Page 1: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

SLUDGING

TECHNICAL TRAINING HANDBOOK ON

AFFORDABLE MANUAL WELL DRILLING

Manual drilling series

Page 2: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling
Page 3: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

PRACTICA Foundation - Manual drilling series

SLUDGINGManual drilling series

TECHNICAL TRAINING HANDBOOK ON AFFORDABLE MANUAL WELL DRILLING

Published by the PRACTICA Foundation

Authors – Arjen van der Wal & Robert Vuik

Co-author – Aris van HerwijnenStructural support – Melanie Stallen

Technical drawings – Erik den Toom, Rob DeddenPhotos - Robert Vuik, Arjen van der Wal

French translation – Xavier GrasIllustrations – Ron Offerman/Tekenteam

Layout – Marijke Kreikamp/4colour design

First edition - 2005Second edition - June 2011

PRACTICA Foundation develops and disseminates low-cost appropriate technology in water and renewable energy in developing countries. We focus on technology that responds to local cultural contexts, can be locally produced and

maintained, and supports existing markets.

PRACTICA foundationOosteind 47 - NL-3356 AB Papendrecht - The Netherlands

(t) +31(0)786150125 [email protected]

Page 4: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

PRACTICA Foundation - Manual drilling series PRACTICA Foundation - Manual drilling series

This manual is free of charge. Any parts of this instruction manual, including the illustrations and technical drawings may be copied to meet local needs, without permission from the author or publisher, provided the parts are distributed free, not for profit and reference to the source is made. The author would appreciate receiving notice and a copy of any materials in which original text or pictures have been used. For any reproduction with commercial ends, written permission must be obtained in advance from the PRACTICA Foundation.

This instruction manual is available in English and in French and has been developed for use in technical training courses organised for the intended users. In case you want to organize such training, you may contact the PRACTICA Foundation for further information and support.

The first publication was made possible by a financial contribution from the ETC Foundation as part of their Technical Training Program (TTP). The second edition has been made possible by ETC Foundation. Another financial contribution to the second edition was made by the Bill & Melinda Gates Foundation through the Rural Prosperity

Initiative (RPI) of International Development Enterprises (IDE).The Technical Training Program (TTP) of the ETC Foundation has also contributed with structural support in the educational aspects of this manual.

While every care has been taken to ensure accuracy of the information given in this manual, neither the publisher(s) nor the author(s) can be held responsible for any damage resulting from the application of the described methods. Any liability in this respect is excluded.

Note to those considering translation or modification; before beginning any translation or modification and in order to avoid duplication of efforts and unintended mistakes, please contact the PRACTICA Foundation. This document or parts of this document may not be copied or published under a new name or author without permission from PRACTICA Foundation.

Disclaimer

Page 5: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

PRACTICA Foundation - Manual drilling series PRACTICA Foundation - Manual drilling series

The high cost of developing potable water sources prevents many rural people from gaining access to clean, safe water supplies. Increasing access to improved water supply for under-served people and communities while keeping up with growing populations will require serious consideration of lower cost alternatives to the existing expensive water supply options. The manual drilling sector has proven itself as a successful, lower-cost approach with great potential under suitable conditions. In numerous countries manual drilling techniques are used as an alternative or to complement machine drilling. Drilling ‘shallow’ water wells by hand using local enterprises, can reduce the cost of a well by a factor 4 - 10 compared to a machine-drilled borehole. This cost reduction not only enables NGOs and Governments to construct more water points, but also ‘opens the door’ to villagers, farmers, schools and small communities to finance well construction independently through the private sector. Strategies and programs should be adopted to professionalize the manual drilling sector in order to scale-up rural water supply for drinking and irrigation purposes.

Variations of four manual drilling technologies are being used, each with their own advantages, disadvantages and suitability for different geological conditions. This handbook describes the practical aspects of the drilling technique Sludging and is part of a series of 5 handbooks providing the basis for local entrepreneurs to start practicing affordable well drilling.

We suggest that this drilling handbook is used in combination with the manual: ‘Understanding Groundwater & Wells in manual drilling’.

READERSHIPThis handbook can be used as a guide during training sessions for well drillers, local trainers and quality controllers. It also serves as a reference for drilling supervisors, NGOs, development agencies, manual drilling teams and enterprises during the entire drilling process. The handbook consists of three sections that can be read together, or used and printed separately for the various target groups.

NOTETechnical terms and the way in which subjects are explained are based on the average expected educational level of the intended users. Sometimes, the use of complicated geological and technical terms has been avoided to create better understanding. Please keep in mind that the objective of the handbook is to create better understanding of well drilling in practice, aimed at technical workers of manual drilling teams who may have a limited educational background.

Foreword

Page 6: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

PRACTICA Foundation - Manual drilling series PRACTICA Foundation - Manual drilling series

Colophon

AVAILABLE MANUALS IN THIS SERIES:

Technical training handbooks on affordable manual well drilling. These practical handbooks create awareness of manual drilling for affordable water supply and a roadmap for implementation of manual drilling programs. The manuals provide an extensive and detailed guide for trainers and drilling teams in the use of various drilling techniques for making affordable boreholes. The techniques are explained in simple and understandable language, using clear illustrations and drawings.

1. Manual drilling series: JETTING This handbook describes in detail the various jetting techniques that can be used to drill wells in loose and soft soil formations. With this technique, wells are drilled in a number of hours rather than days.

2. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling techniques, it is the only manual drilling technique that is able to drill through consolidated rock layers.

3. Manual drilling series: HAND AUGER This handbook describes the hand auger technique. This cheap and effective technique is very suitable for sinking shallow wells in soft soils and is excellent for soil surveys. Many drilling teams have this technique in their toolkit to complement other drilling techniques.

4. Manual drilling series: SLUDGING This handbook describes the sludging technique, and in greater detail the ROTA-sludge technique. It is a combination of sludging and percussion and is particularly useful due to its versatile application for a range of soil formations.

5. Manual: ‘Understanding Groundwater and Wells in manual drilling’ The manual ‘Understanding Groundwater & Wells in manual drilling’ complements the 4 technical training handbooks and highlights those essential subjects which are relevant to manual drilling, geo-hydrology, hygiene, well installation and well development in practice, in simple and understandable language.

Manual drilling series

TECHNICAL TRAINING HANDBOOK ON

AFFORDABLE MANUAL WELL DRILLING

JETTING

PERCUSSIONManual drilling series

TECHNICAL TRAINING HANDBOOK ON

AFFORDABLE MANUAL WELL DRILLING

Manual drilling series

TECHNICAL TRAINING HANDBOOK ON

AFFORDABLE MANUAL WELL DRILLING

AUGERING

in manual drilling

UNDERSTANDING GROUNDWATER & WELLS

for manual drilling teams on

hydro-geology for well drilling,

well installation and well development

INSTRUCTION HANDBOOK

Page 7: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

PRACTICA Foundation - Manual drilling series PRACTICA Foundation - Manual drilling series

Table of contents

Module 1THE CONTEXT OF MANUAL DRILLING

Module 2USING THE SLUDGING TECHNIQUE

Module 3MAKING THE DRILLING EQUIPMENT

1. What is manual drilling2. Choices: the 4 manual drilling

techniques3. What organizations must know4. Getting started

This module creates awareness on manual drilling and provides a road-map for implementation. It is meant for NGO’s, governments and implementing organisations and those interested in using manual drilling for affordable water supply.

1. What is sludging2. What drilling teams must know3. What to bring: tools & materials4. How to drill a borehole5. Specific situations and common pitfalls!

Module 2 describes the drilling technique in detail and includes: how the technique works and where it is can be used. This module is a step-by-step explanation that makes use of cartoons to illustrate the drilling process. This module is designed to be used by technical trainers and as a reference for manual drilling teams.

1. What to buy2. Tips for construction3. Technical drawings

Module 3 is meant for local workshops that want to fabricate drilling equipment. It consists of a package of technical drawings, tips for construction and a list of materials that are necessary to make a complete set of drilling equipment.

2

368

1215171943

464850

Page 8: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

PRACTICA Foundation - Manual drilling series

Page 9: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

Module 1

THE CONTEXT OF MANUAL DRILLING

SLUDGING

Page 10: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

SLUDGING - Module 1 - The context of manual drilling

PRACTICA Foundation - Manual drilling series2 PRACTICA Foundation - Manual drilling series

Affordable waterManually drilled wells for water supply are more affordable than machine drilled wells and more productive than hand dug wells, thereby providing access to improved sustainable water points at a lower cost. This module describes the context in which manual drilling is used in various countries and elaborates on the techniques and its implementation. It gives insights and creates awareness and is meant for NGO’s, governments, implementing organisations and those interested in using manual drilling for affordable water supply. This module might also be interesting for the manual drilling teams themselves, especially once they have gained more field experience in well drilling.

The cost of wells vary among countries and will generally be in the range of € 5000 – 15000 for a 30-meter deep machine drilled well and € 2500 - € 8000 for a lined hand dug well. In many countries manual drilling techniques are used as an alternative.

Costs of 30 meter deep manually drilled wells vary from about € 100 - 2500, depending on geology, country and application (i.e. small scale irrigation to high quality community wells for potable water). The equipment for manual drilling can be locally manufactured, transported and maintained.

1. WHAT IS MANUAL DRILLING

Manual drilling is a practical and affordable solution for wells less than 40 meters deep in alluvial soils (loose material, such as clay and sand) and soft weathered rock formations (such as soft sand stone and lime stone). There are many areas around the world where it can effectively provide water for drinking and for irrigation to un-served rural populations at a fraction of the cost of conventional drilling. This is especially true in small isolated communities that will never benefit from the large donor funded drilling programs because they are often not included in national plans.

WHY MANUAL DRILLING?• Costsavings:4-10timescheaperthanamachinedrilled

well of the same depth.• Betteraccesstodrillingsiteswithlightweightequipment,

remote communities can now be reached.• Locallymanufactureddrillingequipment,under€2,000

initial investment for start-ups.• Ready-to-goinemergencysituationsandinpolitically

unstable countries.• Itcreates jobsandknowledgeremains in thecountry,

evenafterdonorprojectsarefinished.• Overcomesproblems inwaterqualityandquantity in

comparison with hand-dug wells.• Canbeusedforbothdrinkingwaterandirrigation.

Machine drilled wells are high in quality, but also very expensive. Hand dug wells are lower in cost and very useful in formations with a low permeability due to their capacity to store water which seeps in through well walls overnight. However, the total yield/day may be low, and water quality may be poor because the water comes from an open source allowing pollutants to enter easily. Hand dug wells also often collapse if not properly lined. A hand dug well lined with concrete rings, preventing it from collapsing, has a high yield, but the price will come close to that of a machine drilled well.

Page 11: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

PRACTICA Foundation - Manual drilling series

SLUDGING - Module 1 - The context of manual drilling

PRACTICA Foundation - Manual drilling series 3

When a borehole is drilled, different types of geological formations (soil layers) can be encountered. To drill through these diverse formations a range of different manual drilling techniques have been developed and are used around the world. In each case the drilling technique must (a) break or cut the formation, (b) remove the cut material (the soil) from the hole, and (c) if necessary provide support to the walls of the hole, to prevent collapse during drilling.

Each drilling technique has been developed for either one or a range of specific formations (soil layers); therefore it may be possible that combinations of different drilling techniques are used to drill a single borehole. All existing drilling techniques canbedividedintofourmaindrillingprinciples:HandAuger,ManualPercussion,SludgingandJetting.Withinthesefourmaindrilling principles, a wide range of variations have been developed in various countries.

