, developing a diesel generator using bunker C fuel is prohibited in the base scenario. However, PDP 2004, which is the power development plan for the Philippine main grid, assumes there will be the development of diesel generators using bunker C fuel. If this issue becomes a big problem throughout the Philippines, there is the possibility that the environment law will deregulated and diesel generators with bunker C fuel become a candidate. Therefore the study will be conducted based on the bunker C fuel in this scenario. Other conditions are the same as those in the base scenario.

Those four scenarios are summarized in Table 6.2.2.

Page 91: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-29

Table 6.2.2 Scenarios for the Generation Development Plan Scenario System Demand LOLP Diesel Fuel Discount Rate

Base Scenario Existing EC-grid Demand + 6 Barangay Demand

2 days/year Only Diesel 12% (NEDA)

Reliability-Oriented Scenario

Existing EC-grid Demand + 56 Barangay Demand

2 days/year Only Diesel 12% (NEDA)

Environment Friendly Scenario

Existing EC-grid Demand + 6 Barangay Demand

2 days/year Only Diesel Diesel: 12% (NEDA) Hydro: Discounted Rate

Environment Deregulation Scenario

Existing EC-grid Demand + 6 Barangay Demand

2 days/year Bunker C or Diesel

12% (NEDA)

After the study of these four scenarios, sensitivity analysis will be conducted against the key

assumptions in the base scenario. The items for sensitivity analysis are shown in Table 6.2.3.

Table 6.2.3 Sensitivity Analysis for the Generation Development Plan

Scenario Object of Sensitivity Analysis Case Study LOLP 1 day/year, 3 days/year Diesel Plant Construction Cost 30% off from Base Svenario

Base Scenario

Transfer of Gen Set in Roxas & Taytay DPP Transfer in 2007 (2) Assumptions for the generation development plan (i) Assumptions for the generation development simulation

The presumed parameter for the generator development simulation by WASP-IV is described in Table 6.2.4.

The figure of the parameter is determined based on the following direction.

Study year The calculation output of WASP-IV tends to be advantageous to a small generator near the

final year of the study, because the capital cost becomes lower. In order to avoid this influence, final year of the study was set at 2020, 5 years longer than the Master Plan period.

No. of periods

2 periods per year are selected, since the power demand feature and hydropower generator characteristics are different between the rainy season and dry season.

LOLP

2 days/year (0.548%) was determined as the reliability target in the base scenario in accordance with the pre-study results. The magnitude of the LOLP target figure will be verified in the sensitivity analysis.

Plant data

Plant data is determined based on the monthly operation report (2002-2003) and planning data (2004) by NPC-SPUG.

Page 92: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-30

Table 6.2.4 Basic Assumptions for the Generator Development Simulation

Category Items Assumption Data Source Study Year 2003-2020 No of Period 2 periods per year No of Hydro Conditions 2 conditions per year LOLP 2 days/year (=0.548%)

General Index

Depreciation Method Straight Depreciation Method Generator Capacity Past Record of Dependable Capacity NPC-SPUG Monthly Report Heat Rate Past Record of Heat Rate NPC-SPUG Monthly Report Fuel Cost Past Record of Fuel Cost NPC-SPUG Monthly Report O&M Cost Planed O&M for Universal Charge NPC-SPUG MEDP 2004 Forced Outage Rate NPC-SPUG : 4% Typical for Diesel Scheduled Maintenance Mid. Speed : 22 days/year (6%) JICA Capacity Building

Existing Plant Data

Spinning Reserve 10% Operating Target of NPC-SPUG

(ii) Projects considered in the generation development plan

As of January 2004 the projects that were already approved or supposed to be approved by NPC-SPUG were considered in this Master Plan. Table 6.2.5 shows the list of the projects.

The transfer of Power Barge 106 from Palawan to Iloilo was suddenly decided in January 2004, because of the urgent need for a countermeasure against the power shortage caused by the restriction of Panay-Negros Interconnection. At the same time, the diesel generator temporarily leased (capacity is not certain as of January in 2004) will be installed inside of the Irawan substation. The contract term of the lease is 1 year, however, the contract may be extended at least in 2006. Therefore, plans in this study call for the removal of this temporary generator in 2006.

By the way, the existing generators in Roxas and Taytay can be used in the isolated grids after realizing the backbone transmission. This transfer plan is not considered in the base scenario, but will be evaluated in the sensitivity analysis.

Table 6.2.5 Projects Considered in the Generation Development Plan Year Project Dependable Capacity Remark

Transfer of Power Barge 106 -8.4MW Approved by NPC-SPUG Installation of Temporal Gen Set in Irawan S/S +8.4MW Approved by NPC-SPUG Transfer of Gen Set in Brooke’s Point DPP - Already not operational

2004

Transfer of Gen Set in Narra DPP - Already not operational 2006 Removal of Temporal Gen Set in Irawan S/S -8.4MW Supposed by the Study team

Remark: The dependable capacity of the temporal genset in Irawan S/S is based on assumptions by the Study team.

Page 93: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-31

(iii) Candidate generator models for the generation development plan Diesel and hydropower generators are presumed to be the candidate generator types. The assumed specifications of a candidate generator are as follows.

(a) Candidate model for diesel generation The assumed specifications of a diesel generator for the generation development plan are as

follows. Generator capacity

5 types of capacity from 500kWto 20,000kW are prepared, taking economics of scale into consideration.

The unit capacity should be lower than from 5% to 10% against the power system capacity in contemplation of the Spinning Reserve Ratio (10%) or frequency dropping influence in the case of generator tripping. As the peak demand in 2015 is estimated at 96,989kW, the unit capacity was selected to be 5,000kW with a maximum of 10,000kW.

Available capacity is set at 90% of the rated capacity, because dependable capacity tends to decline year by year.

Construction cost (including interest during construction term)

The construction cost is estimated based on the project budget in 2004 by NPC-SPUG, in consideration of the assumed construction cost in the Philippine main grid study assisted by JICA (50MW, 1,140$/kW, without interest).

The construction cost should be determined carefully, because this assumption sometimes changes the results dramatically. In this study, the construction cost is calculated from the project budget, because NPC-SPUG has not been dealing with a big generator project recently. According to NPC-SPUG, this budget is calculated under the condition of a reliable generator, such as one made in Europe or Japan. The study has to pay attention to the cost since the construction cost will be reduced if a cheaper generator is adopted.

Therefore, a sensitivity analysis will be conducted regarding the construction cost.

Fuel type The fuel type is presumed to be diesel except for the environment deregulation scenario. In the environment deregulation scenario, the fuel type is assumed to be bunker C fuel for a

generator with more than 1,500kW.

Fuel cost, heat rate, O&M cost The fuel cost is estimated from the actual records over the 12 months in 2003 by

NPC-SPUG. The fuel cost is very different between Puerto Princesa City and the isolated grids where transportation cost is high. In the generation development plan, the location of a candidate diesel generator is not specified, but fuel cost is applied at the level around Puerto Princesa City.

Regarding the heat rate, a 500kW generator is determined from the operation records held by NPC-SPUG, while a 1,500kW or greater generator is estimated from the Delta-P IPP model. The O&M cost is estimated from the operation records held by NPC-SPUG.

Plant life

Plant life is set at 15 years, from the assumption that the generator life is around 100,000 hours and the capacity factor is around 75%.

Page 94: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-32

Table 6.2.6 shows the assumptions of candidate generator models for diesel generation.

Table 6.2.6 Candidate Generator Model for Diesel Generation Abbreviation D005 D015 D050 D100 D200 Rated Capacity kW 500 1,500 5,000 10,000 20,000 Capacity by Unit kW 1x500 1x1,500 1x5,000 2x5,000 2x10,000 Dependable Capacity kW 450 1,350 4,500 9,000 18,000 Construction Cost $/kW 1,600 1,452 1,399 1,353 1,310

Fuel Type Diesel Except Environment Deregulation Case: Diesel Environment Deregulation scenario: Bunker C

Fuel Cost $/Gcal 3,082 Except Environment Deregulation Case: 3,082 Environment Deregulation Case: 2,097

Heat Rate (at 25%) Kcal/kWh 2,780 2,595 Incremental Heat Rate Kcal/kWh 2,288 1,995 Fixed O&M Cost $/kW-month 8.12 4.86 2.76 2.00 1.45 Variable O&M Cost c/kWh 2.20 Life Time Year 15 Construction Period Year 2

(b) Candidate model for hydropower generation

In regards to hydropower generation, as studied in Section 4.1.1, 7 candidate sites where the production cost is reasonable and grid access is feasible are studied in the generation development plan. Among those points, only Babuyan has a reservoir and the others are the run-of-river type. In the case of the run-of-river type, there is the possibility that the output becomes 0MW during drought conditions. In the WASP-IV, the probability of output is calculated based on the water flow probability.

The candidate generation model for hydropower is shown in Table 6.2.3. In this table, the data is translated into the WASP-IV format.

Among those candidates, only Babuyan will need 3 years for the construction period. This means that the commissioning year will be later than 2007 even if the construction project starts in 2004. Therefore, it is stipulated in the generation development simulation that Babuyan is available later than 2007.

Page 95: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

Tabl

e 6.

2.7

Can

dida

te S

ites f

or H

ydro

pow

er G

ener

atio

n A

bbre

viat

ion

BY

N

BD

Y1

MTG

B

RB

R

TAL

CB

B

BR

K

BB

Loca

tion

Bab

uyan

B

indu

yan

Mal

atga

o B

aron

g B

aron

g Ta

laka

igan

Cab

inbi

n B

arak

i B

atan

g B

atan

g In

stal

led

Cap

acity

K

W

5,60

0 60

0 2,

200

620

990

800

840

6,70

0 D

epen

dabl

e C

apac

ity

KW

5,

600

600

2,20

0 62

0 99

0 80

0 84

0 6,

700

Stor

age

Cap

acity

M

Wh

50.0

0

Con

stru

ctio

n C

ost

$/kW

3,

765.

9 1,

984.

4 2,

423.

4 2,

329.

6 2,

516.

8 2,

641.

0 3,

802.

1 3,

267.

5 Pe

riod

1-C

ondi

tion

1 M

Wh

7,76

8.0

801.

0 3,

924.

0 77

0.0

1,80

0.0

975.

0 1,

462.

0 3,

406.

0 Pe

riod

2-C

ondi

tion

1 M

Wh

14,1

35.0

2,

241.

0 7,

335.

0 2,

328.

0 3,

364.

0 32

82.0

2,

914.

0 15

,956

.0

Perio

d 1-

Con

ditio

n 2

MW

h 10

,772

.0

1,96

0.0

6,81

1.0

2066

.0

3,12

4.0

2809

.0

2,70

6.0

11,0

09.0

In

flow

Ene

rgy

Perio

d 2-

Con

ditio

n 2

MW

h 16

,822

.0

2,62

8.0

9,63

6.0

2715

.0

4336

.0

3504

.0

3,67

9.0

28,4

47.0

Pe

riod

1-C

ondi

tion

1 M

Wh

6125

.0

0 Pe

riod

2-C

ondi

tion

1 M

Wh

1311

6.0

0 Pe

riod

1-C

ondi

tion

2 M

Wh

9423

.0

0 M

inim

um

Gen

erat

ion

Perio

d 2-

Con

ditio

n 2

MW

h 16

067.

0 0

Perio

d 1-

Con

ditio

n 1

kW

5600

.0

182.

9 89

6.0

175.

9 41

1.1

222.

7 33

3.8

777.

7 Pe

riod

2-C

ondi

tion

1 kW

56

00.0

51

1.7

1,67

5.0

531.

7 76

8.2

749.

6 66

5.4

3,64

3.0

Perio

d 1-

Con

ditio

n 2

kW

5600

.0

447.

7 1,

556.

0 47

1.8

713.

3 64

1.4

617.

9 2,

514.

0 Av

erag

e C

apac

ity

Perio

d 2-

Con

ditio

n 2

kW

5600

.0

600.

0 2,

200.

0 62

0.0

990.

0 80

0.0

840.

0 64

95

Fixe

d O

&M

Cos

t $/

kW-m

onth

0.89

2.

89

Con

stru

ctio

n Pe

riod

Year

3

2 Pl

ant L

ife

Year

40

6-33

Page 96: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-34

(3) Results of the technical study on the generation development plan (i) Optimal generation development plan for each scenario (a) Base scenario

The simulation results for a generation development plan in the base scenario are shown in Table 6.2.8.

Table 6.2.8 Simulation Results for the Generation Development Plan (Base Scenario)

Diesel Hydro

Year Peak

Demand (kW)

Total Capacity

(kW)

LOLP (day/y) D005 D015 D050 D100 D200 BYN BRBR MTG TAL CBB BRK BB

2004 21,517 30,220 0.113 2005 25,263 30,220 1.292 2006 28,680 35,430 1.205 2 1 1 1 1 2007 32,616 38,130 1.898 2 2008 37,156 42,630 1.967 1 2009 42,401 48,230 1.037 1 2010 48,469 53,570 1.643 1 1 2011 55,498 62,570 1.194 1 2012 63,653 71,570 1.179 1 2013 73,125 80,570 1.577 1 2014 84,143 90,920 1.989 1 1 2015 96,971 104,420 1.730 1 1

In the base scenario the generation development plan of Hydropower: 11.05MW (6 sites),

Diesel: 79.5MW (Dependable Capacity: 71.55MW), Total: 90.55MW (Dependable Capacity: 82.6MW) is the one with the least cost. (b) Reliability-oriented scenario

The simulation results for a generation development plan in the reliability-oriented scenario are shown in Table 6.2.9. The simulation conditions are the same except for the power demand.

Page 97: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-35

Table 6.2.9 Simulation Results for the Generation Development Plan (Reliability-Oriented Scenario)

Diesel Hydro Year

Peak Demand

(kW)

Total Capacity

(kW)

LOLP (day/y) D005 D015 D050 D100 D200 BYN BRBR MTG TAL CBB BRK BB

2004 21,588 30,220 0.120 2005 25,405 30,220 1.402 2006 28,893 35,430 1.340 2 1 1 1 1 2007 32,900 41,030 0.285 1 2008 37,511 42,380 1.595 1 2009 42,827 47,720 1.799 1 1 2010 48,966 56,720 0.993 1 2011 56,066 62,570 1.453 1 1 2012 64,292 71,570 1.431 1 2013 73,835 80,570 1.909 1 2014 84,924 92,270 1.679 2 1 2015 97,818 105,770 1.529 1 1

In the reliability-oriented scenario, the order of the generator development is a little different

from the base scenario due to slightly increased demand. At the same time, the amount of developed capacity became a little more than that in the base scenario. Since the reliability-oriented scenario is given almost the same power demand as that in the base scenario, there is no significant difference between these two scenarios. (c) Environment-friendly scenario

In the environment-friendly scenario, assuming the usage of a soft loan only for hydropower generation, the discount rate for the construction cost is changed from 11% to 8%.

The simulation results for the generation development plan in the case of an 8% discount rate are shown in Table 6.2.10, and in the case of a 11% discount rate in Table 6.2.11.

Table 6.2.10 Simulation Results for the Generation Development Plan (Environment-Friendly Scenario: Discount Rate=8%)

Diesel Hydro Year

Peak Demand

(kW)

Total Capacity

(kW)

LOLP (day/y) D005 D015 D050 D100 D200 BYN BRBR MTG TAL CBB BRK BB

2004 21,517 30,220 0.113 2005 25,263 30,220 1.292 2006 28,680 35,430 1.205 2 1 1 1 1 2007 32,616 38,130 1.898 2 2008 37,156 43,730 0.650 1 2009 42,401 48,230 1.037 1 2010 48,469 53,570 1.643 1 1 2011 55,498 64,770 1.522 1 1 2012 63,653 73,770 1.526 1 2013 73,125 84,120 1.369 1 1 2014 84,143 94,470 1.792 1 1 2015 96,971 107,970 1.599 1 1

Page 98: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-36

Table 6.2.11 Simulation Results for the Generation Development Plan (Environment-Friendly Scenario: Discount Rate=11%)

Diesel Hydro Year

Peak Demand

(kW)

Total Capacity

(kW)

LOLP (day/y) D005 D015 D050 D100 D200 BYN BRBR MTG TAL CBB BRK BB

2004 21,517 30,220 0.113 2005 25,263 30,220 1.292 2006 28,680 35,430 1.205 2 1 1 1 1 2007 32,616 38,130 1.898 2 2008 37,156 43,730 0.650 1 2009 42,401 48,230 1.037 1 2010 48,469 53,570 1.643 1 1 2011 55,498 62,570 1.194 1 2012 63,653 71,570 1.179 1 2013 73,125 80,570 1.577 1 2014 84,143 90,920 1.989 1 1 2015 96,971 107,970 1.745 1 1 1

Since the economical advantage of hydropower increases, all of the hydropower candidates

are to be developed, including Batang Batang, which was not to be developed in the base scenario.

Seeing this result from a different angle, the economical inferiority of Batang Batang against a diesel generator is very small. So this inferiority is covered if the discount rate is decreased to under 11%. (d) Environment deregulation scenario

In the environment deregulation scenario, it is presumed that diesel is used for 500kW generators and bunker C fuel is used for 1,500kW and greater generators.

The simulation results for the generation development plan in this scenario are shown in Table 6.2.12.

Page 99: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-37

Table 6.2.12 Simulation Results for the Generation Development Plan (Environment Deregulation Scenario)

Diesel Hydro Year

Peak Demand

(kW)

Total Capacity

(kW)

LOLP (day/y) D005 D015 D050 D100 D200 BYN BRBR MTG TAL CBB BRK BB

2004 21,517 30,220 0.113 2005 25,263 30,220 1.292 2006 28,680 34,630 1.588 2 1 1 1 2007 32,616 38,130 1.898 2 1 2008 37,156 42,630 1.967 1 2009 42,401 48,230 1.037 1 2010 48,469 53,570 1.643 1 1 2011 55,498 62,570 1.194 1 2012 63,653 71,570 1.179 1 2013 73,125 80,570 1.577 1 2014 84,143 90,920 1.989 1 1 2015 96,971 104,420 1.730 1 1

Although the economical advantage of diesel is improved, the amount of the developed

generator capacity until 2015 becomes the same as that for base scenario. This result shows that 6-point hydropower candidates, except Batang Batang, have an economical advantage against a diesel candidate using bunker C fuel. However, SOx environment regulations affect the power development plan including the policy on electric tariffs. Therefore, attention will be given to this issue when the Master Plan is revised. (ii) Comparison among the scenarios from discounted cash flow

Except when the environment-friendly scenario adopts different discount rates, the three scenarios are compared from the viewpoint of a discounted cash flow.

The discounted cash flow defined here is based on the object function of WASP-IV; the formula is as follows.

"Capital Cost - Salvage Value (worth of remaining life) + Fuel Cost +O&M Cost"

Figure 6.2.8 shows the yearly and accumulated discounted cash flow in each scenario. It is

common that the cost will increase in 2006 because of the removal of the temporary generator. The result in the reliability-oriented scenario is almost the same as the base scenario. The result in the environment deregulation scenario shows that it is the least expensive

development plan and there is a significant difference from the other two scenarios. The accumulated discounted cash flow for 12 years, from 2004 to 2015, is $10.54 Million (-8.1%) lower than that of the base scenario. This difference is equivalent to the cost for the environmental protection.

Page 100: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-38

Figure 6.2.8 Comparison of the Discounted Cash Flow by Scenario (iii) Sensitivity analysis (a) Sensitivity analysis of LOLP target

The LOLP target in the backbone grid is assumed to be "2 days/year" until here. In this sensitivity analysis, the LOLP target is changed to "1 day/year" and "3 days/year" in the case of the base scenario.

Figure 6.2.9 shows the comparison of the LOLP and reserve ratio when the LOLP target is changed.

Figure 6.2.9 Comparison of LOLP and Reserve Ratio

If the LOLP target is set at 3 days/year, reserve capacity becomes lower than the maximum generator unit capacity (Installed Capacity: 5,000kW, Dependable Capacity: 4,500kW) in several years. This result means that the risk of power shortages becomes larger, especially in the case of generator trouble involving the largest unit.

On the other hand, if the LOLP target is set at 1 day/year, the amount of the developed

0

5

10

15

20

25

30

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Yea

rly D

CF

(M$)

0

50

100

150

Acc

umul

ated

DC

F (M

$)

BaseScenario(Yearly) ReliabilityOriented(Yearly)EnvironmentDeregulation(Yearly) BaseScenario(Accm.)ReliabilityOriented(Accm.) EnvironmentDeregulation(Accm.)

0

5,000

10,000

15,000

20,000

25,000

30,000

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

Res

erve

Cap

acity

(kW

)

0.0

0.5

1.0

1.5

2.0

2.5

3.0LO

LP (d

ay/y

ear)

BaseScenario(Reseve kW) LOLP 1d/y (Reseve kW)LOLP 3d/y (Reseve kW) BaseScenario(LOLP d/y)LOLP 1d/y (LOLP d/y) LOLP 3d/y (LOLP d/y)

Page 101: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-39

generator capacity until 2015 becomes 95.55MW, while 90.55MW in the base scenario. Furthermore, reserve capacity will exceed 10MW in the later years when using the 1 day/year scenario.

Secondly, the comparison result from discounted cash flow is shown in Figure 6.2.10.

Figure 6.2.10 Comparison of the Discounted Cash Flow by LOLP Target

If the LOLP target is set at 1 day/year, the accumulated DCF for 12 years from 2004 to 2015 is $2.9Million (+2.2%) higher than that in the base scenario, while in for the 3 day/year scenario it is $1.3Million (-1.0%) lower. Those differences are equivalent to the cost for reliability. (b) Sensitivity analysis of construction cost for a diesel generators

Generally the price of a diesel generator depends on the production maker or its quality. In the base scenario, the construction cost of the candidate diesel generator is presumed to be

a reliable one, such as one made in Europe or Japan. In this sensitivity analysis, the construction cost is assumed to be 30% lower than that in the base scenario in order to verify its influence.

The assumed construction cost for the sensitivity analysis is shown in Table 6.2.13

Table 6.2.13 Assumed Construction Costs of Diesel Generators for Sensitivity Analysis Abbreviation D005 D015 D050 D100 D200 Rated Capacity kW 500 1,500 5,000 10,000 20,000 Dependable Capacity kW 450 1,350 4,500 9,000 18,000 Construction Cost $/kW 1,120 1,016 979 947 917

This simulation result of the optimal generation development by WASP-IV is the same as

the results in the base scenario, although the discounted cash flow is increased. From this result, it can be said that the impact on the construction cost of a diesel generator is

not so large at least in the base scenario.

0

5

10

15

20

25

30

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Yea

rly D

CF

(M$)

0

50

100

150

Acc

umul

ated

DC

F (M

$)

Base Scenario (Yearly) LOLP 1d/y (Yearly)LOLP 3d/y (Yearly) Base Scenario (Accm.)LOLP 1d/y (Accm.) LOLP 3d/y (Accm.)

Page 102: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-40

(c) Sensitivity analysis in the case of transferring the existing generators After the backbone grid extension to Roxas and Taytay, Roxas DPP (Dependable Capacity:

870kW) and Taytay DPP (Dependable Capacity: 550kW), which are operated in the isolated grids, will no longer be essential. Moreover, the production costs of those power plants are higher than the cost of a generator around Puerto Princesa City due to the difference in fuel transportation cost. Therefore the plan to transfer the generators in Roxas DPP and Taytay DPP to the isolated grids is assumed to be reasonable.

