SHAILENDRA KUMAR SHARMA NOKIA PT-ID ZEPP/D/TL3/042549 RZ-91/271, HANSPARK, WEST SAGARPUR, NEW DELHI- 110046, INDIA Indian : +919455680193 E- mail:[email protected] PROFESSIONAL EXPERIENCE “5 Years 6 Month” Nokia Networks Limited ,Noida on Payroll of Future Focus Infotech Pvt. Ltd., Delhi Project Coordinator (Client Mobily, Middle East Region) 27 JAN 2016 to Till Now Remotely handling the end to end project of Mobily Middle East . Scheduling meetings with different stake holders of the project on WebEx. Mailing MOM of the meetings to the stakeholders. Closely follow up the action points of the MOM. Coordinating with project manager for 2G\3G\4G technologies in Mobily. Closely follow up with targets defined for the month. Currently handle Global Delivery Centre (GDC) for Nokia, Mobily Project Saudi Arabia. Coordinate with planning and CPM team based at Saudi for POR and TSSR approval of the sites. Responsible for SOR sharing among Stakeholders. Responsible for the POR creation. Responsible for the KPI of the roll out. Defining SLA for partners on IPM for submission of documents. Coordinate with Partner for I&C, site integration. Coordinate with Nokia Planning Team site is ready for DT with tilt picture. IPM uploading at each level and approval of the relevant documents under the defined SLA. Coordinate with Customer for Pre-Launch Team and Optimization Team for On-Air sites.

Shailendra Sharma9455680193

Embed Size (px)

Citation preview

Page 1: Shailendra Sharma9455680193

SHAILENDRA KUMAR SHARMA NOKIA PT-ID ZEPP/D/TL3/042549

RZ-91/271, HANSPARK, WEST SAGARPUR, NEW DELHI- 110046, INDIA Indian :+919455680193 E-mail:[email protected]

PROFESSIONAL EXPERIENCE “5 Years 6 Month”

Nokia Networks Limited ,Noida on Payroll of Future Focus Infotech Pvt. Ltd. , Delhi Project Coordinator (Client Mobily, Middle East Region) 27 JAN 2016 to Till Now

Remotely handling the end to end project of Mobily Middle East . Scheduling meetings with different stake holders of the project on WebEx. Mailing MOM of the meetings to the stakeholders. Closely follow up the action points of the MOM. Coordinating with project manager for 2G\3G\4G technologies in Mobily. Closely follow up with targets defined for the month. Currently handle Global Delivery Centre (GDC) for Nokia, Mobily Project Saudi Arabia. Coordinate with planning and CPM team based at Saudi for POR and TSSR approval of the

sites. Responsible for SOR sharing among Stakeholders. Responsible for the POR creation. Responsible for the KPI of the roll out. Defining SLA for partners on IPM for submission of documents. Coordinate with Partner for I&C, site integration. Coordinate with Nokia Planning Team site is ready for DT with tilt picture. IPM uploading at each level and approval of the relevant documents under the defined SLA. Coordinate with Customer for Pre-Launch Team and Optimization Team for On-Air sites. Coordinating with Close out team for completing the all work at sites. Coordinate with Customer for Invoicing and Justification for Ready for Site Services.

PeakWay Wireless Engineering Pvt. Ltd. ChandigarhProject Coordinator 1NOV-2015-10Dec2015

Coordinating with the team regarding Installation of BTS & All project work. ENodeB (LTE) site Installation and commissioning 2300, 1800 and 850 band of GSM &RRU. ENodeB (LTE) two day’s take training schedule in Chandigarh Samsung office. Software and Firmware up gradation (4.0 to 5.0) of ENode-B. L9CA (2300+1800), and LCB3 (850) install according to Band into CDU. RET change according to plan provided by RF team. ATP 11A and ATP11B Submission of 2300, 1800, 850 Bands on Site forge Account ENode B Login via Telnet through Secure CRT. Specially dedicated for Alarm Rectification before Handover to Customer.

Micro Clinic India Pvt. Ltd. New Delhi

Page 2: Shailendra Sharma9455680193

Sr. Customer Support Engineer 25FEB 2013 – 18 Apr2015

Relcom Engineering Pvt Ltd. BrazilProject installer & Integrator Engineer 25MAY2012 – 28AUG2012

Ericsson 6000 NodeB’s Integration, Installing SW/HW and any required updates. Correction on Script .E1 Port configuration, Loop Test to backbone site. After completion

of Cell Sites installation and commissioning, call in RNC for site Creation. Verification of Installation & Commissioning of NEs prior to handover to O&M. Configuring Node B’s as per the customer request. Activation and License with BPFTP.iubover ATM, IUBover IP ,LicensMe,Updates and other

tasks; use Win commander for Software Dump Transfer from Laptop to NodeB’s. Installation, Testing, Commissioning and Alarm configuration of Ericsson Node B Ericsson transmission equipment like Minilink TN Traffic node, NPU, MMU, LTU, ETU. Coordinating with the team regarding Installation of Node B &All project work. Responsible for determining the quality of vendor’s work. & Acceptance Test.

