Effective October 2014 www.cardcompro.com 1
SERIES CF451T 2” x 4½” - B2
SERIES CF451TINSTALLATION INSTRUCTIONS
Fabrication for Panel Assembly
High Performance Thermal Storefront System
2 www.cardcompro.com Effective October 2014
SERIES CF451T 2” x 4½” - B2
Effective October 2014 www.cardcompro.com 3
SERIES CF451T 2” x 4½” - B2
TABLE OF CONTENTSGENERAL NOTES ................................................................................................................. 4 - 5Common Storefront System Field Failures................................................................................... 6Key Elevations ............................................................................................................................. 7System Component Identification ........................................................................................... 8 - 9
FRAME FABRICATIONDetermine Frame Size................................................................................................................. 10Cut Lengths ......................................................................................................................... 11 - 14Fabricate Sill, Vertical & Jamb Members ..............................................................................15 - 16Fabricate Head & Subsill Receptors.....................................................................................17 - 18
FRAME ASSEMBLYAssemble Frames.................................................................................................................19 - 20Subsill Receptor End Dam .......................................................................................................... 21
FRAME INSTALLATIONInstall Subsill Receptor ................................................................................................................ 22Subsill Receptor Splice................................................................................................................ 22Install (Optional) Head Receptor .................................................................................................. 23Clean Subsill Receptor ................................................................................................................ 24Expansion Mullion ....................................................................................................................... 25Panel Installation ..................................................................................................................26 - 27
GLAZINGABC’s of Glazing ................................................................................................................ 28 - 29Install Water Diverter .................................................................................................................. 30Glazing Steps .............................................................................................................................. 31
SPECIAL CONDITIONSSubsill Receptor at Doorframe .................................................................................................... 32Corner Mullions ........................................................................................................................... 33Column Covers ............................................................................................................................ 34Bulkhead/Horizontal .................................................................................................................... 35
BUTT GLAZINGKey Elevation and Details............................................................................................................ 36Glazing Sequence ....................................................................................................................... 37
PERIMETER SEALPerimeter Seal ............................................................................................................................. 38Sealant Coverage Chart .............................................................................................................. 39
PERIMETER ANCHORFastener Embedment .................................................................................................................. 40Wood Substrate Fastener Schematics .................................................................................41 - 44Steel Substrate Fastener Schematics ..................................................................................45 - 48Concrete Substrate Fastener Schematics ............................................................................49 - 52
NOTE: These instructions are prepared for Series CF451T. Use these same instructions for Series CF451 non-thermal and delete the “T” suffix from part numbers.
4 www.cardcompro.com Effective October 2014
SERIES CF451T 2” x 4½” - B2
INSTALLATION INSTRUCTIONS
PART 1-Handling, Storing and Protection of Aluminum
A. PRECAUTIONS: The following precautions are recommended to protect architectural aluminum materials against damage. Following these precautions will help ensure early acceptance of your products and workmanship.
B. HANDLE CAREFULLY: All aluminum materials stored at job site must be stored with adequate separation and not stacked directly onto the concrete floor slab to prevent materials from being damaged when handling. Cardboard wrapped or paper interleaved materials must be kept dry.
C. CHECK ARRIVING MATERIALS: Check for quantity and keep records of where various materials are stored.
D. KEEP MATERIAL AWAY FROM WATER, MUD AND SPRAY: Prevent cement, plaster or other materials from damaging the finish.
E. PROTECT MATERIALS AFTER ERECTION: Wrap aluminum section profiles with polyethylene or protect by erecting a polyethylene splatter screen. Cement, plaster, terrazzo, other alkaline solutions and acid based materials used to clean masonry are very harmful to the finish and should be removed with water and mild soap IMMEDIATELY. Please reference AAMA 609 and AAMA 610-2 for cleaning architectural aluminum.
PART 2- General Installation Instructions
A. CHECK SHOP DRAWINGS, INSTALLATION INSTRUCTIONS AND GLAZING INSTRUCTIONS to become thoroughly familiar with the project. The SHOP DRAWINGS take precedence and include specific details for the project. The INSTALLATION INSTRUCTIONS are of general nature and cover most common conditions.
B. ERECTION: All materials are to be installed plumb, level and true.
C. BENCH MARKS: All work should start from bench marks and/or column lines established by the ARCHITECTURAL DRAWINGS and the GENERAL CONTRACTOR with guaranteed accuracy. Check mullion spacing from both ends of masonry opening to prevent dimensional build-up of daylight opening.
D. SURROUNDING CONDITIONS: Make certain construction which will receive your materials is in accordance with the contract documents. Notify the general contractor in writing of any discrepancies and resolve differences before proceeding with work.
E. ISOLATION OF ALUMINUM: Aluminum to be placed in direct contact with uncured masonry or incompatible materials should be isolated with a heavy coat of zinc chromate or bituminous paint.
F. SEALANTS: Sealants must be compatible with all materials which they have contact, including other sealant surfaces. Consult with sealant manufacturer for recommendations relative to joint size, shelf life, compatibility, cleaning/priming, tooling, adhesion, etc. It is the responsibility of the GLAZING CONTRACTOR to submit a statement from the sealant manufacturer indicating that glass and glazing materials have been tested for compatibility and adhesion with glazing sealants, and interpreting test results to relative to material performance, including recommendations for primers and substrate preparation required to obtain adhesion. The chemical compatibility of all glazing materials and framing sealants with each other and with like materials used in glass fabrication must be established. This is required on every project.
Effective October 2014 www.cardcompro.com 5
SERIES CF451T 2” x 4½” - B2
INSTALLATION INSTRUCTIONS(Continued)
G. FASTENING: Within the body of these instructions, “fastening” means any method of securing one part to another or to adjacent materials. Only those fasteners used within the system are specified in these instructions. Due to various substrates to which the framing may be attached, structural perimeter anchor fasteners are not specified in these instructions. For structural perimeter fasteners, reference the shop drawings, structural anchor charts or consult with the fastener supplier.
H. BUILDING CODES: Glass and glazing codes governing the design and use of products vary widely throughout the USA. Cardinal Commercial Products does not control the selection of product configurations, operating hardware, or glazing materials, and assumes no responsibility for these design considerations. It is the responsibility of the owner, specifier, architect, general contractor and installer to make these selections in strict conformance with all applicable codes.
I. EXPANSION JOINTS: Expansion joints and perimeter seals shown in these instructions and in the shop drawings are shown at normal size. Actual dimensions may vary due to perimeter conditions and differences in metal temperature between time of fabrication and the time of installation. Detailed instructions and formula used to calculate expansion joints are shown within the body of these instructions.
J. FIELD TESTING: It is recommended that AAMA 501.2 Water Hose Test be conducted once a sufficient portion of the framing is installed, glazed and sealed to ensure proper installation. This test should be repeated on large projects at specific intervals as deemed necessary by job conditions and acceptable quality control standards.
K. COORDINATION WITH OTHER TRADES: Coordinate with the GENERAL CONTRACTOR and sequence with other trades any materials which offset your framing installation. For example, backup walls, partitions, ceilings, mechanical ducts, converters, etc.
L. FINAL CLEANING (CARE AND MAINTENANCE): Final cleaning of exposed aluminum surfaces should be done in accordance with AAMA publications 609.1 for anodized aluminum and AAMA 610.1 for applied painted coatings (liquid or powder). M. PRODUCT DESIGN CHANGES: Cardinal Commercial Products reserves the right to change product designs without prior notice when deemed necessary for product improvement. Please visit our website at www.cardcompro.com for the latest product installation instruction manual prior to commencing work.
6 www.cardcompro.com Effective October 2014
SERIES CF451T 2” x 4½” - B2
Fig. 6.1
A
B
C
D
E
Sill flashing interior leg less than full height
Blind seal
Fastener penetrating interior flashing leg
A
CB
E
D
AVOID THESE COMMON INSTALLATION PRACTICES
COMMON STOREFRONT SYSTEM FIELD FAILURES
1. Product not installed in accordance with manufacturer’s installation instructions.2. Workmanship.3. Frames not installed level, true and plumb.4. Frames not anchored properly to substrate to resist dynamic forces of shear, tension and compression.5. Leaks at subsill pan receptor/flashing due to design or workmanship.6. Debris left in glazing pockets and subsill pan receptor blocking weep holes.7. Glazing gaskets not installed properly and failure to seal corners.8. Water diverters not installed each end of intermediate horizontals.9. End dams not installed at each end of subsill receptor pan.10. Glazing: a. Glass not centered into opening. b. Positioning of setting blocks. c. Not using anti-walk blocks in areas prone to seismic movement. d. Not using anti-walk blocks in areas with helicopter traffic.
KEY WATER CONTROL FEATURES
A well designed storefront system has a full height interior leg with a recessed cavity for holding sealant to ensure a good seal between the subsill pan and the sill framing member. The subsill pan must have a recessed cavity so structural fasteners can be installed, cap sealed and inspected prior to installing the frame panels. To reduce air infiltration and to prevent harmonic whistling noises, each weep hole should be backed by a urethane coated baffle. A High Performance subsill pan design is standard for all Cardinal Commercial Products storefront systems.
Effective October 2014 www.cardcompro.com 7
SERIES CF451T 2” x 4½” - B2SYSTEM COMPONENT IDENTIFICATION
Fig. 7.1
CF451-13T
CF451-2T CF451-2TCF451-3
CF451-3
CF451-2T CF451-3
CF451-2TCF451-3 CF451-6T
CF451-2TCF451-3 CF451-6T
3
4
52"2"
2"D
.L.O
.
