170
Sample to Insight__ September 2019 QIAcube ® Connect User Manual

September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

Sample to Insight__

September 2019

QIAcube® Connect User Manual

Page 2: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 2

Contents

1 Introduction .............................................................................................................5

1.1 About this user manual ...............................................................................5

1.2 Intended use of the QIAcube Connect ............................................................6

1.3 Requirements for QIAcube Connect users .......................................................6

2 Safety Information ....................................................................................................7

2.1 Proper use .................................................................................................7

2.2 Electrical safety ..........................................................................................9

2.3 Environment .............................................................................................11

2.4 Biological safety .......................................................................................11

2.5 Chemicals ................................................................................................12

2.6 Waste disposal .........................................................................................13

2.7 Mechanical hazards ..................................................................................13

2.8 Heat hazard.............................................................................................15

2.9 Maintenance safety ...................................................................................15

2.10 Radiation safety .......................................................................................17

2.11 Symbols on the QIAcube Connect ...............................................................18

3 General Description ................................................................................................19

3.1 QIAcube Connect principle .........................................................................19

3.2 External features of the QIAcube Connect ....................................................21

3.3 Internal features of the QIAcube Connect .....................................................27

4 Installation Procedures ............................................................................................35

4.1 Installation environment ............................................................................35

4.2 Installation of AC power cord .....................................................................37

4.3 Unpacking the QIAcube Connect.................................................................37

4.4 Installing the QIAcube Connect ...................................................................38

4.5 Configuration of the QIAcube Connect .........................................................42

4.6 Packing the QIAcube Connect .....................................................................60

5 Operating Procedures .............................................................................................63

5.1 QIAcube Connect software .........................................................................67

Page 3: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 3

5.2 Switching on the instrument and logging in ..................................................69

5.3 Setting up a protocol run ...........................................................................71

5.4 Starting the protocol run ............................................................................89

5.5 End of the protocol run ..............................................................................90

5.6 Stopping a protocol run .............................................................................91

5.7 Saving run reports to the USB stick .............................................................91

5.8 Operating the heater/shaker .....................................................................92

5.9 Operating the centrifuge ............................................................................94

5.10 Logging out..............................................................................................97

6 Maintenance Procedures .........................................................................................98

6.1 Cleaning agents .......................................................................................99

6.2 Servicing .............................................................................................. 102

6.3 Regular maintenance procedure .............................................................. 102

6.4 Daily maintenance procedure .................................................................. 103

6.5 Monthly maintenance procedure .............................................................. 104

6.6 Periodic maintenance procedure .............................................................. 105

6.7 Decontaminating the QIAcube Connect ..................................................... 120

7 Troubleshooting .................................................................................................. 121

7.1 General information ............................................................................... 121

7.2 Contacting QIAGEN Technical Services ..................................................... 121

7.3 Operation ............................................................................................. 122

8 Glossary ............................................................................................................ 131

9 Appendix A – Technical data ................................................................................ 133

9.1 Operating conditions .............................................................................. 133

9.2 Transport conditions ............................................................................... 133

9.3 Storage conditions ................................................................................. 133

9.4 Mechanical data and hardware features .................................................. 134

9.5 Declaration of Conformity ....................................................................... 135

9.6 Waste Electrical and Electronic Equipment (WEEE) ...................................... 135

9.7 FCC Declaration ..................................................................................... 136

9.8 Liability Clause ...................................................................................... 137

Page 4: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 4

10 Appendix B – QIAcube Connect Accessories ........................................................... 138

11 Appendix C – Consignes de sécurité ...................................................................... 140

11.1 Utilisation appropriée ............................................................................. 140

11.2 Sécurité électrique .................................................................................. 143

11.3 Atmosphère .......................................................................................... 144

11.4 Sécurité biologique ................................................................................ 144

11.5 Produits chimiques ................................................................................. 145

11.6 Traitement des déchets ........................................................................... 146

11.7 Dangers mécaniques .............................................................................. 147

11.8 Dangers liés à la chaleur ........................................................................ 149

11.9 Sécurité relative à la maintenance ........................................................... 149

11.10 Sécurité contre les rayonnements ............................................................. 150

11.11 Symboles sur le QIAcube Connect ............................................................ 152

12 Appendix D – Sicherheitshinweise ......................................................................... 153

12.1 Sachgemäße Handhabung ...................................................................... 153

12.2 Schutz vor Stromschlag .......................................................................... 156

12.3 Atmosphären ........................................................................................ 157

12.4 Biologische Sicherheit ............................................................................. 158

12.5 Chemikalien .......................................................................................... 159

12.6 Entsorgen von Abfällen .......................................................................... 160

12.7 Gefahren durch mechanische Teile ........................................................... 160

12.8 Hitzegefahr ........................................................................................... 162

12.9 Sicherheitshinweise – Wartungsarbeiten ................................................... 162

12.10 Strahlensicherheit .................................................................................. 164

12.11 Symbols on the QIAcube Connect ............................................................ 165

13 Version history .................................................................................................... 166

Index 167

Page 5: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 5

1 Introduction

Thank you for choosing the QIAcube Connect. We are confident it will become an integral part of

your laboratory. Before using the QIAcube Connect, it is essential that you read this user manual

carefully and pay attention to the safety information. The instructions and safety information in the

user manual must be followed to ensure safe operation of the instrument and to maintain the

instrument in a safe condition.

1.1 About this user manual

This user manual provides information about the QIAcube Connect in the following sections:

1. Introduction

2. Safety Information

3. General Description

4. Installation Procedures

5. Operating Procedures

6. Maintenance Procedures

7. Troubleshooting

8. Glossary

9. Appendix A – Technical data

10. Appendix B – QIAcube Connect Accessories

11. Appendix C – Consignes de sécurité (Safety Information in French)

12. Appendix D – Sicherheitshinweise (Safety Information in German)

13. Version history

1.1.1 Technical assistance

At QIAGEN®, we pride ourselves on the quality and availability of our technical support. Our

Technical Services Departments are staffed by experienced scientists with extensive practical and

theoretical expertise in molecular biology and the use of QIAGEN products. If you have any

questions or experience any difficulties regarding the QIAcube Connect or QIAGEN products in

general, do not hesitate to contact us.

QIAGEN customers are a major source of information regarding advanced or specialized uses of

our products. This information is helpful to other scientists as well as to the researchers at QIAGEN.

Page 6: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 6

We therefore encourage you to contact us if you have any suggestions about product performance

or new applications and techniques.

For technical assistance and more information, please see our Technical Support Center at

www.qiagen.com/support/technical-support or call one of the QIAGEN Technical Service

Departments or local distributors (see back cover or visit www.qiagen.com).

1.1.2 Policy statement

It is the policy of QIAGEN to improve products as new techniques and components become

available. QIAGEN reserves the right to change specifications at any time.

To produce useful and appropriate documentation, we appreciate your comments on this user

manual. Please contact QIAGEN Technical Services.

1.2 Intended use of the QIAcube Connect

The QIAcube Connect is designed to perform fully automated purification of nucleic acids and

proteins in molecular biology applications. The system is intended for use by professional users

trained in molecular biological techniques and the operation of the QIAcube Connect.

The QIAcube Connect is intended to be used only in combination with QIAGEN kits indicated for

use with the QIAcube Connect for the applications described in the kit handbooks.

1.3 Requirements for QIAcube Connect users

The table below covers the general level of competence and training necessary for transportation,

installation, use, maintenance, and servicing of the QIAcube Connect.

Task Personnel Training and experience

Delivery No special requirements No special requirements

Installation, routine use and maintenance

Laboratory technicians or equivalent Appropriately trained and experienced personnel familiar with use of computers and automation in general

Servicing QIAGEN Field Service Specialists only Trained and authorized by QIAGEN

Page 7: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 7

2 Safety Information

Before using the QIAcube Connect, it is essential that you read this user manual carefully and pay

attention to the safety information. The instructions and safety information in the user manual must

be followed to ensure safe operation of the instrument and to maintain the instrument in a safe

condition.

Note: Translations of the Safety Information in French and German are available in Appendix C –

Consignes de sécurité and Appendix D – Sicherheitshinweise.

The following types of safety information appear in this manual.

WARNING

The term WARNING is used to inform you about situations that could result in personal injury to you or other persons. Details about these circumstances are given in a box like this one.

CAUTION

The term CAUTION is used to inform you about situations that could result in damage to the instrument or other equipment. Details about these circumstances are given in a box like this one.

The advice given in this manual is intended to supplement, not supersede, the normal safety

requirements prevailing in the user’s country.

2.1 Proper use

WARNING

Risk of personal injury and material damage [W1] Improper use of the QIAcube Connect may cause personal injuries or damage to the instrument. The QIAcube Connect must only be operated by qualified personnel who have been appropriately trained. Servicing of the QIAcube Connect must only be performed by a QIAGEN Field Service specialist.

Perform the maintenance as described in section 6 Maintenance Procedures. QIAGEN charges for

repairs that are required due to incorrect maintenance.

Page 8: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 8

WARNING

Risk of personal injury and material damage [W2] The QIAcube Connect is too heavy to be lifted by one person. To avoid personal injury or damage to the instrument, do not lift the instrument alone.

WARNING

Risk of personal injury and material damage [W3] Do not attempt to move the QIAcube Connect during operation.

CAUTION

Damage to the instrument [C1] Avoid spilling water or chemicals onto the QIAcube Connect. Damage caused by water or chemical spillage will void your warranty.

In case of emergency, power OFF the QIAcube Connect at the power switch located in front of the

instrument and unplug the power cord from the power outlet.

CAUTION

Damage to the instrument [C2] Only use QIAGEN spin columns and QIAcube Connect specific consumables with the QIAcube Connect. Damage caused by use of other types of spin columns or chemistries will void your warranty.

WARNING

Risk of personal injury and material damage [W4] Do not use damaged rotor adapters. The rotor adapters can only be used once. High g forces exerted in the centrifuge can cause damage to re-used rotor adapters.

CAUTION

Damage to the instrument [C3] Empty the tip disposal container prior to use to prevent a tip jam in the waste drawer. Failure to empty the waste container may block the robotic arm that could cause run failure or instrument damage.

WARNING

Risk of personal injury and material damage [W5] To prevent plastic crash, load the tubes properly. After a plastic crash, sharp plastic particles could be inside the centrifuge. Be careful when handling items inside the centrifuge.

CAUTION

Damage to the instrument [C4] Only use the correct volume of liquids.

Exceeding the recommended volume of liquids may damage the centrifuge rotor or instrument.

Page 9: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 9

WARNING

Risk of fire or explosion [W6] When using ethanol or ethanol-based liquids on the QIAcube Connect, handle such liquids carefully and in accordance with the required safety regulations. If liquid has been spilled, wipe it off and leave the QIAcube Connect hood open to allow flammable vapors to disperse.

WARNING

Risk of explosion [W7] The QIAcube Connect is intended for use with reagents and substances supplied with QIAGEN kits or other than outlined in respective Information for use. Use of other reagents and substances may lead to fire or explosion.

If hazardous material is spilled on or inside the QIAcube Connect, the user is responsible for

carrying out appropriate decontamination.

Note: Do not place items on top of the QIAcube Connect hoods.

CAUTION

Damage to the instrument [C5] Do not lean against the touchscreen when it is pulled out.

2.2 Electrical safety

Note: Disconnect the line power cord from the power outlet before servicing.

WARNING

Electrical hazard [W8] Any interruption of the protective conductor (earth/ground lead) inside or outside the instrument or disconnection of the protective conductor terminal is likely to make the instrument dangerous.

Intentional interruption is prohibited.

Lethal voltages inside the instrument When the instrument is connected to line power, terminals may be live and opening covers or removing parts is likely to expose live parts.

Page 10: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 10

WARNING

Damage to electronics [W9] Before powering ON the instrument, make sure that the correct supply voltage is used.

Use of incorrect supply voltage may damage the electronics.

To check the recommended supply voltage, refer to the specifications indicated in the type plate of the instrument.

WARNING

Risk of electric shock [W10] Do not open any panels on the QIAcube Connect.

Risk of personal injury and material damage Only perform maintenance that is specifically described in this user manual.

To ensure satisfactory and safe operation of the QIAcube Connect, follow these guidelines:

The line power cord must be connected to a line power outlet that has a protective conductor

(earth/ground).

Do not adjust or replace internal parts of the instrument.

Do not operate the instrument with any covers or parts removed.

If liquid has spilled inside the instrument, power OFF the instrument, disconnect it from the

power outlet, and contact QIAGEN Technical Services.

If the instrument becomes electrically unsafe, prevent other personnel from operating it, and contact

QIAGEN Technical Services.

The instrument may be electrically unsafe when:

It or the line power cord appears to be damaged.

It has been stored under unfavorable conditions for a prolonged period.

It has been subjected to severe transport stresses.

Liquids come in contact directly with electrical components of the QIAcube Connect.

Page 11: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 11

2.3 Environment

2.3.1 Operating conditions

WARNING

Explosive atmosphere [W11] The QIAcube Connect is not designed for use in an explosive atmosphere.

CAUTION

Damage to the instrument [C6] Direct sunlight may bleach parts of the instrument and cause damage to plastic parts.

The QIAcube Connect must be located out of direct sunlight.

2.4 Biological safety

Specimens and reagents containing materials from humans should be treated as potentially

infectious. Use safe laboratory procedures as outlined in publications such as Biosafety in

Microbiological and Biomedical Laboratories, HHS (www.cdc.gov/biosafety).

Page 12: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 12

2.4.1 Samples

Samples may contain infectious agents. You should be aware of the health hazard presented by

such agents and should use, store, and dispose of such samples according to the required safety

regulations.

WARNING

Samples containing infectious agents [W12] Some samples used with this instrument may contain infectious agents. Handle such samples with the greatest of care and in accordance with the required safety regulations.

Always wear safety glasses, 2 pairs of gloves, and a lab coat.

The responsible body (e.g., laboratory manager) must take the necessary precautions to ensure that the surrounding workplace is safe, and that the instrument operators are suitably trained and not exposed to hazardous levels of infectious agents as defined in the applicable Material Safety Data Sheets (MSDSs) or OSHA*, ACGIH† or COSHH‡ documents.

Venting for fumes and disposal of wastes must be in accordance with all national, state, and local health and safety regulations and laws.

2.5 Chemicals

WARNING

Hazardous chemicals [W13] Some chemicals used with this instrument may be hazardous or may become hazardous after completion of the protocol run.

Always wear safety glasses, gloves, and a lab coat.

The responsible body (e.g., laboratory manager) must take the necessary precautions to ensure that the surrounding workplace is safe and that the instrument operators are not exposed to hazardous levels of toxic substances (chemical or biological) as defined in the applicable Material Safety Data Sheets (MSDSs) or OSHA,* ACGIH† or COSHH‡ documents.

Venting for fumes and disposal of wastes must be in accordance with all national, state, and local health and safety regulations and laws.

* OSHA : Occupational Safety and Health Administration (United States of America). † ACGIH : American Conference of Government Industrial Hygienists (United States of America). ‡ COSHH : Control of Substances Hazardous to Health (United Kingdom).

Page 13: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 13

2.5.1 Toxic fumes

If working with volatile solvents or toxic substances, you must provide an efficient laboratory

ventilation system to remove vapors that may be produced.

WARNING

Toxic fumes [W14] Do not use bleach to clean or disinfect the QIAcube Connect. Bleach in contact with salts from the buffers can produce toxic fumes.

WARNING

Toxic fumes [W15] Do not use bleach to disinfect used labware. Bleach in contact with salts from the buffers used can produce toxic fumes.

2.6 Waste disposal

Used labware, such as sample tubes, QIAGEN spin columns, filter-tips, buffer bottle and enzyme

tubes, or rotor adapters, may contain hazardous chemicals or infectious agents from the purification

process. These hazardous wastes must be collected and disposed of properly according to local

safety regulations.

For more information about how to dispose of the QIAcube Connect, see section 9.6 Waste

Electrical and Electronic Equipment (WEEE).

WARNING

Hazardous chemicals and infectious agents [W16] The waste may contain toxic material and must be disposed of properly. Refer to your local safety regulations for proper disposal procedures.

2.7 Mechanical hazards

The hood of the QIAcube Connect must remain closed during operation of the instrument. Only

open the hood when instructed to do so by the instruction for use.

While loading the worktable, always stand clear of the instrument. Do not lean on the worktable

when the robotic arm of the instrument is moving to reach loading position with its lid open. Wait

until the robotic arm completed its movements before you start to load or unload.

Page 14: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 14

WARNING

Moving parts [W17] Avoid contact with moving parts during operation of the QIAcube Connect. Under no circumstances should you place your hands under the robotic arm when it is lowering. Do not attempt to move any tip racks or tubes whilst the instrument is operating.

WARNING

Moving parts [W18] To avoid contact with moving parts during operation of the QIAcube Connect, the instrument must be operated with the hood closed.

If the hood sensor or lock is not functioning correctly, contact QIAGEN Technical Services.

2.7.1 Centrifuge

Make sure that the rotor and buckets are installed correctly. All buckets must be mounted before

starting a protocol run, regardless of the number of samples to be processed. If the rotor or buckets

show signs of mechanical damage or corrosion, do not use the QIAcube Connect; contact QIAGEN

Technical Services.

CAUTION

Damage to the instrument [C7] The QIAcube Connect must not be used if the centrifuge lid is broken, or if the lid lock is damaged.

Make sure that no loose material is inside the centrifuge during operation.

Make sure that the rotor is installed correctly and that all buckets are properly mounted, regardless of the number of samples to be processed. Load the rotor only as instructed by the software.

Only use rotors, buckets, and consumables designed for use with the QIAcube Connect. Damage caused by use of other consumables will void your warranty.

We recommend replacing the centrifuge rotor and buckets after 20000 cycles, which is equivalent to 9 years of usage with two runs per day for 220 days each year. For more information contact QIAGEN Technical Services.

In case of breakdown caused by power failure, the centrifuge lid can be opened manually to

remove the samples (see section 7.3.2).

Page 15: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 15

WARNING

Moving parts [W19] In case of breakdown caused by power failure, remove the power cord and wait 10 minutes before attempting to manually open the centrifuge lid.

CAUTION

Damage to the instrument [C8] After a power failure, do not move the z-module (robotic arm) manually in front of the instrument. Damage may occur if the QIAcube Connect hood is closed and collides with the z-module.

WARNING

Risk of personal injury and material damage [W20] Raise the centrifuge lid carefully. The lid is heavy and may cause injury if it falls.

CAUTION

Risk of overheating [C9] To ensure proper ventilation, maintain a minimum clearance of 10 cm at the sides and rear of the QIAcube Connect.

Slits and openings that ensure the ventilation of the QIAcube Connect must not be covered.

2.8 Heat hazard

The QIAcube Connect worktable contains a heated shaker.

WARNING

Hot surface [W21] The shaker can reach temperatures of up to 70°C (158°F). Avoid touching it when it is hot. Carefully remove the samples after a run.

2.9 Maintenance safety

WARNING/ CAUTION

Risk of personal injury and material damage [W22] Only perform maintenance that is specifically described in this user manual.

Page 16: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 16

WARNING

Risk of explosion [W23] When cleaning the QIAcube Connect with alcohol-based disinfectant, leave the QIAcube Connect hood open to allow flammable vapors to disperse.

Only clean the QIAcube Connect when worktable components have cooled down.

WARNING

Risk of fire [W24] Do not allow cleaning fluid or decontamination agents to come into contact with the electrical parts of the QIAcube Connect.

WARNING

Risk of personal injury and material damage [W25] To prevent the rotor nuts from loosening during operation of the centrifuge, securely tightened the nuts using the rotor key supplied with QIAcube Connect.

WARNING

UV irradiation hazard [W26] A mechanical lock ensures that the hood must be closed for operation of the UV LED.

If the hood sensor or lock is not functioning correctly, contact QIAGEN Technical Services.

WARNING

Risk of personal injury and material damage [W27] Make sure that lids from spin columns and 1.5 ml microcentrifuge tubes are in the correct position and pushed all the way down to the bottom of the slots on the sides of the rotor adapter. Incorrectly positioned lids can break off during centrifugation.

WARNING

Risk of personal injury and material damage [W28] Be sure the lid is completely removed from the spin column. Spin columns with partially removed lids may not be removed properly from the rotor, causing the protocol run to crash.

CAUTION

Damage to the instrument [C10] Do not use bleach, solvents, or reagents containing acids, alkalis or abrasives to clean QIAcube Connect.

Page 17: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 17

CAUTION

Damage to the instrument [C11] Do not use spray bottles containing alcohol or disinfectant to clean surfaces of the QIAcube Connect. Spray bottles should be used only to clean items that have been removed from the worktables.

2.10 Radiation safety

WARNING

Risk of personal injury [W29] Do not expose your skin to UV-C light from the UV LED lamp.

WARNING

Risk of personal injury [W30] Hazard Level 2 laser light: Do not stare into the light beam when using handheld bar code scanner.

Page 18: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 18

2.11 Symbols on the QIAcube Connect

Symbol Location Description

Next to the Shaker Heat hazard – the temperature of the shaker can reach up to 70ºC (158ºF).

Near the centrifuge; near the robotic arm Mechanical hazard — avoid contact with moving parts.

On the instrument, near bottle rack Fire hazard – usage of ethanol in bottle rack.

In front of worktable Biological hazard – some samples used with this instrument may contain infectious agents and must be handled with gloves.

Inside the waste drawer Biohazard — the waste drawer may be contaminated with biohazardous material and must be handled with gloves.

Type plate on the back of the instrument CE mark for European Conformity

Type plate at the back of the instrument CSA listing mark for Canada and the USA

Type plate on the back of the instrument FCC mark of the United States Federal

Communications Commission

Type plate on the back of the instrument RCM mark for Australia and New Zealand

Type plate on the back of the instrument RoHS mark for China (the restriction of the use of certain hazardous substances in electrical and electronic equipment)

Type plate on the back of the instrument Waste Electrical and Electronic Equipment (WEEE) mark for Europe

Type plate on the back of the instrument Legal manufacturer

At the back of the instrument Consult instructions for use

Page 19: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 19

3 General Description

The QIAcube Connect performs fully automated processing of up to 12 samples. The QIAcube

Connect is designed to automate selected QIAGEN kits. The QIAcube Connect controls integrated

components, including a centrifuge, heated shaker, pipetting system, UV LED and robotic gripper.

The QIAcube Connect is preinstalled with various protocols for processing QIAGEN spin columns

for purification of RNA, genomic DNA, plasmid DNA, viral nucleic acids or proteins, plus DNA

and RNA cleanup. The user selects a protocol using the touchscreen and loads labware, samples,

and reagents onto the QIAcube Connect worktable. The user then closes the instrument hood and

starts the protocol, which provides all necessary commands for sample lysis and purification using

QIAGEN spin columns. A fully automated load check helps to ensure correct loading of the

worktable.

The range of protocols available is continually expanding, and additional QIAGEN protocols can

be downloaded free of charge at www.qiagen.com/MyQIAcubeConnect.

3.1 QIAcube Connect principle

Sample preparation using the QIAcube Connect follows the same steps as the manual procedure

(i.e., lyse, bind, wash and elute). Depending on chosen application, the procedure may be

alternated, or steps may not be required. No change in purification chemistry is required as you

simply continue to use trusted QIAGEN spin-column kits.

1. Samples are lysed in the orbital shaker, which can be heated if required by the protocol.

2. Each lysate is transferred to a spin column in a rotor adapter. If the lysate needs to be

homogenized or cleared, it is first transferred to the middle position of the rotor adapter.

3. Nucleic acids or proteins bind to the silica membrane or purification resin of the QIAGEN

spin column and are washed to remove contaminants.

4. The spin column is transferred to a microcentrifuge tube for elution of purified nucleic acids or

protein.

For an example workflow using a QIAGEN spin-column kit, see the flowchart on the next page.

Page 20: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 20

Page 21: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 21

3.2 External features of the QIAcube Connect

Front view of the QIAcube Connect

Pulled-out touchscreen

Rear view of QIAcube Connect Rear view of QIAcube Connect

1 Touchscreen 5 2 USB ports on the left side of the touchscreen; 2 USB ports behind the touchscreen (Wi-Fi module plugged into 1 USB port)

2 Hood 6 RJ-45 Ethernet port

3 Waste drawer 7 Power cord socket

4 Front power switch 8 Cooling air outlet

2

3 4 1

5 5

5

7 6

8

Page 22: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 22

Touchscreen

The QIAcube Connect is controlled using a swivel-mounted touchscreen. The touchscreen allows the

user to select and run protocols, install or delete protocols, save data files and operate the shaker

and centrifuge individually. Information displayed on the touchscreen guides the user through

worktable setup after a protocol has been selected. During sample processing, the touchscreen

shows the protocol status and remaining time.