Nevertheless, the schedule for the generator transfers has to be planed in accordance with the Palawan Backbone Transmission Project for the northern area, because the project will be delayed even if its commissioning is planned in 2004 as explained in Section 3.5.6.

For this reason, the commissioning year of the transmission line is assumed to be in 2006 and the transfer of the generators is planed for 2007 in this sensitivity analysis.

The simulation results of the generation development plan by WASP-IV are shown in Table 6.2.14.

Table 6.2.14 Simulation Result of Generation Development Plan (Sensitivity Analysis of the Existing Generator Transfer)

Diesel Hydro Year

Peak Demand

(kW)

Total Capacity

(kW)

LOLP (day/y) D005 D015 D050 D100 D200 BYN BRBR MTG TAL CBB BRK BB

2004 21,517 30,220 0.113 2005 25,263 30,220 1.292 2006 28,680 35,430 1.205 2 1 1 1 1 2007 32,616 39,610 0.588 1 2008 37,156 42,310 1.354 2 2009 42,401 47,650 1.511 1 1 2010 48,469 53,500 1.632 1 1 2011 55,498 62,500 1.205 1 2012 63,653 71,500 1.205 1 2013 73,125 80,500 1.613 1 2014 84,143 94,000 0.865 1 1 2015 96,971 104,350 1.719 1 1

In comparison with the base scenario, the year to be developed is changed from 2009 to

2007 for Babuyan and from 2010 to 2009 for Baraki. The total capacity of the generator development becomes 92.05MW (Dependable Capacity: 83.95MW), which is larger than 90.55MW (Dependable Capacity: 82.6MW) in the base scenario because of the reduced existing capacity by the transfer.

From the viewpoint of the discounted cash flow including capital cost, the accumulated discounted cash flow in this case is increased by $0.99Million in comparison with the one in the base scenario. This result indicates that there is no advantage if those generators are simply abolished. However, seeing this result only from the perspective of O&M cost, the accumulated discounted cash flow of the O&M cost is decreased by $2.3Million in comparison with the one in the base scenario as shown in Figure 6.2.11. Since the transfer cost per one

Page 103: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-41

generator is expected to be less than around $0.01 Million, the total transfer cost for 7 generators will be recovered easily.

In conclusion, the project to transfer the existing generators in Roxas DPP and Taytay DPP should be included in the Master Plan for the purpose of more economical planning.

Figure 6.2.11 Comparison of the Discounted Cash Flow in O&M Cost (Sensitivity Analysis of the Existing Generator Transfer)

(4) Summary of the generation development plan (i) Summary of the simulation results for the generation development plan

The simulation results of the generation development plan in each scenario and each sensitivity analysis are summarized in Table 6.2.15.

DCF of Operation & Maintenance Cost

02468

101214161820

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Yea

rly D

CF

(M$)

0

50

100

Acc

umul

ated

DC

F (M

$)

BaseScenario(Yearly) GeneratorTransfer(Yearly)BaseScenario(Accm.) GeneratorTransfer(Accm.)

Page 104: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-42

Table 6.2.15 Summary of Results for the Generation Development Plan Additional

Dependable Capacity(2004-2015, MW) Scenario

Diesel Hydro

Implication from Technical Study

Base Scenario 71.55 11.05 6 sites of hydro power plant are developed. Reliability-Oriented Scenario 72.90 11.05 The total capacity of generator development increases due

to the raised demand. Environment Friendly Scenario 68.40 17.75 If a soft loan with interest of less than 11% is applied, all of

the hydro power plants (7 sites) are developed Environment Deregulation Scenario 71.55 11.05

The result is almost the same as that in the Base Scenario. (6 sites of hydro power plants still have an economical advantage in comparison with Bunker C diesel generator.)

LOLP 1 day/year 76.05 11.05 The accumulated DCF is increased by 2.0%. Generators with small capacity tend to be developed.

LOLP 3 day/year 70.20 11.05 The accumulated DCF is decreased by 1.0%. The reserve ratio becomes lower than the capacity of largest unit in some years.

Diesel Const. Cost 71.55 11.05 Even if the construction cost is cheaper by 30% than the one in the Base Scenario, the simulation results for the generator development plan is the same as that in the Base Scenario.

Sens

itivi

ty A

naly

sis

Gen. Transfer 72.90 11.05

The transfer of generators in Roxas DPP and Taytay DPP after the accomplishment of Palawan Backbone Transmission to the northern part makes the generator development plan more economical.

Taking into account of above results, the generator development policy for the backbone grid

should be as follows.

Page 105: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-43

Generator Development Plan Scenario

The demand forecast for the generator development plan is based on the one in the base scenario, because the difference of the forecasted demand coming from the scenario of barangay electrification is not so large.

Regarding the concrete project, the on-going projects planed by NPC-SPUG are considered in the Master Plan. Plans call for the existing generators in Roxas DPP and Taytay DPP to be transferred to other isolated grids in 2007.

As for the finalized optimal generator development plan, not only the basic scenario, but also an optional scenario including the development of Batang Batang is recommended taking account of the feasibility of the soft loan for a hydropower generation.

SOx Environmental Regulations SOx environmental regulations do not affect the generation development plan

since 6 hydropower candidates have an economical advantage over diesel with bunker C fuel. However, it may affect the power development policy including the electric tariff. Therefore, regulation trends should be watched carefully in the rolling plan.

LOLP Target The recommended LOLP target is around 2 days/year in the backbone grid. If the

target is set at more than 3 days/year, the risk of power shortage increases because the reserve ratio may become lower than the capacity of the maximum generator unit. On the other hand, if the target is set at 1 day/year, the generation cost increases by 2.2%, and this results in higher supplying cost in Palawan where a subsidy is required from the Philippine main grid.

(ii) Optimization of the generation development plan

Up to this point, the generation development plan was discussed based on the simulation result optimized in theory. As the result, for example small generators with 1,500kW capacity were developed in 2004 in the base scenario. This result derives from the calculation method that optimizes the cost during the period until 2020.

In order to avoid this issue, the generation development plan is re-optimized into a more practical one. To put it concretely, a new assumption that the diesel generator capacity developed after 2011 is restricted at 5MW.

In the Study, the base scenario is shown in the Master Plan for power development. Table

6.2.16 shows the case of "Base Scenario for the Optimal Generation Development Plan". At the same time, "Option Scenario for the Optimal Generation Development Plan" where

soft loans for hydropower generation are considered is shown in Table 6.2.17.

Page 106: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-44

Table 6.2.16 Generation Development Plan (Base Scenario for the Optimal Generation Development) Diesel Hydro

Year Peak

Demand (kW)

Total Capacity

(kW)

LOLP (day/y) D005 D015 D050 D100 D200 BYN BRBR MTG TAL CBB BRK BB

2004 21,517 30,220 0.113 2005 25,263 30,220 1.292 2006 28,680 35,430 1.205 2 1 1 1 1 2007 32,616 39,610 0.588 1 2008 37,156 42,310 1.354 2 2009 42,401 47,650 1.511 1 1 2010 48,469 53,500 1.632 1 1 2011 55,498 62,500 1.205 1 2012 63,653 71,500 1.205 1 2013 73,125 80,500 1.613 1 2014 84,143 98,500 0.832 1 2015 96,971 107,500 1.646 1

Table 6.2.17 Generation Development Plan (Option Scenario for the Optimal Generation Development)

Diesel Hydro Year

Peak Demand

(kW)

Total Capacity

(kW)

LOLP (day/y) D005 D015 D050 D100 D200 BYN BRBR MTG TAL CBB BRK BB

2004 21,517 30,220 0.113 2005 25,263 30,220 1.292 2006 28,680 35,430 1.205 2 1 1 1 1 2007 32,616 39,610 0.588 1 2008 37,156 42,310 1.354 2 2009 42,401 47,650 1.511 1 1 2010 48,469 53,500 1.632 1 1 2011 55,498 62,500 1.205 1 2012 63,653 71,500 1.205 1 2013 73,125 80,500 1.613 1 2014 84,143 94,000 0.865 1 1 2015 96,971 109,700 1.172 1 1 6.2.4 Technical Study on Transmission Development Plan for the Backbone Grid (1) Transmission development plan scenario

The scenario of the transmission development plan studied here is based on the basic policy described in Section 6.2.1 and the results of the generation development plan.

(i) Base scenario

In the base scenario, the transmission development plan is studied based on the demand-and-supply conditions obtained from "Base Scenario for the Optimal Generation Development".

The technical issues in Table 6.2.18 will be also be verified in this study.

Page 107: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-45

Table 6.2.18 Technical Issues and Related Projects for the Transmission Development Plan Technical Issue Project

Construction of Puerto Princesa S/S Construction of Abo-Abo S/S

Existing Grid Expansion

Additional Transformer (Puerto Princesa City, Narra, Brooke's Point) Construction of Bataraza Transmission Line & S/S New Grid Expansion Construction of El Nido Transmission Line & S/S

Improvement of System Configuration around Puerto Princesa City

Separation of Generator Circuit and Distribution Circuit

(ii) Option scenario

In the Option Scenario, the transmission development plan is studied based on demand and supply conditions obtained from "Option Scenario for the Optimal Generation Development".

Since the demand-and-supply conditions are the same as those in the base scenario until 2013, the study will be carried out only on the condition that 2015 is the representative year. (2) Assumptions for the transmission development plan (i) Access transmission to a power plant (a) Access transmission to a hydropower plant

The optimal method is to have an access transmission line connected to an existing substation directly, taking account of the system reliability against a system fault. However the construction cost tends to become too much especially in the case that the location of hydropower plant is far from a substation. Therefore, for the access transmission it is presumed that the line is connected to the existing substation if the connecting location is near the substation, while the line is tapped to the existing transmission line in other scenario.

As for Cabinbin Hydropower Plant with 800kW capacity, a pre-feasibility study was carried out in the past on the assumption that the power plant is tapped to the existing 13.8kV distribution line at Brooke’s Point. In this study, only Cabinbin is assumed to be constructed in this configuration, because it is the least cost method and sufficiently technically feasible.

The geographical location of hydropower plant and the power system diagram is shown in Figure 6.2.12 and Figure 6.2.13.

(b) Access transmission to a diesel power plant

As discussed at "Basic Policy for the Generation Development Plan" in Section 6.2.1, the concrete location of the future diesel generator is not specified. But two locations suitable for the generation development can be pointed out on the assumption that the generator is constructed only by NPC-SPUG. These locations are shown on Figure 6.2.14.

Inside of the Irawan substation

Inside the Irawan substation is the most suitable location for a land-based diesel power plant, because the Irawan substation has enough land owned by NPC-SPUG and this location is moderately far from the city center of Puerto Princesa City. Furthermore the

Page 108: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-46

cost for the access transmission is very cheap because the Irawan substation is the base of the backbone grid.

Sta Lucia area

The Sta Lucia area is located just in the opposite side from the city center of Puerto Princesa City across the Puerto Princesa Bay. In this location, there is a port that was equipped by a quarry company in the past, but is not used at present. As the port has a water depth of 8ft, a power barge with large capacity can be anchored here. Moreover, the distance from the port to the existing 69kV backbone transmission is only 4.2km. Therefore the Sta Lucia area is the most suitable location for a power barge diesel power plant.

In the transmission development plan of the Study, the location of the developed diesel

power plant is presumed to be inside of the Irawan substation, which is the most feasible and suitable location for a land-based diesel power plant.

(ii) Standards for the transmission expansion planning of the backbone grid

Since NPC-SPUG recently started the construction of transmission in the missionary electrification area, the standards for the transmission expansion planning have not been clearly determined.

In this Master Plan, the transmission development plan will be formulated based on the following standards.

(a) Standard for system reliability

The "N-1 rule" is generally adopted as a standard for system reliability in the world including the Philippine main grid. The "N-1 rule" means that no interruptions happen even if one of the transmission facilities becomes out-of-service.

However, the present backbone grid cannot meet the "N-1 Rule", because it consists of single transmission lines and single transformers.

For this reason, the necessity of transmission development is judged from the condition that all facilities are in service.

(b) Standard for transmission capacity

The transmission capacity is usually decided from "thermal limit", "voltage limit" and "system stability limit" in a regular grid like the Philippine main grid. In the backbone grid, the transmission capacity will be judged in the same way fundamentally.

The figure of thermal limitation for a transmission line is applied as the same number used in NPC-SPUG. Regarding transformers, the rated capacity is used as its limitation. The voltage deviation is allowed within 5%.

As for the system stability, it is expected that there is no technical problems in the backbone grid. Therefore, some typical faults are checked through dynamic simulation.

Page 109: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-47

(c) Point of time and condition for the power flow study The point of time for the power flow study will be selected at the time of the maximum

demand. Although the output of hydropower power plants is changed with probability, the output is

set at the average output because the average output nearly equals the rated capacity in the 2nd half when the maximum demand is recorded.

The power factor is set at 80%; the standard figure in NPC-SPUG.

Page 110: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-48

Figure 6.2.12 Power System Map of the Backbone Grid (2015)

Barong Barong ('06)

Malatgao ('06) Talakaigan ('06)

Bataraza S/S

Baraki ('09)

Babuyan ('07)

Batang Batang ('15op)

Cabinbin ('06)

Brooke’s Point S/S (Tr: '12)

Narra S/S (Tr: '08, '13)

Irawan S/S

Puerto Princesa DPP

Delta-P IPP

Roxas S/S ('06)

Taytay S/S ('06)

Abo-Abo S/S ('06)

El Nido S/S ('15)

Existing Transmission Line Planed Transmission Line (On-going project) Planed Transmission Line (Proposed Project) Existing Substation Planed Substation (On-going project) Planed Substation (Proposed Project)

Puerto Princesa S/S ('09, Tr: '14)

Power System Map of the Backbone Grid

Page 111: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-49

Brooke’sPoint

Narra

Roxas

Taytay

Puerto Princesa

Irawan Delta-P

PowerBarge

El Nido

Bataraza

Babuyan

Malatgao

Talakaigan

Baraki

Batang Batang

Barong Barong

Cabinbin5.0km

7.0km

13.0km

9.1km

9.3km

8.8km

25.0km

17.5km

4.8km

7.8km

56.9km

40.2km

70.9km

76.61km

86.96km

111.09km

65.14km

Abo-Abo 32.0km

44.6km

11.0km 7.0km

5.2km

28.0km

75.0km

Power System Diagram of the Backbone Grid

Figure 6.2.13 Power System Diagram of the Backbone Grid (2015)

Page 112: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-50

Irawan S/S

Puerto Princesa DPP

Sta Lucia DPP

0 1 2 3 4km

Power Barge 10666 6 99 9 kk k VV V PP P aa a ll l aa a ww w

aa a nn n BB Baa a cc c kk k bb b oo o nn n ee e TT T rr r aa a nn n ss s mm m

ii i ss s ss s ii i oo o nn n LL Lii i nn n ee e

111333...888kkkVVV IIIrrraaawwwaaannn---PPPPPPDDDPPPPPP TTTiiieee---lll iiinnneee

111333...888kkkVVV PPPBBB111000666---PPPPPPDDDPPPPPP LLLiiinnneee

11 1 33 3 .. . 88 8 kk k VV V DD D

ee e ll l tt t aa a PP P -- - PP P PP P DD DPP P PP P LL L

ii i nn n ee e

Irawan DPP

Figure 6.2.14 Power System Map around Puerto Princesa City

Power System Map around Puerto Princesa City

Page 113: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-51

(3) Results of the study on the transmission development plan (i) Expansion of the existing backbone grid (a) Construction of Puerto Princesa substation

At present, the transformer capacity in the Irawan substation is 20MVA, while the line capacity of the 13.8kV tie line (single circuit) from the Irawan substation to Puerto Princesa City DPP is 12.5MVA. This means the capacity sent to the center of Puerto Princesa City is restricted by the capacity of the 13.8kV tie line.

On the other hand, the power flow on the 13.8kV tie line is nearly equal to the figure when subtracting the total output in Delta-P and Puerto Princesa City DPP from the demand in Puerto Princesa City. Here the output of these power plants is assumed as the following two cases, the power flow on the 13.8kV tie line with 90% of a load factor is shown in Figure 6.2.15.

Case A: Dependable Capacity of Delta-P (15,000kW) Case B: Dependable Capacity of Delta-P and Puerto Princesa City DPP (20,400kW)

Figure 6.2.15 Forecast Power Flow on the 13.8kV Tie Line

The 13.8kV tie line between the Irawan substation and Puerto Princesa City DPP is originally designed with a double circuit and 69kV insulator as shown Figure 6.2.16. Although the tie line is used at a single circuit due to the broken insulator in one circuit, the capacity becomes double (25MW) if the insulators are repaired. Therefore the doubled circuit is an essential condition in 2008 when the power flow is expected to exceed the present capacity at a single circuit (Case A).

Secondly, an additional transformer will be needed at the Irawan substation in 2009 when the power flow will exceed the present transformer capacity (Case A). However the transformer addition in the Irawan substation is not seen as a good solution, because other countermeasures will be essential in the distribution system to send power from the Irawan substation to the city center of Puerto Princesa City.

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Pow

er F

low

, Cap

acity

(kV

A) PowerFlow(CaseA)

PowerFlow(CaseB)ExistingCapacity(Irawan Tr, kVA)ExistingCapacity(Tie Line, kVA)

Page 114: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-52

If the tie line can be energized at 69kV and a new 69/13.8kV substation is constructed inside of the Puerto Princesa City DPP, this plan may became the optimal plan with the least cost and with a reliable configuration. According to the rough study, some wood poles of the tie line are not suited for use at 69kV because the distance between a conductor and a pole is too narrow. But it is feasible enough to use the tie line at 69kV as long as reinforcements are planed.

For this reason, the construction of the Puerto Princesa substation is recommended in 2009.

To summarize the technical study results, the transmission development plan becomes as follows.

2008 Doubled circuits for the 13.8kV tie line 2009 Voltage step-up for the tie line from 13.8kV to 69kV

Construction of the 69/13.8kV Puerto Princesa substation (40MVA) 2014 69/13.8kV additional transformers (40MVA) in the Puerto Princesa substation

(b) Construction of the Abo-Abo substation

At present, the Quezon area located on the west coast of the Palawan main island is supplied from the Narra substation through a distribution line owned by PALECO. In this area, there is a problem in that the voltage becomes low due to the long distribution line. For this reason, PALECO is requesting NPC-SPUG to construct a new substation that supplies the power to the Quezon area.

This issue was already studied in Section 6.2.4, and it was recommended that a new substation should be installed around Abo-Abo. In conclusion, the transmission development plan considers the construction of an Abo-Abo substation in 2006, taking into account its construction term. (c) Additional transformer in the Narra and Brooke's Point substation

The forecasted power flow of the existing transformer in the Narra and Brooke's Point substation is shown in Figure 6.2.17. In this case, the power factor is regulated at 90% by installing the capacitor at 13.8kV bus.

According to this result, additional transformers should be planed as follows. 2008 69/13.8kV Additional Transformer (5MVA) in the Narra substation 2012 69/13.8kV Additional Transformer (5MVA) in the Brooke's Point substation 2013 69/13.8kV Additional Transformer (5MVA) in the Narra substation

Figure 6.2.16 Present Tie Line

Page 115: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-53

Figure 6.2.17 Forecasted Power Flow on the Transformer in the Narra S/S, Brooke's Point S/S (ii) New extension of the backbone grid (a) Construction of the Bataraza transmission line and substation

According to the transmission development plan by NPC-SPUG, construction projects involving a new transmission line from Brooke's Point to Bataraza and a new substation in Bataraza are planed in 2007. It is said that a nickel mining company in Bataraza requested NPC-SPUG to send power, and that's the reason those projects are planed. This nickel mining company already has generators of its own. Since there is no contract between NPC-SPUG and the nickel mining company, these projects cannot be accepted formally in the Master Plan.

One the other hand, the Bataraza area is already supplied from the Brooke's Point substation through a distribution line owned by PALECO. According to the studies from the distribution side, a new substation in Bataraza is not essential from the viewpoint of power supply for the residential demand.

For these reasons, the construction project of the Bataraza transmission line and substation is not included into the Master Plan. After a contract is realized, these projects should be planed formally. (b) Construction of the El Nido transmission line and substation

According to the transmission development plan by NPC-SPUG, construction projects of a new transmission line from Taytay to El Nido and a new substation in El Nido are planed for 2007. The El Nido area is already supplied from the El Nido DPP owned by NPC-SPUG wit 12-hour operations. This means the project should be for the purpose of economical supply, and the construction cost of those transmission facilities should be recovered from the benefit of the generation cost being reduced by the interconnection.

For this reason, those projects are evaluated from the economical standpoint. The assumption for the evaluation of grid extension to El Nido and the study results are

shown in Tables 6.2.19 and 6.2.20.

02,0004,0006,0008,000

10,00012,00014,00016,000

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

Pow

er F

low

, Cap

acity

(kV

A)

Power Flow (Narra Tr)Power Flow (Brooke's Point Tr)Existing Tr Capacity

Page 116: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-54

Table 6.2.19 Assumptions for the Evaluation of Grid Extension to El Nido El Nido Isolated Grid backbone grid

Fuel Cost c/Gcal 4,245 2,097 Fixed O&M Cost $/kW-month 8.77 1.78 Variable O&M Cost $/MWh 2.54 2.2 Average Heat Rate kcal/kWh 2,479 2,145 Reserve Capacity Ratio % 20% 10% Gen Investment Cost $/kW 1,600 1,310 Load Factor (24hour) % 40% 40% Discount Rate % 12% 12% Trans. Investment Cost 1000$ --- 3,873 S/S Investment Cost 1000$ --- 364 Trans. O&M Cost Ratio % --- 9.1% S/S O&M Cost Ratio % --- 10.6%

Table 6.2.20 Evaluation Results of Grid Extension to El Nido

10 year 15 year 22 year NPV 1000$ -2,972 -1,398 1,574 IRR % -6% 8% 15%

It can be said that the larger the power system capacity grows the better the economic benefit becomes; however the benefit is still small around 2010.

For this reason, the construction project of the El Nido transmission line and substation is planed for 2015, the final year of the Master Plan. (iii) Improvement of the power system configuration around Puerto Princesa City

Since Power Barge 106 will be transferred and temporary diesel generator will be installed inside of the Irawan substation in 2004, the system configuration will be improved at the same time. Moreover the system configuration will be improved after the construction of the Puerto Princesa substation that is recommended for 2009.

Therefore, the improvement project for the purpose of the separation of the generator circuit and the distribution circuit should be planed in collaboration with the Puerto Princesa substation project.

In conclusion, the recommended system configuration in 2009 is shown in Figure 6.2.18.

Page 117: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-55

Figure 6.2.18 Recommended System Configuration around Puerto Princesa City (4) Results of the power system simulation

In order to verify the technical study results for the transmission development in detail, a power system simulation using PSS/E was carried out. (i) Results of the power flow analysis

The power flow analysis was executed under the conditions for 2006 and 2015 as the typical years. Two calculation scenarios, with/without Batang Batang, were executed for the conditions in 2015.

Through the analysis, it is verified that there are no technical problems as long as the recommended projects are put into practice. For example, the power flow calculation result is shown in Figure 6.2.19. (ii) Result of the short circuit capacity analysis

The short circuit capacity analysis was executed under the same conditions as the power flow analysis. The results indicated no technical problems. For example, the short circuit capacity calculation results are shown in Figure 6.2.20.

PALECO DPP

S/S

Puerto Princesa

Irawan

Delta-P PowerBarge

PALECO

S/S

Irawan

Delta-P

DPP

S/S

DPP

Puerto Princesa

PALECO

Present in 2009

Page 118: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-56

(5) Summary of the transmission development plan As the result of the technical study, the Master Plan should include the following

transmission development plan. Access transmission lines to power plants

The access transmission lines to hydropower plants are planed in accordance with the hydropower generation development plan.

