    New Machine Performance Judgment Table

    1 RST-08-01-001EN

    New Machine Performance Judgment TableNew Machine Performance Judgment Table

    SH200

    Performance Judgment Check SheetChecked, S Measured, A Adjusted

    Inspection item Check Remarks

    Water and oil amount inspection

    1. Radiator coolant amount

    2. Engine oil amount

    3. Hydraulic oil amount

    Pre-conditioning operation inspection

    1. Engine start/stop

    2. Air bleeding implementation

    3. Operation check for each section

    4. Oil leak inspection

    Hydraulic oil cleanliness inspection

    Electrical system inspection

    1. Model selection check

    2. Monitor display check

    3. Throttle volume function check

    4. One-touch/auto idle function check

    5. Lever lock function check

    6. Neutral start function check

    7. Travel high-speed function check

    8. Horn volume switching functioncheck

    9. Travel alarm function check

    10. Power-cut delay function

    11. Accessory operation check

    Radio Air conditioner

    Wiper Horn

    Working light Room lamp

    Clock Hour meter

    Backlight

    Engine inspection

    1. Engine speed

    (as

    required)

    Idling min-1

    No-load maximum min-1

    2. Engine rotation condition

    During idling

    No load

    3. Engine exhaust gas color

    4. Engine noise, vibration

    5. Engine Stop

    Key switch OFF

    Emergency stop switch

    Hydraulic equipment inspection

    1.Pressure at each section check

    (separate sheet)

    (as

    required)

    2. Noise check for each section

    3.Natural drop for each cylinder

    (separate sheet)

    4. Operation speed for each cylinder(separate sheet)

    5. Swing speed (separate sheet)

    6.Swing brake performance

    (separate sheet)

    7. Swing status and noise

    8. Travel speed (separate sheet)

    9. Turn

    10. Travel status and noise

    Operability inspection

    1. Operation state for each lever

    Shoe tension status

    Other

    1. Oil leak inspection for each section

    2.Rubber hose lines oil leak inspec-

    tion

    3. Bolt and nut loosening, falling off

    4. Cab inspection

    5. Cylinder inspection

    Inspection item Check Remarks

    1

  • 7/26/2019 SH330-5 Service Text 07

    2/7

    2RST-08-01-001EN

    New Machine Performance Judgment Table

    Performance Measurement Entry Table

    Model name: Serial No.Measurement date

    MeasurerDate

    Hour meter: Attachment Arm m3Bucket Remarks

    1 Engine speedIdling rotation min-1

    No-load maximum speed min-1

    2

    Check the pressure ateach section(and measure as nec-essary).

    Relief name Operation Measurement pressure

    Main relief

    Standard MPa

    Pressureboost

    MPa

    Swing reliefLeft and

    rightMPa

    Pilot relief MPa

    For the measurement and adjustment methods, see the hydraulic measurement adjustment procedures.

    3Natural fall distancefor each cylinder(in 10 min.)

    Boom cylinder mm

    Arm cylinder mm

    Bucket cylinder (open) mm

    Overall (for 10 min.) mm

    4Operating speed foreach cylinder (sec.)

    1 rotations 2 rotations 3 rotations Total Average

    BoomUp

    Down

    ArmOpen

    Close

    BucketOpen

    Close

    5Swing speed (sec./rotation)

    1 rotations 2 rotations 3 rotations Total Average

    Left swing

    Right swing

    6 Swing 180 neutral brake flow angle (degrees)1 rotations 2 rotations 3 rotations Total Average

    7 Travel speed (sec./6 meters)

    1 rotations 2 rotations 3 rotations Total Average

    Front

    Rear

    8 Drive sprocket speed(sec./10 rotations)

    1 rotations 2 rotations 3 rotations Total Average

    Low front

    Low rear

    High front

    High rear

    9Turntable bearing movement dis-tance

    Left and right mm

    Up and down mm

    10Shoe extension distance from the side frame bottom surface tothe shoe top surface

    mm

    11 Travel turning amount mm

    12 Travel motor leakage amount L/min

    13 Swing motor leakage amount L/min

    14 Bucket tip movement amount mm

    2

  • 7/26/2019 SH330-5 Service Text 07

    3/7

    Measurement Method and Main Unit Posture

    3 SST-08-03-005EN

    Measurement Method and Main Unit PostureNew Machine Performance Section

    SH330

    Engine SpeedMeasurement method

    [1] No load operation mode at high idle:SP mode, H mode and A mode speed

    [2] Operation mode at low idle: SP mode speed

    Main unit posture: bucket on ground

    Pressure in Each SectionMeasurement method

    [1] Engine high idle

    [2] Oil temperature is 45- 55

    [3] Travelling and swing is measured between the counter bal-ance and motor.

    [4] Measure the main relief pressure before adjusting the over-load pressure, and then measure the overload pressure afterthe main pressure has been increased to a level as high orhigher than the overload pressure. Return the main pressureto regulation pressure after measurement.