Pulled-out touchscreen

Hood

The QIAcube Connect hood protects users from the moving robotic arm and from potentially

infectious material placed on the worktable. The hood can be manually opened to gain access to

the worktable. During operation of the QIAcube Connect, the hood must remain closed and should

only be opened when instructed to do so by the software. Therefore, a hood lock has been

implemented to avoid inappropriate opening.

WARNING

Moving parts [W18] To avoid contact with moving parts during operation of the QIAcube Connect, the instrument must be operated with the hood closed.

If the hood sensor or lock is not functioning correctly, contact QIAGEN Technical Services.

Power switch

The power switch is located at the front right of the QIAcube Connect. To power ON the QIAcube

Connect, press the switch. The beeper sounds, and the startup screen appears. The instrument then

automatically performs initialization tests.

Page 23: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 23

To conserve energy, the QIAcube Connect can be powered OFF when not in use. To power OFF

the QIAcube Connect, press the switch.

Note: After powering OFF the QIAcube Connect, you must wait for a few seconds before you

power ON the instrument again. The system might fail to start if you do not allow the QIAcube

Connect to rest for a few seconds before powering ON.

RJ-45 Ethernet port

The RJ-45 Ethernet port located at the back of the instrument beside the power cord socket, is only

used to connect the QIAcube Connect to local area network via cable.

USB ports

The QIAcube Connect has four USB ports. Two are located on the left of the touchscreen and two

are located behind the touchscreen.

The USB ports located on the left of the touchscreen allow connection of the QIAcube Connect to a

USB stick. Data files, such as support package, protocols or report files, can be transferred via the

USB port from the QIAcube Connect to the USB stick. The USB ports can also be used to plug in an

external 2D bar code reader.

A USB port located below the touchscreen, allows insertion of a Wi-Fi dongle to enable Wi-Fi

connection to a local network.

New protocols and software versions, available at www.qiagen.com/MyQIAcubeConnect, can be

downloaded to the USB stick and transferred to the QIAcube Connect via the USB port.

Important: The USB port is only for use with the USB stick provided by QIAGEN. Do not connect

other devices to this port.

Important: Do not remove the USB stick while downloading or transferring data or software to or

from the instrument.

Important: Use of a Wi-Fi dongle is only allowed for certified countries. Refer to

www.qiagen.com/MyQIAcubeConnect for a list of certified countries. Always turn off the QIAcube

Connect in order to plug or unplug the Wi-Fi USB device. Plug-and-play of the Wi-Fi USB device

while the instrument is turned on is not supported.

Page 24: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 24

Waste drawer

Used disposable filter-tips are discarded through two slots in the worktable and collected in the

waste drawer. Used columns (e.g., QIAshredder columns) are also discarded into this drawer.

CAUTION

Damage to the instrument [C3] Empty the tip disposal container prior to use to prevent a tip jam in the waste drawer. Failure to empty the waste container may block the robotic arm that could cause run failure or instrument damage.

WARNING

Hazardous chemicals and infectious agents [W16] The waste may contain toxic material and must be disposed of properly. Refer to your local safety regulations for proper disposal procedures.

WARNING

Hazardous chemicals [W13] Some chemicals used with this instrument may be hazardous or may become hazardous after completion of the protocol run.

Always wear safety glasses, gloves, and a lab coat.

The responsible body (e.g., laboratory manager) must take the necessary precautions to ensure that the surrounding workplace is safe and that the instrument operators are not exposed to hazardous levels of toxic substances (chemical or biological) as defined in the applicable Material Safety Data Sheets (MSDSs) or OSHA*, ACGIH† or COSHH‡ documents.

Venting for fumes and disposal of wastes must be in accordance with all national, state, and local health and safety regulations and laws.

* OSHA : Occupational Safety and Health Administration (United States of America). † ACGIH : American Conference of Government Industrial Hygienists (United States of America). ‡ COSHH : Control of Substances Hazardous to Health (United Kingdom).

Page 25: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 25

WARNING

Samples containing infectious agents [W12] Some samples used with this instrument may contain infectious agents. Handle such samples with the greatest of care and in accordance with the required safety regulations.

Always wear safety glasses, 2 pairs of gloves, and a lab coat.

The responsible body (e.g., laboratory manager) must take the necessary precautions to ensure that the surrounding workplace is safe, and that the instrument operators are suitably trained and not exposed to hazardous levels of infectious agents as defined in the applicable Material Safety Data Sheets (MSDSs) or OSHA*, ACGIH† or COSHH‡ documents.

Venting for fumes and disposal of wastes must be in accordance with all national, state, and local health and safety regulations and laws.

Power cord socket

The power cord socket is located at the rear right of the QIAcube Connect and allows connection

of the QIAcube Connect to a power outlet via the supplied power cord.

WARNING

Electrical hazard [W8] Any interruption of the protective conductor (earth/ground lead) inside or outside the instrument or disconnection of the protective conductor terminal is likely to make the instrument dangerous.

Intentional interruption is prohibited.

Lethal voltages inside the instrument When the instrument is connected to line power, terminals may be live and opening covers or removing parts is likely to expose live parts.

WARNING

Damage to electronics [W9] Before powering ON the instrument, make sure that the correct supply voltage is used.

Use of incorrect supply voltage may damage the electronics.

To check the recommended supply voltage, refer to the specifications indicated in the type plate of the instrument.

* OSHA : Occupational Safety and Health Administration (United States of America). † ACGIH : American Conference of Government Industrial Hygienists (United States of America). ‡ COSHH : Control of Substances Hazardous to Health (United Kingdom).

Page 26: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 26

WARNING

Risk of electric shock [W10] Do not open any panels on the QIAcube Connect.

Risk of personal injury and material damage Only perform maintenance that is specifically described in this user manual.

Cooling air outlet

Cooling air outlets are located at the rear left side of the QIAcube Connect and allow cooling of

the internal components of the QIAcube Connect.

CAUTION

Risk of overheating [C9] To ensure proper ventilation, maintain a minimum clearance of 10 cm at the sides and rear of the QIAcube Connect.

Slits and openings that ensure the ventilation of the QIAcube Connect must not be covered.

Page 27: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 27

3.3 Internal features of the QIAcube Connect

Internal view of the QIAcube Connect.

1 Centrifuge lid 6 Microcentrifuge tube slots

2 Centrifuge 7 3 Slots for tip racks

3 Shaker 8 Disposal slots for tips and columns

4 Reagent bottle rack 9 Robotic arm (includes 1 channel pipettor, gripper, ultrasonic and optical sensor and UV LED) 5 Tip sensor and hood lock

Centrifuge

The centrifuge is equipped with 12 swing-out buckets, each of which can hold a disposable rotor

adapter. Up to 12 samples can be processed per run. For ease of use and high process safety, a

grey line marks the side of the bucket that must face toward the center of the rotor. All centrifuge

buckets must be mounted before starting a run, regardless of the number of samples to be processed.

Be sure to follow the loading instructions provided by the software to ensure correct loading of the

centrifuge.

1

2

3

9 8

7 6

5

4

Page 28: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 28

The centrifuge can also be operated individually via the touchscreen (refer to section 5.9 Operating

the centrifuge on page 94).

Note: Be sure to follow the centrifuge loading instructions provided by the software.

WARNING

Risk of personal injury and material damage [W5] To prevent plastic crash, load the tubes properly. After a plastic crash, sharp plastic particles could be inside the centrifuge. Be careful when handling items inside the centrifuge.

WARNING

Risk of personal injury and material damage [W20] Raise the centrifuge lid carefully. The lid is heavy and may cause injury if it falls.

Rotor adapter

A disposable rotor adapter holds a QIAGEN spin column and a microcentrifuge tube in a centrifuge

bucket during sample processing. If required by the protocol, an additional column (e.g.,

QIAshredder column) can be placed in the middle position of the rotor adapter. For ease of use

and high process safety, the rotor adapters are designed so that they fit into a centrifuge bucket

only in the correct orientation. Spin-column and microcentrifuge tube lids are held securely in slots

at the edge of the rotor adapter.

Microcentrifuge tube position

Middle position

Wash position

Slot for spin-column lid

Assembly of a rotor adapter

The wash position of the rotor adapter is open at the bottom, enabling wash buffers to flow through

and collect at the bottom of the rotor adapter during centrifugation. The other two positions in the

rotor adapter are closed. Be sure to follow the loading instructions provided by the software.

Page 29: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 29

WARNING

Risk of personal injury and material damage [W4] Do not use damaged rotor adapters. The rotor adapters can only be used once. High g forces exerted in the centrifuge can cause damage to used rotor adapters.

WARNING

Risk of personal injury and material damage [W5] To prevent plastic crash, load the tubes properly. After a plastic crash, sharp plastic particles could be inside the centrifuge. Be careful when handling items inside the centrifuge.

Shaker

The heated orbital shaker enables fully automated lysis of up to 12 samples. Two kinds of shaker

adapters are available for 2 ml microcentrifuge tubes and 2 ml screw-cap tubes. Sample tubes are

placed into a rack that fits onto the shaker adapter. The lid of each microcentrifuge tube or shaker

rack plug of each screw-cap tube is held in a slot at the edge of the shaker rack. This ensures that

microcentrifuge tubes cannot be displaced during sample processing and allows shaker loading to

be checked. The positions on the shaker rack are numbered to enable easy loading.

Sample tube lids are held in slots at the edge of the shaker rack

Shaker rack

The shaker can also be operated individually via the touchscreen (see section 5.8).

Note: For shaker loading follow instructions provided by the software.

WARNING

Risk of personal injury and material damage [W5] To prevent plastic crash, load the tubes properly. After a plastic crash, sharp plastic particles could be inside the centrifuge. Be careful when handling items inside the centrifuge.

Page 30: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 30

WARNING

Hot surface [W21] The shaker can reach temperatures of up to 70°C (158°F). Avoid touching it when it is hot. Carefully remove the samples after a run.

Reagent bottle rack

The reagent bottle rack holds up to six 30 ml QIAcube Connect specific reagent bottles and, for

ease of use and high process safety, fits onto the QIAcube Connect worktable only in the correct

orientation. Liquid is aspirated from the bottles by the pipetting system. A labeling strip should be

attached to the reagent bottle rack. For increased convenience and ease of use, the labeling strip

fits only in the correct orientation on the reagent bottle rack. The use of the labeling strip ensures

that the rack is correctly positioned on the worktable for liquid-level detection.

Note: Reagent bottles designed for use with the QIAcube Connect must be used. Otherwise, errors

may occur during liquid detection.

Reagent bottle rack with labeling strips

WARNING

Risk of fire or explosion [W6] When using ethanol or ethanol-based liquids on the QIAcube Connect, handle such liquids carefully and in accordance with the required safety regulations. If liquid has been spilled, wipe it off and leave the QIAcube Connect hood open to allow flammable vapors to disperse.

Page 31: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 31

WARNING

Risk of explosion [W7] The QIAcube Connect is intended for use with reagents and substances supplied with QIAGEN kits or other than outlined in respective Information for use. Use of other reagents and substances may lead to fire or explosion.

WARNING

Risk of personal injury and material damage [W5] To prevent plastic crash, load the tubes properly. After a plastic crash, sharp plastic particles could be inside the centrifuge. Be careful when handling items inside the centrifuge.

WARNING

Hot surface [W21] The shaker can reach temperatures of up to 70°C (158°F). Avoid touching it when it is hot. Carefully remove the samples after a run.

Tip sensor

During sample preparation, the tip sensor checks that the tip adapter has picked up a tip and checks

whether it is a 200 µl or a 1000 µl type filter-tip.

Microcentrifuge tube slots

In addition to the 12 tubes that the shaker can accommodate, up to 3 additional microcentrifuge

tubes can be used in the microcentrifuge accessory position. These slots are used by applications

in which, for example, proteinase K or another enzyme is required for the purification protocol.

Tip rack slots

Three tip racks can be placed on the QIAcube Connect worktable. Tips can be purchased in

prefilled tip racks holding 200 µl filter-tips or 1000 µl filter tips, regular or wide-bore.

Note: Only filter-tips designed for use with the QIAcube Connect must be used.

Tip disposal slots

Disposable filter-tips are alternately discarded through each of the tip disposal slots into the waste

drawer. This prevents discarded tips from piling up in the waste drawer.

Page 32: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 32

Column disposal slot

Used columns (e.g., QIAshredder columns) are discarded through this slot into the waste drawer.

Robotic arm

The robotic arm provides accurate and precise positioning of the robotic gripper and pipetting

system on the QIAcube Connect worktable and includes an optical and ultrasonic sensor, as well

as a UV LED.

WARNING

Moving parts [W18] To avoid contact with moving parts during operation of the QIAcube Connect, the instrument must be operated with the hood closed.

If the hood sensor or lock is not functioning correctly, contact QIAGEN Technical Services.

WARNING

Moving parts [W17] Avoid contact with moving parts during operation of the QIAcube Connect. Under no circumstances should you place your hands under the robotic arm when it is lowering. Do not attempt to move any tip racks or tubes whilst the instrument is operating.

Robotic gripper

The robotic gripper transfers spin columns. During transfer of a spin column, a stabilizing rod holds

the rotor adapter in place, ensuring it remains properly seated in the centrifuge bucket. The robotic

gripper is behind the panel covering the robotic arm.

Robotic gripper Stabilizing rod

Fully automated spin-column processing

Page 33: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 33

Pipetting system

The QIAcube Connect is equipped with a single-channel pipetting system that moves in the X, Y

and Z directions. The dilutor, fitted with a tip adapter, is connected to a precision syringe pump,

which enables accurate transfer of liquids. The tip adapter allows aspiration and dispensing of

liquid through an attached disposable tip. Disposable filter-tips (200 µl, 1000 µl and 1000 µl wide-

bore) are used for sample processing to minimize the risk of cross-contamination.

Optical sensor

During the load check, the optical sensor checks that the number of rotor adapters corresponds to

the number of samples in the shaker and that both shaker and rotor are correctly loaded. The optical

sensor also checks the type of tips loaded on the worktable and whether there are enough tips for

the protocol run.

Ultrasonic sensor

During the load check, the ultrasonic sensor checks that the buffer bottles in the reagent bottle rack

contain enough buffer for the protocol run.

Note: The ultrasonic sensor has a black beam columnator. If, for any reason, this beam columnator

falls off or is missing, the instrument will display an error message to inform the user that the beam

columnator is missing and that runs cannot be started. To replace the beam columnator, it needs to

be manually adjusted to its original position (see image below).

Black beam columnator (see red circle) of the ultrasonic sensor

Page 34: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 34

UV LED

The QIAcube Connect is equipped with a UV LED light for decontamination. During the maintenance

decontamination procedure, the UV LED is moved over the worktable. The hood and the waste

drawer must be closed before starting the procedure and must not be opened during the procedure.

WARNING

Risk of personal injury [W29] Do not expose your skin to UV-C light from the UV LED lamp.

External hand scanner

The QIAcube Connect is equipped with a 2D handheld scanner to allow kit bar code and sample

bar code scanning.

WARNING

Risk of personal injury [W30] Hazard Level 2 laser light: Do not stare into the light beam when using handheld bar code scanner.

Page 35: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 35

4 Installation Procedures

This section provides instructions on unpacking, packing and installing the QIAcube Connect.

4.1 Installation environment

4.1.1 Site requirements

The QIAcube Connect must be located out of direct sunlight, away from heat sources and away

from sources of vibration and electrical interference. Refer to Appendix A – Technical data on page

133 for the operating conditions (temperature and humidity). The site of installation should be free

of excessive drafts, excessive moisture and excessive dust and should not be subject to large

temperature fluctuations.

Use a level workbench that is large enough and strong enough to accommodate the QIAcube

Connect. Refer to Appendix A – Technical data for the weight and dimensions of the QIAcube

Connect.

Ensure that the workbench is dry, clean and vibration-proof and has additional space for

accessories.

The QIAcube Connect must be placed within approximately 1.5 m of a properly grounded (earthed)

AC power outlet. The power line to the instrument should be voltage regulated and surge protected.

Ensure that the QIAcube Connect is positioned so that it is easy to access the power connector at

the back of the instrument and the power switch on the front at all times, and that it is easy to power

the instrument OFF and disconnect it.

Note: It is recommended to plug the instrument directly into its own power outlet and not to share

the power outlet with another lab equipment. Do not place the QIAcube Connect on a vibrating

surface or near vibrating objects.

WARNING

Explosive atmosphere [W11] The QIAcube Connect is not designed for use in an explosive atmosphere.

Page 36: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 36

CAUTION

Risk of overheating [C9] To ensure proper ventilation, maintain a minimum clearance of 10 cm at the sides and rear of the QIAcube Connect.

Slits and openings that ensure the ventilation of the QIAcube Connect must not be covered.

WARNING

Risk of personal injury and material damage [W2] The QIAcube Connect is too heavy to be lifted by one person. To avoid personal injury or damage to the instrument, do not lift the instrument alone.

CAUTION

Damage to the instrument [C6] Direct sunlight may bleach parts of the instrument and cause damage to plastic parts.

The QIAcube Connect must be located out of direct sunlight.

4.1.2 Power requirements

The QIAcube Connect operates at: 100–240 V AC, 50/60 Hz, 650 VA

Ensure that the voltage rating of the QIAcube Connect is compatible with the AC voltage available

at the installation site. Mains supply voltage fluctuations are not to exceed 10% of nominal supply

voltages.

WARNING

Damage to electronics [W9] Before powering ON the instrument, make sure that the correct supply voltage is used.

Use of incorrect supply voltage may damage the electronics.

To check the recommended supply voltage, refer to the specifications indicated in the type plate of the instrument.

Page 37: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 37

WARNING

Electrical hazard [W8] Any interruption of the protective conductor (earth/ground lead) inside or outside the instrument or disconnection of the protective conductor terminal is likely to make the instrument dangerous.

Intentional interruption is prohibited.

Lethal voltages inside the instrument When the instrument is connected to line power, terminals may be live and opening covers or removing parts is likely to expose live parts.

4.1.3 Grounding requirements

To protect operating personnel, the National Electrical Manufacturers’ Association (NEMA)

recommends that the QIAcube Connect be correctly grounded (earthed). The instrument is equipped

with a 3-conductor AC power cord that, when connected to an appropriate AC power outlet,

grounds (earths) the instrument. To preserve this protection feature, do not operate the instrument

from an AC power outlet that has no ground (earth) connection.

WARNING

Electrical hazard [W8] Any interruption of the protective conductor (earth/ground lead) inside or outside the instrument or disconnection of the protective conductor terminal is likely to make the instrument dangerous.

Intentional interruption is prohibited.

Lethal voltages inside the instrument When the instrument is connected to line power, terminals may be live and opening covers or removing parts is likely to expose live parts.

4.2 Installation of AC power cord

The AC power cord connects to the socket located at the rear of the QIAcube Connect, and the

other end to the AC power outlet.

4.3 Unpacking the QIAcube Connect

WARNING

Risk of personal injury and material damage [W2] The QIAcube Connect is too heavy to be lifted by one person. To avoid personal injury or damage to the instrument, do not lift the instrument alone.

Page 38: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 38

1. Before unpacking the QIAcube Connect, move the package to the site of installation and

check that the arrows on the package point upward. In addition, check whether the package

is damaged. In case of damage, contact QIAGEN Technical Service.

2. Open the top of the transportation box to remove the QIAcube Connect Quick-Start Guide, tablet, travel adapter and power cord before lifting the box.

3. Remove the black foam protector lid and lift the box.

4. When lifting the QIAcube Connect, slide your fingers under both sides of the workstation and

keep your back straight.

Important: Do not hold the touchscreen display while unpacking or lifting the QIAcube

Connect, this might damage the instrument.

5. Check if the packing list document is included after unpacking the QIAcube Connect.

6. Read the packing list to check that you have received all items. If anything is missing, contact

QIAGEN Technical Services.

7. Check that the QIAcube Connect is not damaged and that there are no loose parts. If

anything is damaged, contact QIAGEN Technical Services. Make sure that the QIAcube

Connect has equilibrated to ambient temperature before operating it.

8. Retain the package in case you need to transport the QIAcube Connect in the future. Refer to

section 4.6, Packing the QIAcube Connect for more details. Using the original package

minimizes the possibility of damage during transportation of the QIAcube Connect.

4.4 Installing the QIAcube Connect

This section describes important actions that must be performed before operating the QIAcube

Connect. These actions include:

Removal of the QIAcube Connect accessories.

Removal of the protective film from the QIAcube Connect hood.

Removal of the protector for the robotic arm.

Connection of the power cord to the back of the QIAcube Connect.

Powering ON the QIAcube Connect.

Installation of the centrifuge rotor and buckets.

4.4.1 Remove QIAcube Connect accessories

Remove the power cord, tablet, travel adapter and quick-start guide from the foam packing material

on top of the QIAcube Connect.

Page 39: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 39

Remove the USB stick, rotor key, rotor nut, Allen key, S2 shaker adapter and shaker rack plugs

from the waste drawer.

4.4.2 Remove the protective film from the QIAcube Connect hood

Carefully peel off the protective film from the QIAcube Connect hood.

4.4.3 Remove the foam protector

During transportation, a foam protector prevents the movable parts of the QIAcube Connect from

moving along the X- and Y-axes. Before using the instrument, this protector must be removed.

Foam protector for robotic arm.

To remove the foam protector, gently pull the foam protector towards you (see picture above). After

removing the protector for the robotic arm, make sure to close the QIAcube Connect hood.

4.4.4 Installation of AC power cord

1. Remove the power cord from the foam packing material on top of the QIAcube Connect.

Note: Only use the power cord that is supplied with the QIAcube Connect.

2. Ensure that the power switch is set to OFF: outer position is OFF and inner position is ON.

3. Check that the voltage rating on the label at the back of the QIAcube Connect matches the

voltage available at the installation site.

4. Plug the power cord into the instrument power-cord socket.

5. Plug the power cord into a grounded power outlet.

Page 40: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 40

WARNING

Damage to electronics [W9] Before powering ON the instrument, make sure that the correct supply voltage is used.

Use of incorrect supply voltage may damage the electronics.

To check the recommended supply voltage, refer to the specifications indicated in the type plate of the instrument.

WARNING

Electrical hazard [W8] Any interruption of the protective conductor (earth/ground lead) inside or outside the instrument or disconnection of the protective conductor terminal is likely to make the instrument dangerous.

Intentional interruption is prohibited.

Lethal voltages inside the instrument When the instrument is connected to line power, terminals may be live and opening covers or removing parts is likely to expose live parts.

4.4.5 Powering ON the QIAcube Connect

1. Check that the QIAcube Connect operates properly:

2. Make sure that the hood of the QIAcube Connect is closed.

3. Power ON the QIAcube Connect using the power switch (inner position is ON; outer position

is OFF).

The beeper sounds and the startup screen appears.

The instrument automatically performs initialization tests.

The centrifuge lid opens.

4. If there is an initialization error, check that the power cord is properly connected to the

QIAcube Connect and power outlet. Retry the initialization process. If the problem persists,

contact QIAGEN Technical Services.

Note: If you powered ON the QIAcube Connect before closing the hood, the instrument will not

perform an initialization and the centrifuge lid will not open. Power OFF the QIAcube Connect,

close the hood, and then power ON the QIAcube Connect again.

4.4.6 Installing the centrifuge rotor and buckets

The centrifuge rotor and buckets are pre-installed in the QIAcube Connect. When setting up the

QIAcube Connect for the first time, turn on the instrument and remove the transportation foam inserts

Page 41: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 41

from the centrifuge after it opens. In case you have manually removed the centrifuge rotor and

buckets (e.g., during maintenance), follow the instructions below to re-install them.

The rotor can be mounted in only one orientation: a pin on the rotor shaft fits into a notch on the

underside of the rotor directly underneath rotor position 1. Line up position 1 of the rotor with the

pin on the rotor shaft and carefully lower the rotor onto the shaft. Install the rotor nut on top of the

rotor and tighten using the rotor key supplied with the QIAcube Connect. Make sure that the rotor

is securely seated. Check that all buckets are properly suspended and can swing freely.

Note: The side of the rotor bucket that must face towards the rotor shaft is marked with a grey line

to help prevent buckets from being loaded incorrectly.

Important: All centrifuge buckets must be mounted before starting a protocol run, even if fewer than

12 samples are to be processed.

WARNING

Risk of personal injury and material damage [W25] To prevent the rotor nuts from loosening during operation of the centrifuge, securely tightened the nuts using the rotor key supplied with QIAcube Connect.

WARNING

Risk of personal injury and material damage [W20] Raise the centrifuge lid carefully. The lid is heavy and may cause injury if it falls.

CAUTION

Damage to the instrument [C7] The QIAcube Connect must not be used if the centrifuge lid is broken, or if the lid lock is damaged.