2.CHOICES:THE4MANUALDRILLINGTECHNIQUES

THE HAND AUGER consists of extendable steel rods, rotated by a handle. A number of different steel augers (drill bits) can be attached at the end of the drill rods. The augers are rotated into the ground until they are filled, then lifted out of the borehole to be emptied. Specialized augers can be used for different formations (soil types).

Above the water table, the borehole generally stays openwithouttheneedforsupport.Belowthewatertablea temporary casing may be used to prevent borehole collapsing. Drilling continues inside the temporary casing using a bailer until the desired depth is reached. The permanent well casing is then installed and the temporary casing must be removed. Augers can be used up to a depth of about 15-25 meters, depending on the geology.

Geological application; suitable for unconsolidated formations:Sand,silt&softclay.

MANUAL PERCUSSION uses a heavy cutting or hammering bit attached to a rope or cable and is lowered in the open bore hole or inside a temporary casing. Usually a tripod is usedtosupportthetools.Bymovingtheropeorcableupand down, the cutting or hammering bit loosens the soil or consolidated rock in the borehole, which is then extracted byusingabailer.Justaswithhandaugering,atemporarycasing of steel or plastic may be used to prevent the hole from collapsing. When the permanent well screen and casing are installed, this temporary casing has to be removed. Manual percussion drilling is generally used up to depths of 25 meters.

Geological application; suitable for unconsolidated and consolidated formations: Sand, silt, stiff clays, sandstone,laterite, gravel layers and small stones

Page 12: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

SLUDGING - Module 1 - The context of manual drilling

PRACTICA Foundation - Manual drilling series4 PRACTICA Foundation - Manual drilling series

SLUDGING uses water circulation to bring the cuttings up to the surface. The drill pipes are moved up and down. On the down stroke, the impact of the drill bit loosens the soil and on the up stroke, the top of the pipe is closed by hand (or valve), drawing up the water through the pipe and transporting the cuttings to the surface. On the next down stroke, the hand (valve) opens the top of the pipe and the water squirts into a pit, in front of the well. In this pit, the cuttings separate from the water and settle out, while the water overflows from the pit back into the well. The borehole stays open by water pressure. Thickeners (additives) can be added to the water in order to prevent hole collapse and reduce loss of working water (drill fluid). Sludging (with or without rotation) can be used up to depths of about 35 meters.

Geological application; suitable for unconsolidated formations:Sand,siltandclay.Ifrotated(includingadrillbit) it may be possible to penetrate softer-consolidated formations such as stiff clays, soft sandstone, and weathered laterite.

JETTING is based on water circulation and water pressure. As opposed to sludging, water is pumped down the drilling pipes. The large volume of water has an erosive effect at the bottom and the ‘slurry’ (water and cuttings) are transported up between the drill pipe and the borehole wall. A motor pump is used to achieve an adequate water flow. The drill pipe may simply have an open end, or a drill bit can be added and partial or full rotation of the drill pipe can be used.

Thickeners (additives) can be added to the water in order to prevent hole collapse and reduce loss of working water (drillfluid).Jetting(withrotation)isgenerallyuseduptodepths of 35-45 meters.

Geological application; suitable for drilling in alluvial material such as weakly cohesive sands, silts and thin layers of soft clay .

Page 13: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

PRACTICA Foundation - Manual drilling series

SLUDGING - Module 1 - The context of manual drilling

PRACTICA Foundation - Manual drilling series 5

Average drilling speed for 15m in different geological formations (days)**

Drilling Technique*

Equipment cost (€)

Weak cohesive sand, silt gravel

Soft clay Stiff clay

formations

Soft consolidated formations

Soft weathered

rock

Un-weathered Crystalline

basement rock, e.g. granite

Hand auger 200 - 600 1 1-2

2-4 Not suitable Not suitable Not suitable

Percussion 300 -1200 2-3 2-3 3-4

> 3 > 8 Not suitable

Rotary Jetting 800 - 1400 1 1-2 Less effective

Not suitable Not suitable Not suitable

Rota Sludging 600 - 1000 1-2 1-2 2-3

> 3 Less effective

Not suitable

Advantages Disadvantages Average drilling depth (m)

Drilling Technique*

Hand auger Easy to use above

groundwater table. Cheap equipment

Use of the temporary casing if clay layers are penetrated is very limited If a collapsing sand layer is encountered below a clay layer (through which the temporary casing could not penetrate), the borehole does not stay open

15 - 25

Percussion Drills hard formations Slow and high equipment costs

25

Rotary Jetting Quick Lots of working water is needed at once

35 - 45

Rota Sludging Easy to use Applicable in most soft formations

Highly permeable layers (coarse gravel) causes loss of working water and cannot be drilled

35

CHOICES FOR MANUAL DRILLING TECHNIQUES

*Note:Drillingteamsarekeenonusingavarietyofdrillingtechniquestopenetratedifferentgeologicalformations.

**Note:Manydifferentsoillayersmaybeencounteredduringtheconstructionofoneborehole.Theinformationgiveninthe table is an indication of the drilling speed in one particular type of soil.

Page 14: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

SLUDGING - Module 1 - The context of manual drilling

PRACTICA Foundation - Manual drilling series6 PRACTICA Foundation - Manual drilling series

HOW TO IMPLEMENT MANUAL DRILLING

Using manual drilling as implementing tool for affordable water supply is possible for a wide range of qualities andscales.Beforeonecanstart the implementationofamanual drilling program there is a whole list of things to be considered.Forexample:

• Whatistherequiredqualityofthewells?• Whowillpayfortheconstructionofthewaterpoint?• Who will be the end user of the well (households,

community,farmers,refugeesincamps,etc)?• Arewedrillingforpotablewater, irrigationwateror

multipleuse?• Whatisthenumberofwellsthatneedtobedrilledper

year?• Is there already an existing manual drilling sector

presentandwhatistheircapacity?• Whatistheneedandscaleforqualitymonitoring?• Whatisthesizeoftheprojectarea?• What is the hydro-geologic potential for manual

drillingintheprojectarea(typeofsoilandthedepthofgroundwater)?

• Whatisasustainablenumberofdrillingteamsneeded(basedonthedemand)?

• Whatistherelationbetweenuserdensityandhydro-geologyintheprojectareas(howmanypeoplecanwereachwithmanualdrilling)?

• What are the objectives of the implementingorganization?

• Etc.

The answers to all these questions (and the objectivesfor scale and costs) provide the basis for making the right choice of the approach for training and implementation. Afewexamples:

a) For the introduction of shallow irrigation wells the followingcriteriaarevery important:Thewellhas tobe affordable for the farmer (i.e. low cost materials and shallow), while the water quality is of less importance. A training program in this case will focus on drilling affordable wells, using low cost materials in areas where shallow groundwater exists and where farmers have access to markets to sell their vegetables. Manual drilling enterprises will work directly with farmers.

b) For a professional and sustainable water supply to large communities, the government and larger donors are often involved. The most important criteria here are: a very high quality of the well, high quality ofdrinking water (meeting all standards), sustainability of the well and sustainability of the whole drilling sector. A training program in this case will require a much larger capacity building road map with its focus on professionalization of the drilling sector as a whole, involving technical training, quality control, business skill training, social mobilization and social marketing. Making manual drilling enterprises ready to respond to large tenders and drilling high quality wells, generally through governments or donors.

c) Multiple use of wells by households and small communities oftenrequiresamixofbothpreviousoptions:thewellshould still be affordable (or partly subsidized), but also have an acceptable water quality.

Always realize that the purpose of the well, the water quality, affordability and sustainability go hand-in-hand and that all are important for a right choice of the further approach in training and implementation.

GOING TO SCALE

Once a feasibility study has revealed that there is a high potential for manual drilling in a given area or country

3. WHAT ORGANIZATIONS MUST KNOW

Figure 1. Range of implementation possibilities

€ 50-100 for each waterpoint

Lower quality

€ 250 – 600 for each waterpoint

€ 1000 - 2500 for each waterpoint

Simple shallow wells for irrigation

High quality standard potable water wells for large communities

Multiple use wells for household and small communities

Higher qualityWell quality

Page 15: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

PRACTICA Foundation - Manual drilling series

SLUDGING - Module 1 - The context of manual drilling

PRACTICA Foundation - Manual drilling series 7

and the first team(s) have been drilling successfully, there is potential to scale up the capacity of the sector.

Scalingupisoftenexplainedas:trainingmoreteams.Thatis partly what it is, but be careful: training more teamsalone is not enough to ensure the quality, affordability and sustainability of wells! When going to scale, not only the drilling enterprises are involved. Other actors play an important role in this process. To visualise this, let’s go back tothethreeexamplesofthepreviouspage:a) shallow wells for irrigation, b) high quality communal wells and c) multiple use wells for households.

In all these three examples not only the purpose, quality and price of the wells are different, but also the actors involved. Example b for instance, has its focus on professionalization of the drilling sector as a whole. This involves of course the drilling enterprises, but also quality controllers, the government (responsible for a national quality control system and certification), social actors (to guide communities) and pump suppliers. While in example a, the drilling enterprises, farmer associations and pump suppliers play the biggest role.

Whenever starting a program to go to scale it is important to realize that such a program is not ‘a borehole drilling program’ only. Going to scale requires a capacity building process with its focus on training, repetition, quality and sustainability of the manual drilling sector. This may take as much as 3-5 years to develop. For an example of a more detailed roadmap on the implementation of larger manual drilling programs please read the manual; ‘Professionalizing the Manual Drilling Sector in Africa’ A capacity building program to increase access to safe water in rural areas.

THE FIRST STEPS IN ANY MANUAL DRILLING PROGRAM

Feasibility studyA feasibility study will assess the potential for manual drilling and whether it is a practical solution for water supply under the given conditions. Collecting information on hydrology (depth, quality and quantity of groundwater), geology (soil type) and population density will provide a clear indication of areas with the highest potential. It is also of great importance to assess the existing drilling sector.Domanualdrillingenterprisesalreadyexist?Andif

so,whatisqualityoftheircurrentwork?Andwhattrainingisrequired?Whataretherolesoftheotheractorsinvolvedin the sector such as NGO’s, workshops, well diggers, Governments, pump suppliers, etc? This information willbe used to determine the right approach for training and implementation, building on- and reinforcing the existing local capacity.

Technical hands-on training on manual drillingIf there is not an existing manual drilling sector present or if there is a need for further improvement of technical skills, a technical hands-on training on a specific manual drilling method(s) is required.

The technical trainer will advise on the purchase of tools and well construction materials and assure that the drilling equipment is fabricated properly. During several weeks a hands-on technical drilling training is given to a team(s) of selected manual drilling trainees. During and after this first training several wells are drilled, allowing the teams to practice and improve their technical skills.

Follow-up and geo-hydrological trainingOnce teams have gained sufficient experience in the use of the equipment while drilling boreholes, they are ready for thenextstep:atechnicalfollow-uptrainingcombinedwitha training on geo-hydrology, hygiene, well installation and well development.

Although most existing manual drilling enterprises are very capable of drilling a borehole, a lot of improvements can be made during the construction and development of the wells, resulting in a better water quality, quantity and hygienic use of the well. Most manual drilling teams experience problems with site selection, loss of working water, soil texture determination, logging, well casing installation, well development, water quality and well yield (flow rate of the well). These problems may occur when the drilling process is not completely understood and important steps are missed. The classroom training on geo-hydrology ‘UnderstandingGroundwater&Wells inmanual drilling’,addresses the above issues. During this training, the drilling team will get a technical follow up training in the field to bring the theory and lessons learnt into practice.

Depending on the size and objectives of a program,additional training can be given on business skills and quality control for manual drilling teams.

