  • ZXWR RNCRadio Network Controller

    Hardware Installation Guide

    Version: V3.11.10

    ZTE CORPORATIONNO. 55, Hi-tech Road South, ShenZhen, P.R.ChinaPostcode: 518057Tel: +86-755-26771900Fax: +86-755-26770801URL: http://ensupport.zte.com.cnE-mail: [email protected]

  • LEGAL INFORMATIONCopyright 2011 ZTE CORPORATION.

    The contents of this document are protected by copyright laws and international treaties. Any reproduction or

    distribution of this document or any portion of this document, in any form by any means, without the prior written

    consent of ZTE CORPORATION is prohibited. Additionally, the contents of this document are protected by

    contractual confidentiality obligations.

    All company, brand and product names are trade or service marks, or registered trade or service marks, of ZTE

    CORPORATION or of their respective owners.

    This document is provided as is, and all express, implied, or statutory warranties, representations or conditions

    are disclaimed, including without limitation any implied warranty of merchantability, fitness for a particular purpose,

    title or non-infringement. ZTE CORPORATION and its licensors shall not be liable for damages resulting from the

    use of or reliance on the information contained herein.

    ZTE CORPORATION or its licensors may have current or pending intellectual property rights or applications

    covering the subject matter of this document. Except as expressly provided in any written license between ZTE

    CORPORATION and its licensee, the user of this document shall not acquire any license to the subject matter

    herein.

    ZTE CORPORATION reserves the right to upgrade or make technical change to this product without further notice.

    Users may visit ZTE technical support website http://ensupport.zte.com.cn to inquire related information.

    The ultimate right to interpret this product resides in ZTE CORPORATION.

    Revision History

    Revision No. Revision Date Revision Reason

    R1.0 2011-07-31 First Edition

    Serial Number: SJ-20110704093842-005

    Publishing Date: 2011-07-31 (R1.0)

  • ContentsAbout This Manual ......................................................................................... I

    Chapter 1 Safety Instruction...................................................................... 1-1

    1.1 Safety Instruction ............................................................................................... 1-1

    1.2 Safety Signs ...................................................................................................... 1-1

    Chapter 2 Environment Requirements ..................................................... 2-1

    2.1 Addressing Requirements for Equipment Room ................................................... 2-1

    2.2 Construction Requirements for Equipment Room ................................................. 2-1

    2.2.1 Layout ..................................................................................................... 2-1

    2.2.2 Size......................................................................................................... 2-2

    2.2.3 Height ..................................................................................................... 2-2

    2.2.4 Floors...................................................................................................... 2-3

    2.2.5 Windows/Doors/Walls............................................................................... 2-3

    2.3 Temperature/Humidity Requirements for Equipment Room ................................... 2-3

    2.4 Illumination Requirements for Equipment Room ................................................... 2-5

    2.5 Power Supply Requirements for Equipment Room ............................................... 2-5

    2.6 Grounding Requirements for Equipment Room .................................................... 2-6

    2.6.1 Grounding System Compositions .............................................................. 2-6

    2.6.2 Grounding System Type ........................................................................... 2-7

    2.6.3 Grounding System Design ........................................................................ 2-7

    2.6.4 Grounding System Requirements.............................................................. 2-7

    2.7 Fire Protection Requirements for Equipment Room .............................................. 2-8

    2.8 Lightening Protection Requirements for Equipment Room..................................... 2-8

    2.9 Radiation Protection Requirements for Equipment Room...................................... 2-9

    2.10 Anti-static Requirements for Equipment Room ................................................... 2-9

    2.11 Dustproof Requirements for Equipment Room.................................................. 2-10

    2.12 Quakeproof Requirements for Equipment Room............................................... 2-10

    Chapter 3 Engineering Preparations ........................................................ 3-1

    3.1 Overview to Engineering Preparations ................................................................. 3-1

    3.2 Auxiliary Equipment Preparation.......................................................................... 3-1

    3.3 Instruments and Meters Preparation .................................................................... 3-1

    3.4 Technical Document Preparation ......................................................................... 3-3

    3.5 Goods Unpacking and Inspecting ........................................................................ 3-4

    3.5.1 Preparations for Goods Unpacking and Inspecting ..................................... 3-4

    I

  • 3.5.2 Counting Quantity .................................................................................... 3-4

    3.5.3 Unpacking and Inspecting Goods .............................................................. 3-5

    3.5.4 Counting Articles ...................................................................................... 3-8

    3.5.5 Inspecting Goods ..................................................................................... 3-8

    3.5.6 Handing Over Goods................................................................................ 3-9

    Chapter 4 Hardware Installation Flow ...................................................... 4-1

    4.1 Hardware Installation Flow Chart......................................................................... 4-1

    4.2 Hardware Installation Flow Description ................................................................ 4-1

    4.3 Precautions during Hardware Installation ............................................................. 4-2

    Chapter 5 Cabinet Installation................................................................... 5-1

    5.1 Overview to Cabinet Installation .......................................................................... 5-1

    5.2 Cabinet Installation Flow..................................................................................... 5-1

    5.3 Base Installation Mode ....................................................................................... 5-2

    5.3.1 Base Structure ......................................................................................... 5-2

    5.3.2 Base Installation Flow............................................................................... 5-3

    5.3.3 Positioning Cabinet for Base Installation Mode ........................................... 5-4

    5.3.4 Positioning Base for Base Installation Mode............................................... 5-6

    5.3.5 Installing Base for Base Installation Mode .................................................. 5-6

    5.3.6 Fixing Cabinet for Base Installation Mode .................................................. 5-9

    5.3.7 Testing Insulation for Base Installation Mode.............................................5-11

    5.4 Feet Installation Mode ...................................................................................... 5-12

    5.4.1 Feet and Pressure Plate Assembly.......................................................... 5-12

    5.4.2 Feet Installation Flow.............................................................................. 5-13

    5.4.3 Positioning Cabinet for Feet Installation Mode.......................................... 5-14

    5.4.4 Fixing Cabinet for Feet Installation Mode ................................................. 5-15

    5.4.5 Testing Insulation for Feet Installation Mode............................................. 5-16

    5.5 Connecting Adjacent Cabinets .......................................................................... 5-17

    5.6 Cabinet Accessories Installation ........................................................................ 5-18

    5.6.1 Cable Trough Installation ........................................................................ 5-18

    5.6.2 Installing Decorative Panel...................................................................... 5-19

    5.6.3 Installing Fan Plug-in Box ....................................................................... 5-20

    5.6.4 Installing Fiber Tray ................................................................................ 5-22

    5.6.5 Installing Front/Rear Doors ..................................................................... 5-24

    5.6.6 Installing Air Filter................................................................................... 5-25

    5.6.7 Cabinet Label......................................................................................... 5-27

    5.7 Check after Cabinet Installation......................................................................... 5-27

    Chapter 6 Board Installation...................................................................... 6-1

    II

  • 6.1 Overview to Board Installation............................................................................. 6-1

    6.2 Board Layout ..................................................................................................... 6-1

    6.3 Board Installation Principles ................................................................................ 6-1

    6.4 Board Installation Preparations............................................................................ 6-2

    6.5 Board Installation Methods.................................................................................. 6-3

    6.5.1 Overview to Board Installation Method....................................................... 6-3

    6.5.2 Plugging Board ........................................................................................ 6-3

    6.5.3 Unplugging Board .................................................................................... 6-5

    6.5.4 Replacing Board ...................................................................................... 6-7

    Chapter 7 Cable Installation ...................................................................... 7-1

    7.1 Installing Power Cable and Grounding Cable ....................................................... 7-1

    7.1.1 Overview ................................................................................................. 7-1

    7.1.2 Installation Procedures ............................................................................. 7-2

    7.1.3 Installing Cables inside Cabinet................................................................. 7-2

    7.1.4 Installing Cables between Cabinet and DC Distribution Cabinet .................. 7-8

    7.1.5 Installing the Power Cable between DC Distribution Cabinet and Storage

    Battery ................................................................................................. 7-10

    7.2 Installing Internal Cables....................................................................................7-11

    7.2.1 Cabling Requirements .............................................................................7-11

    7.2.2 Internal Cables Installation...................................................................... 7-12

    7.3 Installing External Cables.................................................................................. 7-17

    7.3.1 Types of External Cables ........................................................................ 7-17

    7.3.2 Monitoring Cable .................................................................................... 7-17

    7.3.3 Ethernet Cable ....................................................................................... 7-18

    7.3.4 External Fiber ........................................................................................ 7-18

    7.3.5 E1/T1 Cable........................................................................................... 7-22

    7.4 Installing Inter-cabinet Cables ........................................................................... 7-22

    7.4.1 Inter-cabinet Cable ................................................................................. 7-22

    7.4.2 Inter-cabinet Fiber .................................................................................. 7-23

    Chapter 8 GPS Antenna Feeder System Installation .............................. 8-1