Make sure that no loose material is inside the centrifuge during operation.

Make sure that the rotor is installed correctly and that all buckets are properly mounted, regardless of the number of samples to be processed. Load the rotor only as instructed by the software.

Only use rotors, buckets, and consumables designed for use with the QIAcube Connect. Damage caused by use of other consumables will void your warranty.

We recommend replacing the centrifuge rotor and buckets after 20000 cycles, which is equivalent to 9 years of usage with two runs per day for 220 days each year. For more information contact QIAGEN Technical Services.

Page 42: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 42

4.4.7 Installing the shaker adapter

A shaker adapter must be installed before the shaker can be used. Two types of shaker adapter

are available:

Adapter for 2 ml microcentrifuge safe-lock tubes (marked with “2”)

Adapter for 2 ml screw-cap tubes (marked with “S2”).

The QIAcube Connect is delivered with the shaker adapter for 2 ml microcentrifuge safe-lock tubes

already installed. If you need to install the shaker adapter for 2 ml screw-cap tubes, follow these

steps:

1. Remove the shaker rack.

2. Remove the shaker adapter for 2 ml microcentrifuge safe-lock tubes by unscrewing the

retaining screws. Use the Allen key supplied with the QIAcube Connect.

3. Place the shaker adapter for 2 ml screw-cap tubes onto the shaker.

4. Tighten the 2 retaining screws using the Allen key.

Note: Make sure to use the correct adapter as displayed on the touchscreen during run setup. This

helps to ensure optimal instrument performance. Using an incorrect shaker adapter can adversely

affect pipetting performance and protocol results.

4.5 Configuration of the QIAcube Connect

When using the QIAcube Connect for the first time, it is recommended to define the required

settings. Other settings can be made later when needed.

For details on using the touchscreen and software, refer to section 5.1 QIAcube Connect software

on page 67.

To configure the QIAcube Connect, follow the steps below.

1. Close the instrument hood.

2. Press the power switch to the inner position to power ON the instrument. The startup screen

appears and the beeper sounds (if enabled in the sound settings). The instrument automatically

performs the initialization tests. If the centrifuge lid is closed, it will open.

3. Initially, only one user account is available: the pre-installed default user. Press OK on the

touchscreen to confirm the message.

4. Initially, if no maintenance has been recorded yet, the maintenance status is initialized using a

default file. Press OK to confirm the message.

Page 43: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 43

5. The Login screen appears after the initialization.

Login screen

6. Initially, only one default user is available. In this case, enter Admin in both the User ID and

Password fields using the on-screen keyboard. Touch in the entry field to open the on-screen

keyboard. For details, refer to section 5.1.1 Entering text and numbers.

7. Press Log in. The Home (main) screen appears.

Home (main) screen

8. If you need to return to the Home screen from another screen, press the Setup icon.

Page 44: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 44

4.5.1 Setting basic system data

This section describes how to set the following:

Name for the QIAcube Connect

Current date and time

When using the QIAcube Connect for the first time, it is recommended to set the current date and

time.

1. On the main screen, press the Configuration icon.

2. Press the System tab. This tab is only available for users assigned the Administrator role.

3. Optionally, enter a name for the QIAcube Connect. The device name serves as the

network/host name when connecting the instrument to the network.

The name can have up to 24 characters: letters A–Z, a–z, digits 0–9 and a hyphen (-).

The name must start with a letter and cannot end with a hyphen (-).

4. In the Date and Time fields, select the current date and enter the current time for the

instrument. These are used to track the start and end time of a run and are also part of the run

report. Date and time are not synchronized using the network. To change the date, touch the

calendar icon ( ) and select the date.

Page 45: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 45

5. Use the left and right arrow icons to change the month Then touch the current day and press

OK to confirm.

4.5.2 User settings

This section describes the optional settings that can be defined by each user:

Audio volume

Display brightness

Internal light

The settings apply to the current user.

1. On the main screen, press the Configuration icon.

2. Press the Settings tab. This tab is available for all users.

Page 46: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 46

3. To adjust the audio volume or display brightness, touch the desired position on the virtual

slider on the screen. For audio volume, a sound is played with the set volume.

4. Check the box next to Use internal light to turn on the LED light inside the instrument. Uncheck

the box to turn it off.

5. To return to the main screen, press the Setup icon.

4.5.3 Managing users

The QIAcube Connect is provided with a User Management feature. This feature enables you to set

up multiple users with two different roles: administrator and operator. When you use the QIAcube

Connect for the first time, a default user named Admin is already pre-installed and configured with

both roles assigned. The user management feature is only available for users assigned the

Administrator role.

Setting up a new user

1. Press the Configuration icon on the main screen.

2. Press the Users tab.

The configured users are shown in the table. Each row contains the data for one user.

Note: It is recommended to create at least one other user with the administrator role.

3. Press New to add a new user.

Page 47: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 47

4. Enter the respective data for the new user. Keep the Activate User box checked.

The User ID, First name and Last name fields are mandatory. These fields may contain up to

30 letters and numerical characters. The user ID must be unique for each user profile. It must

contain at least one letter and cannot contain blank spaces. The user ID is used for logging in

and is printed on run reports. The first and last name are displayed on the touchscreen for the

currently logged in user.

The Password field is mandatory and must contain 8–40 letters or numerical characters. Enter

the same password into the Confirm password field.

Select the user role: Administrator and/or Operator. The operator may only use the

instrument, while the administrator is also allowed to configure the system. One user can have

both roles assigned at the same time. The default user Admin has both user roles assigned.

The E-mail address field is optional. The system does not confirm whether the e-mail address

entered is valid.

5. Press OK to save the new user.

Changing data for an existing user

1. Press the Configuration icon on the main screen.

2. Press the Users tab.

Page 48: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 48

The configured users are shown in the table. Each row contains the data for one user.

3. In the user profile row, press the Edit ( ) icon.

4. A screen will appear showing the current information of the user. Edit the information as

necessary.

The user’s password will not be displayed. If you touch the password field, the existing

password will be cleared, and a new password must be entered and confirmed.

5. To confirm the changes, press OK. To close the dialog and discard the changes, press Cancel.

Deleting or temporarily deactivating a user

1. To delete a user, press the Delete icon ( ) in the user profile row. It is not possible to delete

the currently logged-in administrator.

Page 49: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 49

2. To temporarily deactivate a user, press the Edit icon ( ) in the user profile row. Uncheck the

Activate User box. It is not possible to deactivate the currently logged-in administrator.

3. To reactivate a user profile, press the Edit icon ( ) in the user profile row. Check the

Activate user box.

Note: If a user tries to login with the wrong password, the user profile will be automatically

deactivated after 10 failed login attempts.

Deactivated users can be displayed in the users list by unchecking the box Show only activated

user profiles. If the box is unchecked, all user profiles will be listed.

If the pre-installed administrator user Admin has more than 10 failed login attempts, the password

can be reset. To do so, press Reset admin user. Then log in again with the default user ID Admin

and password Admin.

4.5.4 Changing password

Every user can change their own password.

A user with the role Administrator is allowed to change the password for every user by editing the

user profile. Refer to section Changing data for an existing user on page 47 for more details.

Passwords are never displayed in this process, so the administrator cannot view a user’s password.

Page 50: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 50

Changing your password

1. Press the Configuration icon on the main screen.

2. For users with the role Operator, the Password tab is automatically active.

3. Enter the old password into the Old password field. Touch the field to open the on-screen

keyboard.

4. Enter a new password into the New password field, and re-enter the new password in the

Confirm new password field.

5. Press OK to save the new password. Press Cancel to discard any changes and to keep the old

password.

6. To return to the main screen, press the Setup icon.

4.5.5 Managing protocols

Commonly used QIAGEN standard protocols are installed on the QIAcube Connect upon delivery.

The range of QIAGEN standard protocols is continuously expanding, and these protocols are

downloadable at no cost at www.qiagen.com/MyQIAcubeConnect. QIAGEN’s Application Lab

Specialists can also customize these protocols or develop new protocols depending on your needs.

Protocols that are no longer required can be easily removed from the QIAcube Connect.

Protocols can only be managed by users assigned the Administrator role.

Page 51: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 51

Installing new protocols

1. On a computer running Microsoft® Windows®, download the new protocols from this URL:

www.qiagen.com/MyQIAcubeConnect.

Use the USB stick that was shipped with the QIAcube Connect to transfer the protocol files to

the instrument.

Copy the new protocol zip file(s) to the USB stick into the Protocol_Upload directory. Do not

unzip the files. Make sure to use the correct directory, otherwise, the QIAcube Connect will

not find the protocols.

Note: Do not rename or modify the protocol files. Otherwise, they cannot be used.

2. Connect the USB stick to the QIAcube Connect using one of the USB ports at the left of the

touchscreen.

3. Select the Configuration icon.

4. Press the Protocols tab.

5. Press Copy from USB.

6. A message is displayed indicating how many protocols are found on the USB stick. Press Yes

to start uploading.

All protocol zip file(s) in the New Protocols folder will be installed.

Note: Already installed protocols will not be overwritten. If you attempt to re-install an existing

protocol, a message will appear indicating that not all protocols could be copied.

7. Wait until the transfer is complete. A message is displayed when the transfer is complete.

8. Remove the USB stick and power OFF the QIAcube Connect.

Page 52: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 52

9. Wait a few seconds and then power ON the QIAcube Connect. To use the new protocols, log

in again.

To transfer all installed protocols to the USB stick, press Copy to USB.

Deleting protocols

Important: Before deleting, you should back up the protocols on the USB stick provided with the

instrument.

1. Select the Configuration icon.

2. Press the Protocols tab.

3. To delete all protocols installed on the instrument, press Delete All. It is not possible to delete a

single protocol from the QIAcube Connect.

Note: After deleting all protocols, a selective upload of protocols will reduce the options during run

setup.

Page 53: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 53

4.5.6 Updating software

If an updated software version is available for download, it can be accessed at

www.qiagen.com/MyQIAcubeConnect.

The software can only be updated by users assigned the role Administrator. It is recommended to

download all run reports before updating the software, because run reports and support packages

will be lost during software update (see section 5.7 Saving run reports to the USB stick).

1. On the main screen, press the Configuration icon.

2. Press the System tab.

3. The currently installed software version is shown at the right.

4. On a computer running Microsoft Windows, download the software to the main folder of the

USB stick provided with the QIAcube Connect. Wait until the download has completed before

removing the USB stick.

Note: After download, make sure the following 4 files are in the main folder of the USB stick:

qiacube1.bin

qiacube2.bin

qiacube-connect-<version>.tar.gz

qiacube-connect-<version>.tar.gz.md5sum.

The update will not work if one of the files is missing or has been renamed. Make sure that

only the files for one software version are in the main folder of the USB stick.

5. Connect the USB stick to the instrument using one of the USB ports at the left of the

touchscreen.

Page 54: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 54

Important: Make sure that all run reports and support packages have been backed up before

proceeding to the next step.

6. Press Update Software to start the software update. Follow the instructions on the screen.

7. The software update tool is displayed. Press Start update to start the software update.

Press Cancel if you do not want to update the software. In this case, the instrument will

initialize without updating the software.

8. Wait until the update has completed.

Page 55: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 55

9. Press the arrow button to open the Details screen.

10. Compare the MD5 checksum on the screen with the checksum provided on the software

download page. If the checksums are not identical, contact QIAGEN Technical Services.

11. Press Reboot to continue. The instrument will initialize with the updated software.

12. When instructed by the screen, remove the USB stick from the USB port.

13. Use a computer running Microsoft Windows to delete the previously downloaded software

files from the USB stick.

4.5.7 Network configuration and Q-Base connection

The QIAcube Connect can be connected via intranet to Q-Base, allowing real-time status monitoring

on the tablet delivered with the instrument. This configuration requires connecting the QIAcube

Connect to your network, either by LAN or by Wi-Fi, but not both. Refer to the Q-Base User Manual, which is available at www.qiagen.com, for more details on the Q-Base connection.

Only users assigned the role Administrator can change the network configuration. It is

recommended to consult your network administrator when configuring the network. For

communication with Q-Base, the outbound TCP port 443 (https) is used; ping is supported.

Configuring a LAN connection

1. On the Main screen, press the Configuration icon.

2. Press the LAN tab.

Page 56: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 56

3. To automatically configure the network via DHCP, check the DHCP enabled box. Leave all

fields empty when using this setting. The assigned IP address will be displayed below the box.

4. To manually configure the network, uncheck the DHCP enabled box. Enter the IP address,

Subnet mask and Gateway in the respective fields, using the IPv4 format shown in the picture

above. Entering the DNS server is optional. These settings will not be validated by the

QIAcube Connect.

5. Press Apply to confirm and save the settings made.

Page 57: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 57

Configuring a Wi-Fi connection

The QIAcube Connect supports only WPA-PSK and WPA2-PSK. Additionally, the SSID of the Wi-Fi

network must be visible. Connection to a hidden SSID is not supported.

Before Wi-Fi can be configured, the Wi-Fi USB device supplied with the QIAcube Connect must be

plugged into one of the USB ports behind the touchscreen.

Important: Always turn off the QIAcube Connect before you plug in or unplug the Wi-Fi USB device.

Plug-and-play of the Wi-Fi USB device while the instrument is turned on is not supported.

1. On the Main screen, press the Configuration icon.

2. Press the Wi-Fi tab.

3. Press Scan to scan for available networks. The networks are listed based on their signal

strength.

Page 58: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 58

4. Select one of the available networks from the list. The details for the selected network are

shown at the right.

5. Press Connect to connect to the network. The connected network is marked in the list.

Note: If a network is previously configured and a connection is established successfully at

least once, the instrument will connect to that network automatically.

6. To disconnect from Wi-Fi press Disconnect.

Configuring Q-Base

As a prerequisite for connecting to Q-Base, either LAN or Wi-Fi must be configured and at least

one Q-Base device must be configured and running within the same network as QIAcube Connect.

Refer to the Q-Base User Manual for more details on the Q-Base connection.

Page 59: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 59

1. On the Main screen, press the Configuration icon.

2. Press the Q-Base tab.

3. Check the Communication enabled box, if you want to start the communication to Q-Base.

4. Enter the URL to Q-Base into the Q-Base URL field. This URL is provided during the initial Q-

Base setup workflow. Refer to the Q-Base User Manual for details.

5. Optionally, press Test to test the configured connection.

Note: Do not press Test on the QIAcube Connect touchscreen before pressing Finish

Configuration on the tablet. Otherwise the test will be unsuccessful.

6. Press Apply.

7. If the Communication enabled box has been checked, a dialog is shown asking you to accept

the end user license for Q-Base. Press I agree if you accept the license. The connection will

only be established if you accept the license. If you press I don’t agree, no connection to Q-

Base will be established.

8. The entered Q-Base URL will be saved. A message will indicate that the settings will not take

effect immediately. To use these newly entered settings, you must turn the instrument off and

back on again. Make sure that there is no USB device inserted during the instrument startup.

Page 60: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 60

4.6 Packing the QIAcube Connect

Warning: The QIAcube Connect is too heavy to be lifted by one person. To avoid personal injury

or damage to the instrument, do not lift the instrument alone.

WARNING

Risk of personal injury and material damage [W2] The QIAcube Connect is too heavy to be lifted by one person. To avoid personal injury or damage to the instrument, do not lift the instrument alone.

Before transporting the QIAcube Connect, the instrument must first be decontaminated. Refer to

section 6.7, Decontaminating the QIAcube Connect for more details. Then prepare the instrument

as follows:

1. Prepare the packing material. Materials required are the cardboard carton, the pallet with

foam blocks, the foam lid and the foam protector for the robotic arm.

Note: The centrifuge lid must be open to allow access to the inside of the centrifuge. If the lid

is not open, perform steps 2–5 below. If the lid is already open, proceed to step 6.

2. Close the instrument hood.

3. On the Main screen, press the Tools button.

4. In the Tools menu, press the Run Modules tab.

5. In the Run Modules menu, press the Centrifuge tab and then press Open Centrifuge Lid.

6. Undo the rotor nut on top of the rotor using the rotor key, and carefully lift the rotor off the

rotor shaft.

7. Close the hood.

8. On the Main screen, press the Tools button.

9. In the Tools menu, press the Run Modules tab.

10. In the Run Modules menu, press the Centrifuge tab and then press Close Centrifuge Lid.

11. When the centrifuge lid is closed, power OFF the QIAcube Connect and open the hood.

12. Insert the foam protector into the front of the instrument.

Page 61: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 61

13. Press the foam down between the centrifuge and the robotic arm.

Foam protector inserted between the centrifuge and the robotic arm

14. Push the foam until the rear end touches the back wall of the instrument. Ensure that the arm is

held firmly in place and cannot move.

15. Make sure that the QIAcube Connect hood can be closed properly. The hood should lightly

brush against the foam.

16. Place the accessories into the waste drawer. The following accessories should be packed in

air cushion bags:

Rotor key

Allen key

Rotor nut

USB stick

WLAN module

Shaker rack plugs

Shaker adapter

17. Place the handheld scanner into dedicated handheld scanner box.

18. Place the QIAcube Connect onto the pallet and put the black foam lid over the top of the

instrument. Place the box onto the instrument.

Important: When lifting the QIAcube Connect, slide your fingers under both sides of the

instrument and keep your back straight.

Important: Do not hold the touchscreen display while lifting the QIAcube Connect, as this

might damage the instrument.

WARNING

Risk of personal injury and material damage [W2] The QIAcube Connect is too heavy to be lifted by one person. To avoid personal injury or damage to the instrument, do not lift the instrument alone.

Page 62: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 62

19. Place the accessories into the black foam lid. The following accessories should be packed in

air cushion bags:

Rotor with swing-out buckets

Power cord

20. Seal the outside edges of the carton with tape to protect against moisture.

Note: Using the original package minimizes potential damage during transportation of the

QIAcube Connect.

Page 63: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 63

5 Operating Procedures

This section describes how to operate the QIAcube Connect.

Before proceeding, we recommend that you familiarize yourself with the features of the instrument

by referring to sections 3.2 and 3.3.

Important: The QIAcube Connect is designed for use with QIAGEN spin columns only. Geometry

of spin columns manufactured by other suppliers may not be compatible with the QIAcube Connect.

CAUTION

Damage to the instrument [C2] Only use QIAGEN spin columns and QIAcube Connect specific consumables with the QIAcube Connect. Damage caused by use of other types of spin columns or chemistries will void your warranty.

The hood of the QIAcube Connect must remain closed during operation of the instrument. Only

open the hood when instructed to do so by the software.

WARNING

Moving parts [W18] To avoid contact with moving parts during operation of the QIAcube Connect, the instrument must be operated with the hood closed.

If the hood sensor or lock is not functioning correctly, contact QIAGEN Technical Services.

WARNING

Risk of personal injury and material damage [W3] Do not attempt to move the QIAcube Connect during operation.

WARNING

Risk of personal injury and material damage [W1] Improper use of the QIAcube Connect may cause personal injuries or damage to the instrument. The QIAcube Connect must only be operated by qualified personnel who have been appropriately trained. Servicing of the QIAcube Connect must only be performed by a QIAGEN Field Service specialist.

WARNING

Risk of personal injury and material damage [W4] Do not use damaged rotor adapters. The rotor adapters can only be used once. High g forces exerted in the centrifuge can cause damage to used rotor adapters.

Page 64: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 64

CAUTION

Damage to the instrument [C3] Empty the tip disposal container prior to use to prevent a tip jam in the waste drawer. Failure to empty the waste container may block the robotic arm that could cause run failure or instrument damage.

WARNING

Risk of personal injury and material damage [W5] To prevent plastic crash, load the tubes properly. After a plastic crash, sharp plastic particles could be inside the centrifuge. Be careful when handling items inside the centrifuge.

CAUTION

Damage to the instrument [C4] Only use the correct volume of liquids.

Exceeding the recommended volume of liquids may damage the centrifuge rotor or instrument.

WARNING

Risk of fire or explosion [W6] When using ethanol or ethanol-based liquids on the QIAcube Connect, handle such liquids carefully and in accordance with the required safety regulations. If liquid has been spilled, wipe it off and leave the QIAcube Connect hood open to allow flammable vapors to disperse.

WARNING

Risk of explosion [W7] The QIAcube Connect is intended for use with reagents and substances supplied with QIAGEN kits or other than outlined in respective Information for use. Use of other reagents and substances may lead to fire or explosion.

CAUTION

Damage to the instrument [C5] Do not lean against the touchscreen when it is pulled out.

Page 65: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 65

WARNING

Samples containing infectious agents [W12] Some samples used with this instrument may contain infectious agents. Handle such samples with the greatest of care and in accordance with the required safety regulations.

Always wear safety glasses, 2 pairs of gloves, and a lab coat.

The responsible body (e.g., laboratory manager) must take the necessary precautions to ensure that the surrounding workplace is safe, and that the instrument operators are suitably trained and not exposed to hazardous levels of infectious agents as defined in the applicable Material Safety Data Sheets (MSDSs) or OSHA*, ACGIH† or COSHH‡ documents.

Venting for fumes and disposal of wastes must be in accordance with all national, state, and local health and safety regulations and laws.

WARNING

Hazardous chemicals [W13] Some chemicals used with this instrument may be hazardous or may become hazardous after completion of the protocol run.

Always wear safety glasses, gloves, and a lab coat.

The responsible body (e.g., laboratory manager) must take the necessary precautions to ensure that the surrounding workplace is safe and that the instrument operators are not exposed to hazardous levels of toxic substances (chemical or biological) as defined in the applicable Material Safety Data Sheets (MSDSs) or OSHA,* ACGIH† or COSHH‡ documents.

Venting for fumes and disposal of wastes must be in accordance with all national, state, and local health and safety regulations and laws.

WARNING

Moving parts [W17] Avoid contact with moving parts during operation of the QIAcube Connect. Under no circumstances should you place your hands under the robotic arm when it is lowering. Do not attempt to move any tip racks or tubes whilst the instrument is operating.

WARNING

Hot surface [W21] The shaker can reach temperatures of up to 70°C (158°F). Avoid touching it when it is hot. Carefully remove the samples after a run.

* OSHA : Occupational Safety and Health Administration (United States of America). † ACGIH : American Conference of Government Industrial Hygienists (United States of America). ‡ COSHH : Control of Substances Hazardous to Health (United Kingdom).

Page 66: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 66

WARNING/ CAUTION

Risk of personal injury and material damage [W22] Only perform maintenance that is specifically described in this user manual.

Page 67: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 67

5.1 QIAcube Connect software

The QIAcube Connect is operated through a touchscreen, which guides you step-by-step through

the correct loading of the work deck and selection of the protocol.

General functions of the QIAcube Connect touchscreen are described below.

Button/Icon Function

Enables the user to scroll up through a list.

Enables the user to scroll down through a list.

The software automatically proceeds to the next screen.

Returns to the previous screen.

Returns to previous screen without saving any changes.

Enables the user to change certain settings (e.g., to edit a user account).

Enables the user to delete certain settings (e.g., to delete a user).

Text fields Enables to edit text or value. A pop-up keyboard enables these changes.

Row in tables Can be pressed to select the respective row. Either item will be selected, or row will be highlighted.

Press to show additional information to respective item

Press to show important information that must be followed during run setup for respective item.

Press to show additional information to respective item

Press to show important information that must be followed during run setup for respective item.

Navigation back to the home screen

Tools/Maintenance functions

Configuration

Log out from the instrument

Note: The instrument’s touchscreen does not support swiping gestures.

Page 68: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 68

5.1.1 Entering text and numbers

To enter text or numbers, touch the respective field. The corresponding on-screen keyboard will be

displayed.

Keyboard for entering a password Keyboard for entering a sample name

Keyboard for editing a protocol parameter

For protocol parameters, the value range is displayed. In the example shown in the screenshot

above, values from 50–100 µl can be entered, but only in steps of 10 µl.

Page 69: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 69

Buttons and icons in the on-screen keyboard are described below.

Button/Icon Function

Remove character to the left.

Clear all from the field.

To type the next letter in upper-case. After the letter has typed, the keyboard will show lower-case letters again.

Switch to upper-case letters. Allows to type a number of upper-case letters. Press the symbol again to return to lower-case letters.

Show special characters.

Return to letters.

Confirm and close.

Discard and close.

If the entered value is not correct, the field border will change to red. It is not possible to proceed

to the next screen in this case. Press the field again and correct the value according to the range

displayed next to the field.

5.2 Switching on the instrument and logging in

1. Close the instrument hood.

2. Switch on the instrument by pressing the power switch to the inner position. You will hear a

sound (if sound settings are enabled), and a startup screen appears. The instrument

automatically performs initialization tests. If the centrifuge lid was closed, it will open.

Page 70: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 70

After the initialization is complete, the Login screen appears.