FRA
ME
HE
IGH
T
MA
SO
NR
Y O
PE
NIN
G
MU
LLIO
N L
EN
GTH
D.L
.O.
1 / 4"
1 / 2"
3 / 4"
1 / 4"
41/2"
EXTERIOR GLAZE
3
4
52"2"
2"D
.L.O
.
FRA
ME
HE
IGH
T
MA
SO
NR
Y O
PE
NIN
G
MU
LLIO
N L
EN
GTH
D.L
.O.
1 / 4"
1 / 2"
3 / 4"
1 / 4"
41/2"
INTERIOR GLAZE
⅜" ⅜"
*Includes 1/8” allowance for subsill receptor
* *
1A2B2A21
CF451-13T CF451-4T CF451-4T CF451-1TCF451-1T CF451-5T CF451-7T CF451-8T
CF451-17TGSK-1(Typ)
2" 2" 2" 2" 2"D.L.O. D.L.O. D.L.O. D.L.O.
FRAME WIDTH
MASONRY OPENING
41 / 2"
KEY ELEVATION
1 2
3
2 2 1A
4
5
NOTE: These instructions are prepared for Series CF451T. Use these same instructions for Series CF451 non-thermal and delete the “T” suffix from part numbers.
8 www.cardcompro.com Effective October 2014
SERIES CF451T 2” x 4½” - B2
Head & SillReceptors
CF451-13T CF451-1T
CF451-13T CF451-1T CF451-5T CF451-7T CF451-8T CF451-4T CF450-17T
CF451-2T
CF451-3
Head Receptor(Combination)
Sill/Intermediate Horizontal(Combination)
Head Head(Optional at Head Receptor)
Transition Adaptor(1" to ¼")
Glazing Pocket Filler
90˚ Trim 90˚ Single Pocket(Pocket at Female Snap)
90˚ Single Pocket(Pocket at Male Snap)
Sill & Intermediate HorizontalBulkhead
45˚/135˚ Corner Adaptors
90˚ Two Pocket
Jamb Mullion(Standard)
Mullion(Heavy Duty)
MullionFiller
JambFiller
Expansion Mullion(Male Half) (Female Half)
Sill Receptor
Horizontal Sections
Vertical Sections
Glass PocketAdaptors and Fillers
90˚ CornerMullion Halves
Other Adaptors
CF450-18TCF450-19
CF451-15
Transition Adaptor(1" to ½")
CF451-18 CF451-16
CF451-6T
CF451-8T
CF451-3
FRAMING SECTIONSDESCRIPTION
CF451-11T
CF450-20
CF450-19
CF450-11 CF451-12TCF451-9T CF451-10T
Note: Delete "T" suffix from part number for non-thermal.
(Used with CF451-3 Glass Stops)(Used with CF451-8T)
SYSTEM COMPONENT IDENTIFICATION
Fig. 8.1
Effective October 2014 www.cardcompro.com 9
SERIES CF451T 2” x 4½” - B2
DoorframeJambs
DoorframeHeaders
DoorframeStops and Sash
Threshold
Miscellaneous
Gaskets andWeather Strips
DOORFRAME SHAPESDESCRIPTION
ACCESSORIESDESCRIPTION
Door Jamb(Offset Pivots)
Door Header(Offset Pivots)
Door Header(Offset Hung for Offset Arm)
Door Header(Center Hung)
Transom Sash & Stop(1" Glazing)
Snap-In Door Stop(1" Glazing Pocket)
Threshold(for Offset & Center Hung) Threshold Clip
Offset Arm Cover
Use GSK-5 Gasket
Surface Applied Door Stopand Steel Clip
Door Jamb(Center & Butt Hung)
CF451-30 CF451-34
CF451-33
CF451-31 CF451-32
CF200-1 CF200-8 CF200-4CF200-5
CF450-34
T450
CF200-3 CDH-23-1
CDH-24-1
WP-4(Doorframe)
Wool PileWeather Strips
WP-2
Glazing Gaskets
GSK-1(Standard)
GSK-2(Light)
GSK-3(Heavy)
GSK-4(Door) Two Finger
Gasket
GSK-7
#12 X 1¼” PHSquare Drive
Zinc Plated SMSDrive Bit
AF12-5AF12-4
#10 X 3/8” PPHZinc Plated
AF10-4
Glazing Tape
GT-1
Anti-WalkBlock
(1" Glazing)
AW-2
End Dam
ED-451
WaterDiverter
(1" Glazing)
WD-451-1
SB-3
Weep Baffel(30 PPI)
WB-1
Setting Block for 1” Glass
(Outside Glaze) (Inside Glaze)SB-4
(Butt Glaze)SB-6
SYSTEM COMPONENT IDENTIFICATION
Fig. 9.1
10 www.cardcompro.com Effective October 2014
SERIES CF451T 2” x 4½” - B2
⅜"⅜"
*Includes 1/8” allowance for subsill recepror
* *
Measure
Dimension "A" = "B"
Dimension "A" Dimension "B"
Measure
Measure
Masonry OpeningFrame Width
1/4"
1"
Plu
mb
1/4"
1/2" @ CF451T-6
Mea
sure
Mea
sure
Mea
sure
Mea
sure
Mea
sure
Mas
onry
Ope
ning
Fram
e H
eigh
tM
ullio
n Le
ngth
DETERMINE FRAME SIZE
DETERMINE SQUARENESS Check opening for squareness to Plumb at both ends. Frames must be installed in a true rectangle. See Fig. 10.1.
DETERMINE FRAME WIDTH Measure the width of the masonry opening at top, middle and bottom.Select the smallest dimension measured and subtract 1/2" to determine frame width. See Fig. 10.2.
DETERMINE FRAME HEIGHT Measure the height of masonry opening several times along the entire length of opening. Select the smallest dimension for the masonry opening height. See Fig. 10.3.
ERECTION TOLERANCES:2. Maximum variation of mullions from plumb or horizontals from level should not exceed 1/8” in 12’-0” or 1/4” in any single run.3. To assure the stated tolerances for item 2 are not exceeded in the erected framing, low cost go/no-go gauges can generally be made for use by the framing erector.
ERECTION TOLERANCE:1. Within any rectangular opening there should be no more than 1/8” difference between dimension "A" & "B".
CONTINUOUS HEAD AND SILL Subtract: 1/2” from the masonry opening height. 1/4” caulk joint at head above head. 1/4” caulk joint below sill receptor.
Fig. 10.1
Fig. 10.2
Fig. 10.3
Effective October 2014 www.cardcompro.com 11
SERIES CF451T 2” x 4½” - B2
CF451-6
CF4
51-1
CF45
1-4T
CF451-3
CF451-2
CF451-3
CF451-2
CF451-6T
CF4
51-1
T
CF45
1-4T
CF451-3
CF451-2T
CF451-3
CF451-2T
CF451-3
CF451-2
CF451-3
CF451-2
CF451-3
CF451-2T
CF451-3
CF451-2T
CF451-13T
CF451-13TNOTE:CF451-4T is handed
AF12-4(Typ)
Fig. 11.1
FRAME MEMBER CUTTING
NOTE: These instructions are prepared for Series CF451T. Use these same instructions for Series CF451 non-thermal and delete the “T” suffix from part numbers.
12 www.cardcompro.com Effective October 2014
SERIES CF451T 2” x 4½” - B2
CF451-13T HEAD
CF451-13T JAMB
CF451-1T MULLION & CF451-4T FILLER
CF451-3 GLASS STOP
CF451-2T INTERMEDIATE HORIZONTAL
CF451-2T SILL
CF451-3 GLASS STOP @ SILL
CF451-6T SILL RECEPTOR
1/8"1/8"FRAME WIDTH
FRA
ME
HE
IGH
T
NOTE: CF451-6T is cut Frame Width + 1/4"
CUT SECTIONS TO SIZE
Sill Receptor: = Overall Frame Width PLUS ¼” to allow for last panel installation.
Mullion, Pocket Filler & Jamb Members: Without Head Receptor = Frame Height MINUS 1”. Head, Horizontal & Sill: = Daylight Opening.
Glazing Beads: = Daylight Opening MINUS 1/32”.
Fig. 12.1
FRAME MEMBER CUTTING
Effective October 2014 www.cardcompro.com 13
SERIES CF451T 2” x 4½” - B2
CF451-13T
CF451-13T
CF450-19
CF450-18T
CF451-6
CF4
51-1
CF45
1-4T
CF451-3
CF451-2
CF451-3
CF451-2
CF450-19
CF450-18T
CF451-6T
CF4
51-1
T
CF45
1-4T
CF451-3
CF451-2T
CF451-3
CF451-2T
CF451-3
CF451-2
CF451-3
CF451-2
CF451-3
CF451-2T
CF451-3
CF451-2T
NOTE:CF451-4T is handed
AF12-4(Typ)
Fig. 13.1
FRAME MEMBER CUTTING
Frame with optional Head Receptor(Not recommended for high wind loads)
NOTE: These instructions are prepared for Series CF451T. Use these same instructions for Series CF451 non-thermal and delete the “T” suffix from part numbers.
14 www.cardcompro.com Effective October 2014
SERIES CF451T 2” x 4½” - B2
CUT SECTIONS TO SIZE
Sill Receptor (Standard) & Head Receptor (Optional): = Overall Frame Width PLUS ¼” to allow for last panel installation.
