2
© 2010 Aker Solutions All rights reserved. Photos by Aker Solutions www.akersolutions.com/subsea October 2010 Contact Aker Solutions: North America 2103 City West Blvd Building 4 Houston, Texas 77042 USA Tel: +1 713 685 5700 Fax: +1 713 685 5707 South America Rua da Ajuda, 35-21° andar, Centro Rio de Janeiro - RJ CEP 20.040-915 Brazil Tel: +55 (21) 2122 44 01 Fax: +55 (21) 2122 44 02 Headquarters Snarøyveien 36, 1364 Fornebu P.O. Box 94, 1325 Lysaker Norway Tel: +47 67 82 60 00 Fax: +47 67 82 64 00 United Kingdom Howe Moss Ave. Kirkhill Industrial Estate, Dyce Aberdeen AB21 0NA UK Tel: +44 (0)1224 255 000 Fax: +44 (0)1224 255 100 Africa SONILS OSC Rua 6 - I.L., Boavista, Luanda Angola Tel: +47 51 88 87 00 Fax: +47 67 82 64 00 Asia Pacific Level 20, Menara HLA No. 3 Jalan Kia Peng 50450 Kuala Lumpar Malaysia Tel: +6 (0) 3 2381 8388 Fax: +6 (0) 3 2381 3560 Australia 4-6 Anderson Place Perth Airport, Western Australia 6105 Tel: +61 (0)8 9262 9300 Skandi Santos Subsea equipment support vessel

Skandi Santos - Zetta ASfiles.zetta.no/ · ... and has precautions in accordance with DNV’s “Clean” class requirements ... Design: STX OSCV 03 Skandi Santos Design ... CLEAN

  • Upload
    vandat

  • View
    222

  • Download
    0

Embed Size (px)

Citation preview

© 2010 Aker SolutionsAll rights reserved. Photos by Aker Solutionswww.akersolutions.com/subsea

October 2010

Contact Aker Solutions:

North America2103 City West Blvd Building 4 Houston, Texas 77042USATel: +1 713 685 5700Fax: +1 713 685 5707

South AmericaRua da Ajuda, 35-21° andar, CentroRio de Janeiro - RJ CEP 20.040-915BrazilTel: +55 (21) 2122 44 01Fax: +55 (21) 2122 44 02

HeadquartersSnarøyveien 36, 1364 FornebuP.O. Box 94, 1325 Lysaker NorwayTel: +47 67 82 60 00Fax: +47 67 82 64 00

United KingdomHowe Moss Ave.Kirkhill Industrial Estate, DyceAberdeen AB21 0NAUKTel: +44 (0)1224 255 000Fax: +44 (0)1224 255 100

AfricaSONILS OSCRua 6 - I.L., Boavista, LuandaAngolaTel: +47 51 88 87 00Fax: +47 67 82 64 00

Asia PacificLevel 20, Menara HLA No. 3Jalan Kia Peng 50450 Kuala LumparMalaysiaTel: +6 (0) 3 2381 8388Fax: +6 (0) 3 2381 3560

Australia4-6 Anderson PlacePerth Airport, Western Australia 6105Tel: +61 (0)8 9262 9300

™Skandi SantosSubsea equipment support vessel

Aker Solutions offers complete subsea lifecycle operations to its clients and is present in over 30 countries. Aker Solutions’ subsidiary Aker Oilfield Services is offering fully integrated services ranging from subsea installation and completion to advanced well intervention operations from the company’s fleet of state-of-the-art monohull well intervention units.

Skandi Santos is a state of the art subsea equipment support vessels (SESV) operating for Petrobras off the coast of Brazil. The unit is specially designed and equipped for deepwater subsea equipment installation, intervention or recovery, and represents a first class field construction platform for deep and ultra-deep waters.

The unit is environmental friendly with focus on low fuel consumption, low exhaust emissions, and has precautions in accordance with DNV’s

“Clean” class requirements incorporated into the vessel design.