Page 16: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

SLUDGING - Module 1 - The context of manual drilling

PRACTICA Foundation - Manual drilling series8 PRACTICA Foundation - Manual drilling series

4. GETTING STARTED

The construction of a well, using manual drilling techniques is a complicated process. Before drilling starts a gooddrilling site has to be selected, where experience suggests that there will be an adequate quantity of good quality groundwater. During the drilling process there are a lot of different aspects which require attention to prevent things fromgoingwrong.Besidesthepracticaldrillingskillswhichare executed at ground level, attention also has to be paid to important processes which are happening below ground level during drilling. Water used in drilling (working water) could flow away or worse; the borehole could collapse, burying part of the drilling equipment. And finally, once the hole has been drilled, the well casing, screen and sanitary seals have to be installed at the right depth, preventing contaminated water from entering, and ensuring a sufficient yield. With this in mind, it becomes clear that the introduction of manual drilling needs adequate supervision, with proper training and guidance of the drilling teams.

PREPARATIONS AND THE FIRST TRAINING

Making the drilling equipmentThe decision to use quality tools is one of the key factors for success that manual drilling teams can make. Although this looks obvious, the quality of the tools is often overlooked, resulting in loss of equipment and breakdowns in the field. Howtoavoidthis?

All tools and equipment are purchased and made locally. It is important that a good workshop is selected to manufacture the drilling equipment. The workshop should have the right equipmentandbeskilledtodothe job!Module3of thishandbook has all the technical drawings of the equipment and will guide the workshop during construction. Although it may be expected that the workshop is able to make quality drilling equipment from the drawings, when it is the first time for them, additional supervision is useful. Guidance during construction and quality control of the equipment before it leaves the workshop is essential. At first this quality control can be done by a technical trainer. In a later stage, the drilling enterprises will take care of the quality control themselves.

Training the drilling teamManual drilling must be understood as a profession that develops through training, hands-on experiences, successes and failures. Technical training sessions by experienced

drillers/trainers are an essential base for new teams to become professional manual drillers.

Make a selection of trainees before training starts: It isimportant that the trainees either have experience or affinity with wells (pump workshops, well diggers) and are motivated to run their own business. On average, a team consists of 5 or more workers and 1 team leader. During several weeks, hands-on technical drilling training is given to the manual drilling trainees. During and after this first training, several wells are drilled. It is good to provide the training and these first wells in an area that consists of loose soils, which are easy to drill. This will allow the team(s) to practise and improve their technical skills, without becoming frustrated.

Important:duringthisfirstpracticeperiod(afewmonths)the team(s) will come across problems, may have questions, experience difficult situations or worse may lose some of their equipment. Realize that this is all normal and part of the learning process! It is important that the team(s) are guided well and have access to experienced trainers. After a few months of practise a follow up training will evaluate the problems encountered with the drilling team(s).

GUIDING THE NEW TRAINED TEAM

Drilling in a new area When a drilling team is new to an area, it is important for them to have information on the geology (soil type) they are going to drill. And how deep they have to drill. In other words:whatisthedepthofthegroundwaterandhowdeepdo they need to drill into the groundwater to find a good yieldingaquifer?

Thereareseveralwaystogetthisinformation:Askvillagersto show existing hand dug wells and try to talk with well diggers. They can give information on the different types of formations (soil) and the level of the ground water in dry- and in rainy season.To complement this information; the team should drill its first well to the maximum possible depth. During this exploration, soil sampling will help them to define the depth of a good aquifer. Note that drilling in valley bottoms, floodplains and riverbeds is likely to be more successful than high up in the hills.

Page 17: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

PRACTICA Foundation - Manual drilling series

SLUDGING - Module 1 - The context of manual drilling

PRACTICA Foundation - Manual drilling series 9

Remember; there is NOT a standard for the depth of drilling. This always depends on the depths of an aquifer and the requirements of the users and the pump.

Selecting construction materialsFor the well casing different types of PVC pipe are used. The quality can vary from cheap drain pipes with self made filter screens to expensive, high quality factory slotted filter screens and casing pipes. Around the filter screen a gravel pack or filter cloth is placed to reduce the inflow of fine sand. A sanitary seal is placed to prevent pollution from entering the well. Find more information on construction materials in module 2, chapter2:Whatthedrillingteamsmustknow.

Finalizing the wellOnce installed the well should be further developed to maximize the yield of the well. Then an apron and a pump are placed.

For more details see the manual: ‘Understanding Groundwater and Wells in manual drilling’. An instruction manual on hydro-geology, hygiene, well installation and well development.

Giving a follow up trainingWhen the team has drilled a number of wells and gained practical experience, they are ready for a follow-up training ‘Understanding Groundwater and Wells in Manual Drilling’. This training helps them to understand the drilling process and the theory behind it. It will allow the drilling teams to solve problems in the field. During this training, the teams will get a technical training in the field to bring the theory and lessons learnt into practice.

Page 18: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

SLUDGING - Module 1 - The context of manual drilling

PRACTICA Foundation - Manual drilling series10

Page 19: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

Module 2

Using the rota-slUdge techniqUe

SLUDGING

Page 20: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series12 Practica Foundation - Manual drilling series

1. What is slUdging

this second module of the sludging handbook teaches entrepreneurs and technical trainers how to use the drilling equipment and how to drill wells for drinking water using the sludging technique.

HISTORY

sludging, also known as asian sludging or simple sludging is a traditional drilling technique that originates from Pakistan and is widely used in china, india, Bangladesh and nepal to drill affordable wells. the name ‘sludging’ refers to the use of a drilling mud (‘sludge’). the sludge is continuously circulated through the drill pipes, borehole and mud pit during drilling. sludging exists in many variations that have been developed over time, such as: the rota sludge, Baptist and emas drilling methods.

the Baptist method, developed by terry Waller, uses the sludging principle except that the valve at the top has been replaced by a valve at the bottom in the drill bit. the drill pipes are made of PVc and the up and down movement is created by pulling a rope over a pulley (manually or engine driven). the emas drilling method, developed by Wolfgang Buchner uses a combination of sludging and jetting.

Rota sludgethe rota sludge method was developed by aris van herwijnen, Practica Foundation. aris introduced the asian sludge, observed in north Bengal india, in nicaragua in 2001. however, drilling teams had difficulties using the asian sludge when they had to drill in compact and consolidated formations. to drill through these layers, a drill bit was developed and a rotation movement added, giving it the name “rota” sludge. a rota sludge driven by engine, called the Maq-Perfor, has recently been developed and tested in nicaragua.

this practical module is created with information compiled from available literature, field observations in latin america, asia and african countries, discussions with local drilling teams and interviews with sludging experts. this manual is an updated version of the existing manual “rota sludge and stonehammer drilling”, written by aris van herwijnen, Practica Foundation 2005 and includes lessons learned in rota sludging in the past 5 years and a modification of tools and equipment.

nowadays the rota sludge method is being used in: nicaragua, Madagascar, tanzania, ethiopia, Uganda, ghana, liberia, niger, senegal and Mauritania. this module summarizes best practices in drilling with the rota-sludge technique.

HOW DOES IT WORK?

a rota sludged well is a borehole that is drilled into the ground using water circulation to bring the cuttings up to the surface. the drill pipes are moved up and down and rotated by human power. on the down stroke, the impact and the rotation of the drill bit loosens the soil. on the up stroke, the top of the pipe is closed by hand (or valve), drawing up the water through the pipe and transporting the cuttings to the surface. on the next down stroke, the hand (valve) opens the top of the pipe and the water squirts into a pit, in front of the well. in this pit, the cuttings separate from the water and settle out, while the water overflows from the pit back into the well. as the drilling progresses, more pipes are added

the borehole is kept full of water at all times to prevent the well from collapsing. thickeners (additives) are added to the water to plaster the borehole wall in unstable formations and to make a drilling fluid. drilling fluid helps to bring the drilled material up to the surface and reduces loss of water.

Page 21: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series 13

a simple wooden structure next to the well consists of two vertical poles and an axle between them. this serves as a support for the lever that is used to move the drill pipe up and down. an ‘arm’ is attached to the drill pipe which permits the drill pipe to be rotated at the moment it hits the ground.

sludging (with or without rotation) for drinking water wells is generally used up to depths of about 35 meters on average, and exceptionally deeper in soft formations.

Where does it work?sludging is suitable for unconsolidated formations: sand, silt and clay. if rotated (including a drill bit) it may be possible to penetrate softer-consolidated formations such as stiff clays, soft sandstone, tuff stone and weathered laterite.

Page 22: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series14 Practica Foundation - Manual drilling series

.ADVANTAGES & DISADVANTAGES

Advantages of Rota sludgingthe drilling tools and equipment can be constructed and repaired in local workshops and are easy to transport in rural areas. rota sludging is useful in a large range of soil formations and especially effective in sandy-clay soils, which are difficult to drill with the jetting and augering methods. With sludging, water circulation brings the cuttings up to the surface continuously; there is no need to bring up the drill bit to empty it.

Disadvantages of Rota sludgingto prevent the well from collapsing, fluid-drilled boreholes must be kept full of water during the entire drilling and well installation process. coarse gravel and other highly permeable materials (cracks in the formation) cause loss of working water and cannot be drilled. ,

Page 23: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series 15

BEFORE YOU START DRILLING

Before you start drilling, there are some important things you need to know. First; a drilling site needs to be selected, where a good quantity (high yield) and quality (no pollution) of groundwater is expected. second; some knowledge of construction materials such as PVc casings and also of soil sampling and drilling safety could help you to become a better driller.

Selection of the drilling siteselecting a good location for the well is not always easy and depends on: needs and preferences of the users, expected groundwater level, type of formation (soil) and any nearby sources of pollution (latrines) that may be harmful.

some tips to help you in site selection:

o the needs, preference and ideas of the users should be placed first when you select a location.

o always discuss advantages and disadvantages of the selected location with the users (you are a specialist who has knowledge about the expected quantity and quality of water in relation to the selected site).

o ask villagers to show existing hand dug wells and try to talk with hand diggers. they can give useful information on the different types of formation (soil) and the level of the ground water in dry- and in rainy season.

o note that drilling in valley bottoms and riverbeds is likely to be more successful than high up in the hills. Keep in mind that the selected site is not flooded during the rainy season (if it is the lowest point in the landscape).

o always choose a site at least 30 m away from a latrine. avoid other possible sources of pollution such as waste dumps, fire places and fuel stations.

MATERIALS

What about the PVC pipes?For the well casing, you can use different types of PVc. the quality can vary from cheap drain pipes with self made filter screens to expensive, high quality factory slotted filter screens and casing pipes. the choice of pipes depends on: diameter of the pump (the pumps should fit the pipe), type of the well (irrigation or potable water), user intensity (household or communal) and the users budget (low or high).

2. What drilling teaMs MUst KnoW

Buying the pipesYou can buy high quality factory slotted pipe in a specialized hardware store. the pipe has a thick wall, is strong and has a lot of slots per meter filter screen, resulting in a high water inflow. the pipes are expensive and are often used for large communal wells. You can also buy cheaper PVc pipes. You can find these regular pipes in almost each hardware store. the wall thickness should be 3 mm or more to prevent the pipes from breaking. in this case you have to make the slots of the filter screen yourself.

Making the slots in the filter screenUse a hacksaw to make slots in the pipe. For a 4-inch screen, 6 parallel lines are drawn along the full length of the pipe. the spaces between the alternate lines should be about 4-5 and 6-7 cm (see drawing). the slots are sawn between 6-7 cm lines. the distance between the slots should be about one centimeter. guideline: the length of the filter screen should be at least 3 meter. the last meter of pipe has no slots. this is called the sump in which fine particles that enter the well screen can settle, without blocking the filter screen. the bottom is closed with a PVc cap or by cutting and bending the bottom of the PVc pipe.