    Main unit posture: operate each attachment in the travel pos-ture.

    Cylinder Falling AmountMeasurement method

    [1] Have oil flow into each cylinder before measurement with the oil at 45- 55(Record the oil temperature before and after measurement)

    [2] Make the height of the boom foot pin and the bucket pin the same.The arm cylinder is fully retracted, and the bucket cylinder is fully opened.

    [3] Engine is stopped.

    [4] After 10 min., measure the extension amount and retraction amount of the boom, arm, and

    bucket cylinder rod.[5] Along with measuring the movement amount of the cylinders after 10 min., measure the tip dis-

    placement.

    Main unit posture

    1

  • 7/26/2019 SH330-5 Service Text 07

    4/7

    4SST-08-03-005EN

    Measurement Method and Main Unit Posture

    Attachment SpeedMeasurement method

    [1] Engine high idle

    [2] Oil temperature is 45- 55 .

    [3] No load

    Main unit posture

    Boom cylinder

    With the arm fully out and the bucket fully opened,measure the operation time it takes the boomcyclinder to go from fully upwards to the groundand also from the ground to fully upwards[Note] When the boom is lowered, make sure not

    to directly hit the concrete (place tires onthe ground).

    Arm cylinder

    With the arm cylinder fully out and the arm hori-zontal to the ground, measure the operation time ittakes the arm cylinder to do a full stroke withbucket cylinder fully out

    Bucket cylinder

    Measure the operation time for a full stroke at themaximum radius.

    2

  • 7/26/2019 SH330-5 Service Text 07

    5/7

    Measurement Method and Main Unit Posture

    5 SST-08-03-005EN

    Swing SpeedMeasurement method

    [1] Engine high idle

    [2] Oil temperature is 45- 55 .

    [3] No load

    [4] The time required for the next rotation after one rotation

    Main unit posture

    Swing (180) Brake AngleMeasurement method

    [1] Engine high idle

    [2] Oil temperature is 45- 55 .

    [3] No load

    [4] Swing 180and measure the flow angle after neutral braking

    Main unit posture: same as the above

    Travel SpeedMeasurement method

    [1] Engine high idle and oil temperature is 45- 55with no load.

    [2] Measure the required time to travel 6 m after a 4 - 5 m running start. If the off travel distance is1 m or more, however, use the off travel distance as a reference value to correct the off travel,then measure the travel speed again.

    [3] Travelling should be done on concrete.

    [4] Conduct both high-speed and low-speed travelling.

    3

  • 7/26/2019 SH330-5 Service Text 07

    6/7

    6SST-08-03-005EN

    Measurement Method and Main Unit Posture

    Off Travel AmountMeasurement method

    [1] Engine high idle and oil temperature is 45- 55with no load.

    [2] Measure the required time to travel 20 m after a 4 - 5 m running start.

    [3] Shoe tension amount should be standard.

    [4] Measure for both forward and backward traveling.

    [5] Measure for both high-speed and low-speed traveling.

    Main unit posture: same as with travel speed measurement.

    Travel Sprocket SpeedMeasurement method

    [1] Engine high idle

    [2] Oil temperature is 45- 55.

    [3] Raise a shoe, and after achieving a constant speed, measure thetime required for the sprocket to rotate 10 times both forwardsand backwards.

    [4] Measure for both high-speed and low-speed traveling.Main unit posture: 90swing, shoe raised.

    Shoe Tension AmountMeasurement method

    [1] Raise the shoe and, at the central position of the track, measure the gap between the undersideof lower side frame and the topside of the shoe plate.

    [2] Measure for both the left and right sides.

    4

  • 7/26/2019 SH330-5 Service Text 07

    7/7

    Measurement Method and Main Unit Posture

    7 SST-08-03-005EN

    Swing Ball Race Bearing Movement Amount and Bucket Tip Movement AmountMeasurement method

    A) Up and down direction measurement

    [1] Measure the up and down movement amount at two locations in front of and behind the ballrace.

    [2] Move the arm cylinder out and close the bucket cylinder, and move the bottom surface of thebucket 30 cm above the ground. Attach a dial gauge to the lowering section as shown in thefigure below and do zero point adjustment.

    [3] Jack up the main unit and measure the amount of movement with the dial gauge.* Jack up the main body until the swinging of the dial gauge becomes constant.

    Main unit posture

    B) Left and right direction measurement[1] Measure the left to right movement amount at the front side of the ball race and the left to right

    movement amount of the bucket tip.

    [2] The arm cylinder and bucket cylinder are in the open position, apply 294.2 - 392.3 N of forceto one side, and zero point adjustment is done for these conditions.

    [3] 294.2 - 392.3 N of force is applied to the opposite side and the left to right movement is mea-sured.

    Main unit posture