Login screen

3. Enter User ID and Password using the on-screen keyboard.

4. Press Log in.

5. The Home screen appears.

In case of a failed login, an exclamation icon ( ) and information screen will appear. Touch the

respective field to enter the User ID and Password again, ensuring that you enter the information

correctly. The User ID is case sensitive.

Information screen from failed login, for example, due to entering incorrect password

Page 71: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 71

5.3 Setting up a protocol run

Protocol setup starts from the Home screen.

Commonly used QIAGEN standard protocols are installed on the QIAcube Connect upon delivery.

All available QIAGEN protocols can be downloaded from the QIAcube Connect web portal:

www.qiagen.com/MyQIAcubeConnect.

Important: Before starting any protocol, thoroughly read the relevant QIAGEN kit handbook.

The touchscreen software will guide you through the protocol run setup and loading steps. The

display screens vary depending on the protocol in use and may look different from the screens

shown in this section.

1. Prepare the samples to be processed using the protocol indicated in the protocol selection

screen. Refer to the kit handbook for more information, if required.

2. To start the run setup, select from Applications, Favorites or Scan kit. To scan the 2-D bar code

of the QIAGEN kit, press Scan Kit and then use the handheld scanner, or just scan the bar

code.

The software will automatically proceed to the next screen. If you scanned a kit bar code or if

you selected a protocol from Favorites, the software may skip the Kit, Material and/or

Protocol Selection screens. The software will skip the selection screen if the required

information will be provided by kit bar code scanning or selection from Favorites.

Page 72: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 72

3. To enter information in the next screens, follow the instructions provided in the sections below.

Depending on your selections, the number and order of the screens displayed on your

instrument may vary.

Each section below contains a screenshot image. Follow the instructions in that section with

the corresponding screen displayed on your instrument.

In general, press Next to proceed to the next screen, or press Back to return to the previous

screen. Next will only be active if all required information has been entered in the current

screen.

5.3.1 Select kit screen

1. Use the Up and Down arrow icons ( or ) to scroll through the list of kits.

Select the kit to be used for your run by touching the corresponding row. Only one kit can be

selected per run. Information about the selected kit is shown in the right pane.

2. Press Next to proceed to defining the sample material.

Page 73: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 73

5.3.2 Select material screen

1. Select the sample material by touching the corresponding row. Only one sample material type

can be selected per run.

2. Press Next to proceed to defining the protocol.

5.3.3 Select protocol screen

1. Select the protocol by touching the corresponding row. Only one protocol can be selected per

run. Make sure to read all essential and critical information in the right pane before

proceeding to the next step.

2. Press Next to proceed to defining the run parameters.

Page 74: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 74

5.3.4 Define parameters screen

Depending on the selected protocol, certain parameters must be defined. The protocol defines

default settings, which can be changed. Follow the instructions in the information pane on the right

regarding changing the values and which increments can be used.

1. If required, press the Value field to change a parameter value using the on-screen keyboard.

Refer to section 5.1.1 for details about the on-screen keyboard.

2. Press Next to proceed to defining the sample number. The software automatically proceeds to

the next screen. Follow the instructions in the corresponding section below.

5.3.5 Define sample number screen

Page 75: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 75

1. To select the number of samples for the run, press the corresponding number on the screen.

Sample numbers that would lead to a misbalance during centrifugation cannot be chosen.

2. Press Next to proceed to loading the reagents.

5.3.6 Loading buffer bottles

The Load buffer bottles screen guides you through setting up the required buffers for the run. Make

sure to read all essential and critical information before proceeding to the next step.

Note: To avoid run issues and to guarantee proper sitting of buffer bottle rack, the buffer bottle rack

must be equipped with rack labeling strips.

Depending on the selected protocol, loading of buffer bottles might not be required. In this case,

the software will indicate that this step can be skipped.

Page 76: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 76

1. Prepare the reagents as shown on the screen. Refer to the respective kit handbook for further

information. Always ensure that you use the required tube types. When pouring, ensure that

the buffer does not foam or contain large air bubbles.

Before proceeding to the next step, ensure that you read all essential and critical information

indicated in the Information icon ( ) marked in red. Press the icon to open the information.

2. Make sure that the buffer bottles contain the minimum volumes described in the Volume

column. Each bottle can hold a maximum volume of 30 ml, which can also be used for

subsequent runs. Later, when the run is started, the instrument will determine the filling volume.

3. Place each opened buffer bottle in the correct position of the reagent bottle rack as shown on

the screen. The rack will only fit on the worktable if its orientation is correctly set.

4. Once all the buffer bottles are placed on the reagent bottle rack, place the rack on the

worktable. Ensure that the rack is oriented correctly with number 1 on the top.

Important: Be sure to place the reagent bottle rack correctly into the designated worktable

slot. Bottle racks that are in a leaning position could cause errors during liquid detection.

5. Press Next to proceed to loading the tips and enzymes. The software automatically proceeds

to the next screen. Follow the instructions in the corresponding section below.

WARNING

Risk of fire or explosion [W6] When using ethanol or ethanol-based liquids on the QIAcube Connect, handle such liquids carefully and in accordance with the required safety regulations. If liquid has been spilled, wipe it off and leave the QIAcube Connect hood open to allow flammable vapors to disperse.

Page 77: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 77

5.3.7 Loading tips and enzymes

Important: When the Loading tips and enzymes screen appears, the robotic arm will automatically

move slowly – even when the instrument hood is open – so you can access all of the loading

positions. Always stand clear of the instrument while the robotic arm is moving. Wait until the

robotic arm has completed its movements before you start to load or unload tip racks or enzymes.

After you are finished loading and you proceed from this screen, the robotic arm will automatically

move back to its original position (above tip rack position 3).

If more than one rack of the same tip type is loaded, the instrument will use the tip rack placed in

position 1 first, then continue to position 2, and then position 3. To use a partially filled rack first,

load it in position 1.

Depending on the selected protocol, loading of tips and enzymes might not be required. In this

case, the software will indicate that this step can be skipped.

If for any reason the robotic arm prevents you from reaching a loading position, do not move the

robotic arm manually. Instead, proceed as follows:

Press Move left. The robotic arm will start to move. The hood can remain open during this

movement.

Ensure that you stand clear of the instrument while the robotic arm is moving. Wait until the

robotic arm has completed its movements.

Page 78: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 78

Reagent/Enzyme loading:

1. Prepare the reagent(s) listed on the screen. Refer to the corresponding kit handbook for more

information. Before proceeding to the next step, make sure that you read all essential and

critical information indicated in the Information icon ( ) marked in red.

2. Make sure that you are using the correct tube type. Press the Information icon ( ) in the

respective row to show the details.

3. Make sure that you provide the correct volume as indicated on screen. The volume shown on

the screen is the minimum volume to be loaded. To avoid spill-over during the run, do not

exceed this volume significantly.

4. Place the opened tube in the worktable position as indicated in the table on the screen. It is

important that you load the tube in the correct worktable position.

5. Place the lid of the microcentrifuge tube securely in the lid slot next to the tube.

6. Make sure that the required number of tips for each tip type are loaded as indicated on the

screen. It is possible to use up the tip racks, if the minimum required number of tips for each

type is loaded.

The loading position shown on the screen is the recommended position for tip racks. The

position can also be changed. Later, when starting the run, the instrument will check if the

correct tip racks are placed on the worktable and if there are enough tips for the protocol run.

There are 3 different kinds of tip racks that can be used on the QIAcube Connect, depending

on the protocol selected. A blue rack for 200 µl filter-tips, a light grey rack for 1000 µl filter-

tips and a dark grey rack for 1000 µl wide-bore filter-tips. The instrument uses the notches on

the filter-tip rack to identify the type. To prevent mix up that may lead to a run issue, do not

manually refill tip racks. Only use tips designed for use with the QIAcube Connect.

Important: Do not use damaged filter tips. Do not load damaged tip racks onto the worktable.

Note: When using partially filled tip racks, consider the order in which the racks are loaded.

The tip rack placed in position 1 will be used first.

Waste drawer

Ensure that you empty the waste drawer containing used disposable labware before every run to

avoid waste accumulation.

Press Next to proceed to loading the centrifuge or shaker rack, depending on the selected protocol.

Important: After loading and you proceed from the Loading tips and enzymes screen, the robotic

arm will automatically move back to its original position (above tip rack position 3).

Page 79: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 79

5.3.8 Loading the centrifuge

The Loading centrifuge screen guides you through setting up the required rotor adapters and

centrifuge for the run. Make sure to read all essential and critical information before proceeding to

the next step.

Depending on the selected protocol, loading of the centrifuge might not be required. In this case,

the software will indicate that this step can be skipped.

Rotor adapters can be placed into a rotor adapter holder, enabling convenient and easy

preparation and loading of columns. Place the columns, tubes or samples into the appropriate

positions in each rotor adapter as instructed by the software.

If the software instructs you to cut off the lid of a spin column for a certain rotor adapter position,

do this before loading the spin column. Be sure that the lid is completely removed from the spin

column. Spin columns with partially removed lids may not be gripped properly by the robotic

gripper, and may cause the protocol run to crash.

Column lid removed incorrectly; part of the lid is

still remaining

Column lid removed correctly

If the protocol requires use of spin columns with screw caps (e.g., Qproteome Albumin/IgG

Depletion Spin Columns), remove the screw cap from the spin column, and screw on a spin column

adapter ring (not supplied with the QIAcube Connect; see Appendix B – QIAcube Connect

Accessories) onto the column. The spin column adapter ring enables the robotic gripper to transfer

the column during the purification procedure. Break off the bottom closure of the spin column before

placing into the rotor adapter.

Page 80: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 80

Mounting a spin column adapter ring.

Ensure that the tubes and spin columns have been pushed firmly into the appropriate rotor adapter

position.

Place the lids into the correct lid position of the rotor adapter as indicated on your screen in the Lid

position table column and the rotor adapter illustration. Make sure that the lids are pushed all the

way down to the bottom of the slots on the sides of the rotor adapter. Incorrectly positioned lids can

break off during centrifugation and cause the protocol run to crash.

A

1.5 ml microcentrifuge tube lid is in correct position

B

Correctly loaded rotor adapter. A Rotor adapter is correctly loaded, and the 1.5 ml microcentrifuge tube lid is in the correct position; B Correctly loaded rotor adapter seen from the side.

Page 81: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 81

C

1.5 ml microcentrifuge tube lid not pushed down into slot

D

Incorrectly loaded rotor adapter. C Rotor adapter is incorrectly loaded with a 1.5 ml microcentrifuge tube. The lid of the tube is not pushed all the way down to the bottom of the slot of the rotor adapter and could break off during centrifugation (compare with part A of the above figure); D Incorrectly loaded rotor adapter seen from the side (compare with part B of the above figure).

E

1.5 ml microcentrifuge tube lid is in the wrong slot of the rotor adapter

Rotor adapter is incorrectly loaded with a 1.5 ml microcentrifuge tube. The lid of the tube is positioned in the wrong slot of the rotor adapter. During column transfer, the lid of the spin column could crash onto the lid of the 1.5 ml microcentrifuge tube, causing the protocol run to crash.

WARNING

Risk of personal injury and material damage [W5] To prevent plastic crash, load the tubes properly. After a plastic crash, sharp plastic particles could be inside the centrifuge. Be careful when handling items inside the centrifuge.

WARNING

Risk of personal injury and material damage [W4] Do not use damaged rotor adapters. The rotor adapters can only be used once. High g forces exerted in the centrifuge can cause damage to used rotor adapters.

Page 82: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 82

WARNING

Risk of personal injury and material damage [W27] Make sure that lids from spin columns and 1.5 ml microcentrifuge tubes are in the correct position and pushed all the way down to the bottom of the slots on the sides of the of the rotor adapter. Incorrectly positioned lids can break off during centrifugation.

WARNING

Risk of personal injury and material damage [W28] Be sure the lid is completely removed from the spin column. Spin columns with partially removed lids may not be removed properly from the rotor, causing the protocol run to crash.

Depending on the selected protocol, your screen may look different. Follow the instructions below

the screenshot corresponding to your screen.

Loading the centrifuge in case samples are loaded onto shaker

This section describes a workflow that includes the shaker unit (e.g., for lysis). Tubes with samples

need to be loaded onto the shaker unit (refer to section 5.3.9 Loading the shaker), and the centrifuge

must be prepared according the following description.

The number and tube positions of rotor adapters required for the protocol run will be shown in the

table and illustration on your screen. The table shows how to load and position each rotor adapter.

The Pos. column indicates the position in the rotor adapter, and the Lid position column indicates

where to place the lid of a particular tube.

Page 83: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 83

For each rotor adapter:

1. Load each tube/spin column in its correct position as indicated in the table on the screen.

Touch the table row to highlight the particular tube position in the illustration below the table.

2. Ensure that the tubes and spin columns are pushed firmly into the appropriate rotor adapter

position.

3. Make sure that the lids are pushed all the way down to the bottom of the slots on the sides of

the rotor adapter. Ensure that you place the lids in the correct lid positions.

4. If required and described in the table, cut off the lid, or screw on a spin-column adapter ring

and break off the bottom of the spin column.

5. Repeat steps 1–3 until all rotor adapters have been prepared.

6. Place the loaded rotor adapters into the centrifuge buckets as shown on the right side of the

screen. For ease of use and high process safety, the rotor adapters only fit into the centrifuge

buckets in one orientation.

7. Press Next to proceed with loading the samples into the shaker. Follow the instructions in the

corresponding section below. Depending on the selected protocol, the sequence of the next

screens can be different.

Loading samples into the centrifuge

This section describes a workflow that does not include the shaker unit (e.g., for lysis). Samples are

directly loaded into the centrifuge. For workflows including the shaker unit, refer to section Loading

the centrifuge in case samples are loaded onto shaker on page 82.

The procedures for loading samples into the centrifuge are shown on both sides of the screen.

Page 84: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 84

Prepare the required number of rotor adapters as shown on the screen.

The number and tube positions of the rotor adapters required for the run are shown in the table and

in the illustration. The table shows how to load each rotor adapter. The Pos. column indicates the

position in the rotor adapter, and the Lid position column indicates where to place the lid of a

particular tube.

For each rotor adapter:

1. For samples: Prepare and load the samples as outlined on the screen. Make sure to load the

correct sample amount. Ensure that you read all essential and critical information indicated in

the blue Information box on the right side of the screen.

2. Load each tube/spin column in its correct position as indicated in the table on the screen.

Touch the table row to highlight the particular tube position in the illustration below the table.

3. Ensure that the tubes and spin columns are pushed firmly into the appropriate rotor adapter

position.

4. Make sure that the lids are pushed all the way down to the bottom of the slots on the sides of

the rotor adapter. Ensure that you place the lids in the correct lid positions.

If required and described in the table, cut off the lid, or screw on a spin-column adapter ring

and break off the bottom of the spin column.

5. Repeat steps 1–4 until all rotor adapters have been prepared.

6. Press Next to proceed loading of rotor adapters into centrifuge.

Page 85: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 85

7. If required, change the default value in the Sample ID fields using the on-screen keyboard. You

can enter the value manually or scan the sample bar code using a handheld scanner. The

sample ID is initially created using the YYYYMMDD-HHMM-no. format.

Note: Sample IDs are part of the run reports and can be part of log files and audit trail. These

IDs are not encrypted.

8. Place the prepared rotor adapters into the centrifuge buckets as shown on the right side of

screen. For ease of use and safety, the rotor adapters fit in the centrifuge buckets in only one

orientation. To prevent sample mix up, ensure to load the particular Sample ID into the

defined centrifuge position.

9. Press Next to proceed to start the run.

5.3.9 Loading the shaker

The Load shaker screen guides you through the loading of the shaker.

Depending on the selected protocol, loading of the shaker might not be required. In this case, the

software will indicate that this step can be skipped.

Page 86: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 86

Depending on the selected protocol, samples and/or other tubes must be loaded on the shaker.

Loading of shaker; lid positions filled with shaker rack plugs

In this step, the software displays the shaker positions, tubes and volume to be loaded in the table

and in the schematic on the right. Make sure to load the correct shaker rack type as described on

the right side of the screen. Make sure to read all essential and critical information before

proceeding to the next step.

1. Ensure that you are using the correct shaker rack type.

2. If required, change the default Sample IDs in the respective fields using the on-screen

keyboard. You can enter the value manually or scan the sample bar code using a handheld

scanner. The sample ID is initially created using the YYYYMMDD-HHMM-no. format.

Note: Sample IDs are part of the run reports and can be part of log files and audit trail. They

are not encrypted.

3. Prepare the correct tubes. Ensure that you read all essential and critical information indicated

in the Information icon ( ) marked in red.

4. Load the tubes into the correct position of the shaker rack. Touch the table row to highlight the

position in the schematic at the right.

5. Depending on the tube type, a shaker rack plug or the tube lid must be placed into the slot

next to the tube, as shown on the screen or indicated in the Information icon ( ). Make sure

that the lid/shaker rack plug is securely seated in the slot. Do not place a lid or shaker rack

plug next to an empty shaker rack position.

Note: Depending on the protocol used, positions 1 and 7 may be used differently from the

other positions. Ensure that you follow the instructions in the table and in the schematic to load

Page 87: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 87

the shaker correctly. In this screen below, no lid or shaker rack plug is required for these

positions.

Example of protocol using shaker positions 1 and 7 differently. For this example, do not load lids or shaker rack plugs for these positions.

Page 88: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 88

Loading the shaker rack with sample tubes that have attached lids

Lids of sample tubes must be securely placed into the slots at the edge of the shaker rack

Loading the shaker rack with sample tubes that have screw-cap lids

Shaker rack plugs must be placed into the slots at the edge of the shaker rack

6. Press Next to proceed to starting the run or loading the centrifuge, depending on your

selected protocol.

WARNING

Risk of personal injury and material damage [W5] To prevent plastic crash, load the tubes properly. After a plastic crash, sharp plastic particles could be inside the centrifuge. Be careful when handling items inside the centrifuge.

Do not use 1.5 ml microcentrifuge tubes on the shaker. These microcentrifuge tubes can cause filter-

tips to stick during sample transfer. Using this tube on the shaker can damage the pipetting system

and can cause a centrifuge crash.

Page 89: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 89

5.4 Starting the protocol run

A confirmation message will appear when the final step on the last setup screen has been

completed.

1. Close the hood to continue.

2. Press Start to begin the run. The screen will display the estimated run duration. If required,

press Back to return to the previous setup screen.

Important: Do not open the instrument hood during a run. In the event the hood is opened

during a run, the run will stop. If the tip adapter has picked up a tip, it must be removed

manually.

Note: For the very first run, the estimated run duration is not available.

Page 90: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 90

During the run, you can press the Run Details button to display the run steps. To return to the run

view, press Close.

5.5 End of the protocol run

When the protocol run is completed, the output position and content will be shown on the right side

of the screen. Make sure that you follow the proper procedures for storing and handling the

samples.

Optionally, press Create favorite and enter a name to save the run setup of the finished for future

re-use. This name will appear in the Home screen in the Favorites section at the right. If this section

is filled, the earliest created favorite will be removed from the section to make space for the new

favorite.

Page 91: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 91

Perform regular maintenance as described in section 6.3 Regular maintenance procedure before

starting the next run.

5.6 Stopping a protocol run

In case of emergency, a run can be stopped by pressing the Stop Run button. To confirm the run

stopped, click Yes in the Stop Run dialog.

If a run is stopped, perform the daily maintenance as described in section 6.4 Daily maintenance

procedure, and ensure that no plastic parts are present in the centrifuge before starting the next

run.

Note: If a protocol run is stopped, the run cannot be restarted; the samples must be processed

manually (refer to section 7.3.1 Protocol interruption).

5.7 Saving run reports to the USB stick

Run reports are automatically saved on the instrument after each run. The number of run reports on

the instrument is limited to 200. If this number is reached, the oldest run report will be replaced by

the new run report.

To transfer run reports to the USB stick, proceed as follows:

1. Press the Tools icon.

Page 92: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 92

2. Press the Data exchange tab. The number of available run reports is shown on the screen.

3. If not yet connected, connect the USB stick to one of the USB ports at the left of the

touchscreen.

4. To save all available run reports to the USB stick, select All run reports. To save only the

recent reports, select Recent reports. To enter the number of reports to be saved, touch in the

Recent reports field.

5. If you would like to delete reports from the instrument after download, press Delete reports

after download.

6. Press Download to save the reports to the USB stick.

A confirmation message that run reports are successfully saved to the USB stick will appear.

The USB stick can be removed from the instrument.

Important: Do not remove the USB stick while the files are downloading. Wait until the

download is completed.

5.8 Operating the heater/shaker

The heater/shaker can be operated individually if the QIAcube Connect is not running a protocol.

The heating and shaking functions are not interlinked and can be used independently or in

combination.

Do not attempt to move the QIAcube Connect during operation.

Page 93: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 93

WARNING

Hot surface [W21] The shaker can reach temperatures of up to 70°C (158°F). Avoid touching it when it is hot. Carefully remove the samples after a run.

1. Press the Tools icon.

2. Press the Run Modules tab.

3. Press the Heater Shaker tab.

4. Press the appropriate field to select the Frequency, Temperature and Duration using the on-

screen keyboard.

5. Load the shaker rack tubes containing samples.

6. Close the hood to start run.

The remaining time and current temperature and status of the heater are displayed on the screen.

Wait until the operation is completed.

Page 94: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 94

To stop the run progress, press Stop.

5.9 Operating the centrifuge

The centrifuge can be operated individually if the QIAcube Connect is not running a protocol.

Do not attempt to move the QIAcube Connect during operation.

CAUTION

Damage to the instrument [C7] The QIAcube Connect must not be used if the centrifuge lid is broken, or if the lid lock is damaged.

Make sure that no loose material is inside the centrifuge during operation.

Make sure that the rotor is installed correctly and that all buckets are properly mounted, regardless of the number of samples to be processed. Load the rotor only as instructed by the software.

Only use rotors, buckets, and consumables designed for use with the QIAcube Connect. Damage caused by use of other consumables will void your warranty.

We recommend replacing the centrifuge rotor and buckets after 20000 cycles, which is equivalent to 9 years of usage with two runs per day for 220 days each year. For more information contact QIAGEN Technical Services.

Page 95: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 95

WARNING

Moving parts [W19] In case of breakdown caused by power failure, remove the power cord and wait 10 minutes before attempting to manually open the centrifuge lid.

CAUTION

Damage to the instrument [C8] After a power failure, do not move the z-module (robotic arm) manually in front of the instrument. Damage may occur if the QIAcube Connect hood is closed and collides with the z-module.

CAUTION

Risk of overheating [C9] To ensure proper ventilation, maintain a minimum clearance of 10 cm at the sides and rear of the QIAcube Connect.

Slits and openings that ensure the ventilation of the QIAcube Connect must not be covered.

WARNING

Risk of personal injury and material damage [W20] Raise the centrifuge lid carefully. The lid is heavy and may cause injury if it falls.

1. Press the Tools icon.

2. Press the Run Modules tab.

3. Press the Centrifuge tab.

Page 96: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 96

4. Press the appropriate field to select the Speed and Duration using the on-screen keyboard.

5. If the centrifuge lid is not open, press Open Centrifuge Lid.

6. If required, load opened 1.5 ml microcentrifuge elution tubes and/or QIAGEN spin columns

into the rotor adapters and place the lids into the appropriate slots in the rotor adapter.

7. Ensure that the tubes and spin columns are pushed firmly into the appropriate rotor adapter

position.

8. Make sure that the lids are pushed all the way down to the bottom of the slots on the sides of

the rotor adapter. If required, cut off the lid.

9. Place the rotor adapters into the centrifuge.

Important: If fewer than 12 samples are to be processed, ensure that you load the correct

centrifuge positions as described in the Loading scheme table below. One or 11 samples

cannot be loaded.

10. Close the hood and press Start to start centrifugation.

The Close centrifuge lid button is not needed to start a centrifuge run, as the lid will close

automatically. It is only required in case you need to prepare the QIAcube Connect for

shipment.

Loading scheme:

No. of samples Centrifuge loading scheme No. of samples Centrifuge loading scheme

2

7

3

8

Page 97: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 97

No. of samples Centrifuge loading scheme No. of samples Centrifuge loading scheme

4

9

5

10

6

12 Load all positions

5.10 Logging out

To log out from the instrument, follow these steps:

1. Press Logout at the top right of the screen.

2. To log out, confirm the message with OK. To stay logged in, press Cancel.

3. The Login screen appears.

Page 98: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 98

6 Maintenance Procedures

WARNING/ CAUTION

Risk of personal injury and material damage [W22] Only perform maintenance that is specifically described in this user manual.