    8.1 Structure of GPS Antenna Feeder System ........................................................... 8-1

    8.1.1 Direct Connection of Feeder ..................................................................... 8-1

    8.1.2 Indoor Forwarding .................................................................................... 8-2

    8.2 GPS Antenna Feeder System Installation Flow .................................................... 8-2

    8.3 GPS Antenna Feeder System Installation ............................................................ 8-3

    8.3.1 Preparations for GPS Antenna Feeder System Installation.......................... 8-4

    8.3.2 Making of Feeder ..................................................................................... 8-5

    III

  • 8.3.3 GPS Antenna Installation........................................................................ 8-16

    8.3.4 Laying Feeder........................................................................................ 8-20

    8.3.5 Grounding kit Installation ........................................................................ 8-21

    8.3.6 Installing Lightening Arrester and Power Splitter....................................... 8-27

    Chapter 9 Accessories Installation........................................................... 9-1

    9.1 Overview to Accessories Installation.................................................................... 9-1

    9.2 Alarm Box Installation ......................................................................................... 9-1

    9.3 Sensor Installation.............................................................................................. 9-2

    9.3.1 Overview to Sensor Installation ................................................................. 9-2

    9.3.2 Smog Sensor Installation .......................................................................... 9-4

    9.3.3 Temperature and Humidity Sensor Installation............................................ 9-5

    9.3.4 Infrared Sensor Installation ....................................................................... 9-5

    9.3.5 Door Control Sensor Installation................................................................ 9-7

    9.3.6 Precautions for Sensor Installation ............................................................ 9-7

    Chapter 10 Check after Hardware Installation....................................... 10-1

    10.1 Check for Cabinet Installation Techniques ........................................................ 10-1

    10.2 Check for Cable Connection and Layout .......................................................... 10-2

    10.2.1 Check for Power Cable Installation ........................................................ 10-2

    10.2.2 Check for Intra-cabinet Cable Installation ............................................... 10-2

    10.2.3 Check for Inter-cabinet Cable Installation ............................................... 10-3

    10.2.4 Check for Outdoor Cable Installation...................................................... 10-3

    10.3 Check for Accessories Installation ................................................................... 10-3

    10.3.1 Check for Alarm Box Installation............................................................ 10-3

    10.3.2 Check for Sensor Installation................................................................. 10-3

    10.3.3 Check for Other Device Installation........................................................ 10-3

    Chapter 11 Power-on and Power-off....................................................... 11-1

    11.1 Check before Power-on....................................................................................11-1

    11.2 Power-on ........................................................................................................11-2

    11.2.1 Checking Cabinet Power Supply.............................................................11-2

    11.2.2 Board Power-on for the First Time ..........................................................11-2

    11.2.3 Board Power-on at Usual Time ...............................................................11-2

    11.3 Power-off ........................................................................................................11-3

    Appendix A Packing, Storage and Transportation................................. A-1

    A.1 Packing .............................................................................................................A-1

    A.2 Storage .............................................................................................................A-1

    A.3 Transportation ...................................................................................................A-1

    IV

  • Appendix B Cable Binding and Cabling.................................................. B-1

    B.1 Cabling Standards .............................................................................................B-1

    B.1.1 Cabling Standards of Power Cables ..........................................................B-1

    B.1.2 Cabling Standards of Cables inside Cabinet ..............................................B-2

    B.1.3 Cabling Standards of Outdoor Cables .......................................................B-2

    B.1.4 Cabling Standards for Cables between Cabinets .......................................B-3

    B.2 Binding Standards..............................................................................................B-3

    Appendix C ZTE Engineering Label Specifications ............................... C-1

    C.1 Label Standards ................................................................................................C-1

    C.2 Label Type ........................................................................................................C-1

    C.3 Making Label.....................................................................................................C-1

    C.3.1 How to Paste the Label ............................................................................C-2

    C.3.2 Power Cable and Monitoring Cable Label..................................................C-5

    C.3.3 75 Signal Cable Label ...........................................................................C-8

    C.3.4 120 Signal Cable Label..........................................................................C-9

    C.3.5 Optical Fiber Label................................................................................. C-11

    C.3.6 Net Cable Label.....................................................................................C-14

    Appendix D External Cable Connection Table........................................ D-1

    D.1 Table of 75 E1 Cable Connection ....................................................................D-1

    D.2 Table of 120 E1 Cable Connection...................................................................D-3

    D.3 Table of 75 E3 Cable Connection ....................................................................D-4

    Appendix E Ethernet Cable Making..........................................................E-1

    E.1 Structure of Ethernet Cable ................................................................................E-1

    E.2 Usage of Ethernet Cable ....................................................................................E-2

    E.3 Making of Ethernet Cable ...................................................................................E-3

    E.4 Test of Ethernet Cable........................................................................................E-4

    Figures............................................................................................................. I

    Tables ...........................................................................................................VII

    V

  • VI

  • About This ManualPurpose

    This manual introduces the installation method of the ZXWR RNC hardware, it hepsengineers to install the ZXWR RNC hardware safely and correctly.

    Intended Audience

    l Installation engineersl Maintenance engineers

    What is in This Manual

    Chapter Summary

    Chapter 1, Safety Instruction Introduces the meaning of the symbols in this manual and some

    safety precautions related to ZXWR RNC installation, such as

    precautions against high voltage, thunderstorms and working at

    heights.

    Chapter 2, Environment

    Requirements

    Introduces the environment requirements for the running of ZXWR

    RNC, including the addressing, construction, illumination, power

    supply, grounding, fire proof, lightening protection, radiation proof,

    static proof, dustproof and quake proof of the equipment room.

    Chapter 3, Engineering

    Preparations

    Introduces the environment check prior to ZXWR RNC installation,

    the required items to check and conditions to satisfy. It also

    introduces the tools, meters and instruments, and technical

    documentation necessary for the installation, in addition to, goods

    unpacking and acceptance.

    Chapter 4, Hardware Installation

    Flow

    Introduces the installation steps of ZXWR RNC hardware,

    including the board installation, cable installation, categories

    installation, and the installation check.

    Chapter 5, Cabinet Installation Introduces the installation step of ZXWR RNC cabinet, including

    the similarities/differences between the base installation mode

    and feet installation method, the fixation and connection between

    cabinets, and the installation of cabinet accessories.

    Chapter 6, Board Installation Introduces the board layout, board installation principles,

    installation preparations, and installation methods of ZXWR RNC.

    Chapter 7, Cable Installation Introduces the installation methods of ZXWR RNC cables,

    including the power cable and different types of signal cables.

    Chapter 8, GPS Antenna Feeder

    System Installation

    Introduces the installation methods of GPS antenna feeder

    system.

    I

  • Chapter Summary

    Chapter 9, Accessories

    Installation

    Introduces the installation methods of accessories related to

    ZXWR RNC operation.

    Chapter 10, Check after

    Hardware Installation

    Introduces the checklists of ZXWR RNC installation techniques,

    cable connection and layout, and accessories.

    Chapter 11, Power-on and

    Power-off

    Introduce the power-on/off steps and methods after the installation

    of ZXWR RNC.

    Appendix A, Packing, Storage

    and Transportation

    Introduces the packaging, storage, and transportation of ZXWR

    RNC.

    Appendix B, Cable Binding and

    Cabling

    Introduces the layout and binding techniques of cables.

    Appendix C, ZTE Engineering

    Label Specifications

    Introduces the making and marking methods of ZTE engineering

    labels.

    Appendix D, External Cable

    Connection Table

    Introduces the trunk cables outside ZXWR RNC cabinet.

    Appendix E, Ethernet Cable

    Making

    Introduces how to make Ethernet cables.

    II

  • Chapter 1Safety InstructionTable of Contents

    Safety Instruction .......................................................................................................1-1Safety Signs...............................................................................................................1-1

    1.1 Safety InstructionZXWR RNC bears high temperatures and high voltages. Only trained and qualifiedpersonnel can install and maintain it.

    Observe safety rules and relevant operating procedures during the installation, operationand maintenance. Otherwise, it may cause personal injury or equipment damage. Safetyprecautions covered in this manual are only supplementary to local safety regulations.

    ZTE CORPORATION assumes no responsibility for consequences resulting from violationof general specifications for safe operations, or of safety rules for design, production, anduse of the equipment.

