BAK SA 110 Annual Report 2014.Docx 18 November 2015 PUGET SOUND ENERGY Baker River Hydroelectric Project

SETTLEMENT AGREEMENT ARTICLE 110

SHORELINE EROSION 2014 ANNUAL REPORT REPORTING PERIOD JANUARY 1, 2014 – DECEMBER 31, 2014

BAKER RIVER HYDROELECTRIC PROJECT FERC No. 2150

November 2015

Shoreline Erosion 2014 Annual Report CONTENTS

BAK SA 110 Annual Report 2014.Docx 18 November 2015 PUGET SOUND ENERGY Baker River Hydroelectric Project Page ii

CONTENTS 1.0 Executive Summary .................................................................................................................................................................. 1

2.0 Introduction ............................................................................................................................................................................... 1 3.0 Activity Report .......................................................................................................................................................................... 1

3.1 Principal Management Activities ...................................................................................................................................... 1 4.0 Accounting ................................................................................................................................................................................ 3

4.1 Funding ............................................................................................................................................................................ 3

5.0 References ................................................................................................................................................................................. 3

APPENDIX A: SWIFT CREEK LWD RESTORATION EROSION HAZARD REDUCTION 100% DESIGN DRAWINGS.............. 4

List of Tables Table 1. Funding and expenditures prescribed by SA 110 for January 1, 2014 to December 31, 2014. ......................................... 3

List of Figures Figure 1. The Swift Creek Campground shoreline large woody debris restoration erosion hazard reduction project. .................... 2

BAK SA 110 Annual Report 2014.Docx 18 November 2015 PUGET SOUND ENERGY Baker River Hydroelectric Project Page 1

1.0 Executive Summary This annual report describes recent activity undertaken by Puget Sound Energy (PSE) to implement settlement agreement article 110 (SA 110), “Shoreline Erosion,” and license article 409 (LA 409), “Shoreline Erosion Control Plan,” of the Baker River Hydroelectric Project license. The report covers the reporting period from January 1, 2014 through December 31, 2014, as outlined by the reporting schedule in SA 102. In 2014, principal efforts under SA 110 included continued the finalized design and construction of the shoreline large woody debris restoration erosion hazard reduction project to protect the USDA Forest Service Swift Creek Campground along Swift Creek and the shore of Baker Lake.

2.0 Introduction This annual report has been prepared for the Baker River Hydroelectric Project pursuant to the Order on Offer of Settlement, Issuing New License and Dismissing Amendment Application as Moot (the license) issued by the Federal Energy Regulatory Commission (FERC) on October 17, 2008. In appendix A of the license, settlement agreement article 110, “Shoreline Erosion,” and license article 409, “Shoreline Erosion Control Plan,” set forth the requirements for the Reservoir Shoreline Erosion Control Management Plan (RSECMP), which in turn sets forth the requirements of this annual report.

This report summarizes the activities conducted under SA 110 for the 2014 reporting period from January 1, 2014 to December 31, 2014. These include management activities, monitoring, design and planning, acquisition-related activities, consultation, documents prepared, modifications to or deviations from planned activities, issues and resolution, accounting, and proposed changes to the FERC-approved plan.

This report was reviewed by the Aquatic Resources Group (ARG). The list of ARG members who reviewed this report, along with a table of reviewer comments and PSE responses, is provided in the SA 102 Aquatic Resources 2014 Annual Report.

3.0 Activity Report 3.1 Principal Management Activities

Principal activities in 2014 included the following.

Swift Creek Shoreline Erosion Control Project Design and construction of the Swift Creek shoreline erosion control project was completed in 2014 in coordination with the USDA Forest Service. The goals of the Swift Creek project were to reduce/eliminate shoreline erosion affecting the Swift Creek Campground, to reduce/eliminate sediment deposition affecting water quality and nearshore habitat adjacent to the campground, and to address one of the most severe Baker River Hydroelectric Project erosion sites according to the 2003 Reservoir Shoreline Erosion and Deposition Study (Associated Earth Sciences, 2003). The project addressed two areas of erosion: the right bank at the mouth of Swift Creek where it

Shoreline Erosion 2014 Annual Report Activity Report

BAK SA 110 Annual Report 2014.Docx 18 November 2015 PUGET SOUND ENERGY Baker River Hydroelectric Project Page 2

enters Baker Lake, and the shoreline in the vicinity of the swim beach. PSE has engaged in consultation with the USDA Forest Service throughout the design phase. Design was initiated in March 2012, and a 30-60-90 percent design process was completed in June 2014.

The project included construction of 16 flood fence structures along Swift Creek and adjacent to the Swift Creek Campground swim beach (see appendix A). Flood fence arrays consist of vertical logs embedded in the ground and protruding a certain height above the creek bed. The arrays are designed either to trap woody debris, thereby promoting sedimentation on the lee side of the trapped debris; or to increase local bed roughness and thereby promote local deposition around the structure. In both applications at the Swift Creek Campground project, the deposition of sediment is intended to protect the toe of eroding slopes by decreasing flow depth and velocity during high flow. Construction began in October 2014, and was completed in December 2014.