The following maintenance procedures must be carried out to ensure reliable operation of the

QIAcube Connect:

Regular maintenance: after each protocol run

Daily maintenance: after the last protocol run of the day

Monthly maintenance: every month

Periodic maintenance: when necessary; at least every 6 months

Optionally, these procedures may be performed to check and ensure the reliability of operation of

the QIAcube Connect:

UV Run: recommended to be performed daily

Tightness Test: ensures the tightness of the tip adapter (e.g., after O-Ring change)

The software provides step-by-step guidance under Tools/Maintenance for the maintenance

procedures listed above, except for the regular maintenance.

Following these procedures ensures that the QIAcube Connect is free from dust and liquid spills.

Select the cleaning agent according to the objective of the cleaning procedure, the sample material

used and the downstream assay.

WARNING

Risk of fire or explosion [W6] When using ethanol or ethanol-based liquids on the QIAcube Connect, handle such liquids carefully and in accordance with the required safety regulations. If liquid has been spilled, wipe it off and leave the QIAcube Connect hood open to allow flammable vapors to disperse.

Before using any cleaning or decontamination methods except those recommended by the

manufacturer, users should check with the manufacturer that the proposed method will not damage

the equipment.

Page 99: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 99

6.1 Cleaning agents

The following disinfectants and detergents are recommended for cleaning the QIAcube Connect.

Note: If you want to use disinfectants different from those recommended, ensure that their

compositions are like those described below.

General cleaning of the QIAcube Connect:

Mild Detergents (e.g., Mikrozid® AF sensitive)

70% ethanol (for cleaning the worktable only; not for cleaning the QIAcube Connect hood)

6.1.1 Disinfection

Ethanol-based disinfectants can be used for disinfection of surfaces, such as the worktable or inside

the centrifuge: e.g., 25 g ethanol and 35 g 1-propanol per 100 g liquid or Mikrozid Liquid (Schülke

& Mayr GmbH, cat. no. 109160).

Disinfectants based on glyoxal and quaternary ammonium salt can be used for submerging

worktable items, the centrifuge rotor, and the waste drawer: e.g., 10 g glyoxal, 12 g

lauryldimethylbenzylammonium chloride, 12 g myristyldimethylbenzylammonium chloride, and 5–

15% nonionic detergent per 100 g liquid, Lysetol® AF (Gigasept® Instru AF in Europe, cat. no.

107410, or DECON-QUAT® 100, Veltek Associates, Inc., in the USA, cat. no. DQ100-06-167-01).

Removal of RNase contamination

RNaseZap® RNase Decontamination Solution (Ambion, Inc., cat. no AM9780) can be used for

cleaning surfaces and submerging worktable items, centrifuge rotor, and waste drawer. RNaseZap

can also be used to perform decontamination by spraying the respective worktable items.

Removal of nucleic acid contamination

DNA-ExitusPlus™ (AppliChem, cat. no. A7089,0100) can be used for cleaning surfaces and

submerge worktable items, centrifuge rotor, and waste drawer. DNA-ExitusPlus can also be used to

perform decontamination by spraying the respective worktable items. DNA-ExitusPlus is very sticky

and foamy. For this reason, after cleaning the items with DNA-ExitusPlus, it is required to clean the

items with a wet cloth several times, or rinse them with running water, until the DNA-ExitusPlus is

completely removed. This is especially important for the rotor and swing-out buckets so that the

buckets do not get stuck during centrifugation and positioning.

Page 100: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 100

General instructions

Do not use spray bottles to spray cleaning or disinfectant liquids onto surfaces of the QIAcube

Connect workstation. Spray bottles should be used only for items that have been removed

from the workstation.

If solvents or saline, acidic, or alkaline solutions are spilt on the QIAcube Connect or if

QIAGEN buffers splash the instrument hood, wipe the spilt liquid away immediately.

Follow manufacturer's safety instruction for handling cleaning agents.

Follow manufacturer's instruction for soaking time and concentration of the cleaning agents.

Immersing for longer than the recommended soak time can harm the instrument.

Do not use alcohol or alcohol-based disinfectants to clean the QIAcube Connect hood.

Exposing the QIAcube Connect hood to alcohol or alcohol-based disinfectants will cause

surface cracking. Clean the QIAcube Connect hood with distilled water only or a mild

detergent.

Do not submerge buffer bottles in 70% alcohol. The blue ring is not ethanol resistant.

Take care that no liquid runs down the touchscreen. Liquid may be drawn through the dust

protection sealing by capillary forces and cause malfunction of the display. To clean the

touchscreen, moisten a soft lint-free cloth with water, ethanol, or a mild detergent and carefully

wipe the display. Wipe dry with a paper towel.

CAUTION

Damage to the instrument [C10] Do not use bleach, solvents, or reagents containing acids, alkalis, or abrasives to clean QIAcube Connect.

CAUTION

Damage to the instrument [C11] Do not use spray bottles containing alcohol or disinfectant to clean surfaces of the QIAcube Connect. Spray bottles should be used only to clean items that have been removed from the worktables.

WARNING

Risk of fire [W24] Do not allow cleaning fluid or decontamination agents to come into contact with the electrical parts of the QIAcube Connect.

WARNING

Risk of electric shock [W10] Do not open any panels on the QIAcube Connect.

Risk of personal injury and material damage Only perform maintenance that is specifically described in this user manual.

Page 101: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 101

WARNING

Hazardous chemicals and infectious agents [W16] The waste may contain toxic material and must be disposed of properly. Refer to your local safety regulations for proper disposal procedures.

WARNING

Risk of personal injury and material damage [W1] Improper use of the QIAcube Connect may cause personal injuries or damage to the instrument. The QIAcube Connect must only be operated by qualified personnel who have been appropriately trained. Servicing of the QIAcube Connect must only be performed by a QIAGEN Field Service specialist.

WARNING

Risk of explosion [W23] When cleaning the QIAcube Connect with alcohol-based disinfectant, leave the QIAcube Connect hood open to allow flammable vapors to disperse.

Only clean the QIAcube Connect when worktable components have cooled down.

WARNING

Risk of fire or explosion [W6] When using ethanol or ethanol-based liquids on the QIAcube Connect, handle such liquids carefully and in accordance with the required safety regulations. If liquid has been spilled, wipe it off and leave the QIAcube Connect hood open to allow flammable vapors to disperse.

WARNING

Toxic fumes [W14] Do not use bleach to clean or disinfect the QIAcube Connect. Bleach in contact with salts from the buffers can produce toxic fumes.

WARNING

Toxic fumes [W15] Do not use bleach to disinfect used labware. Bleach in contact with salts from the buffers used can produce toxic fumes.

Page 102: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 102

6.2 Servicing

Contact your local QIAGEN Field Service Specialist or your local distributor for more information

about flexible Service Support Agreements from QIAGEN.

WARNING

Risk of personal injury and material damage [W1] Improper use of the QIAcube Connect may cause personal injuries or damage to the instrument. The QIAcube Connect must only be operated by qualified personnel who have been appropriately trained. Servicing of the QIAcube Connect must only be performed by a QIAGEN Field Service specialist.

6.3 Regular maintenance procedure

After running a protocol, perform the regular maintenance procedure described below.

Regular maintenance procedure:

1. Open the waste drawer and empty tips and columns (if necessary) into a suitable laboratory

waste container.

2. Remove used disposable labware and unwanted samples and reagents from the worktable.

Discard them according to your local safety regulations.

Note: If the robotic arm prevents you from reaching a position, do not move the robotic arm

manually. Instead, proceed as follows:

Page 103: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 103

Press Move left or Move right, as needed. The robotic arm will start to move. The hood can

remain open during this movement.

Ensure that you stand clear of the instrument while the robotic arm is moving. Wait until the

robotic arm has completed its movements.

3. Replace the lids of the reagent bottles and close tightly. Store the bottles according to the

instructions in the relevant kit handbook.

You can now run another protocol or switch off the QIAcube Connect.

6.4 Daily maintenance procedure

After running the last protocol of the day, perform the daily maintenance procedure. The software

guides you through each step to be performed:

1. To start the daily maintenance, press the Tools icon.

2. Then press the Daily subtab under the Maintenance tab. The screen shows the Last Executed

and the Next Due daily maintenance dates.

3. Press Start. Follow the instructions on the screen. Details are provided in the next steps below.

The robotic arm will automatically move slowly to the left – even if the instrument hood is

open – to provide access to the loading positions. Always stand clear of the instrument while

the robotic arm is moving. Wait until the robotic arm has completed its movements before you

start to unload.

4. Remove used disposable labware, adapters and unwanted samples and reagents from the

worktable. If required, discard them according to your local safety regulations.

Page 104: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 104

5. Close the buffer bottles tightly and store according to the instructions in the relevant kit

handbook.

6. Press Done to confirm that the steps have been completed.

7. Empty the waste drawer and check that the inlay is clean. If necessary, clean the inlay of the

waste drawer with alcohol-based disinfection wipes, or by soaking using one of the cleaning

agents listed above, and then rinse with distilled water.

8. Wipe and clean the worktable with alcohol-based disinfection wipes. Incubate as

appropriate, rinse thoroughly with distilled water and wipe dry with paper towels.

Note: Do not use alcohol or alcohol-based disinfectants to clean the hood.

9. Press Done only when the steps listed above have been successfully completed. The date of

the last performed daily maintenance is updated automatically.

The robotic arm will automatically move back to its original position (above tip rack

position 3).

6.5 Monthly maintenance procedure

Perform the daily maintenance procedure before you perform the monthly maintenance procedure.

Select the appropriate cleaning agent according to the sample material and downstream assay

(refer to section 6.1 Cleaning agents).

1. To start the monthly maintenance, press the Tools icon.

2. Then press the Monthly subtab under the Maintenance tab. The screen shows the Last Executed

and the Next Due monthly maintenance dates.

Page 105: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 105

3. Close the hood.

4. Press Start. Follow the instructions on the screen. Details are provided in the next steps below.

The robotic arm will move to the cleaning position.

5. Thoroughly clean the worktable with alcohol-based disinfection wipes. Incubate as

appropriate, rinse thoroughly with distilled water and wipe dry with paper towels.

Important: Do not use alcohol or alcohol-based disinfectants to decontaminate the QIAcube

Connect hood.

6. Clean the touchscreen with alcohol-based disinfection wipes and wipe dry afterwards.

Important: Take care that no liquid runs down the touchscreen. Liquid may be drawn through

the dust protection sealing by capillary forces and cause malfunction of the display. To clean

the touchscreen, moisten a soft lint-free cloth with 70% ethanol or a mild disinfectant and

carefully wipe the display. Wipe dry with a paper towel.

7. Clean the outer hood with a soft lint-free cloth moistened with water or mild detergent.

8. Clean the shaker adapter (grey), shaker tray (metal adapter), buffer bottle rack (and waste

drawer in liner if not done during daily maintenance) with alcohol-based disinfection wipes.

9. Incubate the shaker adapter (grey), shaker tray (metal adapter), buffer bottle rack and waste

drawer in liner by soaking as appropriate. Rinse thoroughly with distilled water and wipe dry

with paper towels.

10. Press Done only when the steps listed above have been successfully completed. The date of

the last performed monthly maintenance is updated automatically.

Important: Inspect the waste drawer during maintenance. Contact QIAGEN Technical

Services if any broken parts are observed.

11. Transfer the run reports from the instrument to the USB stick and remove the run reports from

the instrument. Only the last 200 run reports are saved on the instrument. For details refer to

section 5.7 Saving run reports.

6.6 Periodic maintenance procedure

The periodic maintenance consists of cleaning the robotic arm modules and centrifuge.

Select the appropriate cleaning agent according to the sample material and downstream assay

(refer to section 6.1 Cleaning agents).

6.6.1 Cleaning the robotic arm modules

Cleaning of the robotic arm modules must be performed periodically or could be performed if

required. For example, the robotic arm modules must be cleaned if liquids were spilled due to crash.

Page 106: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 106

Note: Perform the monthly maintenance procedure before you perform the robotic arm cleaning

procedure.

1. To start cleaning the robotic arm modules, press the Tools icon and press the Robotic Arm

subtab under the Maintenance tab. The screen shows the Last Executed maintenance date of

the robotic arm modules.

2. Press Start to begin the cleaning of robotic arm modules. Follow the instructions on the screen.

Details are provided in the next steps below.

3. Make sure that used Labware, adapters and reagents are removed from the worktable. Close

the hood.

4. Press Next to move to cleaning position.

5. Remove the waste drawer and open hood.

6. Open the waster drawer. Moisten a soft lint-free cloth with water and carefully clean the

optical sensor, tip adapter, gripper unit, rotor adapter stabilization rod and the spin column

lid holder. Wipe these items dry as indicated on the touchscreen of the instrument.

7. Close the hood and press Done to finish cleaning of robotic arm. The date of the last

performed cleaning of robotic arm is updated automatically.

6.6.2 Cleaning the centrifuge

Cleaning of the centrifuge arm must be performed periodically or could be performed if required.

For example, the centrifuge must be cleaned in case of plastic crash or spillage of liquids due to

crash.

Page 107: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 107

WARNING

Risk of personal injury and material damage [W5] To prevent plastic crash, load the tubes properly. After a plastic crash, sharp plastic particles could be inside the centrifuge. Be careful when handling items inside the centrifuge.

Note: Perform the monthly maintenance procedure before you perform the cleaning of centrifuge

procedure.

1. To start cleaning the centrifuge, press the Tools icon and press the Centrifuge subtab under the

Maintenance tab. The screen shows the Last Executed centrifuge maintenance date.

2. Press Start to begin the centrifuge cleaning procedure. Follow the instructions on the screen.

Details are provided in the next steps below.

3. The centrifuge lid must be open to allow access to the inside of the centrifuge. The lid should

be opened only after the centrifuge has come to a complete stop. If the lid does not open

automatically, close the hood and press the Open Centrifuge Lid button.

4. Perform cleaning as outlined in the following sections (below): Cleaning the rotor and buckets,

Cleaning the centrifuge, Maintenance of the rotor nut, and Installing the centrifuge rotor and

buckets.

5. Turn on the instrument. Press the Tools icon and press the Centrifuge subtab under the

Maintenance tab.

6. When cleaning is completed, press Start again then press Done to confirm cleaning. The date

of the last performed cleaning of centrifuge is updated automatically.

Page 108: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 108

Cleaning the rotor and buckets

1. Switch off the QIAcube Connect.

2. Remove all disposable rotor adapters, including tubes and spin columns, from the buckets.

3. Remove the buckets from the rotor. Undo the rotor nut on top of the rotor using the rotor key,

and carefully lift the rotor off the rotor shaft.

Rotor key

4. Submerge the rotor, buckets and rotor nut in cleaning agent. Incubate as appropriate.

5. Rinse thoroughly with distilled water. Use a brush (e.g., a toothbrush or tube brush) to clean

any parts that are difficult to access, such as the bucket mount and the rotor head. Wipe

surfaces dry with a soft lint-free cloth. If available, dry the buckets and rotor with pressurized

air.

Brushing a bucket

Brushing the rotor

Important: Make sure the paper towels and brush used are lint-free.

Important: Make sure that all residual salt is removed.

Important: Make sure to remove all traces of cleaning agent from the centrifuge buckets.

Residual agent can cause the buckets to jam.

6. Carefully check the rotor for damage. If the rotor is damaged or shows signs of wear or

corrosion, do not use the rotor. Contact QIAGEN Technical Services.

7. Apply a few drops of mineral oil (Anti-Corrosion Oil (rotor), cat. no. 9018543) on a soft, lint-

free cloth, and wipe the bucket mount and rotor claw. A thin, invisible oil film should cover the

bucket mount and rotor claw, but no droplets or smear should be apparent.

8. Apply oil to the rotor claw and to the bucket mount.

Important: Before applying oil to the rotor buckets on the rotor, make sure that the rotor and

all buckets are completely dry.

Page 109: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 109

Rotor head

Bucket mounts

Cleaning the centrifuge

1. Moisten a soft lint-free cloth with cleaning agent and clean the inside of the centrifuge and the

centrifuge gasket. Incubate as appropriate.

2. Clean the inside of the centrifuge and the gasket with distilled water and wipe dry with lint-

free paper towels. If available, use a vacuum cleaner.

Important: Make sure the gaskets remain in the proper positions.

3. Clean the centrifuge lid with a soft lint-free cloth moistened with cleaning agent. Incubate as

appropriate, clean with water and wipe dry with paper towels.

4. Check the centrifuge gasket for damage. If the gasket is damaged or shows signs of wear,

contact QIAGEN Technical Services.

Maintenance of the rotor nut

Note: Always perform the cleaning procedure after disassembly of the rotor and at least twice a

year.

After cleaning the rotor thread, apply a few drops of mineral oil (Anti-Corrosion Oil (rotor), cat. no.

9018543) on a lint-free cloth, and wipe the thread. A thin, invisible oil film should cover the rotor

thread but no droplets or smear should appear.

Page 110: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 110

Rotor thread. Inner thread of the rotor nut.

After cleaning the inner thread of the rotor nut, wipe the thread using Anti-Corrosion Oil as

described above.

Installing the centrifuge rotor and buckets

1. Mount the rotor.

2. The rotor can be mounted in only one orientation. The pin on the rotor shaft fits into a notch

on the underside of the rotor directly underneath rotor position 1. Line up position 1 of the

rotor with the pin on the rotor shaft and carefully lower the rotor onto the shaft.

3. Install the rotor nut on top of the rotor and tighten securely using the rotor key supplied with

the QIAcube Connect. Make sure that the rotor is securely seated.

Rotor key. Rotor nut.

If the rotor nut is not tightened properly, it can become loose during operation of the

centrifuge and can cause serious damage to the instrument. Such damage is not covered by

the warranty.

WARNING

Risk of personal injury and material damage [W25] To prevent the rotor nuts from loosening during operation of the centrifuge, securely tightened the nuts using the rotor key supplied with QIAcube Connect.

Rotor

thread

Inner

thread

Page 111: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 111

4. Replace the rotor buckets.

When replacing the rotor buckets, the side of the rotor bucket that must face toward the rotor

shaft is marked with a grey line. Hold the bucket at an angle with the grey line facing the

center of the rotor and hang the bucket on the rotor. Check that all buckets are properly

suspended and can swing freely.

Important: All centrifuge buckets must be mounted before starting a run.

Before starting next protocol run, follow the instructions in section 6.6.3 Operating the centrifuge

after cleaning.

6.6.3 Operating the centrifuge after cleaning

The centrifuge must be operated independently before starting further runs to check if residual plastic

parts are still in the centrifuge.

Note: Rotor adapters and other consumables are not required.

1. To start a centrifuge run, press the Tools icon and then the Run Modules tab.

2. In the Set speed and Set duration fields, set the speed to 10,000 g and the duration to 1 min

(1:0 m:s), respectively.

3. Press Start to begin the centrifuge run.

4. Carefully listen to the sound during centrifugation. See below for more details regarding the

sound.

Page 112: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 112

Unusual sound during centrifugation

If any grinding, rattling or crunching sounds are heard during the centrifugation, there are still loose

plastic particles inside the centrifuge. Repeat the cleaning procedure as described in section 6.6.2.

Note: It may be necessary to repeat the procedure several times to remove all plastic particles.

No unusual sound during centrifugation

If no unusual sound from loose plastic particles can be heard during centrifugation, the next protocol

run can be started.

Note: The Open centrifuge lid and Close centrifuge lid buttons are not needed to start a centrifuge

run, as the lid will close automatically. Instead, they are needed in case you need to prepare the

QIAcube Connect for shipment or during troubleshooting.

6.6.4 Tightness test

To ensure that the tightness of the tip adapter is sufficient for accurate pipetting, the tightness test of

the tip adapter must be performed. This test must also be performed after replacing a tip adapter

O-Ring to verify if replacement is successful.

Note: Perform the daily maintenance and cleaning of the robotic arm procedure before you perform

the tightness test.

Page 113: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 113

1. To start the tightness test, press the Tools icon and press the Tightness subtab under the

Maintenance tab. The screen shows the Last Executed tightness test date.

2. Press Start to begin with the tightness test procedure. Follow the instructions on the screen.

Details are provided in the next steps below.

3. Open the hood and load a 1000 µl tip rack with at least one 1000 µl tip into tip rack

position 1.

4. Place an empty 2 ml safe-lock microcentrifuge tube (cat. no. 990381) in position 1 of the

shaker (shaker type 2).

5. Place a buffer bottle filled with ≥10 ml 96–100% ethanol in position 1.

6. Close the hood and press Next to start tightness test.

After the load check, the robotic arm will pick up a tip, aspirate ethanol and move to the tube.

The tip will remain in place above the tube for 2 minutes. The tip will be discarded into the

waste afterwards.

7. Wait until the test has been completed and then press Next.

8. After the protocol is completed, open the QIAcube Connect hood and remove the buffer bottle

and tips to store them accordingly.

9. Remove the tube and visually check if liquid is present:

If no liquid is present, press Yes to record that the test passed.

If liquid is present, press No to record that the test failed.

10. In case the test failed, repeat the test. If test fails again, it is recommended to replace the O-

Ring first (using the O-Ring tab) or contact QIAGEN Technical Services.

11. Press Done to finalize tightness test procedure. The date of the last performed tightness test is

updated automatically.

Page 114: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 114

6.6.5 O-Ring exchange

O-Ring replacement must be performed if the tightness test failed or if the following issues are

observed:

Uneven volume transfers

Dripping on the worktable

The replacement procedure requires the O-Ring change tool and an O-Ring. See Appendix B –

QIAcube Connect Accessories for ordering details.

O-Ring tool with prepared new O-Ring

The O-Ring replacement is semi-automatically and includes movement of robotic arm.

Note: Perform the daily maintenance and cleaning of the robotic arm procedure before you replace

the O-Ring.

Page 115: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 115

1. To start the O-Ring replacement, press the Tools icon and press the O-Ring subtab under the

Maintenance tab. The screen shows the last O-Ring replacement date.

2. Close the hood and press Start to begin the O-Ring replacement procedure. Follow the

instructions on the screen. Details are provided in the next steps below.

3. To prepare the O-Ring tool, perform the following steps:

3a. Slide the new O-Ring over the small end of the peg.

3b. Push the grey lever until you reach the black stop, and insert the small end of the peg into

the hole.

Page 116: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 116

3c. Press the peg down using the back end of the tweezers until the O-Ring sits (in the

middle) on the larger end of the peg.

3d. Open the grey lever and insert the peg with small end first into hole as shown.

4. Press Next to begin loading of the O-Ring tool into the QIAcube Connect.

Page 117: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 117

5. Load the O-Ring tool by opening the grey lever into tip rack position 1 (nearest to user).

6. Close the hood and press Next to begin cutting of the O-Ring.

7. To cut and remove the O-Ring, perform the following steps:

7a. To cut the O-Ring, open the hood and rotate the grey lever counter-clockwise until you

reach the black stop.

Page 118: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 118

7b. Open the grey lever and remove the O-Ring (by using the tweezers) from pipetting

channel.

Note: If required, repeat cutting process until O-Ring is cut completely and can be

removed.

8. Close the hood and press Next to pick up the prepared new O-Ring.

9. Open the hood and visually check if new O-Ring sits firmly on tip adapter.

Note: If the O-Ring was not successfully picked up, complete the O-Ring replacement

procedure and restart.

10. Close the hood press Next to remove the O-Ring change tool.

11. Open the hood and remove the O-Ring change tool.

12. Wipe and clean the O-Ring change tool with alcohol-based disinfection wipes. Incubate as

appropriate, rinse thoroughly with distilled water and wipe dry with paper towels.

13. Press Done to complete the O-Ring replacement. The date of the last performed O-Ring

replacement is updated automatically.

WARNING

Risk of personal injury and material damage [W1] Improper use of the QIAcube Connect may cause personal injuries or damage to the instrument. The QIAcube Connect must only be operated by qualified personnel who have been appropriately trained. Servicing of the QIAcube Connect must only be performed by a QIAGEN Field Service specialist.

Page 119: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 119

6.6.6 UV decontamination

UV decontamination must be performed daily. It helps to reduce possible pathogen or nucleic acid

contamination of the QIAcube Connect worktables. The efficiency of inactivation is to be determined

for each specific organism and depends, for example, on layer thickness and sample type.

QIAGEN cannot guarantee complete eradication of specific pathogens.

During UV decontamination, the robotic arm will move slowly across the worktable. The default

cycle number is 1 (approximately 12 minutes) for maintenance. In case you visually see splashes

on the worktable, you must increase the cycle number based on used sample material/pathogens.

Note: Before starting the UV irradiation procedure, ensure that daily maintenance is performed and

thereby all samples, eluates, reagents and disposable labware are removed from the worktable.

During each cycle, an average summed dose rate of 28 to 46 mW*s/cm2 can be achieved by UV

LED light.

