Shan sun

22.2%

67.3%

1.5%

7.0%

2.0%

19.2%

75.3%

2.3% 2.8% 0.4%

Electricity Generated Installed Capacity

Note: Data by end of 2014.

Operating sites Construction sites Site Preparing

Energy profile - resources

3

Nuclear is an important complement to china’s energy profile.

Coal mine

Taishan 2x EPR

Operating sites Construction sites Site Preparing

Status of nuclear program

4

Sanmen 2xAP1000

Haiyang 2xAP1000

Qinshan 2xCandu

Tianwan 4xVVER

Daya Bay 2x M310

Operating:7 plants,22 units, 20.1GW

Construction:12 plants, 26 units, 28.45GW

Total:48 units, 48.55GW

Site preparing:8 sites

Target: 58GW Operating, 30GW under construction by 2020

Owners: CGNPC, China Light and Power(CL&P, Hong Kong)

Operators: Dayabay Nuclear Operation and Management Company(Founded 2003)

Units: 6 M310 and modification reactors

Daya Bay 2X980MWe (1987-1994)

Ling’ao I 2x990MWe (1997-2003)

Ling’ao II 2x1080MWe (2005-2011)

Setting up nuclear development strategy and plan

Adjustment nuclear industry organization and related authority

Foster domestic industry

Boost technology

Gain experience in develop nuclear project

Build a safe and advanced NPP

Safe and reliable operation

Foster domestic workforce

Setting up an outstanding nuclear power corporation

Building a mid-upper level community for NPP employee

*Statedgic object of Dayabay plant, Department of Nuclear Inudustry, 1983 *Dayabay nuclear plant report to state government 1991

Government Corporation

GNPJVC (CGNPC)

AE

EDF

NI E&P FRA

CI E&P GEC-A BOP E&P

EDF

QA counselor

Bechtel

NI Construction HCCM

CI& BOP Installation

Shandong Electric

Start up EDF/CGN

Operation CGN/EDF

FRA:Framatome GEC-A: General Electric Company-Alstom HCCM: Huaxing,CSCEC,Campenon Bernard, Maeda SB: Spie Batignolles

NI Civil

EDF

NI Installation

FRA/SB

Counselor

Responsible for technical issues

Site feasibility study;

Plant design;

Interface between NI and CI;

Setting specification;

QA on procurement and construction;

Commissioning and operation (first two fuel cycle);

Operator training.

“Big” or “thick” organization

Foreign experts are hired in key positions for owner’s organization;

3 of 7 plant officials from France including plant manager.

28 mid- level managers including engineering, QA, construction

On job shadow training for owner management team;

Contractors ability is as crucial as the owner.

Enforcing QA ability for contractors are the responsibility of the owner

Construction team must be a combination of both domestic company and one foreign company with strong nuclear construction background

Example:Auxiliary pipe issues turn out to be on critical path.

Recruit 70 experience foreign workers, 110 English speaking technician and 400 other workers.

Owners send 20 employee to constructor as deputy manger in various divisions

210 members, 50 from EDF, 30 from Framatome, 10 from GEC-Alsthom,110 from China

A total of 6 shift, each shift 23-25 persons including 7 operators trained in France, 3 French experts( shift manager, one operator and one technical manager)

Maintenance outsourced Framatome for the first two fuel cycles with conditions of certain level of local involvement.

French leadership and maintenance till two fuel cycle.

English is the official language, other languages are highly encouraged during daily communication.

Facts: Very few people speaks French

only 1/5 employee speaks English at beginning

More than 600 foreign experts from 22 countries working on site

Actions: Intensive language training

Recruit employee proficient with English from all over China

Shadow training

Roles Daya bay 1987-1994

Ling’ao I 1997-2003

Ling’ao II 2005-2011

Owner CGNPC CGNPC CGNPC

Construction CGNPC/EDF CGNPC CNPEC

NI Framatome Framatome CNPE

CI GEC-Alstom GEC-Alstom GEDI

Design review EDF EDF CNPE

NI QA EDF EDF CNPEC

CI QA EDF CGNPC CNPEC

BOP design EDF CNPE CNPE

Start up EDF/CGNPC CGNPC/EDF CGNPC

Operation EDF-CGNPC CGNPC CGNPC

CNPE: China Nuclear Power Engineering(CNNC) CNPEC: China Nuclear Power Engineering Company(CGNPC) GEDI: Guangdong Electric Power Design Institute

EDF role: AE - Counselor - Support