39
September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

Embed Size (px)

Citation preview

Page 1: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

September 21, 2005

ICF Consulting

RGGI

Electricity Sector Modeling ResultsUpdated Reference, RGGI Package and

Sensitivities

Page 2: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

2

Outline

RGGI Reference Case: New v. Old

• Changes

• Results

RGGI Policy Scenarios

• RGGI Package Scenario

• Package Scenario with US/Canada Policies

RGGI High Emissions Cases

• RGGI High Emissions Package Scenario

RGGI Low Emissions Cases

• RGGI Low Emissions Package Scenario

Page 3: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

RGGI Reference CaseNew v. Old

Page 4: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

4

New v. Old Reference Case - Changes

Three categories of changes were made to the original February RGGI Reference Case to arrive at the updated August Reference Case:

• Assumptions updates to take advantage of more recent fuel market projections.

•The change increased 2006 gas prices relative to the original Reference Case and resulted in mid- to long-term gas prices (2010-2024) averaging 7.5% higher ($4.89/MMBtu v. $4.55/MMBtu, in year 2003 dollars).

• Near-term calibration measures to bring 2006 model projections more in-line with recent market experience

•Near term oil/gas steam generation in New York and the RGGI region has been calibrated to approximate recent historical levels.

•Transmission flows more closely represent 5-year average historical levels in the near-term.

• Capacity market adjustments

•More closely represent New York’s upstate capacity market.

Page 5: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

5

RGGI Generation MixNew Reference v. Old Reference

-

100

200

300

400

500

600

Old Ref New Ref Old Ref New Ref Old Ref New Ref

2006 2012 2024

TW

h

Net Imports

Other Renewables

Wind

Other

Oil/Gas

Gas

Coal

Nuclear

Page 6: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

6

CO2 EmissionsNew Reference v. Old Reference

0

20

40

60

80

100

120

140

160

2006 2009 2012 2015 2018 2021 2024

Mill

ion

Ton

s

Old Ref

New Ref

Page 7: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

7

RGGI Net ImportsNew Reference v. Old Reference

0

10

20

30

40

50

60

70

80

90

2006 2009 2012 2015 2018 2021 2024

TW

h

Old Ref

New Ref

Note: Net imports have been adjusted to account for losses and now represent the actual energy served by imports.

Page 8: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

RGGI Package Scenariocompared to updated Reference

Case

Page 9: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

9

Package Scenario

The Package Scenario presented here is based on the new RGGI Reference Case and includes the following:

• CO2 Policy – Phased-in cap to 2020

• Offsets – Combined RGGI and CDM Offset Curves, Limited to 50% of Required Reductions

• End Use Efficiency – Technology costs, load shapes, load factors, and potential supply by sector are based on data provided by ACEEE. Program costs to implement measures are based on average of RGGI states’ actual expenditures through 2004 to implement public benefit programs. The Package Scenario assumes that current levels of annual state expenditures for public benefit programs continue through 2025.

The Package Scenario with US and Canada national carbon policies adds the following:

• US policy assumes stabilization at projected 2015 levels starting in 2015

• Canada policy assumes stabilization at projected 2008 levels starting in 2008

Page 10: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

10

RGGI Generation Mix in 2024

-

100

200

300

400

500

600

Reference Package Package + Fed

TW

h

Net Imports

Other Renewables

Wind

Other

Oil/Gas

Gas

Coal

Nuclear

Page 11: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

11

CO2 Emissions Trajectories

0

20

40

60

80

100

120

140

160

2006 2009 2012 2015 2018 2021 2024

Mill

ion

Ton

s

Reference

Package

Package Cap

Page 12: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

12

CO2 Allowance Prices

0

2

4

6

8

10

12

14

2006 2009 2012 2015 2018 2021 2024

$/T

on

Package

Package + Fed

Page 13: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

13

Change in RGGI Average Annual Energy Prices

0%

2%

4%

6%

8%

10%

12%

14%

16%

Ch

an

ge

in E

ne

rgy

Pri

ce

Package

Package+Fed

NOTE: Energy prices represent wholesale market prices and include annualized capacity prices. Note that the RGGI Package Scenario assumes that current levels of annual state expenditures for public benefit programs continue through 2025. While these types of programs cause lower wholesale prices by reducing electricity demand, they are paid for by consumers through a line item charge at the retail level, and are therefore not reflected in the wholesale price changes shown above. Current retail electricity prices already include the annual costs of these programs.