Figure 1. The Swift Creek Campground shoreline large woody debris restoration erosion hazard reduction project.

Flood fences (FF) 7 through 13 are visible.

FF-11

FF-7

FF-8

FF-9

FF-10

FF-12 FF-13

Shoreline Erosion 2014 Annual Report Accounting

BAK SA 110 Annual Report 2014.Docx 18 November 2015 PUGET SOUND ENERGY Baker River Hydroelectric Project Page 3

4.0 Accounting Puget Sound Energy, pursuant to settlement agreement articles 102, 201, 301, 501, and 602, is required to provide an annual summary of expenditures made during the preceding year, as well as an accounting of funding expenditures, any interest earned, disbursements made as required by any article, and adjustments for inflation. This section provides an accounting of all expenditures made during the reporting period, including pre-license expenditures such as costs incurred for early land acquisition efforts.

All disbursement adjustments and relevant calculations were determined using the guidelines provided in settlement agreement article 602.

4.1 Funding Table 1. Funding and expenditures prescribed by SA 110 for January 1, 2014 to December 31, 2014.

Shoreline Erosion Capital Credit Debit Explanation Previous Year’s Remaining Balance 193,825 2014 Required Deposit to Fund 0 2014 Deposit Escalationa 0

Labor Expenses 19,042 Labor costs associated with Swift Creek Project

Outside Services Expenses 100,864

Contractor costs for the Swift Creek Project permitting and construction

Materials & Other Expenses 2,350 Material costs for the Swift Creek Project

Required Interestb 83 0.07% Total Expenditures Against Required Funds 122,256 Total Remaining Balance 71,652

a Escalation is applied to the deposit to required fund only. b Interest is based on the 90-day Treasury bill rate and is applied to the account balance as of the last day of the reporting period.

No additional funds prescribed by SA 110 were deposited for implementation of SA 110 in 2014. The total amount available for use at the end of 2014 was $71,652.

5.0 References Associated Earth Sciences (AESI). 2003. Reservoir shoreline erosion and deposition

study A14a. Prepared for Puget Sound Energy by Associated Earth Sciences Inc., Kirkland, Washington.

BAK SA 110 Annual Report 2014.Docx 18 November 2015 PUGET SOUND ENERGY Baker River Hydroelectric Project Page 4

APPENDIX A: SWIFT CREEK LWD RESTORATION EROSION HAZARD REDUCTION 100% DESIGN DRAWINGS

SWIFT CREEK LWD RESTORATION EROSION

PROJECT MANAGER: JACOB VENARD PUGET SOUND ENERGY (PSE)

BELLEVUE, WA 98273 (425) 462-3771

100% DESIGN

SHEET INDEX

SHEET NAME

COVER SHEET, MAPS, GENERAL ACCESS, LEGEND

PROJECT LAYOUT, ACCESS, STAGING, SEQUENCING

SWIFT CREEK FLOOD FENCES, SECTIONS, DETAILS ( 1)

SWIM BEACH FLOOD FENCES; DETAILS (2) & SPECIFICATIONS

TESC & WATER MANAGEMENT PLANS

SHEET #

HAZARD REDUCTION:

LEGEND

----- SUMMER FULL POOL WSE

-·-·-·- OHWM/2 YR FLOOD WSE ACCESS ROAD ---------- 100 YR FLOOD WSE

2

3

4

5

6 ~ ELEV CONTOURS + TEMPORARY ELEVA llON BM

/

\ \

\ \

VICINITY MAP

2

NO.

/

\ \

\

\

PERMITTING INFORMATION, OUANmlES

TO SR 20, CONCRETE

2/13/14 REPLACED CABLED SlRUClURES W/ FLOOD FENCES POV 5 14 ELIMINATED ARRAYS REQUIRING WATER DIVERSION POV

DAlE REVISION DESCRIPTION BY CHK

SITE MAP

0 100 500

bd==bd=bd SCALE: 1" • 500'

0 1"

BAR MEASURES ONE INCH ON ORIGINAL DRAWINGS

mwm HIGH EROSION AREA ~'Ii:- 'Ii:- "" - 3 WOOD ~ "\iii: .......

~:o~o:&o~o:~ SEVERE EROSION AREA mm 1nw1~ UNDISTURBED EARTH

~ CUT ~vvvv~ v~vvvvv DISTURBANCE AREA

~ FILL ~ STAGING AREA

ABBREVIATIONS

SWIFT CREEK DELTA

BAKER LAKE

BM CL,~ CP cs CY

DBH DIA DIM OS, D/S E EA ELEV EXIST FF-13 FT H HORZ ID IN L LB LT LF LWD MAX MIN

BENCH MARK CENTERLINE CONTROL POINT CROSS SECTION CUBIC YARD DIA AT BREAST HEIGHT DIAMETER DIMENSION DOWNSTREAM EAST EACH ELEVATION EXISTING FLOOD FENCE No. 13 FOOT, FEET HEIGHT HORIZONTAL IDENTIFICATION INCH, INCHES LENGTH, LONG POUNDS LEFT LINEAR FOOT LARGE WOODY DEBRIS MAXIMUM MINIMUM