Mullion, Pocket Filler & Jamb Members: With Optional Head Receptor = Frame Height MINUS 1¾”. Head, Horizontal & Sill: = Daylight Opening.
Glazing Beads: = Daylight Opening MINUS 1/32”.
CF450-18T HEAD RECEPTOR
CF450-19 HEAD RECEPTOR BEAD
CF451-1T HEAD
CF451-13T JAMB
CF451-1T MULLION & CF451-4T FILLER
CF451-3 GLASS STOP
CF451-2T INTERMEDIATE HORIZONTAL
CF451-2T SILL
CF451-3 GLASS STOP @ SILL
CF451-6T SILL RECEPTOR
1/8"1/8"
1/8"1/8"
FRAME WIDTH
FRA
ME
HE
IGH
T
NOTE: CF451-6T is cut Frame Width + 1/4"
NOTE: CF450-18T and CF450-19 are cut Frame Width + 1/4"
Fig. 14.1
Frame with optional Head Receptor
FRAME MEMBER CUTTING
Effective October 2014 www.cardcompro.com 15
SERIES CF451T 2” x 4½” - B2
Cut sill members to length as determined in Fig. 12.1 or 14.1.Drill holes for attachment to subsill. Reference Fig. 27.1 for panel installation.
Fig. 15.1
SILL MEMBER FABRICATION
Ø .213" Hole(#3 Bit)
CF451-2T(Sill)
2".500"
BOTTOM VIEW of CF451-2T SILL MEMBER
2"
Cut Length = D.L.O.
16 www.cardcompro.com Effective October 2014
SERIES CF451T 2” x 4½” - B2
7/8"7/8" 23/4"
7 /32 "
2"2"
2"
7 /32 "
7 /32 "
7 /32 "
7 /32 "
225/32
"225
/32"
DG451
DG451DRILL GUIDE
DG451
DG451
Drill with#2 (Ø .221) Bit
NOTE: CF4541-4T and CF451-8T are handed due to offseting thermal cavities
CF451-8T
CF451-7T
CF451-4T
CF451-1T
HEAD
HORIZONTAL
SILL
CF451-5T
Cut vertical members to length as determined in Fig. 12.1 or 14.1.Mark location for Head, Horizontal and Sill. Reference Fig. 7.1 for typical elevation.
VERTICALS - Drill screw spline holes for HEAD, HORIZONTAL and SILL as shown below.NOTE: CF451-4T is handed. Align in proper orientation with CF451-1T and CF451-5T holes for intermediate horizontal.
NOTE:Never allow two shallow glazing pockets to face each other within any elevation. Plan vertical fabrication and panel assembly accordingly.
Fig. 16.1
VERTICAL MEMBER FABRICATION
NOTE: Drill screw spline holes in 90° corner sections in similar manner using DG451 Drill Guide.
DRILLING SCREW SPLINE HOLES INTO VERTICAL MEMBERS
Effective October 2014 www.cardcompro.com 17
SERIES CF451T 2” x 4½” - B2
CF451-6T1/4" Ø Weep Holes
End of Sill Receptor
Jamb Mullion Mullion
2" 2" 2" 2"
2 21
/ 32"
Ø 9/32" Holes
2" 2"D.L.O. D.L.O. 2"
CF451-6T
⅛"⅛"
2" 2" 2" 2"
Cut CF451-6T sill receptor to frame width + 1/4” as determined in Fig. 12.1 or 14.1.NOTE: CF451-6T is offered with weep holes prefabricated as shown in Fig. 16.1.
Fabricate weep holes as shown in Fig. 17.1 with holes approximately 2” from edge of each vertical member.
Drill ø 9/32” holes for anchoring CF451-6T to substrate as shown in Fig. 17.2. Anchoring hole dimensions are located approximately 2” each side of vertical mullion.
Fig. 17.1
Fig. 17.2
SILL RECEPTOR FABRICATION
NOTE:The anchor holes shown above are for illustration only.
Please reference ANCHOR SCHEMATICS on pages 40 - 52 to determine location and number of holes required based on substrate prior to fabrication.
18 www.cardcompro.com Effective October 2014
SERIES CF451T 2” x 4½” - B2
3 5 / 8
"
CF450-18T
Ø 9/32" Holes
⅛"2" 2"D.L.O. D.L.O. 2"⅛"
2" 2" 2" 2"
Frame Width + ¼"
CF450-19
Cut head receptor to Frame Width + 1/4” as determined in 14.1.
Drill ø 9/32” holes for anchoring CF450-18T to substrate as shown in Fig. 18.1.Anchoring hole dimensions are located approximately 2” each side of vertical mullion.(Reference Fig. 15.1 regarding number of anchor holes)
Cut CF450-19 receptor bead to Frame Width + 1/4” as determined in Fig. 18.2.
NOTE: Insert GSK-7 lace-in gasket prior to installation.
NOTE: Insert GSK-7 lace-in gasket prior to installation.
Fig. 18.1
Fig. 18.2
HEAD RECEPTOR FABRICATION(OPTIONAL)
Effective October 2014 www.cardcompro.com 19
SERIES CF451T 2” x 4½” - B2
2"
1¾"
2"2" 2"
2"2"
1¾"
Fill gasket reglet with a bead of sealant at bottom of mullion and filler as shown.
GT-1Sealant Tape
GT-1Sealant Tape
AF12-4(Typ) AF12-4
(Typ)
Sealant Tape
Protective Cover
GT-1Sealant Tape
Exterior GlazedCut and apply GT-1 sealant tape to verticals at locations where horizontal members intersect as shown in Fig. 19.1. Assembled panels with screws and trim excess tape at joints as required.
NOTE:Never allow two shallow glazing pockets to face each other within any elevation. Plan panel and mullion fabrication accordingly.
Fig. 19.1
EXTERIOR GLAZE PANEL ASSEMBLY
20 www.cardcompro.com Effective October 2014
SERIES CF451T 2” x 4½” - B2
Fig. 20.1
2"2"
2" 2"2"
2"
3"
Fill gasket reglet with a bead of sealant at bottom of mullion and filler as shown. Sealant should be wet when gaskets are installed.
GT-1Sealant Tape
Sealant Tape
Protective Cover Sealant Applied duringframe panel assemblySealant Applied just prior installing CF451-3 glass stop
AF12-4(Typ) AF12-4
(Typ)
3"
Sealant Applied duringframe panel assemblySealant Applied just prior installing CF451-3 glass stop
GT-1Sealant Tape
Sealant
GT-1Sealant Tape
Interior GlazedCut and apply GT-1 sealant tape to verticals at locations where horizontal members intersect as shown in Fig. 20.1. Assemble panel with screws and trim excess tape at joints as required.
NOTE:Never allow two shallow glazing pockets to face each other within any elevation. Plan panel and mullion fabrication accordingly.
INTERIOR GLAZE PANEL ASSEMBLY
Effective October 2014 www.cardcompro.com 21
SERIES CF451T 2” x 4½” - B2
Install GSK-1 gaskets into interior reglets in assembled panels.
Install GSK-1 gaskets into assembled frames as shown in Fig. 21.1.Reference Fig. 28.3 for gasket cutting and installation methods.
Fig. 21.1
CF451-6T
ED-451
Apply sealant full length in “C” slot just prior to installing assembled panels.
Reference Fig. 24.2 for shim support at each end.
Apply sealant and tool to ensure water tight joint.
ED-451
Cut GT-1 tape to length and apply to ED-451 End Dam as shown.Peal protective cover fromtape prior to appling to sill receptor.
GT-1
CF451-6T
ED-451
Install ED-451 End Dam at each end of CF451-6T sill receptor.
Butter ED-451 end dams with sealant and attach to each end of CF451-6T as shown in Fig. 21.2.Apply sealant to joint as shown and tool to ensure good tight joint.
Fig. 21.2
PANEL ASSEMBLY
SILL RECEPTOR END DAM INSTALLATION
22 www.cardcompro.com Effective October 2014
SERIES CF451T 2” x 4½” - B2
Apply bead of sealant at each end of receptor to receive splice sleeve.
SP-450 Splice sleeve(4" x 1/16" x 8") Trim length as required
Sealant should fillthermal break cavity.
Tool sealant
Fill area behind perimeter sill bridging gap between sill receptor Marry sealant of spice to perimeter seal.
Apply sealant full length in “C” slot just prior to installing assembled panels.
Seal interior vertical joint and tool excess sealant.
ED451End Dam
NOTE: CF451-6T sill receptor must be level. Reference Fig. 10.1, 10.2 & 10.3.
Position CF451-6T as required. Match drill through holes into substrate as specified by fastener manufacture.
Force sealant into anchor holes andsecure to substrate.
Cap seal over screw heads andtool sealant.
Position CF451-6T and match drill through anchor holes into substrate with required bit size to specified depth. Clean debris from drilled holes. Shim for proper gap and leveling. Shims must be placed at center of each anchor location. Force sealant into anchor holes and secure with screws. Cap seal all screw heads and tool sealant.
Fig. 22.1
Fig. 22.2
SILL RECEPTOR INSTALLATION
If use of optional CF450-18T Head Receptor is required, splicing method is similar to method shown for CF451-6T Subsill Receptor as shown above.
The Sill Receptor must be set level and straight. There is no practical way to level the sill receptor after glazed panels are installed. A sill receptor not level and straight will cause uneven gaps at verticals.
