29
SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives and Impact on Beneficiary Country Vladimír Benko CEI SAŽP Banská Bystrica

SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

Embed Size (px)

Citation preview

Page 1: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the

Environmental Sector

Project Objectives and Impact on Beneficiary Country

Vladimír Benko

CEI SAŽP

Banská Bystrica

Page 2: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

Institutional and Capacity Building in the Environmental Sector

Page 3: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

Institutional and Capacity Building in the Environmental Sector

Overall objective:

Strengthening the administrative, monitoring and enforcement capacity in the environmental sector, notably as regards the implementation of the acquis in the field of air, water, waste, nature protection, standardisation and reporting.

Page 4: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

Institutional and Capacity Building in the Environmental Sector

Symbology:

• the 1st project as combination of proposals and needs of institutions

• the 1st which covers wide area (not only 1 sector)

• covenant approved in Brussels on the 1 June 2004 as the 1st covenant approved without conditions

• started on the 1 July 2004

• in the 11th year of SEA existence

• with UBA as tw partner - No.1 in EEA PDF ranking

Page 5: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

Institutional and Capacity Building in the Environmental Sector

Twinning Partners

From Slovakia:

SEA Banská Bystrica

From Austria: Vienna

(Austrian Federal Environment Agency)

Page 6: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

Institutional and Capacity Building in the Environmental Sector

• Duration: 24 months

• More than 140 days of foreign experts

• More than 15 nat. institutions

• Budget: 420 000 EUR

• Investment: cca 600 000 EUR

Page 7: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

Institutional and Capacity Building in the Environmental Sector

Beneficiaries

• SEA

• SHMI

• SEI

• SNC of SR

Page 8: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

Institutional and Capacity Building in the Environmental Sector

Beneficiaries

Page 9: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

Project Leaders

• Mr. Vladimír Benko

SAŽP, [email protected]

• Mr. Johannes Mayer

Austrian Federal Environment Agency

[email protected]

• Ms. Ulrike Stärk, Austrian Federal Environment Agency - SEA, [email protected], Tel: 048 4374 196

• Ms. Veronika Košková, SEA project manager

Resident Twinning Advisor and Project Manager

Page 10: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

Institutional and Capacity Building in the Environmental Sector

Activity 1. STANDARDISATION

Preparation of methodology and conditions for standardised data-flows in the areas of air, water, waste, nature

Development and application of automated reporting system based on clearing-house mechanism (CHM) - SK Reportnet

SK Reportnet as pilot european solution of national system interconnected with EEA Reportnet

Page 11: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

Posilnenie inštitucionálnych kapacít v sektore životného prostredia

Activity 1. STANDARDISATION

Preparation of methodology for standardised data-flows in the areas of air, water, waste, nature.

Development and application of automated reporting system based on clearing-house mechanism (CHM) .

Page 12: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

Institutional and Capacity Building in the Environmental Sector

The Reportnet Modules

= actively used by

EEA Member

States

Page 13: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

Institutional and Capacity Building in the Environmental Sector

Activity 2. EEA NATIONAL NETWORK

Support (technical) to expand SK NRC network

(NRC=National Reference Centres) Improvement of capacity of the national server and technical

support for connection of the NRCs in both traditional and new institutions to WANs: ZPNET, EIONET, INTERNET.

Priority data-flow identification based on selection criteria of indicators and its improvement

Training of staff

Page 14: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

Institutional and Capacity Building in the Environmental Sector

SK NATIONAL part of EEA EIONET NETWORK:

• 1 NFP office - 2 persons

• 22 groups of NRCs with 52 subNRCs54 persons in NRCs

new 9 institutions

new 16 persons

Page 15: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

Posilnenie inštitucionálnych kapacít v sektore životného prostredia

Activity 2. EEA NATIONAL NETWORK

Support (technical) to create NRC (National Reference Centres) network at national level.

Improvement of capacity of the national server and technical support for connection of the NRCs in both traditional and new institutions to WANs: ZPNET, EIONET, INTERNET.

Priority data-flow identification based on selection criteria of indicators and its improvement

Training of staff.

Page 16: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

Posilnenie inštitucionálnych kapacít v sektore životného prostredia

Activity 2. EEA NATIONAL NETWORK

Support (technical) to create NRC (National Reference Centres) network at national level.

Improvement of capacity of the national server and technical support for connection of the NRCs in both traditional and new institutions to WANs: ZPNET, EIONET, INTERNET.

Priority data-flow identification based on selection criteria of indicators and its improvement

Training of staff.

Page 17: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

Posilnenie inštitucionálnych kapacít v sektore životného prostredia

Activity 2. EEA NATIONAL NETWORK

Support (technical) to create NRC (National Reference Centres) network at national level.

Improvement of capacity of the national server and technical support for connection of the NRCs in both traditional and new institutions to WANs: ZPNET, EIONET, INTERNET.

Priority data-flow identification based on selection criteria of indicators and its improvement

Training of staff.

Page 18: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

Institutional and Capacity Building in the Environmental Sector

Activity 3. ENVIRONMENTAL INSPECTORATE

Selection of data sets from monitoring in specialised institutions and from administrative procedures

Development of effective system for sharing of data using defined selection criteria (personal effective deskboard) - SEIS

Training of staff Improvement of the equipment for the CITES implementation

and SEI – SNC connection

Page 19: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

EEA Reportnet

SK Reportnet

ISofEOSEIS

SHMI

SEA

SNC

Page 20: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

EEA Reportnet

SK Reportnet

ISofEOSEIS

SHMI

SEA

SNC

for reporting from SK

for Regional & District Officesfor SEI & MoE

Page 21: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

EEA Reportnet

SK Reportnet

ISofEOSEIS

SHMI

SEA

SNC

Page 22: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

EEA Reportnet

SK Reportnet

ISofEOSEIS

SHMI

SEA

SNC

Page 23: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

ArcSDE ArcIMS db Oracle

WEB

Data store

db

Page 24: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

Institutional and Capacity Building in the Environmental Sector

Activity 4. AIR POLLUTION

Support to the existing network of monitoring stations and support for new reporting obligation

Improvement and upgrade of existing sampling and analytical equipment

Improvement of laboratory capacities and analytical quality for air samples analysis

Page 25: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

Institutional and Capacity Building in the Environmental Sector

Activities 1 - 4 are parts of Mosaic of MDIAR chain (Monitoring-Data-Information-Assessment-Reporting) in Slovakia

Parts of Environmental Information in Europe - SEEIS (Shared European Environmental Information System)

INSPIRE and SDI

Page 26: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

Institutional and Capacity Building in the Environmental Sector

Conclusion:

successful – not only from the content point of view, achievement of defined targets, supplied techniques and solutions within 28 mil.Sk, but also by improvement of partnership between institutions of MoE sector:

SEA-SHMI-SEI-SNC of SR and partnership with UBA project was not only about the work, but also about

relations and friendship

Page 27: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

Institutional and Capacity Building in the Environmental Sector

11

Page 28: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

Institutional and Capacity Building in the Environmental Sector

Thanks to:

Ulrike Staerk, RTA, UBA Veronika Košková, PM SEA CEI

Johannes Mayer, PL, UBA

MoE, CFCU, OoG, SHMI, SEI, SNC, SEA and others

Page 29: SK03/IB/EN/01-Financed by EU Phare Programme SK03/IB/EN/01 SK03/IB/EN/01 Institutional and Capacity Building in the Environmental Sector Project Objectives

SK03/IB/EN/01-Financed by EU Phare Programme

Institutional and Capacity Building in the Environmental Sector

Thank you for the attention !

[email protected]