PUGET SOUND ENERGY /US FOREST SERVICE

DESIGNED BY: POV, RN DRAWN BY: POV CHECKED BY: JE PROJECT MGR: POV

,,.~Resource 1V Consultants, Inc. REDMOND, WA 98052 PHONE: (425) 556-1288

MISC MISCELLANEOUS MON MONUMENT N NORTH NO NUMBER NTS NOT TO SCALE OHWM ORDINARY HIGH WATER MARK RT RIGHT s SOUTH SG SPECIFIC GRAVITY SHT SHEET SPEC SPECIFICA llON SS STAINLESS STEEL STA STATION SlO STANDARD SF SQUARE FOOT SY SQUARE YARD TBM TEMPORARY BM TESC TEMPORARY EROSION

AND SEDIMENT CONTROL TYP TYPICAL US, U/S UPSTREAM VAR VARIES VERT VERTICAL w WEST, WIDE W/ WITH WSE WATER SURFACE ELEV W/O WITHOUT

SWIFT CREEK LWD RESTORATION ERO~ON HAZARD REDUCTION

COVER SHEET, MAPS, GENERAL ACCESS, LEGEND 100% DESIGN

DATE: JUNE 9, 2014

SHEET: REV:

1 2

FLOOO FENCE TYPE 1 (ROUGHNESS FUNCTION)

SEE SHEET 4

2./13/14 REPLACED CABLED STRUCTURES W/ FLOOD FENCES POV 2 5/7 /14 ELIMINATED ARRAYS REQUIRING WATER DIVERSION POV

NO. DATE RE\/ISION DESCRIPTION BY CHK

0 100 200

SCALE; 1" = 200'

0 1"

BAR MEASURES ONE INCH ON ORIGINAL DRAWINGS

'\

~

1. STRUCTURE LOCATIONS TO BE STAKED IN FIELO BY ENGINEER, IN CON SUL TA TION WITH USFS AND PSE REPRESENTATIVES. NOTE THAT TOPOGRAPHY HAS CHANGED SINCE SURVEY WAS COMP LE TEO, \\'HERE DEPOSITION HAS OCCURRED AT THE LOCATION OF FLOOD FENCE STRUClURES 7-12. SUCH THAT THE WORK AREA WILL BE HIGH AND DRY.

2. SURVEY ELEVATION CONTROL PROVIDED BY TBMs AT LOCATIONS INDICATED ON THIS SHEET MAY BE COVERED BY S !REAM DEPOSITION; DATUld = NA 1t088. ENGINEER WILL RELOCATE AND/OR ESTABLISH NEW SURVEY CONTROL REBAR TBMs. CONTRACTOR TO PROTECT REBAR FROM EQUIPMENT. BACKUP SURVEY ELEVATION CONTROL POINT IS NE CORNER OF RETAINING WALL AT BOAT RAMP = EL 7J9.5!1. DAILY LAKE ELEVATION MAY BE USED FOR CORR OB ORATION, SUBJECT TO CONFIRMATION BY ENGINEER. BATHYl.IETRIC ELEVATION CONTOURS ARE FROM WALKER ASSOCIATES 2001 PHOTOGRAMMETRY, WITH IN-CHANNEL ELEVATIONS ABOVE -720' ADJUSTED USING CROSS-SECTION SURVEY DATA COLLECTED BY R2 IN MAY 2.012.

3. BANK EROSION RATINGS PER GIS LAYER FROM AESI (2003) REPORT, USED TO GUIDE SITING SINGLE LOG AND FLOOD FENCE STRUCTURES.

4. CONTRACTOR TO CLEAR ANO PREPARE SURFACE OF ACCESS TRAIL TO CHANNEL FROM JUNCTION WITH CAMPGROUND ACCESS ROAD. USE QUARRY SPALLS AS NEEDED TO PROVIDE SUITABLE SURFACE FOR ACCESS BY SKIDDER AND EXCAVATOR. AT END OF JOB, REMOVE QUARRY SPALLS, SCARIFY ACCESS ROAD SURFACE TO RESEMBLE PRE-PROJECT CONDITION, ANO PLACE BOULOERS ( 4-MAN OR LARGER PER WSOOT SPECIFICATION 9-13.7(1)) ANO LOGS ACROSS TOP OF ROAD TO PREVENT ATV OR OTHER MOTORIZED VEHICLE ACCESS TO CHANNEL. BOULOERS SHALL BE APPROVED BY USFS AND PLACED WITH APPROXIMATELY 1/3 BURIED.

5. CONTRACTOR TO CLOSE AND LOCK MAIN CAMPGROUND GA TE AT ALL Tlf.IES. PLACE SIGN AT ENTRANCE WARNING PUBLIC NOT TO ENTER CAMPGROUND. AT END OF EACH DAY, PLACE ORANGE CONSTRUCTION NETTING ACROSS TOP OF ACCESS ROAD AND AROUND SWIM BEACH TO PRE\.£NT INADVERTENT ACCESS TO CONSTRUCTION SITES BY UNAUTHORIZED PERSONS.