Effective October 2014 www.cardcompro.com 23
SERIES CF451T 2” x 4½” - B2
Fabricate optional Storey Gauge from
special cut CF451-1T vertical mullion sections.
CU
T G
AU
GE
TO
MU
LLIO
N L
EN
GTH
PLU
S3/
4" M
INIM
UM
EN
GA
GE
ME
NT
Level and Plumb
3/4" Min
.
NOTE:Reference tolerancesin Fig. 16.1, 16.2 & 16.3
CF450-18Twith GSK-7 gasket
STO
REY
GA
UG
ECF451-6T
Position CF450-18T as required. Match drill through anchor holes into substrate as specified by fastener manufacture.
Force sealant into anchor holes and secure to substrate.
Cap seal over screw heads andtool sealant.
Install GSK-7 Gasket
STO
REY
GA
UG
EST
OR
EY G
AU
GE
SHIM
When using a head receptor, fabricate a STOREY GAUGE to accurately gage spacing between CF451-6T sill receptor and CF450-18T head receptor. (Reference Fig. 15.1 regarding number of anchor holes)NOTE: GSK-7 gasket must be installed in reglet of CF450-18T head receptor prior to assembly.
Fig. 23.1
OPTIONAL HEAD RECEPTOR INSTALLATION
If use of optional CF450-18T Head Receptor is required, long runs must be spliced similar to method shown for CF451-6T Subsill Receptor. See Fig. 22.2.
24 www.cardcompro.com Effective October 2014
SERIES CF451T 2” x 4½” - B2
Use a Shop Vac to remove all debris from sill receptor.ED-451
ED-451
ED-451 End Dam
Cap seal head of fasteners
Center WB-1 baffle on each weep hole
ShimWeep hole
Debris
Apply sealant full length in “C” slot just prior to installing assembled panels.
Remove all debris from CF451-6T sill receptor with Shop Vac to prevent blockage of weep holes. See Fig 24.1
Shim between ED-451 End Dams and structure to prevent knocking dam loose and damaging seal.Install WB-1 weep baffles by pressing into reveal and center on each weep hole.
Baffles reduce air and water infiltration. Weep holes without baffles can cause harmonic whistling noise on the inside of building by gusting winds.
Fig. 24.1
Fig. 24.2
SILL RECEPTOR INSTALLATION
Effective October 2014 www.cardcompro.com 25
SERIES CF451T 2” x 4½” - B2
Calculate gap(See Example Below)
CF451-7T CF451-8T
An expansion mullion is to be used every 20'-0" in wide openings. The dimension of the assembly should be adjusted based on the temperature at the time of installation.
Generally, horizontal expansion joints should be no further apart than 20 feet. Expansion should be from the center toward both ends to minimize joint movements and thereby reduce stresses on sealants and connectors.
Expansion gap is determined by job conditions, project specifications and temperature at time of installation. Expansion mullions allow for 3/8” maximum movement.
EXPANSION GAP SIZE FORMULA = LENGTH (”) X F° DIFFERENCE X .0000129 L = Length in inches between centerline of expansion mullion in elevation. F° = Specified temperature variation .0000129 = Thermal coefficient for aluminum
EXAMPLE:Assume 100° temperature variation specified and temperature at job site on day of installation is 60°. 1. 100° - 60° = 40° temperature difference 2. Length of elevation between expansion mullions equals 20’-0” or 240” 3. 240” x .0000129 x 40° = .124”. Therefore, set expansion gap at 1/8”.
Lace GSK-7 into exterior and interior reglets of CF451-7T.
Crimp reglets at each end on both sides to prevent gasket slippage
CF451-7T
Cut expansion mullions as determined in Fig. 12.1 and 14.1. Fabricate expansion mullions as shown in Fig. 16.1.Cut GSK-7 gaskets 1/8” longer per foot than mullion length. Lace GSK-7 gaskets into interior and exterior reglets. Crimp reglet at each end to prevent gasket slippage.
Fig. 25.2
Fig. 25.1
EXPANSION MULLION
26 www.cardcompro.com Effective October 2014
SERIES CF451T 2” x 4½” - B2
Weep Baffle
NOTE:Apply a continuous bead of sealant into “C”-slot prior to installing frame panels.
INTERMEDIATE PANEL
LAST PANEL
EXPANSION MULLION PANEL
NOTE: CF451-4T is handed
NOTE: CF451-4T is handed
NOTE: CF451-4T is handed
Install assembled panels into sill receptor.
NOTE:Never allow two shallow glazing pockets to face each other within any elevation. Plan panel and mullion fabrication accordingly.
Fig. 26.1
Fig. 26.2
PANEL INSTALLATION
Effective October 2014 www.cardcompro.com 27
SERIES CF451T 2” x 4½” - B2
After assembled panels have been installed, anchor CF451-2T sill to CF451-6T subsill with AF10-4 (#10 x 3/8” PPH SMS) as shown in Fig. 27.1. For hole/screw location see Fig. 15.1.
Fig. 27.1
AF10-4 installed approximatelyon 2" each side of mullion.
Tool excess sealant.
Apply continuous bead of sealant into reveal.
CF451-6T
CF451-2TNOTE:Push panels tightlyagainst back of subsill prior to anchoring.
ELEVATION
PANEL INSTALLATION
28 www.cardcompro.com Effective October 2014
SERIES CF451T 2” x 4½” - B2
D.L.O.
4" longsetting block(min.)
Setting block (2 per lite)Reference Dead Load Charts
6"(min.)
Glass
1/2 1/41/4
2.
1.
3.
Start head and jambgaskets at centers ofopening and corners.
Vertical gaskets runbetween horizontalgaskets.
Start sill gasket at setting block locationsand corners.
D.L
.O.
"A" "B"
"C"
REMOVE ALL TRASH FROM GLAZING POCKETS AND REGLETSSet glass on setting blocks positioned at 1/4 points in opening. Reference "Dead Load Charts" for location of setting blocks at horizontal. Setting blocks should not be placed closer than 6" from the edge of glass for typical conditions.
Cut horizontal and vertical gaskets D.L.O. + 1/8” per foot of D.L.O. to allow for shrinkage. (Ref. Fig. 28.2) It is important that gaskets are cut and installed as shown in Fig. 28.3.
GLASS SIZE = DAYLIGHT OPENING (D.L.O.) + 7/8”Note: This formula does not allow for undersized or out of square daylight openings. The glass manufacturer must indicate the specific glazing requirements for the material being used.
Fig. 28.3
Fig. 28.1 Fig. 28.2
GLAZING
Effective October 2014 www.cardcompro.com 29
SERIES CF451T 2” x 4½” - B2
VIEWED FROM EXTERIOR
2"
2"
Sealant(Typical)
CORNER TREATMENTGlazing gaskets are prone to shrink and pull away at the corners over a period of time allowing for excessive air and water infiltration at the corners. Standard glazing practice is to provide corner treatment to ensure tightness on the exterior and interior corner intersections.
NOT RECOMMENDEDNotched Corners - The corners of the rubber gaskets are notched on the underside without cutting the nearside. The gasket is installed in one length and is butt joined in the center of horizontal section. While this method of glazing is widely used for marine glazing, residential sliding doors and shower doors, it is not recommended for commercial win-dow wall glazing.
RECOMMENDEDSeal Corners - Pull gaskets back 2" in both directions from interior and exterior corners as shown in Fig. 29.2 and apply sealant. This should be done on the interior (inside glaze) or exterior (outside glaze) for best performance. While long-term adhesion to the rubber gaskets with sealant is nor assured, historical field experience has proven this type of corner treatment to be the next best method short of vulcanized gasket corners. Reference ABC's of Glazing Fig. 28.1, 28.2 & 28.3.
Notched Corner - Not RecommendedFig. 29.1
Fig. 29.2
GLAZING
30 www.cardcompro.com Effective October 2014
SERIES CF451T 2” x 4½” - B2
Silicone Sealant
WD-451Water Deflector
Apply a bed of sealant at ends of horizontal. Press WD-451 water deflectors into sealant and tool sealant.
NOTE:Glaze system from bottom to top. Installing WD-451 water deflector at ends of intermediate horizontal as glass is being installed. WD-451 are installed into a bed of sealant as shown in Fig. 30.1 & 30.2.
Force sealant into reglets on vertical members as shown in Fig. 30.2. Tool sealant smooth around flat of Water Deflector in horizontal member to limit water damming.
Glass
After Water Deflectorsare in place, inject additional sealant down into vertical gasket regletsand tool excess sealant.
Fig. 30.1
Fig. 30.2
GLAZING
Effective October 2014 www.cardcompro.com 31
SERIES CF451T 2” x 4½” - B2
SB-3
SB-3
NOTES:- GSK-1 Interior Gasket may be installed into panels at shop prior to transporting to job site.- GSK-1 gasket is used on interior and exterior side of glass.
4
2
1 1
38
8GSK-1
GSK-1 1
1
5
6
7
8
8GSK-1
GSK-1
VIEWED FROM EXTERIOR
TOP VIEW
AW-2
AW-2
EXTERIOR GLAZING1. Press interior gaskets into reglets on all four sides. See Fig. 21.1 & 28.3.2. From the exterior, insert edge of glass into deep pocket vertical.3. Swing opposite edge in and align with pocket.4. Center glass in opening.5. Lift glass to allow setting block insertion.6. Position setting blocks at points under glass as required. See Fig. 28.1.7. Install glazing bead.8. Press exterior gaskets into reglets on all four sides. See Fig. 28.3.
