30
Marianne Badura, 07.05.09 Twinning Project RO/2006/IB/EN/09 Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday, May 7th, 2009 Tulcea, Biosphere Reserve Danube Delta Expert: Ms Marianne Badura Contact: [email protected] , Phone: +49 8161 144 368

Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

  • Upload
    dophuc

  • View
    227

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

Twinning Project RO/2006/IB/EN/09

WORKSHOP

EUROPEAN FUNDING FOR NATURA 2000Thursday, May 7th, 2009

Tulcea, Biosphere Reserve Danube Delta

Expert: Ms Marianne Badura

Contact: [email protected], Phone: +49 8161 144 368

Page 2: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

Content of the presentation

• Background of financing mechanisms for Natura 2000including EFRD (ELER)

• Direct funding schemes for nature conservation topics (LIFE+)

• Cross-financing from other European funding sources

• Overview on trans-national European funding schemes available for nature conservation topics

• …

Page 3: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

Background and motivation

• NEPA/ REPAs/ LEPAs are interested in implementing nature conservation activities in Romania/ their regions.

• NEPA is interested in becoming a project partner in international/ transnational projects in order to enrich the exchange of experience with other European partners.

• NEPA is interested in becoming a project partner in international/ transnational projects in order to increase the capacity to fulfil its tasks.

Why heading for European funding for nature conservation?

Page 4: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

European Biodiversity Action PlanFirst Action Plan 2001 incl. policy

framework at EU level Relaunch in 2006

What goals have to be achieved at European level?

Background and motivation

With regard to biodiversity?European Biodiversity Strategy (COM 98/42)

To stop the loss of biodiversity until 2010

Objectives of new EU Action Plan are to:• Reinforce action to halt loss of biodiversity in the EU by

2010• Accelerate progress towards the recovery of habitats and

natural systems in the EU• Optimise the EU’s contribution towards significantly

reducing the rate of biodiversity loss worldwide by 2010

European Natura 2000 network

Page 5: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

What trends can be observed at European level?

Background and motivation

With regard to sustainable (rural) development?

• Demographic development – in 2008 more people lived in cities than in rural areas of Europe

• Intensification of agriculture and loss of traditional land use in rural and/or less-favoured areas

• Need for more biological farming products throughout Europe

• Diversification in rural areas needed in order to compensate loss of income by ‘normal’ agricultural crops

• …

Page 6: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

Funding principles of the EU

No specific EU budget line available for nature conservation

Policy goals in environmental protection and nature conservation must be covered by the implementation of (other) community policies

Nature conservation measures must always be integrative part of other measures – which makes it sometimes more difficult.

Framework regulations for funding must be adapted to national situation by integrating stakeholders from economy and social life into the process of developing the Operational Programmes.

This is a chance to increase the funds available for Natura 2000!

Page 7: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

What goals have to be achieved at European level?

Funding principles of the EU

With regard to agriculture?

Health Check for the agriculture until 2013more funds for nature conservation, protection of

water resources and climate protection in the 2nd pillar of ELER starting in 2009

Basic strategic and political discussion on EU budget for the next funding period starting in 2014

demand for increased funding for sustainable rural development, biodiversity and nature conservation topics

Page 8: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

Basic principles of CAP

Funding principles of the EU

GAP – Common Agricultural Policy

Pillar 1Market and price policy

Direct payments to farmersSubsidies to support prices-interventions-quantity quota-export subsidies-market protection-etc.

Pillar 2 (ELER)Support of rural develop-ment

-agro-environmentalschemes-Natura 2000 payments-LFA payments

-etc.

(For details see next slide)

Combinationwith

European Structural

Funds possible

(ESF, EFF, EFRE, etc.)