6. GENERAL SEQUENCING OF CONSTRUCTION; 6.1. START DATE WILL BE CONTROLLED BY PSE LAKE LEVEL MANAGEMENT OPERATIONS

AND USFS CAMPGROUND MANAGEMENT. CONTRACTOR TO VERIFY WITH PSE & USFS; NO CONSTRUCTION VEHICLES WILL BE ALLOWED ONSITE BEFORE REGULAR CAl.IPGROUNO CLOSURE, SCHEDULED TD OCCUR AFTER LABOR DAY WEEKEND.

6.2.. REHABILITATE EXIST ACCESS ROAD TO STREAM AS NEEDED; PLACE PROMINENT CONSTRUCTION WARNING SIGNS PROHIBITING PUBLIC ACCESS AT JUNCTION WITH CAMPGROUND ACCESS ROAD, ON BOTH SIDES OF ACCESS ROAD.

6.3. HAUL MATERIALS TO SITE STAGING AREAS. 6.4. BEGIN CONSTRUCTION OF SIXTEEN FLOOD FENCES FF-7 TO FF-22 WHEN LAKE

LEVEL DROPS BELOW 720 FT NAVDBS. PROCEED FROM UPSTREAM TO DOWNSTREAM. 6.5. RESTORE WORK AREA ON S\lllFT CREEK GRAVEL BAR. 6.6. CLOSE OFF ACCESS ROAD AT HEAD TO MOTORIZED VEHICLES. 6.7. BEGIN CONSTRUCTION OF THREE FLOOD FENCES FF-1 TO FF-3 WHEN LAKE LEVEL

DROPS BELOW 710 FT NAVOBB; RESTORE DISTURBED ACCESS ROUTE FRO>.A CAMPGROUND WHEN DONE.

7. QUANTITIES LISTED IN TABLE 2., SHT 6.

..l!liW\""" - '""":::::)~SHEET 4

fF-J r ~ I

'*~< I ~~~, I

_______ _J l:·:·:·:·:·:I DEBRIS CATCHING FLOOD FENCE LOCATIONS

l!!!!!!I ROUGHNESS FLOOD FENCE LOCATIONS

PUGET SOUND ENERGY /US FOREST SERVICE SWIFT CREEK LWD RESTORATION EROSION HAZARD REDUCTION

DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT MGR:

POV, RN POV JE POV

,,~Resource I~ Consultants, Inc. REDl.40ND, WA 98D52 PHONE: ( 425) 556-1286

PROJECT LAYOUT, ACCESS, STAGING, SEQUENCING 100% DESIGN

DATE: JUNE 9, 2014

SHEET: REV:

2 2

ROUGHNESS FLOOD FENCE FF-12

730

~ 728

~ 726 Cl

~ 724 z I- 722

.!=- 720

i5 718 F < 716 > ~ 714 w

712

710 0

DEBRIS CATCHER FLOOD FENCE FF-15 740

738

736 f----'"Ta~

~ 734 IXl IXl 732 ~

+

<( 7 30 f-------PJJ z I- 728 u... ~ 726 z ~ 724

~ 722 w ci 720

718

716

714

712

710 0

+

+

+

+

+

50

I-

+

..

100

+

.,.

+

150

50

SECTION FLOOD FENCES

100

LOOKING U

DEBRIS CATCHER FLOOD FENCE FF-16

+

+

200 250

SECTION FLOOD FENCES

I 300

SUMMER FULL POOL 740

-;;:;- 738

IXl 736 0 > 734 <( z I- 732

.!=- 730 z

728 0 + F < 726 > w

724 _J w

722

+ + +

t I-+

7200 50 100 150 200 250 300

SECTION 30' 0 30'

FLOOD FENCES 1"=60'

1 2/13/14 REPLACED CABLED STRUClURES W/ FLOOD FENCES POV

2 5/7 /14 ELIMINATED ARRAYS REQUIRING WATER DIVERSION PDV

NO. DATE REVISION DESCRIPTION BY CHK

DEBRIS CATCHING FLOOD FENCE FF-13

2 YR FLOOD

-~

f LOW FLOW CHANNEL

I-

200 250 300 350

JO' 0 JO' 60' liiiiiiiii~§~~~~iiiiiiiiiiiiiiiiiiiiiiiiiiiiiii VERTICAL SCALE EXAGGERATED X5

+

+

+

350 JO'

1·-so'

SUMMER FULL POOL

+

I-

CUT & FILL PROFILE; SIDE SLOPE NEAR VERTICAL AS POSSIBLE (~0.2H: 1V)

400 JO'

+

.,.

.,.

+

+

450 60'

c

..

500

722

+ + 720

+ 718

+ + 716

+ 714

712

710 400 450 500

100-YR FLOOD

+

+

+

+

+

550 600

-;;:;-IXl Cl > <( z I-.!=-z 0 F <(

> w _J w

1. CONTRACTOR SHALL COLLECT RESERVOIR DEBRIS FROM CONSTRUCTION AREA AND RACK MATERIAL WITHIN CONSTRUCTED FLOOD FENCES FF-13 TIHROUGH FF-19. PSE AND USFS SHALL PROVIDE MATERIAL AS WELL. AT LEAST 12 PIECES BETWEEN 10-25 FT LONG SHALL BE PLACED BETWEEN BOLES IN A WOVEN PATTERN WITIHIN EACH ARRAY.

