STEP 1
Measure height and width of finished opening.
Finished opening height = _______________.
Finished opening width = _______________.
PRIME-LINE
SLIDING DOORInstallation Instructions
STEP 2
Two Panel door width is 1/2 finished opening
plus 1/2" per panel. Example: Opening width of
48", each door panel must be 241/2".
Three Panel door width is 1/3 finished opening
plus 1/2" per panel. Example: Opening width of
96", each door panel must be 321/2".
Door Height should be 13/4" less than the
finished opening height (measured from header
to finished floor or top of carpeting).
Door Height
Door Width
KIT CONTAINS:
No. of Panels Hardware2 3
1 1 Track*
2 pr. 3 pr. Hangers A & B
1 2 Adjustable Door Guide
2 4 Brass Plated Steel Finger Pulls
All All Necessary Fasteners
* Track length is pre-cut slightly less than opening to minimize need to cut track.
STEP 4
Fasten the track as illustrated below with track
screws provided, centered between jambs. Use
track as a template and mark screw hole
locations. Drill 7/64" pilot holes to approximate
length of screws.
STEP 5
Attach door hangers to the top/back of door
panels using screws provided. Hangers should
be 1-11/2" from side of door. Make sure you
install matching hangers on each door panel.
Use hanger as a template to mark screw hole
locations. Drill 7/64" pilot holes to approximate
length of screws.
STEP 6
Hang doors on track, installing the rear door
panel first. Door panel must be angled to
engage track.
STEP 7
To adjust and align doors with jambs, lift door at
side near jamb to remove weight of door from
hanger. Loosen screws and, using a slotted
screwdriver in bottom slot, adjust left (raise) or
right (lower) for proper alignment.
Tighten screws.
STEP 8
To install the bottom guide, insert nylon guide
post section into metal door guide plate according
to door thickness. Locate guide under overlap of
doors as shown and fasten to floor, using screws
provided. Use guide plate as a template and drill7/64" pilot holes to approximate length of screws.
Note: Some carpeted floors may require the useof a bottom guide riser. See Slide-Co part no16974.
STEP 9
When installing finger pulls, drill a 3/4" hole 3/8"
deep in the door panels, approximately 40" from
the floor and 1- 11/2" from the edge. Insert door
pull.
STEP 10
If baseboard on the sides of door opening
prevents proper closing, remove the baseboard
as required.
Front
1 3/8 1 1/8 1
Front
1 3/8 1 1/8 1
Approx.40" from
floor
1-11/2"
���������������
yyyyyyyyyyyyyyy
STEP 3
If necessary cut track to at least 1/8" less than
the width of the finished opening. Use a fine
tooth hacksaw.
���������������
yyyyyyyyyyyyyyy
���������������
yyyyyyyyyyyyyyy
1-11/2"
To RaiseDoor
ToLowerDoor
Header
Header
Header
Hanger A1/2" Offset
Hanger A1/2" Offset
Hanger B1/4" Offset
Hanger B1/4" Offset
3/4" Doors13/8" Doors
3/16"11/16"
FOR DOORS WEIGHING UP TO 60 LBS. EACH
© 1998 PRIME-LINE San Bernardino, CA
13/8"11/8"
3/4"1"
Floating Center Guide
Front Guide
Mounting Hole
Door thickness guide locations
TOOLS NEEDED
Drill with 3/4"and 7/64" bits
Phillips Screwdriver
TapeMeasure
TrackFinger Pulls
Hangers Adjustable Door Guide