    Fundamentals of

    Project Management

  • 8/8/2019 Slides of Project Mgmt

    2/76

    Concept Of Project

    Project cement, power, refinery, fertilizers etc.the term common to all.

    As soon as the plant is operational, the project isdeemed to be completed.

    Lok sabha election

    Videocon

    Polio drops Sampling surveys

  • 8/8/2019 Slides of Project Mgmt

    3/76

    Project ?... It starts from a scratch with a define

    mission, generates activities involving a

    variety of human and non human

    resources directed towards fulfillment of

    the mission and stops once the mission is

    fulfilled. The project management institute U.S.A

  • 8/8/2019 Slides of Project Mgmt

    4/76

    Characteristics Of Project

    Objectives

    Life span

    Single entity Team work

    Life cycle

    Uniqueness

    Change

    Successive principle

  • 8/8/2019 Slides of Project Mgmt

    5/76

    Characteristics Of Project

    Made to order

    Unity in diversity

    High level of sub contracting Risk and uncertainty

  • 8/8/2019 Slides of Project Mgmt

    6/76

    Project Family TreePLAN

    PROGRAMME

    PROJECT

    WORK PAKAGE

    TASK

    ACTIVITY

  • 8/8/2019 Slides of Project Mgmt

    7/76

    Project Manager

    Indian context- project manager and

    projects.

    Problems faced- Everything is unknown and uncertain.

    Scope comes clearly after passage of

    time.

  • 8/8/2019 Slides of Project Mgmt

    8/76

    Who can be a project manager?.. Engineer

    Vendors

    Contractors

    Government bodies etc.

    Success criteria- completion of task, time

    of completion, budget, performance of thehardware build, etc.

  • 8/8/2019 Slides of Project Mgmt

    9/76

    Basic Education Of Project

    Manager Engineering for engineering projects.

    PG course in project management.

    Real education change the mental make up.

    Some do it without education.

    TIME COST QUALITY

    Project management association new delhi.

    Correspondence course in Punjabi University.

    communication skills I will always choose a lazy person to do a difficult job

    becoz definitely he will find an easy way to do it

    ---Bill gates

  • 8/8/2019 Slides of Project Mgmt

    10/76

    Roles And Responsibility Of Project

    Manager Defining and maintaining the integrity of a

    project.

    Development of project execution plan Organization of project execution plan.

    Setting targets and development of systems andprocedures for accomplishment of project

    objectives and targets. Negotiation for commitments.

    Direction, coordination and control of projectactivities.

  • 8/8/2019 Slides of Project Mgmt

    11/76

    Roles And Responsibility Of Project

    Manager Contract management

    Non human resources managementincluding fiscal matters

    Projectising and problem solving

    Man management

    Satisfaction of customers, government,

    and the publicAchievement of project objectives, cash

    surplus and higher productivity

  • 8/8/2019 Slides of Project Mgmt

    12/76

    Projects Normal project

    Crash project

    Disaster project

  • 8/8/2019 Slides of Project Mgmt

    13/76

    Selection Of Project Manager ?

    ?.....

  • 8/8/2019 Slides of Project Mgmt

    14/76

    Need of project manager From first day start searching.

    Some doesnt appoint, they are not aware of

    benefits. Difficulties in execution of plan

    Unable to estimate losses and responsibility

    Priority for corporate

    No one free to become PM Outside PM for short time

    CEO dont have time

    So no PM means NO TARGET of time , cost ,quality, and performance

  • 8/8/2019 Slides of Project Mgmt

    15/76

  • 8/8/2019 Slides of Project Mgmt

    16/76

    Project Management As Profession

  • 8/8/2019 Slides of Project Mgmt

    17/76

    The Project Team

    Diff project have diff staff needs.

    Behavioral issues in managing team.

    Team members.

  • 8/8/2019 Slides of Project Mgmt

    18/76

    The Project Team Members / roles Project engineer: in-charge of product design,

    development, functional analysis, specification,

    drawings, cost estimates, quality/reliability,engineering changes and documentation.

    Manufacturing engineer: production of the

    product and process the engineer design,

    manufacturing design, tooling, production

    scheduling and tasks etc.