    1.2 Safety SignsThe safety signs are as shown in Table 1-1.

    Table 1-1 SAFETY SIGNS AND CORRESPONDING MEANINGS

    Safety Sign Description

    Caution sign

    Antistatic sign

    Electric shock sign

    Caution against scald

    Caution against microwave

    1-1

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • ZXWR RNC Hardware Installation Guide

    Safety prompts fall into four levels: Danger, warning, caution and attention. Literaldescription of the safe prompt is on the right of the safety sign and detailed description isunder the safety sign. The format is as follows.

    Danger!

    Indicates a potentially hazardous situation which, if not avoided, will result in death orserious personal injuries, or equipment damage or breakdown.

    Warning!

    Indicates a potentially hazardous situation which, if not avoided, could result in seriousinjuries, equipment damage or interruption of major services.

    Caution!

    Indicates a potentially hazardous situation which, if not avoided, could result in seriousinjuries, equipment damage or interruption of some services.

    Note:

    Indicates a potentially hazardous situation which, if not avoided, could result in injuries,equipment damage or partial interruption of services.

    1-2

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • Chapter 2Environment RequirementsTable of Contents

    Addressing Requirements for Equipment Room .........................................................2-1Construction Requirements for Equipment Room .......................................................2-1Temperature/Humidity Requirements for Equipment Room ........................................2-3Illumination Requirements for Equipment Room.........................................................2-5Power Supply Requirements for Equipment Room .....................................................2-5Grounding Requirements for Equipment Room ..........................................................2-6Fire Protection Requirements for Equipment Room....................................................2-8Lightening Protection Requirements for Equipment Room..........................................2-8Radiation Protection Requirements for Equipment Room ...........................................2-9Anti-static Requirements for Equipment Room ...........................................................2-9Dustproof Requirements for Equipment Room..........................................................2-10Quakeproof Requirements for Equipment Room ......................................................2-10

    2.1 Addressing Requirements for Equipment RoomZXWR RNC should be installed indoors. To ensure ZXWR RNC running stably for along time, locate ZXWR RNC in the equipment room according to the telecommunicationnetwork planning and communication technical requirements, as well as the hydrology,geological, traffic. The followings are detailed requirements:

    l Do not place the equipment in the room with high temperature, thick dust, harmfulatmosphere, low air pressure, flammable and explosive objects.

    l Do not place the equipment in the room with shakes.l Do not place the equipment in the room with large noises.l Do not place the equipment in the room near the transformer substation.

    2.2 Construction Requirements for Equipment Room

    2.2.1 LayoutUsually, the equipment room falls into the main equipment room and the auxiliaryequipment room. The main equipment room is to locate the body device of ZXWR RNC,while the auxiliary equipment room is to locate the auxiliary devices, such as, O&Mdevice, uninterrupted power supply, and battery set.

    The followings are detailed requirements:

    2-1

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • ZXWR RNC Hardware Installation Guide

    l To ensure the running environment of the equipment is independent, easy to maintainand manage, the main equipment room and the auxiliary equipment room should beplaced separately. However, they should be placed near the equipment, to save thecables for the next installation.

    l Place the O&M console in the auxiliary equipment room and ensure that the O&Mpersonnel can face the equipment in the main equipment room.

    l Usually, the main equipment room and the assistant room are separated with glasswalls.

    l Do not place the main device and the primary power supply in the same room.

    2.2.2 SizeThe equipment room should be large enough to support the main body and assistantdevices of ZXWR RNC, loading materials and other devices. Usually, keep 1.5 m beforethe ZXWR RNC cabinet for the maintenance person to open the door.

    The layout of the equipment room is as shown in Figure 2-1.

    Figure 2-1 LAYOUT OF EQUIPMENT ROOM

    2.2.3 HeightThe height of the equipment room is related to the cablingmode selected during the systemdesign.

    The system cabling has 2 modes: Upward cabling and downward cabling:

    l Upward cabling: All connection cables are wiring on the top of the cabinet.l Downward cabling: All connection cables are led out from the cabinet bottom.

    2-2

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • Chapter 2 Environment Requirements

    The equipment room height refers to the net height from the beam or ventilation pipe tothe floor surface. Usually, for the upward cabling mode, the equipment room height shouldnot be less than 3 m, while for the downward cabling mode, the equipment room heightshould not be less than 2.7 m.

    2.2.4 FloorsThe floors should be laid in the equipment room according to the following requirements:

    l The bearing weight capacity of the floors in the main equipment room should be over560 kg/m2 and the bearing weight capacity of the auxiliary equipment room should beover 300 kg/m2.

    l The pavement and the support of the floors must be smooth and firm. The error forper m2should be less than 2 mm.

    l Coat the floor with the anti-static floors. Do perform the antistatic grounding. Thegrounding method is to connect a well-conductive lead with the grounding device ofthe equipment room via 1 M current-limiting resistance.

    The grounded system resistance should comply with YD/T754-95 TelecommunicationEquipment Room Static protection Regulations (issued in June, 1995).

    l The floors are better to be 300 mm ~ 330 mm high. Avoid flaring designs.l The paint should be non-glisten and harmless.l When laying the floors, take measures against moisture, moth and rats.

    If the equipment room adopts the downward cabling mode, reserve the hidden pipes,grounding trough, and holes under the floors. Their quantity, location and sizes shouldmeet the requirements for the layout of different cables and the technical design. Takemoisture-proof measures for all troughs. Keep the edge smooth. All the illumination andpower cables should be laid hidden.

    2.2.5 Windows/Doors/Wallsl Door: The effective height is over 2 m and the width over 1 m.l Window: Conditions permitting, all doors and windows use double-deck glass, sealed

    with dustproof rubber bars. Clear the dusts regularly.l Wall: Use the paints or wallpapers against the absorption, fire and moisture. Or, use

    the non-luminous paint.l Ceiling: No leaking and no dusting.

    2.3 Temperature/Humidity Requirements for EquipmentRoom

    The temperature/humidity requirements for the working environment of ZXWR RNC arelisted in Table 2-1.

    2-3

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • ZXWR RNC Hardware Installation Guide

    Table 2-1 TEMPERATURE/HUMIDITY REQUIREMENTS

    Name Long-term Working Condition Short-termWorking Condition

    Temperature 0C ~ 40C -5C ~ 45C

    Humidity 20% ~ 90% 5% ~ 95%

    Note:

    The temperature/humidity is measured when there are no protection boards in front of orbehind the cabinet, 1.5 m above the floors, 0.4 m before the equipment.

    Short-term working duration means no more than 48 hours continuously, and no more than15 days accumulated in the whole year.

    To guarantee the working environment and the temperature/humidity can meet the aboverequirements, the main equipment room should be equipped with the air-conditionerthat is constantly ON, and the auxiliary equipment rooms should also be equipped withthe air-conditioner that runs seasonally as required (based on the climate and financialconditions of the operator). Generally speaking, large equipment rooms should beequipped with the air-conditioners with humidity regulation, while small equipment roomswith general floor-standing or window air-conditioners.

    l Validation

    The capacity of the air-conditioner validating system includes the heat of the mainequipment and the heat of the external devices (such as, the heat brought by thesunlight entering the room through the windows and walls, the heat brought by themaintenance personnel coming into/out of or staying in the room).

    The air-conditioner should be double backed up to ensure the validating systemrunning securely and reliably. Especially in the main equipment room, the capacityof each system should be larger than at least half of the total air-conditioner capacity.

    l Sealing

    Do not destroy the sealing of the equipment room because of installing theair-conditioner. The property of the fresh air entering the equipment room should beover 5%.

    In addition, keep the air clean. Not only the density and the diameter of thedust, but also the salt, acid and sulfur in the air, should comply with CF014-95Telecommunication Equipment Room Condition (Temporary). These harmful gasesmay speed up the corruption of the metal and the aging of some parts. Preventharmful gases, such as, SO2, H2S from entering the equipment room, avoidingharming the health of the missionary.

    2-4

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • Chapter 2 Environment Requirements

    2.4 Illumination Requirements for Equipment RoomIt is better to install incandescent lamps or fluorescent lamps that are embedded into theceiling at proper positions between cabinets (or install emergency illuminating devices),for the convenience of equipment installation and maintenance. The average illuminationis 300 ~ 450 Lx.

    Lamp light or sun light should not irradiate the equipment for a long period, to prevent circuitboards and components from aging and deforming due to high temperature. Therefore, itis better to use the colored glass and non-tint transparent curtain for windows.