Gravel packcoarse river sand in the range 1.5-3 mm is used as a gravel pack. the gravel pack fills the space between the borehole wall and the filter screen. it may also serve to filter some of the fine sand particles from entering the well. Use a minimum and a maximum sized sieve to prepare the ‘gravel’.

Sanitary sealduring installation a sanitary seal is placed on top of the gravel pack to prevent pollution entering the well. a sanitary seal is made of clay or cement grout. if cement is used for the seal, first a half meter of clay is backfilled on top of the gravel pack to prevent the cement from penetrating the gravel pack.

Drilling fluidalthough it sounds dirty, cow dung can be used as an additive to the water to create a drilling mud. this works

Page 24: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series16 Practica Foundation - Manual drilling series

very well, is biodegradable, free of cost and generally widely available. one requirement is that it has to be fresh, collected the same day when you are drilling. cow dung and e-coli (bacteria in the cow dung) can be removed during well development and chlorination of the well when drilling is finished. other additives can be used as an alternative, such as natural clays, fibers and although more expensive, natural polymers. natural polymers are also biodegradable; in other words, after some time they disappear naturally. additives need to be removed when the drilling is finished. Please find more information on additives and how to remove them (well development) in the manual ‘Understanding Groundwater and Wells in manual drilling’.

TO REMEMBER DURING DRILLING

Take soil samplessoil sampling helps you to understand what material you have been drilling through and helps you to indicate when you have reached the final depth of drilling

this sampling is also a good way to determine how easily water flows through the pores (open space) of the drilled material. sand and gravel are very permeable, and are therefore suitable layers which transmit the water easily. if the drilled material is very fine, such as silt and clay, it will not transmit water easily and is called impermeable. do not install the filter screen in this formation.

Field trickstake a sample of the soil and squeeze it into a ball, between your hands. then drop the ball from a height of one meter above ground level. o if the ball consists of non cohesive (non-sticky) particles,

the ball totally falls apart. in this case the material is permeable. the particles of sand or gravel will be easily visible.

o if the ball falls apart only partially, the soil contains some silt or clay and sand. the formation has a low permeability.

o if the ball only deforms and remains more or less in shape, it is composed of clay, and is described as impermeable.

Drilling safetyKeep the borehole full of water at all times! A frequently made mistake is to go for lunch, without

keeping an eye on your working water. When you come back, the water level in the borehole has dropped, the

hole has collapsed and your equipment is lost!When you have to leave the site overnight during drilling, you need to take important precautions:o lift up the pipe at least 3 meters in the borehole or take

it out. this will prevent the drilling pipe from getting stuck.

o always keep your borehole full of water, also during the night. this is necessary to prevent the borehole from collapsing.

o Protect the borehole and the mud pit. take measures to prevent cattle from stepping in

Please be aware that drilling can be a dangerous activity. Watch each other and ask villagers (especially children) to watch you from a safe distance. this prevents them from accidentally being hit by the lever or one of the drilling pipes.

NOTEthese are a few guidelines to help you during drilling. You can find more information on soil, groundwater, hygiene, sampling, well installation and well development in the manual ‘Understanding Groundwater and Wells in manual drilling’.

Page 25: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series 17

3. What to BringTools & materials

drill pipes (17 x 1,5 meter)+ (2 x 0,75 meter)

Weighted pipes (2 x 1,5 meter)

drill bit (1 or 2 pieces)

rotation arm (1 piece)

Frame poles (2 pieces)

Wooden planks (2 pieces)

axle (1 piece)

lever (2 pieces)

half bush (1 piece)

hacksaw (2 pieces)

Pipe wrenches (3 pieces)

shovel (2 pieces)

Page 26: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

SLUDGING- Module 2 - Using the rota-sludge technique

PRACTICA Foundation - Manual drilling series PRACTICA Foundation - Manual drilling series18 PRACTICA Foundation - Manual drilling series

Toolbox (full)

Bucket 12 liters (2 pieces)

Empty oil drums (200 liters) (3 pieces)

Sieves 1,5 & 3 mm (2 types)

Additives (1 bag)

Inner tube (2 meters)

PVC casing pipe

PVC glue

Chain, 6 mm (1,5 meter)

Depth measuring tool (1 piece)

Hand auger (3 meters)

Rope, 15 mm (1 meter)

Rope, 6 mm (5 meters)

Sieved gravel pack (50 kg bag)

Nails 10 cm (10 pieces)

Bolt and nut, 8 x 60 mm (4 sets)

Page 27: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series 19

4. hoW to drill a BoreholeWith the rota slUdge

Dig holes for the framedig 2 holes of 80 cm deep for the poles of the frame. the distance between the holes should be about 30 cm.

TipUse a steel bar or hand auger.

steP 1 setting UP the rig

Page 28: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

SLUDGING- Module 2 - Using the rota-sludge technique

PRACTICA Foundation - Manual drilling series PRACTICA Foundation - Manual drilling series20 PRACTICA Foundation - Manual drilling series

Measure the height of the polesPlace one of the poles in the hole. The top of the pole should be equal to the shoulder height of the team members.

Place the frame polesPlace a large flat stone at the bottom of each hole and put in the frame poles.

Place axle and lever1. Place the axle on the frame poles.

2. Place the half bush with a nail. Place the lever on the axle.

3. Attach two wooden planks between the poles (50 cm height)

TipPut small stones around the poles and tamp the stones with a wooden stick to place the poles firmly into the hole.

TipThe distance from the half bush to the end of the lever is the same as the length from your elbow till the tip of our fingers (about 40 cm)

Page 29: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series 21

Make a starter holeMake a starter hole of at least 1,5 meters deep at this centre point using a steel bar or a hand auger.

Tipif you have the tools, make a starter hole of 2-3 meters deep. this will make the circulation easier.

Mark the position of the welllet the chain touch the ground when the lever is in a horizontal position. Make a mark on the ground 2,5 cm to the right (facing the rig from the front, see picture). this will be the centre point of the well.

Connect the lever and chain

1. turn a thick nail in the frame poles and ty a 15 mm rope around the lever, axle and frame poles to make a tight connection.

2. attach the chain to the lever at a distance of 35 cm from the axle using a bolt and nut. turn a thick nail in the lever. this will prevent the chain from slipping off.

Page 30: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series22 Practica Foundation - Manual drilling series

Dig the mud pitdig the mud pit and surround the mud pit with a dyke. the mud pit consists of a shallow part and a deeper part. connect the mud pit and the starter hole with a channel.

in the deeper part of the mud pit the drilled material will separate from the drilling water.

Plaster the mud pitseal the mud pit and channel with clay or drilling fluid (water + additive) to conserve your water. in sand or in dried clay (cracks) water will leak away easily.

steP 2 PreParing the MUd Pit

Page 31: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series 23

What about the water supply? Fill the mud pit and starter hole with water from a nearby well or river.

Make sure you have water all day! You will loose water during drilling.

Tipestimate how much water you will need for a day’s drilling. Make sure you have more than enough.

Make drilling fluidMix additive to the water until the water is getting thicker.

drilling fluid helps to bring the drilled material up to the surface and reduces loss of water and the chance of collapse.

TipWhen you are losing a lot of working water or the drilled material is not coming up, more additive can be mixed.

Tipcow dung works extremely well as additive and is cheap. Mix fresh cow dung with water in a barrel until it is a soft mixture without chunks. You can use this as additive.

Page 32: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series24 Practica Foundation - Manual drilling series

steP 3 PreParing the eqUiPMent

Connect the drill bit to the weighted pipe connect the drill bit to the weighted drill pipe using the pipe wrenches.

TipKeep threads clean with a steel brush and protect threads during transport to prevent damage.

Page 33: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series 25

Set up the drill pipe Place the weighted pipe and drill bit inside the starter hole.

Attach the chain to the weighted pipe hold the lever in horizontal position. ty the chain to the pipe with a bolt and nut 20 cm above the ground. secure the chain by tying a short natural rope above and below the chain.

Tip a good working height is when the lever is in horizontal position.

Page 34: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series26 Practica Foundation - Manual drilling series

Attach the arm illustratie nr10:attach the arm to the top of the weighted pipe. now drilling can begin.

Page 35: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series 27

the work consists of three tasks; 1. the driller - controls the water flow with his right hand

and is coordinating the team. the driller is standing next to the drill pipe, facing the mud pit.

2. the lever operator(s) - lift and drop the drill pipe by moving the lever up and down.

3. the arm operator - rotates the drill pipe and drill bit. he is facing the driller.

steP 4 PreParing to drill

The drilling team

Page 36: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series28 Practica Foundation - Manual drilling series

Tipin the first meters of drilling it is difficult to maintain circulation. Fill the drill pipe with water each time you start to circulate. this will make it easier.

Fill the drill pipe with water Pour water into the drill pipe until it is filled and close the pipe quickly with your hand. now sludging can begin.

Page 37: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series 29

Circulate the water1. close the top of the pipe with your hand.

2. Move the lever down (lift up the pipe)

3. Push the lever up with high speed (let the drill pipe make a free fall).

4. open your hand. the water is now forced out the pipe. aim the sludge back into the mud pit.

steP 5 starting to drill

5. then close your hand and start the cycle again.

TipWhen you push up the lever, be careful not to hit the hand of the driller on top of the pipe.

Page 38: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series30 Practica Foundation - Manual drilling series

The rotation movement

1. Move the lever down (lift up the pipe).

2. Push the lever up with high speed (let the drill pipe make a free fall).

3. rotate the arm after the drill bit has hit the bottom. rotate the arm a quarter of a turn from the right to the left (clockwise).

Page 39: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series 31

4. Move the lever down again (lift up the pipe)

5. rotate the arm back to the starting position (left to right).

only move the arm back to the right when the drill bit is off the bottom to prevent the threads from being unscrewed (turning loose).

The complete drilling cycle

1. close the top of the pipe with your hand.

2. Move the lever down (lift up the pipe).

3. Push the lever up with high speed (let the drill pipe make a free fall).

4. open your hand. aim the sludge back into the mud pit.

5. rotate the arm after the drill bit has hit the bottom.

6. close the top of the pipe, move the lever down again and rotate back the arm.

Page 40: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series32 Practica Foundation - Manual drilling series

Move up the chaina good working height for the lever is a horizontal position. When you drill deeper, the lever will go up and becomes to high to reach. You now need to move up the chain on the drill pipe to adjust the height of the lever.

1. the lever becomes to high to reach.

2. Push the lever up, to give slack in the chain.

3. slide the chain up the pipe (do not put tension on the chain with the lever).

4. Place the lever back in horizontal position. You have now adjusted the working height.

steP 6 drilling deePer

Page 41: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series 33

Wash the borehole during drilling, a lot of cuttings are drilled loose from the bottom of the borehole. Wash the borehole to remove the cuttings.

TipYou need to wash when;o you feel a high suction on

your hand (driller).o you drill deeper too

quickly.o less water is coming out

of your drill pipe during circulation.

o each time before a break or when a new pipe is added.

1. Move the lever up and down continuously, do not drill any deeper!

(do not hit the bottom of the borehole)2. circulate the sludge until all cuttings have been

removed. (do not rotate the arm)

steP 7 MaKing a teMPorarY stoP & adding a neW drill PiPe

Why do you need to wash?during drilling a lot of cuttings are mixed with the water in the borehole. if there are too much cuttings, the drill pipes will be blocked. or worse; when you stop drilling, the cuttings will sink down on top of the drill bit and you can lose your equipment!

circulate until the sludge is free of cuttings, only then it is safe to stop.

Page 42: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series34 Practica Foundation - Manual drilling series

Empty the cuttings from the mud pitUse a shovel to remove the cuttings from the mud pit.