2. PLACE LOGS TO REST ON DEBRIS REFERENCED IN NOTE 1, SNUG NEXT TO FLOOD FENCE BOLES AS SHOWN IN DETAILS 1 AND 2, THIS SHEET. ALL FLOOD FENCE BOLES SHALL BE INSTALLED LEANING IN UPSTREAM DIRECTION PER DETAIL 2 THIS SHEET. TIE LOGS TO BOLES W/ 1" MANILA ROPE W/ RATED NOMINAL STRENGTH 8100 LB -- ESTIMATED LENGTIH REQUIRED PER BOLE = 25 FT. BUT CONTRACTOR SHOULD VERIFY FOR VARIABILITY IN LOG DIMENSIONS AND CONSTRUCTION. WRAP TWO TIMES AROUND LOG IN OPPOSING DIRECTIONS AND TIE EACH END TWO TIMES AROUND VERTICAL BOLE. DO NOT OVER-TIGHTEN -- ROPE WILL SHRINK ~10%-15% IN LENGTH WHEN WET. TIE ENDS TOGETIHER WITIH CARRICK BEND KNOT (OR ENGINEER-APPROVED AL TERNA Tl VE). TAPE OR TIE LOOSE ENDS TO PREVENT FRAYING.

3. BEFORE PLACING DEBRIS, SCALP GRAVEL FROM AREA ON BAR MIN 20 FT DOWNSTREAM OF ARRAY AND DUMP TO FORM MIN 2 FT HIGH PILE AROUND EACH LASHED BOLE.

DIRECTION OF FLOW

1" MANILA HEMP ROPE; SEE NOTE 2 FOR INSTALLATION DETAILS

~~-FLOOD FENCE BOLE, LEANING UPSTREAM TO PROMOTE ANCHORING

GRAVEL; SEE NOTE 3

FLOOD FENCE DETAIL LASHED DEBRIS LOGS, SECTION; NTS

0 -- VERTICAL SCALE EXAGGERATED X5

350 400

50' VERTICAL SCALE EXAGGERATED X5

PUGET SOUND

DESIGNED BY: PDV 0 1" DRAWN BY: POV

CHECKED BY: JE

BAR MEASURES ONE INCH PROJECT MGR: POV

ON ORIGINAL DRAWINGS

LOG W/O ROOTWAD; MAX 1' DBH---r~~~~-11~

TIE LOG TO FLOOD FENCE BOLES PER NOTE 2 ANO DETAIL 1; VERTICAL BOLES SHALL BE INSTALLED TO LEAN IN UPSTREAM DIRECTION

FLOOD FENCE DETAIL LASHED DEBRIS LOGS, PLAN; NTS

TO STREAM -----1·--FLOOL----® FENCE BOLE

ENERGY/US FOREST SER~CE SWIFT CREEK LWD RESTORATION EROSION HAZARD REDUCTION

r~Resource Consultants, Inc. SWIFT CREEK FLOOD FENCES DATE: JUNE 9, 2014

SECTIONS, DETAILS (1) SHEET: REV: REDMOND, WA 98052 PHONE: (425) 556-1288 100% DESIGN 3 2

TABLE 1. QUANTITI ES & SPECIFICATI ONS -- FLOOD FENCE TIMBER & CONSTRUCTI ON f TOTAL HEIGHT MIN IM UM NUMBER

NUM BER OF DIAM ETER (IN) LENGTH A BOVE DEPTH PER SPACING (FT) 'I

FLOOD FENCE ID. SPECIES BOLES/ FF MINIMUM MAXIMUM EA (FT) BED (FT) INSTALLED (FT) ROW ROW (Sy) COL (Sx) FF-3

FF-1/2/3 DOUGLAS FIR 20 10 12 13 2 11 7:6:7 4 8

FF-7/8/9/10/11 / 12 DOUG LAS FIR 20 10 12 14 2 12 7:6:7 4 8 FF-13/1 4, FF-1 6/17 DOUG LAS FIR 17 12

l 15 15 3 12 6 5:6 8

1

16 FF-15 DOUG LAS FIR 17 12 15 17 5 12 6:5:6 8 16

FF-18/ 19 DOUG LAS FIR 17 12 15 15 3 12 6:5:6 8 16 FF-20/21 DOUG LAS FIR 20 10 12 14 3 11 7:6:7 4 4

FF-22 DOUG LAS FIR 20 10 12 15 3 12 7:6:7 4 4

SUMMER FULL POOL WSE

OUTSIDE ROW --

SWIM BEACH BUOY LINE (APPROX.)

