EngineeringManagement
Hani CherazaieDante Munoz-Castaneda
Tony EbkarianMandeep Singh
Ball Ride-Group 5
Ball Project Problem Statement/Objective
Riders’ complaints have increased by 10% from the previous waterpark season, due to the lack of time spent on the ride. This is in contrast to the 2% of complaints filed during the previous season.
Enhance the customers experience by increasing time spent on ride. Thereby decreasing complaints 5% by the end of the next waterpark season.
Ball Project SIPOCSuppliers Input Process Outputs Customers
ABC Materials Construction Labor
Increase Ride time
Survey
Maintenance Cost Estimate Increase Rider Satisfaction
QA
Warehouse Inventory
Change of Parts Line Trial Execution
Validate Cost On going Customer Satisfaction
Quality Assurance
Specs Magic mountain
Engineering Designer
Materials-board, o-ring, funnel, tubing, bal, stabilizing legs
Drill 2in” apart holes in board
Mount legs onto board
Mount Funnel + O-ring to board
Attach tubing at angle
Measure the rate of time ball travels from time of release
Ball Project- Key Factors
Recalling the Metrics
– Primary Metrics» Baseline- the current time spent on the ride» Angle of the tubing
– Secondary Metrics» Height of Funnel Fixed» Angle of Funnel Fixed
Ball Project-Total Gage R&R
Ball Project- Normality
Ball Project-Metrics
Ball Project-Capability Analysis
Ball Project-DPM
Ball Project- Fishbone Diagram
Ball Project- C&E Matrix
Ball Project- Key Factors
Key Factors from DPM-
• Angle of Tubing
• Height of O-Ring
• Height of Funnel
• Material of Tubing
Ball Project- FEMA
Ball Project-Improve Phase Factors
Angle of Tubing• High-30 degrees
• Low-15 degrees
Height of O-Ring• High-24 inches• Low-20 inches
Tube Material• Plastic• Metal
Ball Project-Full Factorial
Full Factorial Design
Factors: 3 Base Design: 3, 8Runs: 24 Replicates: 3Blocks: 1 Center pts (total): 0
Ball Project-Improve Phase Histogram
3210-1-2-3
99
95
90
80
70
605040
30
20
10
5
1
Standardized Effect
Perc
ent
A angle of tubingB height of O-ringC Tube Material
Factor Name
Not SignificantSignificant
Effect Type
B
Normal Plot of the Standardized Effects(response is measured, Alpha = 0.05)
Ball Project-Improve Phase Normal Plot
BC
AC
A
AB
ABC
C
B
2.52.01.51.00.50.0
Term
Standardized Effect
2.120
A angle of tubingB height of O-ringC Tube Material
Factor Name
Pareto Chart of the Standardized Effects(response is C8, Alpha = 0.05)
Ball Project-Improve Phase Pareto Chart
CurHigh
Low0.00000D
Optimal
d = 0.00000
Targ: 1.670C8
y = 1.6267
0.00000DesirabilityComposite
metal
plastic
-1.0
1.0
-1.0
1.0height o Tube Matangle of
[1.0] [-1.0] plastic
Ball Project-Improve Phase Optimization Plot
30º 20in
Y(x)= 30º + 20in + Plastic
Ball Project-Improved Normality
Ball Project-Improved Capability Analysis
Ball Project-Improved Xbar-R Chart
252321191715131197531
2.0
1.8
1.6
1.4
1.2
Sample
Sam
ple
Mean
__X=1.6798
UCL=2.0514
LCL=1.3082
252321191715131197531
0.60
0.45
0.30
0.15
0.00
Sample
Sam
ple
Range
_R=0.1976
UCL=0.6457
LCL=0
11
Xbar-R for Ball Ride
Ball Project-Improved I-MR Chart
464136312621161161
2.0
1.8
1.6
1.4
1.2
Observation
Indiv
idual V
alu
e
_X=1.680
UCL=2.134
LCL=1.226
464136312621161161
0.60
0.45
0.30
0.15
0.00
Observation
Movin
g R
ange
__MR=0.1706
UCL=0.5574
LCL=0
111
I-MR Chart of Ball Ride
Ball Project- Conclusions
TARGET WAS 1.67 ±0.08 Cpk 0.02, Cpm 0.04 OUR Overall Difficulties
• Measuring• Stability of O-ring, Funnel, Tubing
Optimization Plan• Height
• 20inch
• Angle• 30º
• Material • Plastic