Page 1: Sept. 28, 2016 GC 5 Cabinet Presentation

$100 Million SavingsGOAL  COUNCIL  5:  

EFFICIENT  AND  ACCOUNTABLE  GOVERNMENT

ARIZONA MANAGEMENT SYSTEM48

Page 2: Sept. 28, 2016 GC 5 Cabinet Presentation

Total SpendConsumption (Q)How Goods & Services are Consumed

x =

Foundational Improvements – Lasting Change

Quick Wins - Find and Deliver the Cash

Cost Reduction Levers Foundational Improvements

• Process design• Metrics• Organization Design• Tools/Technology• Sourcing strategy• supplier management• Negotiation planning• Service level definition• Controls and compliance

• Focus on both Rate and Consumption• Prioritize with biggest opportunities• Re-specification• Workforce optimization• Supplier consolidation• Sourcing / Reverse Auctions• Re-negotiations

Cost Reduction

Rate (P)Sourcing / NegotiationsSpecifications / SLA

ARIZONA MANAGEMENT SYSTEM49

Page 3: Sept. 28, 2016 GC 5 Cabinet Presentation

$100M Priority Cost Savings

Q1 

Q1 

$97.3M PROJECTED TOTAL

Q1 

$          < $1M$$       1‐10M$$$   10‐25M$$$$    25M+

Work In Progress

Work Begins (Fiscal Year)Q1 

SavingsSchedule

Rank ProjectsOpportunity

($M) Owner Timing/Plan1 Procurement 50 Seth In flight2 Fleet 5.8 Henderson Q1‐Q2 20173 State Prison Refinancing I 8.2 Romero Q1 20174 Risk 4.4 DiCiccio In‐Flight FY 2017 ‐20205 Statewide Print & Mailing Services 8.4 Edgar Q1 2017  ADOA, BOE, Lottery, SOS6 Online Services $$$$ Reed Q1 2017 Launch ++ ADOA‐ASET7 Cyber Security  10.0 Lettman Q1 2017 8 Early Payment Discounts $$ SPO/GAO Q3 2017 SPO, GAO9 Furniture ‐ Inventory Mgmt. 3.5 Barnes Q3 2017 ADOA_ GSD10 Energy $$ Brown/Donnellan Q3 201711 DoC/DES ‐ 1 Big Item ‐ Top 10 $$ ADOT, AHCCCS, DCS, DHS Q4 201712 Fleet 2.0  Heavy Duty  (design) $$ Henderson Q4 201713 State Prison Refinancing II 7.0 Romero Q1 2018

ARIZONA MANAGEMENT SYSTEM50

Page 4: Sept. 28, 2016 GC 5 Cabinet Presentation

FleetPROBLEM STATEMENTArizona’s Light Duty Fleet costs are 20% greater than other Best in Class states.

SCOPEFrom identification of the need for a Light Duty Fleet vehicle to the time to retire the vehicle.  All transportation alternatives.

GOALReduce Light Duty Fleet costs from $31M to $26M by FY2018.

ARIZONA MANAGEMENT SYSTEM51

Page 5: Sept. 28, 2016 GC 5 Cabinet Presentation

Fleet – Progress, Projects

Project Status

1 Right‐sizing ~60 of 143 vehicles (more coming soon)

2 Metrics 2 months of data

3 MVD Title & Registration DONE

4 Policy Guidelines DONE

5 PM Support DONE

6 Replacement Methodology Developing criteria

7 Process Owner ‐ Gemba Beginning October ‘16

8 POV Reduction DCS pilot on track to save 50%

9 GPS  Pilot underway in numerous agencies

10 Vehicle Disposition Process Coming Soon

11 Employee Training Coming Soon

Legend

Ongoing

Completed

Developing

In ‐ Flight

Coming Soon

ARIZONA MANAGEMENT SYSTEM52

Page 6: Sept. 28, 2016 GC 5 Cabinet Presentation

$27,372,470

$28,632,921

$6,875,428$6,740,434

$8,711,834$1,030,101

$9,282,233

$22,789,574

$530,537

$9,040,017

6222 ‐ External Legal Services

6241 ‐ Temporary Agency Services

7229 ‐ Miscellaneous Rent

7266 ‐ Repair And Maintenance ‐ Other Equipment

7321 ‐ Office Supplies

7471 ‐ Internal Printing

7472 ‐ External Printing

7481 ‐ Postage And Delivery

8421 ‐ Furniture Capital Purchase

8521 ‐ Furniture Non‐Capital Purchase

Administrative ServicesPROBLEM STATEMENTThe State of Arizona has not developed a statewide standard of work to leverage the power of its volume usage of key commodities, which is resulting in an increase cost for Administrative products and services.GOALTo create standard work across agencies to lower costs by 15% or more.

MEASURES & ANALYSIS: $121,005,549

ARIZONA MANAGEMENT SYSTEM53

Page 7: Sept. 28, 2016 GC 5 Cabinet Presentation

ARIZONA MANAGEMENT SYSTEM

Administrative Services

7321 ‐ Office Supplies,  $6,562,197  7471 ‐ Internal Printing,  

$734,186 

7472 ‐ External Printing,  $6,976,271 

7481 ‐ Postage And Delivery,  $19,996,738 

$34,269,393Breakthrough Projects

54

Page 8: Sept. 28, 2016 GC 5 Cabinet Presentation

Administrative Services – Improvement ActionsCat # Action Owner Date

Just Do It 1 Establish Admin Services Team Gregg Edgar, AZL Completed Aug 17, 2016

Just Do It 2 Understand scope of Administrative Services Gregg Edgar, AZLBiju Kamaleswaran, AZLChristopher Lacey, SPOAnita Wadkar, AZL