MIDDLE ROW --

PLAN © SWIM BEACH FLOOD FENCES

SUMMER FULL POOL WSE

100 YR FLOOD SWIM BEACH BUOY LINE

00 750 ·i~~-~-~~-i·~F_L_OO~D_F~EN_C_E~F_F_-_2~ 750 00

~ mt ~ ~ 740f----+---+-___,f----+---+-___,- +--+--f----+--~~___,f----+---+-___,---+- 740~

FLOOD FENCE BOLE; SEE TABLE 1

FOR SPECIFICATIONS

TEMPORARY LOG LATTICE FOR BRACING

OUTSIDE ROW --

COLUMN Sx

FLOOD FENCE DETAIL SPACING KEY PLAN FOR TABLE 1, NIS

~ 730 ~ +---+--+--+-~-+--+--+----+---+-~--+~-+---+----<>---+---+----<--+---+--+--+-----1730~ z 720 720 z 0 0

~ 710 710 ~ > >

DURING INSTALLATION~

d 700 - 00 d 0 50 100 150 200 250 300

SECTION

1. STRUCTURE LOCATIONS AND PLAN ORIENTATION TO BE STAKED IN FIELD BY ENGINEER, IN CONSULTATION WITH USFS AND PSE REPRESENTATIVES. FLOOD FENCES 4, 5, 6 WILL NOT BE CONSTRUCTED, PER DIRECTION OF USFS, AND ARE NOW OMITTED FROM THIS WORK.

FLOOD FENCE FF-2 CD TOP OF GROUND WATER J

2. BATHYMETRIC ELEVATION CONTOURS ARE FROM WALKER ASSOCIATES 2001 PHOTOGRAMMETRY, GROUND ELEVATIONS DERIVED FROM USFS-PROVIDED SURVEY OF CAMPGROUND.

3. TYPICAL SECTIONS SHOWN. SEE TABLE 1 FOR SPECIFICATIONS, FOLLOWING STAGGERED ROW AND COLUMN SPACING DEPICTED IN DETAIL 3.

4. CONSTRUCT FLOOD FENCING BY TRENCHING, WITH SIDE SLOPES AT ANGLE OF REPOSE; START AT ONE END, DIG WITHIN ,.,, 1 FT OF DESIGN DEPTH, SHARPEN END OF BOLE AND PUSH IN TO TARGET DEPTH. WITH BOLE LEANING UPSTREAM PER DETAIL 2, SHEET 3. BACKFILL USING NEWILY EXCAVATED MATERIAL WORKING PROGRESSIVELY TO OTHER END OF ARRAY. MAY CONSTRUCT TEMPORARY LATIICE GRID USING LOGS TO BRACE BOLES IF NEEDED PRIOR TO BACKFILL, REMOVE BRACING LOGS IF USED BEFORE SECOND/FINAL BACKFILL, TAMP DOWN WITH BUCKET AROUND BOLES AFTER BOTH STAGES OF BACKFILL. ENGINEER TO APPROVE COMPACTION. LEAVE BED ELEVATION SAME AS PRE-CONSTRUCTION. IT SHOULD NOT BE NECESSARY HOWEVER IE REQUIRED NO PERSONNEL ARE TO ENTER TRENCH WITHOUT SUITABLE TEMPORARY TRENCH WALL SHORING MEASURES IN PLACE· IE ENTRY TO TRENCH IS REQUIRED MUST FOLLOW STANDARD OSHA ANO WAC COPES FOR TRENCH SAFETY PRACTICES

5. NO FLOOD FENCE EXCAVATION WORK SHALL BE DONE WITH EQUIPMENT IN SURFACE WATER. ALL EXCAVATION TO BE DONE IN DRY DURING LOW FLOW CONDITIONS, WITH DRY WORK AREA ESTABLISHED VIA PUSH-UP BERM PER SHEET 5. IF PUMPING IS REQUIRED, DIRECT PUMPED WATER TO TEMPORARY INFILTRATION BASIN AS SPECIFIED IN TESC PLAN (ALSO PER SHEET 5).

1 2/13/14 REPLACED CABLED STRUCTURES W FLOOD FENCES POV

2 5/7 /14 ELIMINATED ARRAYS REQUIRING WATER DIVERSION POV 20'

NO. DA TE REVISION DESCRIPTION BY CHK

0 20'

0 1"

BAR MEASURES ONE INCH ON ORIGINAL DRAWINGS

40' PUGET SOUND ENERGY/US FOREST SER~CE

DESIGNED BY: POV, JE, RN DRAWN BY: POV.BG CHECKED BY: JE PROJECT MGR: POV

,.~Resource I~ Consultants, Inc. REDMOND, WA 98052 PHONE: (425) 556-1288

FLOOD FENCE SECTION CUT & FILL W/ BRACING; NIS

SWIFT CREEK LWD RESTORATION EROSION HAZARD REDUCTION

SWIM BEACH FLOOD FENCE DETAILS (2) & SPECIFICATIONS 100% DESIGN

1-:::c (.')

w :::c

F a.. w 0

DATE: JUNE 9, 2014

SHEET: REV:

4 2

TEMPORARY EROSION AND SEDIMENT CONTROL NOTES

1. WORK ON THE PROJECT SHALL NOT BEGIN UNTIL THE LAKE LEVEL DROPS SUFFICIENTLY, PER CONSTRUCTION SEQUENCING ON SHEET 2.

2. THE IMPLEMENTAllON OF THESE TESC PLANS AND THE CONSTRUCllON, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE TESC FACILITIES SHALL BE SUPERVISED BY AN INDIVIDUAL WITH EXPERIENCE IN IMPLEMENllNG TESC PLANS.