    2.5 Power Supply Requirements for Equipment RoomAC/DC/UPS of the equipment room should meet the following requirements:

    1. DC

    a. The nominal voltage of power supply for the equipment room is -48V, with anallowed fluctuation range of 57 VDC ~ -40 VDC.

    b. Threshold values measured at DC distributor output terminal, of the noise levelindices that 48 VDC voltages involves, are:l 300 Hz ~ 3400 Hz (phone band) noise (weighted noise) voltage 2 mVl 0 Hz ~ 300 Hz peak-peak value noise voltage 400 mVl 3.4 kHz ~ 15 kHz broadband noise voltage 100 mV effective valuel 150 kHz ~ 30 MHz broadband noise voltage 30 mV effective value.

    Discrete frequency (single frequency) noise voltage:

    l 3.4 kHz ~ 15 kHz, 5 mV effective valuel 150 kHz ~ 200 kHz, 3mV effective valuel 200 kHz ~ 500 kHz, 2mV effective valuel 500 kHz ~ 30 MHz, 1mV effective value.

    c. DC power supply is secured with over-voltage/over-current protection andindicators.

    2. AC

    a. Three-phase power supply: 380 V10%, 50 Hz5%, waveform distortion 0.95l Output voltage: 220V 3% ~ 220V 5%l Output frequency: 50 Hz ~60 Hz

    2-5

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • ZXWR RNC Hardware Installation Guide

    l Harmonic distortion < 5%l Output waveform: Sine wavel Working mode: Online workl Dynamic response time < 2ms

    2.6 Grounding Requirements for Equipment RoomMost faults of the equipment result from improper grounding. Especially in the case oflightning, improper grounding will cause even worse damage. Therefore, it is essentialto check the equipment room grounding and the grounding conditions that the equipmentroom provides to the equipment.

    2.6.1 Grounding System CompositionsA complete grounding system is as shown in Figure 2-2.

    Figure 2-2 COMPLETE GROUNDING SYSTEM

    The grounding system consists of the grounding body, grounding in-lead cable, groundingcable and grounding busbar.

    l Grounding body: The conductor buried underneath the ground and in contact with theearth.

    l Grounding busbar: The public grounding busbar that leads grounding cables out ofthe equipment room and the power supply room.

    l Grounding in-lead cable: The connection cable between the grounding busbar andthe grounding body.

    2-6

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • Chapter 2 Environment Requirements

    l Grounding cable: The connection cable between the communication device and thegrounding busbar.

    2.6.2 Grounding System TypeCommon grounding system includes the lightening protection ground, working ground andprotection ground.

    l Lightning protection ground: The lightning protection system of the constructionfacilities, consisting of the lightning arrester, the down grounding conductor, andconnectors that connect with the grounding system.

    l Working ground: The common potential reference formed by the connectedcomponent loop inside the equipment.

    l Protection ground: The ground that is led from the protection end or the outerenclosure of the equipment. It is to prevent the metal outer enclosure of theequipment from bearing electricity caused by power supply faults or other reasonsof the equipment.

    2.6.3 Grounding System DesignThe equipment room is better to adopt joint grounding mode.

    Joint grounding is to connect the working ground, protection ground of the equipment, andthe lightning ground of the building to form one set of grounding body. It can be severalground grids (for example, equipment room ground grid, power room ground grid, and irontower ground grid).

    Joint grounding can prevent ground level breakdown effect. Ground level breakdowneffect: If the lightning strikes a building with electronic communication equipment,the electromagnetic induction will increase the level of the electronic communicationequipment. If the grounding body of the equipment is separate from the grounding bodyof the building, the level of the equipment is zero, a huge potential occurs between thecircuits and components of the equipment and the ground. In this case, the componentsand the circuits are very likely to break down.

    In the case of joint grounding mode, if the lightning strikes a building with electroniccommunication equipment, the electromagnetic induction will increase both the levelof the circuits of the electronic communication equipment and the ground level. In thiscase, there will not be a sharp potential between the components and the circuits of theequipment and the ground. They are not likely to be damaged.

    2.6.4 Grounding System RequirementsThe resistance for the equipment room in joint grounding mode should be below 1 .

    ZXWR RNC ground includes -48 V ground, working ground, and protection ground.

    l -48 V ground (-48 V GND) and working ground (GVD) are led out from the powerdistribution box, connecting with GND and -48 VGND of all subsystems via the busbar.

    2-7

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • ZXWR RNC Hardware Installation Guide

    l Protection ground (GNDP) connects with the cabinet via the busbar, connecting withDC grounding stake via the cabinet.

    l The cabinet provides up grounding mode and down grounding mode.l The resistance of cabinet bonding connection is 0.1 ~ 0.3 . The grounding resist-

    ance of the equipment room is less than 1 .l The system does not provide analog grounding. The analog grounding on the board

    joins the digital ground at the power supply.

    2.7 Fire Protection Requirements for Equipment RoomThe main building of the equipment room must meet GBJ16-87 Building Design FireProtection Specifications or the corresponding requirements of native standards. Equipthe corresponding fire equipment and reserve sufficient fire passages. Put notice boardsbearing Key Fire Protection Site at proper locations.

    Do not store such hazardous articles as flammable or explosive articles in the main orauxiliary equipment room. Stick No Smoking orNo Smoke and No Fire signs wherenecessary. The fire control water should be enough to guarantee 2 hours supply. Leadthe water pipes across the equipment rooms and do not set the fire hydrant indoors.

    Install the alarming devices for smog and high temperature and inspect frequently toguarantee their good performance.

    2.8 Lightening Protection Requirements for EquipmentRoom

    When the height of the main building or its auxiliary facilities (such as the chimney,antenna and water tower) exceeds 15 m, take measures compliant to the lightning-proofrequirements for Class-II civil buildings and structures. In the lightning protection design,take measures against direct-strike lightning and the lightning current incursion.

    In addition, take measures against side strike when the equipment room is in a high-risebuilding. For example, connect the outer metal windows of the building with the lightningprotection down lead; install horizontal lightning-protection metal straps on the outersurface of the wall at certain intervals along the height of the building.

    Take the following lightning protection measures for the main building of the equipmentroom:

    l Install lightning protection nets or lightning protection straps on the parts of the buildingthat are subject to lightning.

    l Equip protruding objects, such as chimney, antenna and water tower, with overheadlightning conductor or arrestor.

    l The cross section area of the leadwire of the lightning protection device is not less than200 mm2, with a distance not greater than 30 m. The impulse grounding resistanceof the lightning protection grounding device for the building is not greater than 10 .

    2-8

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • Chapter 2 Environment Requirements

    l Ground outdoor cables andmetal pipes before they enter the building. Fix the lightningarrestors where outdoor overhead cables enter the equipment room.

    l Employ the metal components of the building itself (such as reinforcing steel barsinside walls or poles) as the down leads for lightning protection grounding. Connectthese down leads electrically to equalize the inside electric potential.

    l Install proper lightning protection devices for the power supply system along the mainsinput line to the equipment room.

    2.9 Radiation Protection Requirements for EquipmentRoom

    The equipment room should be far away from high-power radio transmitting station, radartransmitting station, and high-frequency large-current equipment. The actual electric fieldintensity radiated to the equipment room should be below 300 mV/m, and the intensity ofmagnetic field should be less than 11 Gs.

    Generally, take the following anti-radiation measures:

    l Shield the equipment room or shield against the definite electromagnetic radiationinterference source.

    l Install a shielding wall between the principal equipment of the system and theequipment containing a transmitter with high-frequency radiation, and using separatepower supply lines.

    l The power line and the conductive line in the pipe should be grounded reasonablyand the shield layer of all the cables should be grounded.

    l Intertwine the signal lines and return lines so that the conductive voltage caused bythe line radiation interference offsets itself.

    l The power cable and the signal line had better be routed separately.l Strictly separate AC grounding cable and DC grounding cable in the equipment room.

    2.10 Anti-static Requirements for Equipment Room

    Note:

    Before operating on the device sensitive to the static, read related precautions carefullyand stick the anti-static labels on both front sides of rack.

    Electrostatic will damage the components in a repeated way. The damage will beaccumulated, which causes intermittent performance problem or performance reduction.Electrostatic will also cause software failure, malfunction or misoperation of the electricswitches and control circuits.

    2-9

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • ZXWR RNC Hardware Installation Guide

    Electrostatic induction comes from external electric fields like high-voltage line andlightning, and from internal systems like interior environment, floorboard, and systemstructure. O&M personnel can also cause ESD from the body by touching the equipment.