1. To start the UV decontamination, press the Tools icon and press the UV run subtab under the

Maintenance tab. The screen shows the Last Executed UV run date and the Cycle duration.

2. In the Cycle field, change the number of cycles. The default cycle number is 1 (approximately

12 minutes).

3. Ensure that all disposable labware has been removed from the worktable.

Important: Ensure that the waste drawer is closed. Do not open it during the UV run.

4. Close the hood and press Start to begin the UV run.

Page 120: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 120

5. Press Done once the UV run is completed. The date of the last performed UV-run is updated

automatically.

WARNING

Risk of personal injury [W29] Do not expose your skin to UV-C light from the UV LED lamp.

6.7 Decontaminating the QIAcube Connect

If the QIAcube Connect is contaminated with infectious material, it should be decontaminated. If

hazardous material is spilt on or inside the QIAcube Connect, the user has responsibility for carrying

out appropriate decontamination.

The QIAcube Connect should also be decontaminated before shipping (e.g., back to QIAGEN). In

this case, a decontamination certificate must be completed to confirm that the decontamination

procedure has been carried out.

To decontaminate the QIAcube Connect, follow the daily, monthly and periodic maintenance

procedure in sections 6.4–6.6, using the recommended disinfection agents. In addition, perform a

UV run with at least 5 cycles as outlined in section 6.6.6.

Page 121: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 121

7 Troubleshooting

7.1 General information

This section provides information about what to do if an error occurs while using the QIAcube

Connect.

7.2 Contacting QIAGEN Technical Services

Whenever encountering a QIAcube Connect error, be sure to have the following information at

hand:

Protocol name and version (found in the report file)

Software version (see section 4.5.6).

Sample input material

Detailed description of the error situation

This information will help you and your QIAGEN Technical Service Specialist to deal most efficiently

with your issue.

Note: Information about the latest software and protocol versions can be found at

www.qiagen.com/MyQIAcubeConnect. In some cases, updates may be available for addressing

specific problems.

7.2.1 Creating a support package

1. On the main screen, press the Tools button.

2. Press the Data Exchange tab.

Page 122: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 122

3. Connect the USB stick to one of the 2 USB ports next to the touchscreen.

4. Press Create and Download. The support package will be created and saved on the USB stick

in the folder Support_Package. The support package is a zip file that can be sent to QIAGEN

Technical Services.

7.3 Operation

Comments and suggestions

Centrifuge

Bucket does not swing back into place

Clean the centrifuge and rotors as described in section 6.

Imbalance detected Make sure the rotor is symmetrically loaded according to instructions on run setup screens. Remove the rotor and check the centrifuge chamber for loose plasticware. Power OFF the QIAcube Connect, wait for a few minutes, and power it ON again. If the error persists, contact QIAGEN Technical Services.

Imbalance detected; loud noise heard during centrifugation

Ensure that loose parts are cleared from the worktable prior to centrifuge operation to avoid loose parts jamming or damaging the centrifuge.

Shaker

Incorrect repositioning of shaker The shaker should re-position itself towards the right side once shaking is completed. Remove any obstructions that prevent the shaker from returning to the correct position.

Page 123: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 123

Comments and suggestions

Robotic arm

Robotic arm does not return to set position

Ensure that the instrument is placed on a stable, flat and level surface as described in section 4.1.1. In other cases, contact QIAGEN Technical Services.

Pipettor

Pipet tips not picked up by automatic pipettor

Make sure that the tip rack is not damaged and is correctly positioned on the worktable.

Pipet tips not disposed of correctly Empty the waste drawer and ensure it is not broken. Check that tip disposal slot is not damaged or obstructed. Perform regular maintenance, as described in section 6.3

Droplets observed on worktable The pipettor is dripping liquid. Check that the reagent bottles contain the correct buffers and are correctly placed in the reagent bottle rack. Be sure to use the right plasticware. Check the volumes in the sample tubes and tubes of accessory buffer(s), if applicable. Do not exceed the recommended amount of starting material to avoid blocking disposable filter-tips. If tip racks have been refilled, make sure that the correct tips were used. Check tightness of pipettor in maintenance section as described in section 6.6.4. If leakage could be detected change O-Ring as described in section 6.6.5. If issue persists, contact QIAGEN Technical Services.

Mechanical

Frame of instrument is distorted (e.g., uneven, unstable or not level)

Ensure that the instrument is placed on a stable, flat and level surface as described in section 4.1.1.

Hood sensor error: instrument will not function

Ensure the hood is properly closed. The instrument will not function if the hood is open.

Broken instrument hood Ensure that only the cleaning products as described in section 6 are used on the hood.

Waste drawer jams but can still be inserted

Empty the waste drawer. Perform daily maintenance, as described in section 6.4.

Incorrectly inserted waste drawer Handle the waste drawer with both hands when inserting or removing the drawer.

Pipet tips not disposed of correctly Make sure the top of the tip disposal slot (refer to section 3.3) is not broken.

Page 124: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 124

Comments and suggestions

Scratches appear on the instrument Always use the cleaning products as described in section 6. Do not use bleach or ethanol, as they can damage the surface of the instrument.

Electronic

Display does not turn on Do not touch the display with excessive force or use corrosive chemicals to clean the display surface. Contact QIAGEN Technical Services for repair.

Error when copying files to USB Power OFF the QIAcube Connect, wait for a few minutes, and power it ON again. Save the file(s) to the USB stick again. Check the USB stick on a PC to ensure it is functional. If the error persists, contact QIAGEN Technical Services.

USB device not detected Power OFF the QIAcube Connect, wait for a few minutes, and power it ON again. Insert the USB stick into the USB port. Check the USB stick on a PC to ensure it is functional. If the error persists, contact QIAGEN Technical Services.

Login screen not visible when launching instrument

If the touchscreen does not display the login screen, but instead a software update message is shown, power OFF the QIAcube Connect, wait for a few minutes. Ensure that the USB stick is not inserted in the USB port. Power ON the QIAcube Connect again. The login screen should be visible. If the error persists, contact QIAGEN Technical Services.

Error displayed when inserting the USB stick into a Windows PC

Ignore the message. In most cases, no scan is needed; use the USB stick as usual. Do not reformat the USB on the Windows PC. This will lead to complete data loss on the USB stick, and it can no longer be used with the QIAcube Connect.

7.3.1 Protocol interruption

If an error occurs during a protocol run, it is possible to continue sample preparation manually. The

error code, the description and the step at which the protocol stopped are displayed in the

touchscreen.

Page 125: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 125

To continue sample processing:

1. Note the step at which the protocol stopped. This is displayed in the touchscreen.

2. Remove the samples and reagents from the QIAcube Connect.

3. Refer to the appropriate protocol in the relevant kit handbook and continue sample processing

manually.

7.3.2 Centrifuge

Opening the centrifuge lid in the event of a breakdown

In case of power failure, the centrifuge lid can be manually opened so that the samples can be

removed. To open the centrifuge lid, follow the instructions below.

WARNING

Moving parts [W19] In case of breakdown caused by power failure, remove the power cord and wait 10 minutes before attempting to manually open the centrifuge lid.

WARNING

Risk of personal injury and material damage [W20] Raise the centrifuge lid carefully. The lid is heavy and may cause injury if it falls.

1. Power OFF the QIAcube Connect.

2. Unplug the power cord from the power outlet. Wait 10 minutes for the rotor to stop.

3. Open the instrument hood.

4. Carefully move the robotic arm to the right side of the worktable, furthest away from the

centrifuge lid.

Page 126: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 126

5. Remove the screw protection on top of the centrifuge lid. Using the rotor key, turn the screw

counter-clockwise.

Turning the screw in the centrifuge lid

6. Remove the waste drawer. The centrifuge release cord will be visible on the left side of the

waste drawer compartment.

Removed waste drawer

Centrifuge release cord

7. Pull the cord firmly to release the lid from the lock.

8. Manually raise the centrifuge lid.

Page 127: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 127

9. Hold the raised lid and remove the samples and rotor adapters from the rotor.

Removing rotor adapters

Contact QIAGEN Technical Services for instructions on how to reset the lid.

Liquid spills in the centrifuge

The rotor adapter is designed for use with QIAGEN automated protocols. Do not fill the rotor

adapters with liquid.

Liquid spills may occur if QIAGEN spin columns become blocked due to sample overloading. Do

not exceed the maximum amount of starting material.

Incorrect installation of the centrifuge buckets may also cause rotor adapters to leak. Check that the

buckets are installed properly and can swing freely.

If there is a liquid spill in the centrifuge, clean according to the instructions in section 6.

7.3.3 Reagent volume detection and ultrasonic pipe

To help prevent errors during detection of reagent volumes, make sure that both rack labeling strips

are attached to the reagent bottle rack. These strips ensure that the reagent bottle rack is positioned

correctly on the worktable for liquid detection during the load check.

Page 128: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 128

The instrument does not start a load check if the ultrasonic pipe (black cap) of the ultrasonic sensor

is missing. Check if cap has been installed before starting a load check.

Black beam columnator (see red circle) of the ultrasonic sensor

7.3.4 Touchscreen

Every time the user presses a button on the touchscreen, a small red sign is displayed at the place

where the touchscreen recognizes the contact. If the point of touch and the recognized contact are

at different positions, a re-calibration of the touchscreen can be performed. The calibration function

can be reached during the instrument’s startup procedure.

It is recommended to use a touch pen or an unused tip for optimal calibration results. In case you

use a tip, discard the tip after calibration.

To re-calibrate the touchscreen:

1. Turn OFF the QIAcube Connect.

2. Wait a few minutes and then turn ON the instrument again.

Page 129: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 129

3. In the second screen press the QIAGEN logo.

Note: If you do not press the logo, the instrument will continue initialization.

4. Press Calibrate touchscreen.

5. An information message is displayed. The message will close automatically after 10 seconds.

Page 130: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 130

6. Plus signs (+) will be shown at different positions on the screen. For each of these, press the

center of the + sign. After one position is touched, the next position will be shown. The

graphic below shows the positions and the order in which the + signs will appear.

7. The calibration is finished after all five positions have been touched. Calibration results are

saved automatically. The previous screen is shown again.

8. Press Start. The instrument continues initialization using the new calibration settings.

To cancel the calibration process, turn OFF the QIAcube Connect.

Page 131: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 131

8 Glossary

Term Description

Centrifuge A component of the QIAcube Connect that accommodates a rotor with 12 swing-out buckets. Each

bucket holds a disposable rotor adapter.

Disposal slots Slots in the QIAcube Connect worktable through which used tips and columns (e.g., QIAshredder

columns) are discarded into the waste drawer.

Hood The main door at the front of the QIAcube Connect. When open, it provides complete access to the

worktable.

Error code A 3- or 4-digit number that indicates an error of the QIAcube Connect.

Filter-tip An item of labware that is picked up by the tip adapter during operation of the QIAcube Connect.

Liquid is aspirated into and dispensed from a filter-tip.

Initialization An operation performed automatically when the QIAcube Connect is switched on and if required

before each protocol run to check the operation of the QIAcube Connect.

Microcentrifuge

tube slots

Three slots located in the labware tray that accommodate accessory buffers, in 1.5 ml or 2 ml

microcentrifuge tubes.

Pipetting system/

Pipettor unit

The component of the QIAcube Connect that aspirates and dispenses liquid. The pipetting system

moves up and down above the worktable and contains a syringe pump that is connected to a tip

adapter.

Power switch A button located at the front of the QIAcube Connect in the bottom-right corner. It allows the user to

switch the QIAcube Connect on and off; inner position is ON and outer position is OFF.

Protocol A set of instructions for the QIAcube Connect that allows the instrument to automate a nucleic acid

or protein purification procedure. Protocols are run using the touchscreen.

Reagent bottle

rack

A rack that can accommodate six 30 ml bottles on the QIAcube Connect worktable.

Page 132: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 132

Term Description

Robotic gripper A component of the QIAcube Connect robotic arm that moves spin columns during sample

processing.

Rotor adapter A disposable plastic adapter that fits into a centrifuge bucket and holds a QIAGEN spin column

and microcentrifuge tube during sample processing.

Tip adapter A metal probe installed on the pipettor head. During operation of the QIAcube Connect, the tip

adapter picks up filter-tips from the worktable.

Tip disposal slots Slots in the QIAcube Connect worktable through which used filter-tips are discarded into the waste

drawer.

Tip rack A plastic rack that accommodates filter-tips on the worktable.

Touchscreen The user interface that allows the user to operate the QIAcube Connect.

Waste drawer A drawer that collects used filter-tips and disposable columns.

Worktable The surface of the QIAcube Connect where samples, reagents, and filter-tips are loaded.

Page 133: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 133

9 Appendix A – Technical data

QIAGEN reserves the right to change specifications at any time.

9.1 Operating conditions

Power 100–240 V AC, 50/60 Hz, 650 VA Mains supply voltage fluctuations are not to exceed 10% of nominal supply voltages. Note: The apparent power can exceed 650 VA for up to 2 seconds during the centrifuge acceleration and can reach an approximate value of 1000 VA.

Fuse 2x T6.3A L 250V

Overvoltage category

II

Air temperature 18 to 28ºC (64.4 to 82.4ºF)

Relative humidity 15–75% (noncondensing)

Altitude Up to 2000 m (6500 ft.)

Place of operation For indoor use only

Pollution level 2

Environmental class 3K2 (IEC 60721-3-3)

9.2 Transport conditions

Air temperature –25ºC to 60ºC (–13ºF to 140ºF) in manufacturer’s package

Relative humidity Max. 75% (noncondensing)

Environmental class 2K2 & 2M2 (IEC 60721-3-2)

9.3 Storage conditions

Air temperature 15ºC to 30ºC (59ºF to 86ºF) in manufacturer’s package

Relative humidity Max. 75% (noncondensing)

Environmental class 1K2 (IEC 60721-3-1)

Page 134: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 134

9.4 Mechanical data and hardware features

Dimensions (hood closed)

Width: 65 cm (25.6 in.) Height: 58 cm (22.8 in.) Depth: 62 cm (24.4 in.)

Dimensions (hood open)

Width: 65 cm (25.6 in.) Height: 86 cm (34 in.) Depth: 62 cm (24.4 in.)

Mass QIAcube Connect: 71.5 kg (157.6 lb.) Accessories: 3 kg (6.6 lb.)

Centrifuge 10,640 rpm maximum 12,000 x g maximum Swing-out rotor, maximum 45° 12 rotor positions

Shaker Speed 100–2000 RPM Amplitude 2 mm Heating range of ambient temperature to 70°C (158°F) Ramp-up time of <5 minutes from ambient temperature to 55°C (±3°C) Difference in the temperature detected by the internal sensor and the temperature of the sample liquid is approximately –2°C

Pipetting system Syringe size 1 ml Pipetting range 5–900 µl

Capacity Up to 12 samples per run

Touchscreen 10.4” TFT Touchscreen, active area 211.2 x 158.4 mm, resolution 800*600 SVGA

USB stick USB2.0 Compatible OS: Windows 8, Windows 7, Windows Vista, Windows XP (SP3 or later); Mac OS X 10.1 or later Operating temperature range: 0 to 35°C Operating humidity range: 10 to 90% (with no condensation) Storage temperature range: –20 to 60°C (–4 to 140°F) Storage humidity range: 10 to 90% (with no condensation) Formatting: FAT32

UV LED Wavelength: 278 nm Optical power: 200–300 mW

Page 135: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 135

Handheld scanner Scan Pattern: Area Image (838 x 640-pixel array) Motion Tolerance: Up to 610 cm/s (240 in/s) for 13 mil UPC at optimal focus Symbol Contrast: 20% minimum reflectance difference Decode Capability: Reads standard 1D, PDF, 2D, Postal and OCR symbologies

Software QIAGEN protocols are preinstalled on the QIAcube Connect or can be downloaded at www.qiagen.com/MyQIAcubeConnect.

9.5 Declaration of Conformity

Name and address of the legal manufacturer:

QIAGEN GmbH

QIAGEN Strasse 1

40724 Hilden

Germany

An up-to-date declaration of conformity can be requested from QIAGEN Technical Services.

9.6 Waste Electrical and Electronic Equipment (WEEE)

This section provides information about disposal of waste electrical and electronic equipment by

users.

The crossed-out wheeled bin symbol (see below) indicates that this product must not be disposed of

with other waste; it must be taken to an approved treatment facility or to a designated collection

point for recycling, according to local laws and regulations.

Page 136: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 136

The separate collection and recycling of waste electronic equipment at the time of disposal helps to

conserve natural resources and ensures that the product is recycled in a manner that protects human

health and the environment.

Recycling can be provided by QIAGEN upon request at additional cost. In the European Union, in

accordance with the specific WEEE recycling requirements and where a replacement product is

being supplied by QIAGEN, free recycling of its WEEE-marked electronic equipment is provided.

To recycle electronic equipment, contact your local QIAGEN sales office for the required return

form. Once the form is submitted, you will be contacted by QIAGEN either to request follow-up

information for scheduling collection of the electronic waste or to provide you with an individual

quote.

9.7 FCC Declaration

The ’’United States Federal Communications Commission’’ (USFCC) (in 47 CRF 15. 105) declared

that the users of this product must be informed of the following facts and circumstances.

‘’This device complies with part 15 of the FCC:

Operation is subject to the following two conditions: (1) This device may not cause harmful

interference, and (2) this device must accept any interference received, including interference that

may cause undesired operation.’’

“This Class B digital apparatus complies with Canadian ICES-0003.’’

The following statement applies to the products covered in this manual, unless otherwise specified

herein. The statement for other products will appear in the accompanying documentation.

Note: This equipment has been tested and found to comply with the limits for a Class B digital

device, pursuant to Part 15 of the FCC Rules and meets all requirements of the Canadian

Interference-Causing Equipment Standard ICES-003 for digital apparatus. These limits are designed

Page 137: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 137

to provide reasonable protection against harmful interference in a residential installation. This

equipment generates, uses, and can radiate radio frequency energy and, if not installed and used

in accordance with the instructions, may cause harmful interference to radio communications.

However, there is no guarantee that the interference will not occur in an installation. If this

equipment does cause harmful interference to radio or television reception, which can be

determined by turning the equipment off and on, the user is encouraged to try to correct the

interference by one or more of the following measures:

Reorient or relocate the receiving antenna.

Increase the separation between the equipment and receiver.

Connect the equipment into an outlet on a circuit different from that to which the receiver is

connected.

Consult the dealer or an experienced radio/TV technician for help.

QIAGEN GmbH Germany is not responsible for any radio television interference caused by

unauthorized modifications of this equipment or the substitution or attachment of connection cables

and equipment other than those specified by QIAGEN GmbH, Germany. The correction of

interference caused by such unauthorized modification, substitution or attachment will be the

responsibility of the user.

9.8 Liability Clause

QIAGEN shall be released from all obligations under its warranty in the event repairs or

modifications are made by persons other than its own personnel, except in cases where the

Company has given its written consent to perform such repairs or modifications.

All materials replaced under this warranty will be warranted only for the duration of the original

warranty period, and in no case beyond the original expiration date of original warranty unless

authorized in writing by an officer of the Company. Read-out devices, interfacing devices, and

associated software will be warranted only for the period offered by the original manufacturer of

these products. Representations and warranties made by any person, including representatives of

QIAGEN, which are inconsistent or in conflict with the conditions in this warranty shall not be

binding upon the Company unless produced in writing and approved by an officer of QIAGEN.

Page 138: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 138

10 Appendix B – QIAcube Connect Accessories

For more information and an up-to-date list of available protocols, visit

www.qiagen.com/MyQIAcubeConnect.

Ordering Information

Product Contents Cat. no.

QIAcube Connect* Instrument and 1-year warranty on parts and labor 9002840

QIAcube Connect System* Instrument and 1-year warranty on parts and labor, 1-year preventive subscription that includes one on-site preventive inspection service

9002844

QIAcube Connect Priority* Instrument, installation, introductory training, 2-year warranty on parts and labor, two preventive inspection services

9002842

QIAcube Connect PrioPLUS* Instrument, installation, introductory training, 3-year warranty on parts and labor, three preventive inspection services

9002843

Starter Pack, QIAcube Reagent bottle racks (3); rack labeling strips (8); 200 µl filter-tips (1024); 1000 µl filter-tips (2048); 30 ml reagent bottles (18); rotor adapters (240); rotor adapter holder; 1.5 ml elution tubes (240)

990395

Accessories

Filter-Tips, 1000 µl (1024) Disposable Filter-Tips, racked; (8 x 128) 990352

Filter-Tips, 1000 µl, wide-bore (1024)

Disposable Filter-Tips, wide-bore, racked; (8 x 128); not required for all protocols

990452

Filter-Tips, 200 µl (1024) Disposable Filter-Tips, racked; (8 x 128); not required for all protocols 990332

Rotor, centrifuge Rotor for the QIAcube centrifuge 9017848

Swing-out Buckets Swing-out buckets for the rotor of the QIAcube centrifuge 9017849

Rotor Adapters (10 x 24) For 240 preps: 240 Disposable Rotor Adapters and 240 microcentrifuge tubes (1.5 ml); for use with the QIAcube Connect

990394

Rotor Adapter Holder Holder for 12 disposable rotor adapters; for use with the QIAcube Connect

990392

* All configurations include: QIAcube Connect robotic workstation for automated purification of DNA, RNA or proteins using QIAGEN spin-column kits, plus

tablet and Q-Base to connect to local network, bar code reader and 1-year warranty on parts and labor.

Page 139: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 139

Product Contents Cat. no.

Reagent Bottle Rack Rack for accommodating 6 x 30 ml reagent bottles on the QIAcube Connect worktable

990390

Reagent Bottles, 30 ml (6) Reagent Bottles (30 ml) with lids; pack of 6; for use with the QIAcube Connect reagent bottle rack

990393

Shaker Rack Plugs (12) For use with 2 ml screw cap tubes 9017854

Sample Tubes RB (2 ml) 1000 safe-lock microcentrifuge tubes (2 ml) for use with the QIAcube Connect

990381

Sample Tubes CB (2 ml) 1000 conical screw-cap tubes without skirted base (2 ml) for use with the QIAcube Connect

990382

USB Stick USB Stick; for use with the QIAcube Connect 9017850

O-Ring Change Tool O-Ring change tool for use with the QIAcube Connect 9026181

O-Ring Set Set of 10 O-Rings for use with the QIAcube Connect 9018472

Spin Column Adapter Rings (25)

Spin column adapter rings for use with spin-columns that have screw-caps; not required for all protocols

990399

For up-to-date licensing information and product-specific disclaimers, see the respective QIAGEN

kit handbook or user manual. QIAGEN kit handbooks and user manuals are available at

www.qiagen.com or can be requested from QIAGEN Technical Services or your local distributor.

Page 140: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 140

11 Appendix C – Consignes de sécurité

Avant d’utiliser le QIAgility, il est impératif de lire attentivement ce manuel et de porter une attention

particulière aux consignes de sécurité. Afin de garantir un fonctionnement de l’appareil en toute

sécurité et de maintenir l’appareil en bon état de marche, il est impératif de suivre les instructions

et consignes de sécurité fournies dans le présent manuel d’utilisation.

Les types d’informations de sécurité suivants sont fournis tout au long du manuel.

AVERTISSEMENT

Le terme AVERTISSEMENT signale des situations risquant d’entraîner des

accidents corporels dont l’utilisateur, ou d’autres personnes, pourraient être

victime.

Les détails concernant ces circonstances sont donnés dans un encadré

identique à celui-ci.

ATTENTION

Le terme ATTENTION signale des situations risquant d’entraîner des

détériorations de l’appareil ou de tout autre matériel.

Les détails concernant ces circonstances sont donnés dans un encadré

identique à celui-ci.

Les conseils donnés dans ce manuel ont pour but de venir compléter les exigences de sécurité

habituelles en vigueur dans le pays de l’utilisateur, et non de s’y substituer.

11.1 Utilisation appropriée

AVERTISSEMENT/ ATTENTION

Risque d’accident corporel et de détérioration du matériel [W1]

L’utilisation inappropriée du QIAcube Connect peut entraîner des accidents corporels ou une détérioration de l’appareil. L’utilisation du QIAcube Connect est réservée exclusivement au personnel qualifié ayant été convenablement formé. L’entretien du QIAcube Connect doit être effectué uniquement par des spécialistes de l’entretien sur site QIAGEN ou par des techniciens d'un agent agréé.

Procéder à la maintenance comme décrit dans Maintenance Procedures, section 6. QIAGEN

facture les réparations dues à une maintenance inappropriée.

Page 141: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 141

AVERTISSEMENT

Risque de dommages corporels et matériels [W2] Le QIAcube Connect est trop lourd pour être soulevé par une personne. Pour éviter des dommages corporels ou matériels, ne pas soulever l’instrument tout seul.