Add a new drill pipe o First use the 1,5 meter weighted pipe and drill this into

the ground.o add a short drill pipe (75 cm).o When this is drilled you add another short pipe (75

cm). o then add normal drill pipes of 1,5 meters length for the

rest of the drilling.

Tipin the first meters of drilling it is difficult to circulate the water (sludge). With the short drill pipes (75cm) it is easier to circulate. When you drill deeper, circulation with the normal pipes will become easier.

Tipdrilling is a heavy task when you drill deeper. let more team members join on the lever.

Page 43: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series 35

Take soil samplestake a soil sample of the drilled soil, every meter or every time before a new pipe is added.

steP 8 drilling to the right dePth

Place a bucket full of clean water in the mud pit. aim the sludge from the top of the pipe into the bucket. take a soil sample out of the bucket.

TipPlace the samples on a piece of plastic and write down the depth.

The right depth of drillingcontinue drilling and washing until you have reached the final depth. the final depth of drilling is reached when you have drilled at least 4 meter into a coarse water bearing layer of sand/gravel.

Page 44: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series36 Practica Foundation - Manual drilling series

Only continue with the next steps if you have reached the final depth of drilling

steP 9 the Final stePs

Wash the borehole circulate (wash) the sludge continuously until all the cuttings are removed from the borehole (do not drill deeper!).

TipWashing is a heavy task. let all the team members join on the lever during washing.

Page 45: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series 37

Lift the drill pipes remove the drill pipes from the borehole. lift up one drilling pipe at the time!

1. lift up the drill pipe (with the lever) and place a pipe wrench around the drill pipe.

2. lower the pipe until the pipe wrench holds the pipe. Move the lever up and slide down the chain along the drill pipe.

3. lift up the drill pipe.

4. repeat step 1-3 until the pipe wrench can be placed under a socket.

TipMake sure the jaws of the pipe wrench have a tight fit with the pipe to have good grip.

Tipto prevent your pipe wrenches and spanners from falling into the borehole, secure them with a small rope to the frame poles

Page 46: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series38 Practica Foundation - Manual drilling series

Tip always secure the drill pipe with the chain before you disconnect a pipe! hold the lever as the pipe may slip out of the pipe wrench.

5. Place the pipe wrench under the socket. lower the pipe until the pipe wrench holds the pipe. remove the chain and place the chain under the socket.

6. now it is now safe to disconnect a drilling pipe.

Be careful!Pay close attention when you remove the drill pipes. all team members should be fully concentrated. if the drill pipe is not held properly by a pipe wrench or chain, the pipe can Fall BacK into the borehole.

Pulling lost drill pipes from the bottom of your borehole will not be easy. Please see in chapter 5 of this module the paragraph: ‘Fishing when a pipe has dropped.’

Page 47: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series 39

Keep the borehole full of water always keep the borehole and the mud pit full of water when you remove the drill pipes install the following well installation process, to prevent the well from collapsing.

Page 48: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series40 Practica Foundation - Manual drilling series

Measuring the depth of drillingMeasure the exact depth of your borehole. this gives you information on the total length of casing pipes needed.

Tip!For measuring; use a rope or long measuring tape with a small weight attached. Measuring with a rope can be best done when you make small knots at every meter.

1

43

2

Tip!always make sure that one person is holding the casing to prevent it from dropping into the borehole.

Installation of the PVC casingPrepare the filter screen, the sump and the casing, before you start the installation (1).

lower the filter screen into the borehole (2). then screw or glue the first PVc casing pipe to the screen (3). lower the casing further into the borehole (4). More PVc pipes are added one by one.

Page 49: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series 41

Cleaning the well and the screenWhen the casing and screen is installed, the borehole and screen are now further cleaned:

drain the dirty water away from the mud pits.

then pour clean water into the casing and allow dirty water to overflow the borehole. only when clean water comes out of the borehole, the cleaning is finished and the gravel packing can start.

Gravel packingstart slowly pouring in the gravel, all around the pipe. While putting the gravel in, keep moving the PVc pipe from side to side in the borehole.

Page 50: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series42 Practica Foundation - Manual drilling series

Measuring the depth of the gravel packMeasure regularly to check if the right depth of gravel packing has been reached. Fill the open space between the casing pipe and the borehole wall for 1-2 m above the top of the filter screen.

Backfillingafter you have installed the gravel pack, you must install the sanitary seal and the rest of the backfilling.

Leaving the well behindWhen the drilling is finished and you are leaving the site, remember to cover the PVc casing!

this can be done with a PVc cap or tightly wrapped with inner tube. this is needed to ensure that nothing can be dropped into the well by children, before the pump is installed.

Page 51: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series 43

5. sPeciFic sitUations and coMMon PitFalls

Drilling in compacted soilsin hard and compact formations such as, stiff clay, tuff stone and sandstone, it is useful to connect a second weighted pipe to the first weighted pipe. this will give more pressure on the teeth of the drill bit and will make the drilling more effective. if this doesn’t work, first drill a hole with a smaller drill bit. then use the normal drill bit to make your borehole wider. do not use a second weight in very soft soils such as loose sands and soft clay. this will make the drilling going too fast, with the risk that you block your pipes easily.

Bouncing pipeWhen your drill pipe starts to ‘bounce’ (jump) you have hit a hard consolidated formations, stone or a big boulder that is difficult or impossible to drill. You can recognize this by a change in sound (higher ‘ping’ sound) and less resistance during the rotation of the arm.

check if there is drilling material coming to the surface. if this is not the case, just keep drilling for a while and check the progress. if drilling deeper is not possible, it is better to move to another drilling site. only install a casing if you have drilled enough meters into a good aquifer.

Blocked pipesometimes it is impossible to circulate the sludge. When you are inexperienced you can face problems with keeping the vacuum on the drilling pipe with your hand. Practice more to overcome this problem. When you lost your vacuum, you can add water in the top of the pipe and try again.

there could also be a leakage in the drill pipe. You can hear this when you lift the pipe, while the top of the pipe is closed. repair the pipe in a workshop and try again.

the drill pipes or bit can also be blocked with cuttings. in this case there are 2 things you can do;

1. lift up the drill pipe one meter or more and try to wash again using large strokes on the lever.

2. remove all pipes from the borehole and remove the cuttings that have caused the blockage. slowly lower the pipes again in the borehole and start to wash until the borehole is clean.

What if your pipe is stuckif you forget to wash before taking a break or when a stone from the borehole wall falls down, the cuttings or stone will fall on top of the drill bit. the drill bit will get stuck. in this case, do not put a lot of pressure on the lever, but try to make very short strokes and rotate clockwise to loosen the material. if you are successful you will notice that bit by bit the strokes become longer. continue until the pipe is loose and start washing.

Drilling deeperthe chain can be attached at different positions on the lever. the closer the distance from chain to the frame, the lighter it is to move the drill pipes up and down, but the stroke of the drill pipes will become shorter, so only do this when you drill deeper. normally the chain is attached 40 cm from the frame. When you drill deeper, the lever is easier to operate when you move the chain to 30 cm from the frame. this way, the lever has more strength for lifting the drill pipe and minimizes the chance of breaking.

The lever the lever is made out of a dry and light weight piece of round wood (preferably eucalyptus) with a length of about 2,5 meters. the diameter varies from 7-10 centimeters at holding position and slightly bigger at the end of the frame. to avoid blisters and cuts, remove all sharp wood chips before you start using it.

Fishing when a pipe has droppedWhen a pipe has fallen back into the borehole by accident, it needs to be recovered quickly. there are 2 things you can do;1. lower your drill pipe slowly back into the borehole

and try to find the top of the lost pipe. carefully try to screw your drilling pipe onto the lost pipe. then slowly lift the pipes again.

2. When a pipe is broken during drilling: lower your drill pipe to find the top of the broken pipe. Make a lasso out of the chain and guide it down along the drill pipe. When the lasso has passed the broken pipe, you pull the chain tight behind a socket and try to lift the pipes with the chain (attach a strong rope to the chain to go deeper).

Page 52: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

slUdging- Module 2 - Using the rota-sludge technique

Practica Foundation - Manual drilling series Practica Foundation - Manual drilling series44

Never forget!!1. Keep your borehole full of water at all times.2. always choose a site at least 30 m away from a latrine

and other sources of pollution.3. if you pause drilling for a longer time (for example

lunch), wash the well and lift up the pipes for 2 meters. this will prevent the drilling pipe from getting stuck.

4. always take soil samples. Place them on a plastic sheet and write down the depth. this will help to determine the depth of your drilling.

5. always place your filter screen in the coarsest layer of sand or gravel under the water table.

6. Use a sump (blind pipe) below your filter screen to collect any fine material that enters the well.

7. a guideline for the length of the filter screen is 3 meter.

8. When the drilling is finished and you are leaving the site, remember to cover the PVc casing. this can be done with a PVc cap or a plastic bag tightly wrapped with inner tube. it is needed to ensure that nothing can be dropped into the well by children.

Tool maintenanceo look after your drilling pipes. Keep threads clean and

apply some grease to the threads. Protect threads with a PVc cap, socket or wrapping, especially during transport, to prevent damage.

o regularly sharpen the teeth of the drilling bit using an angle grinder.

o check the welds on the drilling pipes, arm and drilling bit.

o regularly check the drilling pipes for straightness and leakages.

o check if the tools are complete and replace if necessary.

o inspect the chain and ropes and replace when needed.

Page 53: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

Module 3

MAKING THE DRILLING EQUIPMENT

SLUDGING

Page 54: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

SLUDGING - Module 3 - Making the drilling equipment

PRACTICA Foundation - Manual drilling series PRACTICA Foundation - Manual drilling series46 47PRACTICA Foundation - Manual drilling series46 47

1. WHAT TO BUY

This module explains how to fabricate all drilling equipment. It consists of a materials list for the drilling equipment and tools and a package of technical drawings, including tips that are necessary to make a complete drilling set.

Material list for the construction of drilling equipment

"ROTA SLUDGE" KIT - 30 meters Nr EQUIPMENT Part Dimensions Material + Information Qty 1 Drill bit 3000 D = 15 cm 2 Central pipe 3001 2'' x 3,9 wall x 250mm GI pipe 2 Upper ring 3002 Ø 120 x 10 x 50mm Fe36 pipe 2 Lower ring 3003 Ø 95 x 10 x 50mm Fe36 pipe 2 Ring support 3004 25 x 25 x 3 x 50mm Fe36 angle iron 8 Upper welding support 3005 Ø 8 x 320mm Reinforcement bar 2 Lower welding support 3006 Ø 8 x 200mm Reinforcement bar 2 Tooth short 3007 18 x 10 x 75mm Leaf spring 16 Tooth long 3008 18 x 10 x 90mm Leaf spring 8 Coupling 2'' GI 2 2 Weighted drilling pipe 2100 L = 150 cm 2 Weight 2101 Ø 14 x 1300mm Rebar 32 Drill pipe normal 2200 2'' x 3,9 wall x 1400mm GI 2 Threaded pipe 2001 2'' x 5,5 wall x 100mm GI pipe 2 Rib 2003 Ø6 x 50mm Rebar 16 Coupling 2'' GI 2 3 Normal drilling pipe 2200 L = 150 cm 18 Drill pipe normal 2200 2'' x 3,9 wall x 1400mm GI 18 Threaded pipe 2001 2'' x 5,5 wall x 100mm GI pipe 18 Rib 2003 Ø6 x 50mm Rebar 144 Coupling 2'' GI 18 4 Short drilling pipe L = 75 cm 2 Drill pipe short 2300 2'' x 3,9 wall x 650mm GI 2 Threaded pipe 2001 2'' x 5,5 wall x 100mm GI pipe 2 Rib 2003 Ø 6 x 50mm Rebar 16 Coupling 2'' GI 2 5 Rotation arm 1000 1 Lock ring 1001 Ø 6 x 105mm Round bar 4 Hub 1101 1"x 3,4 wall x 75mm GI pipe 1 Midpiece 1102 1" x 3,4 wall x 150mm GI pipe 1 Reinforcement strip 1103 30 x 4 x 250mm Fe36 strip 1 Clamp strips 1201, 1202 80 x 5 x 140mm Fe36 strip 2 Chain link 1203 Ø 6-7 x max. 40mm Iron 6 Reinforcement 1205 Ø 8 x 80mm Round bar 8 Grip ridge 1206 Ø 8 x 80mm Round bar 8 Axle 1301 Ø 25 x 160mm Round bar 1 Connecting pipe 1302 1" x 3,4 wall x 200mm GI pipe 1 Handle 1303 3/4" x 2,9 wall x 1000mm GI pipe 1 Grip 1304 1" x 3,4 wall x 200mm GI pipe 1 Reinforcement strip 1305 30 x 4 x 250mm Fe36 strip 1 Bolt wing 1401 Ø 10 x 130mm Round bar 1 6 Axle 4000 1 Half bush 4001 80 x 5 x 70mm Fe36 strip 1 Axle 4101 Ø 30 x 500mm Round bar 1 Axle end stop 4102 Ø 10 x 200mm Round bar 2

