Topics
• Shoreline Master Program and Critical Areas Ordinance Integration
• Channel Migration Zones (CMZs)
SMP-CAO Integration
SMPs:
• Required by the Shoreline Management Act
• Must undergo local AND state (Ecology) approval
• Only applicable to “Shorelines of the State” and their adjacent “shorelands”
• SMP must result in “no net loss” of shoreline ecological functions
• Must be based on “current, accurate, complete scientific and technical information”
SMP-CAO Integration
CAOs:
• Required by the Growth Management Act
• Administered by State (Commerce), no formal approval by Ecology (can be appealed)
• Regulates wetlands, fish and wildlife habitats, critical aquifer recharge areas, frequently flooded areas, and geologically hazardous areas
• Rules apply to entire jurisdiction
• Must be based upon “best available science”
Wetland
Shoreline
Jurisdiction
Relationship of SMPs to CAOs
RCW 36.70A. 480
Shoreline master programs shall provide a level of
protection to critical areas located within shorelines of the
state that assures no net loss of shoreline ecological
functions necessary to sustain shoreline natural
resources …
SMP Integration Options:
1. CAO is adopted by reference into the updated SMP
• Critical areas are regulated the same, both within and outside of shoreline jurisdiction
• Can be problematic if CAO is not up-to-date
• Ecology could refuse to approve the SMP unless the CAO if revised to meet No Net Loss
SMP Integration Options:
2. Critical Areas standards are incorporated directly into the SMP
• Creates a “one-stop-shop” for shoreline and critical areas regulations
• Doesn’t require jurisdiction-wide CAO update
• Critical areas regulations may differ within and outside of shoreline jurisdiction
As shoreline development occurs, ecological functions stay the same (or are improved) over time
Eco
logic
al
Fu
nct
ion
Time 2012 2019
Exiting condition
What is No Net Loss?
Development, Mitigation and Restoration
How is No Net Loss Achieved?
Avoid New Impacts (SMP &
CAO rules)
Mitigate Unavoidable
Impacts
Restore Degraded
Areas
No Net Loss
• How do you measure ecological functions?
• At what scale do you account for gains or loses?
• How do you separate the effects of SMP
development from other activities that affect
ecological functions?
• Can you have development and still achieve no net
loss?
• Can/should require restoration? Who pays?
Common Questions About No Net Loss:
Questions to Guide NNL Analysis
• What are the components of healthy shorelines?
• How healthy are the shorelines now?
• What are the major threats to healthy shorelines?
• Where are threats most prevalent?
• How will the SMP & CAO address threats?
• How to compensate for potential loss?
What are Channel Migration Zones
Manastash Creek, May 2011
The area where a river channel is expected to move over a period of time
Photo: Daily Record
Gold Creek
Teanaway River
State Requirements for Mapping CMZs
• Identify “general location” of CMZs (WAC 174-26-201(3)(c)
• Based on historic record (e.g., air photos) and geologic character
• Areas separated from the active channel by artificial structures are not considered to be within the CMZ
• However, structures have to be “built above or constructed to remain intact” through the 100-year flood
Initial Mapping Results
Teanaway River- ‘Tier 1’ Analysis
North Fork Teanaway River- ‘Tier 2’ Analysis
Implications for Shoreline Management
Development within CMZs puts people and property at risk – events can be sudden and catastrophic
Allowing rivers to migrate naturally is important for maintain healthy streams / fish habitat
Implications for Shoreline Management
• CMZs can extend outside of the regulated shoreline zone
• CMZs are critical areas
Implications for Shoreline Management
Strategies for addressing CMZs in the SMP/CAO:
• Development prohibitions
• Wider setbacks
• Require in-depth studies for all proposed development
• Require studies for just land subdivision/major development
• Other?