  • 8/8/2019 Slides of Project Mgmt

    19/76

    The Project Team Field manager: responsible for installation, testing, and

    support of production and process once it is deliver tocustomers.

    Contract administration: official paper work, keepingtrack of customers changes, billings, complaints, legalaspects, costs etc.

    Project controller: daily accounts for budgets, costvariances, labor charges, project suppliers, capitalequipments etc.

    Support service manager: product support, subcontracts, data processing and general managementsupport function.

  • 8/8/2019 Slides of Project Mgmt

    20/76

    Human Factors And The Project

    Team

    Technical fault or human problem?

    Workmanship, professionalism.

  • 8/8/2019 Slides of Project Mgmt

    21/76

    Project life cycle Every phase need appropriate attention at

    their level.

    Every phase is important

    5 phases in project life cycle

  • 8/8/2019 Slides of Project Mgmt

    22/76

    Project life cycle phases Conception phase :

    Idea germinates

    Try to overcome certain problems- funds,plant, capacity, expertise etc

    Solution to problems

    Eg-

  • 8/8/2019 Slides of Project Mgmt

    23/76

    Project life cycle phases Definition stage:

    Areas to be examined

    Raw material- quality and quantity

    Plant size/capacity Location and site

    Technology /process selection

    Project layout

    Plant and machinery

    Electrical instrumentation works

    Civil engineering works Utilities-fuel, power, water

    Manpower/ org pattern

    Financial analysis

    Implementation scheduled

  • 8/8/2019 Slides of Project Mgmt

    24/76

    Project life cycle phases Planning and organising phase:

    Starts much earlier

    Overlaps with definition stage and

    implementation phase

  • 8/8/2019 Slides of Project Mgmt

    25/76

    Project life cycle phases Planning and organising phase: Project infrastructure and enabling services

    System design and basic engineering package

    Organisation and manpower

    Schedules and budgets

    Licensing and governmental clearance

    Finance

    System and procedure

    Identification of project manager

    Design basic, general conditions for purchase andcontracts

    Site preparation and investigation

    Construction resources and materials

    Work packaging

  • 8/8/2019 Slides of Project Mgmt

    26/76

    Project life cycle phases Implementation phase :80-85 % of project work done in this phase

    Project clean up phase:

    Drawings, manuals, paper, documents handedover to customer / management

    Guarantee test runs

    Project accounts closers, materials reconciliationcarried out, outstanding payments, duecollections etc.

  • 8/8/2019 Slides of Project Mgmt

    27/76

    Project life cycle curveLevelof

    contract

    Time

    85% effort

    8% effort

    3% effort

    4% effort

  • 8/8/2019 Slides of Project Mgmt

    28/76

    Ma

    rket Ana

    lysis1.Situation analysis and specification of

    objectives

    Who are customers?

    Total size of market

    Yearly sales graph

    Area

    Potential customersChannel of distribution

    Immediate sales area

  • 8/8/2019 Slides of Project Mgmt

    29/76

    Ma

    rket Ana

    lysis2. Collection of secondary data

    Census of India

    National sample survey reports

    Economic survey

    Institution and other agencyEvaluation of secondary information

  • 8/8/2019 Slides of Project Mgmt

    30/76

    Market Analysis

    3. Conduct market survey

    Market and demand analysis

    Define target populationSelect sampling scheme and sample size

    Develop questionaire

    Recruit and train field investigation

    Scrutinize the information gathered

    Analyze and interpret the information

  • 8/8/2019 Slides of Project Mgmt

    31/76

    Market Analysis

    4. Characterizations of the market

    Effective demand in the past and present

    Breakdown of demandPrice

    Methods of distribution and sales promotion

    Consumers

    Supply and competition

    Government policy

  • 8/8/2019 Slides of Project Mgmt

    32/76

    Market Analysis

    5. Demand fore casting

    6. Uncertainty in demand forecast

    Data about past and present

    Methods of forecasting

    Environment drawings

    7. Market planningMarket strategy

  • 8/8/2019 Slides of Project Mgmt

    33/76

    Technical Analysis

    To insure that project is technically

    feasible in the sense that all the inputs

    required t set up the project are available.