    The following measures can effectively eliminate the harm caused by electrostaticdischarge:

    l Ground the equipment properly Ground the equipment at several points with copperfoils (apply and press copper foils between the concrete floor and the semi-conductivefloor, and connect the copper foils with a ground cable).

    l Lay anti-static floors and ground them. The resistance of the anti-static raised floorshould comply with Technical Requirements on Raised Floor Boards in ComputerRoom. If the raised floor is unavailable, pave the conductive floorboards (the volumeresistance should be 1.0 107 W ~ 1.0 1010 W). The static-conductive or raisedfloor must be grounded, connected to the grounding device via the current-limitingresistor and cables. The value of the current-limiting resistance is 1 MW.

    l O&M personnel should wear ESD wrist strap for operation, and connect ESD strapwith the electric static discharge hole on the equipment cabinet.

    2.11 Dustproof Requirements for Equipment RoomIn the equipment room, it is necessary to limit the density of the dust, the diameter greaterthan 5 m and the density less than 3 104 particles/m3. Make sure the dust particlesnot electric-conductive, magnetic-inductive or corrosive. Take the following dust-proofmeasures:

    l Seal the doors and windows. Install the double-layered glasses on the outer windowand seal. Add dust-proof draught excluder strips on the doors. Preferably, the skylightcan seal the equipment room, equipped with a dust filter.

    l Keep the uniforms and slippers clean and change them at a proper frequency.l Place the operating equipment in the outer room, to avoid opening/closing of the door

    of the equipment room too often.l Keep the relative humidity in the equipment room at a proper high level as allowed, to

    mitigate dust adherence caused by electrostatic.l Coat the walls and ceilings of the equipment room with paint or wallpaper, preferably

    with lusterless paint.

    2.12 Quakeproof Requirements for Equipment RoomTake quakeproof measures on the equipment (especially when the equipment room hasa raised floor) according to the designed intensity of the local quake. The quakeprooffacilities should be available in the equipment room to make the equipment room strongenough against a Richter scale-7 earthquake.

    2-10

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • Chapter 3Engineering PreparationsTable of Contents

    Overview to Engineering Preparations........................................................................3-1Auxiliary Equipment Preparation.................................................................................3-1Instruments and Meters Preparation...........................................................................3-1Technical Document Preparation ................................................................................3-3Goods Unpacking and Inspecting ...............................................................................3-4

    3.1 Overview to Engineering PreparationsMake good preparations before installing ZXWR RNC, including the auxiliary equipment,tools and meters, technical materials, and good acceptance.

    Users should check whether all are ready before start to install.

    3.2 Auxiliary Equipment PreparationBefore installing ZXWR RNC (V3.07.300), it is necessary to check whether relatedauxiliary equipment is in place or applicable, to avoid the potential delay when the systemis undergoing trial test after the installation.

    The related auxiliary equipments include:

    1. Power supply facilities: The power supplies are ready and have enough capacity forthis project.

    2. Transmission equipment: The transmission equipment is ready.3. Distribution frame: ODF and DDF are ready or have ports in reservation.4. Other facilities: A special terminal console is equipped in proper position for the

    terminal equipment, in accordance with the requirements for the equipment roomfloor layout plan.

    3.3 Instruments and Meters PreparationFor the installation and test of ZXWR RNC and its maintenance background console indifferent stages, different instruments are necessary. Please prepare them according tothe requirements listed in Table 3-1. Avoid possible on-site delay.

    3-1

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • ZXWR RNC Hardware Installation Guide

    Table 3-1 INSTRUMENTS AND METERS NECESSARY IN DIFFERENT STAGE

    StageInstruments and

    ToolsFunction

    Pliers, crowbar

    Unpacking and inspecting goods Nail hammer, paper

    cutter, Straight

    screwdriver

    To open the case.

    To measure whether

    the cabinet position

    complies with cabinet

    installation standards;Steel tape

    To check hole interval

    and diameter.

    To mark the positions

    of connection holes on

    the anti-static floor;

    Marker pen To mark the positions

    of the expansion bolts

    for the base installation

    on the cement floor.

    Provided with the

    delivery of the goods. It

    is must be ready before

    the cabinet installation.Marking template

    Its a template when

    marking on the cement

    floor.

    Percussion drill (with

    14 drill bit)

    To drill holes on the

    ground and anti-static

    floor.

    Electric saw

    To cut the cabling

    outlets under anti-static

    floor.

    Vacuum cleanerTo vacuum the dust

    after drilling.

    Rubber hammerTo enhance the fixation

    of the expansion bolt.

    SpannerTo fix the bolts and the

    nuts.

    Positioning cabinet and

    baseInstalling hardware

    3-2

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • Chapter 3 Engineering Preparations

    StageInstruments and

    ToolsFunction

    WasherTo adjust the levelness

    of the base.

    Torque wrench (45Nm)

    To tighten the bolts

    connecting the base

    and the cabinet.

    Horizontal rulerTo adjust the levelness

    of the cabinet.

    Plumb

    To check the

    verticalness of the

    cabinet.

    Fixing base and cabinet

    Common spannerTo adjust the height of

    the feet.

    Fixing board Screwdriver

    To fix the captive

    fastener on the

    upper/lower extractor

    Testing the insulation Multimeter

    To measure the

    resistance between

    the cabinet feet and

    the ground expansion

    bolts.

    Installation acceptance

    testEarth resistance tester

    To measure the ground

    resistance of the

    grounding system.

    3.4 Technical Document PreparationPrepare the following documents before the installation:

    l Engineering Design Documentl ZXWR RNC (V3.11.10) Radio Network Controller Hardware Installation Guidel ZXWR RNC (V3.11.10) Radio Network Controller System Descriptionl ZXWR RNC (V3.11.10) Radio Network Controller Hardware Descriptionl ZXWR RNC (V3.11.10) Radio Network Controller Routine Maintenancel ZXWR RNC (V3.11.10) Radio Network Controller Emergency Maintenancel ZXWR RNC (V3.11.10) Radio Network Controller Trouble Shootingl ZXWR RNC (V3.11.10) Radio Network Controller Engineering Survey Reportl ZXWR RNC (V3.11.10) Radio Network Controller Environment Acceptance Report

    3-3

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • ZXWR RNC Hardware Installation Guide

    Tip:

    Besides the above documents, prepare more according to on-site cases.

    3.5 Goods Unpacking and InspectingDo unpack and inspect goods after the arrival, providing that the relevant ZTE personnelare present.

    Warning!

    ZXWR RNC is a piece of expensive electronic equipment. Do take good packing andappropriate waterproof and shockproof measures during the transportation. After arrivingat the destination, handle with it carefully, and keep it away from rain or sunlight.

    3.5.1 Preparations for Goods Unpacking and InspectingPrepare for the unpacking inspection after satisfactory inspection of environmentalconditions.

    1. Make sure that the participants are from both parties, from the user and the vendor,during the unpacking and inspection;

    2. Confirm where and how to store the goods after the inspection;3. Prepare appropriate tools, including hammer, paper cutter and crowbar.

    3.5.2 Counting Quantity

    Context

    Goods Unpacking and Inspecting List is in Case 1.

    Steps

    1. Open Case 1 and take out the list.

    2. Check the number of the goods against the list.

    3. Check whether the packing case is intact in appearance.

    End of Steps

    3-4

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • Chapter 3 Engineering Preparations

    Follow-Up Action

    If finding mismatching goods, missing goods, or serious damage of the packing, stop theunpacking and find out the causes. ZTE representatives should report to related ZTEdepartments.

    3.5.3 Unpacking and Inspecting GoodsIf the goods are intact, unpack and inspect goods.

    1. Use dedicated tools for the unpacking. Forbid smashing, percussion and prizing inorder not to damage the goods inside.

    2. Handle with care during the unpacking. Protect the coatings of goods. Pay specialattention to anti-static requirements for circuit boards.

    3. Recycle the packing materials as much as possible. Collect the waste and deal withthem together. Do not discard or burn randomly.

    4. Check the components and accessories against Packing List. If theres any shortage,inform ZTE representatives immediately.

    The packing cases of ZTE are of two types, wooden and carton.

    l Wooden Case

    Wooden case is to pack heavy goods, such as racks.

    Cabinet wooden case consists of the case body, foam angle wrap, pearl cotton, andplastic cover, as shown in Figure 3-1.

    Figure 3-1 CABINET WOODEN CASE

    1. Move the packing case in or near the equipment room before unpacking, whichcan protect the cabinet from being damaged.

    2. Unpacking step.

    a. Use the nail hammer, pliers, straight screwdriver, and crowbar to remove thepacking iron nails, and open the upper cover (as indicated by the arrow of thestorage and transportation mark).

    3-5

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • ZXWR RNC Hardware Installation Guide

    b. Put the wooden case upright. Face its feet downwards.

    c. Pull out the cabinet from the wooden case.

    d. Remove the packing plastic bag of the cabinet.