AVERTISSEMENT

Risque de dommages corporels et matériels [W3] Ne pas essayer de bouger le QIAcube Connect pendant son fonctionnement.

ATTENTION

Détérioration de l’instrument [C1] Eviter de renverser de l’eau ou des substances chimiques sur le QIAcube Connect. Tout dommage causé par de l’eau ou des produits chimiques mettra fin à la garantie.

En cas d’urgence, éteindre le QIAcube Connect à l’aide de l’interrupteur d’alimentation situé à

l’arrière de l’appareil et débrancher le cordon d’alimentation de la prise de courant.

ATTENTION

Détérioration de l’instrument [C2] Utilisez uniquement des colonnes de centrifugation QIAGEN et des consommables spécifiques au QIAcube Connect avec l’instrument. Les détériorations causées par l’utilisation d’autres types de colonnes de centrifugation ou de réactions chimiques annulent la garantie.

AVERTISSEMENT

Risque de dommages corporels et matériels [W4] N’utilisez pas d’adaptateurs pour rotor abîmés. Les adaptateurs pour rotor sont à usage unique. L’action importante de la force g exercée à l’intérieur de la centrifugeuse risque d’abîmer les adaptateurs pour rotor déjà utilisés.

ATTENTION

Risque de dommages matériels [C3] Videz le conteneur de cônes usagés avant toute utilisation afin d’empêcher tout amoncellement de cônes dans le tiroir à déchets. Si vous ne videz pas le conteneur de déchets, le bras robotisé risque de se bloquer, ce qui peut conduire à un dysfonctionnement ou un endommagement de l’instrument.

AVERTISSEMENT

Risque de dommages corporels et matériels [W5] Pour éviter tout écrasement du plastique, chargez les tubes correctement. Suite à l’écrasement du plastique, il se peut que des particules de plastique pointues se trouvent à l’intérieur de la centrifugeuse. Faites attention lors de la manipulation des éléments à l’intérieur de la centrifugeuse.

Page 142: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 142

ATTENTION

Détérioration de l’instrument [C4] Utilisez uniquement le bon volume de liquides.

Tout dépassement du volume de liquides recommandé risque d’abîmer le rotor de la centrifugeuse ou l’instrument.

AVERTISSEMENT

Risque d’incendie ou d’explosion [W6] En cas d’utilisation d’éthanol ou de liquides à base d’éthanol sur le QIAcube Connect, manipulez ces liquides avec prudence et conformément aux règles de sécurité nécessaires. En cas de déversement de liquide, essuyez-le et laissez le capot du QIAcube Connect ouvert pour que les vapeurs inflammables puissent s’évaporer.

AVERTISSEMENT

Risque d’explosion [W7] Le QIAcube Connect est conçu pour être utilisé avec les réactifs et les substances fournis avec les kits QIAGEN ou autrement que de la façon décrite dans le mode d’emploi correspondant. L’utilisation d’autres réactifs et d’autres substances peut provoquer un incendie ou une explosion.

Si des substances dangereuses sont renversées sur le QIAcube Connect ou à l’intérieur de celui-ci,

l’utilisateur porte l’entière responsabilité de la réalisation de la procédure de décontamination

appropriée.

Remarque: ne pas placer d’objets à la surface des capots des appareils QIAcube Connect.

ATTENTION

Détérioration de l’instrument [C5] Ne vous appuyez pas contre l’écran tactile lorsqu’il est déboîté.

Page 143: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 143

11.2 Sécurité électrique

Avant l’entretien, débrancher les cordons d’alimentation des prises de courant.

AVERTISSEMENT

Risque d’électrocution [W8] Toute interruption du conducteur de protection à l’intérieur ou à l’extérieur de l’instrument, ou déconnexion du raccord du conducteur de protection (terre) peut rendre l’instrument dangereux. Il est interdit d’interrompre volontairement ce conducteur.

Présence de tensions mortelles dans l’instrument

Lorsque l’instrument est relié au secteur, les raccords peuvent être sous tension, et des parties sous tension peuvent être découvertes en ouvrant des capots ou en retirant des pièces (à l’exception de celles auxquelles il est possible d’accéder manuellement).

AVERTISSEMENT

Endommagement des composants électroniques [W9] Avant de mettre l’instrument SOUS tension, vérifiez que vous utilisez la bonne tension d’alimentation.

L’utilisation d’une tension d’alimentation incorrecte risque d’endommager les composants électroniques. Pour prendre connaissance de la tension d’alimentation recommandée, consultez les spécifications indiquées sur la plaque signalétique de l’instrument.

AVERTISSEMENT

Risque d’électrocution [W10] Ne pas ouvrir les panneaux du QIAcube Connect.

Risque de dommages corporels et matériels Réaliser uniquement la maintenance décrite spécifiquement dans ce manuel.

Afin que le QIAcube Connect fonctionne de manière satisfaisante et en toute sécurité, suivre les

conseils suivants :

Les cordons d’alimentation de l’appareil doivent être branchés sur des prises d’alimentation

munies d’un conducteur de protection (terre/masse).

Les fiches d’alimentation reliées au secteur doivent être facilement accessibles s’il est

nécessaire de débrancher rapidement l’équipement du secteur.

Utilisez uniquement le cordon d’alimentation fourni par QIAGEN.

En cas de déversement de liquides à l’intérieur de l’appareil, débrancher celui-ci de la prise

d’alimentation et contacter les Services techniques de QIAGEN.

Page 144: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 144

Si l’appareil présente un danger électrique, empêcher le reste du personnel de s’en servir et

contacter les Services Techniques de QIAGEN. L’appareil peut présenter un danger électrique dans

les cas suivants :

Le cordon d’alimentation présente des signes de détérioration.

L’appareil a été stocké pendant une longue période dans des conditions non conformes à

celles énoncées dans l’Annexe A.

L’appareil a subi des chocs sévères durant le transport.

Un liquide a pénétré à l’intérieur de l’appareil

11.3 Atmosphère

AVERTISSEMENT

Atmosphère explosive [W11] Le QIAcube Connect n’est pas conçu pour fonctionner dans une atmosphère explosive.

ATTENTION

Détérioration de l’instrument [C6] La lumière directe du soleil peut décolorer des parties de l’instrument et endommager des parties en plastique.

Placer le QIAcube Connect en dehors de la lumière directe du soleil.

11.4 Sécurité biologique

Lors de la manipulation de substances biologiques, employer des procédures de laboratoire sûres

comme décrit dans des publications telles que Biosafety in Microbiological and Biomedical

Laboratories, HHS (www.cdc.gov/od/ohs/biosfty/biosfty.htm).

11.4.1 Échantillons

En cas de déversement de liquides à l’intérieur de l’appareil, débrancher celui-ci de la prise

d’alimentation et contacter les Services techniques de QIAGEN.

Page 145: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 145

AVERTISSEMENT

Echantillons contenant des agents infectieux [W12] Certains échantillons utilisés avec cet instrument peuvent contenir des agents infectieux. Manipuler ce type d’échantillon avec le plus grand soin et en accord avec les règles de sécurité requises.

Toujours porter des lunettes de protection, deux paires de gants et une blouse de laboratoire.

La personne responsable (par exemple le Chef du laboratoire) doit prendre les précautions nécessaires pour assurer la sécurité de l’environnement du poste de travail et pour être sûr que les opérateurs de l’instrument sont suffisamment formés et non exposés à des quantités dangereuses d’agents infectieux comme défini dans “Material Safety Data Sheets (MSDS)” ou des documents “OSHA*, ACGIH† ou COSHH‡”.

L’évacuation des vapeurs et déchets doit être conforme à tous règlements et dispositions légales - au plan national, départemental et local - concernant la santé et la sécurité.

11.5 Produits chimiques

AVERTISSEMENT

Substances chimiques dangereuses [W13] Certaines substances chimiques utilisées avec cet instrument peuvent être dangereuses ou peuvent le devenir après que le protocole ait été effectué.

Toujours porter des lunettes de protection, paire de gants et une blouse de laboratoire.

La personne responsable (par exemple le Chef du laboratoire) doit prendre les précautions nécessaires pour assurer la sécurité de l’environnement du poste de travail et pour être sûr que les opérateurs de l’instrument sont suffisamment formés et non exposés à des quantités dangereuses de substances toxiques (chimique ou biologique) comme défini dans “Material Safety Data Sheets (MSDS)” ou des documents “OSHA*, ACGIH† ou COSHH‡”.

L’évacuation des vapeurs et déchets doit être conforme à tous règlements et dispositions légales - au plan national, départemental et local - concernant la santé et la sécurité.

* OSHA: Occupational Safety and Health Administration (États-Unis d’Amérique) (Administration pour la santé et la sécurité

du travail). † ACGIH: American Conference of Government Industrial Hygienists (États-Unis d’Amérique) (Conférence américaine des

hygiénistes industriels gouvernementaux). ‡ COSHH: Control of Substances Hazardous to Health (Royaume-Uni) (Contrôle des substances dangereuses pour la santé).

Page 146: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 146

11.5.1 Vapeurs toxiques

Si vous travaillez avec des solvants volatils ou des substances toxiques, vous devez disposer d’un

système de ventilation de laboratoire efficace afin d’évacuer les vapeurs qui peuvent être générées.

AVERTISSEMENT

Vapeurs toxiques [W14] N’utilisez pas d’eau de Javel pour nettoyer ou désinfecter le QIAcube Connect. Le contact de l’eau de Javel avec des sels provenant des tampons peut produire des vapeurs toxiques.

AVERTISSEMENT

Vapeurs toxiques [W15] Ne pas utiliser de produit à base d’eau de Javel pour désinfecter les accessoires de laboratoire usagés. Le contact d’un produit à base d’eau de Javel avec des sels provenant des tampons utilisés peut produire des vapeurs toxiques.

11.6 Traitement des déchets

Les produits en plastique usagés, tels que le PyroMark Q48 Disc, peuvent contenir des produits

chimiques ou des agents infectieux dangereux. Ces déchets doivent être convenablement collectés

et mis au rebut conformément aux règles de sécurité locales.

Pour plus d’informations sur la mise au rebut du QIAcube Connect, consultez la section 9.6 Waste

Electrical and Electronic Equipment (WEEE).

AVERTISSEMENT

Produits chimiques dangereux et agents infectieux [W16] Les déchets peuvent contenir des matières toxiques et doivent être mis au rebut de manière appropriée. Reportez-vous aux règles de sécurité locales concernant les procédures de mise au rebut appropriées.

Page 147: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 147

11.7 Dangers mécaniques

Le capot du QIAcube Connect doit rester fermé pendant le fonctionnement de l’instrument. Ouvrir

le capot uniquement lorsque les instructions d’utilisation vous demandent de le faire.

Lors du chargement de la table de travail, restez toujours à bonne distance de l’instrument. Ne vous

penchez pas sur la table de travail quand le bras robotisé de l’instrument se déplace vers la position

de chargement lorsque le couvercle est ouvert. Attendez que le bras robotisé termine son

déplacement avant de commencer un chargement ou un déchargement.

AVERTISSEMENT

Pièces mobiles [W17] Évitez tout contact avec les pièces en mouvement lorsque le QIAcube Connect est en marche. Ne placez en aucun cas vos mains sous le bras robotisé lorsque celui-ci s’abaisse. Ne tentez pas de déplacer des portoirs à cônes ou des tubes lorsque l’instrument est en marche.

AVERTISSEMENT

Pièces mobiles [W18] Pour éviter tout contact avec des pièces en mouvement pendant le fonctionnement du QIAcube Connect, l’appareil doit être utilisé avec le capot fermé.

Si le capteur ou le verrou du capot ne fonctionne pas correctement, contactez les services techniques de QIAGEN.

11.7.1 Centrifuge

Vérifiez que le rotor et les godets sont correctement installés. Tous les godets doivent être montés

avant de lancer un cycle de protocole, quel que soit le nombre d’échantillons à traiter. Si le rotor

ou les godets présentent des signes de détérioration mécanique ou de corrosion, cessez d’utiliser

le QIAcube Connect et contactez les services techniques de QIAGEN.

Page 148: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 148

ATTENTION

Détérioration de l’instrument [C7] Le QIAcube Connect ne doit pas être utilisé si le capot de la centrifugeuse est cassé ou si le verrou du capot est endommagé.

Veillez à ce qu’aucun résidu ne se trouve à l’intérieur de la centrifugeuse en cours de fonctionnement.

Assurez-vous que le rotor est installé correctement et que tous les godets sont bien montés, quel que soit le nombre d’échantillons à traiter. Chargez uniquement le rotor en suivant les instructions du logiciel.

Utilisez uniquement des rotors, des godets et des consommables conçus pour une utilisation avec le QIAcube Connect. Les détériorations causées par l’utilisation d’autres consommables annulent la garantie.

Nous vous recommandons de remplacer le rotor et les godets de la centrifugeuse après 20 000 cycles, ce qui équivaut à 9 années d’utilisation avec deux fonctionnements par jour, pendant 220 jours par an. Pour de plus amples informations, contactez les services techniques de QIAGEN.

In case of breakdown caused by power failure, the centrifuge lid can be opened manually to

remove the samples (see section 7.3.2).

AVERTISSEMENT

Pièces mobiles [W19] Dans le cas d’un arrêt causé par une panne de courant, retirer le câble d’alimentation et attendre 10 minutes avant d’essayer d’ouvrir manuellement le couvercle de la centrifugeuse.

ATTENTION

Détérioration de l’instrument [C8] Après une coupure de courant, ne déplacez pas le bras robotisé manuellement devant l’instrument. Vous risquez d’endommager l’instrument si le capot du QIAcube Connect est fermé et entre en collision avec le bras robotisé.

AVERTISSEMENT

Risque de dommages corporels et matériels [W20] Soulever le couvercle de la centrifugeuse avec précaution. Le couvercle est lourd et peut causer des blessures si il tombe.

Page 149: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 149

ATTENTION

Risque de surchauffe [C9] Laisser un espace d’au moins 10 cm sur les côtés et à l’arrière du QIAcube pour assurer une ventilation efficace.

Les grilles et prises d’air assurant la ventilation du QIAcube ne doivent pas être couvertes.

11.8 Dangers liés à la chaleur

La table de travail du QIAcube Connect contient un agitateur chauffé.

AVERTISSEMENT

Surface brûlante [W21] L’agitateur peut atteindre des températures jusqu’à 70°C (158°F). Eviter de le toucher quand il est chaud.

11.9 Sécurité relative à la maintenance

AVERTISSEMENT/ ATTENTION

Risque de dommages corporels et matériels [W22] Effectuer uniquement la maintenance spécifiquement décrite dans ce manuel.

AVERTISSEMENT

Risque d’explosion [W23] Lors du nettoyage du QIAcube Connect avec un désinfectant à base d’alcool, laisser la porte du QIAcube Connect ouverte pour permettre aux vapeurs inflammables de s’évaporer.

Nettoyer le QIAcube Connect uniquement quand les composants de la table de travail ont refroidi.

AVERTISSEMENT

Risque d’incendie [W24] Ne laissez pas le liquide de nettoyage ou les agents de décontamination entrer en contact avec les contacts électriques du QIAcube Connect.

Page 150: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 150

AVERTISSEMENT

Risque de dommages corporels et matériels [W25] Pour empêcher l’écrou du rotor de se desserrer pendant le fonctionnement de la centrifugeuse, serrez-le bien à l’aide de la clé du rotor fournie avec le QIAcube Connect.

AVERTISSEMENT

Danger de rayonnement UV [W26] Un verrou mécanique veille à ce que le capot soit fermé pour le fonctionnement de la LED à UV.

Si le capteur ou le verrou du capot ne fonctionne pas correctement, contactez les services techniques de QIAGEN.

AVERTISSEMENT

Risque de dommages corporels et matériels [W27] Assurez-vous de positionner correctement les couvercles des colonnes de centrifugation et des tubes de 1,5 ml et de les enfoncer jusqu’au bout de l’emplacement sur les bords de l’adaptateur à rotor. Les couvercles placés incorrectement peuvent se casser lors de la centrifugation.

AVERTISSEMENT

Risque de dommages corporels et matériels [W28] Assurez-vous d’enlever les couvercles des colonnes de centrifugation. Les colonnes de centrifugations avec un couvercle partiellement enlevé se détachent difficilement du rotor ce qui est la cause d’un crash du protocole.

ATTENTION

Détérioration de l’instrument [C10] Ne pas utiliser de produit à base d’eau de Javel, de solvants ou de réactifs contenant des acides, des agents alcalins ou des produits abrasifs pour nettoyer le QIAcube Connect.

ATTENTION

Détérioration de l’instrument [C11] N’utilisez pas de flacons pulvérisateurs contenant de l’alcool ou un agent désinfectant pour nettoyer les surfaces du QIAcube Connect. Les flacons pulvérisateurs ne doivent être utilisés que pour nettoyer les éléments qui ont été retirés de la table de travail.

11.10 Sécurité contre les rayonnements

AVERTISSEMENT

Risque de blessure personnelle [W29] Ne pas exposer votre peau à la lumière UV-C émise par la lampe UV.

Page 151: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 151

AVERTISSEMENT

Risque de blessure personnelle [W30] Lumière laser avec niveau de danger 2 : Ne regardez pas fixement le faisceau lumineux lors de l’utilisation du lecteur de code-barres portable.

Page 152: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 152

11.11 Symboles sur le QIAcube Connect

Symbol Location Description

Agitateur Risque de brûlures — la température de l’agitateur peut atteindre jusqu’à 70°C (158 °F)

Près de la centrifugeuse; près du bras robotique

Danger mécanique — éviter d’entrer en contact avec les parties mobiles

Sur l’instrument, près du portoir de flacons

Risque d’incendie – Utilisation d’éthanol dans le portoir de flacons

Devant la table de travail Risque biologique - Certains échantillons utilisés avec cet appareil peuvent contenir des agents infectieux et doivent être manipulés avec des gants

A l’intérieur du compartiment à déchets Danger Biologique — le compartiment à déchets peut être contaminé par du matériel présentant un risque biologique et doit être manipulé avec des gants

Plaque à l'arrière de l'appareil Marque CE (certification de conformité à la réglementation Européenne)

Plaque signalétique à l’arrière de l’appareil

Label CSA pour le Canada et les Etats-Unis

Plaque à l'arrière de l'appareil Marquage FCC de la commission fédérale des

communications des Etats Unis

Plaque à l'arrière de l'appareil Label RCM pour l’Australie et la Nouvelle-

Zélande

Plaque à l'arrière de l'appareil Marquage RoHS pour la Chine (limitation de l'utilisation de certaines substances dangereuses dans les équipements électriques et électroniques)

Plaque à l'arrière de l'appareil Marquage WEEE pour l’Europe

Plaque signalétique à l’arrière de l’appareil

Fabricant légal

Table de travail Lire le manuel d’utilisation.

Page 153: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 153

12 Appendix D – Sicherheitshinweise

Lesen Sie dieses Handbuch sorgfältig durch, bevor Sie den QIAgility benutzen. Beachten Sie dabei

insbesondere die Sicherheitshinweise. Die Gebrauchsanweisungen und Sicherheitshinweise im

Handbuch müssen befolgt werden, um einen sicheren Betrieb des Geräts zu gewährleisten und das

Gerät in einem sicheren Zustand zu erhalten.

In diesem Handbuch werden die folgenden Kategorien von Sicherheitshinweisen verwendet:

WARNUNG

Der Begriff „WARNUNG“ (“WARNING”) weist Sie auf Situationen hin, in

denen eine Verletzungsgefahr für Sie selbst oder andere Personen besteht.

Nähere Einzelheiten über diese Situationen werden in einem Textfeld wie

diesem beschrieben.

ACHTUNG

Der Begriff „ACHTUNG“ (“CAUTION”) weist Sie auf Situationen hin, in

denen das Gerät oder andere Geräte beschädigt werden könnten.

Nähere Einzelheiten über diese Situationen werden in einem Textfeld wie

diesem beschrieben.

Die in diesem Handbuch enthaltenen Hinweise stellen eine Ergänzung und keinen Ersatz der

üblichen Sicherheits-anforderungen dar, die im jeweiligen Land gelten.

12.1 Sachgemäße Handhabung

WARNUNG/ ACHTUNG

Verletzungsgefahr und Beschädigung des Geräts [W1]

Die unsachgemäße Bedienung des QIAcube Connect kann zu einer Verletzung des Benutzers oder zur Beschädigung des Geräts führen. Die Bedienung des QIAcube Connect darf nur durch qualifiziertes, entsprechend geschultes Personal erfolgen.

Die Instandhaltung des QIAcube Connect darf nur durch einen

Servicespezialisten des QIAGEN Außendiensts oder Servicetechniker eines

autorisierten Vertreters durchgeführt werden.

Führen Sie alle Wartungsarbeiten gemäß den Anweisungen unter Maintenance Procedures,

Abschnitt 6, durch. QIAGEN stellt Reparaturen, die auf nicht fachgerecht durchgeführte

Wartungsmaßnahmen zurückzuführen sind, in Rechnung.

Page 154: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 154

WARNUNG

Gefahr von Verletzungen und Sachbeschädigungen [W2] Der QIAcube Connect ist zu schwer um von einer Person gehoben zu werden. Um Verletzungen des Benutzers oder eine Beschädigung des Gerätes zu vermeiden ist davon abzusehen, das Gerät alleine zu heben.

WARNUNG

Gefahr von Verletzungen und Sachbeschädigungen [W3] Den QIAcube Connect während eines Laufes nicht bewegen.

ACHTUNG

Beschädigung des Geräts [C1] Vermeiden Sie es, Wasser oder Chemikalien auf dem QIAcube Connect zu verschütten. Durch verschüttetes Wasser oder verschüttete Chemikalien verursachte Geräteschäden sind nicht durch die Garantie abgedeckt.

Schalten Sie im Notfall den QIAcube Connect aus (der Netzschalter befindet sich auf der

Gerätevorderseite), und ziehen Sie den Netzstecker aus der Steckdose.

ACHTUNG

Beschädigung des Geräts [C2] Es dürfen ausschließlich QIAGEN Spin-Säulen und QIAcube Connect-spezifische Verbrauchsmaterialien mit dem QIAcube Connect verwendet werden. Kommt es bei der Verwendung von Spin-Säulen oder Chemikalien anderer Hersteller zu Geräteschäden, erlischt die Garantie.

WARNUNG

Gefahr von Verletzungen und Sachbeschädigungen [W4] Verwenden Sie keine beschädigten Rotoradapter. Rotoradapter sind nur für den Einmalgebrauch konzipiert. Benutzen Sie die Rotoradapter kein zweites Mal, da sie durch die hohen g-Kräfte bei der Zentrifugation beschädigt werden können.

ACHTUNG

Gefahr von Materialbeschädigungen [C3] Leeren Sie den Pipettenspitzen-Abfallbehälter vor dem Gebrauch, um einen Rückstau der Spitzen in der Abfallschublade zu vermeiden. Wenn der Abfallbehälter nicht geleert wird, kann es zu einer Blockade des Roboterarms kommen, die zu einem Ausfall oder Sachschäden am Gerät führen kann.

Page 155: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 155

WARNUNG

Gefahr von Verletzungen und Sachbeschädigungen [W5] Um eine Beschädigung von Kunststoffteilen zu vermeiden, müssen die Röhrchen ordnungsgemäß geladen werden. Sollten Kunststoffteile beschädigt sein, können sich scharfe Kunststoffstücke innerhalb der Zentrifuge befinden. Bei der Handhabung von Gegenständen innerhalb der Zentrifuge ist daher Vorsicht angebracht.

ACHTUNG

Beschädigung des Geräts [C4] Verwenden Sie stets das korrekte Flüssigkeitsvolumen.

Eine Überschreitung der empfohlenen Flüssigkeitsvolumen kann Schäden am Zentrifugenrotor oder am Gerät hervorrufen.

WARNUNG

Brand- oder Explosionsgefahr [W6] Bei der Verwendung von Ethanol oder von Flüssigkeiten auf Ethanolbasis auf dem QIAcube Connect müssen diese Flüssigkeiten vorsichtig und in Übereinstimmung mit den erforderlichen Sicherheitsbestimmungen gehandhabt werden. Entfernen Sie verschüttete Flüssigkeiten direkt mit den dafür vorgesehenen Materialien. Lassen Sie dabei die Haube des QIAcube Connect geöffnet, sodass sich entzündbare Dämpfe verflüchtigen können.

WARNUNG

Explosionsgefahr [W7] Der QIAcube Connect darf ausschließlich mit Reagenzien und Substanzen aus den QIAGEN Kits bzw. gemäß den Angaben in der entsprechenden Gebrauchsanweisung verwendet werden. Die Verwendung anderer Reagenzien und Substanzen kann zu einem Brand oder zu einer Explosion führen.

