Service box / Patch panel

Cabling detector counting room

Power supplies LV and HV

LHCb Outer TrackerServices and Infrastructure

Page 2: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

Module Electronics Box

HV1 HV2I2C1 I2C2+5v/2.5A-5v/1.6A

Fiber(gol)

LV ECS-Temp-Volts

TFCsub1

TFCsub2

Gas2

Gas1

Page 3: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

Module Electronics Boxwithout shielding box

Page 4: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

The Hall in 3d

Page 5: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

Outer Tracker with 3Stations and 24 Service Boxes(status proposal still to be discussed, depending on mechanics)

BEAM

STATION 1

STATION 2

STATION 3

Service box

Curtain1.1.rightCurtain1.1.left

Curtain1.2.right

ToCounting Room

Module Electronics Boxes

Page 6: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

A Curtain move out to reach electronics easily

BEAM

STATION 1

STATION 2

STATION 3

Service box

Curtain1.1.rightCurtain1.1.left

Curtain1.2.right

ToCounting Room

Cabling toCounting Room

Page 7: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

Old type Service box for 2 curtains

I2C

I2C

I2C

I2CI2C

I2C

I2C

I2C

I2C TFC

TFC

TFC

TFCTFC

TFC

TFC

TFC

TFC Data

Data

Data

Data

Data

Data

Data

Data

Data

Data

Data HV

HV

HV

HV

HV

HV

HV

HV

HV

HV

HV LV

LV

LV

LVLV

LV

LV

LV

LV

LV

LV

Gas

Gas

Gas

GasGas

Gas

Gas

Gas

Gas

Gas

Gas

GasGas

Gas

Gas

GasGas

Gas

Gas

Gas

Gas

Top view of a part of the Tracker Quadrant

TQ-distriboxPower

low voltage (36x)Powerhigh voltage (36x)I2Cbus (8x)Clock, trigger and resets (36x)

LV

Fibers toL1 Buffer

Fiber to TFC Fiber to ECS Cables to HV supply Cables to LV supply

Matched Cables

(4)

Page 8: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

A Service Box for 1 Curtain

2 outputs

Page 9: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

DC

SPECS

HV

The Cables of 1 Service Boxgoing to counting room

TFC fiber

Data fibers18* 1Gb/s

3 cm

4 cm

DC +5V /50A 12mmdiamDC 0/50A 12mm diamDC-5V 40A 12mm diamDC 0 40A 12mm diam

HV 36/52* 2.5KV , 15mm diam

SPECS STP 4pairs 5 mm diam.

TFC 1 optical fiber 3 mm diam

Data fiber 18 * 3mm diam

Page 10: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

Interface to ECSService Box 1

Detector area

Counting Room area

Wall

Service Box 24

SPECS slave insideI2C 9 connectionsI2C 9 connections

1 Jtag chain internal for 18 Alcapone chips24 SPECS cables

24 specs masteroutputs

Page 11: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

Service Box 1 Detector area

SPECS slave inside

I2C 9 daisy chained connections

1 Jtag chain on Service Boxfor 18 Alcapone chips

I2C for OTIS and GOL

Interface to ECS 2

I2C 9 daisy chained connections

Page 12: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

Interface to TFC 1Service Box 1.1.left

Detector areaCounting Room area

Wall

Service Box 24

TTCrx inside

2 TFC fibers

18 TFC-sub cables

LEFT SIDESEGMENT

Service Box 1.1.right

Service Box 3.2.left

TTCocOptical Splitter 12/16

Service Box 12

1

12

Page 13: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

Interface to TFC 2

Service Box 1.1.left

Detector areaCounting Room area

18 TFC-distr cables

Service Box Left side curtain

TTCrx LVDS buff

B channel decoderActel 54SXxx

Detector Electronics

OTISCLK BX

RESETSL0 trig

ECS

GOL

ASD

RJ45 diff

Optical splitter

Page 14: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

Detector cabling and grounds

Which ground connections do we have

•Signal ground•Safety ground, Frames•Supply grounds•Connection to Counting room•Connection to Other Detectors

Page 15: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

TCF Optical Splitter #1 data fibers (#432)Service box

Slave

DetectorAlu plane

TDC

Amp

Opto Transm Regu-

lators

TDC

Amp

Opto Transm

Regu-lators

Foil 5 m long12um*34cmRseries= 21 milli-ohm

DetectorAlu plane

TDC

Amp

Opto Transm Regu-

lators

TDC

Amp

Opto Transm

Regu-lators

Foil 5 m long12um*34cmRseries= 21 milli-ohm

HV Supplies2.5 KV/200uAwith floating outputs

+5V / 50A typ

-5V / 35A typ }

ECS SPECS Masters

TCF

Frame

TCF fibers (#2)

L1Electronics

Thick DCcables 50mm2(24*4=96)

ECS cables (#24)

}

{

{

TCF Optical Splitter #2

Multi Wire HV Cables 1,5cm thick#24

HV #182.5KV/200uA

LV #18

ECS

}

}

}

I2C

MAIN 80m CABLE DUCT

OtherDeterctor

Central Safety Ground

Detector Cabling

Page 16: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

The Cables of OT in the 100m Cable Duct (total 24 Service Boxes, about Realistic Size on A4)

2 TCF fibers

Cables from 1 Service Box

15 cm

22 cm

Page 17: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

LV supplies / Patch Panel

Each MODULE ELECTRONICS BOX needs +3V/1.6A, -3V/1.6A , +2.5V /~1AToo critical to supply remotely (deviation <+0.1/-0.1V)Radiation Hard Regulators from CERN used.