    Note:

    Do not remove the plastic packing case of the cabinet before pulling it out. Whenmoving and laying the rack, hold solid places, such as base, and avoid tender places(such as cable rack, cable beam). Thus, the damage to the cabinet or other exceptionswould not happen.

    The process of unpacking the cabinets is as shown in Figure 3-2.

    Figure 3-2 UNPACKING WOODEN CASE

    1. Pad 12. Upper cover

    3. Pad 24. Body

    5. ZXWR RNCCabinet6. Side cover

    l Carton

    Cartons are to pack various circuit boards, terminals. The packing list is contained ineach carton. Take out the packing list after unpacking and check the type and numberof boards.

    The circuit boards are placed in the anti-static protection bags during thetransportation. Take proper anti-static protection measures during the unpacking.

    3-6

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • Chapter 3 Engineering Preparations

    Pay attention to the effect of the temperature. Usually, there are some desiccants inthe anti-static protective bag, to keep the bag dry.

    Note:

    When taking the board out, wear antistatic wrist strap so that static would not damagethe circuit board.

    The structure of the carton is as shown in Figure 3-3.

    Figure 3-3 STRUCTURE OF CARTON

    1. Pad2. Foam board

    3. Packing case for 9 Uboard

    4. Plastic bag to stickaddress

    Unpacking step:

    1. Check the label on the carton, count the types and quantities of the boards insidethe carton and accept them with signature.

    2. Cut the straps with a pair of offset pliers.3. Use a paper cutter to cut the adhesive tape along the gap on the case covers. Note

    that the cut should not be too deep to avoid damage to the internal equipment.4. Open the carton, and take out the foam boards.5. Check whether the board quantity is in accordance with that stated in the carton

    label. Take out the boards together with their packing bags.6. Open the anti-static packing bag and take out the circuit board.

    3-7

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • ZXWR RNC Hardware Installation Guide

    Note:

    If moving the equipment from a place with low temperature and low humidity to anotherplace with higher temperature and higher humidity, wait for at least 30 minutes beforeunpacking it. It can avoid damages to the equipment caused by the moisture accumulatedon the equipment surface.

    Tip:

    Usually, terminal equipment needs to purchase. The size of the packing carton differs fromthat of the board carton. Please unpack the case according to actual requirements.

    3.5.4 Counting Articles

    Steps

    1. Unpack the case.

    2. Count the goods according to Packing List. Check whether the items are intact.

    3. ZTE representatives and the carrier sign Unpacking and Inspecting Report, and returnit to ZTE in time.

    End of Steps

    3.5.5 Inspecting Goods

    Steps

    1. Check the appearance.

    After taking the cabinet out of the wooden case, stand it vertically on the solid groundand check:

    l Whether there is protrusion, indention, scratches, peel-off, bubble or taint on theappearance.

    l Whether the fastening screws have loose joint, disconnection or misplacement.l Whether the guide rails of plug-in boxes are complete and whether there is

    damage or rupture on the plug-in slot guide rails.l Whether the auxiliary components and accessories required for the installation

    are intact.l Whether the slot marks are complete and clean.l Whether there is damage or deformation where the grounding copper strips are

    installed, and whether the connection cables are broken or fallen off.

    3-8

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • Chapter 3 Engineering Preparations

    2. Unpack and check the boards.

    Check whether there is scratch or damage on the boards, whether any componentsor devices are damaged or missing, and whether the boards and the version matchPacking List.

    The vendor takes the main responsibility to check electric-sensitive devices. Put thegoods aside in different categories after the check.

    End of Steps

    3.5.6 Handing Over Goods

    Steps

    1. After goods inspection completes, both parties sign Unpacking and Inspecting Report.

    2. Hand over the equipment to the user.

    3. Each party holds one copy of Unpacking and Inspecting Report.

    4. Within seven days, the project supervisor should feed back Inspection Conclusion inUnpacking and Inspecting Report to ZTE for achievement.

    End of Steps

    Follow-Up Action

    Note:

    Inspect the goods according to Unpacking and Inspecting Report and the label attached onthe exterior of the packing case. If there is shortage, wrong delivery, or damaged packingmaterials, please make records in time.

    3-9

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • ZXWR RNC Hardware Installation Guide

    This page intentionally left blank.

    3-10

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • Chapter 4Hardware Installation FlowTable of Contents

    Hardware Installation Flow Chart................................................................................4-1Hardware Installation Flow Description.......................................................................4-1Precautions during Hardware Installation ...................................................................4-2

    4.1 Hardware Installation Flow ChartThe installation flow of ZXWR RNC hardware is as shown in Figure 4-1.

    Figure 4-1 HARDWARE INSTALLATION FLOW

    4.2 Hardware Installation Flow DescriptionThe workload of the hardware installation is large and complex. It can fall into the followingparts:

    1. Installing cabinet

    4-1

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • ZXWR RNC Hardware Installation Guide

    ZXWR RNC adopts 19-inch standard cabinet. The cabinet installation includes baseinstallation mode and feet installation mode. In the case of multi-cabinet, fix a singlecabinet first and then connect the cabinets.

    2. Installing boards

    Usually, the shelf is installed inside the rack before delivery. The users are onlyrequired to install boards and other accessories on the site.

    3. Installing cables

    After installing the cabinet, cables are required to install, including cabinet power cable,cabinet grounding cable, intra-cabinet line, out-of-cabinet line, and inter-cabinet line.

    4. Installing GPS antenna feeder system

    GPS serves as the clock and frequency reference of WCDMA, playing a veryimportant role. In addition, it provides the system with GPS ephemeris signals forAGPS location. GPS antenna receives the navigation location signals from the GPSsatellite, modulating into the frequency, clock signals and AGPS messages via theGPS signal receiver. The clock signals are provided to WCDMA units and AGPSmessages are sent to the processing unit.

    5. Installing accessories

    After installing the cabinet, accessories related to ZXWR RNC operation are requiredto install, including the alarm box and all kinds of sensors.

    6. Checking the installation

    Check the installation of ZXWR RNC hardware completely after it ends. The checkincludes the cabinet installation techniques, cable connection and layout, auxiliarydevice and related items.

    7. Powering on/off the equipment

    After checking the installation, power on/off the equipment for check.

    4.3 Precautions during Hardware Installation

    Warning!

    Nonprofessionals should not perform equipment installation and test individually unlessunder the guidance of professionals.

    1. Before installing the hardware, read this manual and other related manuals carefully.Carry out the installation in strict accordance with the steps described in this manual.

    2. Only professions can install ZXWR RNC hardware. They must have been duly trainedand are well trained.

    4-2

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • Chapter 4 Hardware Installation Flow

    3. During the installation, pay full attention to personal safety, and prevent electrical shockand personal injury.

    4. The installation technicians should wear insulation shoes during the installationactivities.

    5. The installation technicians should wear anti-static wrist strap in insertion/removal theboards.

    In the dry environment, the electrostatic charges carried by human beings maygenerate high voltage electrostatic. The operator carrying the electrostatic maydischarge it and cause damage to the devices when touching the components.Anti-static wrist straps can release the electrostatic charges in human body and avoiddamage to the components.

    6. Do not stare directly into the fiber section or at the optical fiber outlet when installingand maintaining an optical fiber. The laser beam may radiate to the eyeball and causeeye damage.

    7. Keep the boards at least 10 cm away from strong DC magnetic field such ascathode-ray tube of the monitor of the maintenance console.

    8. Do not force the board into the slot less bent pins. Plug the boards along the slots toavoid contact between parallel boards lest any short circuit.

    9. Hold the circuit boards at the edges and do not contact the circuits, components orconnectors of the board. Handle it with care lest you hands might be scratched.

    10. Additional dangers would be caused if you replace components or repair equipments.Do not replace components or repair equipments without authorization.

    ZXWR RNC is a piece of expensive electronic equipment. Be cautious during theinstallation.

    To guarantee safety, please contact with ZTE if you have any question.

    4-3

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • ZXWR RNC Hardware Installation Guide

    This page intentionally left blank.

    4-4

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • Chapter 5Cabinet InstallationTable of Contents

    Overview to Cabinet Installation .................................................................................5-1Cabinet Installation Flow ............................................................................................5-1Base Installation Mode ...............................................................................................5-2Feet Installation Mode ..............................................................................................5-12Connecting Adjacent Cabinets .................................................................................5-17Cabinet Accessories Installation...............................................................................5-18Check after Cabinet Installation................................................................................5-27

    5.1 Overview to Cabinet InstallationAccording to the floors in the equipment room, the installation mode falls into the baseinstallation mode and the feet installation mode.