Page 9: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

Rural development policy

Economicdiversification and improvement of quality of life

Environmental protectionand Landscape management bysustainable land use

Competitiveness in agriculture and forestry

Recall the 3 focal topics of EU funding for agriculture and rural areas:

Funding principles of the EU

Strengthening of the 2nd pillar/focus of EAFRD/ELER foreseen

Page 10: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

Examples for financing of nature conservation measures in ELER:

Focus 1: Competitiveness in agriculture and forestry

Training courses on Natura 2000 aspects for farmers

Investments in agricultural infrastructure, e.g. constructionof shelter for sheep or cattle grazing Natura 2000 areas orspecial mowing equipment

Procedure for re-grouping of agricultural territories in order to achieve large areas accessible for grazing

European Fund for Agriculture and Rural Development (EAFRD/ELER)

Page 11: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

Examples for financing of nature conservation measures in ELER:

Focus 2: Environmental protection and Landscape management bysustainable land use

Agro-environmental funding schemes (adapted to national orLänder conditions)

Compensation payments for restrictions due to Natura 2000

European Fund for Agriculture and Rural Development

Page 12: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

Examples for financing of nature conservation measures in ELER focus 1-3:

Focus 3: Economic diversification and improvement of quality of life

Individual consulting of farmers – awareness raising

Management plans and concepts for Natura 2000 sites

Investments for the conservation of natural heritage (e.g. measures for landscape elements, creation of habitats, revitalization of rivers, etc.)

Purchase of land for nature conservation purposes

European Fund for Agriculture and Rural Development

Page 13: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

European Fund for Agriculture and Rural Development

Examples for financing of nature conservation measures in ELER:

Focus 4: Leader +(Method to identify the potential for regional development by defining a common and integrated implementation strategy)

Projects to increase regional business and value creation

Local Action Groups (LAG) necessary

Integrated co-operation at regional level – e.g. suitable fordevelopment of (eco-)tourist offers

Selection procedure at national level for LAGs

Page 14: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

Possible funding sources for Natura 2000

What project funding sources for Natura 2000 can be considered?

• National Structural funds (SOP Env, ROP)• European funding schemes (INTERREG, LIFE+, etc.)• World Bank Funding / GEF• Norwegian Grants• Bilateral funding from other countries• …

Page 15: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

Project framework

What is needed to be considered for project funding?

• A good project idea• A sound and well-build project concept• A powerful project consortium (for transnational projects) with

reliable partners• A stable co-financing • Well-functioning mechanisms for the absorption of project

means in the staff capacity of NEPA/ REPAs/ LEPAs• A sound mechanism for reporting and financial controlling

Page 16: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

General principles for (EU) project development

Define your specific potential: - NEPA represents the national level of topics.- NEPA covers the whole range of environmental topics.- REPA XY covers a special regional need / measure.

Derive your potential project ideas from your daily work:- Which tasks have to be fulfilled in the next year / next 2 years / next 5 years ?- Which of them could be supported by transnational funding?

Install a continuous „project radar“ in your brain.

Regular brainstorming on project ideas per department is recommended.

Page 17: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

Basic information for project ideas

Responsible department / person:

Partnership:

Budget estimation:

Durability of the project results:

Components of the project:

Expected outputs and results of the project:

Objectives of the Project:

-Problem Description - Issue addressed

-Brief History of the project:

Description of the project:

Usea S

tanda

rd tem

plate

forpro

ject id

eas!

Page 18: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

Typical hurdles for project development

Long period of development of the idea towards a good concepton structural and thematic level

The work on a project idea should be independent of a specificcall.

Make sure there is sufficient support + teamwork within NEPA on the idea in order to achieve maximum benefit.

Page 19: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

Presentation of the

EU funding programmes

2007 - 2013

Page 20: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

Interreg IVB South Eastern European Space

• Calls for investment preparation projects in a European wide context.

• Programme area (see map below), it is allowed to integrate partners outside of the programme area for up to 20% of the total project budget

• Funding rate: 75 % (up to 80% in Eastern Europe) + 18% from State budget in RO – rest of 2% for applicant to cover

• A project budget between 1 an 3 Mio EURO is recommended.

• Public bodies and institutions, and private partners are eligible.

Page 21: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

South East European Space (SEES)

Page 22: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

Romania can take part up to 20% of a project budget.

