15
siemens.com Restricted © Siemens 2019 Siemens Experiences in the field of Flexible Operation EEC Seminar Ahmedabad | February 6, 2020 Ian Rebello

Siemens Experiences in the field of Flexible Operation · 2020-02-12 · Restricted Siemens 2020 Page 3 EEC Seminar / Ahmedabad / 06.02.2020 SPPA-P3000 Process Optimization for steam

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Siemens Experiences in the field of Flexible Operation · 2020-02-12 · Restricted Siemens 2020 Page 3 EEC Seminar / Ahmedabad / 06.02.2020 SPPA-P3000 Process Optimization for steam

siemens.comRestricted © Siemens 2019

Siemens Experiences in thefield of Flexible OperationEEC SeminarAhmedabad | February 6, 2020 Ian Rebello

Page 2: Siemens Experiences in the field of Flexible Operation · 2020-02-12 · Restricted Siemens 2020 Page 3 EEC Seminar / Ahmedabad / 06.02.2020 SPPA-P3000 Process Optimization for steam

Restricted © Siemens 2020Page 2 EEC Seminar / Ahmedabad / 06.02.2020

Siemens Experiences in the field of Flexible OperationJourney of Coal Fired Power Plants

Operation in Full LoadFocus on High Efficiencyand High AvabillityBase Load PlantsMiddle Load PlantsPeak Load Plants

Unit ControlFrequency ControlAutomatic Generation Control

Operation in Partial LoadHigher Load RampMin Load ReductionStart Up Optimization

Min Load Reduction (<30%)Less Operating hoursStrategical Power Plants

Chile

Brazil

Poland

India

Australia

Germany

Page 3: Siemens Experiences in the field of Flexible Operation · 2020-02-12 · Restricted Siemens 2020 Page 3 EEC Seminar / Ahmedabad / 06.02.2020 SPPA-P3000 Process Optimization for steam

Restricted © Siemens 2020Page 3 EEC Seminar / Ahmedabad / 06.02.2020

SPPA-P3000 Process Optimization for steam power plantsHigher profitability through intelligent solutions

Runback PlusLife Time PlusUptime Plus

Fast StartFast Ramp

Frequency Control

Dispatch ControlMinimum Load Reduction

Maximum Load Plus

NOx ReductionCO2 ReductionLoI Reduction

Low Loss StartCombustion OptimizerSootblower Optimizer

Temperature OptimizerLow Throttling

Best Point

High Availability

Low Emissions

High FlexibilityHigh Efficiency

Minimal mechanicalchanges

2/6/2020Page 3

Page 4: Siemens Experiences in the field of Flexible Operation · 2020-02-12 · Restricted Siemens 2020 Page 3 EEC Seminar / Ahmedabad / 06.02.2020 SPPA-P3000 Process Optimization for steam

Restricted © Siemens 2020Page 4 EEC Seminar / Ahmedabad / 06.02.2020

Omnivise Performance Combustion OptimizationP3000 Coal Flow – Recommended

Competence in measuringof bulk solids

Competence in Powerplants control and

optimization

Advanced Coal FlowMeasuring SystemMeasuring, Monitoring,

Optimizing

Page 5: Siemens Experiences in the field of Flexible Operation · 2020-02-12 · Restricted Siemens 2020 Page 3 EEC Seminar / Ahmedabad / 06.02.2020 SPPA-P3000 Process Optimization for steam

Restricted © Siemens 2020Page 5 EEC Seminar / Ahmedabad / 06.02.2020

Siemens Experiences in the field of Flexible OperationOmnivise Performance Coal Flow Measurement Solution

Measuring

Monitoring

Optimizing

Fuel flow Monitoring for■ Calculation of average coal■ Detection of unbalanced coal flow situations■ Full transparency in coal flow in all pipes

over all load cases

Fuel flow Monitoring for■ Calculation of average coal■ Detection of unbalanced coal flow situations■ Full transparency in coal flow in all pipes

over all load cases

Flow Measurement per Mill■ microwave sensor■ Roping detection by three sensor

concept and compensation

Flow Measurement per Mill■ microwave sensor■ Roping detection by three sensor

concept and compensation

ü Better efficiencyü Reduction of min. loadü Higher Load Ramps

Optimized plant economyOptimized plant economyPlant specific solution■ Adjustment of control strategy■ Compensation of unbalances in air-fuel

Plant specific solution■ Adjustment of control strategy■ Compensation of unbalances in air-fuel