While the modeling assumes that end-use energy efficiency is implemented entirely by public benefit programs, it is recognized that energy efficiency could also be implemented by actions such as appliance standards and building codes that do not require state funding and could possibly be done at lower costs.

Page 14: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

14

RGGI Net Imports

Note: Net imports have been adjusted to account for losses and now represent the actual energy served by imports.

0

10

20

30

40

50

60

70

80

2006 2009 2012 2015 2018 2021 2024

TW

h

Reference

Package

Package + Fed

Page 15: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

15

Package Scenario Cumulative CO2 ReductionsRGGI and Eastern Interconnect/Canada

0

50

100

150

200

250

300

Mill

ion

Ton

s C

O2

Strategic Carbon Fund

Offsets

On System Reductions

2015 2021

In RGGI In EI + Canada

In RGGI In EI + Canada

Page 16: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

RGGI Package Scenariocompared to

High Emissions Cases

Page 17: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

17

RGGI Cumulative Capacity Additions by 2024

-

5

10

15

20

25

30

35

40

Reference Package High Emission High Emission+ Package

GW

Other Renewables

Wind

Gas

Coal

Nuclear

Page 18: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

18

RGGI Generation Mix in 2024

-

100

200

300

400

500

600

Reference Package High Emission High Emission +Package

TW

h

Net Imports

Other Renewables

Wind

Other

Oil/Gas

Gas

Coal

Nuclear

Page 19: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

19

CO2 Emissions Trajectories

0

20

40

60

80

100

120

140

160

180

200

2006 2009 2012 2015 2018 2021 2024

Mill

ion

Ton

s

Reference

Package

High Emission

High Emission + Package

Page 20: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

20

CO2 Allowance Prices

0

1

2

3

4

5

6

7

2006 2009 2012 2015 2018 2021 2024

$/T

on

Package

High Emission + Package

Page 21: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

21

Change in RGGI Average Annual Energy Prices

NOTE: Energy prices represent wholesale market prices and include annualized capacity prices. Note that the RGGI Package Scenario assumes that current levels of annual state expenditures for public benefit programs continue through 2025. While these types of programs cause lower wholesale prices by reducing electricity demand, they are paid for by consumers through a line item charge at the retail level, and are therefore not reflected in the wholesale price changes shown above. Current retail electricity prices already include the annual costs of these programs.

While the modeling assumes that end-use energy efficiency is implemented entirely by public benefit programs, it is recognized that energy efficiency could also be implemented by actions such as appliance standards and building codes that do not require state funding and could possibly be done at lower costs.

0%

1%

2%

3%

4%

5%

6%

2006 2009 2012 2015 2018 2021 2024

Ch

ang

e in

En

erg

y P

rice

Package High Emission + Package

Page 22: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

22

RGGI Net Imports

0

10

20

30

40

50

60

70

80

90

2006 2009 2012 2015 2018 2021 2024

TW

h

Reference

Package

High Emission

High Emission + Package

Page 23: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

23

Cumulative CO2 Reductions by 2015RGGI and Eastern Interconnect/Canada

0

100

200

300

400

500

600

700

800

Mill

ion

Ton

s C

O2

Strategic Carbon Fund

Offsets

On System Reductions

Package High Emission + Package

In RGGI In EI + Canada

In RGGI In EI + Canada

Page 24: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

24

Cumulative CO2 Reductions by 2021RGGI and Eastern Interconnect/Canada

0

100

200

300

400

500

600

700

800

Mill

ion

Ton

s C

O2

Strategic Carbon Fund

Offsets

On System Reductions

Package High Emission + Package

In RGGI In EI + Canada

In RGGI In EI + Canada

Page 25: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

Package Scenario with US/Canada Policies

Page 26: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

26

CO2 Allowance Prices

0

2

4

6

8

10

12

2006 2009 2012 2015 2018 2021 2024

$/T

on

High Emission + Package+ Fed

Package

High Emission + Package

Page 27: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

27

Change in RGGI Average Annual Energy Prices

NOTE: Energy prices include annualized capacity prices.