3. BOUNDARIES OF CLEARING LIMITS IN RIPARIAN VEGETAllON AREAS SHALL BE CLEARLY FLAGGED BY SURVEY TAPE PRIOR TO CONSTRUCTION; DURING CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED.

4. THE TESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED PRIOR TO OR IN CONJUNCTION WITH ALL CLEARING AND GRADING SO AS TO ENSURE THAT THE TRANSPORT OF SEDIMENT TO SURFACE WATERS, DRAINAGE SYSTEM, AND ADJACENT PROPERTIES IS MINIMIZED.

5. THE TESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR THE ANTICIPATED SITE CONDlllONS. DURING THE CONSTRUCTION PERIOD. THESE TESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND MODIFIED TO ACCOUNT FOR CHANGING SITE CONDITIONS (E.G., SUMP PUMP, INST ALLA llON/RELOCA TION OF SILT FENCES, ETC.)

6. THE TESC FACILITIES SHALL BE INSPECTED DAILY AND MAINTAINED TO ENSURE CONTINUED PROPER FUNCTIONING.

7. ANY AREA NEEDING TESC MEASURES, NOT REQUIRING IMMEDIATE ATTENllON SHALL BE ADDRESSED WITHIN FIFTEEN (15) DAYS.

8. WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE APPLIED AT A MINIMUM 2-INCH THICKNESS.

9. WHERE NECESSARY, IN ADDITION TO STRAW BALES, SILT FENCE MAY BE USED FOLLOWING THESE SPECIFICAllONS: FABRIC SHALL BE EQUAL TO "MIRAFLI" WITH 100 LB GRAB TENSILE STRENGTH, 200 PSI BURST STRENGTH, AND 70-200 SIEVE # APPARENT OPENING. SEE DETAIL 4 THIS SHEET.

10. ALL CONSTRUCTION MATERIALS, WASTE MATERIALS, AND DEMOLITION DEBRIS SHALL BE HANDLED AND DISPOSED OF IN A MANNER SO AS TO PREVENT CONTAMINATION OF STORMWATER RUNOFF AND ADJACENT WATERWAYS. CONTRACTOR TO OBSERVE ALL WASHINGTON DEPARTMENT OF FISH AND WILDLIFE HPA REQUIREMENTS FOR EQUIPMENT FLUIDS AND HANDLING.

11. MAINTENANCE AND FUELING OF CONSTRUCTION EQUIPMENT SHALL BE PERFORMED IN SUCH A MANNER TO MINIMIZE THE POTENTIAL CONTAMINATION OF STORMWATER RUNOFF AND ADJACENT WATERWAYS. SPILL CONTAINMENT AND CLEANUP KITS SHALL BE MAINTAINED ONSITE AND ANY SPILLS OF FUELS, HYDRAULIC FLUID, LUBRICANTS, OR OTHER HAZARDOUS MATERIAL SHALL BE CLEANED UP IMMEDIATELY AND PROPERLY DISPOSED OF.

12. EROSION CONTROL MEEllNG ALL WHATCOM COUNTY DESIGN AND CONSTRUCTION STANDARDS SHALL BE DEEMED ACCEPTABLE FOR THIS PROJECT.

13. ALL CONSTRUCTION EQUIPMENT ACCESS SHALL BE ALONG THE GENERAL ROUTES INDICATED ON SHEETS 1 AND 2.

WATER HANDLING:

1. AS LAKE LEVEL DROPS, FLOW AT THE SITE IS TYPICALLY LOW DURING THE FALL SEASON SUCH THAT WORK WILL BE CONDUCTED PRIOR TO HEAVY FALL RAINS. ALL FLOOD FENCES WILL BE CONSTRUCTED ON EXPOSED LAKE/RIVER BED, AWAY FROM THE WETTED CHANNEL EDGE. NO WATER DIVERSION OR COFFERDAMS ARE NEEDED. IN MOST CASES, THE TRENCH MAY BE EXCAVATED, LOG BOLES INSERTED, AND THE TRENCH REFILLED WITH STANDING WATER IN THE TRENCH AND WITHOUT RUNOFF TO STREAM. IF NECESSARY, CREATE A TEMPORARY PUSH-UP BERM USING LOCAL EXPOSED LAKE AND RIVER BED MATERIAL TO PREVENT RUNOFF OF MUDDY WATER INTO STREAM. IF WATER HANDLING IS REQUIRED BECAUSE OF EXCESSIVE CAVING OF TRENCH SIDEWALLS (TYPICALLY ASSOCIATED WITH FINER SUBSTRATES), A PUMP AND INFILTRATION FACILITY SHALL BE EMPLOYED AS DEPICTED ON THIS SHEET.

2. CHANGES TO THE PLAN MUST BE PROPOSED TO AND APPROVED BY THE ENGINEER. THERE SHALL BE A BACKUP PUMP AVAILABLE ON THE PROJECT SITE.