Install AW-2 Anti-Walk block into deep pocket near mid-point of vertical mullion.
Fig. 31.2
Fig. 31.1
GLAZING
32 www.cardcompro.com Effective October 2014
SERIES CF451T 2” x 4½” - B2
Fig. 32.2
Fig. 32.1
T450Threshold
CF451-6TSill receptor
Door Jamb(CF451-30 Shown)
Weep hole(Weep Baffle not shown)
Door Jamb(CF451-30 Shown)
T450Threshold
Marry sealant with exterior and interior perimeter sealant.
CF451-6TSill Receptor
Seal as shown
Seal exposed hole at each end of thresholdfor offset hung doors
Completely dam void at end of sill receptor with sealant.
Fill gaskets with sealant
Continuous seal along interior line at bottom of doorframe and side light.
CF451-4TOpen back filler of side light panel
CF451-30Door Jamb
CF200-8Snap-in door stop
T450Threshold
CF451-6TSill Receptor
Perimetersealant atsill receptor
Sealant in exposed holeat threshold offset
SPECIAL CONDITIONSSILL RECEPTOR AT DOOR FRAME
Effective October 2014 www.cardcompro.com 33
SERIES CF451T 2” x 4½” - B2
Construct sill receptor corners as shown in Fig. 33.1. 90° Outside Corner is shown, Inside corners and other corner angles are similar.
Install each corner half. Install adjacent straight panels working out from corner assembly.
18"
12"
3"C L of Splice
18"
12"
3"
C L of splice
Apply sealant to miter joint at corners.
CF451-6TAnchor sill receptors as shown.Cap seal all fastener heads.
Prepare and seal splice joints as shown in Fig. 22.2.
NOTE:Apply a continuous bead of sealant into “C”-slot prior to installing frame panels.
Fig. 33.1
Fig. 33.2
SPECIAL CONDITIONSCORNER INSTALLATION
34 www.cardcompro.com Effective October 2014
SERIES CF451T 2” x 4½” - B2
90º
CF451-8T
CF451-8T
Varies
Varies
Varie
s
CF451-8TCF451-8T
CF451-8T CF451-8T
Formed Aluminum Trim
Formed Aluminum Trim
Aluminum Trim
Metal Column
Seal joint of sill receptor and around column
Seal joint of sill receptor and around column
Seal interior & exterior gap at break metal and sill receptor fin.
Seal interior & exterior gap at break metal and sill receptor fin.
Apply sealant to all expansion mullion reglets recieving break metal.
Seal joint of sill receptor and around column
Seal interior & exterior gap at break metal and sill receptor fin.
Fabricate CF451-8T female half of expansion mullion as shown in Fig. 12.1 and 14.1. Assemble column cover panels and install as shown in Fig. 34.1 below.
Fig. 34.1
SPECIAL CONDITIONSCOLUMN COVER INSTALLATION
Effective October 2014 www.cardcompro.com 35
SERIES CF451T 2” x 4½” - B2SPECIAL CONDITIONS
BULKHEAD/HORIZONTAL
BULKHEADINTERMEDIATEHORIZONTAL
BULKHEADSILL
CF451-3
CF451-4T
CF451-11T
CF451-3
CF451-6T
CF451-11T
Just prior to glazing, run a continuous bead of sealant into interior glass stop receptor hook. Install CF451-3 Glass Stop at interior. (Vertical mullions not shown)
Snap-in CF451-4T Filler as shown.
Attach CF451-11T Bulkhead to CF451-6T Sill Receptor with #10 x 2⅛" PH SMS 2" from each end and one at center.
Fabricate weep holes asshown in Fig. 17.1.
Fig. 35.1
36 www.cardcompro.com Effective October 2014
SERIES CF451T 2” x 4½” - B2BUTT GLAZING
12"½
"G
lass
Bite
1 / 4"
DLO
FRA
ME
HE
IGH
T
MA
SO
NR
Y O
PE
NIN
G
MU
LLIO
N L
EN
GTH
41/2"
FRA
ME
HE
IGH
T
MA
SO
NR
Y O
PE
NIN
G
MU
LLIO
N L
EN
GTH
3
2" DLO
CF451-13T
FRAME WIDTH
MASONRY OPENING
KEY ELEVATIONS
4Opp.
1A (Optional)1
1A (Optional)1
2
3 34
22"
7 / 16"
11/ 16
"
1 / 4"
DLO
CF451-13T
CF451-6T
5 8Opp.
1A
2
3 4
2
1
6
7Opp.
CF451-13T
CF451-18
CF451-18
CF451-18
Entrance
1/2" Glass
½"
Gla
ss B
ite
1A
DLO
FRA
ME
HE
IGH
T
MAS
ON
RY
OPE
NIN
G
41/2"1 / 4
"
2"
CF451-2TCF451-3
OptionalHead
41 / 2"
4
1/2"Butt Joint
Structural Silicone
1 / 2"
CF451-34
D.L.O. DOOR OPENING
FRAME WIDTH
MASONRY OPENING
2"
5
CF451-4T
GSK-2(Typ)
Offset hung narrow stile door shown
Optional steel reinforcementas required by design load.
CF200-3
SB-6 Setting Block
GSK-2
⅜"
*Includes allowance for subsill.
*
Fig. 36.1
Effective October 2014 www.cardcompro.com 37
SERIES CF451T 2” x 4½” - B2BUTT GLAZING
3
24
1
15
5
NOTE:Install and position setting blocks prior to glass installation.
A
A A B
B C
Glass Frame
SB-6 Setting Block
Fig. 37.2
Fig. 37.1
Install left and right jamb lights (A & B) first followed by intermediate lights (C).
Seal joint gaps with structural silicone.
Painters masking tape
Painters masking tape
Glass GlassGlass Glass
½" Butt Joint
Fig. 37.3
38 www.cardcompro.com Effective October 2014
SERIES CF451T 2” x 4½” - B2
Sealant & Backer Rod
Sealant & Backer Rod
Sealant & Backer Rod
Sealant & Backer Rod
31
2
2
1
33OppositeOpposite
44ELEVATION
4
Jamb substrate not shown
Marry exterior and interior sealant to form one continuous perimeter seal as shown.
Apply continuous exterior and interior perimeter seal to elevation as shown in Fig. 38.1.Marry exterior and interior sealant to jamb sealant as shown below in Detail 4 of Fig. 38.2.
Fig. 38.1
Fig. 38.2
PERIMETER SEAL
Effective October 2014 www.cardcompro.com 39
SERIES CF451T 2” x 4½” - B2
JOINT SIZEDepth X Width
(Inches)
FEETper
TUBE
FEETper
SAUSAGE
97.2148.6132.4024.3019.4416.2013.8912.15
24.3016.2012.159.728.106.946.08
10.808.106.485.404.634.05
6.084.864.053.473.04
3.893.242.782.43
2.702.312.03
1.981.74
1.52
192.5096.2564.1748.1338.5032.0827.5024.06
48.1332.0824.0619.2516.0413.7512.03
24.3916.0412.8310.699.178.02
12.039.638.026.886.02
7.706.425.504.81
5.354.584.01
3.933.44
3.01
.125 x .125
.125 x .250
.125 x .375
.125 x .500
.125 x .625
.125 x .750
.125 x .875
.125 x 1.00
.250 x .250
.250 x .375
.250 x .500
.250 x .625
.250 x .750
.250 x .875
.250 x 1.00
.375 x .375
.375 x .500
.375 x .625
.375 x .750
.375 x .875
.375 x 1.00
.500 x .500
.500 x .625
.500 x .750
.500 x .875
.500 x 1.00
.625 x .625
.625 x .750
.625 x .875
.625 x 1.00
.750 x .750
.750 x .875
.750 x 1.00
.875 x .875
.875 x 1.00
1.00 x 1.00
SEALANT DEPTH
SEA
LAN
T W
IDTH
Framing system
Sealant
Backer Rod
Substrate
1 tube = 10.1 Ounce
1 Sausage = 20 Ounce
FOR EXAMPLE:1. Job requires 1000 feet exterior and interior caulking.2. Aveage caulk space = .25 X .253. Yield/tube from chart = 24.30 Yield/sausage from chart = 48.134. 1000 ÷ 24.30 = 42 tubes required (Rounded up) 1000 ÷ 48.13 = 21 sausages required (Rounded up)
SEALANT COVERAGE CHARTThis chart may be used to estimate the sealant tubes or sausages required based on the average joint size and lineal feet to be sealed. To use the chart you must know the depth and width of the joint. For example, 1 tube of sealant yields approximately 16.2 feet in a joint 3/8" deep x 1/4" wide. (See other Example below in Fig. 39.1)
PERIMETER SEALANT COVERAGE
Fig. 39.1
40 www.cardcompro.com Effective October 2014
SERIES CF451T 2” x 4½” - B2
AB A+B
AB A+B
2½"Min. Edge Distance
1½"Min. Edge Distance
WOOD SUBSTRATE(For #2 Southern Yellow Pine)
CONCRETE SUBSTRATE(For 3,000 PSI Concrete)
A = Framing Thickness Including Shim Space B = 1¾" Minimum EmbedmentA+B = Anchor Screw Length
A = Framing Thickness Including Shim Space B = 2½" Minimum EmbedmentA+B = Anchor Screw Length
Concrete Screw Installation Instructions
Fabricate anchor holes in framing at locations shown in Anchor Charts.
