5
Slide: 1 7 th CEOS Plenary |Montréal | 5 - 6 November 2013 Item 20 Francis Lindsay, NASA CEOS PLENARY Disasters SBA Report

Slide: 1 27 th CEOS Plenary |Montréal | 5 - 6 November 2013 Item 20 Francis Lindsay, NASA CEOS PLENARY Disasters SBA Report

Embed Size (px)

Citation preview

Page 1: Slide: 1 27 th CEOS Plenary |Montréal | 5 - 6 November 2013 Item 20 Francis Lindsay, NASA CEOS PLENARY Disasters SBA Report

Slide: 127th CEOS Plenary |Montréal | 5 - 6 November 2013

Item 20Francis Lindsay, NASA

CEOS PLENARY Disasters SBA Report

Page 2: Slide: 1 27 th CEOS Plenary |Montréal | 5 - 6 November 2013 Item 20 Francis Lindsay, NASA CEOS PLENARY Disasters SBA Report

27th CEOS PlenaryMontréal, Canada

5-6 November, 2013

2

Objective of the presentation

•This presentation is intended to provide the Plenary with the current status and updated progress on the disaster activities supported within CEOS.

•Currently CEOS is engaged in ten disaster actions/activities:

 C1_1: Satellite data Needs and Gaps: PoC Guy Seguin, NASA

C1_2: Architecture: PoC Karen Moe, NASA C1_3: Global Observation Strategy for DRM: PoC,Ivan Petiteville, ESA

C1_4: Hyogo Framework stakeholder: PoC Chu Ishida, JAXA C1_5: Use of Satellite data for coastal zones: PoC Guy Seguin, NASA

C2_1: Global web-based volcanic ash service: PoC Claus Zehner, ESA C2_2: Supersite proposal evaluation: PoC Jörn Hoffmann, DLR

C2_4: Supersite data provision coordination: PoC Jörn Hoffmann, DLR

C3_1: Caribbean Satellite Disaster Pilot: PoC Stuart Frye, NASA

C3_2: Southern African Flood and Health Pilot: PoC Stuart Frye, NASA

• C1_3 & C1_4 on DRM was presented under item 19• C2_2 & C2_4 on Supersite was presented under item 18

Page 3: Slide: 1 27 th CEOS Plenary |Montréal | 5 - 6 November 2013 Item 20 Francis Lindsay, NASA CEOS PLENARY Disasters SBA Report

27th CEOS PlenaryMontréal, Canada

5-6 November, 2013

3

Disasters SBA ReportAccomplisments

1. Report on the progress of the Disaster Task was presented at the GEO Symposium (June 2013)

2. A Gap analysis was completed for flood observations3. A high-level model/architecture was developed for Disaster management4. A Global Observation Strategy was developed under the DRM actions

(item 20)5. Utilization of Satellite data for Coastal Zone was analysed (moved to the

Blue Planet GEO Task)6. Supersites proposals were received and evaluated by the Supersites

Coordination Team (item 22)7. The 2013 season of the Caribbean Satellite Disaster Pilot was completed8. Flood event in Namibia was used for a Cal/Val exercise9. GEO WP review was completed for the Disaster Task

Page 4: Slide: 1 27 th CEOS Plenary |Montréal | 5 - 6 November 2013 Item 20 Francis Lindsay, NASA CEOS PLENARY Disasters SBA Report

27th CEOS PlenaryMontréal, Canada

5-6 November, 2013

4

Disasters SBA ReportCurrent/ Future challenges

Actions plan

• 4 actions will be closed; C1_1 on needs and gaps analysis C1_2 on architecture C1_5 on coastal zone as the topics is moved under Blue Planet C2_2 on Supersites as all activities will fall under one action C2_4

• 5 actions will be remapped in the 2014 Workplan;• DRM C1_3, C1_4• Volcanic Ash monitoring C2_1 • Flood Pilots C3_1, C3_2

• A new action to determine when to respond to a new requests for data for disaster and to continue the mission gaps analysis for different type of disasters may be formulated.

Page 5: Slide: 1 27 th CEOS Plenary |Montréal | 5 - 6 November 2013 Item 20 Francis Lindsay, NASA CEOS PLENARY Disasters SBA Report

27th CEOS PlenaryMontréal, Canada

5-6 November, 2013

5

Disasters SBA ReportCurrent/ Future challenges

Challenges:

• Leadership of the new WG • Organization of the activities under the new WG• Role of CEOS in the GEO Disaster Task