Page 55: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

PRACTICA Foundation - Manual drilling series PRACTICA Foundation - Manual drilling series46 47

SLUDGING - Module 3 - Making the drilling equipment

PRACTICA Foundation - Manual drilling series46 47

Purchase list for additional tools

Nr TOOLS & MATERIALS Dimensions Additional information Qty

Set up rota-sludge 7 Frame pole 10-14 cm X 240 cm wood (round or square) 2

8 Support planks 10 x 80 cm wood 2

9 Lever 7-8 cm x 250 cm dry wood (round & straight eucalyptus) 2

10 Chain 6 x 30 x 150 cm steel 1 11 Bolt + nut 8 x 60 cm steel 4 12 Nails 10 cm steel 10 13 Rope Ø 15 mm (4 meters) organic 1 Tools 14 Conical auger Ø 160 mm Minimum length of 150 cm

15 Sieves mesh 1,5 & 3,0 mm holes can also be punched in sheet metal using nails 2

16 PVC glue 1

17 Pipe wrenches 24 inch good quality 3 18 Toolbox (full) hammer, spanners (M8), steel brush, scissors 1

19 Empty oil drums 200 liters steel (plastic drums can also be used) 3 20 Hack saw assure spare blades 2 21 Buckets 12 liters plastic 3 22 Shovel steel 1 23 Crowbar 150 cm 1 24 Rope Ø 6 mm (35 meters) organic 1 25 Strip 150 cm rubber (innertube) 1 26 Depth measuring tool 1 Materials 27 PVC casing pipe size depends on pump/user requirements 1 28 Additives 1 bag 1 29 Gravel pack 1 and 3 mm 1

Page 56: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

SLUDGING - Module 3 - Making the drilling equipment

PRACTICA Foundation - Manual drilling series PRACTICA Foundation - Manual drilling series48 49PRACTICA Foundation - Manual drilling series48 49

2. TIPS FOR CONSTRUCTION

Read the following tips together with the technical drawings at the end of this module. These tips will help you in the fabrication of the drilling pipes, drill bit and the measuring tool. The other drilling equipment can be made with the technical drawings only.

TIPS FOR MAKING THE DRILLING PIPES(To be used by construction of drawing nr: 2000 – 2301)

Normal drilling pipesThin wall drilling pipes are cheap and great in use, but when intensively used they break at the threaded connections! To overcome this problem:a) Screw a regular steel coupling on the one side of the

thin wall pipe and weld it.b) Weld a short piece of thicker wall pipe with threads to

the other side of the thin wall pipe.

How to weld the couplingThe thin wall pipe needs to be threaded on one side. Then, screw the steel coupling completely on this thread and weld the coupling to the thin wall pipe.

How to weld the thick wall pipeTake a short piece of thick wall pipe and make threads on one side. Now weld the opposite side to the thin wall pipe. Be careful: It is very important that they are centered properly!

Tip A good tool to make is a mould (welding jig) as shown in the picture. The mould consists of two pieces of angle iron welded inline on a solid base (1). The thin wall pipe (2) and the short piece thick wall pipe can now be placed in the mould (3). Shift the two pipes to each other (4). Then weld the two pieces together, all around (5). This will as-sure a straight connection.

Tip: Make sure the threads are greased to protect the threads during welding (welding sparks).

Weighted pipesFirst make a normal drilling pipe as described above; weld a coupling on one side and short piece of thick wall pipe on the other side.

Then, weld pieces of re-bar around the normal drilling pipe, to increase the weight of the pipe. Make welds at the bottom, middle and top as shown in the picture. Two sizes of re-bar can be used; 1) 14 mm re-bar of 1,3 meters. Use 16 pieces.2) 16 mm re-bar of 1,3 meters. Use 14 pieces.

TipBe careful when welding the re-bar, NOT to burn holes in the normal drilling pipe! This will give problems with the circulation (you will loose your vacuum) during drilling.

Page 57: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

PRACTICA Foundation - Manual drilling series PRACTICA Foundation - Manual drilling series48 49

SLUDGING - Module 3 - Making the drilling equipment

PRACTICA Foundation - Manual drilling series48 49

TIPS FOR MAKING THE DRILL BIT(To be used by construction of drawing nr: 3000 – 3008)

The drill bit

There are 2 important tips for construction.

1) Make the drill teeth out of spring leaf steel (use spring leaves of trucks). This is hard steel and will last longer than ordinary steel. Use stainless steel electrodes to weld the teeth on the rings.

2) Weld the teeth on the smallest ring (the pipe) to point slightly inwards; the inner diameter of the teeth must be equal to the inner diameter of the pipe. In this way, dril-led material can always pass through the pipe.

TIPS FOR MAKING THE DEPTH MEASURING TOOL

Take a rope (6mm) of about 35 meters long and make knots at every meter.

Option 1: measuring the depth of the water table. Use a short piece of pipe (Ø 50 x 80 mm) and close one side, by welding on a small plate. Drill a hole in this side to attach the rope.

Option 2: measuring the depth of the gravel pack. Take the same rope, and remove the short piece of pipe that was used in option 1. Attach a long re-bar (Ø 6 x 1000 mm).

Page 58: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

SLUDGING - Module 3 - Making the drilling equipment

PRACTICA Foundation - Manual drilling series PRACTICA Foundation - Manual drilling series50 PB

3. TECHNICAL DRAWINGS

Rotating armDrawing 1000 - 1401

Short drilling pipeDrawing 2300

Drill bitDrawing 3000 - 3008

AxleDrawing 4000 - 4102

Weighted pipeDrawing 2100

Normal drilling pipeDrawing 2200

Page 59: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

NO. DESCRIPTION QTY.1000 Arm 12000 Drill pipe 13000 Drill bit 14000 Axle 1

BASE MATERIAL:

C

2 31 4

B

A

D

E

PROJECT:Rota SludgeRota SludgeRota SludgeRota Sludge

A4A4A4A4DWG NO.

F

0000000000000000VERSION:DRAWN BY:

TITLE:

DATE:18-2-2011 Practica model - v1.0Erik den Toom 1:201:201:201:20

SCALE:

Part specificPart specificPart specificPart specific

FORMAT: PAGE NO.

222

Rota Sludge

2000

1000

4000

3000

Page 60: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

Bend around part

BASE MATERIAL:

C

2 31 4

B

A

D

E

PROJECT:Rotation armRotation armRotation armRotation arm

A4A4A4A4DWG NO.

F

1000100010001000VERSION:DRAWN BY:

TITLE:

DATE:18-2-2011 Practica model - v1.0Erik den Toom 1:101:101:101:10

SCALE:

Part specificPart specificPart specificPart specific

FORMAT: PAGE NO.

333

Rota Sludge

DETAIL ASCALE 1 : 5

Nut M12

1001

4,5

63

4,5

DESCRIPTION:

Lock ringLock ringLock ringLock ringRound bar Ø6 x 105mmRound bar Ø6 x 105mmRound bar Ø6 x 105mmRound bar Ø6 x 105mm

1001100110011001BASE MATERIAL:

6

NO. DESCRIPTION QTY.Nut M12 2

1001 Lock ring 21100 Hinge 11200 Clamp 11300 Arm 11400 Clamp bolt 1

DWG NO.

4x4x4x4x

1400

12001100

1300

A

Page 61: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

1103

1101

1102

VERSION:

HingeHingeHingeHingeC

2 31 4

B

A

D

E

F

A4A4A4A4DWG NO.

TITLE:

DRAWN BY:Erik den Toom

Rota Sludge

18-2-2011SCALE:

BASE MATERIAL:

FORMAT: PAGE NO.DATE:

1:21:21:21:2SCALE:

444

1100110011001100DWG NO.

TITLE:

Part specificPart specificPart specificPart specificBASE MATERIAL:

Practica model - v1.0

PROJECT:

1101110111011101 1:11:11:11:1

33,4

3,4

1x1x1x1x

Pipe size is indicative.Needs to fit over axle (dwg no. 1301).

NO. DESCRIPTION QTY.1101 Hub 11102 Midpiece 11103 Reinforcement

strip 1

GI pipe NPS 1" 75mmGI pipe NPS 1" 75mmGI pipe NPS 1" 75mmGI pipe NPS 1" 75mm

HubHubHubHub

1x1x1x1x75

Page 62: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

15033,4

3,4

DWG NO.

C

2 31 4

B

A

D

E

F

A4A4A4A4DWG NO.

TITLE:

DRAWN BY:Erik den Toom

Rota Sludge

18-2-2011SCALE:

BASE MATERIAL:

FORMAT: PAGE NO.DATE:

1:21:21:21:2SCALE:

MidpieceMidpieceMidpieceMidpiece

1102110211021102

555

TITLE:

GI pipe NPS 1" 150mmGI pipe NPS 1" 150mmGI pipe NPS 1" 150mmGI pipe NPS 1" 150mmBASE MATERIAL:

Practica model - v1.0VERSION:

PROJECT:

1x1x1x1x

1x1x1x1x

and hub, and weld.

Dimensions are indicative.Bend around midpiece

Fe36 strip 30 x 4 x 250mmFe36 strip 30 x 4 x 250mmFe36 strip 30 x 4 x 250mmFe36 strip 30 x 4 x 250mm

100

30

1103110311031103

Reinforcement stripReinforcement stripReinforcement stripReinforcement strip1:21:21:21:2

4

33,4

Diameters are indicative.Choose same pipe as hub (dwg 1101).

Page 63: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

45° (

4x)

5

25

5

40

1x1x1x1x

4x

1203

1206

1205

1202

1201

4x

4x4x

NO. DESCRIPTION QTY.1201 Clamp strip 11202 Clamp strip (open

ended) 1

1203 Chain link 31205 Reinforcement 41206 Grip ridge 4Erik den Toom 666

BASE MATERIAL:

C

2 31 4

B

A

PAGE NO.

E

PROJECT:ClampClampClampClamp

D

DWG NO.

F

1200120012001200 A4A4A4A4VERSION:

TITLE:

DATE:DRAWN BY:Practica model - v1.018-2-2011 1:21:21:21:2

SCALE:

Part specificPart specificPart specificPart specific

FORMAT:

Rota Sludge

Page 64: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

20

40

3(4x)

14

38R

40

5

2,5

1:11:11:11:11203120312031203

3x3x3x3x

1x1x1x1x

Strips are equal,except for cut out hole.