Optimized Combustion via closed loop balancing

Measuring

Acting

Page 6: Siemens Experiences in the field of Flexible Operation · 2020-02-12 · Restricted Siemens 2020 Page 3 EEC Seminar / Ahmedabad / 06.02.2020 SPPA-P3000 Process Optimization for steam

Restricted © Siemens 2020Page 6 EEC Seminar / Ahmedabad / 06.02.2020

Omnivise Performance Combustion OptimizationP3000 Coal Flow - High Standardized Solution

Extendible up to 9 mills

Basic Setup for one Mill

• 3 Sensors and 1 C-Box per coaldust pipe

• 1 D-Box per mill• 1 T3000 Box• Defined acceptance tests• Commissioning 1 week/mill• Connection to main DCS optional

Extendible up to 9 mills

Can be installed by SiemensIndia and local partners.

D-Box D-Box D-Box

SPPA-T3000-Box

Page 7: Siemens Experiences in the field of Flexible Operation · 2020-02-12 · Restricted Siemens 2020 Page 3 EEC Seminar / Ahmedabad / 06.02.2020 SPPA-P3000 Process Optimization for steam

Restricted © Siemens 2020Page 7 EEC Seminar / Ahmedabad / 06.02.2020

Omnivise Performance Combustion OptimizationFirst P3000 Coal Flow Reference

South Korea Coal Power Plant,Hard Coal, Output 870 MW

• 6 Mills• 7 Coal dust pipes per mill• Communication to DCS via interface

0

2

4

6

8

10

12

14

1 2 3 4 5 6 7

Coa

l Flo

w [t

/h]

Flow CFMS Flow Sampler

Inconsistence between P3000 Coal Flow and Coal Dust Sampler

High unbalanced coal flow

Page 8: Siemens Experiences in the field of Flexible Operation · 2020-02-12 · Restricted Siemens 2020 Page 3 EEC Seminar / Ahmedabad / 06.02.2020 SPPA-P3000 Process Optimization for steam

Restricted © Siemens 2020Page 8 EEC Seminar / Ahmedabad / 06.02.2020

Omnivise Performance Combustion OptimizationFirst P3000 Coal Flow Reference

43,4

39,0

48,9

35,4

63,2

42,6

48,8

3,02,8

2,6

2,1

1,3

1,7

2,1

0

2

4

6

8

0

10

20

30

40

50

60

70

80

Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7

Coal Input [t/h] Zone O2 [Vol.-%]

Zone 5 with the highest fuel inputhas the lowest zone oxygen value

Page 9: Siemens Experiences in the field of Flexible Operation · 2020-02-12 · Restricted Siemens 2020 Page 3 EEC Seminar / Ahmedabad / 06.02.2020 SPPA-P3000 Process Optimization for steam

Restricted © Siemens 2020Page 9 EEC Seminar / Ahmedabad / 06.02.2020

Omnivise Performance Combustion OptimizationFirst P3000 Coal Flow Reference

Mill Pre-warming28.05.2018 15:35

Coal feeder initialization28.05.2018 16:45

Mill started28.05.2018 17:35

• well distribution ofprimary air when millis purged

• adjustable orificevalve setting seemsright if only based onair purging

• after feederinitialization the airdistribution changessignificantly

• Coal mass flowdoes not follow theprimary air massflow

Page 10: Siemens Experiences in the field of Flexible Operation · 2020-02-12 · Restricted Siemens 2020 Page 3 EEC Seminar / Ahmedabad / 06.02.2020 SPPA-P3000 Process Optimization for steam

Restricted © Siemens 2020Page 10 EEC Seminar / Ahmedabad / 06.02.2020

Omnivise Performance Combustion OptimizationFirst P3000 Coal Flow Reference – next step

Higher Partial Load with optimization of air/fuel ratio

FD Fan

CoalMill

Secondary Air Flap

PA Fan

Option 1: Adjust Air

Higher Partial Load with optimization of air/fuel ratio

FD Fan

Coal Mill

CF Sensor

Secondary Air Flap

Control Valves

Speed Flow

PA Fan

Option 2: AdjustCoal

Page 11: Siemens Experiences in the field of Flexible Operation · 2020-02-12 · Restricted Siemens 2020 Page 3 EEC Seminar / Ahmedabad / 06.02.2020 SPPA-P3000 Process Optimization for steam

Restricted © Siemens 2020Page 11 EEC Seminar / Ahmedabad / 06.02.2020

Siemens Experiences in the field of Flexible OperationPoland 200+ Program - Flexibilization of Jaworzno CFPP