0%

1%

2%

3%

4%

5%

6%

7%

8%

9%

10%

2006 2009 2012 2015 2018 2021 2024

Ch

ang

e in

En

erg

y P

rice

Package High Emission + Package High Emission + Package + Fed

Page 28: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

RGGI Low Emissions Cases

Page 29: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

29

RGGI Load Growth Comparison

0

100

200

300

400

500

600

Ref

eren

ce

Ref

eren

ce-

1xR

efer

ence

- 2x All

Eco

nom

ic

Ref

eren

ce

Ref

eren

ce-

1xR

efer

ence

- 2x All

Eco

nom

ic

Ref

eren

ce

Ref

eren

ce-

1xR

efer

ence

- 2x All

Eco

nom

ic

2006 2012 2024

TW

h

Efficiency

Net Energy ForLoad

Page 30: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

30

RGGI Cumulative Capacity Additions

-

5

10

15

20

25

30

35

Ref

eren

ce

Ref

eren

ce-

2xE

ffici

ency

All

Eco

nom

icE

ff

Ref

eren

ce

Ref

eren

ce-

2xE

ffici

ency

All

Eco

nom

icE

ff

Ref

eren

ce

Ref

eren

ce-

2xE

ffici

ency

All

Eco

nom

icE

ff

2006 2012 2024

GW

Other Renewables

Wind

Gas

Nuclear

Page 31: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

31

CO2 Emissions

0

20

40

60

80

100

120

140

160

2006 2009 2012 2015 2018 2021 2024

Mill

ion

Ton

s

Reference

Reference - 2x Efficiency

All Economic Eff

Page 32: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

32

RGGI Net Imports

0

10

20

30

40

50

60

70

80

2006 2009 2012 2015 2018 2021 2024

TW

h

Reference

Reference - 2x Efficiency

All Economic Eff

Page 33: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

Package Scenario with 2x Efficiency Assumption

Page 34: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

34

CO2 Allowance Prices

0

1

2

3

4

5

6

7

2006 2009 2012 2015 2018 2021 2024

$/T

on

Package + 2x Efficiency

Package

Page 35: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

35

CO2 Emissions

0

20

40

60

80

100

120

140

160

2006 2009 2012 2015 2018 2021 2024

Mill

ion

Ton

s

Reference

Package

Package + 2x Efficiency

Page 36: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

36

RGGI Net Imports

0

10

20

30

40

50

60

70

80

2006 2009 2012 2015 2018 2021 2024

TW

h

Reference

Package

Package + 2x Efficiency

Page 37: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

37

Change in RGGI Average Annual Energy Prices

NOTE: Energy prices represent wholesale market prices and include annualized capacity prices. Note that the RGGI Package Scenario assumes that current levels of annual state expenditures for public benefit programs continue through 2025. While these types of programs cause lower wholesale prices by reducing electricity demand, they are paid for by consumers through a line item charge at the retail level, and are therefore not reflected in the wholesale price changes shown above. Current retail electricity prices already include the annual costs of these programs.

While the modeling assumes that end-use energy efficiency is implemented entirely by public benefit programs, it is recognized that energy efficiency could also be implemented by actions such as appliance standards and building codes that do not require state funding and could possibly be done at lower costs.

0%

1%

2%

3%

4%

5%

6%

2006 2009 2012 2015 2018 2021 2024

Ch

ang

e in

En

erg

y P

rice

Package Package + 2x Efficiency

Page 38: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

38

Cumulative CO2 Reductions by 2015RGGI and Eastern Interconnect/Canada

0

100

200

300

400

500

600

700

800

Mill

ion

Ton

s C

O2

Strategic Carbon Fund

Offsets

On System Reductions

Package Package + 2x Efficiency

In RGGI In EI + Canada

In RGGI In EI + Canada

Page 39: September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities

39

Cumulative CO2 Reductions by 2021RGGI and Eastern Interconnect/Canada

0

100

200

300

400

500

600

700

800

Mill

ion

Ton

s C

O2

Strategic Carbon Fund

Offsets

On System Reductions

Package Package + 2x Efficiency

In RGGI In EI + Canada

In RGGI In EI + Canada