Falls Gefahrstoffe auf dem oder im QIAcube Connect verschüttet werden, ist der Benutzer für die

Durchführung einer entsprechenden Dekontamination verantwortlich.

Hinweis: Stellen Sie keine Gegenstände oben auf der Gerätehaube des QIAcube Connect ab.

ACHTUNG

Beschädigung des Geräts [C5] Do not lean against the touchscreen when it is pulled out.

Page 156: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 156

12.2 Schutz vor Stromschlag

Ziehen Sie das Netzanschlusskabel aus der Steckdose, bevor Sie Wartungsarbeiten am Gerät

vornehmen.

WARNUNG

Gefährdung durch Elektrizität [W8] Das Gerät muss zum Betrieb immer geerdet sein.

Es ist verboten, die Schutzleiter im Gerät oder in der Netzzuleitung zu trennen oder zu entfernen.

Gefährliche Spannung im Gerät

Auch in ausgeschaltetem Zustand kann an einigen Stellen im Gerät Netzspannung anliegen, wenn das Gerät am Stromnetz angeschlossen ist. Das Öffnen oder Entfernen von Gehäuseteilen kann diese stromführenden Teile freilegen.

WARNUNG

Beschädigung von elektronischen Bauteilen [W9] Stellen Sie vor dem Einschalten des Geräts sicher, dass die korrekte Versorgungsspannung verwendet wird.

Eine falsche Versorgungsspannung kann Schäden an der Elektronik hervorrufen.

Überprüfen Sie die empfohlene Versorgungsspannung anhand der technischen Daten auf dem Typenschild des Geräts.

WARNUNG

Gefährdung durch Elektrizität [W10] Unter keinen Umständen darf das Gehäuse des QIAcube Connect geöffnet werden.

Gefahr von Verletzungen und Sachbeschädigungen

Keine Pflege- und Wartungsarbeiten durchführen, die nicht in diesem Handbuch beschrieben sind.

Page 157: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 157

Um einen zufriedenstellenden und sicheren Betrieb des QIAcube HT zu gewährleisten, befolgenden

Sie bitte die nachstehenden Richtlinien:

Das Netzkabel muss an eine Wechselstrom-Steckdose mit Schutzleiter (Erdungs-/ Masseleiter)

angeschlossen werden.

Nehmen Sie im Geräteinneren keine Einstellungen an Teilen vor und wechseln Sie keine Teile

aus.

Nehmen Sie das Gerät nicht in Betrieb, wenn Abdeckungen oder Teile entfernt worden sind.

Falls Flüssigkeit auf dem Gerät verschüttet wird und in das Gerät läuft, dann schalten Sie es

sofort aus, trennen Sie es von der Netzspannung (Stecker ziehen!) und setzen Sie sich mit

dem Technischen Service von QIAGEN in Verbindung.

Falls die elektrische Sicherheit bei der Bedienung des Geräts nicht mehr gewährleistet werden kann,

muss das Gerät gegen unbefugte oder unabsichtliche Benutzung gesichert werden. Kontaktieren

Sie anschließend den Technischen Service von QIAGEN. Die elektrische Sicherheit des Geräts ist

nicht mehr gegeben, wenn:

Das Netzkabel beschädigt ist.

Das Gerät längere Zeit unter ungünstigen Bedingungen, d. h. unter anderen Bedingungen als

in Anhang A angegeben, gelagert wurde.

Das Gerät unsachgemäß transportiert worden ist.

12.3 Atmosphären

12.3.1 Operating conditions

WARNUNG

Explosionsfähige Atmosphären [W11] Der QIAcube Connect darf nicht in explosionsfähigen Atmosphären betrieben werden.

ACHTUNG

Beschädigung des Geräts [C6] Direktes Sonnenlicht kann Teile des Gerätes bleichen und Plastikteile schädigen.

Der QIAcube Connect darf nicht ins direkte Sonnenlicht gestellt werden.

Page 158: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 158

12.4 Biologische Sicherheit

Bei Substanzen und Reagenzien, die humanes Untersuchungsmaterial enthalten, sollte immer von

einer möglichen Infektionsgefahr ausgegangen werden. Wenden Sie nur sichere Laborverfahren

an, wie sie z. B. in Veröffentlichungen wie Biosafety in Microbiological and Biomedical

Laboratories (HHS, www.cdc.gov/biosafety/publications) beschrieben werden.

12.4.1 Proben

Proben können infektiöse Erreger enthalten. Sie sollten sich der Gesundheitsgefahr bewusst sein,

die von diesen Erregern ausgeht, und derartige Proben gemäß den erforderlichen

Sicherheitsbestimmungen handhaben, lagern und entsorgen.

WARNUNG

Infektiöses Probenmaterial [W12] Einige Proben, die mithilfe dieses Geräts verarbeitet werden, können infektiöse Erreger enthalten. Gehen Sie beim Umgang mit diesen Proben mit der größtmöglichen Vorsicht und gemäß den erforderlichen Sicherheitsbestimmungen vor.

Tragen Sie immer eine Schutzbrille, zwei Paar Laborhandschuhe und einen Laborkittel.

Die verantwortliche Person (z. B. der Laborleiter) muss alle erforderlichen Vorsichtsmaßnahmen treffen, um sicherzustellen, dass die unmittelbare Umgebung des Arbeitsplatzes sicher ist und die Bediener des Geräts ausreichend geschult sind. Außerdem dürfen die Grenzwerte in Bezug auf infektiöse Erreger, die in den entsprechenden Sicherheitsdatenblättern (SDS) oder den Vorschriften der OSHA*, ACGIH† oder COSHH‡ festgelegt sind, nicht überschritten werden.

Beim Betrieb des Abzugs und bei der Entsorgung von Abfallstoffen müssen

alle Bestimmungen und Gesetze zu Gesundheitsschutz und Sicherheit am

Arbeitsplatz auf übernationaler, nationaler und regionaler Ebene eingehalten

werden.

* OSHA: Occupational Safety and Health Administration (Vereinigte Staaten von Amerika). † ACGIH: American Conference of Government Industrial Hygienists (Vereinigte Staaten von Amerika). ‡ COSHH: Control of Substances Hazardous to Health (Vereinigtes Königreich).

Page 159: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 159

12.5 Chemikalien

WARNUNG

Gefährliche Chemikalien [W13] Einige Chemikalien, die mit diesem Gerät verwendet werden, können gefährlich sein oder nach Beendigung eines Protokolllaufs gefährlich werden.

Tragen Sie immer eine Schutzbrille, Laborhandschuhe und einen Laborkittel.

Die verantwortliche Person (z. B. der Laborleiter) muss alle erforderlichen Vorsichtsmaßnahmen treffen, um sicherzustellen, dass die unmittelbare Umgebung des Arbeitsplatzes sicher ist. Auch dürfen die Grenzwerte in Bezug auf infektiöse Erreger, die in den entsprechenden Sicherheitsdatenblättern (SDS) oder den Vorschriften der OSHA*, ACGIH† oder COSHH‡ festgelegt sind, nicht überschritten werden.

Beim Betrieb des Abzugs und bei der Entsorgung von Abfallstoffen müssen alle Bestimmungen und Gesetze zu Gesundheitsschutz und Sicherheit am Arbeitsplatz auf übernationaler, nationaler und regionaler Ebene eingehalten werden.

Bei der Behandlung von Abluft und bei der Abfallbeseitigung sind alle gesetzlichen Regelungen zur Gesundheit und Sicherheit auf nationaler, regionaler und lokaler Ebene zu berücksichtigen.

12.5.1 Giftige Dämpfe

Alle Arbeiten mit flüchtigen Lösungsmitteln oder toxischen Substanzen müssen unter einem

funktionierenden Laborabzugssystem durchgeführt werden, damit die möglicherweise entstehenden

Dämpfe abziehen können.

WARNUNG

Giftige Dämpfe [W14] Verwenden Sie keine Bleichmittel zum Reinigen oder Desinfizieren des QIAcube Connect Geräts. Bleichmittel können mit Salzen, die in den Puffern enthalten sind, reagieren und giftige Dämpfe erzeugen.

WARNUNG

Giftige Dämpfe [W15] Verwenden Sie zum Desinfizieren von gebrauchtem Labormaterial keine Bleichmittel. Bleichmittel können mit Salzen, die in den Puffern enthalten sind, reagieren und giftige Dämpfe erzeugen.

* OSHA : Occupational Safety and Health Administration (Vereinigte Staaten von Amerika). † ACGIH : American Conference of Government Industrial Hygienists (Vereinigte Staaten von Amerika). ‡ COSHH : Control of Substances Hazardous to Health (Vereinigtes Königreich).

Page 160: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 160

12.6 Entsorgen von Abfällen

Benutzte Kunststoff-Laborartikel können gefährliche Chemikalien enthalten. Derartige Abfälle

müssen gemäß den geltenden regionalen Sicherheitsbestimmungen gesammelt und entsorgt

werden.

Weitere Informationen zur Entsorgung des QIAcube Connect finden Sie unter Abschnitt 9.6 Waste

Electrical and Electronic Equipment (WEEE).

WARNUNG

Gefährliche Chemikalien und infektiöse Erreger [W16] In diesem Abfall können toxische Probenmaterialien enthalten sein, die sachgerecht entsorgt werden müssen. Bitte beachten Sie bei der Entsorgung die geltenden Sicherheitsbestimmungen.

12.7 Gefahren durch mechanische Teile

Die Gerätehaube des QIAcube Connect muss während des Betriebs geschlossen sein. Öffnen Sie

die Gerätehaube nur, wenn Sie dazu in der Gebrauchsanweisung angewiesen werden.

Halten Sie immer Abstand zum Gerät, wenn Sie die Arbeitsplattform beladen. Stützen Sie sich nicht

auf die Arbeitsplattform, wenn sich der Roboterarm des Geräts bei geöffnetem Deckel bewegt, um

die Ladeposition einzunehmen. Warten Sie, bis der Roboterarm seine Bewegungen abgeschlossen

hat, bevor Sie mit dem Beladen oder Entladen beginnen.

WARNUNG

Sich bewegende Geräteteile [W17] Vermeiden Sie jeglichen Kontakt mit sich bewegenden Geräteteilen, während der QIAcube Connect in Betrieb ist. Ihre Hände dürfen sich niemals unter dem Roboterarm befinden, während dieser sich senkt. Versuchen Sie niemals, Pipettenspitzen oder Reaktionsgefäße zu entnehmen oder zu bewegen, während der Roboterarm in Betrieb ist.

WARNUNG

Sich bewegende Geräteteile [W18] Um einen Kontakt mit sich bewegenden Teilen beim Betrieb des QIAcube Connect Geräts zu vermeiden, darf das Gerät nur mit geschlossener Haube betrieben werden. Sollten der Haubensensor oder die Haubenverriegelung nicht ordnungsgemäß funktionieren, kontaktieren Sie bitten den Technischen Service von QIAGEN.

Page 161: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 161

12.7.1 Zentrifuge

Vergewissern Sie sich, dass der Rotor und die Zentrifugenbecher ordnungsgemäß installiert sind.

Vor dem Start eines Protokolllaufs müssen unabhängig von der Anzahl der zu verarbeitenden

Proben alle Zentrifugenbecher eingesetzt werden. Falls der Rotor oder die Zentrifugenbecher

Anzeichen einer mechanischen Beschädigung oder von Korrosion aufweisen, verwenden Sie den

QIAcube Connect nicht; kontaktieren Sie den Technischen Service von QIAGEN.

ACHTUNG

Beschädigung des Geräts [C7] Der QIAcube Connect darf nicht verwendet werden, wenn der Zentrifugendeckel defekt ist oder die Deckelverriegelung beschädigt ist.

Stellen Sie sicher, dass sich während des Betriebs kein loses Material in der Zentrifuge befindet.

Stellen Sie sicher, dass der Rotor korrekt installiert ist und dass sämtliche Zentrifugenbecher ordnungsgemäß montiert sind, ungeachtet der Anzahl der zu verarbeitenden Proben. Beladen Sie den Rotor nur gemäß den Softwareanweisungen.

Benutzen Sie ausschließlich Rotoren, Zentrifugenbecher und Verbrauchsmaterialien, die für die Verwendung mit dem QIAcube Connect konzipiert sind. Kommt es bei der Verwendung anderer Verbrauchsartikeln anderer Hersteller zu Geräteschäden, erlischt Ihre Garantie.

Wir empfehlen, den Zentrifugenrotor und die Zentrifugenbecher nach 20.000 Zyklen zu ersetzen. Bei 2 Läufen am Tag an 220 Tagen im Jahr entspricht dies einer Betriebsdauer von 9 Jahren. Weiterführende Informationen erhalten Sie beim Technischen Service von QIAGEN.

In case of breakdown, caused by power failure, the centrifuge lid can be manually opened to

remove the samples (see section 7.3.2).

WARNUNG

Sich bewegende Geräteteile [W19] Bei einem durch Stromausfall entstandenen Ausfall des Gerätes das Stromkabel entfernen und 10 Minuten warten bevor der Zentrifugendeckel manuell geöffnet werden kann.

ACHTUNG

Beschädigung des Geräts [C8] Bewegen Sie den Roboterarm nach einem Stromausfall nicht manuell vor das Gerät. Beim Schließen der QIAcube Connect Haube kann es zu Schäden kommen, wenn diese mit dem Roboterarm kollidiert.

Page 162: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 162

WARNUNG

Gefahr von Verletzungen und Sachbeschädigungen [W20] Den Zentrifugendeckel vorsichtig anheben. Der Deckel ist schwer und kann Verletzungen verursachen falls er herunter fällt.

ACHTUNG

Überhitzung des Gerätes [C9] Zur Sicherstellung einer ausreichenden Belüftung des QIAcube Connect muss ein Mindestabstand von 10 cm an den Seiten und an der Rückseite des Gerätes eingehalten werden.

Lüftungsschlitze und –öffnungen des Gerätes nicht abdecken.

12.8 Hitzegefahr

Die Arbeitsplattform des QIAcube Connect enthält einen beheizten Schüttler.

WARNUNG

Heiße Oberfläche [W21] Der Schüttler kann Temperaturen bis zu 70°C (158°F) erreichen. Vermeiden Sie es den Schüttler zu berühren, solange er heiß ist.

12.9 Sicherheitshinweise – Wartungsarbeiten

WARNUNG/ ACHTUNG

Gefahr von Verletzungen und Sachbeschädigungen [W22] Führen Sie nur Wartungsarbeiten durch, die ausdrücklich in dieser Gebrauchsanweisung beschrieben sind.

WARNUNG

Explosionsgefahr [W23] Beim Reinigen des QIAcube Connect mit einem auf Alkohol basierenden Desinfektionsmittel muss die Tür des QIAcube Connect offengelassen werden, damit die brennbaren Dämpfe entweichen können.

Den QIAcube Connect nur reinigen, sobald die entsprechenden Module auf der Arbeitsfläche abgekühlt sind.

Page 163: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 163

WARNUNG

Brandgefahr [W24] Achten Sie darauf, dass keine Reinigungsflüssigkeit oder Dekontaminationsmittel in Kontakt mit den elektrischen Kontakten des QIAcube Connect kommen.

WARNUNG

Gefahr von Verletzungen und Sachbeschädigungen [W25] Die Rotorschraube muss zur Sicherheit mit dem Rotorschlüssel angezogen werden, der zusammen mit dem QIAcube Connect geliefert wird. Sollte die Schraube nicht fest genug angezogen sein, kann sie sich während der Zentrifugation lösen.

WARNUNG

Gefahr durch UV-Strahlung [W26] Eine mechanische Verriegelung gewährleistet, dass die Haube während des Betriebs der UV LED geschlossen bleibt.

Sollten der Haubensensor oder die Haubenverriegelung nicht ordnungsgemäß funktionieren, kontaktieren Sie bitten den Technischen Service von QIAGEN.

WARNUNG

Gefahr von Verletzungen und Sachbeschädigungen [W27] Stellen Sie sicher, dass die Deckel von den Spin-Säulen und den 1,5 ml Mikrozentrifugationsröhrchen in der korrekten Position angebracht sind und bis zum Boden des Deckelschachts an den Seiten des Rotor-Adapters durchgedrückt sind. Falsch positionierte Deckel können während der Zentrifugation abgerissen werden.

WARNUNG

Gefahr von Verletzungen und Sachbeschädigungen [W28] Stellen Sie sicher, dass der Deckel von der Spin-Säule abgetrennt ist. Spin-Säulen mit unvollständig entfernten Deckeln lassen sich nicht korrekt aus dem Rotor entnehmen, was einen Protokollabbruch zur Folge hätte.

ACHTUNG

Beschädigung des Geräts [C10] Verwenden Sie keine Bleichmittel, Lösungsmittel oder Reagenzien, die Säuren, Laugen oder Abrasivstoffe enthalten, um den QIAcube Connect zu reinigen.

ACHTUNG

Beschädigung des Geräts [C11] Verwenden Sie keine Sprühflaschen, die Alkohol oder Desinfektionsmittel enthalten, um die Oberflächen des QIAcube Connect zu reinigen. Sprühflaschen sollten nur zum Besprühen von Gegenständen benutzt werden, die zuvor von der Arbeitsplattform entfernt wurden.

Page 164: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 164

12.10 Strahlensicherheit

WARNUNG

Verletzungsgefahr [W29] Die Haut nicht dem UV-C-Licht von der UV-Lampe aussetzen.

WARNUNG

Verletzungsgefahr [W30] Laserlicht der Gefahrenklasse 2: Schauen Sie bei Verwendung des Bar code-Handscanners nicht in den Laserstrahl.

Page 165: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 165

12.11 Symbols on the QIAcube Connect

Symbol Location Description

Schüttler Verbrennungsgefahr — die Temperatur des Schüttlers kann bis zu 70°C (158°F) heiß werden

Nahe der Zentrifuge; nahe des Roboterarms

Mechanische Gefahr — Kontakt mit beweglichen Geräteteilen vermeiden

Im Gerät, in der Nähe des Flaschengestells

Feuergefahr – Verwendung von Ethanol im Flaschengestell

Vor der Arbeitsfläche Biologische Gefährdung – Manche Proben, die mit diesem Gerät verwendet werden, können infektiöse Erreger enthalten und dürfen nur mit Laborhandschuhen angefasst werden

Innerhalb des Abfallbehälters Biologische Gefährdung — der Abfallbehälter kann durch biologisch gefährliches Material kontaminiert sein und muss mit Handschuhen angefasst werden.

Plakette auf der Rückseite des Gerätes CE-Kennzeichen (Zertifizierung gemäß europäischer Richtlinien)

Plakette auf der Rückseite des Gerätes Plakette auf der Rückseite des Gerätes

Plakette auf der Rückseite des Gerätes FCC Markierung der Federal Communications

Kommission der USA

Plakette auf der Rückseite des Gerätes RCM-Mark-Zeichen für Australien und

Neuseeland

Plakette auf der Rückseite des Gerätes RoHS Markierung für China (Beschränkung der Verwendung bestimmter gefährlicher Stoffe in Elektro- und Elektronikgeräten)

Plakette auf der Rückseite des Gerätes WEEE-Zeichen für Europa

Plakette auf der Rückseite des Gerätes Hersteller i.S.d. Gesetzes

Arbeitsplattform Lesen Sie die Gebrauchshinweise im Handbuch

Page 166: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 166

13 Version history

Document Date Description of changes

HB-2594-002 September 2019 Updated text on Caution number 7.

Updated some screenshots all throughout the document.

Added information on Section 5.3.7, “Loading tips and enzymes.”

Added information on Section 5.6, “Stopping a protocol run.”

Added information on Section 5.8, “Operating the heater/shaker.”

HB-2594-001 January 2019 First release

Page 167: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 167

Index

About this user manual, 5 AC power cord, 37 Accessories, 136 Bar code scanner, 34 Cautions, 7 Centrifuge, 27 Centrifuge operation, 91 Centrifuge rotor and buckets installation, 40 Changing password, 49 Cleaning agents, 97 Column disposal slot, 32 Configuration, 42

Changing password, 49 LAN, 55 Managing protocols, 50 Managing users, 46 Network, 55 Q-Base, 58 Q-Base connection, 55 Software update, 53 System data, 44 User settings, 45 Wi-Fi, 56

Consignes de sécurité, 138 Cooling air outlet, 26 Creating a support package, 119 Declaration of Conformity, 133 Decontaminating the instrument:, 118 Disinfecting the instrument, 97 End of the protocol run, 88 External features of QIAcube Connect, 21 FCC Declaration, 134 General Description, 19 Glossary, 129 Grounding requirements, 37 Heater/shaker operation, 90 Hood, 22 Installation, 38

AC power cord, 37 Accessories, 38 Centrifuge rotor and buckets, 40 Connecting to power, 39 Foam protector, 39 Grounding requirements, 37 Power requirements, 36 Powering ON the instrument, 40

Protective film, 39 Shaker adapter, 42 Site requirements, 35 unpacking, 37

Installation environment, 35 Installation procedures, 35 Instrument administration, 35 Instrument configuration, 42 Instrument operation, 62 Intended use, 6 Internal features of QIAcube Connect, 27 LAN configuration, 55 Liability Clause, 135 Logging out, 95 Maintenance, 96

Cleaning the centrifuge, 104 Cleaning the robotic arm modules, 103 Daily maintenance procedure, 101 Decontaminating the instrument, 118 Monthly maintenance procedure, 102 Operating the centrifuge after cleaning,

109 O-Ring exchange, 112 Periodic maintenance procedure, 103 Regular maintenance procedure, 100 Tightness test, 110 UV decontamination, 117

Managing protocols, 50 Managing users, 46 Microcentrifuge tube slots, 31 Network configuration, 55 Operating the centrifuge, 91 Operating the heater/shaker, 90 Operation procedures, 62 Optical sensor, 33 Packing the instrument, 59 Pipetting system, 33 Policy statement, 6 Power cord socket, 25 Power requirements, 36 Power switch, 22 Q-Base configuration, 58 Q-Base connection, 55 QIAcube Connect accessories, 136 QIAcube Connect principle, 19 QIAcube Connect software, 66

Page 168: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 168

Reagent bottle rack, 30 RJ-45 Ethernet port, 23 Robotic arm, 32 Robotic gripper, 32 Rotor adapter, 28 Safety information, 7

Biological safety, 11 Centrifuge, 14 Chemicals, 12 Electrical safety, 9 Heat hazard, 15 Maintenance, 15 Mechanical hazards, 13 Operating conditions, 11 Proper use, 7 Radiation safety, 17 Symbols, 18 Waste disposal, 13

Safety information – French, 138 Safety information – German, 151 Saving run reports, 89 Sensor

Optical, 33 Ultrasonic, 33

Servicing, 99 Setting up a protocol run, 70 Shaker, 29 Shaker adapter installation, 42 Sicherheitshinweise, 151 Site requirements, 35 Software update, 53 Starting the protocol run, 87 Stopping a protocol run, 89 Switching on the instrument, 68 Symbols on the QIAcube Connect, 18, 163

System data, 44 Technical assistance, 5 Technical data, 131

Declaration of Conformity, 133 FCC Declaration, 134 Hardware features, 132 Liability Clause, 135 Mechanical data, 132 Operating conditions, 131 Storage conditions, 131 Transport conditions, 131 WEEE, 133

Tip disposal slots, 31 Tip rack slots, 31 Tip sensor, 31 Touchscreen, 22 Touchscreen calibration, 126 Troubleshooting, 119

Centrifuge, 123 Creating a support package, 119 Instrument operation, 120 Protocol interruption, 122 Touchscreen calibration, 126

Ultrasonic sensor, 33 Unpacking instructions, 37 USB ports, 23 User requirements, 6 User settings, 45 UV LED, 34 Version management, 164 Warnings, 7 Waste drawer, 24 Waste Electrical and Electronic Equipment

(WEEE), 133 Wi-Fi configuration, 56

Page 169: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 169

Trademarks: QIAGEN®, Sample to Insight®, QIAcube®, Qproteome® (QIAGEN Group); DNA-ExitusPlus™ (AppliChem); RNaseZap® (Ambion, Inc.); Microsoft®, Windows® (Microsoft Corporation); Gigasept®, Lysetol®, Mikrozid® (Schülke & Mayr GmbH); DECON-QUAT® (Veltek Associates, Inc.). Registered names, trademarks, etc. used in this document, even when not specifically marked as such, are not to be considered unprotected by law.

HB-2594-002 09/2019 1115952

© 2019 QIAGEN, all rights reserved.

Page 170: September 2019 QIAcube Connect User Manual...QIAcube Connect User Manual 09/2019 5 1 Introduction Thank you for choosing the QIAcube Connect . We are confident it will become an integral

QIAcube Connect User Manual 09/2019 170

1115952 09/2019 HB-2594-002

www.qiagen.com

Technical Support

www.support.qiagen.com