Lag Bolt (Wood) Installation Instructions
Fabricate anchor holes in framing at locations shown in Anchor Charts.
PERIMETER ANCHORINGFASTENER EMBEDMENT
Fig. 40.1
Effective October 2014 www.cardcompro.com 41
SERIES CF451T 2” x 4½” - B2
42"Max. D.O.W. 2⅜
"
Dim
. "B
"
■
■
■
■
DOOROPENING
84" D
.O.H
.96
" D.O
.H.
42"Max. D.O.W. 2⅜
"2"
Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
2"2"
▼
■■
■
■■
■
▼
DOOROPENING
84" D
.O.H
.96
" D.O
.H.
2⅜"
2"
Dim
. "B
"
C L
C L2"
■
■
■
■
▼ ▼
♦♦ ♦♦1½"
DOOROPENING
3"
84" D
.O.H
.96
" D.O
.H.
2⅜"
Dim
. "B
"
2"
C L C L
2"
48"Max.
72"Max. D.O.W.C L C L
C L2"
3"
2"2"
C L
Mid
-Poi
nt84" D
.O.H
.96
" D.O
.H.
■
■
▼▼ ▼ ▼ ▼
♦▼▼ ♦ ♦
►►
2"
DOOROPENING
DOOROPENING
C L2" 2⅜"
2"
Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
2"2"
♦ ♦
■■
■
■■
■
▼▼
84" D
.O.H
.96
" D.O
.H.
2"
48"Max.
72"Max. D.O.W.C L
C L
C L
C L
C L
DOOROPENING
2"2"2"
2"
2⅜"
2"
Mid
-Poi
nt
Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
84" D
.O.H
.96
" D.O
.H.
2"
2"
1½"▼
♦♦
▼ ▼▼ ▼
►►
■■
▲
▼
■▼▼ ♦ ♦1½"
D.O.H. “A” “B” 84" - 82⅜" 96" - 94⅜"
STANDARD LOCATIONS
= 1/4" Lag Bolts 2½" Minimum Embedment with filler plate full length of mullion. 1½" Minimum Spacing.
= 1/4" Lag Bolts 2½" Minimum Embedment. 1½" Minimum Spacing.
= #14 Wood Screws 2½" Minimum Embedment.
■
▲
♦
FASTENER LEGEND for#2 S.Y.P. WOOD SUBSTRATE
See Fig. 40.1 for Embedment Description
PERIMETER ANCHORINGFASTENER LOCATION SCHEMATICS0 - 20 PSF INTO WOOD SUBSTRATE
42 www.cardcompro.com Effective October 2014
SERIES CF451T 2” x 4½” - B2PERIMETER ANCHORING
FASTENER LOCATION SCHEMATICS20 - 30 PSF INTO WOOD SUBSTRATE
84" D
.O.H
.96
" D.O
.H.
42"Max. D.O.W. 2⅜
"
Dim
. "A
" Dim
. "B
"
2"
■
■■
■
■
■■
■
DOOROPENING
C L
84" D
.O.H
.96
" D.O
.H.
42"Max. D.O.W. 2⅜
"2"
Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
2"2"
▼
■■■
■
■■■
■
▼
DOOROPENING
84" D
.O.H
.96
" D.O
.H.
2⅜"
2"
Dim
. "A
" Dim
. "B
"
2"
C L
C L
C L
2"
■
■■
■
■
■■
■
▼ ▼
♦♦ ♦♦1½"
DOOROPENING
3"
2⅜"
Dim
. "A
" Dim
. "B
"
2"
2"
C L C L
2"
1½"
48"Max.
72"Max. D.O.W.C L C L
C L
C L
2"
3"
2"2"
1½" 1½"
C L
Mid
-Poi
nt84" D
.O.H
.96
" D.O
.H.
■
■■
■
▼▼▼ ▼▼ ▼ ▼
♦♦▼▼▼ ♦♦ ♦♦
►►
2"
DOOROPENING
84" D
.O.H
.96
" D.O
.H.
DOOROPENING
C L2"
1½"
2⅜"
2"
Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
2"
1½"
2"
♦♦ ♦♦
■■■
■
■■■
■
▼▼▼▼1½"
2"
48"Max.
72"Max. D.O.W.C L
C L
C L
C L
C L
DOOROPENING
2"2"2"
2"
2⅜"
2"
Mid
-Poi
nt
Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
84" D
.O.H
.96
" D.O
.H.
2"2"
1½" 1½"▼
♦♦♦
▼ ▼▼▼ ▼ ▼
►►►
■■■
▲
▼ ▼
■▼▼▼ ♦♦ ♦♦1½" 1½"
STL-1Steel
Reinforcement
D.O.H. “A” “B” 84" 44" 82⅜" 96" 50" 94⅜"
STANDARD LOCATIONS
= 1/4" Lag Bolts 2½" Minimum Embedment with filler plate full length of mullion. 1½" Minimum Spacing.
= 1/4" Lag Bolts 2½" Minimum Embedment. 1½" Minimum Spacing.
= #14 Wood Screws 2½" Minimum Embedment.
■
▲
♦
FASTENER LEGEND for#2 S.Y.P. WOOD SUBSTRATE
See Fig. 40.1 for Embedment Description
Effective October 2014 www.cardcompro.com 43
SERIES CF451T 2” x 4½” - B2PERIMETER ANCHORING
FASTENER LOCATION SCHEMATICS30 - 40 PSF INTO WOOD SUBSTRATE
= 1/4" Lag Bolts 2½" Minimum Embedment with filler plate full length of mullion. 1½" Minimum Spacing.
= 1/4" Lag Bolts 2½" Minimum Embedment. 1½" Minimum Spacing.
= #14 Wood Screws 2½" Minimum Embedment.
■
▲
♦
FASTENER LEGEND for#2 S.Y.P. WOOD SUBSTRATE
See Fig. 40.1 for Embedment Description
84" D
.O.H
.96
" D.O
.H.
42"Max. D.O.W. 2⅜
"2"
Dim
. "A
" Dim
. "B
"
2"2"
■
■■
■
■■
■
■■
■
■■
DOOROPENING
C L
84" D
.O.H
.96
" D.O
.H.
42"Max. D.O.W. 2⅜
"2"
Dim
. "A
" Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
2"2"
▼
■■■
■
■■■
2"
■■■■■■
■
▼
DOOROPENING
C L
84" D
.O.H
.96
" D.O
.H.
2⅜"
2"
Dim
. "A
" Dim
. "B
"
2"2"
C L
C L
C L
2"
■
■■
■
■■
■
■■
■
■■
▼ ▼
♦♦ ♦♦1½"
DOOROPENING
3"
2⅜"
2"
Dim
. "A
" Dim
. "B
"
2"
2"
C L C L
2"
1½"
48"Max.
72"Max. D.O.W.C L C L
C L
C L
2"
3"
2"2"
1½" 1½"
C L
Mid
-Poi
nt84" D
.O.H
.96
" D.O
.H.
■
■■
■
■■
▼▼▼ ▼▼ ▼ ▼
♦♦▲▼▼ ♦♦ ♦♦
►►►
2"
2"
STL-1Steel
Reinforcement
DOOROPENING
84" D
.O.H
.96
" D.O
.H.
DOOROPENING
C L2"
1½"
2⅜"
2"
Dim
. "A
" Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
2"
2"
1½"
2"
♦♦ ♦♦
■
■■■
■■
■
■
■■■
■■
■
▼▼▼▼1½"
C L
2"
48"Max.
72"Max. D.O.W.C L
C L
C L
C L
C L
DOOROPENING
2"2"2"
2"
2⅜"
2"
Mid
-Poi
nt
Dim
. "A
" Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
84" D
.O.H
.96
" D.O
.H.
2"
2"
2"1½"1½" 1½"
▼
♦♦♦♦
▼ ▼▼▼▼ ▼ ▼
►►►►
■
■■■
■■
▲▲
▼ ▼▼▼
■▼▼▼▼ ♦♦ ♦♦1½"1½" 1½"
STL-1Steel
ReinforcementC L
D.O.H. “A” “B” 84" 44" 82⅜" 96" 50" 94⅜"
STANDARD LOCATIONS
44 www.cardcompro.com Effective October 2014
SERIES CF451T 2” x 4½” - B2PERIMETER ANCHORING
FASTENER LOCATION SCHEMATICS40 - 50 PSF INTO WOOD SUBSTRATE
= 1/4" Lag Bolts 2½" Minimum Embedment with filler plate full length of mullion. 1½" Minimum Spacing.
= 1/4" Lag Bolts 2½" Minimum Embedment. 1½" Minimum Spacing.
= #14 Wood Screws 2½" Minimum Embedment.
■
▲
♦
FASTENER LEGEND for#2 S.Y.P. WOOD SUBSTRATE
See Fig. 40.1 for Embedment Description
42"Max. D.O.W. 2⅜
"2"
Dim
. "A
" Dim
. "B
"
2"2"
■
■■■
■
■■
■
■■■
■
■■
DOOROPENING
C L
42"Max. D.O.W. 2⅜
"2"
Dim
. "A
" Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
2"
2"2"
1½"
2"
1½"▼▼
■
■■■
■■■■
■■
■
■■■
■■■■
■■
▼▼
DOOROPENING
C L
2⅜"
2"
Dim
. "A
" Dim
. "B
"
2"2"
C L
C L2"
■
■■■
■
■■
■
■■■
■
■■
▼ ▼
♦♦ ♦♦1½"
DOOROPENING
3"
C L
2⅜"
2"
Dim
. "A
" Dim
. "B
"
2"
2"
C L C L
2"
1½"1½"
48"Max.