The access transmission lines to diesel power plants are ignored in the Master Plan, because no transmission facility will be required as long as a generator will be installed in the Irawan substation. It is also the most practical plan.

Expansion projects of the backbone grid The following projects shown in Table 6.2.21 are considered in the Master Plan.

Table 6.2.21 Expansion Projects of the Backbone Grid Year Transmission Substation 2006 69kV Puerto Princesa City - Roxas T/L

69kV Roxas - Taytay T/L 69/13.8kV Roxas S/S 69/13.8kV Taytay S/S 69/13.8kV Abo-Abo S/S

2008 Doubled Circuit of 13.8kV Tie Line 69/13.8kV Add. Tr . in Narra S/S 2009 Voltage step-up of Tie Line to 69kV 69/13.8kV Puerto Princesa S/S 2012 69/13.8kV Add. Tr . in Brooke's Point 2013 69/13.8kV Add. Tr . in Narra 2014 69/13.8kV Add. Tr in Puerto Princesa S/S 2015 69kV Taytay-El Nido T/L 69/13.8kV El Nido S/S

Page 119: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-57

Figure 6.2.19 Power Flow Calculation Result in the Backbone Grid (2015)

Transmission line, Transformer Upper: active power (MW) Lower: reactive power (MVar)

Bus Upper: voltage (PU) Lower: voltage (kV)

Page 120: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-58

Figure 6.2.20 Short Circuit Capacity Calculation Result in the Backbone Grid (2015)

Upper: short circuit current (A) Lower: phase of current (degree)

Page 121: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-59

6.2.5 Technical Study on the Power System Operation Plan for the Backbone Grid (1) Basic policy for the power system operation plan of the backbone grid

The power system operation of the backbone grid just started in 2000. Since the system capacity is still small, the facilities for operation are very simple and the power systems operation relies on manpower. According to the generation development plan of the backbone grid, the peak demand will reach 96,971W with 120,550kW of installed capacity in 2015 and there is the possibility that the system operations will be beyond its ability without reinforcement for these operation.

In this section, the necessity of the reinforcement for the system operation will be discussed mainly from the technical viewpoint.

The investment for the power system operation is basically for the purpose of improving reliability. So decisions should be made taking into account the priorities compared with other investment such as the electrification project. (2) Technical study on the power system operation plan

In the backbone grid at present, the minimum facility is equipped for the power system operation, for instance radio equipment or protection relays. In a large power system like the Philippine main grid, for example, the following equipment are installed.

SCADA/EMS System EMS (Energy Management System) controls the generator automatically, while

SCASA (Supervisory Control And Data Acquisition System) controls a switch-gear in a substation remotely. These computer systems are installed in the dispatching center where the whole power system is managed.

In the Philippine main grid, the computer system previously installed was replaced in 2002 with a brand-new system through the National Load Dispatching Center Project loaned by World Bank.

System Stabilizing Equipment

The System Stabilizing Equipment prevents system-wide blackouts by performing emergency control such as load shedding.

In the Philippine main grid, ALD (Automatic Load Dropping) is installed throughout the power system, which executes load shedding in accordance with the settings shown in Table 6.2.22 automatically when system frequency declines.

Other equipment named SPS (System Preservation Scheme) is also installed to prevent generator step-out.

The necessity of this type of equipment is studied hereafter.

Setting Load SheddingGroupHz Second MW

1 59.0 0 145 2 58.9 0 145 3 58.8 0 145 4 58.7 0 145 5 58.6 0 150 6 58.5 0 150 7 58.4 0 165 8 58.3 0 220 9 58.2 0 220

10 58.1 0 220 11 58.0 0 250 12 57.9 0 250 13 57.8 0 250 14 57.7 0 400

Subtotal 2,855 1 59.2 15 50 2 59.1 7.5 50

Total 2,955

Table 6.2.22 ALD Setting in the Philippine Main Grid

Page 122: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-60

(i) Necessity of dispatching center According to the transmission development plan, the number of substations will become 6

(7 if Abo-Abo S/S is included) by 2015, which is still small from the viewpoint of the necessity of the SCADA system. But 6 sites for the hydropower plan will be developed by 2009 from the result of the generation development plan. A diesel power plant where fuel is stored is difficult to operate remotely, while a hydropower plant is easy as it is operated remotely in Japan. Therefore it is worth studying a dispatching center that controls not only a substation but also a hydropower plant remotely. (a) Estimated construction cost of Palawan dispatching center

The construction cost of the EMS/SCADA system for the National load dispatching center where the Philippine main grid is managed is 19.2 million US$, and the construction cost of telecommunication system reaches 35 million US$. For the backbone grid, where the system capacity is very small, a cheaper edition of the SCADA named “Mini-SCADA” can be applied.

The roughly estimated construction cost of the Palawan dispatching center using the Mini-SCADA is shown in Table 6.2.23.

Table 6.2.23 Estimated Construction Cost of the Palawan Dispatching Center

Category Particulars Foreign (thousand US$)

Local (thousand Php)

SCADA System (Hardware & Software) 300 Remote Terminal Unit (RTUs) 260

SCADA System

Intelligent Electronic Device (meters) 120 Uninterruptible Power Supply (UPS) 40

Control Center 3 Substations 6 Relay Stations (with genset) 36

Chargers and Batteries

Hydro Power Stations 18 Telecom System Option 1: Microwave Radio System

Option 2: UHF Radio System Option 3: VSAT Communication System

1,000 700 500

Building 10,000Control Center Air-conditioning & Ventilation System 1,000Building 2,900Relay Stations

(Not needed for VSAT) Air-conditioning & Ventilation System 120Total Option 1: Microwave Radio System

Option 2: UHF Radio System Option 3: VSAT Communication System

1,763 1,463 1,263

14,02014,02011,000

(b) Economic evaluation of the Palawan dispatching center

The dispatching center will contribute to the cost reduction for the operator by controlling a substation and a hydropower plant remotely. On the other hand, the additional operation cost for a technical expert and the additional maintenance cost for SCADA and telecommunication systems are required.

Here the economic considerations for the Palawan dispatching center are roughly evaluated based on the following assumptions.

Page 123: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-61

Number of employees (in comparison with no dispatching center)

No of Site No of Engineer No of Electrician Substation 6 - -24 Hydropower Plant 6 -6 -24

Operator

Dispatching Center 1 +1 +4 SCADA 1 +1 +1 Telecom 1 +1 +2

Maintenance Worker

Hydropower Plant 1 +1 +4 Total -2 -37

Salary

Engineer: 15,000PHP/month, Electrician: 8,000PHP/month

Construction cost of SCADA and telecom system 1,263,000$ + 11,000,000PHP (VSAT Communication System)

Equipment life of SCADA and telecom system 15 years

Maintenance cost (per year) SCADA and telecom: 1% of the construction cost Building: 0.8% of the construction cost

Discount rate 12%

The evaluation result is NPV: -53 million pesos and IRR: -7.2%. This results show that

there is no benefit for the dispatching center from just the economic standpoint. However the operation in the backbone grid will become complex in 2015, since the grid

will have more than 30 generator units (diesel & hydropower) and more than 100MW in installed capacity.

Therefore the dispatching center should be constructed in 2015, taking into account such benefits as the O&M cost reduction and the system reliability improvement. (ii) Necessity of system stabilizing equipment

As described in Section 3.5.4, 2% of the gross generation was lost due to blackouts; mostly caused by system-wide blackouts. The fundamental cause is derived from the system configuration around Puerto Princesa City, however, some parts of the loss may be recovered if system stabilizing equipment were installed.

On the other hand, system blackouts can be restored in 30 minutes now. However, it will take more than one hour in 2015, when the system capacity will be around 100MW.

In the transmission development plan, an expansion project around Puerto Princesa City is recommended in 2009 in accordance with the constriction of the Puerto Princesa substation.

Page 124: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-62

This project will contribute greatly to improved system reliability. But the risk of system blackouts cannot be removed completely. If ALD can recover 0.1% of the gross generation, the energy sales will be increased by 0.53GWh. This figure is equivalent to 2.9 million pesos of income on the condition the electricity price being 5.5Php/kWh. Taking into consideration the investment cost for ALD, which is estimated at around 1 million pesos, this project is supposed to be feasible enough.

In conclusion, it is recommended that ALD should be installed in 2009, when the system

configuration is improved around Puerto Princesa City. (iii) Necessity of modernization of work for power system operations

Modernization is required not only for a dispatching center, but also for fundamental operations of the power system. For example, power system analysis, which is essential for power system planning grid system operations, is not carried out sufficiently within NPC-SPUG. As for the recording of operation, not only is a great deal of effort spent on making these records, but also the data of the operations is not managed well because there are no personal computers in the power plants and the substations.

The construction of the dispatching center is recommended in 2015. However, these improvements for the daily operations should be addressed with as soon as possible. (3) Summary of the Power System Operation Plan

As the result of technical study for the power system operation plan, the following plan should be included into the Master Plan.

Dispatching Center

The dispatching center should be installed around 2015, the final year of the Master Plan.

But this plan should be revised in the rolling plan taking into account the actual operation condition, because this project has insufficient economic benefits.

System Stabilizing Equipment ALD, which can prevent system blackouts in the case of frequency dropping,

should be installed in 2009 when the system configuration around Puerto Princesa City is improved.

6.2.6 Technical Study on the Power Development Plan for the Isolated Grids (1) Assumptions for the power development plan of the isolated grids

The power development plan for the other isolated grids will be studied based on the basic policy described in Section 6.2.1.

The assumptions for the power development plan of isolated grids are as follows.

Page 125: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-63

Reserve capacity In the isolated grids where a few generators are operated, the reliability target of LOLP

is not useful, because the probability of calculated reliability is not linear and too complex. For this reason, the "Reliability Index" explained in Section 3.5.2 is applied for the

decision of power development. If the plan becomes a two-year consecutive development plan, two units will be developed at the same time.

New generator installation project As of January in 2004, the on-going projects approved by NPC-SPUG are presumed to

be put into service in 2005. Busuanga : 2 x 500kW Cuyo : 4 x 500kW

Type of diesel generators and its selection The candidate type of diesel generator and the conditions in order to select the

generator type are shown in Table 6.2.24. The capacity of the generator shall be selected in consideration of the power system

capacity. So the condition to select the generation type is based on the peak demand, except for the transferred generator from the backbone grid.

Table 6.2.24 Diesel Generator Type and its Selection

Rated Capacity Dependable Capacity Condition for Selection 54kW 50kW Peak Demand<150kW

163kW 150kW 150kW<Peak Demand<300kW 260kW 240kW 300kW<Peak Demand<600kW 500kW 450kW 600kW<Peak Demand<2500kW 1000kW 900kW Peak Demand>2500kW

Transfer of the existing generators

The transfers of the existing generators whose worth decreases after the accomplishment of the backbone grid are considered in order to use those generators in the isolated grids. But the generators in the Narra and Brooke's Point DPP are abolished in this plan, because the generators already reach their expected lifespan.

Concretely, the following generators are planed for use within the Palawan Province.

Table 6.2.25 Generators Transferred from the Backbone Grid

Power Plant Name Unit No. Maker Fuel

Installed Capacity

(kW)

Dependable Capacity

(kW) Roxas 1 DALE-PERKINS Diesel 260 240 Roxas 2 DALE-PERKINS Diesel 260 240 Roxas 3 DALE-PERKINS Diesel 260 240 Roxas 4 DALE-PERKINS Diesel 163 150 Taytay 1 DALE-PERKINS Diesel 163 150 Taytay 2 DALE-PERKINS Diesel 260 240 Taytay 3 DALE-PERKINS Diesel 163 150

Page 126: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-64

Renovation of Generators Some of the existing generators will need to be renovated before 2015, because some of

those are already near their expected lifespan. However, the Master Plan does not refer to the renovation.

(2) Result of the technical study on the power development plan for the isolated grids (i) Developed capacity

The study results on the developed capacity in each isolated grid are shown in Table 6.2.26. Power shortages will happen in some areas in 2004. However, the feasible year of generator

construction is assumed to be 2005 except for Busuanga and Cuyo, where the power development projects are now on-going.

In Table 6.2.26, 6 generators developed in 2007 (marked in the table) are transferred from the backbone grid. One 260kW gen-set is assumed to be transferred to another province.

Table 6.2.26 Results of Developed Capacity in the Isolated Grids

Year ElNido SnVicente Busuanga Cuyo Culion Linapacan Araceli Balabac Cagayancillo Agutaya Total 2004 - - 1,000 1,000 - - - - - - 2,0002005 520 260 - - 520 326 163 163 54 54 2,0602006 - - - - - - - - - - -2007 - 260 - 500 - 260 260 163 163 163 1,7692008 500 - - - - - - - - - 5002009 - - 1,000 500 500 - - - - - 2,0002010 - - - - - - - - - - -2011 500 500 2,000 2,000 500 - - - - - 5,5002012 - - - - - 260 - - - - 2602013 - 500 2,000 - 500 - 260 260 - - 3,5202014 500 - - 2,000 - 500 - - - 163 3,1632015 - - 2,000 - 500 - - 260 - - 2,760Total 2,020 1,520 8,000 6,000 2,520 1,346 683 846 217 380 23,532

Page 127: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-65

(ii) Dependable capacity The study results for the dependable capacity in each isolated grid are shown in Table

6.2.27.

Table 6.2.27 Results of Dependable Capacity in the Isolated Grids Year ElNido SnVicente Busuanga Cuyo Culion Linapacan Araceli Balabac Cagayancillo Agutaya Total 2004 400 550 2,180 2,005 400 100 300 300 200 200 6,6352005 880 790 2,180 2,005 880 400 450 450 250 250 8,5352006 880 790 2,180 2,005 880 400 450 450 250 250 8,5352007 880 1,030 2,180 2,455 880 640 690 600 400 400 10,1552008 1,330 1,030 2,180 2,455 880 640 690 600 400 400 10,6052009 1,330 1,030 3,080 2,905 1,330 640 690 600 400 400 12,4052010 1,330 1,030 3,080 2,905 1,330 640 690 600 400 400 12,4052011 1,780 1,480 4,880 4,705 1,780 640 690 600 400 400 17,3552012 1,780 1,480 4,880 4,705 1,780 880 690 600 400 400 17,5952013 1,780 1,930 6,680 4,705 2,230 880 930 840 400 400 20,7752014 2,230 1,930 6,680 6,505 2,230 1,330 930 840 400 550 23,6252015 2,230 1,930 8,480 6,505 2,680 1,330 930 1,080 400 550 26,115

(ii) Reliability index

The study results for the Reliability Index in each isolated grid are shown in Figure 6.2.21. In 2004, the Reliability Index becomes below "1" in El Nido, San Vicente, Culion,

Linapacan and Agutaya. In fact, in Linapacan the Reliability Index actually becomes minus. Therefore, a very severe situation for supplying power can be expected even if all generators are in service.

Figure 6.2.21 Result of Reliability Index in the Isolated Grids

0.0

0.5

1.0

1.5

2.0

2.5

3.0

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Rel

iabi

lity

Inde

x

El Nido

Sn Vicente

Busuanga

Cuyo

Culion

Linapacan

Araceli

Balabac

Page 128: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

6-66

(3) Summary of the Power Development Plan for the Isolated Grids The technical study results for the isolated grids are summarized as follow.

Power Development

The total capacity developed during 2004 to 2015 is 23,532kW in rated capacity and 21,280kW in dependable capacity, including the transferred generators from the backbone grid.

In 2004 some generators are being developed in Busuanga and Cuyo. However, the shortage of power is expected in the other islands. Therefore, the power development project should be started as soon as possible to complete it by 2005.

Generator Transfer from the Backbone Grid On the assumption that the backbone grid will be completed in 2006, the transfer

of generators to the isolated grids is planned for 2007. In this Master Plan, the generators with 260kW capacity are transferred to San Vicente, Linapacan and Araceli, while the generators with 163kW are transferred to Balabac, Cagayancillo and Agutaya.

Page 129: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

7-1

Chapter 7 Master Plan for the Power Development in Palawan Province 7.1 Current Status of Power Sector in Palawan Province 7.1.1 Status of Electrification (1) Status of Barangay Electrification

Table 7.1.1 Status of Electrification (As of end of December, 2003)

Electrification Status Electrification Level

Electrification Method

Number of

BarangaysShare (%)

Number of

Households

Number of Electrified

Households

HouseholdElectrification Ratio (%)

Electrified 271 62.9 119,685 56.924 47.6 LEVEL III Barangay 44 10.2 28,646 28,646 100.0 ( EC-grid ) (44) (10.2) (28,646) (28,646) (100.0) ( Mini-grid ) (0) (0.0) (0) (0) (0.0) ( Stand-alone ) (0) (0.0) (0) (0) (0.0) LEVEL II Barangay 118 27.4 40,478 22,185 54.8 ( EC-grid ) (111) (25.8) (38,948) (21,512) (55.2) ( Mini-grid ) (1) (0.2) (754) (300) (39.8) ( Stand-alone ) (6) (1.4) (776) (373) (48.1) LEVEL I Barangay 109 25.3 50,561 6,093 12.1 ( EC-grid ) (57) (13.2) (33,099) (4,258) (12.9) ( Mini-grid ) (5) (1.2) (3,637) (570) (15.7) ( Stand-alone ) (47) (10.9) (13,825) (1,265) (9.2) Un-electrified 160 37.1 47,706 0 0.0

Total 431 100.0 167,391 56,924 34.0

Page 130: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

7-2

7.1.2 Existing Power Facilities of the Backbone Grid and Isolated Grids

ARACELI DPP 326 kW

AGUTAYA DPP217 kW

BALABAC DPP 326 kW

BROOKE’S POINT DPP600 kW

BUSUANGA DPP1620 kW

CAGAYANCILLO DPP217 kW

CULION DPP423 kW

CUYO DPP1,634 kW

EL NIDO DPP423 kW

LINAPACAN DPP108 kW

NARRA DPP1448 kW

POWER BARGE 106 DPP 14,400 kW

PUERTO PRINCESA DPP9,000 kW

ROXAS DPP943 kW

SAN VICENTE DPP586 kW

TAYTAY DPP 586 kW

DELTA-P DPP (IPP) 16,000 kW

Backbone Transmission Line

IRAWAN Sub Station

Total Installed Capacity : 48.9 MW(As of end of February 2003)

Figure 7.1.1 Location Map of the Existing Power Facilities in Palawan

Page 131: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

7-3

*Bas

e S

cena

rio (C

ase1

) T

arge

t Hou

seho

ld E

lect

rific

atio

n R

atio

: EC

-grid

50%

、M

ini-g

rid 3

5%、

Stan

d-al

one

syst

em 3

5%

Who

le B

aran

gay

Ele

ctrif

icat

ion

(Pha

se I)

H

ouse

hold

Ele

ctrif

icat

ion

Impr

ovem

ent

(Pha

se II

)

2004

20

0520

06S

ub

Tota

l20

0720

0820

0920

10

2011

2012

2013

2014

2015

Sub

To

tal

Tota

l

EC

-Grid

E

xten

sion

9.

5 8.

73.

922

.1-

- -

- -

- -

- -

- 22

.1

Min

i-Grid

S

yste

m

- -

115.

011

5.0

- -

- -

- -

- -

- -

115.

0

Ele

ctrif

icat

ion

Met

hod

Stan

d-A

lone

S

yste

m

21.0

21

.04.

246

.275

.276

.677

.380

.0

75.7

76.7

77.3

78.9

47.5

665.

271

1.4

Tota

l 30

.5

29.7

123.

118

3.3

75.2

76.6

77.3

80.0

75

.776

.777

.378

.947

.566

5.2

848.

5

Bara

ngay

Ele

ctrif

icatio

n R

atio

77

.0%

91

.6%

100.

0%10

0.0%

100.

0%10

0.0%

100.

0%10

0.0%

100.

0%10

0.0%

100.

0%10

0.0%

HH

Ele

ctrif

icat

ion

Rat

io

39.7

%

40.3

%40

.4%

42.5

%44

.6%

46.5

%48

.3%

49.9

%51

.3%

52.7

%54

.0%

54.5

%

7.2 Barangay Electrification PlanTa

ble

7.2.

