View
213
Download
0
Embed Size (px)
Citation preview
SM1205 Interactivity
Instruction forAssignment 2
Spring 2010 SCM-CityU 1
Assignment 2
• Topic: Interactive System with Multiple Objects• Requirements– Use Both for loop and array– Interact with multiple objects – Music playback control (e.g., play, stop)– Meaningful system – Documentation (in Word format)
• Title, motivation, how-to-use, screenshots, references
– Note: if you want to base this work on what you did for Assignment 1, you must clearly state the difference
Spring 2010 SCM-CityU 2
Assignment 2
• Submission – Via ACS • Max total file size: 30M• .fla, .swf, .doc (documentation) files and other files
– Deadline: 23:59:59, Wednesday 7 April, 2011• No late submission is allowed
• In-class presentation, 31 March– Each student has roughly 5 minutes for presentation
Spring 2010 SCM-CityU 3
Assignment 2
• Assessment – Based on • Implementation difficulty + UI design + creativity (80%)• Presentation performance (10%)• Documentation (10%)
– Note: if you use any technique which has not been taught in this course, you must state its source or reference in the documentation clearly • Otherwise, some marks will be deducted
– ActionScript 2.0 is not allowed!
Spring 2010 SCM-CityU 4