30
Sacha Tetzlaff WWOA Annual Conference October 20, 2010 Simple and Cost Effective Methods of Manhole Rehabilitation

Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

  • Upload
    buinhu

  • View
    214

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

Sacha TetzlaffWWOA Annual ConferenceOctober 20, 2010

Simple and Cost Effective Methods of Manhole

Rehabilitation

Page 2: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

Presentation Overview

Ø Why worry about MH I/I and deterioration?Ø Types of Problems Commonly FoundØ Basic or Minor Problems

l Simple, cheap and easy fixesØ Complex or Major Problems

l Relatively simple to complex, but more expensive fixes

Page 3: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

Budgetary and Capacity Concerns

Ø Cost to transport and treat

Ø Need bigger more expensive pump stations and WWTPs

Ø Power costs

Ø More chemical use due to dilution

Ø More equipment wear and tear

Ø Silt, sediment, and grit issues

Ø Erosion leads to manhole failures

Ø Basement backups and overflows

Page 4: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

WWTP Process Concerns

Ø Hydraulic overloading and short-circuiting

Ø High flows may require process changes including having more treatment tanks in service

Ø Reduces water temperature

Ø Sediment reduces tank capacity

Ø Less effective BPR

Page 5: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03
Page 6: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

Sources and Causes of Manhole Leaks and Deterioration

Ø Cover and sealØ Under frame/castingØ Joints, cracks & holesØ Pipe sealsØ Root penetrationsØ Hydrogen sulfide

corrosionØ Groundwater levelØ Traffic loading/impactØ Freeze/thaw cycles

Page 7: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

Manhole Cover Inflow Estimations

Water Head Over Cover

Bearing Surface Only - concealed pickholes; no gasket (gpm)

Inflow (gpd)

One 1.5-inch Open Pick Hole (gpm)

Inflow (gpd)

1/16 inch 10 14,400 10 14,400

¼ inch 12 17,280 15 21,600

½ inch 14 20,160 19 27,360

1 inch 17 24,480 26 37,440

4 inch 23 33,120 40 57,600

20 manholes with 1.5 inch open pick hole and ¼ inch of water over them

*Data taken from 1976 Neenah Foundry Company’s “A Report on Inflow of Surface Water Through Manhole Covers”

= 432,000 gpd

Page 8: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

Infiltration EstimationsType of Leak GPM GPD

Slow Drip 0.015 20Fast Drip 0.03 45

Steady Dribble 0.062 901/16 Inch Stream 0.28 4001/8 Inch Stream 0.56 800

Drinking Fountain Stream 0.5 720½ Inch Garden Hose 5 7,200

*Compiled from collections of data by National Power Rodding, Inc. and Strand Associates, Inc.

50 manholes with 1/16 inch stream leaks = 20,000 gpd

Page 9: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

Important Factors to ConsiderØ General location and elevation of the area

surrounding manholel Low-lying areal Recessed manholel Drainage pathwaysl Proximity to curbl Cracked pavementl Wetland, lake, waterwayl Surrounding surface materiall Nearby trees and roots

Page 10: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03
Page 11: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

Common Manhole ProblemsØ Many very simple problems

l Coversl Pick holesl Gaskets/sealing

Ø Deteriorationl Cracks/gapsl Mortar erodedl Beginnings of structural failure

Ø Commonly in upper portion of manholesØ Relatively easy and inexpensive to fix

Manhole location and elevation

Page 12: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

Covers and Gaskets

Ø Plug open pick holes or replace covers

Ø Use gasketed covers (replace gaskets)

Ø Provide for good sealing

Page 13: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

Are Your Covers Effectively Sealed?

Page 14: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03
Page 15: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

Common Manhole Problems (cont.)Ø Many simple problems

l Location/elevationl Offsetsl Deterioration in chimneyl Few minor infiltration leaks

Page 16: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

Some Simple Solutions

Ø Chimney sealsØ Barrel joint sealsØ Concrete patchingØ GroutingØ Rebuild upper portion of manholeØ Raise to, or above, grade

Page 17: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

Click icon to add SmartArt graphic

Chimney and Barrel Seals

Page 18: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

Click icon to add SmartArt graphic

Concrete Patching and Plugging

Click icon to add SmartArt graphic

Page 19: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

Click icon to add SmartArt graphic

Grouting

Page 20: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

Rebuilding the Chimney

Page 21: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

Common Manhole Problems (cont.)

Ø More significant or complex problemsl Significant infiltrationl Structural deteriorationl Hydrogen sulfide corrosion

Page 22: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

Some More Involved Solutions

Ø Concrete patchingØ Manhole linersØ Corrosion protectionØ Build a manhole within a manhole

Note: Multiple methods may need to be used to achieve goal successfully

Page 23: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

Manhole Lining

Cementitious manhole liner over brick substrate

Page 24: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

Epoxy Lining

Page 25: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

Cured In Place Liner

Page 26: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

Manhole Within A Manhole

Concrete

FRP

Page 27: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

A spokeswoman for the public works department said the sinkhole was caused when a manhole gave way as rainwater gushed through Milwaukee’s drainage system.

July 22, 2010 – Milwaukee

It will take the city at least 6 weeks to fix the sink hole. Traffic will continue to be rerouted during that time, Barrett said.

Page 28: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

Summary

Ø Manholes can be significant I/I sourceØ Many leaks and structural problems can

be relatively inexpensive to fixØ Lots of repair/rehabilitation methods

availableØ Appropriate rehabilitation method and

material selection is crucial

Page 29: Simple and Cost Effective Methods of Manhole … and Cost Effective Methods of Manhole Rehabilitation. Presentation Overview ... Type of Leak GPM GPD Slow Drip 0.015 20 Fast Drip 0.03

ConclusionØ Successfully reduce I/IØ Prevent structural failures, backups and

overflowsØ Save money and headachesØ Increase system capacityØ Improve WWTP process operations