    To facilitate the most optimal formulation

    of the project in the terms of technology,

    size, location and so on.

  • 8/8/2019 Slides of Project Mgmt

    34/76

    Technical Analysis

    A. Manufacturing process/ technology

    Cement

    Soap

    Choice of technologyPlant capacity

    Principle inputs

    Investment outlay and production cost

    Use by other unitsProduct mix

    Latest developments

    Ease of absorption

  • 8/8/2019 Slides of Project Mgmt

    35/76

    Technical Analysis

    Appropriateness of technology

    Whether the technology utilises local raw material?

    Whether the technology utilises local man power?

    Whether the goods and services produced cater to thebasic needs?

    Whether the technology protects ecological balance?

    Whether the technology is harmonious with social and

    cultural condition?

  • 8/8/2019 Slides of Project Mgmt

    36/76

    Technical Analysis

    B. Technical arrangements

    Technical know-how

    Nature of supportProcess and performance guarantees

    Price of technology-one time licensing, periodicroyalty fee

    R&D

    Period of collaboration agreement

    Sharing management control

  • 8/8/2019 Slides of Project Mgmt

    37/76

    Technical Analysis

    C. Material and input utilities

    Study of material and utilities

    Four broad categories1. Raw material

    Agricultural products

    Mineral products

    Livestock and forest products

    Marine products

  • 8/8/2019 Slides of Project Mgmt

    38/76

    Technical Analysis

    2. Processed industrial materials and

    components

    3. Auxiliary materials and factory suppliesChemicals, packing materials, paint, varnishes,

    oils, grease, cleaning material, etc.

    4. Utilities power, water, steam, fuel, etc

  • 8/8/2019 Slides of Project Mgmt

    39/76

    Technical Analysis

    D. Product mix

    E. Plant capacity

    FNC-Feasible normal capacity

    NMC- nominal maximum capacityTechnological requirements

    Inputs consideration

    Investment cost

    Market conditionsResources of the firm

    Government policy

  • 8/8/2019 Slides of Project Mgmt

    40/76

    Technical Analysis

    F. Location and site

    Proximity of raw material and markets

    Availability of infrastructure

    Labour situation

    Government policy

    Other factorsSite selection

  • 8/8/2019 Slides of Project Mgmt

    41/76

    Technical Analysis

    G. Machines and equipments

    Constraints in selecting machineries and

    equipmentProcurement of plant and machinery

    H. Structures and civil works

    Site preparation and development

    Building and structuresOutdoor works

  • 8/8/2019 Slides of Project Mgmt

    42/76

    Technical Analysis

    Projects charts and layouts:

    General function layout- relationship between building,equipment and civil works

    Material flow diagram Production line diagrams

    Transport line diagrams

    Utility consumptions diagrams

    Communication layout

    Organizational layout

    Plant layout

  • 8/8/2019 Slides of Project Mgmt

    43/76

    PROJECT PLANNING

  • 8/8/2019 Slides of Project Mgmt

    44/76

    Project Planning

    Initial project coordination: Overall mission

    Goals

    Strategy of the organization Outlining the scope of the project

    Project lunch meeting

    Technical scope is established

    Basic area of performance responsibility accepted

    Any tentative delivery dates or budgets set by theorganization are clearly noted

    Risk management team is created

  • 8/8/2019 Slides of Project Mgmt

    45/76

    Project Plan Elements Overview

    Objectives

    General approach- managerial and technical

    Contractual aspects

    Schedules

    Resources

    Personnel

    Risk management plans

    Evaluation methods

  • 8/8/2019 Slides of Project Mgmt

    46/76

    Project Planning In Action Planning from start to completion

    Sequence of things

    9Segments of projects are:

    Concept evaluation

    Requirement identification

    Design

    Implementation

    Test

    Integration

    Validation

    Customer test and evaluation

    Operational and maintaince

  • 8/8/2019 Slides of Project Mgmt

    47/76

    ENVIRONMENT ANALYSIS

    Environment impact assessment/

    appraisal are considered to be the first

    step in the process because they give anopportunity to man to consider the effects

    of his actions on the environment.