1 S

umm

ary

of In

vest

men

t Cos

ts fo

r the

Bar

anga

y El

ectri

ficat

ion

Plan

Uni

t: m

illion

Php

7-3

Page 132: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

7-4

7.2.1 Barangay Electrification Program

Table 7.2.2 List of Whole Barangay Electrification Programs

<ABORLAN>

<AGUTAYA>

<ARACELI>

Barangay Name Electrification Method Target Year Capacity (kW) Investment Cost(million Php)

Sagpangan Stand-alone 2004 20 households 0.35

Culandanum (a) Stand-alone 2005 20 households 0.35

Barangay Name Electrification Method Target Year Capacity (kW) Investment Cost(million Php)

Diit Stand-alone 2004 20 households 0.35

Villafria Stand-alone 2004 20 households 0.35

Villasol Stand-alone 2004 20 households 0.35

Algeciras Mini-grid 2006 87 kW 3.70

Conception (a) Mini-grid 2006 63 kW 3.20

Maracanao Stand-alone 2006 20 households 0.35

Matarawis Stand-alone 2006 20 households 0.35

Barangay Name Electrification Method Target Year Capacity (kW) Investment Cost(million Php)

Dagman Stand-alone 2005 20 households 0.35

Lumacad Stand-alone 2005 20 households 0.35

Mauringuen Stand-alone 2005 20 households 0.35

Osmena (a) Stand-alone 2005 20 households 0.35

Taloto Stand-alone 2005 20 households 0.35

Balogo Stand-alone 2006 20 households 0.35

Dalayawon Stand-alone 2006 20 households 0.35

Madoldolon Stand-alone 2006 20 households 0.35

San Jose De Oro Stand-alone 2006 20 households 0.35

Santo Nino (a) Stand-alone 2006 20 households 0.35

Page 133: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

7-5

<BALABAC>

<BATARAZA>

Barangay Name Electrification Method Target Year Capacity (kW) Investment Cost(million Php)

Catagupan Stand-alone 2004 20 households 0.35

Ramos Stand-alone 2004 20 households 0.35

Salang Stand-alone 2004 20 households 0.35

Agutayan Stand-alone 2005 20 households 0.35

Bugsuk (New Cagayancillo) Stand-alone 2005 20 households 0.35

Indalawan Stand-alone 2005 20 households 0.35

Malaking Ilog Stand-alone 2005 20 households 0.35

Melville Stand-alone 2005 20 households 0.35

Pandanan Stand-alone 2005 20 households 0.35

Pasig Stand-alone 2005 20 households 0.35

Rabor Stand-alone 2005 20 households 0.35

Sebaring Stand-alone 2005 20 households 0.35

Bancalaan Mini-grid 2006 87 kW 4.60

Mangsee Mini-grid 2006 63 kW 4.10

Barangay Name Electrification Method Target Year Capacity (kW) Investment Cost(million Php)

Buliluyan Stand-alone 2004 20 households 0.35

Igang igang Stand-alone 2004 20 households 0.35

Iwahig Stand-alone 2004 20 households 0.35

Ocayan Stand-alone 2004 20 households 0.35

Sapa Stand-alone 2004 20 households 0.35

Sarong Stand-alone 2004 20 households 0.35

Taratak Stand-alone 2004 20 households 0.35

Bulalacao (a) EC-grid extension 2005 20 kW 3.90

Malihud EC-grid extension 2005 19 kW 4.80

Malitub Stand-alone 2005 20 households 0.35

Puring Stand-alone 2005 20 households 0.35

Tabud Stand-alone 2005 20 households 0.35

Tagnato Stand-alone 2005 20 households 0.35

Tagolango Stand-alone 2005 20 households 0.35

Culandanum (b) Mini-grid 2006 50 kW 4.30

Rio Tuba Mini-grid 2006 108 kW 7.50

Sandoval (a) Mini-grid 2006 34 kW 5.20

Sumbiling Mini-grid 2006 34 kW 3.60

Tarusan EC-grid extension 2006 41 kW 3.90

Page 134: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

7-6

<BROOKE’S POINT>

<BUSUANGA>

<CAGAYANCILLO>

<CULION>

<CUYO>

<DUMARAN>

Barangay Name Electrification Method Target Year Capacity (kW) Investment Cost(million Php)

Imulnod EC-grid extension 2004 18 kW 2.00

Barangay Name Electrification Method Target Year Capacity (kW) Investment Cost(million Php)

Cheey Stand-alone 2004 20 households 0.35

Halsey Stand-alone 2005 20 households 0.35

Maglalambay Stand-alone 2005 20 households 0.35

Burabod Stand-alone 2006 20 households 0.35

Barangay Name Electrification Method Target Year Capacity (kW) Investment Cost(million Php)

Magsaysay (a) Stand-alone 2005 20 households 0.35

Mampio Stand-alone 2006 20 households 0.35

Nusa Stand-alone 2006 20 households 0.35

Barangay Name Electrification Method Target Year Capacity (kW) Investment Cost(million Php)

Binudac Stand-alone 2004 20 households 0.35

Barangay Name Electrification Method Target Year Capacity (kW) Investment Cost(million Php)

Caponayan Stand-alone 2005 20 households 0.35

Lubid Stand-alone 2005 20 households 0.35

Barangay Name Electrification Method Target Year Capacity (kW) Investment Cost(million Php)

Capayas Stand-alone 2004 20 households 0.35

Ilian Stand-alone 2004 20 households 0.35

Santo Tomas Stand-alone 2004 20 households 0.35

Tanatanaon Stand-alone 2004 20 households 0.35

San Juan (b) Stand-alone 2005 20 households 0.35

Santa Maria Stand-alone 2005 20 households 0.35

Page 135: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

7-7

<EL NIDO (BACUIT)>

<LINAPACAN>

<MAGSAYSAY>

Barangay Name Electrification Method Target Year Capacity (kW) Investment Cost(million Php)

Barotuan Stand-alone 2004 20 households 0.35

Bebeladan Stand-alone 2004 20 households 0.35

Mabini (b) Stand-alone 2004 20 households 0.35

Manlag Stand-alone 2004 20 households 0.35

New Ibajay Stand-alone 2004 20 households 0.35

Pasadena Stand-alone 2004 20 households 0.35

San Fernando Stand-alone 2004 20 households 0.35

Sibartan Stand-alone 2004 20 households 0.35

Villa Libertad Stand-alone 2004 20 households 0.35

Villa Paz Stand-alone 2005 20 households 0.35

Bucana Mini-grid 2006 63 kW 5.30

Teneguiban Mini-grid 2006 50 kW 6.70

Barangay Name Electrification Method Target Year Capacity (kW) Investment Cost(million Php)

Nangalao Stand-alone 2004 20 households 0.35

Barangay Name Electrification Method Target Year Capacity (kW) Investment Cost(million Php)

Canipo Stand-alone 2005 20 households 0.35

Cocoro Stand-alone 2005 20 households 0.35

Alcoba Stand-alone 2006 20 households 0.35

Page 136: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

7-8

<PUERTO PRINCESA CITY (CAPITAL)>

<QUEZON>

<RIZAL (MARCOS)>

Barangay Name Electrification Method Target Year Capacity (kW) Investment Cost(million Php)

Babuyan* EC-grid extension 2004 22 kW 3.60

Bahile Stand-alone 2004 20 households 0.35

Conception (c) Stand-alone 2004 20 households 0.35

Langogan Stand-alone 2004 20 households 0.35

Macarascas Stand-alone 2004 20 households 0.35

San Rafael (b) Stand-alone 2004 20 households 0.35

Simpocan Stand-alone 2004 20 households 0.35

Tagabinit Stand-alone 2004 20 households 0.35

Bagong Bayan (b) Stand-alone 2005 20 households 0.35

Binduyan Stand-alone 2005 20 households 0.35

Buena Vista (b) Stand-alone 2005 20 households 0.35

Marufinas Stand-alone 2005 20 households 0.35

New Panggangan Stand-alone 2005 20 households 0.35

Tanabag Stand-alone 2005 20 households 0.35

Cabayugan Mini-grid 2006 34 kW 3.40

* Upgraded Bgy: Bgy. Babuyan was already electrified by a stand-alone system in 2003.

Barangay Name Electrification Method Target Year Capacity (kW) Investment Cost(million Php)

Kalatagbak Stand-alone 2004 20 households 0.35

Calumpang Stand-alone 2004 20 households 0.35

Maasin (b) Stand-alone 2004 20 households 0.35

Sowangan Stand-alone 2004 20 households 0.35

Tagusao Stand-alone 2004 20 households 0.35

Malatgao (b) EC-grid extension 2005 23 kW 3.60

Aramaywan (b) Mini-grid 2006 34 kW 5.20

Isugod Mini-grid 2006 34 kW 4.00

Quinlogan Mini-grid 2006 50 kW 4.50

Barangay Name Electrification Method Target Year Capacity (kW) Investment Cost(million Php)

Canipaan Mini-grid 2006 50 kW 4.70

Culacian (b) Mini-grid 2006 50 kW 3.00

Iraan (b) Mini-grid 2006 108 kW 9.30

Latud Mini-grid 2006 34 kW 6.50

Panalingaan Mini-grid 2006 87 kW 5.80

Ransang Mini-grid 2006 87 kW 6.90

Page 137: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

7-9

<ROXAS>

<SAN VICENTE>

<SOFRONIO ESPANOLA>

Barangay Name Electrification Method Target Year Capacity (kW) Investment Cost(million Php)

Caramay Stand-alone 2004 20 households 0.35

Dumarao Stand-alone 2004 20 households 0.35

Nicanor Zabara Stand-alone 2004 20 households 0.35

Sandoval (c) Stand-alone 2004 20 households 0.35

Tinitian Stand-alone 2004 20 households 0.35

Tumarabong Stand-alone 2004 20 households 0.35

Antonino Stand-alone 2005 20 households 0.35

Bagong Bayan (c) Stand-alone 2005 20 households 0.35

Barangay VI (Pob) (Johnson) Stand-alone 2005 20 households 0.35

Santo Tomas (Iraan) Stand-alone 2005 20 households 0.35

Jolo Stand-alone 2005 20 households 0.35

Mendoza Stand-alone 2005 20 households 0.35

Rizal (b) Stand-alone 2005 20 households 0.35

Salvacion (b) Stand-alone 2005 20 households 0.35

San Isidro (c) Stand-alone 2005 20 households 0.35

San Miguel (b) Stand-alone 2005 20 households 0.35

San Nicolas (c) Stand-alone 2005 20 households 0.35

Taradungan Stand-alone 2005 20 households 0.35

Barangay V (Pob) (Porao Is) Stand-alone 2006 20 households 0.35

Barangay Name Electrification Method Target Year Capacity (kW) Investment Cost(million Php)

Binga Stand-alone 2004 20 households 0.35

Kemdeng Stand-alone 2005 20 households 0.35

New Canipo Stand-alone 2005 20 households 0.35

Caruray Mini-grid 2006 50 kW 4.40

Barangay Name Electrification Method Target Year Capacity (kW) Project Cost(million Php)

Iraray Stand-Alone 2004 20 households 0.35

Pulot Interior (Pulot II) Stand-Alone 2004 20 households 0.35

Punang Stand-Alone 2004 20 households 0.35

Labog Mini-Grid 2006 50 kW 5.00

Page 138: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

7-10

<TAYTAY>

Barangay Name Electrification Method Target Year Capacity (kW) Investment Cost(million Php)

Alacalian Stand-alone 2004 20 households 0.35

Bantulan Stand-alone 2004 20 households 0.35

Libertad Stand-alone 2004 20 households 0.35

Paglaum Stand-alone 2004 20 households 0.35

Paly (Paly Is) Stand-alone 2004 20 households 0.35

Pancol Stand-alone 2004 20 households 0.35

San Jose (d) Stand-alone 2004 20 households 0.35

Tumbod Stand-alone 2004 20 households 0.35

Baras Stand-alone 2005 20 households 0.35

Batas Stand-alone 2005 20 households 0.35

Depla Stand-alone 2005 20 households 0.35

Meytegued Stand-alone 2005 20 households 0.35

Minapla Stand-alone 2005 20 households 0.35

Old Guinlo Stand-alone 2005 20 households 0.35

Pamantolon Stand-alone 2005 20 households 0.35

Sandoval (d) Stand-alone 2005 20 households 0.35

Silanga Stand-alone 2005 20 households 0.35

Talog Stand-alone 2005 20 households 0.35

New Guinlo Mini-grid 2006 34 kW 4.30

Page 139: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

7-11

Mun

icip

ality

Num

ber o

f HH

to E

lect

rify

2007

2008

2009

2010

2011

2012

2013

2014

2015

AB

OR

LAN

1,30

80.

007.

520.

007.

520.

007.

520.

310.

000.

00A

GU

TAY

A54

97.

520.

002.

080.

000.

000.

000.

000.

000.

00A

RA

CEL

I39

00.

006.

820.

000.

000.

000.

000.

000.

000.

00B

ALA

BA

C1,

059

7.52

0.00

7.52

0.00

3.48

0.00

0.00

0.00

0.00

BA

TAR

AZA

2,54

07.

520.

007.

520.

007.

527.

527.

526.

820.

00B

RO

OK

E'S

POIN

T 3,

130

0.00

7.52

0.00

7.52

0.00

7.52

7.52

15.0

49.

62B

USU

AN

GA

1,42

27.

520.

007.

520.

007.

522.

310.

000.

000.

00C

AG

AY

AN

CIL

LO14

70.

002.

570.

000.

000.

000.

000.

000.

000.

00C

OR

ON

1,89

30.

007.

520.

007.

527.

520.

007.

523.

030.

00C

UY

O27

40.

004.

790.

000.

000.

000.

000.

000.

000.

00D

UM

AR

AN

1,27

77.

520.

007.

520.

007.

290.

000.

000.

000.

00EL

NID

O (B

AC

UIT

)1,

839

7.52

0.00

7.52

0.00

7.52

7.52

2.08

0.00

0.00

LIN

APA

CA

N92

27.

520.

007.

520.

001.

080.

000.

000.

000.

00M

AG

SAY

SAY

126

0.00

2.20

0.00

0.00

0.00

0.00

0.00

0.00

0.00

NA

RR

A1,

701

0.00

7.52

0.00

7.52

0.00

7.52

7.19

0.00

0.00

PUER

TO P

RIN

CES

A C

ITY

(CA

PITA

L)3,

859

0.00

0.00

7.52

7.52

0.00

7.52

7.52

15.0

422

.37

QU

EZO

N2,

503

0.00

7.52

0.00

7.52

7.52

7.70

7.52

6.00

0.00

RO

XA

S2,

313

0.00

7.52

0.00

7.52

7.52

0.00

15.0

42.

850.

00SA

N V

ICEN

TE1,

132

7.52

0.00

7.52

4.76

0.00

0.00

0.00

0.00

0.00

TAY

TAY

3,23

47.

520.

007.

520.

007.

527.

527.

5215

.04

3.92

KA

LAY

AA

N0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

CU

LIO

N1,

070

0.00

7.52

0.00

7.52

3.67

0.00

0.00

0.00

0.00

RIZ

AL

(MA

RC

OS)

3,67

57.

520.

007.

527.

520.

007.

527.

5215

.04

11.6

3SO

FRO

NIO

ESP

AN

OLA

1,66

50.

007.

520.

007.

527.

526.

560.

000.

000.

00To

tal

38,0

2875

.22

76.5

777

.30

79.9

875

.71

76.7

477

.28

78.8

847

.55

Elec

trific

atio

n C

ost =

17,4

93.0

0 Ph

p/H

H

(Uni

t: m

illio

n Ph

p)7.2.2 Household Electrification Improvement Programs

Tabl

e 7.

2.3

Lis

t of t

he H

ouse

hold

Ele

ctrif

icat

ion

Impr

ovem

ent P

rogr

ams

7-11

Page 140: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

7-12

Mai

nlan

d Pa

law

an

<PU

ERTO

PR

INC

ESA

CIT

Y, B

RO

OK

E’S

POIN

T, N

AR

RA

>

2004

20

05

2006

20

07

2008

20

09

2010

20

11

2012

20

13

2014

20

15

Peak

Dem

and

(kW

)21

,517

25

,263

28

,680

32

,616

37

,156

42

,401

48

,469

55

,498

63

,653

73

,125

84

,143

96

,971

En

ergy

Sal

es

(MW

h)

103,

597

121,

626

138,

067

157,

007

178,

856

204,

099

233,

305

267,

141

306,

397

351,

998

405,

038

466,

802

Gros

s Gen

eratio

n (M

Wh)

117,

723

138,

210

156,

894

178,

416

203,

244

231,

930

265,

118

303,

567

348,

176

399,

995

460,

267

530,

457

Load

Fac

tor (

%)

62%

62%

62%

62%

62%

62%

62%

62

62%

62%

62%

62%

<E

L N

IDO

> 20

04

2005

20

06

2007

20

08

2009

20

10

2011

20

12

2013

20

14

2015

Pe

ak D

eman

d (k

W)

361

414

476

548

632

729

842

973

1,12

7 1,

306

1,51

6 1,

761

Ener

gy S

ales

(M

Wh)

57

1 65

6 75

4 86

8 1,

000

1,15

4 1,

333

1,54

1 1,

784

2,06

8 2,

400

2,78

8

Gros

s Gen

eratio

n (M

Wh)

635

729

838

964

1,11

1 1,

282

1,48

1 1,

712

1,98

3 2,

298

2,66

7 3,

098

Load

Fac

tor (

%)

20%

20%

20%

20%

20%

20%

20%

20

20%

20%

20%

20%

<T

AYTA

Y>

2004

20

05

2006

20

07

2008

20

09

2010

20

11

2012

20

13

2014

20

15

Peak

Dem

and

(kW

)37

3

Ener

gy S

ales

(M

Wh)

63

8

Gros

s Gen

eratio

n (M

Wh)

709

Lo

ad F

acto

r (%

) 22%

<RO

XA

S>

2004

20

05

2006

20

07

2008

20

09

2010

20

11

2012

20

13

2014

20

15

Peak

Dem

and

(kW

)75

8

Ener

gy S

ales

(M

Wh)

3,

095

Gros

s Gen

eratio

n (M

Wh)

3,43

9

Load

Fac

tor (

%)

52%

<SA

N V

ICEN

TE>

20

04

2005

20

06

2007

20

08

2009

20

10

2011

20

12

2013

20

14

2015

Pe

ak D

eman

d (k

W)

314

357

407

465

532

609

698

802

922

1,06

2 1,

224

1,41

2 En

ergy

Sal

es

(MW

h)

333

379

432

494

564

646

741

850

978

1,12

6 1,

298

1,49

8

Gros

s Gen

eratio

n (M

Wh)

370

421

480

548

627

718

823

945

1,08

6 1,

251

1,44

2 1,

664

Load

Fac

tor (

%)

13%

13%

13%

13%

13%

13%

13%

13

13%

13%

13%

13%

7.3 EC-Grids Power Development Plan

7.3.1 Power Demand Forecasts for the EC-Grids

Tabl

e 7.

3.1

Po

wer

D

eman

d Fo

reca

sts

for

the

EC-G

rids

in

Pala

wan

7-12

Page 141: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

7-13

Isla

nd M

unic

ipal

ities

<B

USU

AN

GA

& C

OR

ON

>

2004

20

05

2006

20

07

2008

20

09

2010

20

11

2012

20

13

2014

20

15

Peak

Dem

and,

(k

W)

968

1,11

2 1,

282

1,48

4 1,

728

2,02

3 2,

384

2,83

1 3,

388

4,08

9 4,

980

6,12

0

Ener

gy S

ales

(M

Wh)

3,

970

4,55

8 5,

254

6,08

5 7,

083

8,29

4 9,

775

11,6

05

13,8

88

16,7

62

20,4

12

25,0

90

Gros

s Gen

eratio

n ( M

Wh)

4,56

3 5,

240

6,03

9 6,

994

8,14

2 9,

533

11,2

35

13,3

39

15,9

64

19,2

67

23,4

62

28,8

38

Load

Fac

tor (

%)

54%

54%

54%

54%

54%

54%

54%

54

54%

54%

54%

54%

<C

ULI

ON

> 20

04

2005

20

06

2007

20

08

2009

20

10

2011

20

12

2013

20

14

2015

Pe

ak D

eman

d (k

W)

324

372

428

496

578

676

797

946

1,13

2 1,

366

1,66

4 2,

045

Ener

gy S

ales

(M

Wh)

52

9 60

7 70

0 81

1 94

4 1,

105

1,30

2 1,

546

1,85

0 2,

233

2,72

0 3,

343

Gros

s Gen

eratio

n (M

Wh)

588

675

778

901

1,04

9 1,

228

1,44

7 1,

718

2,05

6 2,

481

3,02

2 3,

714

Load

Fac

tor (

%)

21%

21%

21%

21%

21%

21%

21%

21

21%

21%

21%

21%

<L

INA

PAC

AN

>

2004

20

05

2006

20

07

2008

20

09

2010

20

11

2012

20

13

2014

20

15

Peak

Dem

and

(kW

)12

9 14

8 17

1 19

8 23

1 27

0 31

8 37

8 45

2 54

6 66

4 81

7 En

ergy

Sal

es

(MW

h)

165

189

218

253

294

344

406

482

576

696

847

1,04

1

Gros

s Gen

eratio

n ( M

Wh)

183

210

242

281

327

383

451

535

641

773

941

1,15

7 Lo

ad F

acto

r (%

) 16%

16%

16%

16%

16%

16%

16%

16

16%

16%

16%

16%

<C

UY

O>

2004

20

05

2006

20

07

2008

20

09

2010

20

11

2012

20

13

2014

20

15

Peak

Dem

and

(kW

)1,

152

1,30

3 1,

476

1,67

3 1,

899

2,15

8 2,

455

2,79

7 3,

188

3,63

9 4,

159

4,75

8 En

ergy

Sal

es

(MW

h)

3,34

4 3,

784

4,28

5 4,

859

5,51

6 6,

268

7,13

0 8,

120

9,25

8 10

,568

12

,077

13

,816

Gros

s Gen

eratio

n ( M

Wh)

3,71

6 4,

204

4,76

2 5,

399

6,12

8 6,

964

7,92

2 9,

023

10,2

87

11,7

42

13,4

18

15,3

51

Load

Fac

tor (

%)

37%

37%

37%

37%

37%

37%

37%

37

37%

37%

37%

37%

<A

RA

CEL

I>

20

04

2005

20

06

2007

20

08

2009

20

10

2011

20

12

2013

20

14

2015

Pe

ak D

eman

d (k

W)

145

165

188

214

244

278

317

363

416

477

548

630

Ener

gy S

ales

(M

Wh)

27

2 30

8 35

1 39

9 45

5 51

9 59

3 67

9 77

8 89

2 1,

024

1,17

8

Gros

s Gen

eratio

n ( M

Wh)

302

343

390

444

506

577

659

754

864

991

1,13

8 1,

309

Load

Fac

tor (

%)

24%

24%

24%

24%

24%

24%

24%

24

24%

24%

24%

24%

7-13

Page 142: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

7-14

<BA

LAB

AC

>

2004

20

05

2006

20

07

2008

20

09

2010

20

11

2012

20

13

2014

20

15

Peak

Dem

and

(kW

)14

5 16

5 18

8 21

4 24

4 27

8 31

7 36

3 41

6 47

7 54

8 63

0 En

ergy

Sal

es

(MW

h)

272

308

351

399

455

519

593

679

778

892

1,02

4 1,

178

Gros

s Gen

eratio

n ( M

Wh)

302

343

390

444

506

577

659

754

864

991

1,13

8 1,

309

Load

Fac

tor (

%)

24%

24%

24%

24%

24%

24%

24%

24

24%

24%

24%

24%

<C

AG

AYA

NC

ILLO

>

2004

20

05

2006

20

07

2008

20

09

2010

20

11

2012

20

13

2014

20

15

Peak

Dem

and

(kW

)45

51

58

66

76

86

99

11

3 12

9 14

8 17

0 19

5 En

ergy

Sal

es

(MW

h)

91

103

118

134

152

174

199

227

260

299

343

394

Gros

s Gen

eratio

n ( M

Wh)

94

107

121

138

157

179

205

234

268

308

353

406

Load

Fac

tor (

%)

24%

24%

24%

24%

24%

24%

24%

24

24%

24%

24%

24%

<A

GU

TAYA

>

2004

20

05

2006

20

07

2008

20

09

2010

20

11

2012

20

13

2014

20

15

Peak

Dem

and

(kW

)68

77

88

10

1 11

5 13

1 15

0 17

2 19

7 22

6 26

0 29

9 En

ergy

Sal

es

(MW

h)

138

156

178

203

231

264

302

346

397

455

523

602

Gros

s Gen

eratio

n ( M

Wh)

142

161

183

209

238

272

312

357

409

469

540

621

Load

Fac

tor (

%)

24%

24%

24%

24%

24%

24%

24%

24

24%

24%

24%

24%

7-14

Page 143: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

7-15

7.3.2 Power Development Plan for the Backbone Grid

(1) Power development plan for the backbone grid (a) Generation development plan for the backbone grid

As a result of the detailed technical study, the generation development projects based on the optimal generation development plan are shown in Table 7.3.2.

For 2014 and 2015 the JICA Study team recommends two scenarios for optimal generation development. One is the Base Scenario (A) and the other is the Optional Scenario (B) that takes into consideration the environment.

Table 7.3.2 Project List for the Generation Development Plan of the Backbone Grid

Year Project GeneratorType

Rated Capacity

(kW)

Dependable Capacity

(kW) Remark

(Transfer of Power Barge 106) Bunker C (14,400) (8,400) On-going 2004

Temporally Leased Genset (8,400) Diesel 8,400 8,400 On-going

2005 -------(No Project)-------

(Removal of Temporally Genset) Diesel (8,400) (8,400) JICA assumption

New Diesel (2x5,000) Diesel 10,000 9,000

Malatgao Hydro (2,200) Hydro 2,200 2,200

Barong Barong Hydro (620) Hydro 620 620

Talakaigan Hydro (990) Hydro 990 990

2006

Cabinbin Hydro (800) Hydro 800 800

(Removal of Roxas & Taytay Genset) Diesel (1,529) (1.420) 2007

Babuyan Hydro (5,600) Hydro 5,600 5,600

2008 New Diesel (2x1,500) Diesel 3,000 2,700

Baraki Hydro (840) Hydro 840 840 2009

New Diesel (5,000) Diesel 5,000 4,500

2010 New Diesel (1,500, 5,000) Diesel 6,500 5,850

2011 New Diesel (2x 5,000) Diesel 10,000 9,000

2012 New Diesel (2x 5,000) Diesel 10,000 9,000

2013 New Diesel (2x 5,000) Diesel 10,000 9,000

A New Diesel (2x 10,000) Diesel 20,000 18,000 Base Scenario 2014

B New Diesel (3x 5,000) Diesel 15,000 13,500 Option Scenario

A New Diesel (2x 5,000) Diesel 10,000 9,000 Base Scenario

Batang Batang Hydro (6,700) Hydro 6,700 6,700

2015

B New Diesel (2x 5,000) Diesel 10,000 9,000

Option Scenario

Page 144: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

7-16

0

100,000

200,000

300,000

400,000

500,000

600,000

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Gro

ss G

ener

atio

n (M

Wh)

DieselBunkerHydro

(b) Generation capacity and LOLP in the backbone grid The yearly peak demand, generation capacity (dependable capacity) and LOLP in the

Base Scenario are as shown in Figure 7.3.1.