The unit’s main features are:• Ultra deepwater capabilities • Installation, testing and maintenance of subsea modules • Rapid module deployment • ROV with possibility to launch ROV in moonpool, on starboard side and port side• Subsea construction and maintenance work

The 121 meter long vessel with its Class 3 dynamic positioning and classification makes for a secure and flexible working platform with a large operational window for subsea well intervention, installation and construction work in rough weather and sea conditions around the world.

Skandi Santos comes with one heave compensated crane of 250 tonnes capacity. The vessel has a skidding system with pallet capacities of 125 tonnes in the moonpool area and 50 tonnes outside, which enables safe and reliable equipment handling in rough weather conditions.

Skandi Santos

About Skandi Santos

Built by: STX Europe at Aukra

Operator: Aker Solutions

Yard no: 716

Delivered: November 2009

Design: STX OSCV 03

Skandi Santos

DesignSTX OSCV 03

Main particularsLength overall: 120.7 mLength between perpendiculars: 105,2 mBreadth moulded: 23.0 m Depth main deck: 9.0 mMax scantling draft midship: 7.0 mGross tonnage: 9 074 Speed at draft 4.9 m approx.: 15 knots

AccommodationAccommodation for 120 people plus hospital2 single cabins - Captain class2 single cabins - Client class10 single cabins - Officer class14 single cabins - Crew class46 double cabins - Crew class

ClassificationsDNV 1A1, E0, DYNPOS-AUTRO (IMO III), CRANE, HELDK-SH, CLEAN DESIGN with NAUT-AW, Comf-V(3) C(3), ICE C, SF, DK(+)

Dynamic positioningDNV DYNPOS-AUTRO (IMO DP-Class III)

Power and propulsion4 x MAN main engines w/total capacity: 11 880 kW4 x Siemens generators 1 x MTU engine w/Stamford emergency generator: 2 080 kW2 x tunnel thrusters: 1 500 kW2 x retractable azimuth thrusters: 1 090 kW2 x contra-rotating azimuth thrusters: 3 000 kW

CapacitiesFuel oil: 1 930 m3

Fresh water: 1 060 m3

Water ballast: 3 700 m3 Deck cargo: above 3 200 mtCargo deck area: 1 125 m2 Free deck area: 1 300 m2 (excl. derrick and crane)Deck load: 10 mt/m2

Free deck width: 21.0 mFree deck length: 45.0 m

Lifesaving equipment2 x Eide Marine Tech Type JY102C with capacity for 120 persons1 x Weedo 700 FRC MOB BoatLife rafts 150% coverage each side, DSB

Skandi Santos

Key specificationsSkandi Santos

Offshore and subsea cranes 250 mt AHC knucle boom crane rated 2 500 msw: • Harbor: 250 mt @ 14 m • Subsea (1 000 m): 240 mt @ 12 m • Subsea (2 500 m): 170 mt @ 12 m

Deck cranes2 x ABAS knucle boom cranes: 3 mt @ 15 m

Anti heeling systemTwo tanks each sideTwo reversible propeller pumps, each of 1 500 m3/h

Roll damping systemThree off passive roll reduction tanks

Module handling systemModule handling main deck: 50 mtModule handling moonpool area: 125 mt

Moonpool7.2 m x 7.2 m moon-pool

Topside equipmentSubsea equipment deployment system: • 1 off Subsea equip. orientation system (SOES) • 1 off 125 ton fiber rope deployment system • 1 off main cursor system • 2 off test cursor systems • 1 off moonpool hatch • 1 off tower control cabin • 1 off nitrogen factory

Deck skid systemDistributed skid system on deck3 off hydraulic tractor systems10 off storage pallets 50 mt2 off test pallets 125 mt

Test equipmentTest and flushing capabilities1 off high collaps resistant hose system (HCR)

ROV system2 x Perry Slingsby Triton XLX 150 Work Class ROV systems1 x SAAB Cougar seaeye OBS ROVOne centre moon pool and two sliding side ports with LARS

HelideckSikorsky S-92 @ D-value 1.05 (21 m diameter, 8.2 mt)