KRAFTERS TELECOM SERVICES MUMBAI, INDIAProject Coordinator OCT-2010-JULY-2011

Operation and Maintenance of Nokia Cell Sites. Handling FHO & FHY Project and Coordinating with the team regarding Installation. Build MRF, SRN & CAM report with according to NSN. Provide help Engineer on sites integrate online swap and more. Operation and maintenance of microwave links of 7 GHz & 15 GHz bands including STM

hops. Maintenance of MW antennas, alignment and Rx level as provided by TNI Department. Problems as also to work for emergency support. Supervising Microwave link which is handover from Project to O&M Dept. Traffic routing on SDH Chain & Ring. Installation, Commissioning, operation and maintenance of NEC IDU & with alarm

rectification. Also Familiar with Mux Alcatel Lucent. Suggesting solutions & plans for various transmission related problems for better meant

and growth of network. Maintenance, Protection Planning, Installation and commissioning for Ultra as well as Flexi

BTS. Also has good hand on Nokia BTS (Installation & Commissioning). Ensure Fast Restoration of network during outage & Rectify outage reason after worth.

ZEPPELIN MOBILE SYSTEM INDIA LTD. UTTAR PRADESH, INDIAProject Engineer Jun, 2009 to Oct 2010.

Coordinating with the team regarding Installation of BTS & All project work. Responsible for determining the quality of work. & Acceptance Test. I&C of Nokia BTS (ULTRA, FLEXI). Different NSN products. Commissioning of transmission units FIU 19E, FIU19, FXC RRI, FIFA, FIPA. I&C of Alignment of Microwave link. E1 provisioning for a new &cabinet Expansion Site. Completely responsible for Integration and I&C, and Handover of sites.

Page 3: Shailendra Sharma9455680193

Rectification of Punch points, If any observed during AT. Configuring BTS as per the customer request and BTS Expansion Quality & A.T check for new sites,and V.S.W.R measurement using site master. Rectification all types of problems related to BTS and Microwave. Preparing BTS documentation and final Acceptance test report. Verification of Installation & Commissioning of NEs prior to handover to O&M.

Relcome Engineering Private Limited UP, HP, INDIAProject Engineer Jan-2009 to jun-2009

O&M Installation and commissioning of Nokia ultra site BTS. O& M and Implementation and Commissioning of FIU 19, FIU 19E Working and Commissioning of ODU (7 GHz and 15 GHz) and Nokia FIU. Carrying out traffic routings for new sites Looking after the whole Team and planning the installation and commissioning

of cell sites within specified time frame. Installation of 2964 & 2954 Checking the earthlings of the Equipment Checking the power connection Power ON the BTS and check the status of all TRX Making the Hardware Configuration according to the actual hardware Configuring the Cross connection. Preventive Maintenance BTS Sites E1 testing and commissioning Transceivers test. Commissioning & Alignment of M/W Links (.3m, .6m, 1.2m,1.8m).

TRAINING

2 Weak 2G&3G Practical Training organized by Zeppeline Mobile System India Ltd. for NOKIA SIEMENS NETWORK (INDORE)

1 Weak 2G&3GSystra Training organized byZeppeline Mobile System India Ltd. (BHOPAL) Catia v5, Autocad, Ideas, Unigraphics, nx, 3D Modelling, Pro e, part modelling, Surface Modeling,

pro engineer, wildfire, auto cad, cad, pro engineering, ugnx, proe, solid works, Maintenance & Assembling of Pc’s, Computer Networking & Administration (A.V.T.S, KANPUR).

QUALIFICATION10TH UTTAR PRADESH, INDIA12TH UTTAR PRADESH, INDIAI.E.T.E NEW DELHI, INDIAB.TECH in (Computer Science)

COMPUTER SKILLS

MS-Office, Basic Operating System Troubleshooting

Operating System - Windows2K (SERVER, XP SP2/SP3) WINDOWS 7.

PERSONAL DETAILS

Page 4: Shailendra Sharma9455680193

NAME : SHAILENDRA KUMAR SHARMA.FATHER’S NAME : SHRI JANARDAN SHARMA.SEX : MALE.MARITAL STATUS : MARRIED.LANGUAGE : HINDI, ENGLISH, PORTEGESE.Passport No : (H 5528476)

I, hereby declare that the details furnished above are true and complete to the best of my knowledge and belief.

Place: NEW DELHI

Date……………… SHAILENDRA KUMAR SHARMA