    Note:

    When connecting the cabinet with the feet or the base, make sure that the contactresistance is very low. To obtain the purpose, clear the paint and dope from the contactplanes.

    l Base installation mode

    It is applicable when the equipment room is equipped with anti-static floor. Usersshould install the adjustable base (ZTE provides) to level the cabinet.

    l Feet installation mode

    It is applicable when the equipment room is equipped with cement floor. Use thepressure plates to install the feet under the cabinet (with four feet).

    After installing a single cabinet and if several cabinets are required to be installed,inter-connect the adjacent cabinets and remember to install accessories inside thecabinet.

    5.2 Cabinet Installation FlowThe cabinet installation flow is as shown in Figure 5-1.

    5-1

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • ZXWR RNC Hardware Installation Guide

    Figure 5-1 CABINET INSTALLATION FLOW

    5.3 Base Installation ModeThis mode is applicable on the anti-static floor. Both the base and the installation rackbase support the cabinet.

    5.3.1 Base StructureThere are three types of the base, Type A, B and C. Figure 8 shows the base of type A.The base structure of Type A is same with the other two, only differs in the height.

    Adjust the position of bolt 3 to adjust the height, H, of the base.

    5-2

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • Chapter 5 Cabinet Installation

    Figure 5-2 BASE STRUCTURE

    1. Adjustable pad 22. Adjustable pad 13. Bolt M12 30

    4. Upper beam5. Upper column6. Lower column

    7. Lower beam

    The application range of different type is as shown in Table 5-1.

    Table 5-1 APPLICATION RANGE OF DIFFERENT TYPE

    Type Application Range

    Type A Height of anti-static floor: 155 mm ~ 210 mm

    Type B Height of anti-static floor: 210 mm ~ 310 mm

    Type C Height of anti-static floor: 310 mm ~ 510 mm

    5.3.2 Base Installation FlowThe flow of the base installation mode is as shown in Figure 5-3.

    5-3

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • ZXWR RNC Hardware Installation Guide

    Figure 5-3 FLOW OF BASE INSTALLATION MODE

    5.3.3 Positioning Cabinet for Base Installation Mode

    Steps

    1. Mark on the floor.

    According to the cabinet installation position, put the marking template on the floor,mark the positions of expansion bolts (each cabinet has four expansion bolt holes,that is, four holes on the template) and the cabinet outline. The marking template isas shown in Figure 5-4.

    5-4

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • Chapter 5 Cabinet Installation

    Figure 5-4 MARKING TEMPLATE OF BASE INSTALLATION MODE

    Tip:

    Measure the positions of all hole repeatedly after marking all hole lines, to avoid anyerror and ensure the correct size.

    2. Drill holes on the cement floor.

    Remove the marking template and drill on the marking position on the floor. Thespecification of holes is 14 and the depth is 90 mm.

    When drilling holes with a percussion drill (or an electric hammer), make sure that thedrill bit is vertical to the ground. Hold the drillstock firmly with both hands and press itdownward vertically. Be stable to avoid damaging the ground, enlarging the apertureand slanting the hole.

    If the ground surface is too smooth to position the drill bit, first cut a concave at thehole position through punching, to help position the drill bit.

    After drilling, use a vacuum cleaner to clean up the dust, and measure the distanceamong holes. Reposition and re-drill holes if the error is too big.

    5-5

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • ZXWR RNC Hardware Installation Guide

    Tip:

    Marking and drilling are the base during the hardware installation. The inaccuracywill cause great inconvenience to the subsequent work and affect the project quality.Therefore, ensuring the quality is the prerequisite for the quality of the whole project.

    End of Steps

    5.3.4 Positioning Base for Base Installation Mode

    Context

    To position the cabinet is to determine where to install the cabinet.

    Steps

    1. Check whether the cabinet installation position meets the requirement.

    2. Check whether the position of base installation conflicts with that of the framework ofthe anti-static floor.

    Keep the floor framework intact. If the conflict is unavoidable, remove the floorframework where the conflict occurs during the installation.

    End of Steps

    5.3.5 Installing Base for Base Installation Mode

    Steps

    1. Install the expansion bolt.

    The installation of the expansion bolt is as shown in Figure 5-5, Figure 5-6, and Figure5-7.

    Figure 5-5 INSTALLING EXPANSION BOLT (Step 1)

    5-6

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • Chapter 5 Cabinet Installation

    Figure 5-6 INSTALLING EXPANSION BOLT (Step 2)

    Figure 5-7 INSTALLING EXPANSION BOLT (Step 3)

    i. Before the installation, use a vacuum cleaner to clean up the dust inside andoutside the holes. Measure the spacing between holes, place the adjustable base,and check whether the base matches the holes. For holes with a large deviation,it is necessary to reposition and re-drill the holes before installing the expansionbolts.

    ii. Take off the washer and the nut of the expansion bolt and place the expansion rodand expansion bush vertically into the hole.

    iii. Use a rubber hammer to strike the expansion bolt until the expansion bush is fullyinto the ground.

    2. Adjust the base height.

    According to the floor height and the adjustable height of the cabinet feet, adjust allthe bases to the pre-determined height. Meanwhile, use a torque wrench to fasten theheight-locking bolt to 45 Nm. When fastening the base height and locking the bolts,follow the principle of Middle first, then sides. The height difference between the twobases for each cabinet should be not more than 1.5 mm after adjustment.

    For a rough ground surface, it is better use the washers provided by ZTE to raise thepartial height between the base and the ground. For the washer, two types of thicknessare available: 1 mm and 2 mm, as shown in Figure 5-8.

    5-7

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • ZXWR RNC Hardware Installation Guide

    Figure 5-8 WASHER SPECIFICATIONS

    1. 1 mm washer 2. 2 mm washer

    3. Fix the base.

    Clean the ground and the base surface, align the base mounting holes facing rightto the corresponding expansion bolts, and fix the base to the ground with nuts andwashers. The expansion bolts and nuts should be fastened to 45 Nm. The baseinstallation of a single cabinet is as shown in Figure 5-9.

    Figure 5-9 COMPLETED BASE INSTALLATION OF SINGLE CABINET

    End of Steps

    5-8

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • Chapter 5 Cabinet Installation

    Example

    Follow-Up Action

    5.3.6 Fixing Cabinet for Base Installation Mode

    Prerequisites

    Each cabinet is equipped with four feet at its bottom, as shown in Figure 5-10.

    Figure 5-10 FEET STRUCTURE AND INSTALLATION POSITION

    1. Cabinet2. Feet

    3. M16 bolt4. Fastener nut

    5. Height-adjustable nut6. Insulation rubber pad

    Steps

    1. Adjust the cabinet height.

    Loosen the fastening nut, as shown in Figure 5-10. Place the cabinet onto the installedbase manually or with the lifting device. Ensure that the front/rear/left/right sides of thecabinet are parallel to the walls of the equipment room. Adjust the cabinet height byadjusting the nut height. There should be a gap of 10 mm between the cabinet bottomand the anti-static floor, to ensure the door to open, as shown in Figure 5-11.

    5-9

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • ZXWR RNC Hardware Installation Guide

    Figure 5-11 GAP BETWEEN CABINET BOTTOM AND ANTI-STATIC FLOOR

    1. Anti-static floor

    2. Level the cabinet.l Cabinet top: Place two horizontal rulers at two mutually-vertical directions on the

    top of the cabinet, checking the cabinet level degree.l Cabinet bottom: Adjust the height of the four feet to level the cabinet bottom.

    After the adjustment, tighten the fastening nut as shown in Figure 5-10.

    3. Fix the cabinet.

    Press the cabinet feet with the pressure plate, put on the insulating washers, and fixthe cabinet with the washers, spring washers and bolts. The fastening torque shouldreach 45 Nm. Figure 5-12 shows how to fix the cabinet.

    Figure 5-12 FIXING CABINET

    1. Screw2. Washer

    3. Flat washer4. Insulating washer

    5. Pressure plate6. Insulating pad

    The pressure plate is as shown in Figure 5-13.

    5-10

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • Chapter 5 Cabinet Installation

    Figure 5-13 PRESSURE PLATE

    1. Pressure plate 2. Insulating pad

    Fix the fastening bolts in turn to lessen the stress between the bolts and the cabinet.

    A single cabinet after being fixed is as shown in Figure 5-14.

    Figure 5-14 COMPLETED FIXATION OF SINGLE CABINET

    To install multiple cabinets, after positioning the first row of cabinets, adjust and fastenthe outmost cabinet, and then adjust and fasten other cabinets one by one based uponthe first one. Then, install the second and third rows of cabinets.