Figure 7.3.1 Peak Demand, Generation Capacity and LOLP in the Backbone Grid

(c) Gross generation in the backbone grid The yearly gross generation in the Base Scenario is as shown in Figure 7.3.2.

Figure 7.3.2 Gross Generation in the Backbone Grid

0

20,000

40,000

60,000

80,000

100,000

120,000

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Dem

and,

Cap

acity

(kW

)

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

LOLP

(day

/yea

r)

Diesel CapacityHydro CapacityPeak DemandLOLP

Page 145: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

7-17

(2) Power development plan for the isolated grids (a) Generation development plan for the isolated grids

As a result of the detailed technical study, the generation development projects with their respective rated capacities (kW) are shown in Table 7.3.3.

Table 7.3.3 Project List for the Generation Development Plan for the Isolated Grids (Unit: kW)

Year ElNido SanVicent

e Busuanga Cuyo Culion Linapacan Araceli Balabac Cagayancillo Agutaya Total

2004 - - 2x500 2x500 - - - - - - 2,0002005 2x260 260 - - 2x260 2x163 163 163 54 54 2,0602006 - - - - - - - - - - -2007 - 260 - 500 - 260 260 163 163 163 1,7692008 500 - - - - - - - - - 5002009 - - 2x500 500 500 - - - - - 2,0002010 - - - - - - - - - - -2011 500 500 2x1,000 2x1,000 500 - - - - - 5,5002012 - - - - - 260 - - - - 2602013 - 500 2x1,000 500 - 260 260 - - 3,5202014 500 - 2x1,000 - 500 - - - 163 3,1632015 - - 2x1,000 - 500 - - 260 - - 2,760Total 2,020 1,520 8,000 6,000 2,520 1,346 683 846 217 380 23,532

(b) Generation capacity in the isolated grids

The yearly total peak demand and total generation capacity (dependable capacity) of the isolated grids are shown in Figure 7.3.3.

Figure 7.3.3 Total Peak Demand and Total Generation Capacity in the Isolated Grids

0

5,000

10,000

15,000

20,000

25,000

30,000

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Dem

and,

Cap

acity

(kW

)

Diesel CapacityPeak Demand

Page 146: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

7-18

7.3.3 Transmission Development and Power System Operation Plans for the Backbone Grid (1) Transmission development and power system operation plans in the backbone grid

The proposed projects for the development of transmission lines, substations and system operation equipment are shown in Tables 7.3.4, 7.3.5 and 7.3.6

Table 7.3.4 Project List for the Transmission Line Development Plan

Year Project Project Type

Distance (km) Note

69kV Puerto Princesa-Roxas T/L New T/L 111.1 On-going

69kV Roxas-Taytay T/L New T/L 65.1 On-going

69kV Malatgao Hydro T/L New T/L 9.1 69kV Barong Barong Hydro T/L New T/L 7.0 69kV Talakaigan Hydro T/L New T/L 9.3

2006

13.8kV Cabinbin Hydro S-T/L New S-T/L 5.0 2007 69kV Babuyan Hydro T/L New T/L 25.0 2008 13.8kV Tie Line (Doubled Circuit) Rehabilitation 11.0

69kV Baraki Hydro T/L New T/L 8.8 2009 69kV Tie Line (Voltage step-up ) Rehabilitation 11.0 A 69kV Taytay-El Nido T/L New T/L 75.0 Base Scenario

69kV Taytay-El Nido T/L New T/L 75.0

2015

B Batang Batang Hydro T/L New T/L 13.0

Option Scenario

Table 7.3.5 Project List for the Substation Development Plan

Year Project Project Type

Capacity (kVA) Note

69/13.8kV Roxas S/S New S/S 5,000 69/13.8kV Taytay S/S New S/S 5,000

2006

69/13.8kV Abo-Abo S/S New S/S 5,000 2008 69/13.8kV Transformer (Narra S/S) Additional Tr. 5,000 2009 69/13.8kV Puerto Princesa S/S New S/S 40,000 2012 69/13.8kV Transformer (Brooke's S/S) Additional Tr. 5,000 2013 69/13.8kV Transformer (Narra S/S) Additional Tr. 5,000 2014 69/13.8kV Transformer (Puerto S/S) Additional Tr. 40,000 2015 69/13.8kV El Nido S/S New S/S 5,000

Table 7.3.6 Project List for the Power System Operation Plan Year Project Project Type Remark 2009 ALD System System Stabilizing Equipment 2015 Palawan Dispatching Center SCADA/ EMS System

Page 147: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

7-19

(2) Future power system configuration of the backbone grid The power system map and configuration of the backbone grid in 2015 are as shown in

Figures 7.3.4 and 7.3.5.

Figure 7.3.4 Power System Map of the Backbone Grid (2015)

Barong barong('06)

Malatgao ('06) Talakaigan ('06)

Bataraza S/S

Baraki ('09)

Babuyan ('07)

Batang Batang ('15op)

Cabinbin ('06)

Power System Map of the Backbone Grid

Brooke’s Point S/S (Tr: '12)

Narra S/S (Tr: '08, '13)

Irawan S/S

Puerto Princesa DPP

Delta-P IPP

Roxas S/S ('06)

Taytay S/S ('06)

Abo-Abo S/S ('06)

El Nido S/S ('15)

Existing Transmission Lines Planed Transmission Lines (on-going projects) Planed Transmission Lines (proposed projects) Existing Substations Planed Substations (on-going projects) Planed Substations (proposed projects)

Puerto Princesa S/S ('09, Tr: '14)

Page 148: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

7-20

Figure 7.3.5 Power System Diagram of the Backbone Grid (2015)

Brooke'sPoint

Narra

Roxas ('06)

Taytay ('06)

Puerto Princesa ('09, Tr:'14)

Irawan

El Nido ('15)

Bataraza

Babuyan

Malatgao

Talakaigan

Baraki

Batang Batang

Barong Barong

Cabinbin

('06)

('06)

('15/op)

('06)

('06)

('09)

('07)

('06)

Abo-Abo ('06)

(2cct: '08, 69kV: '09)

('15)

(Tr: '08, '13)

(Tr: '12)

Delta-P

Power System Diagram of the Backbone Grid

69kV Circuit (existing) 69kV Circuit (planed) 13.8kV Circuit (existing)13.8kV Circuit (planed)

('06)

Page 149: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

7-21

7.3.4 Investment Costs for the EC-Grids Power Development Plan The investment costs for the EC-grid power development plan are summarized in Table

7.3.7. In this table, investment costs for one project are calculated at the commissioning year with the interest for construction term. Costs for the temporally leased generator projects in 2004 are not included.

Table 7.3.7 Investment Costs for the EC-Grids Power Development Plan

(million Php) Generation Transmission

Year Backbone Isolated Subtotal T/L S/S Operation Subtotal

Total

2004 158.4 158.4 158.4

2005 102.7 102.7 102.7

2006 1,226.9 1,226.9 444.0 70.3 514.3 1,741.2

2007 1,121.4 44.6 1,166.0 19.2 19.2 1,185.2

2008 215.6 39.6 255.2 10.5 10.5 265.7

2009 492.7 158.4 651.1 20.1 88.5 1.0 109.6 760.7

2010 454.1 454.1 454.1

2011 669.7 419.0 1,088.7 1,088.7

2012 669.7 12.1 681.8 10.5 10.5 692.3

2013 669.7 253.4 923.1 10.5 10.5 933.6

2014 1,296.9 238.1 1,535.0 44.3 44.3 1,579.3

2015 669.7 201.8 871.5 281.0 43.1 78.2 402.3 1,273.8

2004-15 7,486.4 1,628.1 9,114.5 764.3 277.7 79.2 1,121.2 10,235.7

Page 150: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target
Page 151: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

8-1

Chapter 8 Recommendations for Achievement of the Master Plan for Power Development in Palawan Province

8.1 Issues in Implementation of the Master Plan 8.1.1 Outlook for Assurance of Funding Sources for Electrification in Palawan Province

The electrification of all barangays in Palawan Province by the end of 2006 as noted in the master plan would require the electrification of the 160 barangays there that had not been electrified as of December 2003 over a period of about three years. However, the financing required for this work is still under heavy constraints. As compared to the island of Luzon, Palawan is saddled with poor geographical conditions that would drive up facility construction costs considerably. (In Luzon, the cost of electrification by extension of the grid averages an estimated 1 million pesos per barangay, but the corresponding cost in Palawan is about three times as much.) The financial constraints are therefore particularly serious in its case.

Let us consider the financial outlook for electrification plans in 2004. The main prospective

funding sources are outlays from independent power producers (IPPs) under the Adopt-a-Barangay Program, subsidies from the National Electrification Administration (NEA) for electric cooperatives (ECs), amounts budgeted under the Missionary Electrification Development Plan (MEDP) promoted by the Small Power Utility Group (SPUG) of the National Power Corporation (NPC) and the adaptable program loan (APL) package currently being negotiated between the Philippine government and the World Bank. Nevertheless, there are several factors of uncertainty in this outlook.

Regarding the funding from IPPs, under the framework of the Adopt-a-Barangay Program

to which KEPCO and Mirant1 are already committed, the former is to electrify 34 barangays in 2004, and the latter, 50 barangays in 2004 and 2005.

As for the second source (NEA subsidies), ECs have thus far applied such funds in

electrifying three or four barangays a year. However, the NEA tends to be slow to execute its budget; the 2003 budget was executed in October of that year.

There are some apprehensions about future subsidies from the NEA. The NEA dismissed

all 700 of its staff in late 2003 and is going to rehire 400 in 2004 as it instates a shakeup. Even under this shakeup, the NEA will reportedly continue to provide subsidies from the General Appropriation, but it is not clear at present whether there will be a change in its policy. 1 KEPCO decided to design the project and procure funds itself for electrification of 34 barangays, and launched the project in January 2004. It

intends to complete the project, inclusive of field studies, determination of electrification method, and construction of facilities, by the end of 2004. The Mirant project had already electrified 17 of the 50 barangays as of January 31, 2004, but the construction cost per barangay was far in excess of the 1 million pesos originally anticipated. The project has consequently gone far over budget, and the handling of the remaining 33 barangays was left to the Department of Energy (DOE). In subsequent negotiations with the DOE, Mirant sought a list of barangays that would be candidates for electrification, and received one from ECs. The remaining 33 barangays are to be electrified over the two-year period of 2004-2005.

Page 152: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

8-2

Thirdly, the NPC-SPUG has announced its intention to electrify 20 barangays in 20042. Nevertheless, these 20 barangays have not yet been included in the electrification plans for which budget is to be executed in the first half of 20043. Therefore, budget will be executed for these plans no earlier than the second half of 2004.

Lastly, a final determination has not yet been made on the APL package from the World Bank

for the prospective electrification of 40 barangays (the loans are expected to be received by June 2004).

Even if all of the aforementioned projects were executed, there would still be no outlook for

funding for electrification of 20 to 30 barangays (the possibility that the budget may not be available for even the other projects cannot be denied). In other words, even in Palawan there remains the problem of a shortage of funds that must be procured over the next three years4. The financial difficulties should become even worse in the next phase that begins in 2007, which is aimed at increasing the electrification rate on the household basis.

Table 8.1.1 Current Status of the Barangay Electrification Projects

Funding sources Number of barangays

Target year Comments

Mirant 17 33

2003 2004-05

− Virtually completed as of January 2004 − Presentation of a list of candidate barangays by

ECs KEPCO 34 2004 − Execution of all tasks from preparation of

drawings to funding procurement by KEPCO − Electrification methods including mini-grids

and stand-alone power systems 2002 NEA subsidies 5 2003 − Construction completed at 3 barangays and

underway for 1 barangay − Shelving of budget execution for 1 barangay

2003 NEA subsidies 4 2004 − 2003 budget execution delayed until October 2004 NEA subsidies 3 2004 − Under negotiation World Bank APL 40 2004-06 − Under negotiation between the government and

the World Bank UNDP/PGP/DOE 2 2004 − Under negotiation NPC-SPUG/MEDP 20 2004 − Not included in the budget execution in the first

half of 2004 (no earlier than the second half) Notice: APL: Adaptable Program Loan; BEP: Barangay Electrification Program Source: Prepared by the JICA Study Team based on interview findings

2 This is to be done by constructing a photovoltaic battery charge station. 3 These plans envision the electrification of 116 barangays nationwide. The SPUG has also announced plans for the electrification of 426

barangays over the three-year period ending with 2006. 4 See Section 2.5.2

Page 153: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

8-3

8.1.2 Limits of the Current Electrification Scheme

It would, in reality, be extremely difficult to achieve barangay electrification solely through the ECs and the SPUG as the two major principals of rural electrification (RE). The biggest reason is the aforementioned financial constraints.

Obviously, the ECs are expected to play the largest role in RE promotion. With the structural

reform in the power sector, however, the NEA has become unable to provide ECs with funding other than the subsidies from the General Appropriation. As such, for future investment, ECs will have to obtain funds through the market based on earnings from their power distribution business. This is to say that they must procure funds on their own responsibility as power distributors. As viewed from this standpoint, it will become increasingly difficult to extend distribution lines into areas that do not afford good earning prospects.

There are clearly also limits to the financial capabilities of the NPC-SPUG, which is

responsible for missionary electrification. The passage of the Electric Power Industry Reform Act (EPIRA) led to recognition of the imposition of a universal charge as a funding source for missionary electrification. At present, however, there is a big gap between the amount applied for by the NPC-SPUG and that authorized by the ERC5. Moreover, most of the income (subsidies) obtained through the universal charge "disappears," in that it is used to compensate for the deficits at existing facilities. Funding available for investment in new projects is extremely limited6.

In other words, both the ECs and the NPC-SPUG have very restricted resources to fund

further investment. As a means for supplementing the activities of the ECs and the NPC-SPUG, local

government units (LGUs) are installing diesel generators known as "gen-sets" for the supply of power to barangays. This approach is also saddled with many problems. To be sure, gen-sets can be installed with funding from the Provincial Government of Palawan (PGP), but the LGUs lack the ability to maintain and manage the gen-sets themselves. In some cases, gen-sets are being left idle due a lack of fuel because of budget shortages7. At present, LGUs clearly lack the capability needed for operation of power supply on the project basis.

In light of the limits associated with the current scheme for electrification, it will not be

possible to attain the RE targets in Palawan without introducing some new mechanism to compensate for these limits.

5 The universal charge approved for imposition in missionary electrification in 2003 was only 3.37 centavos per kilowatt-hour as opposed to

that of 9.52 centavos in the NPC-SPUG application. 6 See Section 2.3.4 7 CERF/International Institute for Energy Conservation - Asia 2002

Page 154: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

8-4

Shell Solar is already expanding its sales of solar home systems (SHSs) in Palawan based on financial assistance from the Government of the Netherlands. In the context of the Palawan New and Renewable Energy and Livelihood Support Project (PNRELSP), the PGP is also attempting to build a new mechanism for financial programs, toward the success of the SHS sales business model introduced by Shell with funds from the United Nations Development Programme Global Environment Facility (UNDP-GEF). Similarly, efforts are being made to promote SHS diffusion and launch private-sector distribution projects based on mini-grids in place of ECs and the NPC-SPUG, with APLs from the World Bank.

There is a limit to the funds that can be prepared by the government, and also to the

capabilities of the existing ECs and the NPC-SPUG. The situation demands the construction of a scheme for diversified project promotion that will give full play to private-sector funds and aid from bi- and multi-lateral institutions, and thereby resolve the difficulties now being confronted. Unless this is done, the master plan described in this study cannot be achieved. 8.1.3 New Electrification Projects with Poor Prospects for Retrieval of Costs

The un-electrified districts in Palawan that are the targets for future electrification are farther

away from the installed transmission and distribution grids, and also have a lower demand density. This naturally results in a higher level of construction cost per kilowatt of capacity and operating cost per kilowatt-hour of service. It consequently becomes even harder to retrieve costs.

Grid extension by ECs into un-electrified districts has been lagging because of difficulties

in two major aspects: securing earnings from the additional investment and procuring the requisite funds.

It would be hard for ECs to make new investments for the electrification of barangays not affording

good prospects for retrieval of costs without some scheme enabling the procurement of funds and retrieval of costs (which ultimately would mean a hike in rates or dependence on subsidies). In particular, a rate hike would probably deepen dissatisfaction and opposition among the existing EC members.

Steps must be taken not only to reduce construction costs but also to resolve such problems

with the operations. This cannot be done merely by according priority to expansion of distribution service by ECs; other electrification methods must be incorporated to curtail the investment cost as much as possible. For example, electrification based on off-grid systems and stand-alone power systems for installation in individual households could be adopted. These methods must be actively incorporated into programs for barangay electrification.

In addition, the construction of this new framework for additional electrification projects

will require a new scheme for the procurement of funds. Mere technical feasibility is not enough; without assurance of operating methods and funding sources, it will be impossible to electrify Palawan as envisioned in the master plan.

Page 155: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

8-5

8.2 Advisable Setup for Promotion of Barangay Electrification 8.2.1 Importance of Incorporating Stand-Alone Power Systems

Viewed from the standpoint of beneficiaries, grid extension is naturally the most preferable of all the electrification methods in various respects, including supply potential and stability.

In reality, however, methods other than grid extension must be applied due to constraints in

the cost aspect (e.g., low demand density and long distances from existing grids) as well as in the aspects of fund procurement and the environment, such as Environmentally Critical Areas Network (ECAN) zoning.

As described above, there are as yet no prospects for procuring funds for electrification of 20

to 30 barangays by the end of 2006. In the case of these barangays, all options must be considered, including that of beneficiary burdens. In addition, seeing that the provision of additional funding in large amounts cannot be expected within the next three years, the practical approach would lie in devising electrification methods that curtail costs to the lowest possible level.

For these reasons, it is thought that supply through mini-grids and the installation of

stand-alone systems such as battery charge stations (BCSs) and SHSs will have a vital role to play for electrification of a fairly large proportion of the remaining un-electrified barangays. 8.2.2 Need for Diversification of the Project Setup and Issues related to New Project Models

The operation of stand-alone power systems requires the instatement of diverse new project models. There are already several models that could serve as archetypes. Some examples are listed below. (1) Barangay power associations

One such model is the barangay power association (BAPA), which is operated by the barangay residents. However, BAPAs also have many problems. They generally lack the technical foundation needed for operation and maintenance (O&M) as required for running the works. They also tend to be on very weak financial ground. At present, the barangays take over facilities constructed by ECs or LGUs and use them to supply power to the residents. When the facilities break down or otherwise require repair, the BAPAs have no choice but to depend on the ECs or LGUs. The facilities are therefore at risk of being left idle and un-repaired.

In addition, residents may feel discontent over the cost burden. As compared to the EC

retail rate of 5.8 pesos per kilowatt-hour, the cost burden of the beneficiaries in BAPA distribution service, which is on the order of 15 pesos per kilowatt-hour, must be termed extremely high.

Page 156: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

8-6

(2) SHS dealers The diffusion of SHSs is another option. There are two major methods of SHS sales: 1)

leasing of SHSs to customers and collection of a monthly fee for use, and 2) outright purchase by customers and provision of post-sales services by dealers for a fee. In its current business in Palawan, Shell applies the latter method. Leasing holds a high risk of non-payment of the leasing fees, and past experience made Shell decide against it.

Shell's business is smoothly expanding, but it is being supported by subsidies from the

Dutch government for initial investment (the cost of purchase)8. In other words, it cannot be denied that the expanded sales of SHSs rest on these subsidies. The Dutch government has appropriated 5 million dollars for the subsidies, which are to be discontinued once 15,000 systems have been sold.

As such, there is a limit to the direct provision of subsidies, and the preparation of a

financial scheme enabling individual beneficiaries to procure funds will eventually assume more importance for the widespread diffusion of SHSs. (3) Distribution service by qualified third parties using mini-grids

Distribution service may also be provided through mini-grids with "qualified third parties" as defined in EPIRA serving as the operators. Based on concession agreements, this approach may be taken in districts where there are no prospects for grid extension by ECs. This model has already been incorporated into the World Bank APL package, and plans are being made for its implementation in 40 barangays in Palawan. It is also one of the options in the KEPCO "Adopt-a-Barangay" program.

Nevertheless, the economic feasibility varies with the number of customers as one of the

preconditions, and therefore must be assessed on a case-by-case basis. In the World Bank APL package, there are plans to prepare 66 million dollars in funding. The way has also been paved for subsidies from a universal charge.

In the mechanism for this project, the incentives for investors (operators) would greatly

differ depending on the level at which rates can be set for final customers and the amount of subsidies available. Thus far, the DOE has taken a definite stance of providing subsidies only for initial investment and not for operating costs, in order to see that operators maintain disciplined operation.

As in the case of BAPAs, rates could possibly be higher than those offered by ECs. It

consequently could be difficult to find a point of compromise between the assurance of operator profits and curtailment of discontent among customers.

8 The standard 50-Wp model costs about 33,000 pesos without subsidies, but sells for 18,360 pesos with the subsidies.

Page 157: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

8-7

(4) Power supply using privately owned power systems (POPSs) In areas where the demand is too small to support a power supply as a self-sufficient

business, use of systems owned by individuals for supplying power to neighboring homes must be considered as one of the options. The premise here is the use of small generators for supplying power to neighboring households by running distribution lines to them or by connecting BCSs to them.

The facilities are completely privately owned and are by no means installed for business

purposes. As such, the supply may not be accompanied by a definite contract relationship with the beneficiaries receiving the power, or by the setting of authorized rates. These points constitute some cause for apprehension about how to assure social credibility and sustainability as a power supply scheme. 8.2.3 Preparation of a New Electrification Setup in Palawan and Role of PGP

For the success of the master plan, various service models must be put into practical application. It will be impossible to raise the funds needed for electrification without mobilizing those in the private sector and individuals, instead of depending solely on public-sector funds. To this end, much must be expected of the PGP as regards encouraging a lot of entrants to participate in the market and preparing conditions conducive to the operation of their businesses. For this reason, the PGP must more clearly define its role and the tasks to be tackled from now on. (1) Clarification of the PGP role

The PGP ought to act as a policy-maker; it would not be advisable for it to get directly involved in the operation of businesses.

One of the main reasons for this is that the capabilities of official agencies are quite different

from those needed by operators. This is evidenced by cases in which generation facilities owned by LGUs lie idle because of the lack of adequate O&M capabilities and budgetary backing. Furthermore, an assumption of responsibility extending to O&M by the PGP in order to avoid such situations could swell the PGP organization into areas that are not within its proper jurisdiction. There is also the strong possibility that this would expand the administrative cost burden.

In contrast, the role that is most desired of the PGP, as policy-maker, is to petition the

national government and assembly for action on various matters, such as policy support for the service plans of the NPC-SPUG and ECs. Depending on the case, it may also have to make overtures that are political in nature. Funds from the national government (including NEA subsidies, DOE budget and funds for aid from overseas donors) are extremely important to the electrification of Palawan. The PGP must take the initiative in making the systemic (institutional) arrangements required for promoting electrification.