Completed Sep 15, 2016

Just Do it 3 Analyze Statewide Internal Print Services Dale Bulgrin, DOE Oct 15, 2016

Just Do It 4 Office Supply Survey Heather Ryan, ADOA Oct 31, 2016

Just Do It 5 Print Shop Roadshow Dale Bulgrin, DOEShelby Alessi, AZL

Nov 30, 2016

Just Do It 6 Procurement Roadshow Christopher Lacey, SPOShelby Alessi, AZL

Nov 30, 2016

Just Do It 7 Shared Services Model Biju Kamaleswaran

Breakthrough 8 Office Supply Review TBD TBD

Breakthrough 9 Print Services Review TBD TBD

Breakthrough 10 Postage & Delivery Review TBD TBD

ARIZONA MANAGEMENT SYSTEM55

Page 9: Sept. 28, 2016 GC 5 Cabinet Presentation

Cybersecurity StandardizationCurrent Risk to State of Arizona

Montana1.3M Records – Data Breach$250K Loss

Utah280K Records – Data Breach$3.2M Loss

South Carolina3.2M Records – Data Breach$27M Loss

Attacked by ransomware and encrypting files

Suffering credential compromise and fraud losses 

Downloading Trojan to compromise identity, gain access to applications, and put into question the integrity of data

Implement 16 Standards in 36 agencies by June 2017

ARIZONA MANAGEMENT SYSTEM56

Page 10: Sept. 28, 2016 GC 5 Cabinet Presentation

Cybersecurity Standardization

10/01/2016‐06/30/201710/01/2016‐06/30/201710/01/2016‐02/28/201710/01/2016‐02/28/201710/01/2016‐12/31/201610/01/2016‐12/31/2016

Data Collection

Develop Standards

AgencyImplementation

10/01/2016‐03/30/201710/01/2016‐03/30/2017

Procure Products

Project Roadmap

Next Steps:o Conduct detail security assessments of 8 agencieso Additional agency meetings to determine opportunitieso Finalize and share the 16 enterprise security standardso Create the agency gap listo Begin procurement of enterprise technologies

ARIZONA MANAGEMENT SYSTEM57

Page 11: Sept. 28, 2016 GC 5 Cabinet Presentation

Arizona Online Services PROBLEM STATEMENTThe State of Arizona delivers hundreds of services to citizens each year, but the majority of those services are being requested, processed and completed the same way they were 30 years ago.

SCOPE• External Facing Services• Cabinet level agencies, excluding the Universities.• Does not include Internal Processes

GOALMigrate agency services to an online experience for the citizen where they can request services without a pen, paper or stamp. Modernize 3‐6 services per fiscal year.

ARIZONA MANAGEMENT SYSTEM58

Page 12: Sept. 28, 2016 GC 5 Cabinet Presentation

Project Roadmap

8/12/2016                                        10/28/2016                                12/31/2016                        2/28/2017

Implementation

Proposals

Analytics

Discovery

8/31Agencies

114Responses

Survey Delivered9/19/2016

ARIZONA MANAGEMENT SYSTEM59

Page 13: Sept. 28, 2016 GC 5 Cabinet Presentation

Summary

• $100M savings comes from statewide participation of both rate and volume reduction projects.

• Process to find and revert the savings is THE MAJOR Q2 DELIVERABLE. Full cooperation from Agency Directors and CFOs required.

• Manage the opportunity to deliver results through statewide standard work while maintaining agency autonomy.

ARIZONA MANAGEMENT SYSTEM60

Page 14: Sept. 28, 2016 GC 5 Cabinet Presentation

The Arizona Management System

ARIZONA MANAGEMENT SYSTEM

GOAL  COUNCIL  5:  

EFFICIENT  AND  ACCOUNTABLE  GOVERNMENT

61

Page 15: Sept. 28, 2016 GC 5 Cabinet Presentation

The Arizona Management System

ARIZONA MANAGEMENT SYSTEM

Set Targets

Measure Results against Targets

Identify Gaps between targets 

and results

Take action to close gaps

62

Page 16: Sept. 28, 2016 GC 5 Cabinet Presentation

The OpportunityProblem: The lack of an intentional management system adopted across the enterprise has historically resulted in the absence of tracking progress towards goals and lack of widespread improvement

Scope: All 35 executive cabinet agencies will adopt the Arizona Management System as their results‐driven operating system

Goal:  Arizona will be the best run state in the country.  The Arizona Management System will be fully implemented by December 31, 2018.

ARIZONA MANAGEMENT SYSTEM63

Page 17: Sept. 28, 2016 GC 5 Cabinet Presentation

Activities to Date

ARIZONA MANAGEMENT SYSTEM

• Deployment of the Arizona Management System has been accelerated through consultant partnerships

• Agency Business Reviews now standard

• Goal Councils & State Breakthroughs launched

• 17 agencies are implementing the full AMS system• Represent 75% of FTE and 50% of General Fund

64

Page 18: Sept. 28, 2016 GC 5 Cabinet Presentation

100 BreakthroughsDefinition of a Breakthrough:A significant performance improvement in a key mission outcome or operational measure (service, cost, or quality).  The beneficiary, whether it be a customer or taxpayer investor, will say “Wow!”

*71 active Breakthroughs currently in progress

ARIZONA MANAGEMENT SYSTEM65

Page 19: Sept. 28, 2016 GC 5 Cabinet Presentation

Next Steps

• October 31 ‐ Identify additional 30 breakthroughs• Still gives agencies 8 months to achieve breakthrough performance

• Q3 – Launch next wave of Full AMS implementations (10 agencies)

• Q4 – Achieve our 100 Breakthroughs target

ARIZONA MANAGEMENT SYSTEM66