    4. Clean the floor.

    End of Steps

    5.3.7 Testing Insulation for Base Installation Mode

    Prerequisites

    The insulation test is required for the cabinet feet once one cabinet foot is fixed.

    Steps

    1. Set the multimeter to the resistor mode.

    2. Measure the resistance by connecting the two instrument probes to the metal part ofthe cabinet feet and the expansion bolt respectively.If the circuit disconnects, this foot passes the insulation test. Otherwise, the foot is notinsulated with the ground. In this case, check whether the insulating tube is installedor whether the insulating tube is damaged.

    5-11

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • ZXWR RNC Hardware Installation Guide

    Note:

    Perform the insulation test every time fixing one foot. Otherwise, the workload is heavyafter the insulation test is found unqualified at a latter stage of the installation.

    3. Repeat the previous flow and perform the insulation test again.

    End of Steps

    5.4 Feet Installation ModeThis mode is applicable on the cement floor. Fix the cabinet onto the ground by fixing thefour feet with the pressure plates.

    5.4.1 Feet and Pressure Plate AssemblyFeet installation mode is related to the feet and pressure plate assembly. Therefore, it isnecessary to know about their structures before the installation.

    The structure of pressure plate assembly is as shown in Figure 5-15 and the structure offeet is as shown in Figure 5-16.

    Figure 5-15 STRUCTURE OF PRESSURE PLATE ASSEMBLY

    1. Pressure plate2. Large washer

    3. Insulating washer4. Insulating pad

    5-12

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • Chapter 5 Cabinet Installation

    Figure 5-16 STRUCTURE OF FEET

    1. Hexagonal nut M16 2. Foot

    5.4.2 Feet Installation FlowThe step for the feet installation is shown in Figure 5-17.

    Figure 5-17 FLOW OF FEET INSTALLATION MODE

    5-13

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • ZXWR RNC Hardware Installation Guide

    5.4.3 Positioning Cabinet for Feet Installation Mode

    Prerequisites

    l Determine the installation position according to the engineering design plan.l Determine the location for the four expansion bolts on the ground

    Steps

    1. Marking

    According to the cabinet installation position, put the marking template on the floor,mark the positions of expansion bolts (each cabinet has four expansion bolt holes,that is, four holes on the template) and the cabinet outline. The marking template isas shown in Figure 5-18.

    Tip:

    Measure the positions of all hole repeatedly after marking all hole lines, to avoid anyerror and ensure the correct size.

    Figure 5-18 MARKING TEMPLATE OF FEET INSTALLATION MODE

    2. Drilling

    Remove the marking template and drill on the marking position on the floor. Thespecification of holes is 14 and the depth is 90 mm. Guarantee the quality and thedepth of holes.

    5-14

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • Chapter 5 Cabinet Installation

    When drilling holes with a percussion drill (or an electric hammer), make sure that thedrill bit is vertical to the ground. Hold the drillstock firmly with both hands and press itdownward vertically. Be stable to avoid damaging the ground, enlarging the apertureand slanting the hole.

    3. Cleaning

    After drilling, use a vacuum cleaner to clean up the dust, and measure the distanceamong holes. Reposition and re-drill holes if the error is too big.

    End of Steps

    5.4.4 Fixing Cabinet for Feet Installation Mode

    Steps

    1. Install the expansion bolt.

    2. Level the cabinet.

    Loosen the fastening nut as shown in Figure 14, and position the cabinet manually orwith a lifting device. Ensure that the front/rear/left/right sides of the cabinet are parallelto the walls of the equipment room. Adjust the height, levelness and verticality of thecabinet by adjusting the nut height, and tighten the fastening nuts.

    3. Fix the cabinet.

    Press the cabinet feet with the pressure plate, put on the insulating washers, and fixthe cabinet with the washers, spring washers and nuts. The fastening torque shouldreach 45 Nm. Figure 5-19 shows how to fix the cabinet.

    Figure 5-19 FIXING CABINET

    1. Nut2. Spring washer3. Washer

    4. Insulating washer5. Pressure plate

    6. M12 80 expansionbolt

    7. Insulating pad

    5-15

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • ZXWR RNC Hardware Installation Guide

    Tighten the fastening bolts in turn to lessen the stress between the bolts and thecabinet.

    A single cabinet after being fixed is as shown in Figure 5-20.

    Figure 5-20 FIXED CABINET

    To install multiple cabinets, after positioning the first row of cabinets, adjust and fix theoutmost cabinet, adjust and fix other cabinets one by one according to the first one.Then. install the second and third rows of cabinets.

    4. Clean the floor.

    End of Steps

    5.4.5 Testing Insulation for Feet Installation Mode

    Context

    The insulation test is required for the cabinet feet once one cabinet foot is fixed.

    Steps

    1. Set the multimeter to the resistor mode.

    2. Measure the resistance by connecting the two instrument probes to the metal part ofthe cabinet feet and the expansion bolt respectively.

    If the circuit disconnects, this foot passes the insulation test. Otherwise, the foot is notinsulated with the ground. In this case, check whether the insulating tube is installedor whether the insulating tube is damaged.

    Note:

    Perform the insulation test every time fixing one foot. Otherwise, the workload is heavyafter the insulation test is found unqualified at a latter stage of the installation.

    5-16

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • Chapter 5 Cabinet Installation

    3. Repeat the previous flow and perform the insulation test again.

    End of Steps

    5.5 Connecting Adjacent Cabinets

    Steps

    1. Remove the angle connecting adjacent cabinets, as shown in Figure 5-21. Rotate theangle by 90 degrees to connect the cabinets back to back.

    Figure 5-21 REMOVING AND REINSTALLING ANGLE CONNECTING ADJACENTCABINETS

    1. Fastening screw 2. Angle

    2. Connect the angle of adjacent cabinets by adding diagonal bolt M8 12, flat washer,spring washer, and M8 nut in turn to the angle. The connection of adjacent cabinetsis as shown in Figure 5-22.

    5-17

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • ZXWR RNC Hardware Installation Guide

    Figure 5-22 CONNECTING ADJACENT CABINETS

    1. M8 12 diagonal bolt2. Spring washer

    3. Flat washer4. Angle

    5. M8 nut

    End of Steps

    5.6 Cabinet Accessories InstallationAccessories are required to be installed after the cabinet installation completes.

    Cabinet accessories include cable trough, decorative panel, fan plug-in box, fiber tray,front/rear door, air filter and label.

    5.6.1 Cable Trough InstallationThe requirements for cable trough installation are as follows:

    1. The installation positions of the cabling ducts and troughs should comply with thespecifications given in the construction design chart.

    2. The horizontal ducts should be parallel to the cabinet row or intersected with it in aright angle.

    3. The vertical duct should be strictly vertical to the ground.4. The hanging brackets of the ducts should be neatly and firmly installed. Keep them

    strictly vertical without tilting.5. Install the sub-cover for protection where the cabling duct passes the floor hole or the

    wall hole. After laying and binding the cables, seal the holes with the cover plates.Both the sub-cover and the cover plates are made from fireproof materials.

    6. When installing the unilateral or bilateral cabling ducts along the wall, the supports onthe wall should be firm and reliable, evenly spaced in the horizontal direction. Theducts should be neat in line and in order.

    7. The cable troughs and ducts should be straight, firm and vertical to the major row. Thetroughs between cabinet rows should be in line without any dust inside. The troughsfor high-current cables and those for weak-current cables should be completelyseparated. To put high-current cables in the trough for the weak-current cables,proper shielding measures should be taken.

    5-18

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • Chapter 5 Cabinet Installation

    5.6.2 Installing Decorative Panel

    Steps

    1. Install the front/rear decorative panels.

    Align the connection holes of the front/rear decorative panels with the connection holesof the upper beam. Tighten the decorative panels with screws. Figure 5-23 shows howto fix the front/rear decorative panels.

    Figure 5-23 FIXING FRONT/REAR DECORATIVE PANELS

    1. Screw 2. Front decorative panel 3. Rear decorative panel

    To install the multiple cabinets, fixed the front/rear decorative panels of the first cabinet,and install the cabinets one by one. The completed installation of front/rear decorativepanels is as shown in Figure 5-24.

    Figure 5-24 COMPETED INSTALLATION OF FRONT/REAR DECORATIVE PANELS

    2. Install the side decorative panels.

    The side decorative panels are installed on the front/rear panels. Align the connectionholes of the side decorative panels with the connection holes of the front/reardecorative panels. Tighten with screws. Figure 5-25 shows how to fix the sidedecorative panels.

    5-19

    SJ-20110704093842-005|2011-07-31 (R1.0) ZTE Proprietary and Confidential

  • ZXWR RNC Hardware Installation Guide

    Figure 5-25 FIXING SID