Capacity: 220 MWBoiler: RafakoType: Drum BoilerNumber of mills: 4Total coal dust pipes: 24

Poland 200+ Program• Program from Polnish Government with

financing from European Union• Flexibilzation of 50 Units with 200MW• Cold/Warm/Hot Start Optimization• 40% min Load• 4% Load Ramps• Partial Load Efficiency Increasing

Recommended measures

• Unit Control to coordinate slow-acting boiler and fast-acting turbine• Temperature Control• Coal Flow Measurement System to increase partial load

efficiency and load ramps

Current Situation

• Coal Flow System installed in one mill• Performance tests done

Page 12: Siemens Experiences in the field of Flexible Operation · 2020-02-12 · Restricted Siemens 2020 Page 3 EEC Seminar / Ahmedabad / 06.02.2020 SPPA-P3000 Process Optimization for steam

Restricted © Siemens 2020Page 12 EEC Seminar / Ahmedabad / 06.02.2020

Siemens Experiences in the field of Flexible OperationPoland 200+ Program – Load ramp tests in Jaworzno CFPP

§ Load Ramps with 1%/min

§ From min to max

½ hours excerpt from load ramp1 – average feeder speed [%]4 – generated load [MW]

1

4

Current Load Ramp

1 – average feeder speed [%]

2 - primary air flow mill 1 [m3/h)

§ Coal Flow Measurement in Mill1

§ Step Change with Primary Air

Primary Air Flow Test

§ Delay of Load ~90s behind Air Flow

§ Load ramp with 3,1%

1

2

4

3

Conclusion• Storage capacity of the mills

can be used for load ramp

• CFMS necessary to identifythe moment of coal increase-ment

3 – coal flow measurement

4 – generated load [MW]

Next StepExtension of Coal Flow

Measurement Solution to all Mills

Page 13: Siemens Experiences in the field of Flexible Operation · 2020-02-12 · Restricted Siemens 2020 Page 3 EEC Seminar / Ahmedabad / 06.02.2020 SPPA-P3000 Process Optimization for steam

Restricted © Siemens 2020Page 13 EEC Seminar / Ahmedabad / 06.02.2020

Siemens Experiences in the field of Flexible OperationBenefit of Coal Flow Measurement Solution

Overfiring 10%

ULDBLDpHP SP

100 -

50 -

100 -

50 -

220 -

170 -

0 30min17.06.2008 05:43

Higher Load Ramps with less fuelcosts / Overfiring

CF Sensor

Min load 40%Load RampsHigher Efficiencyin partial load

Min load <30%

HigherEfficiency

„Effective Investmentfor the flexibility journeyof coal fired powerplants!“

Page 14: Siemens Experiences in the field of Flexible Operation · 2020-02-12 · Restricted Siemens 2020 Page 3 EEC Seminar / Ahmedabad / 06.02.2020 SPPA-P3000 Process Optimization for steam

Restricted © Siemens 2020Page 14 EEC Seminar / Ahmedabad / 06.02.2020

Siemens Experiences in the field of Flexible OperationSuccessful Min Load Tests in Dadri CFPP Unit 06

Capacity: 500 MWBoiler: BHELType: Drum BoilerNumber of mills: 9Total coal dust pipes: 36Turbine: BHEL-KWU design

Min Load Test on June 21, 2018• Load reduction from 490MW to 250MW• Changing from four to three mills operation• Load reduction in steps of 5 MW• 195MW achieved and kept for 2.5 hours

Recommended measures to automize 40% min load:• Unit Control to coordinate slow-acting boiler and fast-acting turbine• Reheat / Flue Gas / Main Steam Temperature Control

• Mill Scheduler to switch coal mills on/offautomatically depending on the firing demand

• Fatigue Monitoring System to determineresidual lifetime of highly stressed components

• Replacing of the feed water recirculation valveby a control valve

Next step:• Installation of an Online Coal Flow Measurement System

Page 15: Siemens Experiences in the field of Flexible Operation · 2020-02-12 · Restricted Siemens 2020 Page 3 EEC Seminar / Ahmedabad / 06.02.2020 SPPA-P3000 Process Optimization for steam

Restricted © Siemens 2020Page 15 EEC Seminar / Ahmedabad / 06.02.2020

Contact

Ian RebelloOmnivise P3000 SalesGP SCD GTM

R & D BuildingThane Belapur Road - 400708

Mobile: +91 9820 737004

E-mail:[email protected]