39
Technical Training Technical Training Good Installation Practices Good Installation Practices Service Section Service Section Technical Training Technical Training

Service Section Technical Training. Good Air Conditioning Installation Practices

Embed Size (px)

Citation preview

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Service SectionService Section

Technical Training Technical Training

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Good Air Conditioning Good Air Conditioning Installation PracticesInstallation Practices

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Contents

• Location of installationLocation of installation

• PipingPiping

• CleanlinessCleanliness

• ElectricalElectrical

• Refrigerant CircuitRefrigerant Circuit

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of InstallationLocation of Installation

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

Indoor unitIndoor unit

• Ceiling too highCeiling too high

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

Indoor unitIndoor unit

• Unit installed in an enclosed areaUnit installed in an enclosed area

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

Indoor unitIndoor unit

• Dirty or chemically hazardous environmentDirty or chemically hazardous environment

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

Indoor unitIndoor unit

• Avoid high electrical interference environment ( infra Avoid high electrical interference environment ( infra red bar code scanning machine, lighting with red bar code scanning machine, lighting with electronic ballast)electronic ballast)

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

Indoor unitIndoor unit

• No service openingNo service opening

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

Indoor unitIndoor unit

• Duct work too shortDuct work too short

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

Outdoor unitOutdoor unit

• Select a suitable installation siteSelect a suitable installation site

A place where …...A place where …...

…… …… Easy for serviceEasy for service

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

Outdoor unitOutdoor unit

• Select a suitable installation siteSelect a suitable installation site

A place where …...A place where …...

…… …… Comply to installation clearanceComply to installation clearance

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

Outdoor unitOutdoor unit

• Select a suitable installation siteSelect a suitable installation site

A place where …...A place where …...

…… …… Do not block the air dischargeDo not block the air discharge

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

Outdoor unitOutdoor unit

• Select a suitable installation siteSelect a suitable installation site

A place where …...A place where …...

…… …… The return air is not short cycleThe return air is not short cycle

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

Outdoor unitOutdoor unit

• Select a suitable installation siteSelect a suitable installation site

A place where …...A place where …...

…… …… To avoid strong windTo avoid strong wind

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

DrainageDrainage

• A proper drainage system is crucialA proper drainage system is crucial

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

DrainageDrainage

• A proper drainage system must be slopedA proper drainage system must be sloped

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

DrainageDrainage

• Beware of where it endsBeware of where it ends

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Location of Installation

DrainageDrainage

• Proper length is crucialProper length is crucial

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

PipingPiping

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Piping

• Keep the piping as short as possibleKeep the piping as short as possible

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Piping

• Provide oil traps if height of installation exceed 10mProvide oil traps if height of installation exceed 10m

10m

5m

Condenser

Evaporator

Condenser

Evaporator

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Piping

• Insulate the pipe and insulate it separatelyInsulate the pipe and insulate it separately

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Piping

• Bend the pipe using pipe bender instead of hands.Bend the pipe using pipe bender instead of hands.

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Piping

• Do not size up or size down the pipe (especially for Do not size up or size down the pipe (especially for heatpump model)heatpump model)

> Pipe size up - refrigerant velocity downPipe size up - refrigerant velocity down

> Pipe size up - more refrigerant needed - refrigerant Pipe size up - more refrigerant needed - refrigerant floodbackfloodback

> Pipe size up - dilution of oilPipe size up - dilution of oil

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

CleanlinessCleanliness

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Cleanliness

• Do not expose pipes or components to Do not expose pipes or components to environment over an prolong period.environment over an prolong period.

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Cleanliness

• Keep moisture out of pipes or components Keep moisture out of pipes or components

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Cleanliness

• When laying pipes through walls, end of When laying pipes through walls, end of pipes must be properly sealedpipes must be properly sealed

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Cleanliness

• When cutting a copper pipe, use copper When cutting a copper pipe, use copper cutter instead of saw.cutter instead of saw.

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Cleanliness

• Always vacuum before charge in refrigerantAlways vacuum before charge in refrigerant

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Cleanliness

• Always braze with present of nitrogenAlways braze with present of nitrogen

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

ElectricalElectrical

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Electrical

• Remote control wiring should be separated from Remote control wiring should be separated from power cablepower cable

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Electrical

• Screw must be tight at terminalsScrew must be tight at terminals

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Electrical

• Examine the power sourceExamine the power source

• Determine the maximum load the power source can Determine the maximum load the power source can handlehandle

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Refrigerant CircuitRefrigerant Circuit

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Refrigerant Circuit

• Proper leak checkProper leak check

• Properly charge the systemProperly charge the system

• For no pre-charge system which is using scroll For no pre-charge system which is using scroll compressor, must contain 80% charge before startcompressor, must contain 80% charge before start

• For system that using TXV, make sure the TXV is For system that using TXV, make sure the TXV is properly installedproperly installed

Te

chn

ica

l Tra

inin

gT

ech

nic

al T

rain

ing

Good Installation PracticesGood Installation Practices

Thank youThank you