Page 158: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

8-8

(2) Review of the Master Plan and drafting of an electrification program The Master Plan is a blueprint for electrification in the province up to 2015 as part of the

expanded rural electrification (ER) program on the national governmental level. However, this blueprint ought to be revised as actual progress is made in electrification, and these points to a need for reviews at regular intervals.

For the execution of electrification, the PGP should draft a medium-term program for

specific actions based on the Master Plan, and furnish support for the individual projects making up this program.

The PGP must define targets for each year up to and including 2015, and formulate

individual projects needed for attaining these targets. It also must stay constantly apprised of the progress of each project already under way, and propose countermeasures or alternative projects in the event of delays or major changes. In addition, it must approach concerned parties (e.g., ECs, the SPUG, private enterprises, beneficiaries, the national government and overseas aid institutions) on behalf of the project. All of these activities are vital parts of the PGP role.

The instatement of a scheme for implementing new business models is a field where the

PGP must furnish formidable support. This is especially true in the case of operations led by residents, such as BAPAs and POPSs. While these are expected to be of crucial importance for expanded electrification, resident-centered organizations tend to have extremely frail foundations in both financial and technical terms. To obtain the requisite funding and the technical capabilities needed for O&M, it is indispensable for them to have the support of local banks and ECs in Palawan. The PGP must make the requisite arrangements for such support. (3) Necessity of establishment of a dedicated energy section in the PGP

As described above, to secure the implementation of the master plan proposed in this study, the PGP must establish a diversified institutional and organizational framework for electrification, show its leadership as policymaker, and plan electrification programs and projects. In this sense, the role of the PGP is very important and critical.

In the PGP organization, however, there is no dedicated section that oversees energy issues including power development. In the current situation, only six personnel from the Planning and Development Office were assigned to be engaged in the Master Plan Study.

It is strongly recommended that this tentative organization be strengthened as an independent and dedicated section (e.g., a provisional energy department) and also that its capacity be reinforced. This provisional energy department must carry out the following tasks:

• Periodical review and revision of the master plan; • Planning of individual power development and electrification programs and projects; • Preparation and analysis of necessary data for planning electrification programs and

projects, and establishment of a system for such data that relevant organizations and persons can freely access;

Page 159: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

8-9

• Coordination of and policy support for individual power projects, which are carried out by various stakeholders such as EC, NPC-SPUG, private investors, and beneficiaries;

• Promotion of development and use of new-and-renewable energies for power development;

• Provision of policy necessary for implementing the master plan, and negotiation with and petition to the national government and assembly for necessary policy and funding support; and

• Establishment and management of a scheme for fundraising required for power development (A concrete rural electrification funding scheme is shown in the section 8.3)

In addition, to see that these organizational capabilities function effectively and to improve

staff skills, it is necessary to continue programs of capacity building, not only for the organization but also for each staff member.

8.3 Establishment of an RE Fund and Construction of a Scheme for Mobilizing Funds

Organizations with a budgetary foundation, such as ECs and the SPUG, may face problems

but are generally able to procure funds. In contrast, funding is hard to obtain for the diffusion of residential SHSs and mini-grid service, which have a vital role to play in electrification over the coming years. Provisions must be made to mobilize funds for them.

As an additional means of fund procurement, the Master Plan proposes the establishment of a

rural electrification fund pool (REFP) managed by the PGP, as well as the promotion of RE with funds from this pool. 8.3.1 Funding Sources

The REFP would be a pool that manages several funds in the interest of administering

funding available from various institutions. Its objective is to use these funds for additional investments on the project basis and for the provision of O&M budgets for existing facilities. Its major sources of base funds are as follows.

(1) Energy Regulation 1-94

Energy Regulation 1-94 (ER 1-94) is a funding source that is manageable by the PGP (see Section 2.3.2). To fund RE, the PGP could use the entire 0.5 centavos per kilowatt-hour from the Electrification Fund and a part of the 0.25 centavos per kilowatt-hour from the Livelihood Fund.

The Livelihood Fund was set up for applying funds to projects aimed at bettering the life of

residents. Nevertheless, its funds may also be used for the cost of wiring houses to promote electrification and for operating costs required for power supply.

Page 160: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

8-10

With the effectuation of the EPIRA implementing rules and regulations (IRR), ER 1-94 came to be applied even to small generators, which had previously been exempted from its application. As a result, even Delta-P and diesel power plants operated by the NPC-SPUG in Palawan will be obliged to pay the ER 1-94 levy, and this will constitute a financial resource. (2) Share of benefits from utilization and development of natural wealth

This is stipulated in Item B, Rule 29 of the IRR. It compels any agencies, corporations or other entities engaged in the utilization and development of national wealth (i.e., natural resources) to pay to the concerned LGU whichever is higher: 1% of their sales, or 40% of the national wealth taxes, royalties, fees or charges paid to the national government.

In Palawan, the Malampaya Natural Gas Project falls under this stipulation, which

consequently can be applied to royalties from it. At present, however, there is a dispute between the PGP and the national government about whether or not the geographical location of the Malampaya gas field is actually in the province. A conclusion has not yet been reached on this question.

If the rights are recognized as belonging to the province, about 2 billion dollars in funding

could be obtained by the end of 2021. (3) Provision of funds from developed-country corporations

There are good chances for utilization of renewable energy such as mini hydropower, photovoltaic systems and biomass in Palawan electrification projects. By applying the Clean Development Mechanism (CDM) to these projects, it would be possible to build a scheme for receipt of funding from companies from developed countries.

The basic idea would be to have a CDM fund established mainly by the PGP and seek

contributions (i.e., a sort of equity) from companies that want to get quotas for greenhouse gas (GHG) emissions in other countries. The CDM fund could be used to fund investment for CDM projects. The GHG emission quotas would, in turn, be allocated among the investing companies, in proportion with their contribution.

The Philippines ratified the Kyoto Protocol in October of 2003, and therefore has footing

for the introduction of CDM schemes. A decision has already been made to set up a designated national authority (DNA) for it within the Department of Environment and Natural Resources (DENR). The national government and aid institutions are moving ahead with preparations for the launch of CDM projects applying renewable energy9. In this sense, the foundation for utilizing the CDM is now taking shape.

9 The UNDP has determined technical assistance for establishment of the DNA.

Page 161: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

8-11

(4) Local taxes A local tax could be imposed on distribution companies in the province. The prospective

targets would be ECs. ECs receive continuous funding for the purchase of wholesale power from the SPUG,

investment in distribution lines and facility O&M. This funding enables them to hold down their rates. In contrast, rates must be set on extremely high levels by electrification entities that lack schemes for such ongoing assistance (e.g., BAPAs). The local tax would be aimed at rectifying this inconsistency, if only by a slight degree.

In the following respects, however, the imposition of such a local tax would have to be

preceded by in-depth studies among the concerned parties. It cannot be denied that BAPAs, too, receive assistance for initial investment, in that they

are furnished with facilities from LGUs and ECs virtually free of charge. Putting initial investment aside, the continuation of the service requires the retrieval of depreciation and repair costs, but arrangements have not yet been made for such funding, and this is creating problems for the business continuity. In fact, such problems are already surfacing. If all of these costs were transferred to customers under the beneficiary burden principle, the BAPA rate levels, which are already high at about 15 pesos per kilowatt-hour, could jump to 30-40 pesos with the addition of depreciation costs. Owing to such circumstances, it would in effect not be practical to transfer all costs to beneficiaries, and some kind of solution is therefore needed.

Another issue has to do with the reforms and the related actions aimed at correcting the

structure of cross-subsidization that has been practiced for electric utilities thus far in the Philippines. Naturally, some may question the appropriateness of reallocating subsidies through such a scheme. 8.3.2 Application of Funds

Expenditures from the REFP resting on the aforementioned sources would be made through the following prospective framework. (1) Promotion of SHS diffusion through the SHS fund

Sales of SHS are already being assisted by grant aid from the Dutch government. This aid is supporting their diffusion, which is smoothly proceeding.

Under these circumstances, measures are being taken for the provision of loans to

individuals from financial institutions and for the avoidance of the related risk of non-performing debt with aid from the UNDP-GEF in the context of the PNRELSP. There is also a movement for the use of APL from the World Bank to provide a financial source for the

Page 162: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

8-12

flow of funds from commercial banks to local banks. These steps are aimed at paving the way for financing for individuals who have a low credit rating and would find it hard to borrow from ordinary commercial banks, by putting local banks and micro-credit in the middle.

In light of the risk of failure to repay loans, the establishment of a loss reserve fund to hedge

the risk of default has been proposed in the PNRELSP. At any rate, SHSs have a critical role to play in the electrification of Palawan and some

institutional arrangements must be made to expand the extension of loans to individuals and to hedge risks in order to secure these loans.

To support SHS sales, the PGP must institute such a SHS fund in a manner consistent with

the existing institutional mechanisms and use it to furnish assistance to dealers and funding to residents (e.g., public loans and partial subsidization of down payments). (2) O&M fund as a reserve for retrieval of depreciation costs and O&M expenses for

reinvestment in facilities Provisions have already been made for the loan of power generation facilities to BAPAs by

LGUs or ECs. These provisions are expected to expand over the coming years. Thus far, LGUs and ECs have lent facilities to resident organizations either for no fee or for

only a nominal fee, and the facility costs have not been recovered through rates. The problem with this setup lies in the limited service life of the facilities; unless depreciation costs are retrieved, funding has to be procured all over again for facility reinvestment. This reveals a need for preparation of a financial scheme enabling recovery of the cost of facilities lent to BAPAs.

If the facilities are owned by the ECs, they are counted as assets on the EC balance sheet and

are amortized in the context of EC financial affairs. As a result, even if depreciation costs cannot be retrieved from BAPAs, the EC can recover them from its rates (tariff revenue).

If the facilities are owned by LGUs, on the other hand, different problems would be

involved. Because governments do not have balance sheets, they also lack the concept of depreciation. In addition, at present, the Palawan LGUs take only 1 peso in facility leasing fees from BAPAs, and this is obviously far from the genuine retrieval of depreciation costs. Furthermore, arrangements have not been made for the recovery of O&M costs from rates. As such, there is no mechanism for balancing expenditures (costs) and income (cost recovery). It will consequently become impossible to keep electrification projects in operation if the government does not make budget appropriations for them every year.

In addition, there is some cause for apprehension about the emergence of future problems if

LGUs come to own even more facilities and continue to lend them to BAPAs under the current

Page 163: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

8-13

conditions. This would lead to a steady swelling of the funds needed for reinvestment and the routine O&M costs. As a result, the financial burden on the PGP would become heavier by the year.

The objective of the O&M fund would be to resolve these problems and assume the burden

of costs that cannot be transferred to rates. (3) Investment fund for general projects

This fund would be instituted to provide funds for additional investment in electrification or for the expansion of installed facilities. Its range of application should be as wide as possible in order to furnish the funds needed for construction of facilities owned by LGUs and lent to BAPAs, and to serve as part of the funds for investment by private enterprises.

Its prospective main sources would be the ER 1-94 Electrification Fund and the share of

benefits from the utilization and development of the national wealth in accordance with IRR Item 29. (4) Investment fund for CDM projects

As described in the section on funding sources, this fund would be confined to CDM projects. It would collect contributions from overseas companies and apply funds to specific projects.

It should be noted that, because of the small scale of electrification projects in Palawan,

application of the CDM to each project individually would be unrealistic, owing to the cost of obtaining authorization for each project separately. For this reason, the PGP must lead efforts to design a project that could serve as a model, obtain CDM authorization for it and then implement many others in the same manner.

Projects for which application of this fund is desired could be automatically made into

CDM projects by following (in other words, copying) this model designed for such application. With such preparations, the work of obtaining CDM authorization would be completed with

the design of the initial model project. In this way, the concerned parties could avoid the redundant work of repeatedly obtaining authorization at the stage of project implementation.

CDM application requires considerable time and expense for the establishment of the

baseline, assessment of the GHG-reducing effect and procedures for obtaining authorization as a CDM project. This work therefore should be undertaken quickly, beginning right from the stage of instituting the fund.

Page 164: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

8-14

EC

Universalcharge

POPS

BAPA

Rural Electrification Fund Pool(REFP)

Developed-countryinvestors

Overseas aidinstitutions

Private-sectorfinancial

institutions(banks, micro finance, etc.)

NGO

PGP

LGUs

Resourcedevelopment

WB-APL financing

IRR Rule 29, B

Provision of facilities,O&M support

Final customers

Rate (revenue) Power supply

Technical assistanceSHS sales

Electrification projects

NPC-SPUG

NEA GeneralAppropriation

Subsidies

DOE BEPbudget

Private-sectormini grid

Distributioncompanies

SHS dealers

RESCO projects

SubsidiesManagement

Initial investment expenses,O&M costs, assistance, etc.

ER 1-94

Financing

Contributions

EC

Universalcharge

POPS

BAPA

POPS

BAPA

Rural Electrification Fund Pool(REFP)

Developed-countryinvestors

Overseas aidinstitutions

Private-sectorfinancial

institutions(banks, micro finance, etc.)

NGO

PGP

LGUs

Resourcedevelopment

WB-APL financing

IRR Rule 29, B

Provision of facilities,O&M support

Final customers

Rate (revenue) Power supply

Final customersFinal customers

Rate (revenue) Power supply

Technical assistanceSHS sales

Electrification projects

NPC-SPUG

NEA GeneralAppropriation

Subsidies

DOE BEPbudget

Private-sectormini grid

Distributioncompanies

SHS dealers

RESCO projects

Private-sectormini grid

Distributioncompanies

SHS dealers

RESCO projects

SubsidiesManagement

Initial investment expenses,O&M costs, assistance, etc.

ER 1-94

Financing

Contributions

Source: Prepared by the JICA Study Team

Figure 8.2.1 Setup for Promotion of Electrification in Palawan

Rural Electrification Fund Pool (REFP)

SHS fund (includinga loss reserve fund) O&M fund General project

Investment fundCDM project

Investment fund

PGP

ER 1-94Electrification Fund-0.5 centavos/kWh

Livelihood Fund-0.25 centavos/kWh

Delta-P NCP-SPUGpower plants

New power sales tax

ECs

Developed-countryinvestors

Share of benefit from utilization and

development of national wealth(IRR Rule29, B)

Resourcedevelopmentcompanies

SHS dealers

Private-sectorfinancial

Institutions

Initial investment expenses, O&M cost, assistance, etc.

Beneficiaries

POPS

BAPA LGU ECs

Private-sector mini griddistribution companies Individuals

NPC-SPUG

NGO

Overseas aidinstitutions

ManagementRural Electrification Fund Pool (REFP)

SHS fund (includinga loss reserve fund) O&M fund General project

Investment fundCDM project

Investment fund

PGP

ER 1-94Electrification Fund-0.5 centavos/kWh

Livelihood Fund-0.25 centavos/kWh

ER 1-94Electrification Fund-0.5 centavos/kWh

Livelihood Fund-0.25 centavos/kWh

Delta-P NCP-SPUGpower plants

New power sales tax

ECs

Developed-countryinvestors

Share of benefit from utilization and

development of national wealth(IRR Rule29, B)

Resourcedevelopmentcompanies

SHS dealers

Private-sectorfinancial

Institutions

Initial investment expenses, O&M cost, assistance, etc.

Beneficiaries

POPS

BAPA LGU ECs

Private-sector mini griddistribution companies Individuals

NPC-SPUG

NGO

Beneficiaries

POPSPOPS

BAPABAPA LGULGU ECsECs

Private-sector mini griddistribution companiesPrivate-sector mini griddistribution companies IndividualsIndividuals

NPC-SPUGNPC-SPUG

NGONGO

Overseas aidinstitutions

Management

Source: Prepared by the JICA Study Team

Figure 8.2.2 REFP Scheme

Page 165: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

8-15

8.4 Application to Other Provinces

The province of Palawan, which is the target of this Master Plan, is less economically developed than urbanized districts such as the Manila area, partly due to its geographical situation as an outlying island. As a result, the rate of electrification is also relatively low.

To the Philippines, rural economic development is a key priority that absolutely must be

achieved if the country is to eradicate poverty. In addition, the promotion of RE provides leverage for rural economic development. This is behind the RE campaign that began with the O-Ilaw Project and evolved into the current ER program.

Attainment of the goal of electrifying all barangays by the end of 2006 is almost within

reach. Both the national and local governments are continuing with efforts to attain the next goal, namely electrification of 90% of all households by the end of 2017.

As indicated in this report, the biggest problem facing RE promotion in the Philippines is

the shortage of funds. Goals cannot be achieved on the strength of public-sector funds alone. Resolving this problem will require the injection of private-sector funds and the

establishment of business models that will make this possible. As was found in the Master Plan Study for Palawan, mini-grids and stand-alone systems have a vital role to play as means of electrification. Grid extension by ECs is the approach desired by many, but it could not feasibly be applied to all projects, considering the related cost and funds that must be procured.

What is needed for RE promotion is a variety of service models for power supply by

off-grid approaches. The beneficiaries, too, must be encouraged to mount their own efforts as far as possible to have their barangays electrified and thereby build a better economy and life for themselves. In this sense, the measures to spur installation of SHSs, which will probably carry a lot of weight in the Palawan electrification program, as well as the expansion of individual loans to support it must be regarded as social experiments of crucial importance. This also applies to the projects for power supply by residents themselves based on the BAPA model and those for mini-grid distribution by qualified third parties that are the subject of World Bank APLs.

Each of these attempts is still wrought with numerous difficulties. As compared to power

supply from the distribution network, SHSs have only a limited capacity. In addition, the rates in service through mini-grids operated by BAPAs are much higher than those offered by ECs, and the service operated by private companies based on APLs might magnify the burden on beneficiaries.

Nevertheless, it will be impossible to promote RE in the Philippines unless all parties

incorporate new schemes and take up the challenge of new targets in spite of these problems. Problems cannot be resolved merely by looking for subsidies from the government for the

Page 166: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

8-16

entire cost burden. In the midst of the far-reaching reform in the power sector, the government, too, has only limited funds and is no longer able to shoulder all costs as part of the fiscal burden.

Finally, it should be noted that the preparation of this Master Plan did not include in-depth

studies on possible increases in income levels through electrification. Even so, electrification is heavily bound up with the payment capabilities of residents. Solutions will never be found merely by repeating the line that low-income levels would prevent residents from paying bills and, conversely, projects could not be executed because costs therefore could not be retrieved.

For this reason, the preparation of RE plans and program must incorporate projects for

raising the income level of residents through electrification.

Page 167: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

S-1

Environmental Checklist S.1.1 Existing IEE Checklist (1) Review of the Philippine environmental impact statement system

Presidential Decree (PD) No.1151, which was proclaimed on June 6, 1977 and commonly known as the Philippine Environmental Policy, is the first policy issuance on the Environmental Impact Statement (EIS) system in the Philippine. In Section 4 of PD 1151, it is declared that all agencies shall prepare an environmental impact statement for every action, project and undertaking that significantly affects the quality of the environment. Then the Philippine EIS system was formally established on June 11, 1978 by virtue of PD No.1586.

PD No.1586 declared that environmentally critical projects (ECPs) and projects within

environmentally critical areas (ECAs) require the submission of an EIS, and the proponents are not allowed to undertake or operate any part of such ECPs or projects within ECAs without first securing an Environmental Compliance Certificate (ECC).

After that the EIS system has undergone several improvements by continuously introducing

new features and requirements, and now the EIS system is operated based on the DENR Administrative Order No.37, 1996 Series (DAO 96-37). According to DAO 96-37, in order to secure an ECC, proponents of ECPs are required to submit an EIS report with the Environmental Management Bureau (EMB). On the other hand, proponents of projects within ECAs are generally required to submit an Initial Environmental Examination (IEE) report to the concerned Regional Office of DENR-EMB. It is clarified that an IEE is a form of an EIS. The basic differences between these two documents are the depth and extent of the data requirement. An EIS report may be prepared instead of an IEE report for proposed projects within ECAs at the discretion of the proponent in certain cases or upon an order from the Regional Executive Director.

The projects or undertakings covered by the EIS system are defined as “any activity,

regardless of scale or magnitude, which may have significant impact on the environment” in DAO 96-37. All of the projects and undertakings are not covered by the EIS system. In the case that the project is not covered by the EIS system, a Certificate of Non-Coverage (CNC) may be issued by the EMB or the DENR regional office upon request from a proponent.

For the selected projects with relatively small scales and magnitudes, an IEE checklist report has been developed by the DENR-EMB in line with the target of streamlining the EIS system. The IEE Checklist report is a simplified form, instead of the standard EIS document, designed to assist the proponents. The list of projects covered by the IEE Checklist is defined by the DENR-EMB Memorandum Circular No.01, 2000 Series. The Memorandum Circular also defines format, contents and implementing procedures for the IEE Checklist.

Page 168: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

S-2

In this study, based on the review of the existing IEE Checklist Report, environmental checklists for the study of the power development master plan in Palawan Province were created.

(2) EIS process for the power facilities

Power facilities and related facilities that defined as the ECPs by DAO 96-37 are following: Major dams with storage volumes equal to or exceeding 20 million cubic meters Geothermal plants, waste-to-energy facilities, thermal power plants with capacities

equal to or exceeding 10MW Hydropower plants or any non-conventional power projects with capacities equal to or

exceeding 6MW Power barges with total capacity in excess of 32MW

In addition, a Memorandum of Agreement (MOA) on the streamlining of EIS processes for

power facilities and related facilities was reached between the DENR and DOE in 1999. This MOA, defined the kinds and scales of the projects for all facilities that were not covered by the EIS system. Also the projects covered by the EIS system are classified into following three categories; IEE checklist required, IEE report required, and EIS report required.

Regarding to the energy facilities mentioned in this MOA, Table S.1.1 shows the results for

selecting and classifying the power facilities and related facilities. According to this MOA, only the power plants with capacities equal to or less than 1MW, substations and switchyard (up to 220kV) are classified as not being covered by the EIS system. Renewable energy, hydropower, and power barges with capacities equal to or less than 10MW are classified as the projects that required an IEE checklist.

As for Palawan Province, the classifications of Table S.1.1 are not applicable directly,

because the entire province is classified as ECAs and the ECAN zoning was adopted. Although the transmission lines are classified as projects that require an IEE checklist in Table S.1.1, an EIS report is submitted to the DENR-EMB in the case of the Palawan backbone transmission line project.

Page 169: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

S-

3

Tabl

e S.