72"Max. D.O.W.C L C L
C L2"
3"
2"2"
1½"1½" 1½"
C L
Mid
-Poi
nt84" D
.O.H
.96
" D.O
.H.
■
■■■
■
■■
▼▼▼▼ ▼ ▼▼ ▼ ▼ ▼
♦♦♦▲▲▼▼▼ ♦♦♦ ♦♦♦
►►►
2"
2"
STL-1Steel
ReinforcementDOOR
OPENINGC L
DOOROPENING
C L2"
1½"
2⅜"
2"
Dim
. "A
" Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
2"2"
2"
1½"
2"
♦♦ ♦♦
■
■■■
■■■■
■■
■
■■■
■■■■
■■
▼▼▼▼1½"
C L
2"
48"Max.
72"Max. D.O.W.C L
C L
C L
C L
C L
DOOROPENING
2"2"2"
2"
2⅜"
2"
Mid
-Poi
nt
Dim
. "A
" Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
84" D
.O.H
.96
" D.O
.H.
2"
2"2"
2"
1½"1½" 1½"▼
♦♦♦♦♦
▼ ▼▼▼▼ ▼ ▼
►►►►
■
■■■
■■■■
▲▲
▼ ▼▼▼▼▼
■■▼▼▼▼ ♦♦♦ ♦♦♦▼
1½"1½" 1½"
STL-1Steel
ReinforcementC L
D.O.H. “A” “B” 84" 44" 82⅜" 96" 50" 94⅜"
STANDARD LOCATIONS
Effective October 2014 www.cardcompro.com 45
SERIES CF451T 2” x 4½” - B2PERIMETER ANCHORING
FASTENER LOCATION SCHEMATICS0 - 20 PSF INTO STEEL SUBSTRATE
42"Max. D.O.W.
DOOROPENING
2⅜"
Dim
. "B
"
■
■
■
■
42"Max. D.O.W.
2"2"
▼▼
DOOROPENING
2⅜"
Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
■
■
■
■
C L
C L2"
▼ ▼
♦ ♦
DOOROPENING
3"
2⅜"
Dim
. "B
"
■
■
■
■
2⅜"
Dim
. "B
"
■
■
2"
C L C L
2"
48"Max.
72"Max. D.O.W.C L C L
C L2"2"2"
▼ ▼ ▼ ▼▼
3"
84" D
.O.H
.96
" D.O
.H.
▼▼ ▼ ▼ ▼
DOOROPENING
C L
Mid
-Poi
nt
►
DOOROPENING
C L2"
2"2"
■
■
▼▼
2⅜"
Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
■
■
D.O.H. “A” “B” 84" - 82⅜" 96" - 94⅜"
STANDARD LOCATIONS
▼ ▼▼
►
■
▼
■▼ ▼ ▼ ▼ ▼ ▼▼
2"
48"Max.
72"Max. D.O.W.C L
C L
C L
C L
C L
DOOROPENING
2"2"2"
2"
2⅜"
Mid
-Poi
nt
Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
84" D
.O.H
.96
" D.O
.H.
2"
= 1/4" Tek Anchor with filler plate full length of mullion.
= 1/4" Tek Anchor
■
▲
FASTENER LEGEND forSTEEL SUBSTRATE - FY = 36 KSI Min.
46 www.cardcompro.com Effective October 2014
SERIES CF451T 2” x 4½” - B2PERIMETER ANCHORING
FASTENER LOCATION SCHEMATICS20 - 30 PSF INTO STEEL SUBSTRATE
42"Max. D.O.W.
DOOROPENING
2⅜"
Dim
. "A
" Dim
. "B
"
C L
■
■
■
■
■
■
42"Max. D.O.W.
2"2"
▼▼
DOOROPENING
2⅜"
Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
■
■
■
■
C L
C L2"
▼ ▼
♦ ♦
DOOROPENING
3"
2⅜"
Dim
. "A
" Dim
. "B
"
C L
■
■
■
■
■
2⅜"
Dim
. "A
" Dim
. "B
"
C L
■
■
■
2"
C L C L
2"
48"Max.
72"Max. D.O.W.C L C L
C L2"2"2"
▼ ▼ ▼ ▼▼
3"
84" D
.O.H
.96
" D.O
.H.
▼▼ ▼ ▼ ▼
DOOROPENING
C L
Mid
-Poi
nt
► ■
DOOROPENING
C L2"
2"2"
■
■
▼▼
2⅜"
Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
■
■
D.O.H. “A” “B” 84" 42" 82⅜" 96" 48" 94⅜"
STANDARD LOCATIONS
▼ ▼▼
►
■
▼
■▼ ▼ ▼ ▼ ▼ ▼▼
2"
48"Max.
72"Max. D.O.W.C L
C L
C L
C L
C L
DOOROPENING
2"2"2"
2"
2⅜"
Mid
-Poi
nt
Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
84" D
.O.H
.96
" D.O
.H.
2"
STL-1Steel
Reinforcement
= 1/4" Tek Anchor with filler plate full length of mullion.
= 1/4" Tek Anchor
■
▲
FASTENER LEGEND forSTEEL SUBSTRATE - FY = 36 KSI Min.
Effective October 2014 www.cardcompro.com 47
SERIES CF451T 2” x 4½” - B2PERIMETER ANCHORING
FASTENER LOCATION SCHEMATICS30 - 40 PSF INTO STEEL SUBSTRATE
42"Max. D.O.W.
DOOROPENING
2⅜"
Dim
. "A
" Dim
. "B
"
C L
■
■
■
■
■
■
42"Max. D.O.W.
2"2"
▼▼
DOOROPENING
2⅜"
Dim
. "A
" Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
■
■
■
■
■
■
C L
C L
C L2"
▼ ▼
♦ ♦
DOOROPENING
3"
2⅜"
Dim
. "A
" Dim
. "B
"
C L
■
■
■
■
■
2⅜"
Dim
. "A
" Dim
. "B
"
C L
■
■
■
2"
C L C L
2"
48"Max.
72"Max. D.O.W.C L C L
C L2"2"2"
▼ ▼ ▼ ▼▼
3"
84" D
.O.H
.96
" D.O
.H.
▼▼ ▼ ▼ ▼
STL-1Steel
ReinforcementDOOR
OPENINGC L
Mid
-Poi
nt
► ■
DOOROPENING
C L2"
2"2"
■
■
■
▼▼
2⅜"
Dim
. "A
" Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
■
■
■
C L
D.O.H. “A” “B” 84" 42" 82⅜" 96" 48" 94⅜"
STANDARD LOCATIONS
▼▼ ▼▼ ▼
►►
■
■
▼
■▼▼ ▼▼ ▼ ▼ ▼ ▼▼
1½"
2"
48"Max.
72"Max. D.O.W.C L
C L
C L
C L
C L
DOOROPENING
2"2"2"
2"
2⅜"
Mid
-Poi
nt
Dim
. "A
" Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
84" D
.O.H
.96
" D.O
.H.
2"
2"1½"
STL-1Steel
Reinforcement C L
= 1/4" Tek Anchor with filler plate full length of mullion.
= 1/4" Tek Anchor
■
▲
FASTENER LEGEND forSTEEL SUBSTRATE - FY = 36 KSI Min.
48 www.cardcompro.com Effective October 2014
SERIES CF451T 2” x 4½” - B2PERIMETER ANCHORING
FASTENER LOCATION SCHEMATICS40 - 50 PSF INTO STEEL SUBSTRATE
42"Max. D.O.W.
DOOROPENING
42"Max. D.O.W.
2"2"
▼▼
DOOROPENING
2⅜"
Dim
. "A
" Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
■
■
■
■
■
■
C L
C L
C L2"
▼ ▼
♦ ♦
DOOROPENING
3"
2⅜"
Dim
. "A
" Dim
. "B
"
2"
C L
■
■■
■2⅜
"
Dim
. "A
" Dim
. "B
"
2"
C L
■
■■
■
■
■■
■2⅜
"
Dim
. "A
" Dim
. "B
"
2"
C L
■
■■
■
■
■■
■
2"
C L C L
2"
48"Max.
72"Max. D.O.W.C L C L
C L2"2"2"
▼ ▼ ▼ ▼▼
3"
84" D
.O.H
.96
" D.O
.H.
▼▼ ▼ ▼ ▼
STL-1Steel
ReinforcementDOOR
OPENING
1½"
DOOROPENING
C L2"
2"2"
■
■
■
▼▼
2"
48"Max.
72"Max. D.O.W.C L
C L
C L
C L
C L
DOOROPENING
2"2"2"
2"
2⅜"
Mid
-Poi
nt
Dim
. "A
" Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
84" D
.O.H
.96
" D.O
.H.
2"
2"
1½"▼▼ ▼▼ ▼
►►
■
■
▼
■▼▼ ▼▼ ▼ ▼ ▼ ▼▼
C L
Mid
-Poi
nt2"
►►
STL-1Steel
Reinforcement C L
2⅜"
Dim
. "A
" Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
■
■
■
C L
D.O.H. “A” “B” 84" 43" 82⅜" 96" 49" 94⅜"
STANDARD LOCATIONS
= 1/4" Tek Anchor with filler plate full length of mullion.
