SIP 18 WATER AND SANITATION MASTER PLAN
Water and Sanitation Master PlanNDHS and DWA
2013
1Water & Sanitation Master Plan
Legislative Framework
• The Constitution, 1996 9Act no 108 of 1996) sec10: Every person has inherent dignity and the right to have their dignity respected and protected– Sec 24(a) Everyone has the right to an environment that is
not harmful to their health or well being.• Water Services Act, 1997 (Act no 108 of 1997)– Sec 3(1) Everyone has a right of access to basic water
supply and basic sanitation.– Sec 3(3) Every water services authority must, in its water
services development plan provide for measures to realise these rights
Water & Sanitation Master Plan 2
SANITATION BACKLOG AND CURRENT STATU Households National Sanitation Backlog Profile :1994 - 2011.
(Source: Water Services National Information System (WS/NIS April 2011).
Province Households with no access to basic Sanitation - April 1994
Households with no access to basic Sanitation - Oct 2001
Households with no access to basic Sanitation - April 2011
Households Served 2010/2011 (MIG)
Eastern Cape 1,001,327 899,487 288,346 49,371
Free State 399,780 348,433 236,647 9,104
Gauteng 621,394 522,836 406,054 33,667
KwaZulu-Natal 939,542 1,063,336 348,629 92,149
Limpopo 800,352 840,257 464,257 37,151
Mpumalanga 421,757 434,306 296,169 13,420
North West 368,290 411,760 236,577 17,845
Northern Cape 143,068 85,530 47,909 2,958
Western Cape 388,745 153,239 80,743 4,707
National 5,084,255 4,759,184 2,405,331 260,372
3Water & Sanitation Master Plan
Backlog Categorisation• Service delivery backlogs (people who have never been served);• Refurbishment backlogs (sanitation infrastructure that has deteriorated
beyond regular maintenance requirements);• Extension backlogs (existing infrastructure that needs to be extended to
provide the service to• New households in the communities)• Upgrade needs (infrastructure that does not meet the minimum
standards)• Operation and Maintenance (O&M) backlogs (infrastructure that has not
been properly operated and maintained, but can be adequate if funds are allocated to ensure proper operation and maintenance)
Water & Sanitation Master Plan 4
Backlog estimated cost.• Households without access R13.66bn• R36.64bn to address all the infrastructure and Operations and
Maintenance related backlogs– Include extension of service to brownfields without access as well as
new settlements (and informal settlements)– Includes 88 127 buckets in formal areas to be eradicated– Includes about 30 000 buckets in informal areas to be eradicated – Include refurbishment of about 1000 Wastewater Treatment Plants
that are not functioning properly• Based on the 2011 pricing it is estimated that about R50 billion is needed
to address the above sanitation challenges
Water & Sanitation Master Plan 5
Sanitation Delivery (2009/10 – 2012/13)
• Department of Human Settlements delivered – 63,118 VIP toilets to homes through RHIG Grant in
four years (2009/10 – 2012/13)– 800 000 VIP toilets to individual homes in four
years through its HSDG Grant (2009/10 – 2012/13)
• Municipalities through MIG funds delivered about 1,2 million VIP toilets in four years
Water & Sanitation Master Plan 6
SIPP 18 Water and Sanitation Master Plan
Water & Sanitation Master Plan 7
Scope of Project
• Provide a country-wide position on the state of sanitation • Assess current sanitation backlog, with all permeations• Provide a scientific focast on future sanitation needs• Provide future Water Supply estimates to support Sanitation
and Hygiene (WASH) • Review Institutional capacity to guide Sanitation strategy• Development of technical variants for a sustainable operation
of sanitation systems (on-site sanitation and water-borne sewer systems)
• Socio-economic survey (household interviews, survey of focus groups and key informants)
8Water & Sanitation Master Plan
Ultimate aim of the Master Plan
The ultimate aim of the Master Plan is to: – Country attain Open Defecation Free (ODF) status, – Promote sustainable hygiene behavior for people’s health
improvement,– Promote central, regional, district, municipality
cooperation– Institutionalise Village Development Committees (VDC)
levels to back up sanitation movement at strategic and operational levels/ local awareness
Water & Sanitation Master Plan 9
What Master Plan will entails
• The Master Plan will include key principal objectives. – Firstly, define realistic design criteria for an integrated
sanitation system with special regard to institutional strengths and weaknesses, community preferences as well as environmental considerations
– Secondly, identify areas where on-site sanitation proves the most economic and appropriate solution and,
– thirdly, develop alternate solutions for on-site sanitation systems or a centralised water-borne sewer system.
– Provide for sustainable O&M i.t.o funding, water supply and technical skills requirements
Water & Sanitation Master Plan 10
Water and Sanitation value chain
• Potable water supply• Drinking water treatment• Waste Water Disposal• Waste Water Treatment• Waste Water reuse
Water & Sanitation Master Plan 11
Funding Gap R45.5 billion
• Eradication of 80 000 buckets (EC, FS, GP & WC) – R1billion• Eradication of 2.2. million backlog plus un-served R13.5 billion• Bulk Infrastructure requirements for Mater Plan – R31 billion
– 317 WWTPs in under severe strain– 143 WWTPs at high risk– Almost 10 % WWTPs over design capacity– 90 % WWTPs non compliant on more than 3 effluent determinants
Water & Sanitation Master Plan 12
Targeted: Bucket Eradication Projects
Phase One FY2013/14 (115,000 buckets)• Free State 25,000• Eastern Cape 15,000• North west 15,000• Gauteng 15,000• Western Cape 15,000• Kwa Zulu Natal 10,000• Northern Cape 10,000• Limpopo 5,000• Mpumalanga 5,000
Phase Two 2014/15 (106,000 buckets)
• Free State 30,000• Eastern Cape 15,000• North west 15,000• Gauteng 15,000• Western Cape 15,000• Kwa Zulu Natal 5,000• Northern Cape 5,000• Limpopo 3,000• Mpumalanga 3,000
13Water & Sanitation Master Plan
Project timeline
• Service Providers secured end December 2013• First Interim report expected March 2014• Draft Master Plan by June 2014• Final Water and Sanitation Master Plan by
August 2014
Water & Sanitation Master Plan 14
Interim strategies
• Eradicating buckets – MIG and USDG– Negotiate 50% MIG exclusively to Water and Sanitation in
line with formula (MTEF 2014/15 – 2016/17)– Negotiate 50% of USDG exclusively to Sanitation (MTEF
2014/15 – 2016/17)• Treatment of WWTPs under strain • Upgrade & Maintenance of WWTPs – RBIG or MWIG• Urban Sanitation – O&M equitable shares• Rural Sanitation – O&M
Water & Sanitation Master Plan 15