1.1

Doc

umen

ts R

equi

red

by th

e EI

S Sy

stem

for P

ower

Fac

ilitie

s as t

o th

e K

ind

and

Scal

e in

MO

A b

etw

een

DEN

R a

nd D

OE

To b

e co

vere

d by

the

EIS

Syst

em

Proj

ect

Not

cov

ered

by

the

EIS

Syst

em*

Req

uirin

g an

IEE

Che

cklis

t R

equi

ring

an IE

E D

ocum

ent

Req

uirin

g an

EIS

Doc

umen

t G

ener

al

A

ny

ener

gy

proj

ect

that

re

quire

s si

gnifi

cant

m

echa

nica

l ear

th m

ovin

g &

ec

olog

ical

/veg

etat

ive

dist

urba

nce

activ

ities

R

enew

able

Ene

rgy

(sol

ar, w

ind,

was

te to

en

ergy

, bi

ogas

, an

d tid

al

pow

er,

geot

herm

al)

C

apac

ity

from

gr

eate

r th

an 1

to 1

0MW

C

apac

ity

grea

ter

than

10

MW

Hyd

ropo

wer

Pla

nts

C

apac

ity

from

gr

eate

r th

an 1

to 1

0MW

Or

with

le

ss

than

20

m

illio

n cu

. m

. w

ater

im

poun

dmen

t

Cap

acity

gr

eate

r th

an

10M

W

O

r w

ater

im

poun

dmen

t gr

eate

r th

an 2

0 m

illio

n cu

. m

. Th

erm

al p

ower

Pla

nts

Bun

ker,

dies

el-f

ired

and

natu

ral

gas-

fired

w

ith

capa

city

less

than

or e

qual

to

10M

W

C

apac

ity

grea

ter

than

10

MW

Pow

er B

arge

s

R

esea

rch

(sei

smic

surv

ey,

grav

ity

surv

ey,

geos

cien

tific

, ge

ophy

sica

l sur

veys

, fea

sibi

lity

stud

y, o

ther

s) a

nd d

evel

opm

ent

activ

ities

th

at

don’

t in

volv

e si

gnifi

cant

ear

th m

ovin

g an

d ec

olog

ical

/ ve

geta

tive

dist

urba

nce

activ

ities

us

ing

mec

hani

cal

equi

pmen

t th

at

affe

ct th

e en

viro

nmen

t

All

dem

onst

ratio

ns a

nd p

ilot

ener

gy p

roje

cts,

pow

er p

lant

s w

ith c

apac

ity th

at is

less

than

or

equa

l to

1MW

as

long

as

soci

al

acce

ptab

ility

gu

idel

ines

ha

ve

been

co

mpl

ied

purs

uant

to

D

ENR

an

d th

e Lo

cal

Gov

ernm

ent

Cod

e re

quire

men

ts

Cap

acity

fr

om

grea

ter

than

1 to

10M

W

C

apac

ity e

qual

to 1

0 up

to

32M

W

C

apac

ity

grea

ter

than

32

MW

Po

wer

Tr

ansm

issi

on

Syst

ems

and

Subs

tatio

ns

Su

bsta

tions

/sw

itch

yard

onl

y (u

p to

220k

V)

Po

wer

tra

nsm

issi

on

syst

em a

nd su

bsta

tions

Subm

arin

e ca

bles

* Pr

ojec

ts th

at a

re n

ot c

over

ed b

y th

e EI

S sy

stem

may

be

issu

ed C

ertif

icat

e of

Non

-Cov

erag

e (

CN

C)

by

the

EMB

or D

ENR

regi

onal

offi

ce u

pon

requ

est f

rom

the

prop

onen

t. T

here

is n

o ne

ed

for t

he p

ropo

nent

to p

repa

re th

e IE

E or

EIS

and

to se

cure

the

ECC

. So

urce

: Stu

dy te

am (b

ased

on

DEN

R-D

OE

Mem

oran

dum

of A

gree

men

t (M

OA

) on

Stre

amlin

ing

of E

IS P

roce

sses

for E

nerg

y Pr

ojec

ts)

S-3

Page 170: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

S-4

(3) Existing IEE checklists for the power facilities Based on the DENR-EMB Memorandum Circular No.01 Series of 2000, IEE checklists

are prepared for the following power facilities; mini hydropower plant with capacity from greater than 1 to 10MW or with less than 20 million cubic meters water impoundment, power barges with capacity from greater than 1 to 10MW, and power transmission systems and substations greater than 220kV. It is possible to obtain these IEE checklists from the DENR-EMB website. And there is another example of the IEE checklist for land-based power plant (for thermal, hydropower, and renewable energy) made by DENR-EMB.

Basically the contents of the IEE checklists are as follows;

General information regarding the proponent; project location, project area description, plan/design components and activities during the development and operation phases

Information regarding the description of the existing environmental condition where the road or bridge will be located - the physical biological, socio-cultural and economic environment

Listing of possible potential impacts that may occur in the various stages of the project establishment and operation; corresponding mitigation and enhancement measures to prevent the occurrence of adverse impacts and strengthen the positive effects of the project;

Required attachments As for the environmental checklist for this Master Plan, the description of the existing

environmental condition and the impact assessment and the mitigation measures will be discussed among the above-mentioned contents of the existing IEE checklists. (a) The description of the existing environmental condition

The items included in the description of the existing environmental condition, which are described in the existing IEE checklists, are listed in Table S.1.2. They are roughly classified into the following three categories;

Natural and physical environment such as topography, geology, water, air, disaster

(erosion, flood, typhoon, earthquake, others) Biological environment such as significant wildlife, forest, vegetation, others Socio-cultural and economic environment such as settlements, infrastructures,

economic conditions, others

As for the natural and physical environments, the existing IEE checklists cover the items that are considered to have major impacts or to be strongly related to the target power facilities, such as the river characteristics and water quality for mini hydropower plants, air pollution for power barges, and typhoons, tornadoes and lightning for transmission lines. As for biological environments, almost the same items are prepared for each power facility. As

Page 171: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

S-5

for socio-cultural and economic environments, although detailed items are not entered in the case of land-based power plant, detailed items such as health conditions, education level, employment and income are included in the case of mini hydro, power barges and transmission lines.

To describe the existing environmental conditions, the proponent will answer “Yes” or

“No” for the simple questions related to each component/parameter, select the most probable answer from among the proposed items, or describe the situation briefly. For example, Table S.1.3 shows the questions for each component/parameter and the description of remarks for the items.

Page 172: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

S-

6

Tabl

e S.

1.2

Com

pone

nts /

Par

amet

ers f

or D

escr

iptio

n of

Exi

stin

g En

viro

nmen

t on

the

Cur

rent

IEE

Che

cklis

t La

nd-B

ased

Pow

er P

lant

M

ini H

ydro

pow

er P

lant

Po

wer

Bar

ge

Tran

smis

sion

Lin

e, S

ubst

atio

n 1.

Slo

pe an

d to

pogr

aphy

2.

Are

as w

here

soil

eros

ion

is po

ssib

le3.

In

dica

tors

of e

rosio

n, li

quef

actio

n,

land

slide

, gro

und

subs

iden

ce

4. F

lood

ing

durin

g th

e w

et s

easo

n or

typh

oon

5. B

odie

s of

wat

er w

ithin

1.5

km

such

as c

reek

s or s

tream

s 6.

Pre

sent

usa

ge o

f th

e bo

dy o

f w

ater

;bat

hing

, w

ashi

ng,

fishi

ng,

drin

king

, rec

reat

ion

7. C

ritic

al e

colo

gica

l sys

tem

: m

angr

ove,

fo

rest

land

s, aq

uife

r, sa

nctu

ary,

cor

als

8. R

ecla

imed

are

a 9.

Exi

stin

g st

ruct

ures

10

. Pub

lic o

r Priv

ate

ease

men

ts

11. E

xist

ing

envi

ronm

enta

l pro

blem

s w

ithin

500

m; w

ater

pol

lutio

n, a

ir po

llutio

n,

nois

e,

eros

ion,

flo

odin

g 12

. Exi

stin

g tre

es a

nd v

eget

atio

n 13

. Bird

s an

d w

ildlif

e w

hich

hav

e si

gnifi

cant

val

ue

14. F

ishe

ry re

sour

ces

<Nat

ural

and

Phys

ical E

nviro

nmen

t >

1. R

iver

cha

ract

eris

tics

2. F

lood

cha

ract

eris

tics

(Sta

tistic

al

Floo

d D

isch

arge

) 3.

Soi

l ero

sion

, cau

ses

4. L

ands

lides

5.

Pre

sent

use

s of

bod

ies

of w

ater

(w

ashi

ng,

recr

eatio

n,So

urce

of

dr

inki

ng,

Sani

tatio

n,

irrig

atio

n,

fishi

ng, o

ther

s)

6. P

rese

nt la

nd u

se o

f the

are

a (p

rime

agric

ultu

ral

land

, G

rass

land

, bu

ilt-u

p,

orch

ard,

m

angr

ove,

fis

hpon

d, o

ther

s)

7. P

rese

nt w

ater

qua

lity

(pH

, SS

, co

lifor

m, o

il &

gre

ase,

chl

orid

es,

copp

er,

lead

, iro

n, m

anga

nese

, to

tal

hard

ness

, al

kalin

ity,

pest

icid

es)

<Bio

logi

cal E

nvir

onm

ent>

8.

Flo

ra &

/or f

auna

of e

colo

gica

l or

com

mer

cial

si

gnifi

cant

in

th

e bo

dies

of w

ater

9.

Met

hods

& d

ata

sour

ce to

ass

ess

the

flora

& fa

una

in th

e bo

dies

of

wat

er

<Wat

er R

esou

rces

> 1.

Coa

stal/m

arin

e eco

logy

2.

Bod

ies

of w

ater

(cre

eks,

river

s, es

tuar

ies)

that

mig

ht b

e af

fect

ed

dista

nce,

dept

h, w

idth

, qua

lity

3. W

ater

on

qual

ity i

nfor

mat

ion

befo

re th

e pro

ject

4.

Exi

sting

aqua

tic fl

ora &

faun

a 5.

Exi

sting

pat

tern

s of

pol

luta

nt

sour

ces

6. D

iscus

sion

of fl

oodi

ng ev

ents

<Air

Res

ourc

es>

7. M

eteo

rolo

gica

l dat

a (T

empe

ratu

re, w

ind)

8.

Am

bien

t air

qual

ity

(Par

ticul

ate,

othe

rs)

9. S

tatio

nary

sour

ces o

f em

issio

n 10

. Mob

ile so

urce

s of e

miss

ions

<G

eolo

gic R

esou

rces

> 11

. Pro

file o

f the

area

(soi

l map

) <T

erre

stri

al E

colo

gy>

12. F

ores

t/man

grov

e re

serv

e or

a

prot

ecte

d w

ater

shed

area

< Ph

ysic

al E

nviro

nmen

t >

1. E

leva

tion

rang

e 2.

Slo

pe an

d to

pogr

aphy

3.

Gen

eral

geo

logy

4.

Indi

catio

ns o

f lan

dslid

ing

5. O

ccur

renc

es o

f flo

odin

g 6.

Soi

l typ

e 7.

Indi

catio

n of

eros

ion

occu

rring

8.

Affe

cted

riv

er o

r bo

dies

of

wat

er

9. O

ther

na

tura

l dr

aina

ge

way

s/cre

eks

that

dr

ain

tow

ards

co

mm

uniti

es

dow

nstre

am

10. R

ecor

ds o

f typ

hoon

s 11

. Rec

ords

of t

orna

does

/twist

ers

12. N

eare

st ea

rthqu

ake,

faul

t zo

ne o

r vol

cano

, oth

ers

13. L

ight

ning

strik

es

<Bio

logi

cal E

nviro

nmen

t>

14. E

xisti

ng tr

ees a

nd o

ther

type

s of

ve

geta

tion,

lis

t of

th

e sp

ecie

s 15

. Bird

s an

d ot

her

form

s of

w

ildlif

e, lis

t of t

he sp

ecie

s

S-6

Page 173: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

S-

7

15. E

xist

ing

settl

emen

t th

at w

ill b

e af

fect

ed ;

hous

ehol

ds, l

egiti

mat

e la

ndow

ners

, ten

ants

, squ

atte

rs

16. L

ocal

org

aniz

atio

n 17

. Opp

ositi

ons

10. F

lora

&/o

r fau

na o

f eco

logi

cal o

r co

mm

erci

al s

igni

fican

ce o

utsi

de

the

bodi

es o

f wat

er

11. M

etho

ds &

dat

a so

urce

to a

sses

s th

e flo

ra &

fau

na o

utsi

de t

he

bodi

es o

f wat

er

12. L

ying

w

ithin

a

wat

ersh

ed

or

fore

st re

serv

atio

n ar

ea

<Soc

io-C

ultu

ral,

Eco

nom

ic

and

Polit

ical

Env

iron

men

t>

13.

Exis

ting

settl

emen

ts

in

the

wat

ersh

ed ar

ea (l

ocat

ion/

num

ber

of

hous

ehol

ds,

fam

ilies

&

po

pula

tion)

14

. Met

hods

& d

ata

sour

ce to

gai

n in

form

atio

n on

th

e ex

istin

g se

ttlem

ent

15.

Soci

al i

nfra

stru

ctur

es (

loca

tion

& c

apac

ity o

f sc

hool

s, he

alth

ce

nter

s, cl

inic

s, ho

spita

ls

and

othe

rs)

16.

Polit

ical

si

tuat

ion

(pea

ce

&

orde

r)

17.

Maj

or e

mpl

oym

ent

& i

ncom

e so

urce

s 18

. Exi

stin

g lo

cal N

GO

19

. So

cial

ac

cept

abili

ty

of

the

proj

ect

(com

mun

ity,

gove

rnm

ent,

NG

O)

13. L

imes

tone

ca

vern

s or

si

nkho

les i

n th

e be

droc

k 14

. Ber

thin

g or

pie

r stru

ctur

e 15

. Ero

sion

pro

ne, s

tatu

s 16

. Exi

stin

g na

tura

l haz

ards

(e

.g.

stor

m

surg

e,

land

slid

es,

gully

ing,

subs

iden

ce)

17.

Iden

tific

atio

n of

tre

es

&

othe

r veg

etat

ion

18. S

peci

es &

oth

er w

ildlif

e (k

now

n w

ildlif

e, d

omes

ticat

ed

anim

als)

<

Soci

oeco

nom

ic E

nviro

nmen

t >19

. Dem

ogra

phic

Dat

a (T

otal

po

pula

tion,

av

erag

e ho

useh

old

size

, av

erag

e ag

e/se

x di

strib

utio

n,

ethn

ic

com

posi

tion,

C

omm

unity

or

gani

zatio

ns,

empl

oym

ent

data

in

the

area

, Mal

e/fe

mal

e ra

tio,

popu

latio

n py

ram

id,

mar

ital s

tatu

s, sp

ecify

whe

ther

ru

ral

or

urba

n,

dom

inan

t la

ngua

ge/d

iale

ct

spok

en

by

the

popu

lace

, la

bor

forc

e &

em

ploy

men

t) B

enef

it fo

r lo

cal

inha

bita

nts,

cultu

ral

mor

als

&

lifes

tyle

, w

omen

’s li

velih

ood

& ro

les

20. E

duca

tion/

liter

acy

data

lit

erac

y ra

te (o

vera

ll, m

ale/

fe

mal

e),

educ

atio

nal

atta

inm

ent (

mal

e/fe

mal

e)

16. F

isher

y re

sour

ces

in

the

bodi

es o

f w

ater

, lis

t of

the

sp

ecie

s 17

. Wat

ersh

ed o

r for

est

rese

rvat

ion

area

18

. Exi

sting

fore

st re

sour

ces

(tim

ber,

fuel

woo

d, n

on-ti

mbe

r pr

oduc

ts,

food

pl

ants,

m

edic

inal

pl

ants,

w

ild

anim

als,

min

eral

s, ot

hers

) <S

ocio

-Cul

tura

l, Ec

onom

ic

and

Polit

ical

Env

ironm

ent>

19

. Exi

sting

settl

emen

ts (n

umbe

r of

hou

seho

lds

and

fam

ilies

, le

gitim

ate

land

owne

rs,

tena

nts,

care

take

rs, s

quat

ters

) 20

. To

tal

popu

latio

n of

th

e ba

rang

ays

21. A

vera

ge fa

mily

size

22

. Num

ber o

f the

hou

ses (

mad

e of

co

ncre

te,

woo

d,

bric

k,

adob

e)

23. A

nces

tral l

ands

or i

ndig

enou

s pe

ople

com

mun

ities

24

. Lea

ding

cau

ses

of m

orbi

dity

an

d m

orta

lity

25. E

xisti

ng lo

cal o

rgan

izat

ions

26

. Soc

ial i

nfra

struc

ture

s (s

choo

ls, h

ealth

cen

ter/c

linic

s, ro

ads,

com

mun

icat

ion,

pol

ice

statio

n,

com

mun

ity

cent

er,

hosp

ital,

trans

porta

tion,

ch

urch

es/c

hape

ls, o

ther

s)

S-7

Page 174: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

S-

8

21. I

ncom

e (in

com

e fro

m th

e se

a, di

strib

utio

n,

sour

ce,

pres

ent

econ

omic

activ

ities

22

. Hea

lth D

ata

(mor

bidi

ty an

d m

orta

lity

rate

s,in

fant

mor

bidi

ty, m

alnu

tritio

n da

ta,

birth

rat

e, nu

mbe

r of

he

alth

fa

cilit

ies,

doct

ors,

nurs

es, h

ealth

serv

ices

, oth

ers

< C

urre

nt W

aste

Man

agem

ent >

23. W

aste

man

agem

ent

tech

niqu

es,

drai

nage

sys

tem

&

toile

ts

Sour

ce:

Land

-bas

ed p

ower

pla

nt D

ENR

EM

B R

QE/

9/18

/200

1/G

uide

for I

EE C

heck

list o

n La

nd-B

ased

Pow

er P

lant

s (fin

al)

Min

i hyd

ro, p

ower

bar

ge, t

rans

mis

sion

line

, sub

stat

ion

D

ENR

EM

B W

eb S

ite (h

ttp://

ww

w.e

mb.

gov.

ph/e

ia/c

heck

list.h

tm)

S-8

Page 175: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

S-9

No.1 to 5 in the case of a land-based plant are shown in Table S.1.3. Table S.1.3 Examples for the Description of Existing Environment in the Case of a Land-Based Power Plant

Components/Parameters Yes No Remarks 1. Slope and topography of the area

covered by the project - Terrain is flat (0 - 3%) - Gently sloping our undulating (3 – 8%)- Undulating to rolling (8 - 18%) - Rolling to moderately steep (18 - 30%)- Steeply rolling (30 - 50%) - Very steep to mountainous (>50%)

2. Are there areas in the site where there are possible occurrence of soil erosion?

Cause of erosion: [ ]heavy rains [ ]unstable slope [ ]others, Specify

3. Are there indicators in the area of the following?

[ ]erosion [ ]liquefaction [ ]landslides [ ]ground subsidence [ ]Non

4. Has the area experienced any flooding during the wet season?

Period of flooding: Causes of flooding: [ ]low area [ ]poor drainage [ ]water-logged areas

5. Are there existing bodies of water within 1.5km of the proposed building such as creeks or streams?

If Yes, indicate the name and distance to the body of water.

Source: DENR EMB RQE/9/18/2001/Guide for IEE Checklist on Land-Based Power Plants (final) (b) Impact assessment and mitigation measures

The outline of the description about predicted impacts, evaluation and mitigation measures in the existing IEE checklists for each power facility are as follows;

As for a land-based power plant, various predicted impacts are listed and the proponents have

to evaluate the significance of the impacts for the pre-construction, construction, and operation phases of the project, respectively. Some mitigation/enhancement measures are also described corresponding to each predicted impact. Evaluations of the significance of the impact is composed of the following four alternatives; positive or negative, direct or indirect, long-term or short-term, and reversible or irreversible. Table S.1.4 shows the predicted impacts and mitigation/enhancement measures for a land-based power plant.

Page 176: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

S-10

Table S.1.4 Impact Assessment and Mitigation for a Land-Based Power Plant Significance of ImpactsPredicted Impacts +/- D/In L/S R/I Mitigating/Enhancement Measures

Pre-Construction and Construction Phase of the Project 1. Increase in dust generation due to clearing, civil works and earthmoving activities

・ Regular watering of unpaved roads or exposed soil/ground

・ Remove soil/mud from tires of trucks and equipment before leaving the area

・ Hauling trucks should be covered with canvass or any equivalent materials

・ Set-up temporary fence around the construction area

2. Top soil removal and loss due to earthmoving activities, transport, access road construction

・ Stockpile the top soil in a safe place and use as final grading material or final layer

・ As soon as possible, rip-rap or re-vegetate the area

3. Erosion from exposed cuts and landslides due to earthmoving and excavation activities

・ Conduct construction activities during the dry season

・ Avoid long exposure of opened cuts ・ Installation of barrier nets

4. Sedimentation/siltation of drainage or waterways from unconfined stockpiles or soil and other materials

・ Set-up temporary silt trap/ponds to prevent siltation

・ Proper stockpiling of spoils (on flat areas and away from drainage routes

・ Disposal of spoils generated from civil works as filling materials

5. Pollution of nearby body of water due to improper disposal of construction wastes

・ Set-up temporary disposal mechanism within the construction area and properly dispose the generated solid wastes

・ Set up proper and adequate toilet facilities ・ Strictly require the contractor and its workers

to observe proper waste disposal and proper sanitation

6. Loss of vegetation due to land clearing

・ Limit land clearing as much as possible ・ Provide temporary fencing for vegetation that

will be retained ・ Use markers and fences to direct heavy

equipment traffic in the construction site and avoid damage to plants

・ Re-plant/plant indigenous tree species and ornamental plants

7. Disturbance or loss of wildlife within the influence area due to noise and other construction activities

・ Re-establish or simulate the habitat of affected wildlife in another suitable area

・ Schedule noisy construction activities during the day time

・ Undertake proper maintenance of equipment and use sound dampers

8. Noise generation that can affect the nearby residents

・ Schedule noisy construction activities during the day time

・ Undertake proper maintenance of equipment and use sound dampers

9. Generation of employment ・ Hiring priority shall be given to qualified local residents

Page 177: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

S-11

Table S.1.4 Impact Assessment and Mitigation for a Land-Based Power Plant (Continued) 10. Right of way conflicts ・ Conduct consultations and settle agreements

before finalizing the detailed design 11. Increased traffic and possible congestion

・ Strict enforcement of traffic rules and regulations

・ Proponents should provide traffic aid during peak hours

12. Increase in the incidence of crime and accidents

・ Strictly require the contractor and its workers to follow safety rules and regulations in the construction and in the locality (in coordination with local authorities)

Operation Phase of the Project 1. Generation of domestic effluents

・ Provision of an effective (at least 3-chamber septic) tank

・ Provision of adequate wastewater treatment facilities

2. Generation of solid wastes ・ Separation of recyclable materials ・ Proper collection and disposal of solid wastes・ Proper housekeeping and waste minimization

3. Increased traffic and possible congestion as well as increase risk of vehicular related accidents

・ Strict enforcement of traffic rules and regulations

・ Placement of signs and warnings in appropriate places

Legend +/-:Positive impact/negative impact D/In:Direct impact/indirect impact L/S:Long-term/short-term R/I:Reversible/irreversible Source: DENR EMB RQE/9/18/2001/Guide for IEE Checklist on Land-Based Power Plants (final)

As for a mini hydropower plant, a total eighteen (18) items are listed as the predicted impacts regarding project location and design, construction phase, operation and maintenance, and abandonment and rehabilitation phase. The proponents have to evaluate those predicted impacts and answer the simple questions about mitigation measures.

Regarding the evaluation, it will be described for the project specifications or relevant parameters considered as being the cause of environmental impacts. The magnitude of the impact will be selected from four degrees: none, low, moderate, and high. Regarding the mitigation measures, the proponents will select the most likely measure from among prescribed measures or specify other measures. Table S.1.5 shows some examples of impact assessment/mitigation measures for a mini hydropower plant. These are extracted from the existing IEE checklist for a mini hydropower plant.

Page 178: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

S-12

Table S.1.5 Examples of Impact Assessment / Mitigation Measures for a Mini Hydropower Plant Evaluation

Impact Relevant Subject and Parameters

Magnitude of Impact

Mitigation Measures

Project Location and Design Loss of species due to obstructions to movement of aquatic life

Height of the weir(m):_____

□ none □ low □ moderate □ high

□ No mitigation measure □ Fishway or by-pass planned.