= 1/4" Tek Anchor
■
▲
FASTENER LEGEND forSTEEL SUBSTRATE - FY = 36 KSI Min.
Effective October 2014 www.cardcompro.com 49
SERIES CF451T 2” x 4½” - B2PERIMETER ANCHORING
0 - 20 PSF INTO CONCRETE SUBSTRATE
42"Max. D.O.W.
DOOROPENING
2⅜"
Dim
. "A
"
■
■
■
■
42"Max. D.O.W.
2"2"
▼▼
DOOROPENING
2⅜"
Dim
. "A
" 125
½"
Max
. Fra
me
Hei
ght
■
■
■
■
C L
C L3"
▼ ▼
♦ ♦
DOOROPENING
3"
2⅜"
Dim
. "A
"
■
■
■
■
2⅜"
Dim
. "A
"
■
■
2"
C L C L
2"
48"Max.
72"Max. D.O.W.C L C L
C L3"2"2"
▼ ▼ ▼ ▼▼
3"
84" D
.O.H
.96
" D.O
.H.
▼▼ ▼ ▼ ▼
DOOROPENING
C L
Mid
-Poi
nt
►
DOOROPENING
C L3"
2"2"
▼▼
2⅜"
Dim
. "A
" 125
½"
Max
. Fra
me
Hei
ght
■
■
■
■
D.O.H. “A” “B” 84" - 82¼" 96" - 94¼"
STANDARD LOCATIONS
▼ ▼▼
►
■
▼
■▼ ▼ ▼ ▼ ▼ ▼▼
2"
48"Max.
72"Max. D.O.W.C L
C L
C L
C L
C L
DOOROPENING
3"2"2"
2"
2⅜"
Mid
-Poi
nt
Dim
. "A
" 125
½"
Max
. Fra
me
Hei
ght
84" D
.O.H
.96
" D.O
.H.
2"
See Fig. 40.1 for Embedment Description
= 1/4" Tapcon 1¾" Minimum Embedment. 1½" Minimum Edge Distance. with filler plate full length of mullion.
= 1/4" Tapcon 1¾" Minimum Embedment. 1½" Minimum Edge Distance.
■
▲
FASTENER LEGEND for3,000 PSI CONCRETE SUBSTRATE
50 www.cardcompro.com Effective October 2014
SERIES CF451T 2” x 4½” - B2PERIMETER ANCHORING
FASTENER LOCATION SCHEMATICS20 - 30 PSF INTO CONCRETE SUBSTRATE
42"Max. D.O.W.
DOOROPENING
2⅜"
Dim
. "A
" Dim
. "B
"
C L
■
■
■
■
■
■
42"Max. D.O.W.
2"2"
▼▼
DOOROPENING
2⅜"
Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
■
■
■
■
C L
C L2"
▼ ▼
♦ ♦
DOOROPENING
3"
2⅜"
Dim
. "A
" Dim
. "B
"
C L
■
■
■
■
■
2⅜"
Dim
. "A
" Dim
. "B
"
C L
■
■
■
2"
C L C L
2"
48"Max.
72"Max. D.O.W.C L C L
C L3"2"2"
▼ ▼ ▼ ▼▼
3"
84" D
.O.H
.96
" D.O
.H.
▼▼ ▼ ▼ ▼
DOOROPENING
C L
Mid
-Poi
nt
► ■
DOOROPENING
C L3"
2"2"
▼▼
2⅜"
Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
■
3"
■■
■
■■
D.O.H. “A” “B” 84" 42" 82⅜" 96" 48" 94⅜"
STANDARD LOCATIONS
3"
■
▼▼ ▼▼ ▼
►►
■
■
▼
■▼▼ ▼▼ ▼ ▼ ▼ ▼▼
3"
2"
48"Max.
72"Max. D.O.W.C L
C L
C L
C L
C L
DOOROPENING
3"2"2"
2"
2⅜"
Mid
-Poi
nt
Dim
. "A
" Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
84" D
.O.H
.96
" D.O
.H.
2"
3"
3"
STL-1Steel
Reinforcement C L
See Fig. 40.1 for Embedment Description
= 1/4" Tapcon 1¾" Minimum Embedment. 1½" Minimum Edge Distance. with filler plate full length of mullion.
= 1/4" Tapcon 1¾" Minimum Embedment. 1½" Minimum Edge Distance.
■
▲
FASTENER LEGEND for3,000 PSI CONCRETE SUBSTRATE
Effective October 2014 www.cardcompro.com 51
SERIES CF451T 2” x 4½” - B2PERIMETER ANCHORING
FASTENER LOCATION SCHEMATICS30 - 40 PSF INTO CONCRETE SUBSTRATE
42"Max. D.O.W.
DOOROPENING
2⅜"
Dim
. "A
" Dim
. "B
"
C L
■
■
■
■
■
■
42"Max. D.O.W.
2"2"
▼▼
DOOROPENING
2⅜"
Dim
. "A
" Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
■
■
■
■
■
■
C L
C L
C L3"
▼ ▼
♦ ♦
DOOROPENING
3"
2⅜"
Dim
. "A
" Dim
. "B
"
C L
■
■
■
■
■
2⅜"
Dim
. "A
" Dim
. "B
"
C L
■
■
■
2"
C L C L
2"
48"Max.
72"Max. D.O.W.C L C L
C L3"2"2"
▼ ▼ ▼ ▼▼
3"
84" D
.O.H
.96
" D.O
.H.
▼▼ ▼ ▼ ▼
STL-1Steel
ReinforcementDOOR
OPENINGC L
Mid
-Poi
nt
► ■
DOOROPENING
C L3"
2"2"
▼▼
2⅜"
Dim
. "A
" Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
■
■
C L
3"
■■
■
■
■■
D.O.H. “A” “B” 84" 42" 82¼" 96" 48" 94¼"
STANDARD LOCATIONS
3"
■
▼▼ ▼▼ ▼
►►
■
■
▼
■▼▼ ▼▼ ▼ ▼ ▼ ▼▼
3"
2"
48"Max.
72"Max. D.O.W.C L
C L
C L
C L
C L
DOOROPENING
3"2"2"
2"
2⅜"
Mid
-Poi
nt
Dim
. "A
" Dim
. "B
" 125
½"
Max
. Fra
me
Hei
ght
84" D
.O.H
.96
" D.O
.H.
2"
2"3"
STL-1Steel
Reinforcement C L
See Fig. 40.1 for Embedment Description
= 1/4" Tapcon 1¾" Minimum Embedment. 1½" Minimum Edge Distance. with filler plate full length of mullion.
= 1/4" Tapcon 1¾" Minimum Embedment. 1½" Minimum Edge Distance.
■
▲
FASTENER LEGEND for3,000 PSI CONCRETE SUBSTRATE
52 www.cardcompro.com Effective October 2014
SERIES CF451T 2” x 4½” - B2PERIMETER ANCHORING
FASTENER LOCATION SCHEMATICS40 - 50 PSF INTO CONCRETE SUBSTRATE
42"Max. D.O.W.
DOOROPENING
42"Max. D.O.W.
2"2"
▼▼
DOOROPENING
C L
C L3"
▼ ▼
♦ ♦
DOOROPENING
3"
2⅜"
Dim
. "A
" Dim
. "B
"
3"
C L
■
■■
■
2⅜"
Dim
. "A
" Dim
. "B
"
3"
C L
■
■■
■
■
■■
■
2⅜"
Dim
. "A
" Dim
. "B
"
3"
C L
■
■■
■
■
■■
■
C L
72"Max. D.O.W.
C L3"
▼ ▼
3"
84" D
.O.H
.96
" D.O
.H.
▼ ▼
STL-1Steel
ReinforcementDOOR
OPENING
3"
3"
48"Max.C L C L
2"2"
▼▼ ▼▼▼
DOOROPENING
C L2"
2"2"
▼▼
2"
48"Max.
72"Max. D.O.W.C L
C L
C L
C L
C L
DOOROPENING
3"2"2"
2"
Mid
-Poi
nt
125
½"
Max
. Fra
me
Hei
ght
84" D
.O.H
.96
" D.O
.H.
2"
3"
3"▼▼ ▼▼ ▼
►►
▼
▼▼ ▼▼ ▼ ▼ ▼ ▼▼
C L
Mid
-Poi
nt2"
►►
STL-1Steel
Reinforcement
2⅜"
3"
Dim
. "A
" Dim
. "B
"
3"
C L
■
■■
■
■
125
½"
Max
. Fra
me
Hei
ght
2⅜"
3"
Dim
. "A
" Dim
. "B
"
3"
C L
■
■■
■
■
■
■■
■
■
125
½"
Max
. Fra
me
Hei
ght
2⅜"
3"
Dim
. "A
" Dim
. "B
"
3"
C L
■
■■
■
■
■
■■
■
■
2"
C L
2"
3"▼▼▼ ▼▼
D.O.H. “A” “B” 84" 43½" 82⅜" 96" 49½" 94⅜"
STANDARD LOCATIONS
See Fig. 40.1 for Embedment Description
= 1/4" Tapcon 1¾" Minimum Embedment. 1½" Minimum Edge Distance. with filler plate full length of mullion.
= 1/4" Tapcon 1¾" Minimum Embedment. 1½" Minimum Edge Distance.
■
▲
FASTENER LEGEND for3,000 PSI CONCRETE SUBSTRATE