Bend strip around pipeor in vice grip.

DWG NO.

C

2 31 4

B

A

D

E

F

A4A4A4A4DWG NO.

TITLE:

DRAWN BY:

Rota SludgeDATE:18-2-2011

SCALE:

BASE MATERIAL:

FORMAT: PAGE NO.

TITLE:

1:21:21:21:2SCALE:

777

1201, 12021201, 12021201, 12021201, 1202

Clamp stripClamp stripClamp stripClamp strip

Erik den Toom

Fe36 strip 80 x 5 x 140mmFe36 strip 80 x 5 x 140mmFe36 strip 80 x 5 x 140mmFe36 strip 80 x 5 x 140mmBASE MATERIAL:

Practica model - v1.0VERSION:

PROJECT:

IronIronIronIron

40mm.

Choose availablechain type, forexample:

DIN766 7mm, orBritish Mild SteelLink Chain 1/4"

Link thickness should bebetween 6 and 7mm.Width should not exceed

Chain linkChain linkChain linkChain link

6-7

Page 65: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

Practica model - v1.0VERSION:

DWG NO.

C

2 31 4

B

A

D

E

F

A4A4A4A4DWG NO.

TITLE:

DRAWN BY:Erik den Toom

Rota Sludge

18-2-2011SCALE:

BASE MATERIAL:

FORMAT: PAGE NO.

TITLE:

1:11:11:11:1SCALE:

888

1205120512051205

ReinforcementReinforcementReinforcementReinforcement

DATE:

Round bar Ø8 x 80mmRound bar Ø8 x 80mmRound bar Ø8 x 80mmRound bar Ø8 x 80mmBASE MATERIAL:

PROJECT:

8

8045°

Round bar Ø8 x 80mmRound bar Ø8 x 80mmRound bar Ø8 x 80mmRound bar Ø8 x 80mm

80

8

4x4x4x4x

4x4x4x4x

Grind down edges after welding.

1:11:11:11:1

Grip ridgeGrip ridgeGrip ridgeGrip ridge

1206120612061206

Page 66: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

1x1x1x1x

SCALE 1:10

NO. DESCRIPTION QTY.1001 Lock ring 21301 Axle 11302 Connecting pipe 11303 Handle 11304 Grip 11305 Reinforcement

strip 1PROJECT:

C

2 31 4

B

A

D

E

F ArmArmArmArm

A4A4A4A4DWG NO.

TITLE:

1300130013001300VERSION:DRAWN BY: DATE:

Rob Dedden 18-2-2011 Practica model - v1.0SCALE:

1:51:51:51:5

BASE MATERIAL:Part specificPart specificPart specificPart specific

FORMAT: PAGE NO.

999

Rota Sludge

SECTION A-A

Insert at least 100mm!100

15

A A

1304 1001

13031301 1305 1302

Page 67: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

TITLE:C

2 31 4

B

A

D

E

F

A4A4A4A4DWG NO.

TITLE:

DRAWN BY:

1 01 01 0DATE:18-2-2011

SCALE:

BASE MATERIAL:

FORMAT: PAGE NO.

Rota Sludge

1:21:21:21:2SCALE:

AxleAxleAxleAxle

1301130113011301DWG NO.

Rob Dedden

Round bar Ø25 x 160mmRound bar Ø25 x 160mmRound bar Ø25 x 160mmRound bar Ø25 x 160mmBASE MATERIAL:

Practica model - v1.0VERSION:

PROJECT:

25

1x1x1x1x

30

1:11:11:11:11305130513051305

Reinforcement stripReinforcement stripReinforcement stripReinforcement strip

Fe36 strip 250 x 30 x 4mmFe36 strip 250 x 30 x 4mmFe36 strip 250 x 30 x 4mmFe36 strip 250 x 30 x 4mm

Dimensions are indicative.Bend in shape during assembly!

4

R12,5

1x1x1x1x

160

Page 68: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

1x1x1x1x

Connecting pipeConnecting pipeConnecting pipeConnecting pipeC

2 31 4

B

A

D

E

F

A4A4A4A4DWG NO.

TITLE:

DRAWN BY:

Rota SludgeDATE:18-2-2011

SCALE:

BASE MATERIAL:

FORMAT: PAGE NO.Rob Dedden

1:21:21:21:2SCALE:

1 11 11 1

1302130213021302DWG NO.

TITLE:

GI pipe NPS 1" x 200mmGI pipe NPS 1" x 200mmGI pipe NPS 1" x 200mmGI pipe NPS 1" x 200mmBASE MATERIAL:

Practica model - v1.0VERSION:

PROJECT:

1304130413041304

GI pipe NPS 1" x 200mmGI pipe NPS 1" x 200mmGI pipe NPS 1" x 200mmGI pipe NPS 1" x 200mm

GripGripGripGrip1:21:21:21:2

200

33,4

25

150 50

A

A

SECTION A-A33,4

3,41x1x1x1x

33,4

3,4

Page 69: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

1x1x1x1x

BASE MATERIAL:

C

2 31 4

B

A

D

E

PROJECT:HandleHandleHandleHandle

A4A4A4A4DWG NO.

F

1303130313031303VERSION:DRAWN BY:

TITLE:

DATE:18-2-2011 Practica model - v1.0Rob Dedden 1:51:51:51:5

SCALE:

GI pipe NPS 3/4" x 1000mmGI pipe NPS 3/4" x 1000mmGI pipe NPS 3/4" x 1000mmGI pipe NPS 3/4" x 1000mm

FORMAT: PAGE NO.

1 21 21 2

Rota Sludge

A

DETAIL ASCALE 1 : 2

26,7

2,9

70°700

250

Page 70: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

1x1x1x1x

NO. DESCRIPTION QTY.Bolt M12x60 1Nut M12 1

1401 Bolt wing 1

Round bar Ø10 x 130Round bar Ø10 x 130Round bar Ø10 x 130Round bar Ø10 x 130

1401140114011401

10

40

19

Weld nut at the inside!

1401

Weld nut on top of bolt.

1x1x1x1x

Clamp boltClamp boltClamp boltClamp boltC

2 31 4

B

A

D

E

F

A4A4A4A4DWG NO.

TITLE:

DRAWN BY:

Rota SludgeDATE:18-2-2011

SCALE:

BASE MATERIAL:

FORMAT: PAGE NO.Erik den Toom

1:11:11:11:1SCALE:

1 31 31 3

1400140014001400DWG NO.

TITLE:

Part specificPart specificPart specificPart specificBASE MATERIAL:

Practica model - v1.0VERSION:

PROJECT: Bolt wingBolt wingBolt wingBolt wing1:11:11:11:1

Page 71: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

DETAIL BSCALE 1 : 5

2200

B2300

2100

A

DRAWN BY:

A

Erik den Toom 18-2-2011 Practica model - v1.0SCALE:

1:201:201:201:20

BASE MATERIAL:Part specificPart specificPart specificPart specific

FORMAT: PAGE NO.DATE:

PROJECT:

C

2

1 41 41 4

1 4

B

D

DWG NO.

E

F

3

A4A4A4A4

Drill stringDrill stringDrill stringDrill stringTITLE:

2000200020002000VERSION:

Rota Sludge

DETAIL ASCALE 1 : 5

NO. DESCRIPTION QTY.2100 Weighted pipe 12200 Drill pipe normal 12300 Drill pipe short 1

Page 72: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

8x8x8x8x

G 2" BSP

30

100

3x4

5

RibRibRibRib2003200320032003

Reinforcement bar Ø6 x 50mmReinforcement bar Ø6 x 50mmReinforcement bar Ø6 x 50mmReinforcement bar Ø6 x 50mm

1:11:11:11:1

50

5,5

60,3

6

SCALE:

SCALE:DWG NO.

2001200120012001

TITLE: Threaded pipeThreaded pipeThreaded pipeThreaded pipe

GI pipe NPS XS 2" x 100mmGI pipe NPS XS 2" x 100mmGI pipe NPS XS 2" x 100mmGI pipe NPS XS 2" x 100mmBASE MATERIAL:

Practica model - v1.0VERSION:

Rota Sludge

C

2 31

B

1:21:21:21:2

A

D

E

F

A4A4A4A4

4

TITLE:

DRAWN BY:21-2-2011Erik den Toom

DWG NO.DATE:

BASE MATERIAL:

FORMAT: PAGE NO.

1 51 51 5

PROJECT:

1x1x1x1x

Page 73: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

G 2" BSP

1400

3

30

x45

3x45

60,3

3,9

1x1x1x1x

BASE MATERIAL:

C

2 31 4

B

A

D

E

PROJECT:Midsection longMidsection longMidsection longMidsection long

A4A4A4A4DWG NO.DATE:

2002200220022002VERSION:DRAWN BY:

Erik den Toom

F

18-2-2011 Practica model - v1.0

TITLE:

2:52:52:52:5SCALE:

GI pipe NPS 2" x 1400mmGI pipe NPS 2" x 1400mmGI pipe NPS 2" x 1400mmGI pipe NPS 2" x 1400mm

FORMAT: PAGE NO.

1 61 61 6

Rota Sludge

Page 74: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

1 71 71 7

PROJECT:

C

2 31 4

B

A

D

E

F Weighted pipeWeighted pipeWeighted pipeWeighted pipe

A4A4A4A4DWG NO.

TITLE:

2100210021002100VERSION:DRAWN BY: DATE:

Erik den Toom 18-2-2011 Practica model - v1.0SCALE:

2:52:52:52:5

BASE MATERIAL:Part specificPart specificPart specificPart specific

FORMAT: PAGE NO.

Rota Sludge

SECTION A-A

2" pipe coupling

3045

1x1x1x1x

2003

2101

2001

2002

A

A

16mm round bar = 14 bars14mm round bar = 16 bars

NO. DESCRIPTION QTY.Pipe coupling 1

2001 Threaded pipe 12002 Midsection normal 12003 Rib 82101 Weight 14

Page 75: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

1300

16x45

14-16x14-16x14-16x14-16x

16mm round bar = 14 bars14mm round bar = 16 bars

14 -16

BASE MATERIAL:

C

2 31 4

B

A

D

E

PROJECT:WeightWeightWeightWeight

A4A4A4A4DWG NO.

F

2101210121012101VERSION:DRAWN BY:

TITLE:

SCALE:18-2-2011 Practica model - v1.0DATE:

2:52:52:52:5Erik den Toom

Reinforcement bar Ø16 x 1300mmReinforcement bar Ø16 x 1300mmReinforcement bar Ø16 x 1300mmReinforcement bar Ø16 x 1300mm

FORMAT: PAGE NO.

1 81 81 8

Rota Sludge

Page 76: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

SCALE:

C

2 31 4

B

A

D

E

PROJECT:Drill pipe normalDrill pipe normalDrill pipe normalDrill pipe normal

A4A4A4A4DWG NO.

F

2200220022002200VERSION:DRAWN BY:

Erik den Toom

TITLE:

18-2-2011 Practica model - v1.0

BASE MATERIAL:

1:51:51:51:5DATE:

Part specificPart specificPart specificPart specific

FORMAT: PAGE NO.

1 91 91 9

Rota Sludge

2001

2002

2002

2" pipe coupling A

A

SECTION A-A

7575

NO. DESCRIPTION QTY.Pipe coupling 1

2001 Threaded pipe 12002 Midsection normal 12003 Rib 8

Page 77: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

Practica model - v1.0SCALE:

1:51:51:51:5

BASE MATERIAL:Part specificPart specificPart specificPart specific

FORMAT: PAGE NO.