Remote Supply 5V on detector (Regulators need extra voltage)

Corners of the Detector have 18 Module Electronics Boxes to feed.So +5V/ ~50A typical , -5V / 40A typical (->50A)THE SERVICE BOX SERVES AS PATCH PANEL

Cables 4 * ~50mm2 50A, 1.7V drop over 100 m

LV Supplies in Counting room for each of the 24 Service Boxes with24 times +5V/50A and 24 times +5V/ 40APlus and Minus have separate ground cables, not combined !Outputs are “Floating”, Grounded ON DETECTOR

Patch panels on Service Boxes

Page 18: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

HV supplies / patch panelsModule needs 2.5KV, 200uA max for 128 channels. ( typical; 1.5KV / 10uA )Current limiting without damage of detector (0-200uA levels ok)

Ground On Detector, HV Supplies semi floating. (safety rules respected)

First fan out on Service Box (patch panel 1)

Multi Wire HV Shielded Cable ( 2*18=36 wires) to Counting Room supplies

Patch Panel2 in Counting Room Used for further combining of module layers(also used for fuse handling)

HV supplies in Counting Room proposed 432 (+spare) outputs for 0-2.5KV/ 200uA in about 3 cratesECS prepared ( for instance CAEN 1527 equipped with modules)

DETAILS OF DESIGN

2 layers of module each have own connector. But are combined with 1other layer

HV Fuses would need “extra local supply of 1.5KV 2mA”

Page 19: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

Count Room Patch Panel

Main HV Supply

Incl LV for distributors

1

24

18 modules/curtain(=36 wires)

Corner Service box

Detector Area(Radiation Area)

Count Room Area(Radiation Free Area)

Radiation Protection

Wall

HV cabling schematic

Page 20: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

Cooling……

•No Heat dump in Hall , Hall- air conditioner can handle 80KW total

•Mixed water for : no condensation on HV parts 19C = above dew point

•Module Electronics needs to be cooled also in view of high packing density

•Counting Room Crates cooled by LHCb standards, “intercoolers” etc.

Page 21: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

Cooling the LHCb Outer Tracker electronics

Detector Electronics L1 Crates

Wall Counting roomDetector

LV Crates HV Crates

Feb 2003/TS

Page 22: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

Dowel Pin

Electronics box

Cooling flap

Thermal isolation Module hanger

Cooling plane

Detector Electronics Cooling Possibility(IN STUDY)

Module with straws

Enlarged module ends side view

Rotated modules front view

Page 23: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

Station 1

Hanging frame 1

Module spacer /Thermal isolation

Curtain Guide

Possible Cooling of Detector Electronics for OT stations

curtain 1 curtain 2 curtain 1 curtain 2 curtain 1 curtain 2Station 2 Station 3

225W typ

225W typ

Page 24: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

1 module 25W typical9 modules in a layer= 225W2 layers in a curtain, (separate cooling tubes) = 450W

2 curtains in a station = 900W at the top cornerAlso 900W at the bottom corner

This means 1800W per station left, and 1800W per station right. = 3600W/station

3 stations = 10800W typical power capacity needed.

We need to move the curtains 2.5 to 3 meters,

This needs Flexible hoses,

Cooling capacity needed

Page 25: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

Cooling wish-list:

”Mixed water” from O.T regulated circuit 19 degree C

Flow and pipe diameters to be determined

Closing valves at each station manifold

Page 26: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

• Expected 10 KRAD

• Rad Tolerant components used– On Detector Electronics:

• HV board 32 ceramic HV capacitors, 32 resistors, 32 springs

• Preamp board ASDBLR + resistors, capacitors, protection diodes (like atlas TRT, 1Mrad )

• TDC board : OTIS 0.25um, rad-hard lib

• Optical transmitter + auxillary board:– 1 GOL CERN Rad hard, 1 optical transmitter (VCSEL)

– 4 Voltage Reg. Rad Hard

– TFC trig, clk, resets LVDS input from distribution box

– I2C in/out OTIS

Radiation Tolerance1

Page 27: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

Radiation Tolerance2• Expected 10 KRAD

• Rad Tolerant components used– On Detector Electronics 2:

• Distribution box– Alcapone gate all around, also adc,

» Alcapone from alice 4 ch 8 bits 0.25um, rad tol, rad hard lib, jtag readout/control

» Power up reset needed for ADC … out of SPECS slave

– TTCrx + lvds+ decoder in atmel antifuse, triple vote…… still in study

– Specs Slave 10KRad with I2C buffer and Jtag lvds buffer ….. SaclayPerhaps combine with Specs slave with TTC decoder in Atmel.

Page 28: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

Conclusion

Infrastructure concept in proposal stage based on LHCb- light

Number of cables (even curtains) not fixed yet due to mechanic construction uncertainties

Talks with ECS / SPECS and TCF for consensus have to start.

Page 29: Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure

Some Problems to Solve ……..

1 When do we install cables, who does it

2 Need for Rad. Tol. lvds buffers, (QPLL, and Antifuse logic) etc.

3 Radiation Tolerant Supplies cheaper? (reduced cabling and installation)

4. SPECS grounding currents ? safety grounds potential difference between detector and Counting Room garanteed to be < 100mV??