    Example what you people do?....... For/ against

  • 8/8/2019 Slides of Project Mgmt

    48/76

    Environment Analysis

    Economic development is the result of the

    interaction between natural resources and

    technology supported by and designed forpeople.

    Example: nuclear power plant, petrol

    engines, electricity, wind power solarpower etc.

  • 8/8/2019 Slides of Project Mgmt

    49/76

    Types And Dimensions Of

    Projects1.Cement, steel, paper, chemical etc.

    Natural resources into saleable andexchangeable products.

    These projects inflict a large number of physicalchanges and description on environment andhence disturb the environment and ecologicalsystem.

    2. Produce render various kinds of services suchas health, education, transport, energy, defence,law and order etc

    Not much physical changes on the environment

  • 8/8/2019 Slides of Project Mgmt

    50/76

    Project Objectives

    Intended objective

    Unintended objective/ consequences

    Social cost planned, unwanted, unanticipated.

    Environmental analysis is the study of unintended

    consequences on the environment done by

    various projects

    GOAL IS DEVELOPMENT WITHOUT DAMAGING

    ENVIRONMENT

  • 8/8/2019 Slides of Project Mgmt

    51/76

    Stress On Environment

    Eutrophic stress- release of various kinds os

    waste into the rivers, lakes, other water bodies.

    Exploitation stress- natural resources egagriculture, marine, forest

    Distruptive stress- cutting of forests, factories,

    industries in forest areas

    Chemical and industrial

  • 8/8/2019 Slides of Project Mgmt

    52/76

    ERV Environment resources/ values

    Environmentalist developed this concept

    Study of environment which benefits the mankind

    4 important components are

    Level 1- physical resources covering land, water and air.Level-2- ecological resources consisting of aquatic,

    terrestrial and endangered species

    Level-3-human use values covering transport, agriculture,water supply, recreation, mining, industry, flood control

    etc.Level-4- quality of life values covering socio economic,

    cultural and aesthetic aspects

  • 8/8/2019 Slides of Project Mgmt

    53/76

    Environment 8 Attributes

    Air

    Water

    Land

    Ecology

    Sound

    Human aspects

    Economics

    Resources

  • 8/8/2019 Slides of Project Mgmt

    54/76

    Environment Appraisal Projects

    Follow either

    ER/Vs

    EA

    Impact vary on the nature of project Impact analysis depend upon

    Nature and size, type of projects such as manufacturing,mining, logging, power, chemicals, sugar etc

    Technology

    Location / eco region such as urban or rural areas,coastal, river valley, forest hill areas of any eco system.

  • 8/8/2019 Slides of Project Mgmt

    55/76

    Meaning And Scope EIS & EIA

    EIA-Env Impact Assessment

    EIS-Env Impact System

    Helps in achieving objectives

    NO ONE HAS ANY RIGHT TO USE THE

    PRECIOUS RESOURCES RESULTING

    IN GREATER LOSS THAN GAIN TOSOCIETY- Funda of EIA & EIS

  • 8/8/2019 Slides of Project Mgmt

    56/76

    EIA

    An activity designed to identify, predict,

    interpret and communicate information

    about the impact of an action on manshealth and well being . In turns, the action

    is include any engineering projects,

    legislative proposals, policy programme or

    operational procedure with environmental

    implication

  • 8/8/2019 Slides of Project Mgmt

    57/76

    EISA report based on studies disclosing the

    likely or certain environmentalconsequences of a proposed actions, thus

    ascertain the decision makers, the publicand the government to environment risksinvolved; findings enables better informeddecisions to be made, perhaps to reject or

    defer the proposal action or permit itsubject it subject to specific conditions

  • 8/8/2019 Slides of Project Mgmt

    58/76

    Objective of EIS To identify and describe (Qty) the environmental

    R/Vs and EA which will be effected by theproposed project under existing or with orwithout project conditions.