PUMPED DIRTY WATER FROM EXCAVATION; DO NOT OVERFILL, MAINTAINING MAXIMUM PONDED DEPTH = 3"; MIN PUMP CAPACITY = 500 GPM 7

"'" -40· I

TRENCH

SECTION PUSH-UP BERM; NTS

r 2"x2" BY 14 Ga. WIRE OR EQUIVALENT. IF STANDARD STRENGTH FABRIC IS USED

FILTER FABRIC~ MINIMUM 4 "x4" TRENCH

6' MAX.

BACKFILL TRENCH WITH NATIVE SOIL OR 3/4"-1.5"

WASHED GRAVEL

2"x4" WOOD POSTS, STEEL FENCE POSTS, REBAR, OR EQUIVALENT

2' MIN.

12" MIN.

STRAW BALES BUTTED SNUG TOGETHER TO FORM CONTAINMENT PERIMETER, EMBEDDED AND HELD IN PLACE BY DRIVING #4 REBAR INTO GRAVEL SURFACE;

POST SPACING MAY~E INCREASED TO B' IF WIRE BACKING IS USED

JOINTS IN FILTER FABRIC SHALL BE SPLICED AT POSTS. USE STAPLES, WIRE RINGS, OR

EQUIVALENT TO ATTACH FABRIC TO POSTS.

DETAIL SECTION TEMPORARY INFILTRATION AREA;

1 2/13/14 2 5/7/14

NO GAPS ALLOWED BETWEEN ADJACENT BALES. BACKFILL/SCRAPE GRAVEL MATERIAL UP AGAINST EXPOSED BASE OF BALE ON CONTAINMENT SIDE.

REPLACED CABLED STRUCTURES W/ FLOOD FENCES POV

ELIMINATED ARRAYS REQUIRING WATER DIVERSION POV

SILT FENCE BARRIER DETAILS; NTS

PUGET SOUND ENERGY/US FOREST SER~CE SWIFT CREEK LWD RESTORATION EROSION HAZARD REDUCTION

DESIGNED BY: POV, RN r~Resource 0 1" DRAWN BY: PDV Consultants, Inc. TESC & WATER MANAGEMENT DATE: JUNE 9, 2014

CHECKED BY: JE SHEET: REV: PLANS BAR MEASURES ONE INCH PROJECT MGR: POV REDMOND, WA 98052 5 2 NO. DATE REVISION DESCRIPTION BY CHK ON ORIGINAL DRAWINGS PHONE: (425) 556-1288 100% DESIGN

NOTES

1. SEE SHEET 2 FOR PLAN DESCRIPTION.

2. CONTRACTOR TO \£RIFY QUANllTIES FOR BID PURPOSES. SUBSTITUTIONS MAY BE PROPOSED TO ENGINEER FOR APPROVAL.

TABLE 2. QUANTITIES

PURPOSE

JARPASTATS

TESC

FLOOD FENCE

ITEM

CUT & FIL!. VOLUME · FLOOD FENCES CUT & FILL AREA • FLOOD FENCES ACCESS ROAD CLEARl\/GIFILL AREA VEGETATION CLEARING AREA (ON BAR) MA!QMUM AREA OF DISTURBANCE

STRAW BALE (PER TESC INFILTRATION AREA) RESAR SILT FENCE (BACKUP) ACCESS ROAD QUARRY SPALLS (POTENTIAL MA)()

DOUGLAS FIR LOGS (2 BOLESILOG) DOUGLAS FIR LOGS (2 BOLES/LOG) DOUGLAS FIR LOGS (2 BOLESILOG) DOUGLAS FIR LOGS (2 BOLES/LOG) DOUGLAS FIR LOGS (2 BOLES/LOG)

SPEC/DIM AMOUNT UNI T

4691 CY 0.34 ACRE 0.13 ACRE 0.16 ACRE 6.00 ACRE

>1Vv' x 3'L x 1.5'H 31 EA # 4 x 3'L 31 EA

AS NEEDED PER SHEET 8 PER WSDOT 9-13.8 103 CY

11"·12" D9H r. 26'L 30 EA 11"·12" DBH x 2S'l 50 EA 11"-12" D3H x 30'L 12"-15" DBH x 30'l 12' ·15' DBH x 1S'l

10 51 18

EA EA EA

2/13/14 REPLACED CABLED STRUCTURES W/ FLOOO FENCES POV 2 5/7 /14 ELll.41NATED ARRAYS REQUIRING WATER DIVERSION POV

NO. DATE RE\/ISION DESCRIPTION BY CHK

0 100 200

SCALE: 1" = 200'

0 1"

BAR MEASURES ONE INCH ON ORIGINAL DRAWINGS

GENERAL DISTURBANCE LIMITS (APPROX)

OUTERMOST EXTENT, 2 YR FLOOO/OHWM

GENERAL DISTURBANCE LIMITS (APPROX)

PUGET SOUND ENERGY /US FOREST SERVICE SWIFT CREEK LWD RESTORATION EROSION HAZARD REDUCTION

DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT MGR:

PDV, RN PDV JE POV

,,~Resource I~ Consultants, Inc. REDl.40ND, WA 98052 PHONE: ( 425) 556-1288

PERMITTING IN FORMATION, QUANTITIES 100% DESIGN

....

DATE: JUNE 9, 2014

SHEET: REV:

6 2