Central European Space (CEUS)

Page 23: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

What is important:

Improved Strategic Approach: Contribution to the implementation of the LISBON – Strategy for Growth and Employment and the GÖTEBORG – Strategy for Sustainable Development

What is strategic?A project is regarded strategic if it demonstrates the following features: - its geografical area or area of influence encompasses the whole SEES - it refers not to a single standing local or regional case, but to a problemessential for the stable development of the whole SEES- it has strong political backup at the national level, which takes responsibility forendorsement of the policy recommendations

INTERREG IV – Strand B

Page 24: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

4 thematic priorities (derived from the Structural Funds Regulations)

INNOVATION

ENVIRONMENTAL PROTECTION AND PREVENTION OF RISKS

ACCESSIBILITY

SUSTAINABLE URBAN DEVELOPMENT

Interreg IVB South Eastern European Space

Note: 2-step application procedure with Expression of Interest (1st step) and Application Form (2nd step after invitation)

Page 25: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

• Calls for networking projects in a European wide context

• All European regions can participate

• A project budget between 1 an 3 Mio EURO is recommended

• Public bodies and institutions are eligible partners, but no commercial company

• Funding rate: 75 % (up to 80% in Eastern Europe)

• Difficult to get approved as evaluation criteria are very restrictive due to big competition.

Interreg IVC

Page 26: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

LIFE+

The programme covers 3 sub-domains:

1. Nature and biodiversity

2. Environmental policy and capacity building

3. Information and communication

Possible Topics of LIFE+

- „Best-practice“ and demonstration measures for the support of nature protection and biodiversity

- Innovative or demonstration measures which support EU Environmentalpolicies (Water, Chemicals, Air pollution, etc)

- Information and communication measures

Page 27: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

Correct Name: 7th European Framework Programme for Research, Technological Development and Demonstration

7th Framework Programme

- Most important funding instrument for RTD

- Third biggest financial instrument of the EU (50,5 Billion without EURATOM)

- Allows not „only research“, but also application, demonstration, events, etc.

- non-research organisations can play an important rules as „users“ or„disseminators“

4 Sub-Programmes:Co-operation –32,4 Billion EUROIdeas –7,5 Billion EUROPeople –4,75 Billion EUROCapacities –4,09 Billion EURO

Page 28: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

Sub-programme „Co-operation“ – Core of 7th FPThematic priorities II

5. Energy (2,350)

6. Environment (including Climate Change) (1,890)

7. Transport including Air transport (4,160)

8. Social-, Economic and societal science (0,623)

9. Security (1,400)

10. Space (1,430)

(All measures include cross-border or transnational co-operation.)

7th Framework Programme

Page 29: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

Three types of programmes

- Country or Multi-country-programmes

- Cross-border Co-operation (ENPI CBC)

- Thematic Programmes

Opportunities under ENPI (European Neighbourhood and Partnership Instrument)

ENPI CBC Objectives: - Sustainable economic and social development in border areas

- Co-operation in the thematic areas environement, public health, prevention and fight against organised crime

- Neigbourhood-actions (people-to-people actions) on local level

Available funds: approx. 1,2 Billion EURO

Page 30: Twinning Project RO/2006/IB/EN/09 WORKSHOP … Project RO/2006/IB/EN ... Twinning Project RO/2006/IB/EN/09 WORKSHOP EUROPEAN FUNDING FOR NATURA 2000 Thursday ... • Optimise the EU…

Marianne Badura, 07.05.09Twinning Project RO/2006/IB/EN/09

1. Definition of thematic priorities in NEPA/ REPAs/ LEPAs2. Information of staff to develop project ideas and routines for

collecting3. Check of framework conditions for project implementation4. Setting up of appropriate management routines for project

development5. Receiving and integrating key-advice6. Systematic evaluation of project ideas7. Search for upcoming project consortia where NEPA/ REPAs/ LEPAs

can enter as PP

Challenges to be met in order to developa funding strategy for the objectives of NEPA

………thank you very much for your attention!