    Describe measure and assess the +ve and veeffect which will increase ER/Vs or decrease it

    Direct or indirect

    Short term or long term Alternatives which can reduces the effects

  • 8/8/2019 Slides of Project Mgmt

    59/76

    Guidelines On The Scope And

    Contents Of EIS & EIA Description of the project proposed action, technical

    details

    Proposed action to the land use plans, policies and

    controls in affected areas Probable impact of the proposal project on the EA and in

    what quantity

    Alternative to the proposed project

    Adverse Env effect which cannot be avoided

    Relationship between local short term use of resourcesand maintainers of an enhancement of long termproductivity

  • 8/8/2019 Slides of Project Mgmt

    60/76

    Methodology for conducting an EIS

    study Quanitifying methods

    Meaning parameters are rear and not well developed

    Major problems in the study are

    Diffused nature of impact both over time and space andlags in impacts after caused worked

    An environmental effect is the joint product of severalpollutants

    Inadequate of techniques to estimate the impacts and

    their Costs

    Since the impact are imperceptible people are not awareof the impacts

  • 8/8/2019 Slides of Project Mgmt

    61/76

    Steps in Environment Approach Make a rapid or quick scanning or appraisal of the basic

    environmental resources eg. District level

    Project surroundings zone using maps

    Identify areas and describe all the environmental

    attributes that will give us a total description of the Envbefore the start of the project

    Ranking of attributes depending upon their significance

    Carry out item by item review of effects of the proposedproject on the already identify ER/Vs

    Arrange/ group effects Prepare remedial plans

    Corrective

    Compensatory

    Enhancing

  • 8/8/2019 Slides of Project Mgmt

    62/76

    WBS-Work Breakdown Structure

    Subdivided into smaller and smaller workelements.

    Hierarchical process is called the WBS

    All the elements of the project in a hierarchicalframework and establishes their relationship tothe project items.

    OBS-organization breakdown structure

    Organizational units and individuals areassigned responsibility for accomplishingobjectives.

  • 8/8/2019 Slides of Project Mgmt

    63/76

    WBS-Work Breakdown Structure

    LevelHierarchical breakdown Description

    Project

    Deliverable

    Sub deliverable

    Lowest sub deliverable

    Cost account

    Work package

    Complete project

    Major deliverable

    Supporting deliverable

    Low management

    responsibility level

    Identify work activities

    Grouping of work package

    For monitoring progress

    And responsibility

  • 8/8/2019 Slides of Project Mgmt

    64/76

    WBS

  • 8/8/2019 Slides of Project Mgmt

    65/76

    WBS- work breakdown structure

    To review, each work package in the WBS

    Defines work (what)

    Identifies time to complete a work package (how long)

    Identifies a time phased budget to complete a workpackage (cost)

    Identifies resources needed to complete a work package(how much)

    Identifies a single person responsible for units of work(who)

    Identifies monitoring points for measuring progress

  • 8/8/2019 Slides of Project Mgmt

    66/76

    TIME VALUE

    OFMONEY

  • 8/8/2019 Slides of Project Mgmt

    67/76

    Time LINE

    A time line shows the timing and the

    amount of each cash flow stream.

    12%12%12%12%12%12%

  • 8/8/2019 Slides of Project Mgmt

    68/76

    Time value of money

    PV = present value

    FVn= future value n years hence

    Ct=cash flow occurring at the end of year t

    A=a stream of constant periodic cash flow overgiven period of time

    r= Interest rate or discount rate

    g= expected growth rate

    n= number of periods over which cash flowoccur

  • 8/8/2019 Slides of Project Mgmt

    69/76

    Future value of single amount

    1st

    1000

    100

    2nd

    1100

    110

    3rd

    1210

    121

    1331Formula

    FV n =PV (1+r)n

  • 8/8/2019 Slides of Project Mgmt

    70/76

    Compound and Simple Interest

    Compound interest formula

    Future value= PV [1+No. of years *interest

    rate]

    PV = FV n [1/ (1+r)n ]

  • 8/8/2019 Slides of Project Mgmt

    71/76

    Doubling Period

    0.35 +____69__

    interest rate

    Growth Rate

    (1+g)

  • 8/8/2019 Slides of Project Mgmt

    72/76

    Present Value Of Uneven Series

    PV n= A1/(1+r)+ A2/(1+r)n +..

  • 8/8/2019 Slides of Project Mgmt

    73/76

    Future Value Of An Annuity

    An annuity is as stream of constant cash

    flow (payment or receipt) occurring ar

    regular intervals of time. LIC