2 02 02 0

PROJECT:

C

2 31 4

B

A

D

E

F Drill pipe shortDrill pipe shortDrill pipe shortDrill pipe short

A4A4A4A4DWG NO.

TITLE:

2300230023002300VERSION:DRAWN BY: DATE:

Erik den Toom 20-2-2011

Rota Sludge

SECTION A-A

7575

NO. DESCRIPTION QTY.Pipe coupling 1

2001 Threaded pipe 12003 Rib 82301 Midsection short 1

A

A

Page 78: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

1x1x1x1x

60,3

3,9

SCALE:

C

2 31 4

B

A

D

E

PROJECT:Midsection shortMidsection shortMidsection shortMidsection short

A4A4A4A4DWG NO.

F

2301230123012301VERSION:DRAWN BY:

TITLE:

DATE:20-2-2011 Practica model - v1.0

BASE MATERIAL:

2:52:52:52:5Erik den Toom

GI pipe NPS 2" x 650mmGI pipe NPS 2" x 650mmGI pipe NPS 2" x 650mmGI pipe NPS 2" x 650mm

FORMAT: PAGE NO.

2 12 12 1

Rota Sludge

G 2" BSP

650

x45

3

3x45

30

Page 79: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

BASE MATERIAL:

C

2 31 4

B

A

D

E

PROJECT:Drill bitDrill bitDrill bitDrill bit

A4A4A4A4DWG NO.

F

3000300030003000VERSION:DRAWN BY:

Rob Dedden

TITLE:

4-3-2011 Practica model - v1.0DATE:

1:21:21:21:2SCALE:

Part specificPart specificPart specificPart specific

FORMAT: PAGE NO.

2 22 22 2

Rota Sludge

NO. DESCRIPTION QTY.3001 Central pipe 13002 Upper ring 13003 Lower ring 13004 Ring support 43005 Upper welding

support 1

3006 Lower weldingsupport 1

3007 Tooth short 83008 Tooth long 4

Pipe coupling 1

3005

3007

3002

3001

3004

3008

3003

3007

3006

1x1x1x1x

Pipe coupling

Page 80: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

Rob Dedden

C

2 31 4

B

A

D

E

TITLE: Drill bitDrill bitDrill bitDrill bit

A4A4A4A4DWG NO.

PROJECT:

3000-DIMS-13000-DIMS-13000-DIMS-13000-DIMS-1VERSION:DRAWN BY:

BASE MATERIAL:

DATE:5-3-2011 Practica model - v1.0

F

2:52:52:52:5SCALE:

Part specificPart specificPart specificPart specific

FORMAT: PAGE NO.

2 32 32 3

Rota Sludge

SECTION A-A

160

110

A A

B B

1x1x1x1x

SECTION B-B

NO. DESCRIPTION QTY.3001 Central pipe 13002 Upper ring 13003 Lower ring 13004 Ring support 43005 Upper welding

support 1

3006 Lower weldingsupport 1

3007 Tooth short 83008 Tooth long 4

Pipe coupling 1

Page 81: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

45°

BASE MATERIAL:

C

2 31 4

B

A

D

E

PROJECT:Drill bitDrill bitDrill bitDrill bit

A4A4A4A4DWG NO.DATE:

3000-DIMS-23000-DIMS-23000-DIMS-23000-DIMS-2VERSION:DRAWN BY:

Rob Dedden

F

5-3-2011 Practica model - v1.0

TITLE:

1:51:51:51:5SCALE:

Part specificPart specificPart specificPart specific

FORMAT: PAGE NO.

2 42 42 4

Rota Sludge

NO. DESCRIPTION QTY.3001 Central pipe 13002 Upper ring 13003 Lower ring 13004 Ring support 43005 Upper welding

support 1

3006 Lower weldingsupport 1

3007 Tooth short 83008 Tooth long 4

Pipe coupling 1

1x1x1x1x

Inner diameter of teeth must

SCALE 2 : 5

with weld

be smaller than central pipe

DETAIL C

Fill space

10°

35

70°

DETAIL BSCALE 2 : 5

70°

DETAIL ASCALE 2 : 5

10

70°

teeth level 2

teeth level1 + 3

Page 82: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

1:11:11:11:1

Fe36 angle iron 25 x 25 x 3 x 50mmFe36 angle iron 25 x 25 x 3 x 50mmFe36 angle iron 25 x 25 x 3 x 50mmFe36 angle iron 25 x 25 x 3 x 50mm

Ring supportRing supportRing supportRing support3004300430043004

20

20

3

4x4x4x4x

DWG NO.

C

2 31 4

B

A

D

E

F

A4A4A4A4DWG NO.

TITLE:

DRAWN BY:Rob Dedden

Rota Sludge

20-2-2011SCALE:

BASE MATERIAL:

FORMAT: PAGE NO.DATE:

1:51:51:51:5SCALE:

TITLE:

3001300130013001

Central pipeCentral pipeCentral pipeCentral pipe

2 52 52 5

GI pipe NPS XS 2" x 250mmGI pipe NPS XS 2" x 250mmGI pipe NPS XS 2" x 250mmGI pipe NPS XS 2" x 250mmBASE MATERIAL:

Practica model - v1.0VERSION:

PROJECT:

60,3

5,5

50

G 2" BSP

30250

3x45

1x1x1x1x

Page 83: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

3003300330033003

Lower ringLower ringLower ringLower ring

Fe36 pipe 95 x 10 x 50mmFe36 pipe 95 x 10 x 50mmFe36 pipe 95 x 10 x 50mmFe36 pipe 95 x 10 x 50mm

1:51:51:51:5

95

10

DWG NO.

C

2 31 4

B

A

D

E

F

A4A4A4A4DWG NO.

TITLE:

DRAWN BY:Rob Dedden

Rota Sludge

20-2-2011SCALE:

BASE MATERIAL:

FORMAT: PAGE NO.DATE:

1:51:51:51:5SCALE:

2 62 62 6

3002300230023002DWG NO.

TITLE:

Fe36 pipe Ø120 x 10 x 50mmFe36 pipe Ø120 x 10 x 50mmFe36 pipe Ø120 x 10 x 50mmFe36 pipe Ø120 x 10 x 50mmBASE MATERIAL:

Practica model - v1.0VERSION:

PROJECT:

C

2 31 4

B

A

D

E

F

A4A4A4A4DWG NO.

TITLE:

DRAWN BY:Rob Dedden

Upper ringUpper ringUpper ringUpper ring

20-2-2011SCALE:

BASE MATERIAL:

FORMAT: PAGE NO.

Upper ringUpper ringUpper ringUpper ring

1:51:51:51:5SCALE:

2 62 62 6

3002300230023002

DATE:

TITLE:

Fe36 pipe Ø120 x 10 x 50mmFe36 pipe Ø120 x 10 x 50mmFe36 pipe Ø120 x 10 x 50mmFe36 pipe Ø120 x 10 x 50mmBASE MATERIAL:

Practica model - v1.0VERSION:

PROJECT:

1x1x1x1x

1x1x1x1x

5012010

50

Page 84: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

3005300530053005

DATE:

TITLE:

Reinforcement bar Ø8 x 320Reinforcement bar Ø8 x 320Reinforcement bar Ø8 x 320Reinforcement bar Ø8 x 320BASE MATERIAL:

Practica model - v1.0VERSION:

supportsupportsupportsupport

C

2 31 4

B

A

D

F

DWG NO.

A4A4A4A4DWG NO.

TITLE:

DRAWN BY:Rob Dedden

E

20-2-2011SCALE:

Rota SludgeFORMAT:

2 72 72 7

BASE MATERIAL:

PAGE NO.

1:11:11:11:1SCALE:

Upper weldingUpper weldingUpper weldingUpper welding

PROJECT: supportsupportsupportsupport3006300630063006

Lower weldingLower weldingLower weldingLower welding

1:21:21:21:2

60,3

Reinforcement bar Ø8 x 200mmReinforcement bar Ø8 x 200mmReinforcement bar Ø8 x 200mmReinforcement bar Ø8 x 200mm

B

B

95

A

A

1x1x1x1x

1x1x1x1x

SECTION A-ASCALE 1 : 2

8

SECTION B-BSCALE 1 : 2

8

Page 85: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

10

1818

10

20

75

8x8x8x8x

4x4x4x4x

Rota Sludge

C

2 31 4

B

A

D

E

F

A4A4A4A4DWG NO.

TITLE:

DRAWN BY: DATE:Rob Dedden 12-12-2010

SCALE:

BASE MATERIAL:

FORMAT: PAGE NO.

2 82 82 8

1:11:11:11:1SCALE:DWG NO.

3007300730073007

TITLE: Tooth shortTooth shortTooth shortTooth short

Leaf springLeaf springLeaf springLeaf springBASE MATERIAL:

Practica model - v1.0VERSION:

PROJECT:

3008300830083008

Leaf springLeaf springLeaf springLeaf spring

Tooth longTooth longTooth longTooth long1:11:11:11:1

90

20

Page 86: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

NO. DESCRIPTION QTY.Lever 1

4001 Half bush 14100 Axle 1

A

4100

Lever

DETAIL ADETAIL ADETAIL ADETAIL ASCALE 1 : 5SCALE 1 : 5SCALE 1 : 5SCALE 1 : 5

BASE MATERIAL:

C

2 31 4

B

A

D

E

PROJECT:AxleAxleAxleAxle

A4A4A4A4DWG NO.

F

4000400040004000VERSION:DRAWN BY:

TITLE:

DATE:21-2-2011 Practica model - v1.0Erik den Toom 1:51:51:51:5

SCALE:

Part specificPart specificPart specificPart specific

FORMAT: PAGE NO.

2 92 92 9

Rota Sludge

4001

1x1x1x1x

Page 87: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

4101

4102

40

35

4

1x1x1x1x

NO. DESCRIPTION QTY.4101 Axle 14102 Axle end stop 2

80

4100410041004100

Part specificPart specificPart specificPart specific

AxleAxleAxleAxle1:51:51:51:5 3 03 03 0

C

2 31 4

B

A

D

E

F

A4A4A4A4DWG NO.

TITLE:

DRAWN BY:Erik den Toom

Rota Sludge

21-2-2011SCALE:

BASE MATERIAL:

FORMAT: PAGE NO.

DWG NO.

1:21:21:21:2SCALE:

Half bushHalf bushHalf bushHalf bush

4001400140014001

DATE:

TITLE:

Fe36 strip 80 x 5 x 70mmFe36 strip 80 x 5 x 70mmFe36 strip 80 x 5 x 70mmFe36 strip 80 x 5 x 70mmBASE MATERIAL:

Practica model - v1.0VERSION:

PROJECT:

5

1x1x1x1x

Page 88: SLUDGING - Practica Foundation. Manual drilling series: PERCUSSION This handbook describes in detail the percussion technique. Although the technique is slower than other drilling

DWG NO.

C

2 31 4

B

A

D

E

F

A4A4A4A4DWG NO.

TITLE:

DRAWN BY:

Rota SludgeDATE:21-2-2011

SCALE:

BASE MATERIAL:

FORMAT: PAGE NO.Erik den Toom

1:51:51:51:5SCALE:

TITLE:

4101410141014101

AxleAxleAxleAxle

3 13 13 1

Round bar Ø30 x 500mmRound bar Ø30 x 500mmRound bar Ø30 x 500mmRound bar Ø30 x 500mmBASE MATERIAL:

Practica model - v1.0VERSION:

PROJECT:

4102410241024102 1:11:11:11:1

200

10

Round bar Ø10 x 200mmRound bar Ø10 x 200mmRound bar Ø10 x 200mmRound bar Ø10 x 200mm

Axle end stopAxle end stopAxle end stopAxle end stop

30

2x2x2x2x

1x1x1x1x

500