Please describe the design and arrangement of the proposed mitigation facility and attach plans:

□ Further measures, please specify.Dying out of the riverbed between the intake and the outlet

Minimum residual flow with proposed project:

-In m3/s or l/s: ____ In % of mean annual

flow without proposed project: ___

□ none □ low □ moderate □ high

How is the residual flow provided? □ With a residual flow section in

the weir □ By-pass pipeline □ Other, please specify:

Construction Phase Contamination of soil and water due to spilling of dangerous substances (fuel, oil, lubricants, chemicals)

Storage, handling and disposal of dangerous substances

□ none □ low □ moderate □ high

□ following of the regulation of RA 6969

□ Other measures, please specify:

Operation and Maintenance Accumulation of floating debris at the intake

Design of intake □ none □ low □ moderate □ high

□ No mitigation measure □ Measures to reduce or avoid

accumulations of floating debris at the intake, please describe:

If there will be accumulations of floating debris at the intake, how will it be disposed? Please describe:

Abandonment and Rehabilitation Phase Flooding due to blocking of abandoned dam or weir

Abandonment of plant facilities including all equipment (machinery, electro-mechanical equipment)

□ none □ low □ moderate □ high

□ No mitigation measure □ Abandonment plan including

cost estimate, please describe and attach plan:

□ Other measures, please specify:

As for a power barge, a total of forty-five (45) questions are listed regarding the pre-construction/ construction, operation and maintenance, and abandonment and rehabilitation phases. The proponents have to evaluate those predicted impacts and answer simple questions about mitigation measures. The content of the questions are similar to the items for the description of the existing environments. They are composed of natural and physical, biological, and socio-economic environments including the following; excavation works and cut and fill activities during construction, impact on ecology, increase in the availability of employment, impact on indigenous people, noise, air pollution and hazardous waste during operation.

The proponents replay to the questions by answering “Yes” or “No”, and describe the process

Page 179: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

S-13

and impacts, as well as their mitigating/enhancement measures. There are no prescribed impacts or mitigation measures like the case of a land-based power plant or mini hydropower plant, so the proponents have to describe the impacts and mitigation measures by themselves.

Regarding the transmission lines and substations, the existing prepared format is the same as

land-based power plant. But there are no descriptions of the impacts and mitigation measures, so the proponents have to prepare these on their own.

S.1.2 Environmental Checklist for the Master Plan (1) Basic concept of making up environmental checklist

In this Master Plan an electrification method with a stand-alone system such as SHS, BCS or a mini diesel were also studied regarding the barangay electrification plan. These stand-alone systems were excluded from the target of the environmental checklist because the impacts on environment from them during installation and operation are considered very small. Regarding distribution lines, usually they will be constructed along the existing roads. In this environmental checklist, it is considered that a distribution line is the same as in the environmental checklist of a transmission line. Regarding a wind power plant, it will be considered as the target of the environmental checklist because it is impossible to deny that there will be a study or survey on wind farms in the future.

Therefore the target facilities of the environmental checklist are as follows;

Mini-micro hydropower plants Diesel power plants Power barges Transmission lines and substations Wind power plants

Again as mentioned in the foregoing paragraph, the IEE checklists have already been created

by the DENR-EMB for mini hydropower plants, power barges, transmission lines and substations. They are opened to the public on the DENR-EMB website (http://www.emb. gov.ph/eia/checklist.htm) and can be downloaded. Diesel power plants and wind power plants are not listed on the DENR-EMB website, but the IEE checklist was prepared in the past for land-based power plants.

In the case that power plants or related facilities are considered in the Master Plan, it is

necessary to study the development of those facilities. At the same time, the procedures that satisfy the existing Philippines EIS system will be necessary.

Therefore, the environmental checklist proposed by this Master Plan follows the style and the

contents that have already been employed as the existing IEE checklists for mini-micro

Page 180: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

S-14

hydropower plants, power barges, transmission lines and substations. Furthermore, items considered to be required will be added to the existing IEE checklist in consideration of the natural and social environments of Palawan Province.

Especially regarding transmission lines and substations, because there are no descriptions in

the existing IEE checklists forms about the predicted impacts and mitigating/enhancement measures, they should be included as much as possible.

Regarding diesel plants, the existing IEE checklist for power barges will also be used as the

checklist for a diesel power plant. It is considered that the existing IEE checklist for power barges cover the environmental consideration matters for diesel power plants such as noise or air pollution during operation

Regarding wind power plants, the environmental consideration matters will be listed with reference to other existing IEE checklists for a large-scale facility like a wind farm.

While the existing IEE checklists consist of many items, including the general information of

the project and required attachments, the environmental checklist for the power development Master Plan narrows the targets to the description of the existing environment and the impact assessment and mitigation. By corresponding with the form of the existing IEE checklists for the EIS system, it will be useful as the basic information on the necessary data for requiring EIS documents at the time of development.

(2) Environmental checklist for a mini and micro hydropower plant

The following contents will be added to the existing IEE checklist for a mini hydropower plant. (a) Description of existing environment <Natural and physical environment>

What area of the ECAN zoning is the project site located in? Are there limestone caverns or sinkholes around the project area?

< Socio-cultural, economic environment> Are there any cultural heritage sites around the project area? Are there any ancestral lands or communities of indigenous people in and around the

project area? Is the project site located in a NIPAS protected area?

(b) The impact assessment and the mitigation measures

The items shown in Table S.1.6 will be added to the existing IEE checklist. Moreover, the items indicated as the predicted impacts and mitigating/enhancement measures of a land-based power plant shown in Table S.1.4 will be also examined if necessary.

Page 181: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

S-15

Table S.1.6 Additional Impact Assessment / Mitigation Measure Items for a Mini Hydropower Plant Evaluation

Impact Relevant Subject and Parameters

Magnitude of Impact

Mitigation Measures

Project Location and Design Drying up of existing source of water supply along the waterway

Relationship between the proposed waterway route and existing source of water supply

□ none □ low □ moderate □ high

□ No mitigation measure □ Secure an alternative source of

water supply □ Further measures, please specify.

(3) Environmental checklist for diesel power plants and power barges

The following contents will be added to the existing IEE checklist for power barges.

(a) Description of existing environments < Natural and physical environments >

What area of the ECAN zoning is the project site located in? < Socio-cultural, economic environment >

Are there any cultural heritage sites around the project area? Is the project site located in the protected area of NIPAS?

(4) Environmental checklist for transmission lines and substations

The following contents will be added to the existing IEE checklist for transmission lines and substations, and the impact assessment and the mitigation measures will be described.

(a) Description of existing environment <Natural and physical environment>

What area of the ECAN zoning is the project site located in? <Socio-cultural, economic environment>

Are there any cultural heritage sites around the project area? Is the project site located in the protected area of NIPAS?

(b) The impact assessment and the mitigation measures

Table S.1.7 shows the impact assessment and the mitigation measures for transmission lines and substations.

Page 182: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

S-16

Table S.1.7 Impact Assessment and Mitigation Measures for Transmission Lines and Substations

Predicted Impacts Mitigation Measures

Pre-Construction and Construction Phases of the Project 1. Loss of vegetation due to land

clearing along the proposed route ・ Limit land clearing as much as possible ・ Provide temporary fencing for vegetation that will be

retained ・ Re-plant/plant indigenous tree species and ornamental

plants 2. Top soil removal and loss due to

earthmoving activities, transport, access road construction

・ Stockpile the top soil in a safe place and use as final grading material or final layer

・ As soon as possible, rip-rap or re-vegetate the area 3. Erosion from exposed cuts and

landslides due to earthmoving and excavation activities

・ Conduct construction activities during the dry season ・ Avoid long exposure of opened cuts ・ Installation of barrier nets

4. Sedimentation / siltation of drainage or waterways from unconfined stockpiles or soil and other materials

・ Set-up temporary silt trap/ponds to prevent siltation ・ Proper stockpiling of spoils (on flat areas and away from

drainage routes ・ Dispose of spoils generated from civil works as filling

materials 5. Pollution of nearby body of water

due to improper disposal of construction wastes

・ Set-up temporary disposal mechanisms within the construction area and properly dispose of the generated solid wastes

・ Set up proper and adequate toilet facilities ・ Strictly require the contractor and its workers to observe

proper waste disposal and proper sanitation 6. Disturbance or loss of wildlife

within the influence area due to noise and other construction activities

・ Re-establish or simulate the habitat of affected wildlife in another suitable area

・ Schedule noisy construction activities during the day time ・ Undertake proper maintenance of equipment and use sound

dampers 7. Noise generation that can affect the

nearby residents ・ Schedule noisy construction activities during the day time ・ Undertake proper maintenance of equipment and use sound

dampers 8. Generation of employment ・ Hiring priority shall be given to qualified local residents 9. Conflicts in right of way ・ Conduct consultations and settle agreements before

finalizing the detailed design 10. Significant decrease in the aesthetic

value of the area due to the tower or transmission line

・ Consider the shape and color of the tower to minimize the impact to the aesthetic value of the area

11. Increased traffic and possible congestion

・ Strict enforcement of traffic rules and regulations ・ Proponents should provide traffic aid during peak hours

12. Increase in the incidence of crime and accidents

・ Strictly require the contractor and its workers to follow safety rules and regulations in the construction and in the locality (in coordination with local authorities)

Operation Phase of the Project 13. Obstacle to the movement of

wildlife ・ Installation of trails for wildlife

14. Economic growth as the result of stable supply of electricity

・ Stable supply of electricity

15. Increased traffic and possible congestion as well as increased risk of vehicular related accidents

・ Strict enforcement of traffic rules and regulations ・ Placement of signs and warnings in appropriate places

Page 183: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

S-17

(5) Environmental checklist for a wind power plant The construction work of a wind power plant, including the construction of the tower to install

the wind turbine, is considered to be similar to the construction of a transmission line. The environmental checklist for transmission lines and substations will be used as the environmental checklist of a wind power plant. The features peculiar to a wind power plant should be considered. The following contents and items will be added to the environmental checklist for transmission lines and substations.

(a) Description of existing environments <Natural and physical environments >

Are there any the flyways of migratory birds around the planning site? (b) The impact assessment and the mitigation measures

Table S.1.8 shows the impact assessment and mitigation measures for a wind power plant. These will be added to the environmental checklist for transmission lines and substations.

Table S.1.8 Impact Assessment and Mitigation Measures added for a Wind Power Plant

Predicted Impacts Mitigation Measures

Operation Phase of the Project 1. Impact on migratory birds according

to the rotation of wind turbines ・ Paint the wind turbine blades with visible colors ・ Slow the rotation of the large blades to allow birds to pass

through 2. Noise of the wind turbine rotation ・ Adopt turbines that generate low noise during rotation

Page 184: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

S-18

Database

The Study team created a database, which consists of a wide range of data collected in the Study. The database serves many functions. It can store the data, calculate it and retrieve the data that the planers want. Additionally, the database makes it possible to update data easily.

At present, DOE and PGP have no databases for practical use for barangay electrification and power development at the provincial level. Databases can assist them in managing data related to the power sector, especially the electrification planning of un-electrified barangays.

However, the data collected in the Study is the data at present and they will change over time (e.g. population data, socio-economic data, barangay boundary data and environmental conditions will change over time). Therefore, updating data and upgrading databases will be needed in the future.

In this section, the basic concept and outline of the database is mentioned. For the details of each data item, please refer to the related individual sections.

S.2.1 Basic Concept of the Database

The database consists of the database software “ACCESS1” and GIS2 software “Arc View3”.

The basic structure of the database is shown in Figure S.2.1.

1 Copyright © Microsoft. All rights reserved 2 Geographic Information System 3 Copyright © ESRI. All rights reserved

DATABASE

Barangay Basic Data

Barangay Electrification Data

Barangay Center Data

Distribution Line Data

Diesel Power Data

Hydropower Data

Socio-Economic survey data

Environmental Data

Hydropower Potential - - - - -

Figure S.2.1 Basic Structure of the Database

ACCESS

ArcViewBarangay Name

Population& Households

Map

Electrification Condition

- - - - - - - - - - -

Form (Barangay Base Data)

Form (Nearest Tapping Point)

Un Electrified Bgy

ElectrifiedBgy

***km

Map

Map (Barangay Electrification)

Map (Diesel Power Plant L ti )

- - - - -

Page 185: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

S-19

Most of the data for the database is collected by the Study team in the Study, and the spatial data for GIS is mainly from PGP.

All data are stored in 1 storage box “DATABASE”. ACCESS and ArcView share these data. This kind of database is called a “Personal Geodatabase”. ACCESS can help users to retrieve the data they want and to update the data easily by using the “Form”. On the other hand, ArcView can show not only the special data, but also attributes on the screen. Therefore, this software can help users to prepare maps for a presentation (e.g. Barangay Electrification Level Map, Hydropower Potential Classification Map, Environmental Protected Barangay Map and others).

The operation of the database is interactive on the screen for easy operation and users can select contents and retrieve the data easily.

S.2.2 Contents of the Database The database contents are summarized below; - Barangay Base Data - Electrification Condition - Demand Forecast - Distribution Line - Diesel Power - Mini-Micro Hydropower - Photovoltaic System - Barangay Electrification - Transmission Line - Environment - Power Development (WASP) - Data Updating

Figure S.2.2 Main Menu of the Database Storing these sector data in the database makes it possible to calculate and extract data that

users want by using the “Form”. Here is a part of the forms used in the database. (1) Barangay Base Data

This form shows the basic data of a barangay that was selected by users through a dialog box for a barangay selection (see Figure S.2.3).

The data contents shown in this form are listed below. - Population and number of households - Electrification level and methods - Barangay boundaries and location of a barangay center - Data from a socio-economic survey

Contents of Database

Contents of Database

Page 186: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

S-20

Figure S.2.3 Form of Barangay Base Data

(2) Electrification Conditions This form is useful to grasp the current electrification conditions in a province. The data is

mainly from ECs (in this case, from PALECO and BISELCO).

- Barangay electrification ratio (%) - Household electrification ratio (%) - No. of barangays by electrification level - No. of barangays by electrification method 1 (EC-grid, mini-grid or stand-alone) - No. of barangays by electrification method 2 (more detailed classification)

Figure S.2.4 Form of Electrification Condition

(3) Power Demand Forecast This form can calculate the data for power demand forecasts and show the results of power

demand forecasts for the barangay electrification and power development of the EC-grids. In this form, users can set parameters for the power demand forecasts.

Figure S.2.5 Form of Power Demand Forecasts (Daily Energy Consumption Pattern)

Select Municipality

Select Barangay

Popularion & Households Data

Location Data

Electrification Condition Data

Electrification Level

Electrification Method

Consumption Pattern for Photovoltaic System

Consumption Pattern for Mini-grid System

Page 187: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

S-21

Figure S.2.6 Form for Power Demand Forecasts (Results of Power Demand Forecast)

(4) Distribution Line Storing data for a distribution line with spatial information gives valuable information to planners

since the feasibility of distribution line extension for the electrification of un-electrified barangay depends on its expansion length. The database stores the location data of a barangay center, and storing these data makes it possible to retrieve data on barangays that are located around a certain barangay electrified by a distribution line.

The database also can retrieve the nearest barangay center for a target barangay and calculate distances between them automatically. Additionally, applying the criteria for the electrification level of the calculated data, the database makes it possible to find the nearest barangay electrified by a distribution line for a certain un-electrified barangay and to calculate the distance between them.

The form for a distribution line includes following items. - Barangay data connected to a distribution line (includes electrification conditions for neighboring barangays) - The nearest tapping point and distance (for a un-electrified barangay) - Cost data for distribution line extension Figure S.2.7 shows the form of a distribution line.

Figure S.2.7 Form of Distribution Line (Nearest Tapping Point)

Demand Forecast (kW)For Mini-Grid system

Demand Forecast (kWh)For Mini-Grid system

Nearest tapping point Data Target un-electrified Barangay Data Distance

Page 188: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

S-22

(5) Diesel Power The form shows the technical data and cost data for diesel power. The form consists of 2

components (diesel power for a mini-grid and stand-alone system, and diesel power for the backbone grid). The technical data and cost data of the candidate diesel power plant that will be developed to meet the demand of the backbone grid in the future are used in WASP analysis.

The form for distribution lines includes the following items. - Technical data and cost data (for a mini-grid and stand-alone system) - Technical data and cost data (for the backbone grid connection) - Existing power plant data

Figure S.2.8 Form of Diesel Power S.2.3 GIS Map

The database can also store spatial information for GIS. Using the GIS software application

“Arcview”, which was installed for DOE and PGP at the beginning of the Study, planners can create a variety of maps for a visual presentations. Figure S.2.9 shows the conceptual diagram of the GIS mapping.

Figure S.2.9 Conceptual Diagram of GIS Mapping

Diesel Power Plant Technical Data

DATABASE

Barangay Boundary Data

- - -

Spatial Data

Barangay Electrification Data - Electrification LEVEL

Table Data

1 2 3

LEVEL I

LEVEL II Un-Electrified

Spatial & Graphical

Add IndividualAttribute Value

Page 189: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

S-23

Once a planner creates a map in ArcView (saved as the “map document file” extension “.mxd”), they do not have to update the file in ArcView since table data is updated through an update form in the ACCESS software. The Study team has prepared the following map document files in the Study.

- Barangay Electrification Map (all of Palawan, detailed Map for Municipalities) - Existing Diesel Power Plant Map - Mini and Micro Hydropower Potential Location Map - River Gauging Station Map - Existing Distribution Line Map4 - Transmission Line Map5(existing and under construction transmission line) - Environment Protected Barangay Map - Indigenous People Living Location Map

Figure S.2.10 and S.2.11 shows examples of the GIS maps.

Figure S.2.10 Barangay Electrification Map (all of Palawan)

4 Distribution lines are shown as lines between barangay centers since PALECO does not have an exact location map for the existing distribution lines at present. 5 Transmission lines are plotted based on roughly estimated location maps since SPUG does not have an exact location map for the existing

backbone transmission line at present.

Page 190: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

S-24

Figure S.2.11 Transmission Line Location Map S.2.4 Data Updating

Data updating is an important job in order to grasp precisely the current status of electrification

in the province and this work requires database manageability. Considering that such points are required, the Study team put the form for updating data on the database. A series of forms make it easy for planners to update.

Figure S.2.12 shows a form for updating data.

Figure S.2.12 Form of Updating Data

Page 191: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target
Page 192: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

List of References Aldover, Regelio Z. (2002), Palawan New and Renewable Energy and Livelihood Support Project -

Mid-Term Project Evaluation (Draft Evaluation Report for Discussion, September 23, 2002 Asian Development Bank (2002), Indigenous Peoples/Ethnic Minorities and Poverty Reduction,

Philippines, June 2002, Manila Delta P (2003), ECC (PARAGUA DIESEL POWER PLANT) QUARTER REPORT (PCO, Waste

Generators), 3rd, 2003, Puerto Princesa Department of Energy (2003), Interim Missionary Electrification Development Plan (MEDP) Final Report,

Manila (2002), 2002 Missionary Electrification Development Plan, Manila (2001), R.A.9136 Electric Power Industry Reform Act of 2001 Distribution Code, 2001, Manila Department of Energy and Development Bank of the Philippines (2003), Project Proposal for

“Philippines: Rural Power Project,” Manila Department of Energy in cooperation with GTZ, Guide On Mini-Hydropower Development In The

Philippines Department of Energy in cooperation with USAID (2000), Task 7Ba Report Philippine Renewable Energy

Project, Assessment of Micro-hydro Resourced in the Philippines Japan External Trade Organization (2001), The Feasibility Study on the Batang Batang Mini Hydropower

Development In Palawan, Philippines Japan International Cooperation Agency (1985), Feasibility Study Report on Infrastructure Survey for Rio

Tuba Nickel Mine (Candawaga Hydropower Development) Japan International Cooperation Agency (2004), The study on the institutional capacity building for the

DOE under a restructured Philippine electric power industry in the Republic of the Philippines final report

Manny M. Vergel III (1999), Preliminary Engineering Study Of Cabinbin Mini-Hydro Project, the Report for DOE mini-hydro business meeting/conference at Puerto Princesa, Palawan 27 April 1999

National Electrification Administration (1993), NEA ENGINEERING BULLETIN (Volume 1,2,3,4), Manila National Power Corporation (2003), PBTP MONTHLY PROGRESS REPOR, December 2002, Puerto

Princesa (2003), PBTP MONTHLY PROGRESS REPORT, January 2003, Puerto Princesa (2002), ECC (POWER BARGE 106) QUARTERLY REPORT (PCO, Waste Generators), 1st and

3rd, 2002, Palawan (2002), QUARTERLY REPORT (ECC Monitoring, PCO, Waste Generators), Araceli Power

Plant, 4th, 2002, Araceli, Palawan (2002), QUARTERLY REPORT (PCO, Waste Generators), Jolo Power Plant, 2nd and 3rd, 2002,

Jolo, Sulu (2002), UNFOLDING NEW HORIZONS -NATIONAL POWER CORPORAION 2001 ANNUAL

REPORT-, 2002, Manila (1992), Small Hydroelectric Projects Of The Visayas Isalands- Feasibility Study Volume IV :

Palawan Projects New Energy Foundation (1996), Guide Manual for Development Aid Programs and Studies of Hydro

Electric Power Projects

Page 193: Chapter 5 Barangay Electrification Plan 5.1 Procedure of ... · Chapter 5 Barangay Electrification Plan 5.1 Procedure of the Barangay Electrification Plan 5.1.1 Electrification Target

Office of the Provincial Planning and Development (2002), Summary of the 2003 Projects of the Energy Stakeholders in the Province of Palawan, Energy Committee Meeting, November 6, 2002, Puerto Princesa

Palawan Electric Cooperative, Inc. (2002), 24th Annual General Membership Meeting, August 24, 2002, Roxas, Palawan

Palawan Integrated Area Development Project Office (1989), Palawan Hydrometric Network, Volume 1 ,Annual Databook 1988

Palawan Museum, (1991), BOUNTIFUL PALAWAN 1991, Puerto Princesa Provincial Development Council of Province of Palawan, MEDIUM TERM DEVELOPMENT PLAN

2003-2012, October 2, 2003, Puerto Princesa, Palawan Department of Environment and Natural Resources, (2002), SUMMARY OF EMISSION TEST (PARAGUA,

2002), DENR-EMB Region-IV, 2002, Manila (2000), MEMORANDUM CIRCULAR #01 Series of 2000 IEE Checklist for Selected Projects,

DENR-EMB, 2000, Manila Provincial Information Office, Discover Palawan, Philippines, Province of Palawan, Puerto Princesa UNDP (2000), Project Document—Palawan New and Renewable Energy and Livelihood Support Project,

United Nations Development Programme University of the Philippines Solar Laboratory/UP Engineering Research and Development Foundation, Inc.

(2002), Palawan New and Renewable Energy and Livelihood Support Project—Formulation of Palawan Renewable Energy Policies (Fourth Progress Report/Annual Report Year 2001), UP Engineering Research and Development Foundation, Inc., February 2002, Manila

(2001), Palawan New and Renewable Energy and Livelihood Support Project—Formulation of Palawan Renewable Energy Policies (Second Progress Report/Annual Report Year 2000), February 2002, Manila

DENR-EMB Web Site, http://www.emb.gov.ph/ NEA Web Site, http://www.nea.gov.ph NSCB Web Site, http://www.nscb.gov.ph/ NSO Web Site, http://www.census.gov.ph PCSD Web Site, http://www.pcsd.ph/ PD WIRE & CABLE Web Site, http:// pdwireandcable.com/